pti es
ROUTING su
Reference: RI2.35-485-292),
Fo pare
orc- osracr enainecr
CASS. DISTRICT ENGINEER
lromniStearve orien
ov gk &
lomrens Yee
rea aco uP
ermence NO: ma2s-482821
rowto
art: o3062019|
[URGENT PLEASE RUSH ones: FALL Cone NED PORSoMIBES.
[see e’ Le cas
Brat reply EEE SDP Pe
Breet it
Somptiance DA_ AMPTP
‘Cte commen eommentaton
Go exicwerntsticn PREG EV TPT,
-Brsrippopeate sn SE eS
_ Bi nett
rere
[ike cure ine
DEADLINE ‘1D treeRepublic of he Plpines Beak
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
‘CENTRAL OFFICE
ania,
August 15, 2018 (SEP 06 9 2, -yacyay
aiacyn, ot
‘MEMORANDUM i
FoR/TO: ALL CONCERNED
“This Department
SUBJECT: Internal Quality Audit Notification
{In connecton withthe upcoming Qualty Management System ~ Interna Qualty Aut, please
see attached 1Q8 plan forte sched of au as goproved by Undersecretary Emi K. Sedan,
Overall QUE Head,
‘The audit objective Isto determine compliance and effectiveness of the processes and
‘mandatory procedures in the DPWH documented Qualty Management Systm In conformance
to the requrements of 150 9001:2015, The auc il als follow-up compliance to previous
"or-confarmites and deny areas for inprovenent fr al processes,
‘Should you have any query or darfcations, please contact us at (02) 304-2002 or the ISO
(veal Secretariat at (02) 304-43006 and leak for Ms. Nancy 3. Manansala,
Asst. Dir FAUSTINO, BRS
Internal Qaity Chairpersonep tte mips
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
INTERNAL QUALITY AUDIT PROGRAM
cv2019,
1. Objectives
1 To determine conformance tothe DPWH requirements for quality management
stems,
2. To provide information wether te quality iranagement system is effectively
Implementedandmaintaied
3. To verty compliance, adherence to quay policy and achievement of objectives
‘end targets, anc
4. To determine areas for mprovement onal prcesses,
TL, Scopeand Frequency of Audit
‘Al the processes described in the DPWH QMS Manual being performed by the Servis,
Bureaus, Unied Project Management Offces (UPMOs), Regional Ofees (ROs) and
District Engineering OMaes (DEO), shal be aultet at planned interval, atleast once
year
[II. Audit schedule
rea Process/es ‘Audit Schedule
1, | Management Commitee | Leadership - Management Commitment | November 2019
wc) and Review; Respersity and
Pathorty; Poy and Progam
fica nf the Secretary,
Undersecretaries, Assistant | Deveonment; Conrmunication and
Secretaries ‘Awareness; Improvement; Strategic
Panning; Menagerent Review
2. | manning Service (P5) ‘Operations - Date Gathering; Project | November 2019,
"denifation; Formulation of Pans &
Tvesment Pregrans; and Public
Consitaion
3. [Bureau of Design (B00) | Operations ~Enginering Survey 8 | November 2019
vestigations; ané Pian Preparation
4. [sureau of Construction | Operations - Cost Estimation, Project | November 2039
(oc) Implementation, Pest Project
vationIntra Qusty Aust Progra for 2019
‘urea of Martenance
(eon)
Perfomance Evauation — Monitoring
‘and Heasuremen_ Operations ~
Infrastructure Asset Maintenance; and
Inspectorate and Mentoring;
November 2019
Bureau of Research anc
‘Standards (BRS)
Research and Development - New
Product Tecnolegy evaluation &
Aecrectaton; Naural Occuring
Materials Evaluaton; Standards
Specicavons Formulation; Physical
Resources Management; Survey,
Laboratory and Feld Testing Equipment
Management|
November 2019
Bureau of Quality ana Safety
(835)
Performance Evaliaton — Quelty and
Safery Assurance; ana Mentoring &
Measurement
November 2019
‘Bureau of Equipment (BOE)
Physical Resources Management —
Equipment Flt Nanagement
November 2019
Humen Resource ana
‘Administrative Service
(HRs)
Recruitment, Seleston and acement;
Peformance Management; Rewards
‘and Recognition; earring and
‘Development. Phsieal Resource
Management Fits and Work
Envronment Management
November 2018
0.
Finance Service (FS)
Financial Managenient - Budget
Preparation; Fund Convol Accounting;
Fecal/Fnancal Aecountablty; and
Reporting
November 2018
1,
Toformation Management
service (IMS)
{information Management — Needs
Idenicaton; Aplestion
Development; Aplicalon Deployment
fad IT Infastrctire Maintenance
November 2019
2.
Procurement Service (5)
Procurement Maragement- Bid
Documents Preperation;
Prequalfication & Bd Evaluation;
Performance Evalition; and Avard
of Contract
‘November 2019
2.
‘Stakeholders Relations
Service (SRS)
Performance Evekation - Feedback
Management; External Stakeholders
Relations; Legslatve Liason
November 2018rem Qalty Aust Progra or 2019
14, | Legal Sevice (15) ‘Legal Services -Legitatve amas | November 2019,
‘and ReseerchjLegal Opinion
Preparation; Sit/Location
Aeguiston; Conract Letting Review
& Ltigaton and vestigation
Hearing,
1, | Inmernal Aut Service (IAS) | Operations = Evaluation and Control” | November 2018,
‘of Nor-contermy
16 | Publ Paate Partnership | Planning ~ Stratene Panning November 2018
Service (PPPS)
17.| UbMO AMC —Biotera! | Operations ~ Projet Implementation
and Infrastructure Asset Management _| November 2019
noe eee ee ee eo
a oe
19. | UPMO — Flood Control rations ~ Project Implementation
Womens” | egos Re tomer | ant 219
fs on soe | Soe eee Loman
pecs aN rian teecaacee
es
ee ee
7 mene Oto | emai Peaee Geren | aaa
Performance Evaluation; Procurement | November 2019
Management; Hunan Resource
Management; Financial Vanagement;
Piya Resour Menoyee
Information Manayement, Legal
Services, fappleble; and
Documentation Management
16 Regional Offices (RO)
and 183 District Engineering
Offices (0E0s)
IV. Audit criteria
ceria for aut are a follows:
1, 150 $001:2015 standards
2. DPWH Qualty Management System Manual ard Procedures
‘3. Quality Objectives) Balanced Scorecard
4 Qualty Plans
5. Operations Manual
6. Department Orders
7 Statutory and Reguiatoiy Las Aecting the DPWH OperationsIntra! Qusty Aust Program for 2088
‘Audit Methodology
‘Autors may use te following audit methodoleces:
1. 1QA Procedure
2 Audit Checklist
2, Question-Observe-Check (@-0-¢) Method
4, Others (as appicable)
VE. Selection and Evaluation of Auditors
‘ucts were selected cn the bass of education, taining kil and experience, The aisitors
rust havea leas attended seminars on 1S0 90012015 and IQA Training,
VI. Reporting
Resuits of audits shall be presented and delbersted during the closing meeting. The
Internal Quality Audit report together wah the Corrective Action Report (CAR), f any,
shall be issued tothe aucites afer the closing meting,
VIII. Verification of Non-conformities (NC)/Follow Up actions
AILNCs sti open shal be veiled onthe next aud
In onder to advocate independence as an audit principle, cross posting of auditors wall
bo implemented, Inno case wil any auctor be assigned ta aude his/her ow Work oF
‘luton,
Propared by Reviewed by
=
Asst. FAUSTINO
i Ault ChainRep tne ries
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
INTERNAL QUALITY AUDIT PLAN.
‘CY 2019,
Purposos:
1. To determine conformance to the DPWH dacumented cuaity management system and to the
reauirements of 150 9001:2015;,
2. To very egal compliance, adherence to qualty poly and achievement of objectives and targets;
and
23, To determine areas for improvement onal processes.
area criteria Await
— aaa schedule
Gontraloffice _
1 | Management. eadership~ — [D0No43S._— | Asst. DI. Reynaldo P. | November
Commitee (Hc) | Management | 2019 (Revision Faustino 2019
CCommfoment and_| of te Qs
Review, anual on
‘fce ofthe Responsibity and | conformance io
Secretary, ‘thoy; Potiey | 150 9001:2015
Undersecretaies, | and Program | 0.0. 445, 20:9.
Assistant Secetvies | Development; | (Implementation
{Communiation | ofthe Qu
‘and Awareness; | References) |
Improvement; | DO No 325,
States 2017 (RODE
Panning; Standard
Management | Procedure
Review Manual,
‘lus Su
10 s001:3015
Tssuances and
‘other Pertnere
Rules and
Reguiations
2. | planning service (PS). | Operaens - Date ‘Engr, Josito Ma. T. | November
Gathering; Project | “o> Jacalne 2019
Ientineaton,
Formulation of
Plans &
Investment
Programs; and
Puble
Consutaioneputicothe ieee
DEPARTMENT OF PUBLIC WOFKS AND HIGHWAYS
OFFICE OF THE SECRETARY
tn
August 15,2019
MEMORANDUM
70 + All Concarned
SUBJECT + 150 9001:2015 QMS Internal Quality Audit Schedule
1s preparation for the upcoming thd party sud, and determine conformance to the DPW
documented! quaity management system and to te requirements af 150 9001-2015, you are hereby
rected to corduct tema qualty aut onthe following schadse exchisive of travel ine:
Office tobe Audited ‘Audie Team ‘Audit Schedule
Central office
1 | Management Committe (MC) | Asst Dir. Reynaldo P. | Team Leader | November 2019
Office of the Secretary, ee)
Undersecretares, Asitant
Secretaries
2. | paring Seve (5) fom nato 6. Tranter | Novenber 2019
3,_| Bureau of Design (800) Engr. Eryn T. Caguioa | Membor robe 2019 |
4. |B ot consruion (206) | Ser Eber | Member November 2019
« [omuanemnagon | evans [row | tomurne
o. | Brett Rc ant wenber | Aoenber 2019
2 [BOAT aces [rene | See
8, [eveavotEavpmene(80=) | Er. ChdyH. Age | Member | November 2019
| Adrrtaratve Sova (R45) Me Armand. | wember Novernber 2019
} 10, | Finance Service (FS) ee ae —
as
Page toaREGION XI
1 | Regional office x1
2 | Davao aty 1st DEO
3 | Davao city 2ne DEO
4 | Daveo dl Norte DEO
5 | Compostota Vatey DEO
6 | Davao del Sur 1 DEO
7 | Davao Occidental (former Davao
fel Sur 2) DEO
8 | Davao Onental st 060
8 | Davao Oriental 2nd 0€0
Regional uit eam : Region 13
‘Teain Leader:
Engr. Hermotina M. Balbes
Members:
Engr. Ritchie 3. Rulona
Engr, Elbert Lendel P, Manalo
Ms, Miraflor C.Corro
Me. Zaldy 1. Ives
Nov. 27-29, 2019
October 7-14,
2019
Sept. 23-27,
2019
Nov. 18-22, 2019
REGION xa
1 | Resional offs Xan
2 | South Cotabato 1st DEO.
3 | South cotabate 2nd DEO
4 | Saranggani D&O
5 | Cotabato cty DEO
6 | North Cotabato ist 0€0
7 | north Cotabato 2nd DEO
| sia arte
9 | Sultan Kudarat 2nd DEO
Regional Aut Team : Region 11
“Team Leader
Ms, ohnette-Lee , Celo
Membre
Engr. Cecilia C: Dela Pena
Engr. Alexander D, Turingan
Engr. Ryann Heen T. Gingatan
Ms, Angelia R. Apigo
oct 23-25, 2019
ct 21-22, 2019
ct 5 46,2019
‘Sept. 17-18, 2019
‘Sept. 3-4, 2019
Sept. 5-6, 2019,
gems, |
oct. 3-4, 2019,
Page 220633REGION xu
1 | Reglonal Office XI Regional Aust Team : Region 9 Now. 18-20, 2019
~ Team Leader: |
2 | Butuan Gry DEO
ee atty ain 2am ¢, Duran ‘Aug. 26-30, 2019
3 | Agusan de Hoste DEO Members
fl errors Engr. Vincent Ariel F, Andalahao
Engr. Belen A. Sapalieda oct. 21-25, 2019
5 | Agusan del Sur 2nd DEO Engr. Benedict, Elopre
Ms. Alles M. Tilldh
6 | suigao de sur 1st DEO
pr Nov. 4-8, 2019
7 | Surigao ot Sur 2nd OE
8 | surigao del Norte 1st DEO) Sept. 23-25,
2019
9 | Surigao det Norte 2nd DEO
10] binagattsand DEO
{inthe conduct ofthe QMS aud, you should ensure thet all-equements in the 150 9001:2015 standards
are met
All your traveling expenses, per dlems and ether incidental expenses shall be charged agelnst any
‘avalale appropriate funds of the Deparener, subject to te Usval accounting and auditing ules and
‘equations.
| CESOT
for UPHO Operations and Technical Services