SLNo.
= SIEGER | SUPPLIER EVALUATION FORM
Date 17.10.2020
SIEGER SPINTECH EQUIPMENTS PVT LTD
01, | Name ofthe Company M proce TECH
in | aoe PoeNo 234, 1!*Msin, 3 Cos, 3 Phase, Peony nds Area, Bunglo-$60088
TaipEne Wo OORT
04, | Mobile No. 9845333154
Fax No osoasa7rp
Mal adress snnpeipnalcom
Website Address vrefegeiechooin
onufacture Service ] Other
Assemb!| bistibut| Dealer | Trader
ar | Nature of Business | or Prowser | (Speci)
(Tick Appropriately)
08 | Nature of the company Proprietary Private limited
[al _Partnerehip Public imited
09 | Scope of Supply : Raw materials / Part suppliers:
Raw Materials T [Sheet metal work 7__[Die Forging
[5] Consumables Machining TJ | Assembling
| Components |) | Surface finishing *** | Products:
1] Packaging materials | | injection moulding 1] Others (Specify)
"= [Please specy deta of surface coat
Brief description of the scope
Manufacturers of Open & Close Di
.nd Ring Forgings of Ferrous and Non Ferrous Metals
‘Are Gauges / Instruments in use are Periodically ar
10. | calibrated? If‘No", please justify
Do you vert incoming materials for qualty and
11. | quantity? If ‘Not, please justify Yes oe
‘Sheet 01 of 02Is process inspection done during
"2 | manufacture? I "No, please justify “ve
Do you have Final product
'3. | inspection? If"No*, please justify v Yes
44, | Doyou provide inspection report / test certificate
along with each supply? If"No", please justify | vves te
18. | Do you have separate identiied storage area VYES No
16 ATTACHED
Do you have your Organization chart? (If yes" please VYes
enclose)
Quailty Systems: QUALITY MANUAL ATTACHED
7
|s your company certified to any quality system standards? (If"Yes" enclose the
‘copy, Ifnot, please enclose your action plan)
Yes
18. | a) Please specify the details of Government, Safety and Environmental regulations to
be followed by your Company.
| certify thatthe informations furnished herein (including all pages attached) are correct to the best of my knowledge.
RSE M
oo PNG M.E.FORGE TECH
‘Company Seal: Plot No. 234, 11th Main, 3rd Cross,
Sra Phase, Peenya Industrial Area,
BANGALORE - 560 058.
Designation: GENERAL MANAGER
Place: BANGALORE Date: 17.10.2020
For SIEGER SPINTECH EQUIPMENTS PVT LTD use only
SIEGER SPINTECH EQUIPMENTS PVT LTD evaluation remarks:
Ms, can
bbe considered as a Potential supplier for SIEGER SPINTECH EQUIPMENTS PVT LTD for the supply of
Sheet 02 of 02
‘Approved by / Date
‘SSEIFTIPURIO02 Rev: 00, Dated on 03.10.2018