Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Introductory Information
Bidding Requirements
Bidder's Qualifications
Invitation to Bid
001000 Solicitation
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
001153 Request for Qualifications
002100 Instructions
0030 Advertisement
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
003131 Geophysical Data
Allowance Form
Alternate Form
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Contractor's Qualifications
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Contracting Requirements
00500 Agreement
Agreement - Procurement
Allowance Amounts
00570 Definitions
00610 Bonds
Consent of Surety
Lien Bonds
Maintenance Bonds
Performance Bonds
Payment Bonds
Special Bonds
Warranty Bonds
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
00620 Certificates
Acceptance Certificate
Certificates of Insurance
Certificates of Compliance
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Assigned Contracts
Insurance Requirments
Letter of Assent
Procurement Contracts
Statutory Requirements
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Wage Determination Schedule
00890 Permits
Notices
00910 Addenda
009113 Addenda
00920 Claims
Clarification Notices
Proposal Requests
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
00940 Modifications
Amendments
Change Orders
Field Order
Supplemental Instructions
Written Amendments
01 - - GENERAL REQUIREMENTS
01100 Summary
011000 Summary
Work By Owner
Construction Sequence
Construction By Owner
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Contract Interface
Summary of Contracts
Use of Site
Use of Premises
01210 Allowances
Cash Allowances
Contingency Allowances
Installation Allowances
Product Allowances
Quantitiy Allowances
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
012129 Quality Allowances
01230 Alternates
012300 Alternates
012643 Amendments
Schedule of Values
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
01310 Project Management and Coordination
The Contractor shall perform all works required in this section,
including, but not limited to coordiantion and other responsib-
lities; as per the specification
Superintendence Item
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
013219 Submittals Schedule Item
Samples Item
Certificates Item
013313 Certificates
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
specifications
Mock-ups Item
014113 Codes
014116 Laws
014119 Fees
014126 Permits
01420 References
Definitions
Reference Standards
Symbols
014200 References
01425 Abbreviations
Fabricator Qualifications
Installer Qualifications
Manufacturer Qualifications
Supplier Qualifications
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
014339 Mockups
0144216 Definitions
Field Samples
Mock - Up Requirements
Plant Inspection
Provide permanent water supply from the main line (storage Item
6 system)
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
9 Ventilation Item
12 Hoists Item
13 Scaffolding Item
24 Protect against noise, dust, water, fire, nuisance from rubbish and deItem
01505 Mobilization
Temporary Electricity
Temporary Lighting
Temporary Telephone
Temporary Water
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
First Aid
Sanitary Facilities
Temporary Bridges
Temporary Decking
Temporary Overpasses
Temporary Ramps
Temporary Runarounds
Swing Staging
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
01550 Vehicular Access and Parking
Access Roads
Haul Routes
Parking Areas
Temporary Roads
Traffic Control
Air Barriers
Barricades
Dust Barriers
Fences
Noise Barriers
Pollution Control
Protective Walkways
Security Measures
Pest Control
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Signs
01631 Substitutions
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
01710 Examination
Acceptance of Conditions
Existing Conditions
017113 Mobilization
01720 Preparation
Construction Layout
Field Engineering
Surveying
01730 Execution
Application
Erection
Existing Products
Installation
Selective Demolition
17300 Execution
017313 Application
017316 Erection
017319 Installation
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
017326 Existing Products
01740 Cleaning
Final Cleaning
Progress Cleaning
Site Maintenance
Checkout Prodecures
5 Warranties Item
The Works will not be considered as being completed until all the
Contractor's temporary installations and equipment have been
8 cleared away and the areas left clean and tidy to the satisfaction of
the Employer Item
Maintenance Contracts
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Maintenance Data
Maintenance Materials
Operation Data
Product Bond
Product Warranties
Spare Parts
017833 Bonds
017836 Warranties
01810 Commissioning
Commissioning Summary
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
01890 Reconstruction
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
019100 Commissioning
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
GENERAL REQUIREMENTS
Division 01 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
02 - SITE CONSTRUCTION
02055 Soil
02060 Aggregate
Asphalt Cement
Hydraulic Cement
02070 Geosynthetic
Geogrids
Geotextiles
Hydrants
Manholes
Meters
Utility Boxes
Valves
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
02090 Joint Material
Reverse Osmosis
Chemical Precipitation
Ion Exchange
Neutralization
Incineration
Thermal Desorption
Vitrification
Aerobic Processes
Anaerobic Processes
Bio - Remediation
022000 Assessment
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Core Drilling
Geophysical Investigations
Groundwater Monitoring
Seismic Investigation
Test Pits
022100 Surveys
Building Demolition
Selective Clearing
Sod Stipping
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Stripping and Stockpiling of Soil
Tree Pruning
02240 Dewatering
Foundation Grouting
Grillages
Needle Beams
Sheetpiling
Shoring
Slabjacking
Soil Stabilization
Underpinning
Anchor Tiebacks
Cofferdams
Ground Freezing
Reinforced Earth
02261 Cofferdams
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
022636 Hazardous Waste Drum Assessment
02300 Earthwork
02310 Grading
Finish Grading
Rough Grading
Excavation
Borrow Excavation
Compaction
Backfill
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
The contractor shall allow for testing all materials as required by
2 the specifications or directed by the engineer Item
02325 Dredging
02330 Embankment
Armoring
Earth Dams
Soil Embankment
Reconditioning
Subgrade Modification
Rodent Control
Termite Control
Veggitation Control
Gabions
Geogrids
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Rock Barriers
Rock Basins
Slope Paving
Breakwaters
Groins
Jetties
Moles
Revetments
Seawalls
Muck Disposal
024100 Demolition
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Rock Bolting
02441 Microtunneling
Composite Piles
Shhet Piles
Steel H Piles
Timber Piles
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Bored and Augered Pile Load Tests
Drilled Caissons
02475 Caisson
Box Caissons
Excavated Caissons
Floating Caissons
Open Caissons
Pneumatic Caisoons
Sheeted Caissons
Anchored Walls
Concrete Cribbing
Metal Cribbing
02490 Anchor
Rock Anchors
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Cistems
Water Supply
02520 Well
Extraction Wells
Monitoring Wells
Recharge Wells
Test Wells
Well Abandonment
Gauging Stations
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Packaged Lift Stations
Sanitary Cleanouts
Drainage Field
Grease Interceptor
Sand Filter
Septic Tank
Siphon Tank
Oil Distribution
Steam Distribution
Antenna Towers
Transmission Towers
Utility Poles
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
02600 Drainage and Containment
02605 Manholes
02620 Subdrainage
Geocomposite Drains
Subgrade Drains
Inlets
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Cooling Water Ponds
Distribution Reservoirs
Leaching Pits
Retention Basins
Sewage Lagoons
Stabilization Ponds
Aggregate Subbase
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Sub - Ballast
Top Ballast
Cinder Surfacing
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Drop off interlocking concrete paving, Colour/ Finish: To match
Architect's specification of H51 110 m2
Pavement Markings
Gutters
Stone Curbs
02775 Sidewalk
Brick Pavers
Pressed Pavers
Stone Pavers
Cape Seal
Chip Seal
Fog Seal
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Micro - Surfacing
Sand Seal
Sandwich Seal
Slurry Seal
Suface Treatment
Resilient Matting
02815 Fountain
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Wall Guard
Supply and install corrugated rubber wall and column guards;
include strips of fluorescent tape, and all necessary material
and accessories; as per the specifications and drawings
Column Guard No
Convex Mirror
Supply and install convex mirror unit; include all necessary ma-
terial and accessories; as per the specifications and drawings
Guide Rail
Parking Bumpers
Traffic Barriers
Sound Barriers
Bicycle Racks
Prefabricated Planters
Seating
Tables
Playground Equipment
Play Structures
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Planting
02905 Transplanting
Shrub Transplanting
Tree Transplanting
Blankets
Hydro - Punching
Mats
Mulching
Netting
Soil Preperation
Stakes
Topsoil
Hydro - Mulching
Plugging
Sodding
Sprigging
Stolinizing
Agricultural Soil
Allow for filling with imported topsoil for areas to be plan-
ted including finish grading and planting accessories; as per
the specifications and drawings.
m3
Fertile top soil
Plants
Irrigation System
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Supply and install automatic irrigation system, shall include for all
materials, labor, plant and tools.The contract shall include for the
complete installation, testing and commissioning of the automatic
irrigation system summarized below and as per this specification
and contract drawing no 57070.00 PC4 (97)L100
No.
Main Water Outlet
No.
Field Controller Flood Bubler
No.
Dripper
No.
Valve with Flow Control
No.
Valve for Drppers
Valves No.
Allow for provisional sum for GRP Irrigation tanks, filters, filter
pumps, booster pumps, piping and accessories etc. PS= USD
20,000 PS
Fertilizing
Liming
Mowing
Pruning
Watering
Watering
Landscape Edging
Landscape Timbers
Planters
Tree Grates
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Tree Grids
Roadbed Modification
02975 Flexible and Bituminous Pavement Reinforcement and Crack and Joint Sealants
Joint Rehabilitation
Slab Stabilization
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
SITE CONSTRUCTION
Division 02 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
03 - - CONCRETE
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
03250 Post-Tensioning
Provide all materials and lay in position R.C concrete for Short
3 columns as per drawings and with 1:2:4 mix,with strength not less M3
than 25 N/mm2
4 Provide all materials and lay in position R.C concrete for grade M3
beams 1:2:4 mix, with strength not less than 25 N/mm2
Provide all materials and lay in position R.C concrete for Ground
5 Floor Columns as per drawings and with 1:2:4 mix,with strength M3
not less than 25 N/mm1
Provide all materials and lay in position R.C concrete for First
6 Floor Columns as per drawings and with 1:2:4 mix,with strength M3
not less than 25 N/mm1
Provide all materials and lay in position R.C concrete for Second
7 Floor Columns as per drawings and with 1:2:4 mix,with strength M3
not less than 25 N/mm1
Provide all materials and lay in position R.C concrete for Roof
8 Columns as per drawings and with 1:2:4 mix,with strength not less M3
than 25 N/mm1
Manholes
Supply and install Manholes shall be in accordance to BS en 752 &
BS en 12056. Size of the manhole covers manufactured to BS en
124All pipe sleeves through rc walls to be coordinated with
structural drawings
MH-01 No.
MH-02 No.
MH-03 No.
MH-04 No.
MH-05 No.
Concrete repairs
Allow for provisional sum for concrete repair works.
PS = USD 5,000 PS
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
03301 Fly Ash
03304 Finishing
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Supply and install GRC elements; include anchors, seals, and all
necessary material and accessories; as per the specifications and
drawings
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Supply and pour concrete floor topping having a 28 day comp-
ressive strength of 24 Mpa; include steel wire mesh, and all ne-
cessary material and accessories; as per the specifications and
drawings
Gypsum Underlayment
03600 Grouts
03600 Grout
036000 Grouting
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
038200 Concrete Boring
CONCRETE
Division 03 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
TOTAL CONCRETE
04 - - Masonry
Epoxy Mortar
Mortar Pigments
Premixed Mortar
Refractory Mortar
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Reinforcing Bars
Stone Anchors
Embedded Flashing
Weepholes
04100 Mortar
Brick
Building Brick
Clay Tile
Facing Brick
Terra Cotta
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Concrete Brick
04400 Stone
Bluestone
Granite
Limestone
Marble
Quartzite
Sandstone
Slate
04414 Limestone
Excavated Stone
Field Stone
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Riverbed Stone
Crushed Stone
Dimension Stone
04500 Refractories
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Concrete Lintels
Supply and pour concrete; include formwork, steel reinforce-
ment, and all necessary material and accessories; as per the spe-
cifications and drawings
Concrete Threshold
Supply and pour concrete; include formwork, steel reinforce-
ment, and all necessary material and accessories; as per the spe-
cifications and drawings
Concrete thresholds m3
Cavity Walls
Masonry Veneer
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
04880 Masonry Fireplace
Stone Repair
Stone Replacement
Stone Repointing
Brick Cleaning
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
MASONRY
Division 04 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
TOTAL MASONRY
05 - - Metals
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
05050 Basic Metal Materials and Methods
Tubular Steel
Geodesic Structures
Space Frames
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Electrical Supports
Mechanical Supports
Medical Supports
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Supply and install stainless steel (Grade 316) steps; include
plates, anchors, bolts and all necessary material and accesso-
ries; as per the specifications and drawings
Ladder
Supply and install galvanized steel ladder; include epoxy primer,
intermediate high build epoxy paint and polyurethane finish paint,
and all necessary material and accessories; as per the specifica-
tions and drawings
Staircase Handrail
Supply and install painted steel handrail; include anchors,
plates, epoxy paint, and all necessary material and accessories;
as per the specifications and drawings
Handrail (Staircase) m
Grating
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
055213 Pipe & Tube Railings
05530 Grating
Column Covers
Bifurcation
Bulkheads
Manifolds
Penstocks
Trashracks
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
METALS
Division 05 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
TOTAL METALS
PreservativeTreatment
Log Structures
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Pole Construction
Railroad Ties
Timber Trusses
06160 Sheathing
Insulation Sheathing
Subflooring
Underlayment
061600 Sheathing
Wood Joists
Wood Trusses
06220 Millwork
062200 Millwork
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
062500 Prefinished Paneling
Closet
Supply and install wood closets comprising plastic laminate
box and drawers, MDF leaf covered with wood veneer, hardwood
architraves, internal mirror, stainless steel hardware and cloth
hanging rod, retractable rod for the upper compartment, polyu-
rethane varnish, and all necessary material and accessories; as
per the specifications and drawings
Vanity Units
Supply and install water resistant MDF or blockboard wood
vanity; include plastic laminated interior, hardwood architraves
and edges, polyurethane paint, stainless steel hardware, and
all necessary material and accessories; as per the specifications
and drawings
Laminated Wood Cover for Counter Cabinets (Bath type 2A) No.
Laminated Wood Cover for Counter Cabinets (Bath type 3B) No.
Access Panels
Supply and install MDF wood access panels; include flush hard-
wood frame, perimeter seal, and all necessary material and acces-
sories; as per the specifications and drawings
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Access Panel; 300x440mm (Bath Type 5) No.
Reception Desk
Supply and install MDF reception desk,
including 22mm MDF drawer unit finished with wood veneer,
20mm MDF counter top with wood veneer, hardwood edges,
stainless steel hardware andall necessary material and accessories;
as per the specifications and drawings (Top priced separately)
Wood Cladding
Supply and install water resistant blockboard wood wall panel
covered with wood veneer; include solid wood studs, solid
wood edges, adhesive, polyurethane varnish, fixing material
and all necessary material and accessories; as per the specifi-
cations and drawings
Nahar wood veneer with groove side panel (Corridor / Lift lobby) m2
Cabinet Hardware
06415 Countertop
06420 Paneling
Wood Balusters
Wood Corbels
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Wood Cupolas
Wood Finials
Wood Mantels
Wood Aprons
Wood Cornices
Plastic Lumber
Structural Tubular
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Cultured Marble
Plastic Handrails
Plastic Paneling
Solid Surfacing
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
07110 Dampproofing
Bituminus Dampproofing
Cementious Dampproofing
071100 Dampproofing
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Prepare surface, supply and apply primer and single compo-
nent, unmodified polyurethane waterproofing; include reinfor-
cing the system at corners; include all necessary material and
accessories; as per the specifications and drawings
Crystaline Waterproofing
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
07201 Pre-Insulated Instrument Enclosures
07310 Shingle
Asphalt Shingles
Metal Shingles
Plastic Shakes
Slate Shingles
Wood Shingles
Wood Shakes
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Plastic Roof Tiles
Sod Roofing
Thatched Roofing
07460 Siding
Aluminum Siding
Composition Siding
Hardboard Siding
Plastic Siding
Plywood Siding
Steel Siding
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Wood Siding
074600 Siding
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Planted Areas
Supply and apply cold applied bituminous emulsion at an
average of 350gr/m2, 1 hot applied elastomeric membrane of
4mm thick SBS modified bitumen with 180gr/m2 polyester re-
inforcement and 1 SBS modified bitumen membrane, 4mm thick
with 60gr fiberglass, anti root self protected with miniral gra-
nules. The whole system shall be protected with rounded gra-
vel with no sharp edges and non woven geotextile 170 gr/m2;
include concrete edge form, joint sealant, and all necessary
material and accessories; as per the specifications and drawings
Roof Removal
Roofing Resaturants
Roofing Restoration
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Copings
Counterflashing Systems
Reglets
Scuppers
Manufactured Curbs
Relief Vents
Rdige Vents
Roof Hatches
Roof Walkways
Smoke Vents
Snow Guards
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Cementious Fireproofing
07840 Firestopping
078400 Firestopping
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
078700 Smoke Containment Barriers
Compression Seals
Joint Gaskets
Backer Rods
Calking
Joint Eillers
Sealents
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Door Type 10; Overall dim.: 1800x2200mm, 90mins Fire Rated No.
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
08150 Preassembled Metal Door and Frame Unit
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Hangar Doors
Lightproof Doors
Industrial Doors
Airtight Doors
Watertight Doors
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
084200 Entrances
084300 Storefronts
08500 Windows
08500 Window
085000 Windows
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Detention Windows
Pass Windows
Storm Windows
Window Restoration
Window Replacement
08600 Skylight
Pyramidal Skylights
08700 Hardware
087000 Hardware
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Controlling Hardware
Door Trim
Hanging Hardware
Latching Hardware
Locking Hardware
Thresholds
Window Locks
Window Lifts
Window Operators
Detention Hardware
08800 Glazing
088000 Glazing
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
ting structure, anchors, seals, and all necessary material and ac-
cessories; as per the specifications and drawings
RAL 1012 float glass color baked glass graphic, AAU 00328 fea-
ture color wall, RAL 6021 float glass baked glass graphic, RAL
9003 stained white baked glass, RAL 9003 stained white baked
glass with patterns: 3720x2200mm (Corridor / Lift Lobby) m2
RAL 9003 Satin white glass in-set panel (Corridor / Lift Lobby) No.
08810 Glass
Bent Glass
Coated Glass
Composite Glass
Decorative Glass
Float Glass
Insulating Glass
Laminated Glass
Mirrored Glass
Rolled Glass
Tempered Glass
Wired Glass
088300 Mirrors
08830 Mirror
Supply and install mirror units, comprising 6mm clear mirror
glass fixed on waterproof MDF backboard; include stainless
steel accessories; hardwood frame, polyurethane varnish, and
all necessary material and accessories; as per the specifications
and drawings
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
089100 Louvers
089500 Vents
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
09 - - Finishes
Gypsum Lath
Metal Lath
Plaster Accessories
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
To internal walls m2
To internal soffits m2
Plaster to Facades
Prepare surfaces, spatterdash, supply and apply ordinary
portland cement and sand plaster coat to a min. thickness of
15mm, textured plaster to a thickness of 15mm; include metal
lath 1mm thick having approximately 50 nets per m2 where re-
quired scratching under layers; trowelling to a smooth final
layer unless noted otherwise; include forming drip over all
openings; as per the sepcifications and drawings
AAU 00190 cream color lift / core wall plaster (Corridor / Lift
Lobby) m2
Adobe Finish
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
92400 Portland Cement Plastering
Gypsum Sheathing
09300 Tile
093000 Tiling
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Tops
Supply and install tops; include seals, adhesive, provision for
receiving sinks, and all necessary material and accessories; as
per the specifications and drawings
Ceramic Mosaics
Conductive Tile
09320 BrickTile
Agglomerate Tile
09400 Terrazzo
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Supply and install terrazzo tiles; include sand bed, mortar, grout,
cleaning, polishing, and all necessary material and accessories;
as per the specifications and drawings
Terrazzo Tile
09500 Ceilings
095000 Ceilings
Integrated Ceilings
Luminous Ceilings
Gypsum Panel
Metal Panel
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
09600 Flooring
096000 Flooring
Athletic Flooring
Brick Flooring
Flagstone Flooring
Granite Flooring
Marble Flooring
Slate Flooring
Stone Flooring
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Mastic Fills
Resinous Flooring
09680 Carpet
Carpet Cushion
Carpet Tile
Sheet Carpet
096800 Carpeting
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Wall Fabrics
Wallpaper
Acoustical Insulation
Acoustical Sealants
09900 Painting
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
09910 Paint
Exterior Paints
Interior Paints
099100 Painting
Transparent Coatings
Elastomeric Coatings
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Intumescent Paint
Marine Coatings
Maintenance Coatings
Paint Cleaning
FINISHES
Division 09 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
TOTAL FINISHES
010 - - Specialties
10110 Chalkboard
Fixed Chalkboards
Operable Chalkboards
Portable Chalkboards
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
101100 Visual Display Surfaces
10115 Markerboard
Electronic Markerboards
Fixed Markerboards
Operable Markerboards
Portable Markerboards
Fixed Tackboard
Portable Tackboard
101300 Directories
101400 Signage
10190 Cubicle
Cubicle Curtains
Aluminum Louvers
Supply and install powder coated aluminum louver units; inc-
lude frame, supports, and all necessary material and accesso-
ries; as per the specifications and drawings
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Louver S02-L1; Overall dim.: 3000x4225mm No.
Motorized Louvers
Operable Louvers
Stationary Louvers
102200 Partitions
10230 Vent
Soffit Vents
Wall Vents
Bumper Guards
Corner Guards
Bird Control
Insect Control
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Rodent Control
Fireplace Dampers
Fireplace Inserts
10320 Stove
Clocks
Cupolas
Spires
Steeples
Weatehrvanes
10350 Flagpoles
10350 Flagpole
Automatic Flagpoles
Nautical Flagpoles
103500 Stoves
10410 Directories
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Electronic Directories
10411 Directoies
10420 Plaque
10425 Signs
10431 Signs
Supply and install signs; include anchors, bolts, and all neces-
sary material and accessories; as per the specifications and dra-
wings
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Detection and Counting Devices
Rotary Gates
Turnstiles
10500 Lockers
Glass Lockers
Metal Lockers
Plastic Lockers
Wood Lockers
105100 Lockers
Fire Extinquishers
Awnings
Canopies
Car Shelters
Walkway Coverings
Collection Boxes
Mail Boxes
Mail Chutes
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
10600 Partition
Coiling Partitions
Sliding Partitions
Telephone Enclosures
Telephone Shelving
107500 Flagpoles
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
108000 Other Specialties
10880 Scale
108800 Scales
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
SPECIALTIES
Division 10 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
TOTAL SPECIALTIES
011 - - Equipment
Housekeeping Carts
Safes
Baptisteries
Chancel Fittings
Book Depositories
Bells
Carillons
Organs
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Display Cases
Finishing Equipment
Ironing Equipment
Vending Machines
Learning Laboratories
Projection Screens
Projectors
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Fuel Dispensing Equipment
Lubrication Equipment
Parking Gates
Ticket Dispensers
Dock Bumpers
Dock Levelers
Dock Lifts
Truck Restraints
Bins
Packages Incinerators
Pulping Machines
Recycling Equipment
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
11200 Water Supply and Treatment Equipment
11225 Clarifier
Chlorination Equipment
Bulkhead Gates
Radial Gates
Slide Gates
Sluice Gates
Butterfly Valves
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Regulating Valves
Sewage Ejectors
11370 Compressor
Bar Equipment
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Soda Fountain Equipment
Floors 1 to 5
Transfer Cabinets
Backstops
Exercise Equipment
Gymnasium Dividers
Gymnasium Equipment
Scoreboards
Therapeutic Equipment
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
EQUIPMENT
Division 11 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
TOTAL EQUIPMENT
012 - - Furnishings
12050 Fabrics
12100 Art
121000 Art
12110 Murals
Commissioned Paintings
Faux Finishes
Photo Murals
121100 Murals
12140 Sculpture
121400 Sculptures
Etched Glass
Stained Glass
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
123000 Casework
Bank Casework
Dental Casework
Display Casework
Dormitory Casework
Hospital Casework
Kitchen Casework
Laboratory Casework
Library Casework
Medical Casework
Religious Casework
Residential Casework
Study Carrels
123600 Countertops
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
124000 Furnishings & Accessories
Desk Accessories
China
Flatware
Glassware
Hollowware
Napery
Silverware
Table Linens
Desk Lamps
Floor Lamps
Table Lamps
Bath Linens
Bath Mats
Bath Towels
Shower Curtains
Bed Linens
Blankets
Comforters
Pillows
Ash Receptacles
Bowls
Clocks
Decorative Crafts
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Decorative Screens
Vases
Waste Receptacles
Floor Mats
Rugs
Runners
Blinds
Interior Shutters
Shades
12500 Furniture
125000 Furniture
12520 Seating
Chairs
Upholstered Seating
125200 Seating
Hotel Furniture
Motel Furniture
Restaurant Furniture
Book Shelves
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Classroom Furniture
Dormitory Furniture
Laboratory Furniture
Library Furniture
Study Carrels
Folding Chairs
Interlocking Chairs
Stacking Chairs
Telescoping Bleachers
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Furnishings
Division 12 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
TOTAL FURNISHINGS
Prison Cells
Athletic Rooms
Clean Rooms
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Hyperbaric Rooms
Insulated Rooms
Planetariums
Prefabricated Rooms
Saunas
Steam Baths
Vaults
Fabric Structures
Glazed Structures
Modular Mezzanines
Observatories
131200 Fountains
131300 Aquariums
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
13160 Aquariums
Water Slides
Wave Pools
Hot Tubs
Therapeutic Pools
Whirlpool Tubs
Sludge Incinerators
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Solid Waste Incinerators
Tank Lining
Filter Bottoms
Filter Media
Package Filters
Fixed Covers
Floating Covers
Gasholder Covers
132300 Planetariums
Oxygen Generators
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
133600 Towers
13420 Instrument
Control Valves
Flowmeters
Level Instruments
Potentiometric Instruments
Pressure Instruments
Receiver Instruments
Temperature Instruments
Annunciators
Controllers
Indicators
Recorders
Instrument Diagrams
Instrument Layouts
Instrument Lists
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Air Collectors
Liquid Collectors
Solar Glazing
Solar Reflectors
Door Answering
Intrusion Detection
Security Access
Video Surveillance
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Clock Control
Door Control
Environmental Control
Lighting Control
Fire Alarm
Gas Detection
Leak Detection
Smoke Alarm
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Manual pull station water proof No
Piping Specialties
Valves
Halon Alternative
Water Mist
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
SPECIAL CONSTRUCTION
Division 13 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
TOTAL CONSTRUCTION
14100 Dumbwaiter
141000 Dumbwaiters
14200 Elevators
142000 Elevators
1 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract
3 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Refer to particular Conditions of Contract
5 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract
7 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract
1 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract
3 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract
5 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract
7 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract
Cab Finishes
Elevator Doors
Elevator Controls
14400 Lift
144000 Lifts
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Inclined Wheel Chair Lifts
Orchestra Lifts
Stage Lifts
14550 Conveyor
Belt Conveyors
Bucket Conveyors
Container Conveyors
Monorail Conveyors
Oscillating Conveyors
Pneumatic Conveyors
Roller Conveyors
Scoop Conveyors
Screw Convyors
14560 Chute
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
3 Escape Chutes No.
9 Compactor No.
Apron Feeders
Vibratory Feeders
14690 Derrick
14700 Turntables
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
14690 Derrick
14800 Scaffolding
148000 Scaffolding
Beam Scaffolding
Carriage Scaffolding
Hook Scaffolding
14900 Transportation
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
14920 Monorail
14930 Funicular
CONVEYING SYSTEMS
Division 14 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
15 - - Mechanical
15055 Motors
Duct Insulation
Equipment Insulation
Piping Insulation
15110 Valve
1 20 mm Gate Valve No
2 25 mm Gate Valve No
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
15130 Pump
WATER PUMPS
1 20 mm diameter m
Interceptors
Sanitary Piping
25 m
40 m
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Drainage acoustic PVC pipe work system, including all fittings,
spouts, joints, connections, hangers, supports, clips, anchors and
the like complete; as specified and as shown on drawings ()
75 m
Roof Drains
RWO No
Hydronic Piping
Refrigerant Piping
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
2.1 Allow for provisional sum for construction of bulk fuel store room
including all civil and MEP related works: Blockwork, lighting,
flame detector, power, containment etc. PS = USD 12,000
PS
Air Compressors
Gas Equipment
Gas Piping
Helium Piping
Nitrogen Piping
Vacuum Pumps
Vacuum Piping
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
25 mm diameter m
Upright Sprinklers No
Pre-action sprinkler No
1 50mm diameter m
2 75mm diameter m
3 100mm diameter m
4 110mmdiameter m
5 160mm diameter m
Sanitary Fixtures
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
wash basin, central tap hole purched, 2 semi pre-punched outer .
Bathroom (TYPE 6)
Shower Set / Mixer and shower head for over bath / Celia
12 collection .
Celia 3F hand spray , ideal flex 1600mm, sliding bar / 900mm . No.
Shower Set / Mixer and shower head for over bath / Ideal standard
13 jasper
Morison Thermistatic mixer and shower head . No.
Bathroom (Type 3)
Shower Set / Mixer and shower head for over bath / Celia
23 collection .
Celia 3F hand spray , ideal flex 1600mm, sliding bar / 900mm . No.
Shower Set / Mixer and shower head for over bath / Ideal standard
24 jasper
Morison Thermistatic mixer and shower head . No.
Shower Set / Mixer and shower head for over bath / Celia' shower
25 mixer
build-in 185mm dia, with metal handle . No.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
26 Toilet Roller Holder / Chrome / Nemox' Collection . No.
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Shower Set / Mixer and shower head for over bath / Celia
55 collection .
Celia 3F hand spray , ideal flex 1600mm, sliding bar / 900mm . No.
Bathroom (Type 5)
Shower Set / Mixer and shower head for over bath / Celia
66 collection .
Celia 3F hand spray , ideal flex 1600mm, sliding bar / 900mm . No.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Bathroom (TYPE 4)
Shower Set / Mixer and shower head for over bath / Celia
77 collection .
Celia 3F hand spray , ideal flex 1600mm, sliding bar / 900mm . No.
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
87 Bath / Ideal cast rectangular bath as specified. No.
Guard Wc in B1
98 Wc No.
99 Shower No.
103 Wc No.
Kitchen
Compact Circulators
Inline Pumps
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Packaged Booster Pumping Station
Sewage Ejectors
Sump Pump
EWH1 No
Water Conditioners
Water Softeners
Rechargable Filters
Water Conditioners
Water Softeners
Disposable Filters
Rechargable Filters
Fountain Equipment
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Condensing Boilers
Deaerators
15530 Furnace
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Dehumidifiers
Humidifiers
Air Coils
Convectors
Induction Units
Infrared Heaters
Unit Heaters
Unit Ventilators
Heat Pipe
Heat Wheels
15783 Split-Type
15810 Duct
Flexible Ducts
Metal Ducts
Ductwork Kg
100x200 No
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Size 200x150 No
15830 Fan
Ceiling Fans
Centrifugal Fans
Power Ventilators
SPF-C04-S01 No
Size 150x150 No
Size 250x150 No
ED-1 No
EG-1 No
FAL-1 No
EAL-1 No
Constant Volume
Gravity Ventilators
Penthouse Ventilators
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Air Filters
Dust Collectors
ULPA Filters
15890 Ductwork
Control Panels
Terminal Boxes
15948 Instrumentation
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
MECHANICAL
Division 15 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
TOTAL MECHANICAL
016 - - Electrical
Seismic Controls
Maintenance Testing
16105 Demolition
16110 Raceways
16111 Conduit
630mm2 m
1 x 240 mm (E) m
Type E4
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
4x4mm2+4mm2E m
Cabinets
Cutout Boxes
Enclosures
Junction Boxes
Outlet Boxes
Pull Boxes
Surface Raceway
Lighting Point No
20 A Flex Oultet No
THERMOSTAT CONTROLER No
Shaver Adaptor No
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
1 WAY GANG SWITCH No
DOOR BELL No
Floor Boxes
Receptables
Wall Plates
Supply, install and connect the following low tension prime Diesel
Generator set rated as shown on drawings, including main circuit
breaker, Set mounted engine generator annunciator panel with its
wiring and conduits
Generator G1 2000KVA No
Generator G2 500KVA No
Engine Generators
Frequency Changers
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Motor Generators
Rotary Converters
Batteries
Battery Racks
Battery Units
Battery Chargers
Slip Controllers
16270 Transformer
Distribution Transformers
Network Transformers
Power Transformers
Substation Transformers
Capacitors
350KVAR No
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Arresters
Cutouts
Insulators
Line Materials
Supports
16425 Switchboards
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
MAIN DISTRIBUTION SWITCHBOARDS
C04-MDB-1 No
C04-MDB-2 No
16442 Panelboards
C04-SMDB-1 No
16452 Grounding
16477 Fuses
16500 Lighting
16500 Lighting
A1 No.
B1 No
B2 No
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Area Lighting
Aviation Lighting
Flood Lighting
Navigation Lighting
Parking Lighting
Roadway Lighting
Site Lighting
Sports Lighting
Walkway Lighting
PS
Detention Lighting
Display Lighting
Medical Lighting
Outline Lighting
Security Lighting
Theatrical Lighting
Underwater Lighting
Obstruction Lighting
16700 Communications
16700 Communication
TELEPHONE SYSTEMS
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Voice outlet – single jack WP (WP DENOTES WATER PROOF)
No
TEB-PC05 No
TEB-PC05-MDF No
VIDEOPHONE SYSTEMS
Supply, install and connect Videophone system complete with
conduits and wiring
Videophone No
4 way video No
8 way video No
ENTRANCE PANEL No
CONTROLLER No
16 CHANNEL DVR No
KEYBOARD No
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
4 POLE LMB No
MULTISWITCH No
AMPLIFIER No
AMPLIFIER Rack No
16950 Testing
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
ELECTRICAL
Division 16 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO
Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
TOTAL ELECTRICAL