Professional Documents
Culture Documents
Introduction
MART SPEED CONSTRUCTION LIMITED is an entirely and legally Zambian owned Construction Company
that prides itself in providing efficient, effective and high-quality services to its clients.
The company was established in February, 2006 but was officially registered as a private limited
company on the 13th of December, 2007 in Lusaka, and has up to date lived on its objectives of Client
Satisfaction with a highly dedicated team which is always available to offer our clients a very high
valued customer support and construction project service.
Mission Statement
Mart Speed Construction Limited’s mission is to provide service that qualitatively satisfies its clients
and it is therefore committed to providing effective and efficient services, maintaining extremely high
standards of professionalism in project delivery to different clientele.
Mart Speed Construction Limited has a Successful Project Delivery founded on a broad base of in-house
skills and resources to serve our clients needs, tailor made to match their requirements. It is able to
assist in all aspects of development through feasibility, design, construction and operation phases.
Our knowledge of the local market and local services makes Mart Speed Construction an essential
partner in your plans for development.
To maintain the above, management expects all employees to be enthusiastic and strive for Mart
Speed Construction Limited’s mission of quality.
Scope of Business
Mart Speed Construction Ltd provides a wide range of services to its clientele. The main
business activity is centered on the following;
1. Tower construction for telecommunication companies
Bending and fixing steel reinforcement for foundations as per bending schedule
Setting hold down bolts and template for the towers according to specifications
Installation of nextubes, trunking etc for cables
Shuttering and casting of vibrated concrete
Assembling and rigging of the tower as per specifications
Installation of Generators, UPS and all electrical equipment on tower sites
Installation of Low Loss RG cables, Anterna’s and other telecommunications equipment
Installation of BTS and RF equipment on Tower sites
Maintenance and servicing of all electrical installations on towers
Management Structure
Management is assigned to function within the company with defined authority on activities affecting
the Quality Management System.
COMPANY STRUCTURE
Responsibilities
MANAGING DIRECTOR
PROJECTS DIRECTOR
We always strive to bring an independent and constructive approach to our work. To this end members
of staff are able to combine thoroughness with a commercial approach to their work.
Bankers
Our bankers are
Our official business premises are situated on Plot No. 37665, Off Twin Palm Road, Ibex Hill, P.O. Box
30223, Lusaka.
Contact Details
P. O. Box 30223,
Lusaka, Zambia
Mobile Cell:
+260 977 766145
+260 967 766145
Email: tumwa5@yahoo.com
Company Directors
Mrs. Mutinta Sichali Managing Director Mutinta Sichali Architect +260 979 940038
Mr. Chisala Kapumpu Estates Manager Zambia Revenue Authority +260 971 283014
Mr. Fidelis Kabwiri Country Manager A++ Urban Techniques +260 966 455224
Mr. Amenye Mwasaga Managing Director Ngwala Hardware and +260 977 859612
Electrical
Mr. John Phiri Projects Manager Prison Service-Central +260 977 517495
Province
Mr. Moris Chitondo Director of Projects National Housing Authority +260 977 773513
Mr. Snowden Nkhoma Projects Manager PEAS Zambia Limited +260 974 513745
Mrs. Chitambeya Musongole Quantity Surveyor Challenge TB/FHI360 +260 977 423836
PROJECTS COMPLETED IN THE LAST TEN (10) YEARS
CONTRACT YAER OF
No. PROJECT NAME AND COUNTRY CLIENT/CONTACT PERSON COMPLETION VALUE OF CONTRACT
MR. ZULU ZEBRON. CELL 0966
1001 GEO SURVEY ENTERPRISES, ZAMBIA MARCH 2006 ZMK 400,000,000.00
433 232
CHAWAMA CONSTITUENCY
1015 DEVELOPMENT COMMITTEE FEE MR. CHITUTA CELL 0979 787978 DEC, 2008 ZMK 33,673,788.48
PAYING ABLUTION BLOCK
NECOR ZAMBIA SHOW GROUNDS
MISS. MARIA BANDA CELL 0977
1016 CANOPY AND FLOOR FINISHES, AUGUST, 2008 ZMK 88,985,454.30
874720
ZAMBIA
1018 UTH SPECIAL SCHOOL, ZAMBIA MR. MWALE CELL: 0977 747411 APRIL, 2008 ZMK 39,365,235.00
CHAWAMA CONSTITUENCY
SEPTEMBER,
1020 DEVELOPMENT COMMITTEE MR. CHITUTA CELL 0979 787978 ZMK 21,361,000.00
2008
CULVERTS INSTALLATIONS
MR CHITONDO, TEL
NATIONAL HOUSING AUTHORITY
1021 +26001251311 CELL +26 0977 OCT, 2011 ZMK 2,600,000,000.00
EXECUTIVE HOUSES, LUSAKA
773513
1025 ZAMBIA PRISON SERVICE DR SIKAZWE CELL; 0977 569132 JUNE, 2012 ZMK 175,000,000.00
SUPRITENDANT PHIRI
1026 ZAMBIA PRISON SERVICE JANUARY 2012 ZMK 612,545,690.74
0977517495
CONSTRUCTION OF MOTHERS
MR MWEEMBA CELL: +260 977 NOVEMBER,
1034 SHELTER AND OUT DOOR KITCHEN ZMK 246,456,000
762245 2013
FOR WORLD VISION ZAMBIA
CONSTRUCTION A FOUNDATION
STORAGE, ABLUTION BLOCK, WALL
DECEMBER,
1033 FENCE AND STEEL STRUCTURE MR LI BIN CELL: +260 972 459159 ZMK 3,800,000,000.00
2013
PORTAL FRAME FOR SEPCO AT
MAAMBA COLLIERY, MAAMBA
CONSTRUCTION OF AN EXECUTIVE
MR SIDNEY CHILESHE
1034 HOUSE FOR FAIR BRAND JANUARY, 2013 ZMW 1,500,000.00
+260978880914
MANAGING DIRECTOR
CONSTRUCTION OF A SEMI-
SISTER DELIANA CELL +260 977
1036 DETACHED HOUSE IN KAUNDA APRIL, 2014 ZMW 600,000.00
748497
SQUARE
CONSTRUCTION OF PERIMETER
SISTER DELIANA CELL +260 977 FEBRUARY,
1041 FENCE AND PALISADE FENCE IN ZMW 120,000.00
748497 2015
KAUNDA SQUARE
PARTITIONING ACCOUNTS OFFICE ENG. EMMANUEL ZULU CELL:
1042 MARCH, 2015 ZMW 70,000.00
AND EXTERNAL WORKS FOR RDA +260 966 913347
CONSTRUCTION OF POULTRY
MR MULENGA CELL +260 964 DECEMBER
1043 HOUSES FOR PINNACLE BROILERS ZMW 400,000.00
626689 2015
IN CHISAMBA
REHABILITATION OF 2 SCHOOLS
MISS DAISY BANDA CELL: +260
1047 (SISINJE AND VIZENGE PRIMARY OCTOBER, 2016 ZMW 4,865,097.25
965 847415
SCHOOLS) IN CHIPATA FOR JTI
CONSTRUCTION OF AN EXECUTIVE
MR NEBAT MBEWE CELL:
1050 SEMI-DETACHED HOUSE FOR MR MAY, 2018 ZMW 1090,000.00
+260966756579
NEBAT MBEWE IN LUSAKA
CONSTRUCTION OF A DORMITORY
PEAS ZAMBIA LIMITED, HOUSE
BLOCK AND ABLUTION BLOCK AT
1061 NO. 35, SHEILA ROAD, DEC 2019 ZMW 1,050,000.00
KAWAMA SECONDARY SCHOOL IN
NORTHRISE, NDOLA.
NDOLA
MART SPEED CONSTRUCTION PROJECTS
Renovation of 3 semi-detached flats for Prism Architects Executive house constructed for Fair Brand services
(Mr Noel Puta) at Northmead, Director Mr Sydney Chileshe in Makeni, Lusaka
Construction of Concrete Driveway and Guard House at Construction of roof canopy and burglar grille and
Mpendwa House, for ZRA in Ndola floor finishes to Necor Zambia, show grounds office
Construction of transparent roof canopy and general House type 24 (high cost) constructed for National
renovations to Necor Zambia, show grounds office, lusaka Housing Authority, twin palm road, ibex, lusaka
Executive house constructed for Fair Brand services Internal finishing for Executive house constructed for
Director Mr Sydney Chileshe in Makeni, Lusaka Fair Brand services Director Mr Sydney Chileshe
Offices constructed for J & J transport including Main toilets constructed for J & J transport including
workshops, service bays, canteen and wall fence all fittings and finishes, Makeni, Lusaka
Steel structure portal frame as Loading Bay constructed Steel structure portal frame as Service Bay
for J & J transport in Makeni, Lusaka constructed for J & J transport in Makeni, Lusaka
Bwacha Local Court constructed for the Judiciary, in Bwacha Local Court constructed for the Judiciary, in
Kabwe (back view) Kabwe (side view)
Construction of Mart Speed Director’s house behind Central Processing Centre at Mpendwa House in
Olympics stadium in Lusaka Ndola for Zambia Revenue Authority
Renovation of 3 semi-detached flats for Prism Architects Kitchen units for Executive house constructed for
(Mr Noel Puta) at Northmead, Lusaka Fair Brand services Director Mr Sydney Chileshe
Construction of Semi-detached flats for sisters of charity, Construction of Storage Ware House for SEPCO at
Kaunda Square in Lusaka Maamba Colliery, Southern Province
During Construction of Dormitory and Ablution Block for Completed Dormitory and Ablution block for SEPCO
SEPCO at Maamba Colliery, Maamba at Maamba Colliery, Maamba.
Semi-detached 2 bedroom flats for Mart Speed Drivers Quarters for Daily Mail
Construction Ltd
Refurbishment of Maternity Ward and Ablution Block at Chipata Central Hospital in Chipata
Refurbishment of an old existing structure to create the MDR TB Ward at Mansa General Hospital in Mansa
District of Luapula Province
Paved driveway and Clear Vu fencing works at the MDR TB Ward at Mansa General Hospital
Construction of the Materials Testing Laboratory at National Council for Construction (NCC) Head Office in
Lusaka
Construction of an Ablution Block at Kashiba Basic School in Mwense District of Luapula Province
Construction of main car park for PACRA at Mwahi House, Lusaka
Construction of a Residential House for Miss Daisy Banda in Salama Park of Ibex Hill, Lusaka
Construction of Cassava Bulking Centre at Chisunka of Mansa District in Luapula Province
CONCRETE PUMP
CONCRETE MIXER ALL 6928
EXCAVATOR/BACK HOE LIGHT TRUCK ALK 6702
LOADER