You are on page 1of 2
SLNo. = SIEGER | SUPPLIER EVALUATION FORM Date 17.10.2020 SIEGER SPINTECH EQUIPMENTS PVT LTD 01, | Name ofthe Company M proce TECH in | aoe PoeNo 234, 1!*Msin, 3 Cos, 3 Phase, Peony nds Area, Bunglo-$60088 TaipEne Wo OORT 04, | Mobile No. 9845333154 Fax No osoasa7rp Mal adress snnpeipnalcom Website Address vrefegeiechooin onufacture Service ] Other Assemb!| bistibut| Dealer | Trader ar | Nature of Business | or Prowser | (Speci) (Tick Appropriately) 08 | Nature of the company Proprietary Private limited [al _Partnerehip Public imited 09 | Scope of Supply : Raw materials / Part suppliers: Raw Materials T [Sheet metal work 7__[Die Forging [5] Consumables Machining TJ | Assembling | Components |) | Surface finishing *** | Products: 1] Packaging materials | | injection moulding 1] Others (Specify) "= [Please specy deta of surface coat Brief description of the scope Manufacturers of Open & Close Di .nd Ring Forgings of Ferrous and Non Ferrous Metals ‘Are Gauges / Instruments in use are Periodically ar 10. | calibrated? If‘No", please justify Do you vert incoming materials for qualty and 11. | quantity? If ‘Not, please justify Yes oe ‘Sheet 01 of 02 Is process inspection done during "2 | manufacture? I "No, please justify “ve Do you have Final product '3. | inspection? If"No*, please justify v Yes 44, | Doyou provide inspection report / test certificate along with each supply? If"No", please justify | vves te 18. | Do you have separate identiied storage area VYES No 16 ATTACHED Do you have your Organization chart? (If yes" please VYes enclose) Quailty Systems: QUALITY MANUAL ATTACHED 7 |s your company certified to any quality system standards? (If"Yes" enclose the ‘copy, Ifnot, please enclose your action plan) Yes 18. | a) Please specify the details of Government, Safety and Environmental regulations to be followed by your Company. | certify thatthe informations furnished herein (including all pages attached) are correct to the best of my knowledge. RSE M oo PNG M.E.FORGE TECH ‘Company Seal: Plot No. 234, 11th Main, 3rd Cross, Sra Phase, Peenya Industrial Area, BANGALORE - 560 058. Designation: GENERAL MANAGER Place: BANGALORE Date: 17.10.2020 For SIEGER SPINTECH EQUIPMENTS PVT LTD use only SIEGER SPINTECH EQUIPMENTS PVT LTD evaluation remarks: Ms, can bbe considered as a Potential supplier for SIEGER SPINTECH EQUIPMENTS PVT LTD for the supply of Sheet 02 of 02 ‘Approved by / Date ‘SSEIFTIPURIO02 Rev: 00, Dated on 03.10.2018

You might also like