You are on page 1of 7

PEMERINTAH

DINAS
Alamat: -

DETAIL ENGINEERING DESIGN


PEKERJAAN :
PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL)
-
-

TAHUN ANGGARAN 2020


K_50
2300
500 150 1000 150 500

INPUT

150
150
300
900
600
300
150
700
SCOPE USER / KSM

3050

2000
2150

900
100
300
150
OUTPUT OUTPUT

B INPUT INPUT

5902
± 0.000

1515
KOMUNAL KOMUNAL

A
DIM. P=2355 T=1210
Ø=1165 1 - 1.950
1 DIM. P=2355 T=1210
Ø=1165 A

1365
KOMUNAL KOMUNAL
DIM. P=2355 T=1210
Ø=1165 2 - 2.000 2 DIM. P=2355 T=1210
Ø=1165

1365 KOMUNAL KOMUNAL


DIM. P=2355 T=1210
Ø=1165 3 - 2.050 3 DIM. P=2355 T=1210
Ø=1165
1365

KOMUNAL KOMUNAL
DIM. P=2355 T=1210
Ø=1165 4 - 2.100 4 DIM. P=2355 T=1210
Ø=1165

11220
1365

KOMUNAL KOMUNAL
DIM. P=2355 T=1210
Ø=1165 5 - 2.150 5 DIM. P=2355 T=1210
Ø=1165
1365

KOMUNAL KOMUNAL
DIM. P=2355 T=1210
Ø=1165 6 - 2.200 6 DIM. P=2355 T=1210
Ø=1165
1365

KOMUNAL KOMUNAL
DIM. P=2355 T=1210
Ø=1165 7 - 2.250 7 DIM. P=2355 T=1210
Ø=1165
PT. CAHAYA MAS CEMERLANG
STATUS GAMBAR

DETAIL ENGINEERING DESIGN


KOMUNAL KOMUNAL

8 8
1515

DIM. P=2355 T=1210 DIM. P=2355 T=1210


Ø=1165 - 2.300 Ø=1165
NAMA GAMBAR

B OUTPUT OUTPUT
Skala Rev No.Gambar Jlh Hal
LAYOUT KOMUNAL 50
SCALE : 1 : 30

A3
5902

Beton t 10 cm ( M6 1lapis )
K-175 + 0.100
± 0.000

INLET Ø 6"

Lantai Kerja
Pasir Urug - 1.950
Tanah Asli - 2.000
- 2.050
5402

POTONGAN A-A
SCALE : 1 : 40

Dinding pasangan bata


Pipa PVC Ø 6" ( output )
Pipa PVC Ø 2" ( 9 buah )
Manehole ( plat beton )
Pipa PVC Ø 2" ( 9 buah )
Manehole ( plat beton )
11220
Pipa PVC Ø 6" ( input )
+ 0.300 + 0.300 + 0.300

± 0.000 ± 0.000 ± 0.000

1000
INPUT

- 0.721
300 300
- 0.820
OUTPUT

200
65 - 0.970
16
5 Ø11 - 1.020
5 Ø1
16
Ø1 - 1.140
- 1.253
- 1.190
- 1.350

Plat bordes t=3mm ( bongkar pasang )

- 1.950 - 1.950
- 2.050 - 2.000
- 2.150

400
- 2.300 - 2.300
- 2.350 - 2.350
- 2.400 - 2.500
1256 1365 1365 1365 1365 1365 1365 1256 - 2.550
10701
Tanah Asli 1300 700
POTONGAN B-B
SCALE : 1 : 30
Pasir Urug
Lantai Kerja
POTONGAN B-B
SCALE : 1 : 30

PT. CAHAYA MAS CEMERLANG


STATUS GAMBAR

DETAIL ENGINEERING DESIGN

NAMA GAMBAR

Skala Rev No.Gambar Jlh Hal

A3
+ 0.300
2855

± 0.000

+ 0.300
Freeeboard Freeeboard Freeeboard 2855

INLET Ø 6" OUTLET Ø 6" ± 0.000

Lantai Kerja
Pasir Urug Ruang lumpur t=22cm Ruang lumpur t=22cm Ruang lumpur t=22cm - 1.950
Freeeboard Freeeboard Freeeboard
Tanah Asli - 2.000
- 2.050
INLET Ø 6" OUTLET Ø 6"
2355

DETAIL BAK PENGENDAPAN ( TANGKI 1 )


SCALE : 1 : 20

LAMELLA LAMELLA LAMELLA

Lantai Kerja
+ 0.300 Pasir Urug - 1.950
2855 - 2.000
Tanah Asli
- 2.050
± 0.000
2355

DETAIL BAK LAMELLA ( TANGKI 7 & 8 )


SCALE : 1 : 20

Freeeboard Freeeboard Freeeboard

INLET Ø 6" OUTLET Ø 6"

BIOBOLL BIOBOLL BIOBOLL

Lantai Kerja
Pasir Urug - 1.950 PT. CAHAYA MAS CEMERLANG
Tanah Asli - 2.000 STATUS GAMBAR
- 2.050
2355 DETAIL ENGINEERING DESIGN

DETAIL BAK BIOBALL ( TANGKI 2 s/d 6 ) NAMA GAMBAR


SCALE : 1 : 20

Skala Rev No.Gambar Jlh Hal

A3
Dinding pasangan bata
a
Pipa PVC Ø 6" ( output )
2300
Pipa PVC Ø 2" ( 9 buah )
500 150 1000 150 500
Manehole ( plat beton )
INPUT Pipa PVC Ø 2" ( 9 buah )
Manehole ( plat beton )
150
150

Pipa PVC Ø 6" ( input )


+ 0.300 + 0.300
300
900
600

± 0.000 ± 0.000
300
150

1000
INPUT
700

- 0.721
300 300
- 0.820
OUTPUT
3050

200
- 0.970
- 1.020
- 1.140
- 1.253
- 1.190
2000
2150

- 1.350
900

Plat bordes t=3mm ( bongkar pasang )

Balok 150x150
- 1.950
100

- 2.150

400
300

- 2.350
150

- 2.500
OUTPUT OUTPUT
- 2.550
a
LAYOUT BAK SEDIMENTASI 1300 700
SCALE : 1 : 40

POTONGAN a - a
SCALE : 1 : 40
PT. CAHAYA MAS CEMERLANG
STATUS GAMBAR

DETAIL ENGINEERING DESIGN

NAMA GAMBAR

Skala Rev No.Gambar Jlh Hal

A3
TABEL PENULANGAN KOLOM
NAMA KOLOM K ( 150 x 150 )

150
150

UKURAN 150 x 150


TULANGAN VERTIKAL 4 Ø12
TULANGAN TUMPUAN Ø8 - 150
HORISONTAL LAPANGAN Ø8 - 200
TULANGAN PENGIKAT -

PT. CAHAYA MAS CEMERLANG


STATUS GAMBAR

DETAIL ENGINEERING DESIGN

NAMA GAMBAR

Skala Rev No.Gambar Jlh Hal

A3
490
460
400

108

400
Rabat Beton K175

460
490
Tanah Urug WIRE n7

TAMPAK ATAS GREASE TRAP


SCALE : 1 : 20

490
400
30 30
± 0.000
- 0.050
Rabat Beton K175

Pipa Inlet 3"

Pipa Outlet 3"


Tanah Urug

- 0.380
PT. CAHAYA MAS CEMERLANG
Urugan Sirtu - 0.430 STATUS GAMBAR
300
DETAIL ENGINEERING DESIGN

NAMA GAMBAR
POTONGAN A-A
SCALE : 1 : 20

Skala Rev No.Gambar Jlh Hal

A3