You are on page 1of 185

Project Name 41167 Job:

Scope: Bill Of Quantities BL03 Rev:


BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Introductory Information

00001 Project Title Page Item

00002 Table of Contents Item

00003 Enumeration of Drawings Item

00005 Certifications Page Item

00007 Seals Page Item

00010 Table of Contents Item

000101 Project Title Page Item

000105 Certifications Page Item

000107 Seals Page Item

000110 Table Of Contents Item

000115 List of Drawing Sheets Item

00012 Notice to Bidders Item

000120 List of Schedules Item

00015 List of Drawings Item

00020 List of Schedules Item

00030 Advertisement For Bids Item

00031 Call for Bids Item

Bidding Requirements

00100 Bid Solicitation

Advertisement for Bids

Bidder's Qualifications

Invitation to Bid

Request for Proposal

001000 Solicitation

00110 Removal of Structures and Obstructions

001100 Advertisements & Invitations

001113 Advertisement for Bids

001116 Invitation to Bid

001119 Request for Proposal


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
001153 Request for Qualifications

00120 Roadway & Drainage Excavation & Embankment Construction

00200 Instructions to Bidders

002000 Instructions For Procurement

00210 Supplementary Instructions to Bidders

002100 Instructions

002113 Instruction to Bidders

002116 Instructions to Proposers

00220 Bid Scopes

002200 Supplementary Instructions

002213 Supplementary Instructions to Bidders

002216 Supplementary Instructions to Proposers

00230 Salvaging, Stockpiling, Placing Topsoil

002300 Procurement Definitations

002400 Procurement Scopes

002413 Scopes of Bids

002416 Scopes of Proposals

00250 Pre-Bid Meeting

002500 Procurement Meetings

002513 Pre-Bid Meetings

002516 Pre-Proposal Meetings

00260 Granular Bases and Surfacing

002600 Procurement Substitution Procedures

0030 Advertisement

00300 Information Available to Bidders

003000 Available Information

00305 Bid Form

00310 Preliminary Schedules

003100 Available Project Information

003113 Preliminary Schedules

003116 Project Budget Information

003119 Existing Condition Information

003121 Survey Information

003124 Environmental Assessment Information

003125 Existing Material Information

003126 Existing Hazardous Material Information


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
003131 Geophysical Data

003132 Geotechnical Data

003143 Permit Application

00320 Geotechnical Data

00323 Asphalt Concrete, Class G

00324 Asphalt Concrete Composite

00330 Existing Conditions

00340 Environmental Assessment Information

00350 Project Financial Information

00360 Permit Application

00400 Bid Forms and Supplements

004000 Procurement Forms & Supplements

00410 Bid Forms

Bid Form - Construction Management

Bid Form - Cost-Plus Fee

Bid Form - Procurement

Bid Form - Stipulated Sum

Bid Form - Unit Price

004100 Bid Forms

00420 Bid Bond Form

004200 Proposal Forms

00430 Bid Form Supplements

Allowance Form

Alternate Form

Bid Security Form

Bid Submittal Checklist

Estimated Quantities Form

Proposed Products Form

Proposed Subcontractors Form

Unit Price Form

Wage Rates Form

Work Plan and Equipment Schedule

004300 Procurement Form Supplements

004313 Bid Security Form


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

004321 Allowance Form

004322 Unit Prices Form

004323 Alternates Form

004325 Substitution Request Form

004326 Estimated Quantities Form

004333 Proposed Prodcts Form

004336 Proposed Subcontractors Form

004339 MBE Statement of Intent Form

004343 Wage Rates Form

004373 Proposed Schedule of Values Form

004383 Proposed Construction Schedule Form

004386 Proposed Work Plan Schedule Form

004393 Bid Submittal Checklist

00450 Representatives and Certifications

Contractor's Qualifications

Minority Buisness Enterprise Affidavit

Non - Collusion Affidavit

Qualification Statement for Waste Disposal

Statement of Disposal Facility

Workers' Compensation Certificate Schedule

004500 Representations & Certifications

004513 Bidder's Qualifications

004516 Proposer's Qualifications

004519 Non-Collusion Affidavit

004523 Statement of Disposal Facility

004526 Worker's Compensation Certificate Schedule

004533 Non-Segregated Facilities Affidavit

004536 Equal Employment Opportunity Affidavit

004539 MBE Affidavit

004543 Corporate Resolutionse

004543 Corporate Resolutions

004546 Governmental Certifcations

00490 Bidding Addenda


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Contracting Requirements

00500 Agreement

005000 Contracting Forms & Supplements

00510 Notice of Award

005100 Notice of Award

00520 Agreement Form

Agreement - Construction Management

Agreement - Cos-Plus Fee

Agreement - Procurement

Agreement - Stipulated Sum

Agreement - Unit Price

005200 Agreement Forms

00540 Attachments to Agreement Form

Allowance Amounts

Supplementary Scope Statement

Unit Price Schedule

005400 Agreement Form Supplements

005413 Supplementary Scope Statement

005421 Allowances Schedule

005422 Unit Prices Schedule

00550 Notice to Proceed

005500 Notice To Proceed

00570 Definitions

00600 Bonds and Certificates

006000 Project Forms

00610 Bonds

Consent of Surety

Lien Bonds

Maintenance Bonds

Performance Bonds

Payment Bonds

Special Bonds

Warranty Bonds

006100 Bond Forms

006113 Performance & Payment Bond Form

006116 Lien Bond Form


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

006119 Maintenance Bond Form

006123 Retainage Bond Form

006126 Special Bond Form

00615 Payment Bond

00620 Certificates

Acceptance Certificate

Application for Payment Certificate

Certificates of Insurance

Certificates of Compliance

Certificates of Substantial Performance and Completion

Certificates of Final Performance and Completion

Final Settlement Certificate

006200 Certificates And Other Forms

006211 Submittal Transmittal Form

006216 Certificate of Insurance Form

006219 Infection Control Form

006223 Construction Waste Diversion Form

006233 Products Form

006234 Recycled Content of Materials Form

006239 MBE Certification Form

006273 Schedule of Values Form

006276 Application for Payment Form

006279 Stored Material Form

006283 Construction Schedule Form

006286 Work Plan Schedule Form

006289 Construction Equipment Form

00630 Notice to Proceed

006300 Clarification & Modification Forms

006313 Request for Interpretation Form

006319 Clarification Form

006325 Substitution Request Form

006333 Supplemental Instruction Form

006336 Field Order Form

00634 Payment Request

006343 Written Amendment Form

006346 Construction Change Directive Form


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

006349 Work Change Directive Form

006353 Request for Proposal Form

006354 Proposal Worksheet Summary Form

006355 Proposal Worksheet Detail Form

006357 Change Order Request Form

006363 Change Order Form

00640 Release of Liens

00650 Statutory Declaration Forms

006500 Closout Forms

006513 Certificate of Compliance Form

006516 Certificate of Substantial Completion Form

006519 Certificate of Completion Form

006536 Warranty Form

006573 Statutory Declaration Form

00660 Change Order Form

00700 General Conditions

007000 Conditions Of The Contract

00703 General Conditions

00710 Specific EEO Responsibilities

007100 Contracting Definitations

007200 General Conditions

007300 Supplementary Conditions

00790 Water for use in Portland Cement Concrete

00800 Supplementary Conditions

Anti - Pollution Measures

Assigned Contracts

Equal Employment Opportunity Requirements

Health and Safety Criteria

Insurance Requirments

Labor Stabilization Agreement

Letter of Assent

Non - Segregated Facilities Requirements

Procurement Contracts

Specific Project Requirements

Statutory Requirements 
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Wage Determination Schedule

Wage Rate Requirements

00805 Supplementary Conditions

00810 Supplemental / Special Conditions to the General Conditions

00811 Supplementary Covenants & Provisions

00820 Additional Articles to the General Conditions

00821 Concrete Curing Materials

00824 Special Project Requirements

00850 Index of Drawings

00860 Preformed Expansion Joint Filler for Concrete

00890 Permits

Notices

00900 Addenda and Modifications

009000 Revisions, Clarifications And Modifications

00910 Addenda

009100 Precontract Revisions

009113 Addenda

009116 Bid Revisions

009119 Proposal Revisions

00920 Claims

00930 Clarifications and Proposals

Change Order Proposals

Change Order Requests

Clarification Notices

Minor Changes in the Work

Proposal Requests

Proposal Worksheet Summaries

Requests for Interpretation

009300 Record Clarifications And Proposals

009313 Record Request for Interpretation

009319 Record Clarification Notices

009353 Record Proposal Requests

009357 Record Change Order Request


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

00940 Modifications

Amendments

Architect's Supplemental Instructions

Change Orders

Construction Change Directives

Field Order

Supplemental Instructions

Work Change Directives

Written Amendments

009400 Record Modifications

009433 Record Minor Changes in the Work

009436 Record Supplemental Instructions

009439 Record Field Orders

009443 Record Amendments

009446 Record Construction Change Directives

009449 Record Work Change Directives

009463 Record Change Orders

00984 Traffic Control Devices

01 - - GENERAL REQUIREMENTS

01100 Summary

011000 Summary

01110 Summary of Work

Work By Owner

Work Covered By Contract Documents

011113 Work Covered by Contract Documents

011116 Work by Owner

011119 Purchase Contracts

01120 Multiple Contract Summary

Construction Sequence

Construction By Owner
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Contract Interface

Summary of Contracts

011213 Summary of Contracts

011216 Work Sequence

011219 Contract Interface

01130 Color Schedules

01140 Work Restrictions


The Contractor shall abide by work restrictions as specified in
this section; as per the specifications and drawings

1 Confine construction operations to area indicated on drawings Item

2 Keep driveways and entrances serving premises clear and avai-


lable to Owner, Owner's employees, and emergency vehicles at
all times Item

Coordination With Occupants

Use of Site

Use of Premises

011413 Access to Site

011416 Coordination with Occupants

011419 Use of Site

01150 Method of Measurement & Basis of Payment

01152 Applications for Payment

01153 Change Order Procedure

01180 Project Utility Sources

01200 Price and Payment Procedures

012000 Price And Payment Procedures

01208 Proposal Guaranty

01210 Allowances

Cash Allowances

Contingency Allowances

Inspecting and Testing Allowances

Installation Allowances

Product Allowances

Quantitiy Allowances

012113 Cash Allowances

012116 Contigency Allowances

012119 Testing & Inspecting Allowances

012123 Installation Allowances

012126 Product Allowances


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
012129 Quality Allowances

012143 Time Allowances

012200 Unit Prices

012213 Unit Price Measurement

012216 Unit Price Payment

01230 Alternates

012300 Alternates

01240 Value Analysis

012413 Value Engineering

01250 Contract Modification Procedures

012513 Product Substitution Procedures

012516 Execution Substitution Procedures

012600 Contract Modification Procedures

012613 Request for Interpretation

012619 Clarification Notices

012633 Minor Changes in the Work

012636 Supplemental Instructions

012639 Field Orders

012643 Amendments

012646 Construction Change Directives

012649 Work Change Directives

012653 Proposal Requests

012654 Proposal Worksheet Summaries

012657 Change Order Requests

012663 Change Orders

01270 Unit Prices

01290 Payment Procedures

Applications and Certificates for Payment

Schedule of Values

012900 Payment Procedures

012973 Schedule of Values

012976 Progress Payment Procedures

012983 Payment Procedures for Testing Laboratory Services

01300 Administrative Requirements

013000 Administrative Requirements

01302 Award of Contract

01305 Requirement of Contract Bond


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
01310 Project Management and Coordination
The Contractor shall perform all works required in this section,
including, but not limited to coordiantion and other responsib-
lities; as per the specification

Project Meetings Item

Project Site Administration Item

General project coordination procedures Item

Coordination Drawings Item

Administrative and supervisory personnel


Item
Before commencing of Work on site, give all notices, obtain all
permits and pay all fees, statutorily required. Item

Superintendence Item

Safety Requirements Item

013100 Project Management & Coordination

013113 Project Coordination

013116 Multiple Contract Coordination

013119 Project Meetings

01312 Project Meetings

013123 Project Web Site

01320 Construction Progress Documentation


The Contractor shall submit all documents required in this sec-
tion; as per the specifications

1 Contract Progress Reporting Item

2 Network Analysis Schedule Item

3 Periodic Site Observation Item

4 Progress Schedules and Reports Item

5 Purchase Order Tracking Item

6 Scheduling of Construction Item

7 Survey and Layout Data Item

8 Submittals Schedule Item

9 Daily construction reports Item

10 Material location reports Item

11 Field condition reports Item

12 Special reports Item

13 Construction photographs Item

013200 Construction Progress Documentation Item

013213 Scheduling of Work Item

013216 Construction Progress Schedule Item


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
013219 Submittals Schedule Item

013223 Survey & Layout Data Item

013226 Construction Progress Reporting Item

013229 Periodic Work Observation Item

013233 Photographic Documentation Item

013243 Purchase Order Tracking Item

01325 Construction Progress Schedule Item

01330 Submittal Procedures


The Contractor shall submit all documents required in this sec-
tion; as per the specifications

Samples Item

Certificates Item

Design Data Item

Field Test Reports Item

Shop Drawings, Product Data, and Samples Item

Source Quality Control Reports Item

013300 Submittal Procedures

013313 Certificates

013316 Design Data

013319 Field Test Reporting

013323 Shop Drawings, Product Data, and Samples

013326 Source Quality Control Reporting

013329 Sustainable Design Reporting

01340 Shop Drawings, Product Data and Samples

01350 Special Procedures

013500 Special Procedures

013513 Special Project Procedures

013516 Alteration Project Procedures

013523 Owner Safety Requirements

013526 Governmental Safety Requirements

013529 Health, Safety, and Emergency Response Procedures

013533 Infection Control Procedures

013543 Environmental Procedures

013553 Security Procedures

013591 Historic Treatment Procedures

01370 Schedule of Values and Cost Breakdown

01390 Construction Survey Staking by Engineer

01400 Quality Requirements


Allow for quality control procedures and services; as per the
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
specifications

Inspections, tests, related actions and reports Item

Third party independent testing agency Item

Mock-ups Item

On completion of testing, inspecting, sample taking, and simi-


lar services, repair damaged construction & restore substrates
and finishes Item

014000 Quality Requirements

01404 Maintenance of Traffic

01405 Contract Quality Control

01410 Regulatory Requirements

014100 Regulatory Requirements

014113 Codes

014116 Laws

014119 Fees

014126 Permits

01420 References

Abbreviations and Acronyms

Definitions

Reference Standards

Symbols

014200 References

01421 Reference Standards and Definitions

014213 Abbreviations & Acronyms

014219 Reference Standards

01425 Abbreviations

01430 Quality Assurance

Fabricator Qualifications

Installer Qualifications

Manufacturer Qualifications

Manufacturer's Field Services

Supplier Qualifications

Testing Agency Qualifications

014300 Quality Assurance

014313 Manufacturer Qualifications

014316 Supplier Qualifications

014319 Fabricator Qualifications


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

014323 Installer Qualifications

014326 Testing & Inspecting Agency Qualifications

014329 Code-Required Special Inspector Qualifications

014333 Manufacturers Field Services

014336 Field Samples

014339 Mockups

0144216 Definitions

01450 Quality Control

Contactor's Quality Control

Field Quality Control

Field Samples

Mock - Up Requirements

Plant Inspection

Source Quality Control

Testing and Inspection Services

Testing Laboratory Services

014500 Quality Control

014513 Source Quality Control Procedures

014516 Field Quality Control Procedures

014523 Testing & Inspecting Services

014526 Plant Inspection Procedures

014529 Testing Laboratory Services

014533 Code-Required Special Inspections & Procedures

01500 Temporary Facilities and Controls


The Contractor shall provide, install, maintain and remove at
completion of works all temporary facilities and controls required
in the specifications

1 Consultant office on site Job


one site offices and toliet for (PM and resident engineer) and
provided complete with lights,power onlets, internal network
systems for computers

2 prepare labors facilites (Pitlaterin Shower) Job

3 waste disposal facilities (Small Drum) Job

4 Storm water control Job

Prepare temporary store for materials fron (Iron plates previously


5 used) Job

Provide permanent water supply from the main line (storage Item
6 system)

7 provide permanent electricity from the main cable Item

8 Cooling and heating facilities Item


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
9 Ventilation Item

10 Project identification and temporary signs Item

11 Waste disposal facilities Item

12 Hoists Item

13 Scaffolding Item

14 Construction aids and miscellaneous services and facilities Item

15 Stromwater control Item

16 Pest control Item

17 Security enclosure and lockup Item

18 Barricades, warning signs and lights Item

19 Temporary enclosures Item

20 Fire Protection Item

21 First aid station Item

22 Provide measures to ensure site saftey and security Item

23 Ensure stability and structural integrity of the Work Item

24 Protect against noise, dust, water, fire, nuisance from rubbish and deItem

Provide and maintain during execution of work all shoring,


25 strutting, needling and other supports as may be necessary. Item

26 Temporary Traffic Control Item

27 Operation, termination and removal Item

28 Temporary Diversions & Special Requirements Item

015000 Temporary Facilities & Controls

01505 Mobilization

01507 Utility Property and Service

01510 Temporary Utilities

Temporary Electricity

Temporary Fire Protection

Temporary Fuel Oil

Temporary Heating, Cooling, and Ventilating

Temporary Lighting

Temporary Natural Gas

Temporary Telephone

Temporary Water

015100 Temporary Utilities

015113 Temporary Electricity

015116 Temporary Fire Protection

015119 Temporary Fuel Oil

015123 Temporary Heating, Cooling & Ventilating


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

015126 Temporary Lighting

015129 Temporary Natural-Gas

015133 Temporary Telecommunications

015136 Temporary Water

01516 Temporary Sanitary Facility

01520 Construction Facilities

Field Offices and Sheds

First Aid

Sanitary Facilities

015200 Construction Facilities

015213 Field Offices & Sheds

015216 First Aid Facilities

015219 Sanitary Facilities

01530 Temporary Construction

Temporary Bridges

Temporary Decking

Temporary Overpasses

Temporary Ramps

Temporary Runarounds

015300 Temporary Construction

015313 Temporary Bridges

015316 Temporary Decking

015319 Temporary Overpasses

015323 Temporary Ramps

015326 Temporary Runarounds

01540 Construction Aids

Construction Elevators, Hoists, and Cranes

Scaffolding and Platforms

Swing Staging

015400 Construction Aids

015413 Temporary Elevators

015416 Temporary Hoists

015419 Temporary Cranes

015423 Temporary Scaffolding & Platforms

015426 Temporary Swing Staging


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
01550 Vehicular Access and Parking

Access Roads

Haul Routes

Parking Areas

Temporary Roads

Traffic Control

015500 Vehicular Access And Parking

015513 Temporary Access Roads

015516 Haul Routes

015519 Temporary Parking Areas

015523 Temporary Roads

015526 Traffic Control

015529 Staging Areas

01560 Temporary Barriers and Enclosures

Air Barriers

Barricades

Dust Barriers

Fences

Noise Barriers

Pollution Control

Protective Walkways

Security Measures

Tree and Plant Protection

015600 Temporary Barriers & Enclosures

015613 Temporary Air Barriers

015616 Temporary Dust Barriers

015619 Temporary Noise Barriers

015623 Temporary Barricades

015623 Temporary Fencing

015629 Temporary Protective Walkways

015633 Temporary Security Barriers

015636 Temporary Security Enclosures

015639 Temporary Treet & Plant Protection

01570 Temporary Controls

Erosion and Sediment Control

Pest Control

015700 Temporary Controls


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

015713 Temporary Erosion & Sediment Control

015716 Temporar Pest Control

015719 Temporar Environmental Controls

01572 Traffic Control

015723 Temporary Storm Water Pollution Control

01580 Project Identification

Project Signs

015800 Project Identification

015813 Temporary Project Signage

015816 Temporary Interior Signage

01600 Product Requirements

016000 Product Requirements

01602 Natural Material Sources

01610 Basic Product Requirements

016100 Common Product Requirements

016113 Software Licensing Requirements

01620 Product Options

016200 Product Options

01630 Product Substitution Procedures

Substitution Procedures During Bidding

Substitution Procedures During Construction

01631 Substitutions

01640 Owner-Furnished Products

016400 Owner-Furnished Products

01650 Product Delivery Requirements

016500 Product Delivery Requirements

01660 Product Storage and Handling Requirements

016600 Product Storage And Handling Requirements

016613 Product Storage & Handling Requirements for Hazardous Materials

016616 Product Storage & Handling Requirements for Toxic Materials

01700 Execution Requirements


Allow for the follwing requirments governing execution of the
works; include all requirements as per the specifications

Construction layout Item

Field engineering and surveying Item

General installation of products Item


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Coordination of Owner-installed products Item

Progress cleaning Item

Starting and adjusting Item

Protection of installed construction Item

Correction of the Work Item

017000 Execution And Closeout Requirements

01701 Laws to be Observed

01710 Examination

Acceptance of Conditions

Existing Conditions

017100 Examination And Preparation

017113 Mobilization

017116 Acceptance of Conditions

017123 Field Engineering

017133 Protection of Adjacent Construction

01714 Responsibility for Damage Claims

01720 Preparation

Construction Layout

Field Engineering

Protection of Adjacent Construction

Surveying

01730 Execution

Application

Cutting and Patching

Erection

Existing Products

Installation

Selective Demolition

17300 Execution

01731 Cutting and Patching


Allow for all works of cutting and patching necessary before
and during the progress of works; as per the specifications

Allow for cutting and patching (Concrete) Item

017313 Application

017316 Erection

017319 Installation

017323 Bracing & Anchoring


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
017326 Existing Products

017329 Cutting And Patching

01740 Cleaning

Final Cleaning

Progress Cleaning

Site Maintenance

017400 Cleaning And Waste Management

017413 Progress Cleaning

017416 Site Maintenance

017419 Construction Waste Management And Disposal

017423 Final Cleaning

01750 Starting and Adjusting

Checkout Prodecures

017500 Starting And Adjusting

017513 Checkout Procedures

017516 Startup Procedures

01760 Protecting Installed Construction

017600 Protecting Installed Construction

01770 Closeout Procedures


Allow for administrative and procedural requirements for con-
tract closeout; as per the specifications

1 Final Site Review Item

2 Inspection procedures Item

3 Project record documents Item

4 Operation and maintenance manuals Item

5 Warranties Item

6 Instruction of Owner's personnel Item

7 Final cleaning Item

The Works will not be considered as being completed until all the
Contractor's temporary installations and equipment have been
8 cleared away and the areas left clean and tidy to the satisfaction of
the Employer Item

017700 Closeout Procedures

017713 Preliminary Closeout Reviews

017716 Final Closeout Review

017719 Closeout Requirements

01780 Closeout Submittals

Final Site Survey

Maintenance Contracts
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Maintenance Data

Maintenance Materials

Operation Data

Preventive Maintenance Instructions

Product Bond

Product Warranties

Project Record Documents

Spare Parts

017800 Closeout Submittals

017813 Completion & Correction List

017819 Maintenance Contracts

017823 Operation And Maintenance Data

017829 Final Site Survey

017833 Bonds

017836 Warranties

017839 Project Record Documents


Allow for administrative and procedural requirements for Pro-
ject Record Documents; as per the specifications

Record Drawings Item

Record Specifications Item

Record Bill of Quantities Item

Record Product Data Item

017843 Spare Parts

017846 Extra Stock Materials

017853 Sustainable Design Closeout Documentation

01790 Closeout Submittals

017900 Demonstration And Training

01800 Facility Operation

018000 Performance Requirements

01803 Prosecution of Work

01806 Determination and Extension of Contract Time

01807 Failure to Complete Work on Time

01810 Commissioning

Commissioning Summary

System Performance Evaluation

Testing, Adjusting, and Balancing Procedures

018100 Facility Performance Requirements

018113 Sustainable Design Requirements


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

018116 Facility Environmental Requirements

018119 Indoor Air Quality Requirements

01820 Demonstration and Training

018200 Facility Substructure Performance Requirements

018213 Foundation Performance Requirements

018216 Basement Construction Performance Requirements

01830 Operation and Maintenance

018300 Facility Shell Performance Requirements

018313 Superstructure Performance Requirements

018316 Exterior Enclosure Performance Requirements

018319 Roofing Performance Requirements

018400 Interiors Performance Requirements

018413 Interior Construction Performance Requirements

018416 Stairway Performance Requirements

018419 Interior Finshes Performance Requirements

018500 Conveying Equipment Performance Requirements

018600 Facility Services Performance Requirements

018613 Fire Suppression Performance Requirements

018616 Plumbing Performance Requirements

018619 HVAC Performance Requirements

018623 Integated Automation Performance Requirements

018626 Electrical Performance Requirements

018629 Communications Performance Requirements

018633 Electronic Safety & Security Performance Requirments

018700 Equipment And Furnishings Performance Requirements

018713 Equipment Performance Requirements

018716 Furnishings Performance Requirements

018800 Other Facility Construction Performance Requirements

018813 Special Construction Performance Requirements

018816 Selective Construction Performance Requirements

01890 Reconstruction

018900 Site Construction Performance Requirements

018913 Site Preparation Performance Requirements

018916 Site Improvements Performance Requirements

018919 Site Plumbing Utilities Performance Requirements

018923 Site HVAC Utilities Performance Requirements


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

018926 Site Electrical Utilities Performance Requirements

018929 Other Site Construction Performance Requirements

01900 Facility Decommissioning

Decommissioning Systems and Equipment

Facility Demolition and Removal

Hazardous Materials Abatement

Hazardous Materials Removal and Disposal

Protection of Deactivated Facilites

01900 Life Cycle Activities

01901 Measurement of Payment

01903 Compensation for Increased or Decreased Quant.

01906 Partial Payments

01908 Final Payment

019100 Commissioning

019113 General Commissioning Requirements

019116 Facility Substructure Commissioning

019119 Facility Shell Commissioning

019123 Interiors Commissioning

019200 Facilty Operation

019213 Facility Operation Procedures

019300 Facility Maintenance

019313 Facility Maintenance Procedures

019316 Recycling Programs

019400 Facility Decommissioning

019413 Facility Decommissioning Procedures


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

GENERAL REQUIREMENTS
Division 01 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL GENERAL REQUIREMENTS

02 - SITE CONSTRUCTION

02050 Basic Site Materials and Methods

020500 Common Work Results For Existing Conditions

020519 Geosynthetics for Existing Conditions

02055 Soil

02060 Aggregate

020600 Schedules For Existing Conditions

020630 Schedules for Subsurface Investigations

02065 Cement and Concrete

Asphalt Cement

Hydraulic Cement

Plant - Mixed Bituminous Concrete

Recycled Plant - Mixed Bituminous Concrete

020650 Schedules for Site Remediation

020665 Schedules for Underground Storage Tank Removal

020680 Schedules for Facility Remediation

020686 Schedules for Hazardous Waste Drum Handling

02070 Geosynthetic

Geocomposite Edge Drains

Geocomposite In - Place Wall Drains

Geogrids

Geotextiles

02080 Utility Material

Hydrants

Manholes

Meters

Utility Boxes

Valves

020800 Commissioning Of Existing Conditions


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
02090 Joint Material

02100 Site Remediation

02105 Chemical Sampling and Analysis

02110 Excavation, Removal and Handling of Hazardous Material

02115 Underground Storage Tank Removal

02120 Off-Site Transportation & Disposal

02125 Drum Handling

02130 Site Decontamination

02140 Landfill Construction and Storage

02145 Groundwater Treatment System

02150 Hazardous Waste Recovery Process

Air and Stream Stipping

Soil Vapor Extraction

Soil Washing and Flushing

02160 Physical Treatment

Coagulation and Flocculation

Reverse Osmosis

Solidification and Stabilization

02170 Chemical Treatment

Chemical Precipitation

Ion Exchange

Neutralization

02180 Thermal Process

Incineration

Thermal Desorption

Vitrification

02190 Biological Process

Aerobic Processes

Anaerobic Processes

Bio - Remediation

02195 Remediation Soil Stabilization

02200 Site Preparation

022000 Assessment
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

02210 Subsurface Investigation

Boring and Exploratory Drilling

Core Drilling

Geophysical Investigations

Groundwater Monitoring

Seismic Investigation 

Standard Penetration Testing

Test Pits

022100 Surveys

022113 quantities and Engineer instructions

022116 Measured Drawings

02212 Core Drilling

02220 Site Demolition

Building Demolition

Minor Site Demolition for Remodeling

Selective Site Demolition

022200 Existing Conditions Assessment

02221 Building Demolition

022213 Movement & Vibration Assessment

022216 Acoustic Assessment

022219 Traffic Assessment

02222 Roadway Excavation and Embankment Construction

022223 Accessibility Assessment

02223 Excavation, Embankment and Compaction

02224 Minor Demolition for Remodeling

02230 Site Clearing

Clearing and Grubbing

Selective Clearing

Selective Tree Removal and Trimming

Sod Stipping
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Stripping and Stockpiling of Soil

Tree Pruning

02240 Dewatering

022400 Enviromental Assessment

022413 Natural Environment Assessment

022423 Chemical Smapling & Analysis of Soils

022443 Transbroundary & Global Environmental Aspects Assessment

02250 Shoring and Underpinning

Foundation Grouting

Grillages

Needle Beams

Sheetpiling

Shoring

Slabjacking

Soil Stabilization

Underpinning

Vibrofloatation and Desensification

022500 Existing Material Assessment

022519 Existing Masonry Assessment

022523 Existing Metals Assessment

022526 Existing Wood, Plastics & Composites Assessment

022529 Existing Terminal & Moisture Protection Assessment

02260 Excavation Support and Protection

Anchor Tiebacks

Cofferdams

Cribbing and Walers

Ground Freezing

Reinforced Earth

Slurry Wall Construction

Soil and Rock Anchors

022600 Hazardous Material Assessment

02261 Cofferdams

022623 Asbestos Assessment

022626 Lead Assessment

022629 Polychlorinate Biphenyl Assessment

022633 Biological Assessment


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
022636 Hazardous Waste Drum Assessment

02270 Erosion Control

02280 Grade Adjustment and Abandonment of Existing Miscellaneous Structures

02285 Rebuilt Miscellaneous Structure

02290 Site Monitoring

02300 Earthwork

023000 Subsurface Investigation

02310 Grading

Finish Grading

Rough Grading

023100 Geophysical Investigation

023113 Seismic Investigations

023116 Gravity Investigations

023119 Magnetic Investigations

023123 Electromagnetic Investigations

023126 Electrical Resistivity Investigations

023129 Magnetotelluric Investigations

02315 Excavation and Fill

Excavation

Excavation for foundation and inside of building are classified in


all kinds of soil from the actual surface of soil to the grades shown
on drawing and net size required by the concrete dimension

Excavate and remove the surface layer with thickness of 100 mm


1 M3

2 Excavation for foundation footing as per drawings M3

3 Excavate work for outer fence of the building (depth 80 cm) M3

Borrow Excavation

Compaction

Backfill

provide selected material approved by the engineer 25 cm depth in


layers not exceeding 10 cm, compacted to a minimum of 95%
4 Modified Proctor Test, as per drawings & specifications for M3
footings & as decking for the foundation

02317 Trenching for Site Utilities

023200 Geotechnical Investigations

023213 Subsurface Drilling & Sampling

023216 Material Testing

The contractor shall allow for providing all samples of materials


1 and workmanship required by the engineer. Item
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
The contractor shall allow for testing all materials as required by
2 the specifications or directed by the engineer Item

The contractor shall supply all test certificates and other


3 documentation necessary to prove the suitability of materials for Item
incorporation in the works

023219 Exploratory Excavations

023223 Geotechnical Monitoring Before Construction

02325 Dredging

02330 Embankment

Armoring

Earth Dams

Soil Embankment

02335 Subgrade and Roadbed

Pre - watering of Excavation Areas

Reconditioning

Subgrade Modification

02340 Soil Stabilization

Asphalt Soil Stabilization

Cement Soil Stabilization

Geotextile Soil Stabilization and Layer Separation

Lime Slurry Soil Stabilization

Lime Soil Stabilization

Pressure Grouting Soil Stabilization

02350 Plant Mixed Asphalt Pavement

02357 Bituminous Material for Tack Coat

02360 Soil Treatment

Rodent Control

Termite Control

Veggitation Control

02370 Erosion and Sedimentation Control

Cement Concrete Paving for Stram Beds

Erosin Control Blankets and Mats

Gabions

Geogrids

Geotextile Sedimentation and Erosion COntrol

Mulch Control Netting


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Paved Energy Dissipators

Riprap and Rock Lining

Rock Barriers

Rock Basins

Rock Energy Dissipators

Slope Paving

Synthetic Erosion Control and Revegetation Mats

Turf Reinforcement Mats

Water Course and Slope Erosion Protection

02380 Scour Protection

02390 Shoreline Protection & Mooring Structure

Breakwaters 

Groins

Jetties

Moles

Revetments 

Seawalls

02400 Tunneling, Boring and Jacking

024000 Demolition And Structure Moving

Provisional sum for the demolition of 200mm single leaf facade


blockwork already installed. PS= USD 10,000 PS

02410 Tunnel Excavation

Compressed Air Tunneling

Muck Disposal

Rock Excavation - Drill and Blast

Rock Excavation - Tunnel Boring Machine

Soft Ground Shield - Driven Tunneling

024100 Demolition

024113 Seletive Site Demolition

024116 Structure Demolition

024116 Structure Demolition

024119 Selective Structure Demolition

024119 Selective Structure Demolition

024191 Selective Historic Demolition

02420 Initial Tunnel Support System

Prefabricated Steel Tunnel Linings


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Rock Bolting

Steel Ribs and Lagging

024200 Removal & Salvage of Construction Materials

02425 Tunnel Lining

Cast - in - Place Concrete Tunnel Linings

Precast Concrete Tunnel Lining

024291 Removal & Salvage of Historic Construction Materials

02430 Tunnel Grouting

Earth Stabilization Chemical Grouting

Rock Seam Pressure Grouting

Tunnel Liner Grouting

024300 Structure Moving

024313 Structure Relocation

024316 Structure Raising

02440 Immersed and Sunken Tube Tunnel

02441 Microtunneling

02442 Cut and Cover Tunnel

02443 Tunnel Leak Repair

02444 Shaft Construction

02445 Boring or Jacking Conduit

02450 Foundation & Load-Bearing Element

02455 Driven Pile

Cast - in - Place Concrete Piles

Composite Piles

Concrete Displacement Piles

Concrete - Filled Steel Piles

Driven Pile Repairs

Precast Concrete Piles

Prestressed Concrete Piles

Shhet Piles

Steel H Piles

Timber Piles

Unfilled Tubular Steel Piles

02465 Bored Pile

Augar Cast Grout Piles


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Bored and Augered Pile Load Tests

Bored and Augered Pile Repairs

Bored and Augered Test Piles

Bored and Belled Concrete Piles

Bored and Socketed Piles

Bored Friction Concrete Piles

Drilled Caissons

Drilled Concrete Peirs and Shafts

Uncased Cast - in - Place Concrete Piles

02475 Caisson

Box Caissons 

Excavated Caissons

Floating Caissons

Open Caissons

Pneumatic Caisoons

Sheeted Caissons

02480 Foundation Wall

Anchored Walls

Concrete Cribbing

Manufactured Modular Walls

Mechanically Stabilized Earth Walls

Metal Cribbing

Permanently Anchored Soldier - Beam Walls

Slurry Diaphragm Foundation Walls

Soldier - Beam Walls

02490 Anchor

Rock Anchors

02495 Instrumentation and Monitoring

Foundation Performance Insturmentation


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

02500 Utility Services

025000 Site Remediation

02505 Granular Subbase

02506 Crushed Stone Paving

02510 Water Distribution

Cistems 

Disinfection of Water Distribution

Fire Suppression Water Distribution

Site Water Distribution

Water Supply

025100 Physical Decontamination

025113 Coagulation & Flocculation Decontamination

025116 Rverse-Osmosis Decontamination

025119 Solidification & Stabilization Decontamination

02512 Excavation & Aggregate Base

025123 Mechanical Filtration Dcontamination

025126 Radioactive Decontamination

025129 Surface Cleaning Decontamination

02513 Asphalt Concrete Paving

025133 Surface Removal Decontamination

02516 Existing Concrete Assessment

02520 Well

Extraction Wells

Monitoring Wells

Recharge Wells

Test Wells

Water Supply Wells

Well Abandonment

025200 Chemical Decontamination

02521 Pipe Culverts

025213 Chemical Precipitation Decontamination

025216 Iron Change Decontamination

025219 Neutralization Decontamination

02530 Sanitary Sewerage

Gauging Stations

Packaged Pumping Stations


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Packaged Lift Stations

Sanitary Cleanouts

Sanitary Sewage Systems

Sanitary Sewer Manholes, Frames, and Covers

Sewage Collection Lines

Sewage Force Mains

Site Sanitary Sewage Lines

025300 Thermal Decontamination

02540 Septic Tank System

Drainage Field

Grease Interceptor

Sand Filter

Septic Tank

Siphon Tank

025400 Biological Decontamination

02550 Piped Energy Distribution

Chilled Water Distribution

Hot Water Distribution

Liquid Petroleum Gas Distribution

Natural Gas Distribution

Oil Distribution

Steam Distribution

025500 Remediation Soil Stabilization

025600 Site Containment

02570 Process Materials Distribution Structure

025700 Sinkhole Remediation

02580 Electrical & Communication Structure

Antenna Towers

Lighting Poles and Standards

Transmission Towers

Underground Ducts and Manholes

Utility Poles

025800 Snow Control

02584 Roadway and Parking Marking

02590 Site Grounding


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
02600 Drainage and Containment

026000 Contaminated Site Material Removal

02605 Manholes

02606 Gravel Surfacing

02610 Pipe Culvert

026100 Removal & Disposal of Contaminated Soils

02612 Concrete Pipe

02616 Plastic Pipe

02620 Subdrainage

Foundation Drainage Piping

Geocomposite Drains

Geotextile Subsurface Drainage Filtration

Pipe Underdrain and Pavement Base Drain

Retaining Wall Drainage Piping

Subgrade Drains

Tunnel Drainage Piping

Underslab Drainage Piping

026200 Hazardous Waste Recovery Processes

02621 Foundation Drainage Piping

02630 Storm Drainage

Catch Basins , Grates, and Frames

Combination Storm Drain and Underdrain

Inlets

Storm Drainage Manholes, Frames, and Covers

Storm Drainage Pipe and Fittings

Water Detection Chambers

02640 Culverts & Manufactured Construction

Concrete Arch Buried Bridge

Metal Pipe - Arch Cluverts

Metal Plate Culverts

Precast Reinforced Concrete Arch Culverts

Precast Reinforced Concrete Box Culverts

Precast Reinforced Concrete Rigid Frame Culverts

02645 Sewerage and Drainage

026500 Underground Storage Tank Removal

02660 Ponds and Reservoir


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Cooling Water Ponds

Distribution Reservoirs

Fire Protection Reservoirs

Leaching Pits

Pond and Reservoir Covers

Pond and Reservoir Liners

Retention Basins

Sewage Lagoons

Stabilization Ponds

026600 Landfill Construction & Storage

02670 Constructed Wetland

02675 Cleaning and Disinfection of Water Distribution Systems

Bases, Ballasts, Pavements and Appurtenances

027000 Water Remediation

02701 Asphalt Paving Contractors

02705 Manholes & Catch Basins - Adjust Casting

02710 Bound Base Course

Aggregate - Bitumnious Base Course

Aggregate - Cement Base Course

Asphalt - Treated Permeable Base Course

Bitumnious Concrete Base Course

Cement Stabilized Open Graded Base Course

Cement Treated Courses

Cold - Recycled Bitumnious Base Course

Hydraulic Cement Concrete Base Course

Lean Concrete Base Course

Lime Treated Courses

Lime - Fly - Ash Treated Courses

Plain Cement Concrete Base Course

027100 Groundwater Treatment

02720 Unbound Base Courses and Ballast

Aggregate Subbase

Aggregate Base Course

Cracked and Seated Portland Cement Concrete Base Course

Rubberized Portland Cement Cocnrete Case Course


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Sub - Ballast

Top Ballast

027200 Water Decontamination

02721 Culverts and Storm Drains

02730 Aggregate Surfacing

Cinder Surfacing

Crushed Stone Surfacing

02731 Pipeling Testing

02732 Cleaning of Sanitary Sewer Systems

02740 Flexible Pavement

Asphalt - Rubber and Rubber Modified Bituminous Pavement

Athletic Bituminous Pavement

Bituminous Concrete Pavement

Cold Mix Bituminous Pavement

Fiber - Modified Bituminous Pavement

Polymer - Modified Bituminous Pavement and Rubberized


Asphalt

Road Mix Bituminous Pavement

Stone and Split - Mastic Bituminous Pavement

02741 Hot Mix Asphalt Paving

02750 Rigid Pavement

Continuous Reinforced Cement Concrete Pavement

Exposed Aggregate Pavement

Plain Cement Concrete Pavement

Power Compacted Pavement

Prestressed Reinforced Cement Concrete Pavement

Reinforced Cement Concrete Pavement

Roller - Compacted Concrete Pavement

02751 Portland Cement Concrete Pavement


Prepare surface, supply and install precast or cast-in-place con-
crete (31 Mpa) curbs; include blinding, grout, reinforcement,
anchors, chamfered edges, and all necessary material and ac-
cessories; as per the specifications and drawings

Concrete Curb Stone; 400x150x200mm - chamfered edge m

Drop off interlocking concrete paving, Colour/ Finish: Colour


"C06" (Charcoal), Riven finish m2

foot bath edge interlocking concrete paving, Colour/ Finish: Colour


"R06" (Red), finish shotblasted. m2

panel in terrace interlocking concrete paving, Colour/ Finish:


Colour "R29" (Pinky-Red) m2
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Drop off interlocking concrete paving, Colour/ Finish: To match
Architect's specification of H51 110 m2

Planting area Q23 160 gravel to planting bed m2

Q10 112 Concrete kerb, grey color m

02755 Cement Concrete Shoulder

02760 Paving Specialties

Cold Plastic Pavement Markings and Legends

Curb Cut Ramps

Painted Traffic Lines and Markings

Pavement Joint Sealant

Pavement Markings

Raised Pavement Markings

Snow Melting Cables and Mats

Stamped Pattern Concrete Pavement

Tactile Warning Surface

02765 Pavement Marking

02770 Curbs and Gutter

Bituminous Concrete Curbs

Cement Concrete Curbs

Cement Concrete Curbs and Gutters

Gutters

Stone Curbs

Simulated Stone Curbs

02775 Sidewalk

02780 Unit Paver

Asphalt Block Pavers

Brick Pavers

Interlocking Precast Concrete Pavers

Precast Concrete Pavers

Pressed Pavers

Stone Pavers

02785 Flexible Pavement Coating and Micro-Surfacing

Cape Seal

Chip Seal

Fog Seal

Latex - Modified Emulsion


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Micro - Surfacing

Sand Seal

Sandwich Seal

Slurry Seal

Suface Treatment

02790 Athletic and Recreational Surface

Baseball Field Surfacing

Mulit - Purpose Court Surfacing

Resilient Matting

Synthetic Grass Surfacing

Synthetic Running Track Surfacing

Tennis Court Surfacing

02795 Porous Pavement

Site Improvements and Amenities

028000 Facility Remediation

02810 Irrigation System

Agricultural Irrigation System

Drip Irrigation System

Lawn Sprinkler System

028100 Transportation & Disposal of Hazardous Materials

02815 Fountain

02820 Fences and Gate

Chain Link Fences and Gates

Ornamental Metal Fences and Gates

Plastic Fences and Gates

Wire Fences and Gates

Wood Fences and Gates

028200 Asbestos Remediation

02830 Retaining Wall

Cast - in - Place Concrete Retaining Walls

Interlocking Clock Retaining Walls

Masonry Retaining Walls

Precast Concrete Retaining Walls

Timber Retaining Walls

028300 Lead Remediation

02832 Earth Retainage


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

02840 Walk, Road and Parking Appurtenance

Wall Guard
Supply and install corrugated rubber wall and column guards;
include strips of fluorescent tape, and all necessary material
and accessories; as per the specifications and drawings

Column Guard No

Convex Mirror
Supply and install convex mirror unit; include all necessary ma-
terial and accessories; as per the specifications and drawings

Circular Convex Mirror; diameter = 600mm No.

Guide Rail

Impcat Attenuating Devices

Metal Median Barriers

Parking Bumpers

Traffic Barriers

028400 Polychlorinate Biphenyl Remediation

02850 Prefabricated Bridge

028500 Mold Remediation

02860 Screening Device

Jet Blast Barriers

Screens and Louvers

Sound Barriers

028600 Hazardous Waste Drum Handling

02870 Site Furnishing

Bicycle Racks

Prefabricated Planters

Seating

Tables 

Trash and Litter Receptors

02875 Site and Street Shelter

Bus Stop Shelters

Athletic or Recreational Screening

Playground Equipment

Play Structures

Tennis Court Windbreakers

02890 Traffic Signs and Signal

Post - Mounted Signs

Structure - Mounted Signs


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Traffic Signal Supports and Equipment

Boundary and Survey Markers

02895 Markers and Monument

Planting

02905 Transplanting

Ground Cover Transplanting

Plant and Bulb Transplanting

Shrub Transplanting

Tree Transplanting

02910 Plant Preparation

Blankets

Forms and Stabilizers

Hydro - Punching

Mats

Mulching

Netting

Soil Preperation

Stakes

Topsoil

02915 Shrub and Tree Transplanting

02920 Lawns and Grasses

Hydro - Mulching

Plugging

Seeding and Soil Supplements

Sodding

Sprigging

Stolinizing

02930 Exterior Plant

Agricultural Soil
Allow for filling with imported topsoil for areas to be plan-
ted including finish grading and planting accessories; as per
the specifications and drawings.
m3
Fertile top soil

Plants

Allow for supply and install of plants as per dwg


57070.00 PC4 (96)L100

Irrigation System
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Supply and install automatic irrigation system, shall include for all
materials, labor, plant and tools.The contract shall include for the
complete installation, testing and commissioning of the automatic
irrigation system summarized below and as per this specification
and contract drawing no 57070.00 PC4 (97)L100

No.
Main Water Outlet
No.
Field Controller Flood Bubler
No.
Dripper
No.
Valve with Flow Control
No.
Valve for Drppers

Gate Valve No.

Quick Coupling Valve No.

Irrigation equipments No.

upvc pipes No.

Upvc fittings No.

Polythylene pipes No.

Polythylene pipe fittings No.

Valves No.

Supply and install, irrigation tanks, pumps, filters etc and


associated pump room civil works: shall include for all materials,
labor, plant and tools.The contract shall include for the complete
installation, testing and commissioning of the automatic irrigation
system. include all builders work in relation to this item.

Allow for provisional sum for GRP Irrigation tanks, filters, filter
pumps, booster pumps, piping and accessories etc. PS= USD
20,000 PS

Allow Provisional sum for work in relation to basement pump


room: blockwork, concrete pads, drainage, lighting, power,
containment, etc. All work which may be incidental, contingent or
necessary for the proper completion of works. PS = USD 10,000
PS

02935 Plant Maintenance

Fertilizing

Liming

Mowing

Pruning

Watering

Watering

02945 Planting Accessories

Landscape Edging

Landscape Timbers

Planters

Tree Grates
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Tree Grids

02950 Site Restoration and Rehabilitation

02955 Restoration of Underground Piping

Grouting Underground Piping and Units

Relining Underground Piping and Units

Sealing Underground Piping and Units

Pavement Milling and Pavement Cold Planing

02960 Flexible Pavement Surfacing Recovery

02965 Flexible and Bituminous Pavement Recycling

Cement - Based Bituminous Pavement Base Courses

Cold In - Place Recycled Bituminous Pavement Courses

Full - Depth Reclaimed Bituminous Pavement Base Courses

Hot In - Place Recycled Surface Course Overlays

Roadbed Modification

02975 Flexible and Bituminous Pavement Reinforcement and Crack and Joint Sealants

Fabric Reinforced for Bituminous Pavement

Polymer Modified Asphalt Joint and Crack Sealing

Stress - Absorbing Membrane

Stress - Absorbing Membrane Interlayer

02980 Rigid Pavement Rehabilitation

Cement Cocnrete Bonded Overlays

Cement Concrete Direct Partially Bonded Overlays

Cement Concrete Pavement Recycling

Cement concrete Unbonded Overlays

Concrete Pavement Jacking and Slabjacking

Concrete Pavement Patching

Full Depth Patching

Grinding of Concrete Pavement

Grooving of Concrete Pavement

Joint Cleaning and Resealing

Joint Rehabilitation

Partial Depth Patching

Pavement - Shoulder Joint Resealing

Slab Stabilization

Subsealing and Stabilization

02990 Structure Moving


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

SITE CONSTRUCTION
Division 02 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL SITE CONSTRUCTION

03 - - CONCRETE

03050 Basic Concrete Materials and Methods

030500 Common Work Results for Concrete

030600 Schedule for Concrete

030800 Commissioning of Concrete

03100 Concrete Forms and Accessories

031000 Concrete Forming & Accessories

03110 Structural Cast-in-Place Concrete Form

031100 Concrete Forming

03120 Architectural Cast-in-Place Concrete Form

03130 Permanent Form

Permanent Steel Forms

03200 Concrete Reinforcement

032000 Concrete Reinforcing

03210 Reinforcing Steel

032100 Reinforcing Steel

03220 Welded Wire Fabric

032200 Welded Wire Fabric Reinforcing

03230 Stressing Tendon

032300 Stressing Tendons

03240 Fibrous Reinforcing

032400 Fibrous Reinforcing


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

03250 Post-Tensioning

03300 Cast-In-Place Concrete

33000 Cast-In-Place Concrete

Provide all materials and lay in position plain concrete as


1 per drawings and with 1:3:6 mix , with strength not less than 30 M3
N/mm 2

Provide all materials and lay in position R.C concrete for


2 Foundation as per drawings ,with strength not less than 30 M3
N/mm 2

Provide all materials and lay in position R.C concrete for Short
3 columns as per drawings and with 1:2:4 mix,with strength not less M3
than 25 N/mm2

4 Provide all materials and lay in position R.C concrete for grade M3
beams 1:2:4 mix, with strength not less than 25 N/mm2

Provide all materials and lay in position R.C concrete for Ground
5 Floor Columns as per drawings and with 1:2:4 mix,with strength M3
not less than 25 N/mm1

Provide all materials and lay in position R.C concrete for First
6 Floor Columns as per drawings and with 1:2:4 mix,with strength M3
not less than 25 N/mm1

Provide all materials and lay in position R.C concrete for Second
7 Floor Columns as per drawings and with 1:2:4 mix,with strength M3
not less than 25 N/mm1

Provide all materials and lay in position R.C concrete for Roof
8 Columns as per drawings and with 1:2:4 mix,with strength not less M3
than 25 N/mm1

Suspended slab construction , cement comprising reinforced insitu


9 including formwork and steel reinforcement with strength not less M3
than 25 N/mm2 as per drawings

Suspended Slab construction , cement comprising reinforced


10 insitu including formwork and steel reinforcement with strength M3
not less than 25 N/mm2 as per drawings

Ground Floor Slab construction , cement comprising reinforced


11 insitu including formwork and steel reinforcement with strength M3
not less than 25 N/mm2 as per drawings

First Floor Slab construction , cement comprising reinforced


12 insitu including formwork and steel reinforcement with strength M3
not less than 25 N/mm2 as per drawings

Roof Slab construction , cement comprising reinforced insitu


13 including formwork and steel reinforcement with strength not less M3
than 25 N/mm2 as per drawings

Manholes
Supply and install Manholes shall be in accordance to BS en 752 &
BS en 12056. Size of the manhole covers manufactured to BS en
124All pipe sleeves through rc walls to be coordinated with
structural drawings

MH-01 No.
MH-02 No.
MH-03 No.
MH-04 No.
MH-05 No.

Concrete repairs
Allow for provisional sum for concrete repair works.
PS = USD 5,000 PS
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
03301 Fly Ash

03302 Concrete Ready Mix

03303 Placing - Chuting, Conveying and Pumping

03304 Finishing

03305 Concrete Curing

03310 Structural Concrete

033100 Structural Concrete

03311 Cementitious Grouts

03330 Architectural Concrete

033300 Architectural Concrete

03340 Low Density Concrete

033400 Low Density Concrete

03350 Concrete Finishing

033500 Concrete Finishing

03360 Concrete Finishes

High - Tolerance Floor

03370 Specially Placed Concrete

033700 Specialty Placed Concrete

03371 Concrete Pumping Equipment

03372 Specially Placed Concrete.

03380 Post-Tensioned Concrete

033800 Post-Tensioned Concrete

03390 Concrete Curing

033900 Concrete Curing

03400 Precast Concrete

034000 Pre-cast Concrete

03410 Plant-Precast Structural Concrete

034100 Pre-cast Structural Concrete

034113 Pre-Cast Concrete Hollow Core Planks

03420 Plant-Precast Structural Post-Tensioned Concrete

03430 Site-Precast Structural Cconcrete

Lift - Slab Cocrete

Precast Post - Tensioned Concrete

Strucural Precast Pretensioned Concrete

03450 Plant-Precast Architectural Concrete

Supply and install precast concrete; include steel reinforcement,


anchors, and all necessary material and accessories; as per the
specifications and drawings
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Window frame; 150x225mm m

Faced Architectural Precast Concrete

034500 Pre-Cast Architectural Concrete

03460 Site-Precast Architectural Concrete

03470 Tilt-Up Precast Concrete

034700 Site-Cast Concrete

03480 Precast Concrete Specialties

034800 Pre-Cast Concrete Specialties

03490 Glass-Fiber-Reinforced Precast Concrete

034900 Glass-Fiber-Reinforced Concrete

Supply and install GRC elements; include anchors, seals, and all
necessary material and accessories; as per the specifications and
drawings

GRC Decorative panel; 900x630mm No.

GRC Decorative panel; 1200x630mm No.

GRC Decorative panel; 2100x630mm No.

GRC Decorative panel; 900x610mm No.

GRC Decorative panel; 1200x610mm No.

GRC Decorative panel; 2100x610mm No.

GRC Decorative panel; 900x1090mm (curved) No.

GRC Decorative panel; 1200x1090mm (cuved) No.

GRC Decorative panel; 2100x1090mm (curved) No.

GRC Decorative panel; 2100x2126mm No.

GRC Decorative panel; 2100x780mm No.

03500 Cementitious Decks and Underlayment

035000 Cast Decks & Underlayment

03510 Cementitious Roof Deck

Cementitious Wood Fiber Plank

Gypsum Concrete Roof Deck

035100 Cast Roof Decks

03520 Lightweight Concrete Roof Insulation

Composite Concrete and Insulation

Lightweight Cellular Concrete

Lightweight Insulating Concrete

035200 Lightweight Concrete Roof Insulation

03530 Concrete Topping

035300 Conrete Topping

Standard Floor Topping


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Supply and pour concrete floor topping having a 28 day comp-
ressive strength of 24 Mpa; include steel wire mesh, and all ne-
cessary material and accessories; as per the specifications and
drawings

Screed to internal surfaces (apartment and circulation) m2

Screed to external surfacess (Balconies) m2

Screed; laid on concrete and pipes (WCs & Kitchen) m2

Screed to floor (Water Tank) m2

Allow for a provisional sum for: Basement raft surface preparation


for painting and finishing. Basement walls, columns and ramp
surface preparation for finishing and painting. Fire escape staircase
concrete preperation for finishing and painting. PS=$10,000
PS

Heavy Duty Floor Topping


Supply and pour concrete floor topping having a 28 day com-
pressive strength of 35 Mpa; include steel wire mesh, control
joint, power float finish, and all necessary material and accesso-
ries; as per the specifications and drawings

Concrete pads as required for mechanical equipment and generators


Pad. Thickness = 100mm - include anti vibration isolator pads
"Silomer or approved equivalent" m2

03540 Cementitious Underlayment

Gypsum Underlayment

Portland Cement Underlayment

035400 Cast Underlayment

03600 Grouts

03600 Grout

036000 Grouting

036100 Cementitious Grouting

036200 Non-Shrink Grouting

036300 Epoxy Grouting

036400 Injection Grouting

03700 Mass Concrete

037000 Mass Concrete

037100 Mass Concrete for Raft Foundations

037200 Mass Concrete for Dams

038000 Concrete Cutting & Boring

038100 Concrete Cutting

038200 Concrete Boring

03900 Concrete Restoration and Cleaning

038000 Concrete Cutting & Boring

038100 Concrete Cutting


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
038200 Concrete Boring

03900 Concrete Restoration and Cleaning

03910 Concrete Cleaning

03920 Concrete Resurfacing

03930 Concrete Rehabilitation

CONCRETE
Division 03 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL CONCRETE

04 - - Masonry

04050 Basic Masonry Materials and Methods

040500 Common Work Results for Masonry

04060 Masonry Mortar

Cement and Lime Mortar

Chemical - Resistant Mortar

Epoxy Mortar

Mortar for Engineered Masonry

Mortar for Masonry Restoration

Mortar Pigments

Premixed Mortar

Refractory Mortar

Surface Bonding Mortar

040600 Schedules for Masonry


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

04070 Masonry Grout

Chemical - Resistant Grout

Grout for Engineered Masonry

04080 Masonry Anchorage and Reinforcement

Continuous Joint Reinforcing

Flexible Masonry Ties

Masonry Veneer Ties

Reinforcing Bars

Rigid Masonry Ties

Stone Anchors

040800 Commissioning of Masonry

04090 Masonry Accessories

Control Joint Materials

Embedded Flashing

Expansion Joint Materials

Weepholes

0410 Notice of Award

04100 Mortar

04110 Masonry Work and Repair

04150 Masonry Units

04200 Masonry Units

042000 Unit Masonry

04210 Clay Masonry Unit

Brick

Building Brick

Ceramic Glazed Clay Masonry Units

Clay Tile

Facing Brick

Glazed Structural Clay Tile

Structural Clay Tile

Terra Cotta

042100 Clay Unit Masonry

04211 Brick Masonry

04220 Concrete Masonry Unit


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Concrete Brick

Exposed Aggregate Concrete Masonry Units

Fluted Concrete Masonry Units

Interlocking Concrete Masonry Units

Molded - Face Concrete Masonry Untis

Prefaced Concrete Masonry Units

Preinsulated Concrete Masonry Units

Sound - Absorbing Concrete Masonry Units

Split - Face Concrete Masonry Units

042200 Concrete Unit Masonry

04230 Calcium Silicate Units Masonry

042300 Glass Unit Masonry

04240 Glazed Concrete Masonry Units

042400 Adobe Unit Masonry

042500 Unit Masonry Panels

04270 Glass Masonry Unit

042700 Multiple-Wythe Unit Masonry

042800 Concrete Form Masonry Units

04290 Adobe Masonry Unit

04300 Unit Masonry

04400 Stone

044000 Stone Assemblies

04410 Stone Materials

Bluestone

Granite

Limestone

Marble

Quartzite

Sandstone

Slate

044100 Dry-Placed Stone

04414 Limestone

04420 Collected Stone

Excavated Stone

Field Stone
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Riverbed Stone

044200 Exterior Stone Cladding

04430 Quarried Stone

Cleft - Face Stone

Crushed Stone

Dimension Stone

044300 Stone Masonry

04500 Refractories

045000 Refractory Masonry

045100 Flue Liner Masonry

045200 Combustion Chamber Masonry

045300 Castable Refractory Masonry

045400 Refractory Brick Masonry

04550 Flue Liner

04560 Combustion Chamber

04570 Castable Refractories

045700 Masonry Fireplaces

04580 Refractory Brick

04600 Corrosion-Resistant Masonry

046000 Corrosion-Resistant Masonry

04610 Chemical-Resistant Brick

046100 Chemical-Resistant Brick Masonry

04620 Vitrified Clay Liner Plate

046200 Vitrified Clay Liner Plate

04700 Simulated Masonry

047000 Manufactured Masonry

04710 Simulated Brick

047100 Manufactured Brick Masonry

04720 Cast Stone

047200 Cast Stone Masonry

04730 Simulated Stone

047300 Maufactured Stone Masonry

04800 Masonry Assemblies

04810 Unit Masonry Assemblies


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Concrete Masonry Unit Walls


Install only concrete masonry unit for walling;
Contractor to supply & install bedding mortar including
pointing, and cleaning, galvanized steel accessories; as per the
specifications and drawings

Concrete Masonry Unit wall (Unit: 400x200; 100mm thick) m2

Concrete Masonry Unit wall (Unit: 400x200; 150mm thick) m2

Concrete Masonry Unit wall (Unit: 400x200; 200mm thick) m2

In the case of client supplied blockwork shortfall provide unit


price for:
Supply and install concrete masonry walling; with bedding
mortar including pointing, and cleaning, galvanized steel
accessories; as per the specifications and drawings

5MPa Concrete masonry unit (CMU) Unit

Concrete Lintels
Supply and pour concrete; include formwork, steel reinforce-
ment, and all necessary material and accessories; as per the spe-
cifications and drawings

RC Lintel for opening in 100mm wall m

RC Lintel for opening in 150mm wall m

RC Lintel for opening in 200mm wall m

Concrete Threshold
Supply and pour concrete; include formwork, steel reinforce-
ment, and all necessary material and accessories; as per the spe-
cifications and drawings

Concrete thresholds m3

Concrete form (beneath windows of balconies) m

Cavity Walls

Composite Unit Masonry

Masonry Veneer

Multiple - Wythe Unit Masonry

Single - Wythe Unit Masonry

Surface - Bonded Masonry

Thin Brick Veneer

04820 Reinforced Unit Masonry Assemblies

04830 Non-Reinforced Unit Masonry Assemblies

04840 Prefabricated Masonry Panel

04850 Stone Assemblies

Dry - Placed Stone Assemblies

Metal - Supported Stone Assemblies

Mortar - Placed Stone Assemblies

Stone - Clad Precast Concrete

Stone Curtain Wall Assemblies


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
04880 Masonry Fireplace

04900 Masonry Restoration and Cleaning

04901 Clay Masonry Restoration

04910 Unit Masonry Restoration

Unit Maonry Repair

Unit Masonry Replacement

Unit Masonry Repointing

04920 Stone Restoration

Stone Repair

Stone Replacement

Stone Repointing

04930 Unit Masonry Cleaning

Brick Cleaning

Terra Cotta Cleaning

04940 Stone Cleaning


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
MASONRY
Division 04 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL MASONRY

05 - - Metals
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
05050 Basic Metal Materials and Methods

05050 Basic Metal Materials and Methods

050500 Common Work Results for Metals

05060 Metal Material

050600 Schedules for Metals

05080 Factory-Applied Metal Coating

050800 Commissioning of Metals

05090 Metal Fastening

0510 Notice to Proceed

05100 Structural Metal Framing

05100 Structural Metal Framing

051000 Structural Metal Framing

05120 Structural Steel

Architecturally Exposed Structural Steel

Fabricated Fireproofed Steel Columns

Tubular Steel

051200 Structural Steel Framing

051300 Structural Stainless-Steel Framing

05140 Structural Aluminum

Architecturally - Exposed Structural Aluminum

051400 Structural Aluminum Framing

05150 Wire Rope Assemblies

Aluminum Wire Rope Assemblies

Steel Wire Rope Assemblies

051500 Wire Rope Assemblies

05160 Metal Framing System

Geodesic Structures

Space Frames

051600 Structural Cabling

05200 Metal Joists

052000 Metal Joists

05210 Steel Joist

Deep Longspan Steel Joists

Longspan Steel Joists

Open Web Steel Joists

Steel Joists Girders

052100 Steel Joist Framing


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

05250 Aluminum Joist

052500 Aluminum Joist Framing

05260 Composite Joist Assemblies

05300 Metal Deck

053000 Metal Decking

05310 Steel Deck

Composite Metal Deck

Steel Floor Deck

Steel Roof Deck

053100 Steel Decking

05320 Raceway Deck System

05330 Aluminum Deck

Aluminum Floor Deck

Aluminum Roof Deck

053300 Aluminum Decking

05340 Acoustical Metal Deck

053400 Acoustical Metal Decking

053500 Raceway Decking Assemblies

053600 Composite Metal Decking

05400 Cold-Formed Metal Framing

054000 Cold-Formed Metal Framing

05410 Load-Bearing Metal Stud

054100 Structural Metal Stud Framing

05420 Cold-Formed Metal Joist

054200 Cold-Metal Joist Framing

05430 Slotted Channel Framing

054300 Slotted Channel Framing

054400 Cold-Formed Metal Trusses

05450 Metal Support

Electrical Supports

Mechanical Supports

Medical Supports

054500 Metal Support Assemblies

05500 Metal Fabrications

055000 Metal Fabrications

Stainless Steel Steps (Water Tank)


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Supply and install stainless steel (Grade 316) steps; include
plates, anchors, bolts and all necessary material and accesso-
ries; as per the specifications and drawings

Stainless Steel steps (Water tank) No.

Ladder
Supply and install galvanized steel ladder; include epoxy primer,
intermediate high build epoxy paint and polyurethane finish paint,
and all necessary material and accessories; as per the specifica-
tions and drawings

Ladder (Access to Upper Roof) No.

Stainless Steel Frame


Supply and install stainless stel frame; include all necessary ma-
terial and accessories; as per the specifications and drawings

Stainless steel frame; L=3170mm, 100mm (GF Lobby) No.

Pergola and Canopies


Shading device at high level facade box out. Prefinished aluminum
clad galvanized steel canopy with horizontal blades refer to
supplier details. Sub-frame / steel structure anchored in to concrete
up-stand, contractor to submit proposed structural and architectural
design for approval
No.

05510 Metal Stairs and Ladder

055100 Metal Stairs

05511 Metal Stairs

05519 Steel Handrails & Railings

05520 Handrails and Railing

Pipe and Tube Railings

Tempered Glass Railing Assemblies

055200 Metal Railings

05521 Pipe & Tube Railings

Staircase Handrail
Supply and install painted steel handrail; include anchors,
plates, epoxy paint, and all necessary material and accessories;
as per the specifications and drawings

Handrail (Staircase) m

Handrail (GF Stairs) m

Pipe & Tube Railings

Grating

Supply and install galvanized steel gutter grating with remo-


vable panels; include steel angles, anchors, paint and all ne-
cessary material and accessories; as per the specifications and
drawings

Gutter grating; L = 6875mm; 300mm wide (Ramp) No.

Gutter grating; 300mm wide (Pump room) m


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
055213 Pipe & Tube Railings

05530 Grating

055300 Metal Grating

05540 Floor Plate

055400 Metal Floor Plates

05550 Stair Treads and Nosing

055500 Metal Stair Treads & Nosings

05560 Metal Casting

055600 Metal Castings

05580 Formed Metal Fabrication

Column Covers

Formed Metal Enclosures

Heating / Cooling Unit Enclosures

055800 Formed Metal Fabrications

05586 Column Covers

055900 Metal Specialties

05600 Hydraulic Fabrications

Bifurcation

Bulkheads

Manifolds

Penstocks

Trashracks

05650 Railroad Track and Accessories

05700 Ornamental Metal

05700 Ornamental Metal

057000 Decorative Metal

05710 Ornamental Stair

057100 Decorative Metal Stairs

05715 Fabricated Spiral Stair


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

05720 Ornamental Handrails and Railing

Main Balcony Balustrade - Optional Price 1


Full height glass for full width of balcony as detailed on dwgs
comprising stainless steel grade 316 hidden channel
tempered clear glass,sealant, anchors, ss caping channel
and all necessary material and accessories

Handrail: 15mm thick tempered clear glass with caping detail


H=915mm (Balconies) m

Main Balcony Balustrade - Optional Price 2


Steel balustrade as detailed on dwgs and specification

Handrail: Steel balustrade as detailed.


H=200mm (Balcony above concrete upstand) m

Handrail: Steel balustrade as detailed.


H=915mm (Balcony) m

Glass Balustrade facing hinged glass doors


Handrail: 15mm thick tempered clear glass and caping detail
H=950mm m

05725 Ornamental Metal Casting

05730 Ornamental Formed Metal

057300 Decorative Metal Railings

05740 Ornamental Forged Metal

057400 Decorative Metal Castings

057500 Decorative Formed Metal

057600 Decorative Forged Metal

05800 Expansion Control

05800 Expansion Control

05810 Expansion Joint Cover Assemblies

05820 Slide Bearing

05830 Bridge Expansion Joint Assemblies

05900 Metal Restoration and Cleaning

05900 Metal Restoration and Cleaning


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

METALS
Division 05 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL METALS

06 - - Wood and Plastics

06050 Basic Wood and Plastic Materials and Methods

060500 Common Work Results for Wood, Plastics & Composites

06060 Wood Material

060600 Schedules for Wood, Plastics & Composites

06065 Plastic Material

06070 Wood Treatment

Fire - Retardant Treatment

PreservativeTreatment

06080 Factory-Applied Wood Coating

060800 Commissioning of Wood, Plastics & Composites

06090 Wood and Plastic Fastening

06100 Rough Carpentry

06100 Rough Carpentry

061000 Rough Carpentry

06110 Wood Framing

Engineered Lumber Products

Stress - Related Lumber

061100 Wood Framing

06120 Structural Panel

Cementitious Reinforced Panels

Stressed Skin Panels

061200 Structural Panels

06130 Heavy Timber Construction

Log Structures

Mill - Framed Structures


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Pole Construction

Railroad Ties

Timber Bridges and Trestles

Timber Trusses

061300 Heavy Timber

06140 Treated Wood Foundation

061400 Treated Wood Foundations

06150 Wood Decking

061500 Wood Decking

06152 Wood and Metal Systems

06160 Sheathing

Insulation Sheathing

Subflooring

Underlayment

Wood Board Sheathing

Wood Panel Product Sheathing

061600 Sheathing

06170 Prefabricated Structural Wood

Laminated Veneer Lumber

Metal - Web Wood Joists

Parallel Strand Lumber

Wood Joists

Wood Trusses

061700 Shop-Fabricated Structural Wood

061753 Shop-Fabricated Wood Trusses

06180 Glued-Laminated Construction

061800 Glued-Laminated Construction

06190 Wood Trusses

06193 Wood Trusses

06200 Finish Carpentry

06200 Finish Carpentry

062000 Finish Carpentry

062023 Interior Finish Carpentry

06220 Millwork

062200 Millwork

06250 Prefinished Paneling


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
062500 Prefinished Paneling

06260 Board Paneling

062600 Board Paneling

06270 Closet and Utility Wood Shelving

06400 Architectural Woodwork

064000 Architectural Woodwork

Exterior Architectural Woodwork


Supply and install hardwood (Irokko) elements; include glava-
nized steel structure, anchors, polyurethane varnish, and all
necessary material and accessories; as per the specifications
and drawings

Canopy; 3000x4800mm; H=200mm (GF) No.

Canopy; 2000x4800mm; H=200mm (GF) No.

Canopy; 4600x4800mm; H=200mm (GF) No.

06402 Interior Architectural Woodwork

064023 Interior Architectural Woodwork

Closet
Supply and install wood closets comprising plastic laminate
box and drawers, MDF leaf covered with wood veneer, hardwood
architraves, internal mirror, stainless steel hardware and cloth
hanging rod, retractable rod for the upper compartment, polyu-
rethane varnish, and all necessary material and accessories; as
per the specifications and drawings

Wood Closets (Walnut Veneer) m2

Vanity Units
Supply and install water resistant MDF or blockboard wood
vanity; include plastic laminated interior, hardwood architraves
and edges, polyurethane paint, stainless steel hardware, and
all necessary material and accessories; as per the specifications
and drawings

Laminated Wood Cover for Counter Cabinets (Bath type 3) No.

Laminated Wood Cover for Counter Cabinets (Bath type 2A) No.

Laminated Wood Cover for Counter Cabinets (Bath type 2) No.

Laminated Wood Cover for Counter Cabinets (Bath type 4) No.

Laminated Wood Cover for Counter Cabinets (Bath type 3B) No.

Access Panels
Supply and install MDF wood access panels; include flush hard-
wood frame, perimeter seal, and all necessary material and acces-
sories; as per the specifications and drawings

Access Panel; 300x440mm (Guest WC / Powder Room) No.

Access Panel; 300x300mm (Maid Bath) No.

Access Panel; 300x440mm (Bath Type 6) No.

Access Panel; 300x440mm (Bath Type 2) No.

Access Panel; 300x440mm (Ens. Bath Type 3) No.

Access Panel; 300x440mm (Ens. Bath Type 4) No.


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Access Panel; 300x440mm (Bath Type 5) No.

Access Panel; 300x440mm (Bath) No.

Reception Desk
Supply and install MDF reception desk,
including 22mm MDF drawer unit finished with wood veneer,
20mm MDF counter top with wood veneer, hardwood edges,
stainless steel hardware andall necessary material and accessories;
as per the specifications and drawings (Top priced separately)

Reception counter No.

Wood Cladding
Supply and install water resistant blockboard wood wall panel
covered with wood veneer; include solid wood studs, solid
wood edges, adhesive, polyurethane varnish, fixing material
and all necessary material and accessories; as per the specifi-
cations and drawings

Nahar wood veneer with groove side panel (Corridor / Lift lobby) m2

Eveneer - Eurosable - timber graphic panel with back illuminated


frosted acrylic glass numeral (Corridor / Lift Lobby) m2

Carved wood thalwed 03 timber panel (GF Lobby) m2

Wood Suspended Ceiling


Supply and install MDF suspended ceiling covered with wood
veneer; include solid wood edges, polyurethane varnish, and all
necessary material and accessories; as per the specifications and
drawings

White painted coffer details with concealed strip lighting (GF


Lobby) m2

Cherry Colombo veneer finish ceiling with decorative coatings


ceiling panel (GF Lobby) m2

06410 Custom Cabinet

Cabinet Hardware

Laminate - Clad Wood Cabinets

Opaque - Finish Wood Cabinets

Transparent - Finish Wood Cabinets

064100 Architectural Wood Casework

06415 Countertop

06420 Paneling

064200 Wood Paneling

06430 Wood Stairs and Railing

Ornamental Wood Stairs

064300 Wood Stairs & Railing

06440 Wood Ornament

Custom Wood Turnings 

Fluted Wood Pilasters

Ornamental Wood Grilles

Wood Balusters

Wood Corbels
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Wood Cupolas

Wood Finials

Wood Mantels

Wood Pediment Heads

Wood Posts and Columns

064400 Ornamental Woodwork

06445 Simulated Wood Ornament

06450 Standing and Running Trim

Door and Window Wood Casings

Wood Aprons

Wood Base and Shoe Molding

Wood Chair Rail

Wood Cornices

Wood facias and Soffits

Wood Handrails and Guard Rails

WoodStops, Stools and Sills

06455 Simulated Wood Trim

06460 Wood Frames

Exterior Wood Door Frames and Jambs

Fire-Rated Wood Door Frames

Interior Wood Door Frames and Jambs

Ornamentl Wood Frames

Stick-Built Wood Windows

Wood Veneer Frames

064600 Wood Trim

06470 Screens, Blinds and Shutter

064800 Wood Frames

064900 Wood Screens & Exterior Wood Shutters

06500 Structural Plastics

06500 Structural Plastic

065000 Structural Plastics

06510 Structural Plastic Shapes and Plate

Plastic Lumber

Structural Tubular

065100 Structural Plastic Shapes & Plates


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

06520 Plastic Structural Assemblies

065200 Plastic Structural Assemblies

065300 Plastic Decking

06600 Plastic Fabrications

Cultured Marble

Glass-Fiber Reinforced Plastic

Plastic Handrails

Plastic Paneling 

Solid Surfacing

66000 Plastic Fabrications

66100 Simulated Stone Fabrications

66300 Plastic Railings

66400 Plastic Paneling

6650 Solid Polymer Fabrications

66500 Plastic Simulated Wood Trim

66600 Custom Ornamental Simulated Woodwork

67000 Structural Composites

67100 Structural Composite Shapes & Plates

67200 Composite Structural Assemblies

67300 Composite Decking

68000 Composite Fabrications

68100 Composite Railing

68200 Glass-Fiber-Reinforecd Plastic

06900 Wood and Plastic Restoration and Cleaning

06910 Wood Restoration and Cleaning

Architectural Woodwork Cleaning

Architectural Woodwork Refinishing

Architectural Woodwork Restoration

Wood Framing Restoration

06920 Plastic Restoration and Cleaning


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

WOOD & PLASTICS


Division 06 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL WOOD WORKS

07 - - Thermal and Moisture Protection

07050 Basic Thermal and Moisture Protection Materials and Methods

07050 Basic Thermal and Moisture Protection Materials and Methods

070500 Common Work Results for Thermal & Moisture Protection

070600 Schedules for Thermal & Moisture Protection

070800 Commissioning of Thermal & Moisture Protection

07100 Damproofing and Waterproofing

071000 Dampproofing & Waterproofing

07110 Dampproofing

Bituminus Dampproofing

Cementious Dampproofing

071100 Dampproofing

07120 Built-Up Bituminous Waterproofing

Built-Up Asphalt Waterproofing

Built-Up Coal Tar Waterproofing

071200 Built-Up Bituminous Waterproofing

07130 Sheet Waterproofing

Bituminous Sheet Waterproofing

Elastomeric Sheet Waterproofing

Modified Bituminous Sheet Waterproofing

Thermoplastic Sheet Waterproofing

071300 Sheet Waterproofing

071326 Self-Adhering Sheet Waterproofing

07140 Fluid-Applied Waterproofing

071400 Fluid-Applied Waterproofing

Cold Fluid Applied Waterproofing

Waterproofing to Wet Areas


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Prepare surface, supply and apply primer and single compo-
nent, unmodified polyurethane waterproofing; include reinfor-
cing the system at corners; include all necessary material and
accessories; as per the specifications and drawings

Waterproofing to floor surfaces (WC) m2

Waterproofing to floor surfaces (Kitchen) m2

Waterproofing to floor surfaces (Balconies) m2

Waterproofing to gutter and pits m2

07150 Sheet Metal Waterproofing

071500 Sheet Metal Waterproofing

07160 Cementitious and Reactive Waterproofing

Acrylic Modified Cement Waterproofing

Crystaline Waterproofing

Supply and apply cementitious based elastic layer, with special


treatment on angles and cracks; as per specifications and
drawings

Waterproofing to floor surfaces (Water Tank ) m2

Waterproofing to wall surfaces (Water Tank ) m2

Waterproofing to ceiling surfaces (Water Tank ) m2

Metal Oxide Waterproofing

071600 Cementitious & Reactive Waterproofing

07170 Bentonite Waterproofing

Bentonite Panel Waterproofing

Bentonite Sheet Waterproofing

071700 Bentonite Waterproofing

07180 Traffic Coating

Pedestrian Traffic Coating

Vehicular Traffic Coating

071800 Traffic Coatings

07190 Water Repellent

Acrylic Water Repellents

Silane Water Repellents

Silicone Water Repellents

Siloxane Water Repellents

Stearate Water Repellents

071900 Water Repellents

07200 Thermal Protection

07200 Thermal Protection

072000 Thermal Protection


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
07201 Pre-Insulated Instrument Enclosures

07210 Building Insulation

072100 Thermal Insulation

07220 Roof and Deck Insulation

Asphaltic Perite Concrete Deck

Roof Board Insulation

072200 Roof & Deck Insulation

07240 Exterior Insulation and Finish Systems (EIFS)

Exterior Finish Assemblies

072400 Exterior Insulation & Finish Systems

072500 Weather Barriers

07260 Vapor Retarder

072600 Vapor Retarders

07270 Air Barrier

072700 Air Barriers

07300 Shingles, Roof Tiles, and Roof Coverings

073000 Steep Slope Roofing

07310 Shingle

Asphalt Shingles

Fiberglass Reinforced Shingles

Metal Shingles

Mineral Fiber Cement Shingles

Plastic Shakes

Porcelain Enamel Shingles

Slate Shingles

Wood Shingles

Wood Shakes

073100 Shingles & Shakes

073113 Asphalt Shingles

073129 Wood Shingles & Shakes

07320 Roof Tile

Clay Roof Tiles

Concrete Roof Tiles

Metal Roof Tiles

Mineral Fiber Cement Roof Tiles


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Plastic Roof Tiles

073200 Roof Tiles

07330 Roof Covering

Sod Roofing

Thatched Roofing

73300 Natural Roof Coverings

07400 Roofing and Siding Panels

07400 Roofing and Siding Panel

074000 Roofing & Siding Panels

07401 Roofing Manufacture

07410 Metal Roof and Wall Panel

Metal Roof Panels

Metal Wall Panels

074100 Roof Panels

07412 Exterior Wall Panels

07420 Plastic Roof and Wall Panel

Plastic Roof Panels

Plastic Wall Panels

074200 Wall Panels

074213 Metal Wall Panels

07430 Composite Panel

07440 Faced Panel

Aggregate Coated Panels

Porcelain Enameled Faced Panels

Tile Faced Panles

074400 Faced Panels

07450 Fiber-Reinforced Cementitious Panel

Glass-Fiber-Reinforced Cementitious Panles

Mineral-Fiber-Reinforced Cementious Panels

07460 Siding

Aluminum Siding

Composition Siding

Hardboard Siding

Mineral Fiber Cement Siding

Plastic Siding

Plywood Siding

Steel Siding
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Wood Siding

074600 Siding

07470 Wood Roof and Wall Panel

Wood Roof Panels

Wood Wall Panels

07480 Exterior Wall Assemblies

07500 Membrane Roofing

075000 Membrane Roofing

preparation of surface as required for treatment , supply and apply


1 primer and Exterior Waterproofing Membrane for Footing ; M3
include all necessary material and accessories; as per the
specifications and drawings
* is it also for roof ?
07510 Built-Up Bituminous Roofing

Built-up Asphalt Roofing

Built-up Coal- Tar Roofing

075100 Built-Up Bituminous Roofing

07520 Cold-Applied Bituminous Roofing

Cold Applied Mastic Roof Membrane

Glass Fiber Reinforced Asphalt Emulsion Roofing

075200 Modified Bituminous Membrane Roofing

07530 Elastomeric Membrane Roofing

Cllorinated Polyethelene (CPE) Roofing

Chlorsulfonated Polyethylene (CSPE) Roofing

Ethylene Propppylene Diene Monomer (EPDM) Roofing

Nitrle Butadiene Polymer (NBP) Roofing

Polyisobutylene PIB) Roofing

075300 Elastomeric Membrane Roofing

07531 EPDM Single Ply Membrane Roofing

075323 Ethylene-Propylene-Diene-Monomer Roofing

07533 Thermoplastic Single-Ply Membrane Roofing

07540 Thermoplastic Membrane Roofing

Ethylene Inrwepolyme (EIP) Roofing

Polyvinyl Chloride (PVC) Roofing

Themoplastic Alloy (TPA) Roofing

075400 Thermoplastic Membrane Roofing

07550 Modified Bituminous Membrane Roofing

075500 Protected Membrane Roofing


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Supply and install combo roofing system consisting of layered


methodology using polyurethane foam,polytex liquid UV
protection coat,polyfab filter membrane under concrete screed.
Over which angle fillets are incorporated over polybond bonding
agent. Fabric reinforcement and a polyflex combo top coat is
finished with plaster and paint finish. Note insulation thickness and
specification to meet thermal performance requirement. Approved
waterproofing type or similar to be implemented

Combo roofing system as described on drawings m2

Planted Areas
Supply and apply cold applied bituminous emulsion at an
average of 350gr/m2, 1 hot applied elastomeric membrane of
4mm thick SBS modified bitumen with 180gr/m2 polyester re-
inforcement and 1 SBS modified bitumen membrane, 4mm thick
with 60gr fiberglass, anti root self protected with miniral gra-
nules. The whole system shall be protected with rounded gra-
vel with no sharp edges and non woven geotextile 170 gr/m2;
include concrete edge form, joint sealant, and all necessary
material and accessories; as per the specifications and drawings

Waterproofing to floor surfaces (Planted Areas) m2

07560 Fluid-Applied Roofing

075600 Fluid-Applied Roofing

07570 Coated Foamed Roofing

075700 Coated Foamed Roofing

07580 Roll Roofing

0758700 Roll Roofing

07590 Roof Maintenance and Repairs

Preparation for Reroofing

Roof Maintenance Program

Roof Moisture Survey

Roof Removal

Roofing Resaturants

Roofing Restoration

07600 Flashing and Sheet Metal

076000 Flashing & Sheet Metal

07610 Sheet Metal Roofing

076100 Sheet Metal Roofing

07620 Sheet Metal Flashing and Trim

076200 Sheet Metal Flashing & Trim

07630 Sheet Metal Roofing Specialties

076300 Sheet Metal Roofing Specialties

07631 Gutters and Downspouts

07650 Flexible Flashing

Laminated Sheet Flashing


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Modified Bituminous Sheet Flashing

Plastic Sheet Flashing

Rubber Sheet Flashing

Self-Adhering Sheet Flashing

076500 Flexible Flashing

07700 Roof Specialties and Accessories

07700 Roof Specialties and Accessories

077000 Roof & Wall Specialties & Accessories

07710 Manufactured Roof Specialties

Copings

Counterflashing Systems

Gravel Stops Facias

Gutters and Downspouts

Reglets

Roof Expansion Assemblies

Scuppers

077100 Roof Specialties

07720 Roof Accessories

Manufactured Curbs

Relief Vents

Rdige Vents

Roof Hatches

Roof Walk Boards

Roof Walkways

Smoke Vents

Snow Guards

Waste Containment Assemblies

077200 Roof Accessories

07722 Roof Hatches

07760 Roof Paver

Roof Bassast Pavers

Roof Decking Pavers

077600 Roof Pavers

077700 Wall Specialties

07800 Fire and Smoke Protection

07800 Fire and Smoke Protection


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

078000 Fire & Smoke Protection

07810 Applied Fireproofing

Cement Aggregate Fireproofing

Cementious Fireproofing

Foamed Magnesium Oxchloride Fireproofing

Intumessscent Mastic Fireproofing

Magnesium Cement Fireproofing

Mineral Fiber Cementious Fireproofing

Mineral Fiber Fireproofing

078100 Applied Fireproofing

07811 Sprayed Fire-Resistive Materials

07820 Board Fireproofing

Calcium Silicate Board Fireproofing

Slag Fiber Board Fireproofing

078200 Board Fireproofing

07840 Firestopping

Annular Space Protection

Fibrous Fire Safing

Fire-Resistent Joint Sealents

Intumescent Firestopping Foams

Silicone Firestopping Foams

Thermas Barriers for Plastics

Through Penetration Firestopping Mortars

Through Penetration Firestopping Pillows

Through Penetration Firestopping Pillows

078400 Firestopping

07841 Through-Penetration Firestop

Through-Penetration Firestop Systems


Allow for firestops placed between different fire zones and
non fire rated zones for all cables, cable trays, pipes, and all
penetration services through walls and slabs; include all ne-
cessary material and accessories; a per the specifications and
drawings

Allow for firestop systems Item

07860 Smoke Seal

078600 Smoke Seals

07870 Smoke Containment Barrier


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
078700 Smoke Containment Barriers

07900 Joint Sealers

07900 Joint Sealer

079000 Joint Protection


07901 Joint Sealants

07910 Preformed Joint Seal

Compression Seals

Joint Gaskets

079100 Preformed Joint Seals

07920 Joint Sealant

Backer Rods

Calking

Joint Eillers

Sealents

079200 Joint Sealants

079500 Expansion Control

079513 Expansion Joint Cover Assemblies


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

THERMAL & MOISTURE PROTECTION


Division 07 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL THERMAL & MOISTURE PROTECTION

08 - - Doors and Windows

08050 Basic Door and Window Materials and Methods

08050 Basic Door and Window Materials and Method

080500 Common Work Results for Openings

080600 Schedules for Openings

080800 Commissioning of Openings

08100 Metal Doors and Frames

081000 Doors & Frames

08110 Steel Doors and Frame


Supply and install Painted Finish galvanized steel doors and
welded frames; include mortar fill for the frames, sealants, louvers,
primer, powder coated finish, UL Label for fire rated units; and
all necessary material, and accessories; as per the specifications
and drawings

Steel access trap (Sump pit) m2

Steel access trap (Water tank); Overall dim.: 800x800mm No.

Door Type 5 ; Overall dim.: 1100x2050mm, 90mins Fire Rated No.

Door Type 6; Overall dim.: 900x2050mm No.

Door Type 10 ; Overall dim.: 1800x2200mm, 45mins Fire Rated No.

Door Type 10; Overall dim.: 1800x2200mm, 90mins Fire Rated No.

Door Type 12 ; Overall dim.: 1800x2200mm, 90mins Fire Rated No.

Door Type 12 ; Overall dim.: 1000x2200mm, 90mins Fire Rated No.

Door Type 13 ; Overall dim.: 1500x2200mm, 45mins Fire Rated No.

Door Type19; Overall dim.: 1600x2400mm No.

Door Type19; Overall dim.: 1800x2400mm No.

Door Type 21 ; Overall dim.: 3000x2700mm No.

Custom Steel Doors and Frames

Standard Steel Doors and Frames

081100 Metal Doors & Frames

08111 Standard Steel Door Frames & Doors

081113 Hollow Metal Doors & Frames

08120 Aluminum Doors and Frame

081200 Metal Frames

08130 Stainless Steel Doors and Frame

081300 Metal Doors

08140 Bronze Doors and Frame

081400 Wood Doors

081416 Flush Wood Doors


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
08150 Preassembled Metal Door and Frame Unit

081500 Plastic Doors

08160 Sliding Metal Doors and Grille

Sliding Metal Doors

Sliding Metal Grilles

081600 Composite Doors

08200 Wood and Plastic Doors

08200 Wood and Plastic Door

08210 Wood Door

Carved Wood Doors

Flush Wood Doors


Supply and install wood doors comprising; MDF or structural
lumber core, hardwood stiles, lippings and frames, wood veneer
subframe, polyurethane varnish, and all necessary material and
accessories; as per the specifications and drawings

Semi solid timber door - painted finish

Door Type 5 ; Overall dim.: 1100x2200mm, 90mins Fire Rated No.

Semi solid timber door - walnut veneer finish

Door Type 2; Overall dim.: 900x2200mm No.

Semi solid timber door - moisture resistant finish to bathroom


side, walnut veneer finish to outside face

Door Type 3; Overall dim.: 900x2200mm No.

Semi solid timber door - moisture resistant finish to bathroom


side, white paint to outside face

Door Type 3; Overall dim.: 800x2200mm No.

Metal-Faced Wood Doors

Plastoc-Faced Wppd Doors

Prefinished Wood Doors

Stile and Rail Wood Doors

08211 Flush Wood Doors

08220 Plastic Door

Laminated Plastic Doors

Solid Plastic Doors

08225 Fiberglass Doors


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

08250 Preassembled Wood and Plastic Door and Frame Unit

Preassembled Plastic Door and Frame Units

Preassembled Wood Door and Frame Units

08260 Sliding Wood and Plastic Door

Sliding Plastic Doors

08280 Wood and Plastic Storm and Screen Door

Plastic Screen Doors

Plastic Storm and Screen Doors

Plastic Storm Doors

Wood Screen Doors

Wood Storm and Screen Doors

Wood Storm Doors

08290 Wood and Plastic Door Restoration

08300 Specialty Doors

08300 Specialty Door

083000 Specialty Doors & Frames

08310 Access Doors and Panel

Access Doors and Frames

Access Panels and Frames

083100 Access Doors & Panels

083113 Access Doors & Frames

08320 Detention Doors and Frame

Detention Door Frame Protection

Steel Detention Doors and Frames

Steel Plate Detention Doors and Frames

083200 Sliding Glass Doors

08330 Coiling Doors and Grille

Coiling Counter Doors

Coiling Counter Grilles

Overhead Coiling Doors

Overhead Coiling Grilles

Side Coiling Doors

Side Coiling Grilles

083300 Coiling Doors & Grilles


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

08331 Overhead Coiling Doors

08340 Special Function Door

Cold Storage Doors

Hangar Doors

Lightproof Doors

Radiation Protection Doors

Radio - Frequency - Interference (RFI) Sheilding Doors

Sound Control Doors

Industrial Doors

083400 Special Function Doors

08350 Folding Doors and Grille

Accordion Folding Doors

Accordion Folding Grilles

Folding Fire Doors

Panel Folding Doors

083500 Folding Doors & Grilles

08360 Overhead Door

Sectional Overhead Doors

Single - Panel Overhead Doors

083600 Panel Doors

083613 Sectional Doors

08370 Vertical Lift Door

Multi - Leaf Vertical Lift Doors

Telescoping Vertical Lift Doors

08380 Traffic Door

Flexible Strip Doors

Flexible Traffic Doors

Rigid Traffic Doors

083800 Traffic Doors

08390 Pressure-Resistant Door

Airtight Doors

Blast - Resistant Doors

Watertight Doors

083900 Pressure-Resistant Doors

08400 Entrances and Storefronts

08400 Entrances and Storefront


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

084000 Entrances, Storefronts, & Curtain Walls

08405 Aluminum Windows

08410 Metal-Framed Storefront

Aluminum - Framed Storefronts

Bronze - Framed Storefronts

Stainless - Steel - Framed Storefronts

Steel - Framed Storefronts

084100 Entrances & Storefronts

084113 Aluminum-Framed Entrances & Storefronts

084200 Entrances

084300 Storefronts

084400 Curtain Wall & Glazed Assemblies

08450 All-Glass Entrances and Storefront

084500 Translucent Wall & Roof Assemblies

08460 Automatic Entrance Door

08470 Revolving Entrance Door

08480 Balanced Entrance Door

08490 Sliding Storefront

08500 Windows

08500 Window

085000 Windows

08510 Steel Window

085100 Metal Windows

08520 Aluminum Window

085200 Wood Windows

08530 Stainless Steel Window

085300 Plastic Windows

08540 Bronze Window

085400 Composite Windows

08550 Wood Window

Metal - Clad Wood Windows

Plastic - Clad Wood Windows

085500 Pressure-Resistant Windows

08560 Plastic Window

085600 Special Function Windows

08570 Composite Window


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

08580 Special Function Window

Detention Windows

Detention Window Screens

Pass Windows

Radiation Protection Windows

Radio - Frequency - Interference (RFI) Sheilding Windows

Security Window Screens

Sound Control Windows

Storm Windows

08590 Window Restoration and Replacement

Window Restoration

Window Replacement

08600 Skylight

086000 Roof Windows & Skylights

08610 Roof Window

Metal Roof Windows

Wood Roof Windows

086100 Roof Windows

08620 Unit Skylight

Domed Unit Skylights

Pyramidal Skylights

Vaulted Unit Skylights

086200 Unit Skylights

08630 Metal-Framed Skylight

Domed Metal - Framed Skylights

Motorized Metal - Framed Skylights

Pyramidal Metal - Framed Skylights

Ridge Metal - Framed Skylights

Vaulted Metal - Framed Skylights

086300 Metal-Framed Skylights

086400 Plastic-Framed Skylights

086700 Skylight Protection & Screens

08700 Hardware

087000 Hardware
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

08710 Door Hardware

Controlling Hardware

Door Trim

Hanging Hardware

Latching Hardware

Locking Hardware

087100 Door Hardware

08711 Door Hardware

08720 Weatherstripping and Seal

Door Weatherstripping and Seals

Thresholds

Window Weatherstripping and Seals

08740 Electro-Mechanical Hardware

Card Key Locking Hardware

Electrical Locking Control

Electromagnetic Door Holders

087400 Access Control Hardware

08750 Window Hardware

Automatic Window Equipment

Window Locks

Window Lifts

Window Operators

087500 Window Hardware

08770 Door and Window Accessories

Key Storage and Control Equipment

08780 Special Function Hardware

Detention Hardware

087800 Special Function Hardware

08790 Hardware Restoration

087900 Hardware Accessories

08800 Glazing

088000 Glazing

Back Painted Glass Cladding


Supply and install back painted glass cladding; include suppor-
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
ting structure, anchors, seals, and all necessary material and ac-
cessories; as per the specifications and drawings

RAL 1012 float glass color baked glass graphic, AAU 00328 fea-
ture color wall, RAL 6021 float glass baked glass graphic, RAL
9003 stained white baked glass, RAL 9003 stained white baked
glass with patterns: 3720x2200mm (Corridor / Lift Lobby) m2

RAL 9003 Satin white glass in-set panel (Corridor / Lift Lobby) No.

Colour backed glass to kitchens m2

08810 Glass

Bent Glass

Bullet - Resistant Glass

Chemically - Strengthened Glass

Coated Glass

Composite Glass

Decorative Glass

Fire Rated Glass

Float Glass

Heat - Strengthened Glass

Impact Resistant Glass

Insulating Glass

Laminated Glass

Mirrored Glass

Rolled Glass

Tempered Glass

Wired Glass

088100 Glass Glazing

088300 Mirrors

08830 Mirror
Supply and install mirror units, comprising 6mm clear mirror
glass fixed on waterproof MDF backboard; include stainless
steel accessories; hardwood frame, polyurethane varnish, and
all necessary material and accessories; as per the specifications
and drawings

Mirror to wall; 600x900mm (Guest WC / Powder Room) No.

Mirror to wall; 600x900mm (Maid Bath) No.

Mirror to wall; 600x900mm (Bath Type 6) No.

Mirror to wall; 1400x860mm (Bath Type 2) No.

Mirror to wall; 1749x860mm (Ens. Bath Type 3) No.

Mirror to wall; 1760x860mm (Ens. Bath Type 4) No.

Mirror to wall; 1760x860mm (Bath Type 5) No.

Mirror to wall; 1760x860mm (Bath) No.


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

08840 Plastic Glazing

Bullet - Resistant Plastic Glazing

Decorative Plastic Glazing

Insulating Plastic Glazing

Translucent Plastic Glazing

Transparent Plastic Glazing

088400 Plastic Glazing

08850 Glazing Accessories

088500 Glazing Accessories

088700 Glazing Surface Films

088800 Special Function Glazing

08890 Glazing Restoration

08900 Glazed Curtain Wall


Supply and install glazed aluminum curtain walls comprising
powder coated aluminum frames, galvanized steel reinforcement
brackets, fasteners and accessories, anchors, concealed flashing
framing gaskets, framing sealants, spandrels, perimeter fire con-
tainement system, glazing, and all necessary material and acces-
sories; as per the specifications and drawings

Curtain wall R01-CW1; Overall dim.: 3000x4075mm No.

Curtain wall R01-CW2; Overall dim.: (9330+1900)x4325mm No.

Curtain wall R02-CW1; Overall dim.: 29120x4325mm No.

Door Type 22 ; Overall dim.: 1100x3000mm


Double glass door within curtain wall No.

089000 Louvers & Vents

08910 Metal Framed Curtain Wall

Glazed Aluminum Curtain wall

Glazed Bronze Curtain Wall

Glazed Stainless Steel Curtain Wall

089100 Louvers

08920 Aluminum Curtain Wall System

089200 Louvered Equipment Enclosures

08950 Translucent Wall and Roof Assemblies

089500 Vents

08960 Sloped Glazing Assemblies

08970 Structural Glass Curtain Wall

08990 Glazed Curtain Wall Restoration


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

DOORS & WINDOWS


Division 08 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL DOORS & WINDOWS

09 - - Finishes

09050 Basic Finish Materials and Methods

09050 Basic Finish Materials and Method

090500 Common Work Results for Finishes

09051 Drywall Contractors

090600 Schedules for Finishes

090800 Commissioning of Finishes

09100 Metal Support Assemblies

09100 Metal Support Assemblies

09110 Non-Load-Bearing Wall Framing

09120 Ceiling Suspension

09130 Acoustical Suspension

09190 Metal Frame Restoration

09200 Plaster and Gypsum Board

92000 Plaster & Gypsum Board

9205 Furring and Lathing

Gypsum Lath

Lead - Lined Lath

Metal Lath

Plaster Accessories

Veneer Plaster Base

9210 Gypsum Plaster

Acoustical Gypsum Plaster


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Fireproofing Gypsum Plaster

Gypsum Veneer Plaster

92100 Plaster & Gypsum Board Assemblies

92116 Gypsum Board Assemblies

9220 Portland Cement Plaster

Plaster to Receive Paint Finish


Prepare surfaces, spatterdash, supply and apply ordinary
portland cement and sand plaster coat to a min. thickness of
20mm, include metal lath 1mm thick having approximately 50
nets per m2 where required, and all expanded metal angle and
stop beads at corners and abutments; scratching under layers
trowelling to a smooth final layer unless noted otherwise. Inc-
lude forming drip over opening; as per specs and drawings
(1undercoat of min.8mm, 1undercoat of min. 6mm, 1 finish coat
of min. 6mm)

To internal walls m2

To internal soffits m2

Plaster to Receive Tile Finish


Supply and apply 2 layers of portland cement & sand plaster;
minimum thickness of 6+6mm; scratched upon completion to
a maximum depth of 6mm; include all necessary material and
accessories; as per the specifications and drawings

To internal walls to receive tile finish m2

Plaster to Facades
Prepare surfaces, spatterdash, supply and apply ordinary
portland cement and sand plaster coat to a min. thickness of
15mm, textured plaster to a thickness of 15mm; include metal
lath 1mm thick having approximately 50 nets per m2 where re-
quired scratching under layers; trowelling to a smooth final
layer unless noted otherwise; include forming drip over all
openings; as per the sepcifications and drawings

Cement render / paint finish (external elevations) m2

Cement render paint to balconies soffits m2

Cement render paint with grooves 10x50mm every 250 - 300mm m2

Cement render paint to precase window frames m2

AAU 00190 cream color lift / core wall plaster (Corridor / Lift
Lobby) m2

AAU 00328 feature color wall plaster (Corridor / Lift Lobby) m2

Pigmented plater wall finish ref AAU00328 (GF Lobby) m2

Adobe Finish

Portland Cement Veneer Plaster

92200 Supports for Plaster & Gypsum Board

92216 Non-Structural Metal Framing

9227 Exterior Stud Wall System

9230 Plaster Fabrication

92300 Gypsum Plastering


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
92400 Portland Cement Plastering

9250 Gypsum Board

Cementitious Backing Board

Factory - Finished Gypsum Board

Gypsum Sheathing

Shaft Wall Liner

92500 Other Plastering

9253 Exterior Sheathing

9255 Gypsum Board Assemblies

9260 Gypsum Board Assemblies

Gypsum Board Suspended Ceiling


Supply and install gypsum board false ceiling; include galva-
nized steel suspension system, visit traps, and all necessary
material and accessories; as per the specifications and dra-
wings (Paint is priced separately in section 09912)

C2; Gypsum board suspended ceiling m2

Moisture resistant gypsum board ceilings (Kitchen) m2

Moisture resistant gypsum board ceilings (Guest WC / Powder) m2

Moisture resistant gypsum board ceilings (Maid Bath) m2

Coloured gypsum to wall Fretcut pattern and frame to match (GF


Lobby) m2

Access panel for gypsum, wood or metal ceiling cladding No

Gypsum Board Area Separation Walls

Shaft Wall Assemblies

92600 Veneer Plastering

9265 Gypsum Board Shaft-Wall Assemblies

9270 Gypsum Board Accessories

92700 Plaster Fabrications

9280 Plaster Restoration

92800 Backing Boards & Underlayments

92900 Gypsum Board

09300 Tile

093000 Tiling

Floor and Wall Tiles


Supply and install tile; include adhesive, grout, polishing, clean-
ning, mesh under tile; and all necessary material and accessories;
as per the specifications and drawings

Crema Nauva Marble; polished (Corridor / Lift Lobby) m2

Medium Travertine Vein Cut honed filled floor finish (Corridor /


Lift Lobby) m2

Gialo Real le polish border (Corridor / Lift Lobby) m


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Decorative wall: Golden Quartzite stone featured wall cladding,


Adelia polish marble stone, paint niche finish, Dark Emperador
polished marble, Coloured gypsum fretcut pattern & frame to
match, pigmented plaster wall finish ref: AAU003328 (GF Lobby) m2

Marble thresholds (WCs and Kitchens) m

Marble thresholds (technical) m

Tops
Supply and install tops; include seals, adhesive, provision for
receiving sinks, and all necessary material and accessories; as
per the specifications and drawings

Granite Vanity top m

Granite bench (Kitchen) m

09305 Tile Setting Materials and Accessories

09310 Ceramic Tile

Supply and install tile with adhesive; include grout, cleaning,


and all necessary material and accessories; as per the specifica-
tions and drawings

Ceramic floor tiles; 300x300mm; 10mm thick; 1st choice (Kitchen) m2

Ceramic skirting; 300x100mm; 10mm thick (Kitchen) m

Ceramic Mosaics

Conductive Tile

093100 Thin-Set Tiling

09320 BrickTile

093200 Mortar-Bed Tiling

09330 Quarry Tile

Chemical - Resistant Quarry Tile

093300 Conductive Tiling

09340 Paver Tile

Terra Cotta Tile

093400 Waterproofing-Membrane Tiling

09350 Glass Mosaic

093500 Chemical-Resistant Tiling

09354 Record Proposal Worksheet Summaries

09360 Plastic Tile

09370 Metal Tile

09380 Cut Natural Stone Tile

Agglomerate Tile

Stone Floor and Wall Covering

09390 Tile Restoration

09400 Terrazzo
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

09410 Portland Cement Terrazzo

Supply and install terrazzo tiles; include sand bed, mortar, grout,
cleaning, polishing, and all necessary material and accessories;
as per the specifications and drawings

Concrete, Approved Terrazzo Finish to Landing (Stairs) m2

Concrete, Approved Terrazzo Finish to Treads (Stairs) m

09420 Precast Terrazzo

Terrazzo Tile

09430 Conductive Terrazzo

09440 Plastic Matrix Terrazzo

09450 Stone Facing

09490 Terrazzo Restoration

09500 Ceilings

095000 Ceilings

09510 Acoustical Ceiling

Acoustical Metal Pan Ceilings

Acoustical Panel Ceilings

Acoustical Tile Ceilings

095100 Acoustical Ceilings

09511 Acoustical Panel Ceilings

095113 Acoustical Panel Ceilings

09521 Acoustical Ceiling Wall Panels

095300 Acoustical Ceiling Suspension Assemblies

09540 Special Wall Surfaces

095400 Specialty Ceilings

09545 Speciality Ceiling

Integrated Ceilings

Linear Metal Ceilings

Luminous Ceilings

09547 Linear Metal Ceilings

09550 Mirror Panel Ceiling

09560 Textured Ceiling

Gypsum Panel

Metal Panel

095600 Textured Ceilings

09570 Linear Wood Ceiling

095700 Special Function Ceilings


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

09580 Suspended Decorative Grid

095800 Integrated Ceiling Assemblies

09590 Ceiling Assembly Restoration

09600 Flooring

096000 Flooring

09610 Floor Treatment

Slip - Resistant Floor Treatment

Static - Resistant Floor Treatment

096100 Flooring Treatment

09620 Specialty Flooring

Asphalt Plank Flooring

Athletic Flooring

Plastic Laminate Flooring

096200 Specialty Flooring

09630 Masonry Flooring

Brick Flooring

Chemical - Resistant Brick Flooring

Flagstone Flooring

Granite Flooring

Marble Flooring

Slate Flooring

Stone Flooring

096300 Masonry Flooring

09635 Brick Flooring

09637 Stone Flooring

09640 Wood Flooring

Cushioned Wood Flooring Assemblies

Mastic Set Wood Flooring Assemblies

Resilient Wood Flooring Assemblies

Wood Athletic Flooring

Wood Block Flooring

Wood Composition Flooring

Wood Parquet Flooring

Wood Strip Flooring

096400 Wood Flooring

096429 Wood Strip & Plank Flooring


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

09644 Wood Athletic-flooring Assemblies

09650 Resilient Flooring

Resilient Base and Accessories

Resilient Sheet Flooring

Resilient Tile Flooring

096500 Resilient Flooring

09651 Resilient Tile Flooring

096513 Resilient Base & Assemblies

09652 Sheet Vinyl Floor Covering

09653 Resilient Wall Base and Accessories

09660 Static Control Flooring

Conductive Elastomeric Liquid Flooring

Conductive Resilient Flooring

Static Dissapative Resilient Flooring

Static - Resistant Resilient Flooring

096600 Terrazzo Flooring

09670 Fluid-Applied Flooring

Elastomeric Liquid Flooring

Epoxy - Marble Chip Flooring

Magnesium Oxychloride Flooring

Mastic Fills

Resinous Flooring

Seamless Quartz Flooring

096700 Fluid-Applied Flooring

09675 Resinous Flooring

09680 Carpet

Carpet Cushion

Carpet Tile

Indoor and Outdoor Carpet

Sheet Carpet

096800 Carpeting

096816 Sheet Carpeting

09690 Flooring Restoration

096900 Access Flooring

09700 Wall Finishes

09700 Wall Finishes


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

097000 Wall Finishes

09710 Acoustical Wall Finishes

09720 Wall Covering

Cork Wall Covering

Vinyl - Coated Fabric Wall Covering

Vinyl Wall Covering

Wall Fabrics

Wallpaper

097200 Wall Coverings

09730 Wall Carpet

097300 Wall Coverings

097300 Wall Carpeting

09740 Flexible Wood Sheet

Flexible Wood Veneers

097400 Flexible Wood Sheets

09750 Stone Facing

097500 Stone Facing

09760 Plastic Block

097600 Plastic Blocks

09770 Special Wall Surface

097700 Special Wall Surfacing

09780 Concrete Treatment

09800 Acoustical Treatment

098000 Acoustical Treatment

09810 Acoustical Space Unit

098100 Acoustic Insulation

09820 Acoustical Insulation and Sealant

Acoustical Insulation

Acoustical Sealants

09830 Acoustical Barrier

098300 Acoustic Finishes

09840 Acoustical Wall Treatment

098400 Acoustic Room Components

09900 Paints and Coatings

09900 Paints and Coating

09900 Painting
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

099000 Painting & Coating

09910 Paint

Paint to Internal Surfaces


Prepare surface, supply and apply acrylic sealer, min. 3 coats of
putty, one undercoat, three finish coats of odorless paint; as per
the specifications and drawings

Solvent base paint to ceiling (Kitchen) m2

Solvent base paint to wall (Kitchen) m2

Exterior Paints

Interior Paints

099100 Painting

099113 Exterior Painting

099123 Interior Painting

09930 Stains and Transparent Finishes

Exterior Opaque Stains

Exterior Transparent Finishes

Exterior Transparent Stains

Interior Opaque Stains

Interior Transparent Finishes

Interior Transparent Stains

Transparent Coatings

099300 Staining & Transparent Finishing

09940 Decorative Finishes

099400 Decorative Finishing

09950 Wall Coverings

09960 High-Performance Coating


Prepare surface (shot blasting), supply and apply 1 coat of a
two component polyamide cured sealer and 1 coat of a solvent
free, two component high build polyamine cured epoxy paint;
as per the specifications and drawings

Epoxy paint to floor; 540 microns (Parking) m2

Epoxy paint to floor; 680 microns + silica (Ramp) m2

Extra cost for different color for stall (Parking) m2

Directional Arrow; 540 microns with refelctive beads No

Physically Disabled Sign; 540 microns with reflective beads No.

F8: Flowcrete decksheild flooring (technical) m2

Abrasion - Resistant Coatings

Chemical - Resistant Coatings

Elastomeric Coatings

Fire - Resistant Paints


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Graffiti - Resistant Coatings

High - Build Glazed Coatings

Intumescent Paint

Marine Coatings

Textured Plastic Coatings

099600 High-Performance Coatings

09970 Coatings for Steel

099700 Special Coatings

09980 Coatings for Concrete and Masonry

09990 Paint Restoration

Maintenance Coatings

Paint Cleaning

FINISHES
Division 09 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL FINISHES

010 - - Specialties

10100 Visual Display Boards

10100 Visual Display Board

101000 Information Specialties

10110 Chalkboard

Fixed Chalkboards

Operable Chalkboards

Portable Chalkboards
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
101100 Visual Display Surfaces

101139 Visual Display Rails

10115 Markerboard

Electronic Markerboards

Fixed Markerboards

Operable Markerboards

Portable Markerboards

10120 Tackboard and Visual Aid Board

Fixed Tackboard

Magnetic Display Boards

Operable Display Boards

Portable Tackboard

101200 Display Cases

10130 Operable Board Unit

101300 Directories

10140 Display Track Assemblies

101400 Signage

10145 Visual Aid Board Unit

10150 Compartments and Cubicles

10150 Compartments and Cubicle

10155 Toilet Compartments

10160 Metal Toilet Compartment

10165 Plastic Laminate Toilet Compartment

10170 Plastic Toilet Compartment

101700 Telephone Specialties

10175 Particleboard Toilet Compartment

10180 Stone Toilet Compartment

101800 Informational Kiosks

10185 Shower and Dressing Compartment

10190 Cubicle

Cubicle Curtains

Cubicle Track and Hardware

10200 Louvers and Vents

Aluminum Louvers
Supply and install powder coated aluminum louver units; inc-
lude frame, supports, and all necessary material and accesso-
ries; as per the specifications and drawings

Louvers (for the shafts) m2


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Louver S02-L1; Overall dim.: 3000x4225mm No.

Door Type 14a ; Overall dim.: 5000x2200mm , 90mins Fire Rated


Removable louvre & door No.

Provisional sum for exhausted outlet (In Landscape only). PS =


USD 10,000 PS

102000 Interior Specialties

10210 Wall Louver

Motorized Louvers

Operable Louvers

Stationary Louvers

102100 Compartments & Cubicles

102113 Toilet Compartments

10220 Louvered Equipment Enclosure

102200 Partitions

10225 Door Louver

10230 Vent

Soffit Vents

Wall Vents

10240 Grilles and Screens

10250 Service Walls

102500 Service Walls

10260 Wall and Corner Guards

10260 Wall and Corner Guard

Bumper Guards

Corner Guards

Impact - Resistant Wall Protection

102600 Wall & Door Protection

10270 Access Flooring

Rigid Grid Access Flooring

Snap - On Stringer Access Flooring

Stringerless Access Flooring

102800 Toilet, Bath, & Laundry Accessories

102813 Toilet Accessories

10290 Pest Control

10290 Pest Control

Bird Control

Insect Control
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Rodent Control

1030 Special Conditions

10300 Fireplaces and Stoves

10300 Fireplaces and Stove

103000 Fireplace & Stoves

10305 Manufactured Fireplace

Manufactured Fireplace Chimneys

Manufactured Fireplace Forms

10310 Fireplace Specialties and Accessories

Fireplace Dampers

Fireplace Inserts

Fireplace Screens and Doors

Fireplace Water Heaters

103100 Manufactured Fireplaces

10320 Stove

103200 Fireplace Specialties

10330 Fireplace and Stove Restoration

10340 Manufactured Exterior Specialties

10340 Manufactured Exterior Specialties

Clocks

Cupolas

Spires

Steeples

Weatehrvanes

10345 Exterior Specialties Restoration

10350 Flagpoles

10350 Flagpole

Automatic Flagpoles

Ground - Set Flagpoles

Nautical Flagpoles

Wall - Mounted Flagpoles

103500 Stoves

10400 Identification Devices

10400 Identification Device

104000 Safety Specialties

10410 Directories
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Electronic Directories

104100 Emergency Access & Information Cabinets

10411 Directoies

10420 Plaque

10425 Signs

10430 Exterior Signage

Exterior Dimensional Letters

Exterior Electronic Message Signage

Exterior Post and Panel / Pylon Signage

Illuminated Exterior Signage

Non - Illuminated Exterior Signage

104300 Emergency Aid Specialties

10431 Signs

Supply and install signs; include anchors, bolts, and all neces-
sary material and accessories; as per the specifications and dra-
wings

Provisional Sum for supply and install of Parking signage and


convex mirror . Iincluding but not limited to Exit sign,
Physically Disabled sign, Stall No. Sign, Parking sign, wall
mounted signs. Include service room identification signage.
PS = USD 5,000 PS

Sign behind reception No.

Supply and installation of signage to public toilets and all service


rooms located on public distribution corridors, ground Floor and
basement. As specified.
Set

Apartment identification/number signage (Refer ID Dwgs) No.

10435 Ice Machine

10440 Interior Signage

Engraved Interior Signage

Illuminated Interior Signage

Interior Dimensional Letters

Interior Door Signage

Interior Electronic Message Signage

Non - Illuminated Interior Signage

104400 Fire Protection Specialties

104413 Fire Extinguisher Cabinets

104416 Fire Extinguishers

10450 Pedestrian Control Devices

10450 Pedestrian Control Device


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Detection and Counting Devices

Portable Posts and Railings

Rotary Gates 

Turnstiles

10500 Lockers

Coin Operated Lockers

Glass Lockers

Metal Lockers

Plastic - Laminate - Faced Lockers

Plastic Lockers

Recycled Plastic Lockers

Wood Lockers

105000 Storage Specialties

10505 Metal Lockers

10510 Plastic Laminate Lockers

105100 Lockers

10520 Fire Protection Specialties

Fire Blankets and Cabinets

Fire Extinquisher Accessories

Fire Extinquisher Cabinets

Fire Extinquishers

Wheeled Fire Extinquisher Units

10521 Fire Extiguishers and Cabinets

10522 Fire Extinguishers, Cabinets and Accessories

10530 Protective Cover

Awnings

Canopies

Car Shelters

Walkway Coverings

10550 Postal Specialties

Central Mail Delivery Boxes

Collection Boxes

Mail Boxes

Mail Chutes

105500 Postal Specialties

105600 Storage Assemblies

105700 Wardrobe & Closet Specialties


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

10600 Partition

10605 Wire Mesh Partition

10610 Folding Gate

10615 Demountale Partition

Demountable Gypsum Board Partitions

Demountable Metal Partitions

Demountable Wood Partitions

10630 Portable Partitions, Screens and Panel

10650 Operable Partition

Accordion Folding Partitions

Coiling Partitions

Folding Panel Partitions

Sliding Partitions

10670 Storage Shelving

Metal Storage Shelving

Mobile Storage Units

Prefabricated Wood Storage Shelving

Recycled Plastic Storage Shelving

Wire Storage Shelving

10700 Exterior Protection

107000 Exterior Specialties

10705 Exterior Sun Control Device

10710 Exterior Shutter

107100 Exterior Protection

10715 Storm Panel

10720 Exterior Louver

107300 Protective Covers

107400 Manufactured Exterior Speicalties

10750 Telephone Specialties

Telephone Directory Units

Telephone Enclosures

Telephone Shelving

107500 Flagpoles

10800 Toilet, Bath and Laundry Accessories


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
108000 Other Specialties

10801 Toilet and Bath Accessories

10810 Toilet Accessories

Commercial Toilet Accessories

Detention Toilet Accessories

Hospital Toilet Accessories

108100 Pest Control Devices

10820 Bath Accessories

Residential Bath Accessories

Shower and Tub Doors

108200 Grilles & Screens

10830 Laundry Accessories

Buildt - In Ironing Board

Cloths Drying Racks

108300 Flags & Banners

108600 Security Mirrors & Domes

10880 Scale

108800 Scales

10900 Wardrobe and Closet Specialties

Hat and Coat Racks


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

SPECIALTIES
Division 10 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within the
specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL SPECIALTIES

011 - - Equipment

11010 Maintenance Equipment

Floor and Wall Cleaning Equipment

Housekeeping Carts

Vacuum Cleaning Systems

Window Washing Systems

110100 Operation & Maintenance of Equipment

11012 Vacuum Cleaning Systems

11020 Security and Vault Equipment

11020 Security and Vault Equipment

Safe Deposit Boxes

Safes

Vault Doors and Day Gates

11030 Teller and Service Equipment

Automatic Banking Systems

Money Cart Pass - Through

Package Transfer Units

Service and Teller Window Units

Teller Equipment Systems

11040 Ecclesiastical Equipment

Baptisteries

Chancel Fittings

11050 Library Equipment

Automated Book Storage and Retrieval Systems

Book Depositories

Book Theft Protection Equipment

Library Stack Systems

110500 Common Work Results for Equipment

11070 Instrumental Equipment

Bells

Carillons

Organs
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

11072 Laser Equipment

11074 In-Channel Solids Grinder

11075 Surveying Equipment

11080 Registration Equipment

110800 Commissioning of Equipment

11086 Trickling Filter Rotary Distributor

11087 Synthetic Trickling Filter Media

11090 Checkroom Equipment

11100 Mercantile Equipment

Barber and Beauty Shop Equipment

Cash Registers and Checking Equipment

Display Cases

Food Processing Equipment

Food Weighing and Wrapping Equipment

111000 Vehicle & Pedestrian Equipment

11110 Commercial Laundry and Dry Cleaning Equipment

Dry Cleaning Equipment

Drying and Conditioning Equipment

Finishing Equipment

Ironing Equipment

Washers and Extractors

111100 Vehicle Service Equipment

11120 Vending Equipment

Money - Changing Machines

Vending Machines

111200 Parking Control Equipment

11130 Audio-Visual Equipment

Learning Laboratories

Projection Screens

Projectors

111300 Loading Dock Equipment

11131 Projection Screens

11132 Projection Screens

11140 Vehicle Service Equipment

Compressed Air Equipment


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Fuel Dispensing Equipment

Lubrication Equipment

Tire Changing Equipment

Vehicle Washing Equipment

111400 Pedestrian Control Equipment

11150 Parking Control Equipment

Supply and install automatic barrier gates; including aluminum


arm, vehicle detector, card reader, automatic vehicle counters,
3M reflective sheeting stripes on the arm, rubber protection
against impact, wiring and electrical installations, warning lights,
remote control operation, floor loop, and all necessary material
and accessories; as per the specifications and drawings

Folding-arm automatic barrier gate complete No.

Coin Machine Units

Key and Card Control Units

Parking Gates

Ticket Dispensers

111500 Security, Detention & Banking Equipment

11151 Dry-Pit Submersible Pump

11160 Loading Dock Equipment

Dock Bumpers

Dock Levelers

Dock Lifts

Portable Ramps, Bridges, and Platforms

Seals and Shelters

Truck Restraints

111600 Vault Equipment

11170 Solid Waste Handling Equipment

Bins

Chutes and Collectors

Packages Incinerators

Pneumatic Waste Equipment

Pulping Machines

Recycling Equipment

Waste Compactors and Destructors

111700 Teller & Service Equipment

111800 Security Equipment

11190 Detention Equipment


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
11200 Water Supply and Treatment Equipment

11200 Water Supply and Treatment Equipment

112000 Commercial Equipment

112100 Mercantile & Service Equipment

11220 Mixers and Flocculator

112200 Refrigerated Display Equipment

11225 Clarifier

11230 Water Aeration Equipment

112300 Commercial Laundry & Dry Cleaning Equipment

11240 Chemical Feed Equipment

Coagulant Feed Equipment

112400 Maintenance Equipment

11250 Water Softening Equipment

Base - Exchange or Zeolite Equipment

Lime - Soda Process Equipment

112500 Hospitality Equipment

11260 Disinfectant Feed Equipment

Chlorination Equipment

Hydrogen Power (pH) Equipment

112600 Unit Kitchens

11270 Fluoridation Equipment

11280 Hydraulic Gates and Valves

11280 Hydraulic Gates and Valve

112800 Office Equipment

11285 Hydraulic Gate

Bulkhead Gates

High - Pressure Gates

Hinged - Leaf Gates

Radial Gates

Slide Gates

Sluice Gates

Spillway Crest Gates

Vertical - Lift Gates

112900 Postal, Packaging & Shipping Equipment

11295 Hydraulic Valve

Butterfly Valves
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Regulating Valves

11300 Fluid Waste Treatment and Disposal Equipment

113000 Residential Equipment

11310 Sewage and Sludge Pump

Oil - Water Separators

Packaged Pump Stations

Sewage Ejectors

113100 Residential Appliances

11320 Grit Collecting Equipment

11330 Screening and Grinding Equipment

113300 Retractable Stairs

11335 Sedimentation Tank Equipment

11340 Scum Removal Equipment

11345 Chemical Equipment

11350 Sludge Handling and Treatment Equipment

11360 Filter Press Equipment

11365 Trickling Filter Equipment

11370 Compressor

11375 Aeration Equipment

11380 Sludge Digestion Equipment

11385 Digester Mixing Equipment

11390 Package Sewage Treatment Plant

11400 Food Service Equipment

114000 Foodservice Equipment

11405 Food Storage Equipment

11410 Food Preparation Equipment

114100 Food Storage Equipment

11415 Food Delivery Carts and Conveyor

11420 Food Cooking Equipment

114200 Food Preparation Equipment

11425 Hood and Ventilation Equipment

Surface Fire Suppression Equipment

11430 Food Dispensing Equipment

Bar Equipment

Service Line Equipment


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Soda Fountain Equipment

114300 Food Delivery Carts & Conveyors

11440 Cleaning and Disposal Equipment

114400 Food Cooking Equipment

11450 Residential Equipment

11458 Disappearing Stairs

11460 Unit Kitchens

Supply and install kitchen cabinets and cupboards comprising


plastic laminated box, moisture resistant MDF wood leaves and
drawers, plastic laminate finish, solid polymer fabrication top,
splashback and integral sink, faucet, supplies, sink outlet with
disposer, drain piping, bar sink outlet, stainless steel hardware,
cuttlery drawers and board, indirect lighting, and all necessary
material and accessories; as per the specifications and drawings

Floors 1 to 5

Kitchen Cabinets and Cupboard (Apartment 3H) No.

114600 Food Dispensing Equipment

11470 Darkroom Equipment

Darkroom Processing Equipment

Revolving Darkroom Doors

Transfer Cabinets

114700 Ice Machines

Athletic, Recreational, and Therapeutic Equipment

Backstops

Bowling Alley Equipment

Exercise Equipment

Gymnasium Dividers

Gymnasium Equipment

Scoreboards

Shooting Range Equipment

Therapeutic Equipment

114800 Cleaning & Disposal Equipment

1150 Measurement & Payment

11500 Industrial and Process Equipment

115000 Educational & Scientific Equipment

115100 Library Equipment

115200 Audio-Visual Equipment

115213 Projection Screens

115300 Laboratory Equipment

115500 Planetarium Equipment


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

115600 Observatory Equipment

115700 Vocational Shop Equipment

115900 Exhibit Equipment

11600 Laboratory Equipment

116000 Entertainment Equipment

116100 Theater & Stage Equipment

116200 Musical Equipment

11650 Planetarium Equipment

116500 Athletic & Recreational Equipment

11660 Observatory Equipment

116600 Athletic Equipment

116700 Recreational Equipment


11680 Office Equipment

116800 Play Field Equipment & Structures

11700 Medical Equipment

117000 Healthcare Equipment

11701 Curtain Tracks & Curtains

11710 Medical Sterilizing Equipment

117100 Medical Sterilizing Equipment

11720 Examination and Treatment Equipment

117200 Examination & Treatment Equipment

11730 Patient Care Equipment

117300 Patient Care Equipment

11740 Dental Equipment

117400 Dental Equipment

11750 Optical Equipment

117500 Optical Equipment

11760 Operating Room Equipment

117600 Operating Room Equipment

11770 Radiology Equipment

117700 Radiology Equipment

11780 Mortuary Equipment

117800 Mortuary Equipment

117900 Therapy Equipment

118200 Solid Waste Handling Equipment

11850 Navigation Equipment

11870 Agricultural Equipment


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

11900 Exhibit Equipment

119000 Other Equipment

119100 Religious Equipment

119200 Agricultural Equipment

119300 Horticultural Equipment

EQUIPMENT
Division 11 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL EQUIPMENT

012 - - Furnishings

12050 Fabrics

120500 Common Work Results for Furnishings

120600 Schedules for Furnishings

120800 Commissioning of Furnishings

12100 Art

121000 Art

12110 Murals

Commissioned Paintings

Faux Finishes

Photo Murals

121100 Murals

121200 Wall Decorations

12140 Sculpture

121400 Sculptures

12170 Art Glass

Etched Glass

Stained Glass

121700 Art Glass

12190 Ecclesiastical Art

121900 Religious Art

122000 Window Treatments

122100 Window Blinds


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

122113 Horizontal Louver Blinds

122200 Curtains & Drapes

122300 Interior Shutters

122400 Window Shades

122413 Roller Window Shades

122500 Window Treatment Operating Hardware

12300 Manufactured Casework

123000 Casework

12304 Plastic Laminate Casework

12310 Maunfactured Metal Casework

123100 Manufactured Metal Casework

12320 Manufactured Wood Casework

Wood - Veneer - Faced Casework

Plastic - Laminate - Faced Casework

123200 Manufactured Wood Casework

123400 Manufactured Plastic Casework

12350 Specialty Casework

Bank Casework

Dental Casework

Display Casework

Dormitory Casework

Educational Facility Casework

Hospital Casework

Kitchen Casework

Laboratory Casework

Library Casework

Medical Casework

Nurse Station Casework

Religious Casework

Residential Casework

123500 Specialty Casework

Study Carrels

123600 Countertops

12400 Furnishings and Accessories

12400 Furnishings and Accessories


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
124000 Furnishings & Accessories

12410 Office Accessories

Desk Accessories

124100 Office Accessories

12420 Table Accessories

China

Flatware

Glassware

Hollowware

Napery

Silverware

Table Linens

124200 Table Accessories

12430 Portable Lamp

Desk Lamps

Floor Lamps

Table Lamps

124300 Portable Lamps

12440 Bath Furnishing

Bath Linens

Bath Mats

Bath Towels

Shower Curtains

124400 Bath Furnishings

12450 Bedroom Furnishing

Bed Linens

Blankets

Comforters

Pillows

124500 Bedroom Furnishings

12460 Furnishing Accessories

Ash Receptacles

Bowls

Clocks

Decorative Crafts
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Decorative Screens

Vases

Waste Receptacles

124600 Furnishing Accessories

12480 Rugs and Mat

Floor Mats

Rugs

Runners

124800 Rugs & Mats

12490 Window Treatment

Blinds

Curtain and Drapes

Interior Shutters

Shades

Solar - Control Film

Window Treatment Hardware

12500 Furniture

125000 Furniture

12510 Office Furniture

Custom Office Furniture

Office Case Goods

125100 Office Furniture

12520 Seating

Chairs

Custom Upholstered Seating

Upholstered Seating

125200 Seating

125300 Retail Furniture

12540 Hospitality Furniture

Hotel Furniture

Motel Furniture

Restaurant Furniture

125400 Hospitality Furniture

12560 Institutional Furniture

Book Shelves
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Classroom Furniture

Dormitory Furniture

Health Care Furniture

Index Card File Cabinets

Laboratory Furniture

Library Furniture

Study Carrels

125600 Institutional Furniture

125700 Industrial Furniture

12580 Residential Furniture

125800 Residential Furniture

125900 Systems Furniture

12600 Multiple Seating

126000 Multiple Seating

12610 Fixed Audience Seating

126100 Fixed Audience Seating

12620 Portable Audience Seating

Folding Chairs

Interlocking Chairs

Stacking Chairs

126200 Portable Audience Seating

12630 Stadium and Arena Seating

126300 Stadium & Arena Seating

12640 Booths and Table

126400 Booths & Tables

12650 Multiple-Use Fixed Seating

126500 Multiple-Use Fixed Seating

12660 Telescoping Stand

Telescoping Bleachers

Telescoping Chair Platforms

126600 Telescoping Stands

12670 Pews and Benches

126700 Pews & Benches

12680 Seat and Table Assemblies

126800 Seat & Table Assemblies

12700 Systems Furniture

12710 Panel-Hung Component System Furniture


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

12720 Free-Standing Component System Furniture

12730 Beam System Furniture

12740 Desk System Furniture

12800 Interior Plants and Planters

12810 Interior Live Plant

12820 Interior Artificial Plant

12830 Interior Planter

12840 Interior Landscape Accessories

12850 Interior Plant Maintenance

12900 Furnishings Restoration and Repair

129000 Other Furnishings

129200 Interior Planters & Artificial Plants

129300 Site Furnishings

Furnishings
Division 12 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL FURNISHINGS

013 - - Special Construction

13010 Air-Supported Structures

130100 Operation & Maintenance of Special Construction

13020 Building Modules

Prison Cells

Hotel and Dormitory Units

13030 Special Purpose Rooms

13030 Special Purpose Room

Athletic Rooms

Clean Rooms

Cold Storage Rooms


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Hyperbaric Rooms

Insulated Rooms

Office Shelters and Booths

Planetariums

Prefabricated Rooms

Saunas

Sound - Conditioned Rooms

Steam Baths

Vaults

13038 Cold Storage Rooms

130500 Common Work Results for Special Construction

130600 Schedules for Special Construction

13080 Sound, Vibration, and Seismic Control

130800 Commissioning of Special Construction

13090 Radiation Protection

13090 Radiation Protection

13100 Lightning Protection

131000 Special Facility Components

13110 Cathodic Protection

131100 Swimming Pools

13120 Pre-Engineered Structures

Cable - Supported Structures

Fabric Structures

Glazed Structures

Grandstands and Bleachers

Metal Building Systems

Modular Mezzanines

Observatories

Portable and Mobile Buildings

Pre - Engineered Buildings

Prefabricated Control Booths

Prefabricated Dome Structures

131200 Fountains

13123 Glazed Structures

13128 Portable and Mobile Buildings

131300 Aquariums
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

13150 Swimming Pools

Below Grade Swimming Pools

Elevated Swimming Pools

On - Grade Swimming Pools

Recirculating Gutter Systems

Swimming Pool Accessories

Swimming Pool Cleaning Systems

13152 Pool Pumps

13153 Pool Valves

13154 Pool Piping

13155 Pool Disinfection Syytem & Chemical Equipment

13156 Pool Filter Construction

13157 Pool Sealants

13160 Aquariums

13161 Pool Concrete Formwork

13162 Pool Concrete Reinforcement

13165 Aquatic Park Facilities

13165 Aquatic Park Facilities

Water Slides

Wave Pools

13166 Pool Deck Equipment

13167 Pool Equipment Illustrations

13170 Tubs and Pools

Hot Tubs

Therapeutic Pools

Whirlpool Tubs

131700 Tubs & Pools

13175 Ice Rinks

13175 Ice Rink

13180 Site Constructed Incinerators

131800 Ice Rinks

13185 Kennels and Animal Shelters

13190 Site-Constructed Incinerators

Sludge Incinerators
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Solid Waste Incinerators

131900 Kennels & Animal Shelters

13200 Storage Tanks

13200 Storage Tank

Elevated Storage Tanks

Ground Storage Tanks

Tank Cleaning Procedures

Tank Lining

Underground Storage Tanks

132000 Special Purpose Rooms

132100 Controlled Environment Rooms

13220 Filter Underdrains and Media

Filter Bottoms

Filter Media

Package Filters

132200 Office Shelters & Booths

13230 Digester Covers and Appurtenances

Fixed Covers

Floating Covers

Gasholder Covers

132300 Planetariums

13240 Oxygenation Systems

Oxygen Dissolution System

Oxygen Generators

Oxygen Storage Facility

132400 Special Activity Rooms

13260 Sludge Conditioning Systems

13260 Sludge Conditioning System

132600 Fabricated Rooms

13280 Hazardous Material Remediation

13280 Hazardous Material Remediation

132800 Athletic & Recreational Special Construction

13300 Utility Control Systems

133000 Special Structures

133100 Fabric Structures

133200 Space Frames

133300 Geodesic Structures


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

133400 Fabricated Engineered Structures

133600 Towers

13400 Measurement and Control Instrumentation

134000 Integrated Construction

13410 Basic Measurement and Control Instrumentation Materials and Methods

Elrctronic Wire and Cable

Instrument Air Accessories

Instrument Air Tubing

Optical Fiber Cable

13420 Instrument

Control Valves

Differential Pressure Instruments

Flowmeters

Gage Glasses and Cocks

Level Instruments

Orifice Plates and Flanges

Potentiometric Instruments

Pressure Instruments

Receiver Instruments

Temperature Instruments

Traps and Drainers

134200 Building Modules

13430 Boxes, Panels and Control Center

13440 Indicators, Recorders and Controller

Annunciators

Controllers

Indicators

Recorders

134400 Modular Mezzanines

13450 Central Control

13480 Instrument Lists and Report

Instrument Diagrams

Instrument Layouts

Instrument Lists

134800 Sound, Vibration & Seismic Control


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

13490 Measurement and Control Commissioning

134900 Radiation Protection

13500 Recording Instrumentation

135000 Special Instrumentation

13510 Stress Instrumentation

135100 Stress Instrumentation

13520 Seismic Instrumentation

135200 Seismic Instrumentation

13530 Meteorological Instrumentation

135300 Meteorological Instrumentation

13550 Transportation Control Instrumentation

13560 Airport Control Instrumentation

13570 Railroad Control Instrumentation

13580 Subway Control Instrumentation

13590 Transit Vehicle Control Instrumentation

13600 Solar and Wind Energy Equipment

13610 Solar Flat Plate Collector

Air Collectors

Liquid Collectors

13620 Solar Concentrating Collector

13625 Solar Vacuum Tube Collector

13630 Solar Collector Component

Solar Absorber Plates or Tubing

Solar Coatings and Surface Treatment

Solar Collector Insulation

Solar Glazing

Solar Housing and Framing

Solar Reflectors

13700 Security Access and Surveillance

Door Answering

Intrusion Detection

Security Access

Video Surveillance

13750 Cogeneration Systems

13800 Building Automation and Control

13800 Building Automation and Control


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Clock Control

Door Control

Elevator Monitoring and Control

Energy Monitoring and Control

Environmental Control

Escalator and Moving Walks

Lighting Control

13850 Detection and Alarm

Fire Alarm

Gas Detection

Leak Detection

Smoke Alarm

13851 Fire Alarm

Intelligent/Addressable Fire Alarm System

Supply, install, connect and test, complete addressable working


system including fire resistant cables, conduits, boxes, special
conductors, junction, derivation and outlet boxes, connectors,
fittings and all related accessories, as specified and shown on
drawings

Fire Alarm Control Panel with : power supply, batteries charger,


backup batteries (24 hours operation under normal conditions and 1
hour operation under alarm conditions), surge arresters and built-in
printer No

Interface with Elevators Item

Interface with Emergency Generators Sets Item

Interface with fuel level inside fuel tank Item

Interface with water level inside fire water tank Item

Interface with general authority of civil deffence Item

Monitoring module 1 input for monitoring the flow switch (refer to


fire protection drawings for exact number and location of flow
switches) No

Monitoring module 1 input for monitoring the tamper switch (refer


to fire protection drawings for exact number and location of tamper
switches) No

Supervisory control panel - Repeats/monitors all signals for


mechanical systems. No

Photo electric Smoke detector with sounder base No

Heat Detectors on ceiling No

Photo electric Smoke detector on ceiling No

Combination smoke and heat detectors on ceiling/walls. No

Combination smoke and heat detectors on ceiling, flame proof No

Manual pull station No


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Manual pull station water proof No

End of line resister No

Fire alarm telephone Jack No

Fire Alaram Bell No

Fire Alarm Bell WP No

Fire Alarm Bell With Beacon No

13900 Fire Suppression

13910 Fire Protection Basic Materials and Method

Hangers and Supports

Pipe and Fittings

Piping Specialties

Valves

13920 Fire Pump

13930 Wet-Pipe Fire Suppression Sprinkler

13935 Dry-Pipe Fire Suppression Sprinkler

13940 Pre-Action Fire Suppression Sprinkler

13945 Comination Dry-Pipe and Pre-Action Fire Suppression Sprinkler

13950 Deluge Fire Suppression Sprinkler

13955 Foam Fire Extinguishing

13960 Carbon Dioxide Fire Extinguishing

13965 Alternative Fire Extinguishing System

Halon Alternative

Water Mist

13970 Dry Chemical Fire Extinguishing

13975 Standpipes and Hoses


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

SPECIAL CONSTRUCTION
Division 13 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL CONSTRUCTION

014 - - CONVEYING SYSTEMS

14100 Dumbwaiter

141000 Dumbwaiters

14110 Manual Dumbwaiter

141100 Manual Dumbwaiters

14120 Electric Dumbwaiter

141200 Electric Dumbwaiters

14140 Hydraulic Dumbwaiter

141400 Hydraulic Dumbwaiters

14200 Elevators

142000 Elevators

14210 Electric Traction Elevator

Electric Traction Freight Elevators

1 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract

2 Allow provisional sum for lift seperation beams. Cur

Electric Traction Passenger Elevators

3 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Refer to particular Conditions of Contract

4 Allow provisional sum for lift seperation beams. Cur

Electric Traction Residential Elevators

5 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract

6 Allow provisional sum for lift seperation beams. Cur

Electric Traction Service Elevators

7 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract

8 Allow provisional sum for lift seperation beams. Cur

142100 Electric Trantion Elevators

14240 Hydraulic Elevator

Hydraulic Freight Elevators

1 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract

2 Allow provisional sum for lift seperation beams. Cur

Hydraulic Passenger Elevators

3 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract

4 Allow provisional sum for lift seperation beams. Cur

Hydraulic Residential Elevators

5 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract

6 Allow provisional sum for lift seperation beams. Cur

Hydraulic Service Elevators

7 Allow for coordination, builders work and attendance Fee Only Item
Specify the % of attendance fees that will include:
* Quality control
* time Control
* Coordination
* Monitoring
* Shop Drawings
* Material submittals
Refer to particular Conditions of Contract

8 Allow provisional sum for lift seperation beams. Cur

142400 Hydraulic Elevators

142600 Limited-Use/Limited-Application Elevators

14270 Custom Elevator Cab

Cab Finishes

142700 Custom Elevator Cabs

14280 Elevator Equipment and Control

Elevator Doors

Elevator Controls

142800 Elevator Equipment & Controls

14290 Elevator Renovation

14300 Escalators and Moving Walks

Escalators and Moving Walk


143000
Escalators & Moving Walks
143100
Escalators
143200
Moving Walks
143300
Moving Ramps

14400 Lift

144000 Lifts

14410 People Lift

Counterbalanced People Lifts

Counterbalanced People Lifts

144100 People Lifts

14420 Wheelchair Lift


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Inclined Wheel Chair Lifts

Vertical Wheel Chair Lifts

144200 Wheelchair Lifts

14430 Platform Lift

Orchestra Lifts

Stage Lifts

144300 Platform Lifts

14440 Sidewalk Lift

144400 Sidewalk Lifts

14450 Vehicle Lift

144500 Vehicle Lifts

14500 Material Handling

14510 Material Transport

Guided Vehicle Material Handeling

Track Vehicle Material Handeling

14530 Postal Conveying

14540 Baggage Conveying and Dispensing

14550 Conveyor

Belt Conveyors

Bucket Conveyors

Container Conveyors

Hopper and Track Conveyors

Monorail Conveyors

Oscillating Conveyors

Pneumatic Conveyors

Roller Conveyors

Scoop Conveyors

Screw Convyors

Selective Vertical Conveyors

14560 Chute

Supply and install garbage chute, 600mm diameter, 30 liter hop-


pper door, foot pedal operated with rubber frame, indicator lights,
electro-magnetic lock, cleaning sprinklers, disinfecting and sa-
nitizing unit, automatic brush cleaning system, fan, fire cut off
door at bottom of chute, electrical connections, and all neces-
sary material and accessories; as per the specifications and dra-
wings

1 Coal Chutes No.

2 Dry Bulk Material Chutes No.


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
3 Escape Chutes No.

4 Laundry and Linen Chutes No.

5 Package Chutes No.

6 Refuse Chutes No.

7 Garbage chute No.

8 Garbage containers with 4 wheels, 1.1m3 capacity suitable for


municipality trash collection vehicle No.

9 Compactor No.

14570 Feeder Equipment

Apron Feeders

Reciprocating Plate Feeders

Rotary Airlock Feeders

Rotary Flow Feeders

Vibratory Feeders

14580 Pneumatic Tube System

14600 Hoists and Cables

14600 Hoists and Crane

14605 Crane Rail

14610 Fixed Hoist

Air - Powered Fixed Hoists

Electric Fixed Hoists

Manual Fixed Hoists

14620 Trolley Hoist

Air - Powered Trolley Hoists

Electric Trolley Hoists

Manual Trolley Hoists

14630 Bridge Crane

Top - Running Overhead Cranes

Underslung Overhead Cranes

14640 Gantry Cranes

14650 Jib Cranes

14670 Tower Cranes

14680 Mobile Crane

14690 Derrick

14700 Turntables

14600 Hoists and Crane


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

14605 Crane Rail

14610 Fixed Hoist

Air - Powered Fixed Hoists

Electric Fixed Hoists

Manual Fixed Hoists

14620 Trolley Hoist

Air - Powered Trolley Hoists

Electric Trolley Hoists

Manual Trolley Hoists

14630 Bridge Crane

Top - Running Overhead Cranes

Underslung Overhead Cranes

14640 Gantry Cranes

14650 Jib Cranes

14670 Tower Cranes

14680 Mobile Crane

14690 Derrick

14800 Scaffolding

148000 Scaffolding

14810 Suspended Scaffolding

Beam Scaffolding

Carriage Scaffolding

Hook Scaffolding

148100 Suspended Scoffolding

14820 Rope Climber

Manual Rope Climbers

Powered Rope Climbers

148200 Rope Climbers

14830 Telescoping Platforms

Electric and Battery Telescoping Platforms

Pneumatic Telescoping Platforms

148300 Elevating Platforms

14840 Powered Scaffolding

148400 Powered Scoffolding

14900 Transportation
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

149000 Other Conveying Equipment

14910 People Mover

149100 Facility Chutes

14920 Monorail

149200 Pneumatic Tube Systems

14930 Funicular

14940 Aerial Tramway

14950 Aircraft Passenger Loading

CONVEYING SYSTEMS
Division 14 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL CONVEYING SYSTEMS

15 - - Mechanical

15050 Basic Mechanical Materials and Method

15055 Motors

15060 Hangers and Support

15061 Steel Pipe

15062 Ductile Iron Pipe

15064 Plastic Pipe

15068 PVC Composite Pipe

15070 Mechanical, Sound, Vibration and Seismic Control

15075 Mechanical Identification

15080 Mechanical Insulation

Duct Insulation

Equipment Insulation

Piping Insulation

15090 Mechanical Restoration and Retrofit

15100 Building Services Piping

15102 Plug Valves

15105 Pipes and Tubes

15110 Valve

GENERAL-DUTY VALVES FOR PLUMBING PIPING

Valves and fittings complete; as specified and as shown on


drawings

1 20 mm Gate Valve No

2 25 mm Gate Valve No

Automatic air vent complete with valve and fittings; as specified


and as shown on drawings

11 AAV 100 diameter No

12 GRP tank - Roof top No


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

15120 Piping Specialties

15130 Pump

WATER PUMPS

Water pumps complete with all necessary supports, controls,


gauges, flexible connections, casings, valves, control panel,
accessories, joints, connections, wires and wiring, anti vibration
control, etc complete; as specified and as shown on drawings

RAW CWS TRANSFER PUMP (10 l/s@ 20m) No

FILTERED CWS TRANSFER PUMP (7 l/s@40m) No

CW BOOSTER PUMP SET (6 l/s@25m) No

CENTRIFUGAL FIRE PUMPS

Fire pump sets including supports, valves, controller, anti-vibration


control, wires and wiring, joints, fuel tank, fuel pipes, connections,
accessories, automatic transfer switch, connections to suction and
discharge pipework and electrical connections to local outlets /
control panel, etc. complete; as specified and as shown on drawings

FFP-1 - Main - Electric Driven - (1000 GPM @ 12.5BAR No

JP - Jockey - (10 GPM @ 12.5) No

FFP-2 - Diesel Engine Driven - (1000 GPM @12.5BAR No

15135 Meters and Gauges

15140 Domestic Water Piping

Domestic water Polypropylene (PP-r) pipework system including


fittings, joints, connections, complete; as specified and as shown on
drawings

Disinfecting Potable Water Piping

Non - Potable Water Piping

Potable Water Piping

Cold water pipes

1 20 mm diameter m

10 Roof top G|R|P tank No.

15145 Hangers and Supports

15150 Sanitary Waste and Vent Piping

Interceptors

Sanitary Piping

Sanitary Piping Separators

Drainage PVC pipework system, including all fittings, spouts,


joints, connections, hangers, supports, clips, anchors and the like
complete; as specified and as shown on drawings ()

25 m

40 m
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Drainage acoustic PVC pipe work system, including all fittings,
spouts, joints, connections, hangers, supports, clips, anchors and
the like complete; as specified and as shown on drawings ()

75 m

Rainwater, pipework system, including all fittings, joints,


connections, anchors, supports, clips and the like; as specified and
as shown on drawings ()

100 diameter drain pipe m

15160 Storm Drainage Piping

Retrofit Roof Drains

Roof Drains

Roof Drain Specialties

Storm Drainage Piping

Drainage inlet points, integral trap and auxiliary inlet, adjustable


strainer; set in finished flooring, outlet passing through structural
slab; include for connecting pipework and bends up to horizontal
pipework complete; as specified and as shown on drawings

Garage Floor Drain No

RWO No

Ceiling Clean Out 100mm No

Concrete water tanks

Allow for connections to concrete water tanks, (4 Nos) including


isolating valves, float valves, overflow, drain, vent, puddle flange,
sleeves, level switches and alarms for 2 sets (1 Fire, 1 Domestic
water and 1 Irrigation pump sets); as specified and indicated on
drawings
Item

15170 Swimming Pool and Fountain Piping

Reflecting Pool and Fountain Piping

Reflecting Pool and Fountain Specialties

Swimming Pool Piping

Swimming Pool Specialties

15180 Heating and Cooling Piping

Condensate Drain Piping

Heating and Cooling Pumps

Hydronic Piping

Refrigerant Piping

Steam and Condensate Piping

Steam Condensate Pumps

Water Treatment Equipment

15190 Fuel Piping

Fuel Oil Piping


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Fuel tank black steel including manhole, all fittings, joints,


connections and valves, complete; as specified and as shown on
drawings

1 Daily fuel tank for the Diesel Fire Pump No

2 Bulk fuel tank for generators 16 hrs capacity with associated


equipment as per specification. No

2.1 Allow for provisional sum for construction of bulk fuel store room
including all civil and MEP related works: Blockwork, lighting,
flame detector, power, containment etc. PS = USD 12,000
PS

Fuel Oil Pumps

Fuel Oil Specialties

Liquid Petroleum Gas Piping

Natural Gas and Liquid Petroleum Gas Specialties

Natural Gas Piping

15200 Process Piping

15210 Process Air and Gas Piping

Air Compressors

Compressed Air Piping

Gas Equipment

Gas Piping

Helium Piping

Nitrogen Piping

Nitrous Oxide Gas Piping

Vacuum Pumps

Vacuum Piping

15220 Process Water and Waste Piping

Deionized Water Piping

Distilled Water Piping

Laboratory Acid Waste and Vent Piping

Process Piping Interceptors

Reverse Osmosis Water Piping

15230 Industrial Process Piping

Dry Product Piping

Fluid Product Piping

152300 Wood Product Manufacturing Equipment

15241 Vibration Control


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

15250 Mechanical Insulation

15290 Ductwork Insulation

15300 Fire Protection Piping

15310 Fire Protection Piping

15330 Wet-Pipe Sprinkler System

Black steel schedule 40 pipework distribution network including all


fittings, spouts, joints, connections, hangers, supports, clips,
anchors and the like complete; as specified and as shown on
drawings

25 mm diameter m

Upright Sprinklers No

Recessed type sprinkler No

Ceiling Mounted Automatic Powder Extinguishers No

Pre-action sprinkler No

ABC Dry Powder Extinguisher

ABC dry powder extinguishers as specified and per NFPA 2001,


complete with cylinders, piping, valves, nozzles, detectors, alarms,
dampers, controls and all needed accessories for the good operation
of the system.(540) and foam suppression system (capacity is
subject to approved calculations.)

ceiling mounted ABC automatic dry


Area 130m2 Item

Spare parts for mechanical sytems Item

15400 Plumbing Fixtures and Equipment

15410 Plumbing Fixture

PPRPipes Exposed shall be thermally insulated by 19mm flexible


closed cell elsatometric foam unsulation and cladded 25 gauge
aliminum cladding

1 50mm diameter m

2 75mm diameter m

3 100mm diameter m

4 110mmdiameter m

5 160mm diameter m

Sanitary Fixtures

Supply and install sanitary fixtures; include all necessary ma-


terial and accessories; as per the specifications and drawings
(All brands are or approved equivalent)

Bathroom (TYPE 7) Maid Bathroom

Wc Pan / Close Coupled / Adria' Collection G0801. Floor Standing


6
close coupled Wc bowl, horizontal , outlet . No.

WHB/ Exposed chrome bottle trap/ Adria' collection G0855


7 55x45cm
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
wash basin, central tap hole purched, 2 semi pre-punched outer .

tap holes No.

Shower Fittings/ Wall mounted shower head/ Celia' build-in (wall


8 fixed)
head shower, 3 function overhead shower . No.

Abultion Spray/ ABS minimal shut-off KIT- Art / Pentagono


9 rubinetterie /
2520 Art. No.

Bathroom (TYPE 6)

10 Wc Pan / Floor mounted / Ventuno standard close couple Wc No.


horizontal out T321001.

WHB / Wall mounted / White wash hand basin with exposed


11 chrome
bottle trap, white round / E001301 wash basin 45cm wall mounted,
back
outlet, no tap hole punched . No.

Shower Set / Mixer and shower head for over bath / Celia
12 collection .
Celia 3F hand spray , ideal flex 1600mm, sliding bar / 900mm . No.

Shower Set / Mixer and shower head for over bath / Ideal standard
13 jasper
Morison Thermistatic mixer and shower head . No.

14 Toilet Roller Holder / Chrome / tbc . No.

15 Coat Hook / Chrome / Nemox collection, 6513-02 No.

Towel Rail / Chrome / Nemox' collection. Type 6506-02. Badgreep


16 30cm,
grab rail 30cm . No.

17 Soap Tray / Soap Basket / Bloq' collection. 161x107x50mm . No.

18 SS curtain rail, one sided (Where aapplicable) 700x1500mm No.

Abultion Spray / ABS minimal shut -off KIT -Art / Pentagono


19 Rubinetterie
2520 Art . No.

Bathroom (Type 3)

20 Wc Pan / Floor mounted / Ventuno standard close couple Wc No.


horizontal out T321001.

WHB / Wall mounted / White wash hand basin with exposed


21 chrome
bottle trap, white round / E001301 wash basin 45cm wall mounted,
back
outlet, no tap hole punched . No.

Bath / 1700x800mm / White. Central waste and tap holes .


22 Requires bath
panel, front panel (E002401), end panel (E002501) / Celia bath
mixer . No.

Shower Set / Mixer and shower head for over bath / Celia
23 collection .
Celia 3F hand spray , ideal flex 1600mm, sliding bar / 900mm . No.

Shower Set / Mixer and shower head for over bath / Ideal standard
24 jasper
Morison Thermistatic mixer and shower head . No.

Shower Set / Mixer and shower head for over bath / Celia' shower
25 mixer
build-in 185mm dia, with metal handle . No.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
26 Toilet Roller Holder / Chrome / Nemox' Collection . No.

27 Coat Hook / Chrome / Nemox' Collection, 6513-02 . No.

Towel Rail / Chrome / Nemox' Collection. Type 6506-02.


28 Badgreep 30cm,
grab rail 30cm . No.

29 Soap Tray / Soap Basket / Bloq' collection. 161x107x50mm . No.

30 SS curtain rail, one sided (Where aapplicable) 700x1500mm No.

Abultion Spray / ABS minimal shut -off KIT -Art / Pentagono


31 Rubinetterie
2520 Art . No.

Bathroom (TYPE 1) Powder Room

WHB / Wall hung concealed cistern / Ideal standard, 'White' 40cm


32 back
outlet with 'Silver' 1/4 turn tap set and exposed outlet in chrome.
Wall
mounted, one tap hole. No.

33 Wc Pan / Floor mounted / Ventuno standard close couple Wc No.


horizontal out T321001.

34 Toilet Roller Holder / Chrome / Nemox' Collection . No.

35 Coat Hook / Chrome / Nemox' Collection, 6513-02 . No.

Towel Rail / Chrome / Nemox' Collection. Type 6506-02.


36 Badgreep 30cm,
grab rail 30cm . No.

Abultion Spray / ABS minimal shut -off KIT -Art / Pentagono


37 Rubinetterie
2520 Art . No.

Bathroom (Type 2A) Master Bedroom

38 Wc Pan / Floor mounted / Ventuno standard close couple Wc No.


horizontal out T321001.

39 Bidet / Floor mounted /Ventuno free standing bidet-one


taphole T515001 No.

Vanity Basins/ Top mounted square 460mm diameter / 'White'


40 collection
40cm round vessel basin E000601 . No.

41 Bath / Ideal cast rectangular as specified. No.

Bath Mixer / Chrome plated brass / 'Celia' collection bath and


42 shower
mixer 4 hole RIM mounted . Ceramic vavles, metal handle,
automatic
divertor. Fixed Spout with Height of spout 197mm, manual
diverter on
spout, hand shower with 3 function and flexible 150cm shower
hose, chrome. No.

Shower Set / Shower head / Celia' Collection. Celia 3F hand spray ,


43 ideal flex
1600mm, sliding bar / 900mm. No.

44 Toilet Roller Holder / Chrome / Nemox' Collection . No.

45 Coat Hook / Chrome / Nemox' Collection, 6513-02 . No.

Towel Rail / Chrome / Nemox' Collection. Type 6506-02.


46 Badgreep 30cm,
grab rail 30cm . No.

47 Soap Tray / Soap Basket / Bloq' collection. 161x107x50mm . No.


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

48 ss curtain and rail, one sided (Where applicable) 700x1500mm No.

Abultion Spray / ABS minimal shut -off KIT -Art / Pentagono


49 Rubinetterie
2520 Art . No.

Bathroom (TYPE 2) Master Bedroom

50 Wc Pan / Floor mounted / Ventuno standard close couple Wc No.


horizontal out T321001.

51 Bidet / Floor mounted /Ventuno free standing bidet-one No.


taphole T515001

WHB / Wall hung 'White' collection 40cm round vessel basin


52 E000601. No.

53 Bath / Ideal cast rectangular bath as specified No.

Bath Mixer / Chrome plated brass / 'Celia' collection bath and


54 shower
mixer 4 hole RIM mounted . Ceramic vavles, metal handle,
automatic
divertor. Fixed Spout with Height of spout 197mm, manual
diverter on
spout, hand shower with 3 function and flexible 150cm shower
hose, chrome. No.

Shower Set / Mixer and shower head for over bath / Celia
55 collection .
Celia 3F hand spray , ideal flex 1600mm, sliding bar / 900mm . No.

56 Toilet Roller Holder / Chrome / Nemox' Collection . No.

57 Coat Hook / Chrome / Nemox' Collection, 6513-02 . No.

Towel Rail / Chrome / Nemox' Collection. Type 6506-02.


58 Badgreep 30cm,
grab rail 30cm . No.

59 Soap Tray / Soap Basket / Bloq' collection. 161x107x50mm . No.

60 curtain rail, one sided (Where aapplicable) 700x1500mm


No.
Abultion Spray / ABS minimal shut -off KIT -Art / Pentagono
61 Rubinetterie
2520 Art . No.

Bathroom (Type 5)

62 Wc Pan / Floor mounted / Ventuno standard close couple Wc No.


horizontal out T321001.

WHB / Wall hung 'White' collection 40cm round vessel basin


63 E000601. No.

Bath / 1700x800mm / White. Central waste and tap holes .


64 Requires bath
panel, front panel (E002401), end panel (E002501) / Celia bath
mixer . No.

65 Bath Mixer / Metal Handle/ 'Celia' collection bath and shower


mixer 4 hole RIM mounted . Ceramic vavles, metal handle,
automatic
divertor. Fixed Spout with Height of spout 197mm, manual
diverter on
spout, hand shower with 3 function and flexible 150cm shower
hose, chrome. No.

Shower Set / Mixer and shower head for over bath / Celia
66 collection .
Celia 3F hand spray , ideal flex 1600mm, sliding bar / 900mm . No.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

67 Toilet Roller Holder / Chrome / Nemox' Collection . No.

68 Coat Hook / Chrome / Nemox' Collection, 6513-02 . No.

Towel Rail / Chrome / Nemox' Collection. Type 6506-02.


69 Badgreep 30cm,
grab rail 30cm . No.

70 Soap Tray / Soap Basket / Bloq' collection. 161x107x50mm . No.

71 curtain rail, one sided (Where aapplicable) 700x1500mm


No.

Abultion Spray / ABS minimal shut -off KIT -Art / Pentagono


72 Rubinetterie
2520 Art . No.

Bathroom (TYPE 4)

73 Wc Pan / Floor mounted / Ventuno standard close couple Wc No.


horizontal out T321001.

WHB / Wall hung 'White' collection 40cm round vessel basin


74 E000601. No.

75 Bidet / Floor mounted /Ventuno free standing bidet-one


taphole T515001 No.

Bath / 1700x800mm / White. Central waste and tap holes .


75 Requires bath
panel, front panel (E002401), end panel (E002501) / Celia bath
mixer . No.

76 Bath Mixer / Metal Handle/ 'Celia' collection bath and shower


mixer 4 hole RIM mounted . Ceramic vavles, metal handle,
automatic
divertor. Fixed Spout with Height of spout 197mm, manual
diverter on
spout, hand shower with 3 function and flexible 150cm shower
hose, chrome. No.

Shower Set / Mixer and shower head for over bath / Celia
77 collection .
Celia 3F hand spray , ideal flex 1600mm, sliding bar / 900mm . No.

78 Toilet Roller Holder / Chrome / Nemox' Collection . No.

79 Coat Hook / Chrome / Nemox' Collection, 6513-02 . No.

Towel Rail / Chrome / Nemox' Collection. Type 6506-02.


80 Badgreep 30cm,
grab rail 30cm . No.

81 Soap Tray / Soap Basket / Bloq' collection. 161x107x50mm . No.

82 curtain rail, one sided (Where aapplicable) 700x1500mm


No.
Abultion Spray / ABS minimal shut -off KIT -Art / Pentagono
83 Rubinetterie
2520 Art . No.

Bathroom (Type 3B) Master Bedroom

84 Wc Pan / Floor mounted / Ventuno standard close couple Wc No.


horizontal out T321001.

85 Bidet / Floor mounted /Ventuno free standing bidet-one


taphole T515001 No.

Vanity Basins/ Top mounted square 460mm diameter / 'White'


86 collection
40cm round vessel basin E000601 . No.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
87 Bath / Ideal cast rectangular bath as specified. No.

Bath Mixer / Chrome plated brass / 'Celia' collection bath and


88 shower
mixer 4 hole RIM mounted . Ceramic vavles, metal handle,
automatic
divertor. Fixed Spout with Height of spout 197mm, manual
diverter on
spout, hand shower with 3 function and flexible 150cm shower
hose, chrome. No.

Shower Set / Shower head / Celia' Collection. Celia 3F hand spray ,


89 ideal flex
1600mm, sliding bar / 900mm. No.

90 Toilet Roller Holder / Chrome / Nemox' Collection . No.

91 Coat Hook / Chrome / Nemox' Collection, 6513-02 . No.

Towel Rail / Chrome / Nemox' Collection. Type 6506-02.


92 Badgreep 30cm,
grab rail 30cm . No.

93 Soap Tray / Soap Basket / Bloq' collection. 161x107x50mm . No.

plastic curtain and rail, one sided (Where aapplicable)


94 700x1500mm
No.
Abultion Spray / ABS minimal shut -off KIT -Art / Pentagono
95 Rubinetterie
2520 Art . No.

Guard Wc in B1

96 Wash Basin No.

97 Wash Basin mixer No.

98 Wc No.

99 Shower No.

100 Shower Set No.

Female & Male Toilets in GF

101 Wash Basin No.

102 Wash Basin mixer No.

103 Wc No.

104 Toilet Roller Holder No.

105 Urinals No.

106 Hose No.

Kitchen

107 Kitchen Sink: Stainless steel; Franke or approved equivalent No.

108 Kitchen Tap: Silver color by Hans grone or approved


equivalent (franki) No.

15430 Plumbing Specialties

15440 Plumbing Pump

Base - Mounted Pumps

Compact Circulators

Inline Pumps
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Packaged Booster Pumping Station

Sewage Ejectors

Sump Pump

Submersible Sump pump sets including automatic alternating,


guides, supports, chains, valves, assembly, wires and wiring,
regulators, level signals, accessories, joints, connections,
accessories, connections to pipework and electrical connection to
local outlet/ control panel.etc. complete; as specified and as shown
on drawings

LIFT PIT SUMP PUMP Set

SEWAGE EJECTOR PUMP Set

FILTRATION SYSTEM Set

Potable Water Storage Tank

Domestic Water Conditioning Equipment

Domestic Water Filtrating Equipment

15450 Potable Water Storage Tank

DOMESTIC HOT WATER STORAGE TANKS

Hot water storage tanks, complete with valves, supports, insulation,


controls, connections to water services and power supply,
motorized valves, joints and all accessories, complete; as specified
and as shown on drawings

EWH1 No

15460 Domestic Water Conditioning Equipment

Water Conditioners

Water Softeners

15470 Domestic Water Filtrating Equipment

Sand filter (1 duty and 1 standby for potable water supply to


rooftop tanks and booster arrangement on roof) No

Pressure vessel on roof updated to 400Gal No

Chlorine Dosing Unit No

Rechargable Filters

15480 Domestic Water Heater

Water Conditioners

Water Softeners

Disposable Filters

Rechargable Filters

Domestic Water Heat Exchangers

Packaged Domestic Water Heaters

15481 Special Systems

15482 Medical Gas System

15490 Pool and Fountain Equipment

Fountain Equipment
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Reflecting Pool Equipment

15500 Heat-Generation Equipment

15500 Heat-Generation Equipment

15510 Heating Boilers and Accessories

Cast - Iron Boilers

Condensing Boilers

Finned Water - Tube Boilers

Firebox Heating Boilers

Flexible Water - Tube Boilers

Pulse Combustion Boilers

Scotch Marine Boilers

Steel Water - Tube Boilers

15520 Feedwater Equipment

Boiler Feed Water Pumps

Deaerators

Packaged Deaerator and Feedwater Pump

15530 Furnace

Electric - Resistance Furnaces

Fuel - Fired Furnaces

15540 Fuel-Fired Heater

Fuel - Fired Duct Heaters

Fuel - Fired Radiant Heaters

Fuel - Fired Unit Heaters

15600 Refrigeration Equipment

15600 Refrigeration Equipment

15610 Refrigeration Compressor

Centrifugal Refrigerant Compressors

Reciprocating Refrigerant Compressors

Rotary - Screw Refrigerant Compressors

15620 Packaged Water Chiller

Absorption Water Chillers

Centrifugal Water Chillers

Reciprocating Water Chillers

Rotary - Screw Water Chillers

15630 Refrigerant Monitoring System


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

15640 Packaged Cooling Tower

Mechanical - Draft Cooling Towers

Natural - Draft Cooling Towers

15650 Field-Erected Cooling Tower

15660 Liquid Coolers and Evaporative Condenser

15670 Refrigerant Condensing Unit

Packaged Refrigerant Condensing Coils and Fan Units

Refrigerant Condensing Coils

15700 Heating, Ventilating, and Air Conditioning Equipment

15700 Heating, Ventilating and Air Conditioning Equipment

15710 Heat Exchanger

Steam - to - Water Heat Exchanges

Water - to - Water Heat Exchanges

Built - Up Indoor Air Handling Units

15720 Air Handling Unit

Customized Rooftop Air Handling Units

Modular Indoor Air Handling Units

Modular Rooftop Air Handling Units

15730 Unitary Air Conditioning Equipment

SPLIT-SYSTEM AIR-CONDITIONING UNITS

Ductable Splits units; complete with indoor units and condesning


unit, refrigerant piping, control panels, support,
insulation,connection to ductwork, accessories, wires and wiring to
power source, anti vibration control, etc, complete; as specified and
as per schedule

Split DX Fan Coil Unit (1.8KW) No

Split DX Fan Coil Unit (2KW) No

Packaged Air Conditioners

Packaged Rooftop Air Conditioning Units

Packaged Rooftop Make - Up Air Conditioning Units

Packaged Terminal Air Conditioning Units

Room Air Conditioners

Split System Air Conditioning Units

15740 Heat Pump

Air - Source Heat Pumps

Rooftop Heat Pumps

Water - Source Heat Pumps

15750 Humidity Control Equipment


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Dehumidifiers

Humidifiers

Swimming Pool Dehumidification Units

15755 Heat Exchangers

15760 Terminal Heating and Cooling Unit

Air Coils

Convectors

Fan Coil Units

Finned - Tube Radiation

Induction Units

Infrared Heaters

Unit Heaters

Unit Ventilators

15770 Floor-Heating and Snow-Melting Equipment

15780 Energy Recovery Equipment

Energy Storage Tanks

Heat Pipe

Heat Wheels

15783 Split-Type

15800 Air Distribution

15800 Air Distribution

15810 Duct

Duct Hangers and Supports

Fibrous Glass Ducts

Flexible Ducts

Glass - Fiber - Reinforced Plastic Ducts

Metal Ducts

Galvanized steel sheet metal ductwork including all splitters, air


deflectors, hangers, supports, joints, access doors, sealants, duct
connections, sleeves, frames, collars, fittings, controls and
accessories; all gauges; square or rectangular section; fixing to
concrete soffits and the like, complete; as specified and as shown
on drawings (insulation measured separately)

Ductwork Kg

15820 Duct Accessories

Volume Dampers (VD) to fit the following duct sizes

100x200 No
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Fire Damper (FDR) to fit the following duct sizes

Size 200x150 No

15830 Fan

Air Curtains Axial Fans

Ceiling Fans

Centrifugal Fans

Industrial Ventilating Equipment

Power Ventilators

Centrifugal, in-line fan units in heavy gauge , complete with


discharge dampers, inlet/outlet screens

B-GR-TEF.1 (25l/s@50Pa) No.

Staircase pressurization fan units, axial flow type, complete with


back draught damper, associated controls and accessories,
connections to ductwork and electrical connections to local outlet
and all necessary accessories, complete; as specified and as shown
on drawings (506)

SPF-C04-S01 No

Supply Diffusers and Return Diffusers (SD/RD) (550)

Size 150x150 No

Supply Grill and Return Grill (SG/RG) (550)

Size 250x150 No

Circular Exhaust Air Diffuser (EAD) (550)

ED-1 No

Extract Grill (EG)

EG-1 No

Fresh Air Louvers (FAL)

FAL-1 No

Extract Air Louvers (EAL)

EAL-1 No

15840 Air Terminal Unit

Constant Volume

Variable Volume Units

15850 Air Outlets and Inlet

Diffusers, Registers, and Grilles

Gravity Ventilators

Intake and Relief Ventilators

Penthouse Ventilators

15860 Air Cleaning Device


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Air Filters

Dust Collectors

Electronic Air Cleaners

High - Efficiency Air Filters

ULPA Filters

15880 Air Distribution

15885 Air Cleaning

15890 Ductwork

15891 Metal Ductwork

15900 HVAC Instrumentation and Controls

15900 HVAC Instrumentation and Control

15905 HVAC Instrumentation

15910 Direct Digital Control

15915 Electric and Electronic Control

Central Control Equipment

Control Panels

Terminal Boxes

15920 Pneumatic Control

15925 Pneumatic and Electric Control

15930 Self-Powered Control

15932 Diffusers, Resisters, and Grilles

15933 Variable Air Volume Controllers

15935 Bulding Systems Control

15936 Air Inlets & Outlets

15940 Sequence of Operation

15948 Instrumentation

15950 Testing, Adjusting, and Balancing

15950 Testing, Adjusting, Balancing

Demonstration of Mechanical Equipment

Duct Testing, Adjusting, and Balancing

Equipment Testing, Adjusting, and Balancing

Mechanical Equipment Starting

Pipe Testing, Adjusting, and Balancing

15970 Building Control Systems General Requirements

15971 Control Wiring, Control Air, and Pneumatic Tubing

15972 Field Devices

15973 Digital Control System Architecture


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

15978 Automatic Control Sequences

15990 Testing, Adjusting and Balancing

MECHANICAL
Division 15 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL MECHANICAL

016 - - Electrical

16050 Basic Electrical Materials and Methods

16050 Basic Electrical Materials and Methods

16050(CE) Basic Electrical Materials and Methods

16051 Electrical Related Work

16052 Electrical Identification

16060 Grounding and Bonding

16060(CE) Grounding and Bonding

16070 Hangers and Support

Seismic Controls

16075 Electrical Identification

16075(CE) Electrical Identification

16080 Electrical Testing

Maintenance Testing

16090 Restoration and Repair

16100 Wiring Methods

16100 Wiring Method

16105 Demolition

16110 Raceways

16111 Conduit

16112 Surface Raceways

16118 Duct Bank

16120 Conductors and Cable

16120(CE) Conductors and Cables

Supply, install and connect the following single core cable


XLPE/AWA/PVC including connectors, supports, clamps, etc and
all related accessories as shown on drawings and as specified

630mm2 m

Supply, install and connect the following single core cable


CU/PVC complete with necessary cable ties, cable glands, cable
cleats, etc:

1 x 240 mm (E) m

Multi core cables including connections, fixing materials,


supports, glands, terminations and all necessary accessories; as
specified

Type E4
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
4x4mm2+4mm2E m

16123 Building Wire & Cable

16127 Mounting Heights

16130 Raceway and Boxes

Cabinets

Conduit and Tubing

Cutout Boxes

Enclosures

Indoor Service Poles

Junction Boxes

Multi - Outlet Assemblies

Outlet Boxes

Pull Boxes

Surface Raceway

Wireway and Auxiliary Gutters

16140 Wiring Device

Wiring devices including boxes, conduits, wiring in raceways back


to panel boards and connections, covers, fittings

Lighting Point No

20 A Flex Oultet No

13 A Switched fused spur outlet with neon indicator No

13 A UNSCWITCHED FUSED SPURED OUTLET No

13 A UNSCWITCHED Socket OUTLET No

20 A DP SWITCH WITH NEON INDICATOR No

THERMOSTAT CONTROLER No

JUNCTION PULL BOX No

13 A SINGLE SWITCHED SOCKET OUTLET No

13 A SINGLE SWITCHED SOCKET OUTLET WP No

13 A SINGLE SWITCHED SOCKET OUTLET F No

13 A SINGLE SWITCHED SOCKET OUTLET DW No

13 A TWIN SWITCHED SOCKET OUTLET No

Shaver Adaptor No

Cooker control unit (ccu) No

Cooker control outlet No

Lighting switches (623)


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
1 WAY GANG SWITCH No

2 WAY GANG SWITCH No

DOOR BELL No

DOOR BELL PUSH No

STAIRCASE LIGHTING SWITCH No

Disconnecting switches including enclosure flexible conduit and


wires between equipment and corresponding terminal box and back
to corresponding panelboard: (623)

Spn isolator 16A No

Spn isolator 20A No

Floor Boxes

Receptables

Remote - Control Switching Devices

Wall Plates

Wall Switches and Dimmers

16150 Wiring Connection

16170 Grounding & Bonding

16190 Supporting Devices

16191 Electrical Connections to Equipment

Electrical Company Electricity Connection

Allow for liaison and coordination with Electrical company for


Incoming Power Supply and Connection Item

16195 Electrical Identification

16196 Testing of Electrical Systems

16197 Supplemental Equipment

16200 Electrical Power

16200 Electrical Power

16210 Electrical Utility Service

16220 Motors and Generator

EMERGENCY GENERATOR SYSTEM

Supply, install and connect the following low tension prime Diesel
Generator set rated as shown on drawings, including main circuit
breaker, Set mounted engine generator annunciator panel with its
wiring and conduits

Generator G1 2000KVA No

Generator G2 500KVA No

16230 Generator Assemblies

Engine Generators

Frequency Changers
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

Motor Generators

Rotary Converters

Rotary Uninterruptible Power Units

16240 Battery Equipment

Batteries

Battery Racks

Battery Units

Central Battery Equipment

16260 Static Power Converter

Battery Chargers

Direct Current (DC) Drive Controllers

Slip Controllers

Static Frequency Converters

Static Uninterruptible Power Supplies

Variable Frequency Controllers

16270 Transformer

MEDIUM VOLTAGE TRANSFORMERS

Transformers including pads, supports, cables and connections to


mains, etc; complete

MV transformer 1500 KVA, 11KV/0.415 KV No.

Provisional sum RMU including breaker. PS = USD 100,000 PS

Distribution Transformers

Network Transformers

Pad - Mounted Transformers

Power Transformers

Substation Transformers

16280 Power Filters and Conditioner

Capacitors

POWER FACTOR CORRECTION CAPACITORS

Supply, install and connect capacitor bank complete with main


contactor and protective devices, as specified and as shown on
drawings

350KVAR No

Chokes and Inductors

16300 Transmission and Distribution

16300 Transmission and Distribution

16310 Transmission and Distribution Accessories


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Arresters

Cutouts

Insulators

Line Materials

Supports

16320 High-Voltage Switching and Protection

High - Voltage Circuit Breakers

High - Voltage Cutouts

High - Voltage Fuses

High - Voltage Lightning Arresters

High - Voltage Reclosers

High - Voltage Surge Arresters

16330 Medium-Voltage Switching and Protection

Medium - Voltage Circuit Protection Devices

Medium - Voltage Cutouts

Medium - Voltage Fuses

Medium - Voltage Lightning Arresters

Medium - Voltage Reclosers

Medium - Voltage Surge Arresters

16340 Medium-Voltage Switching and Protection Assemblies

Medium - Voltage Circuit Breaker Switchgear

Medium - Voltage Enclosed Bus

Medium - Voltage Enclosed Fuse Cutouts

Medium - Voltage Enclosed Fuses

Medium - Voltage Fusible Interrupter Switchgear

Medium - Voltage Motor Controllers

Medium - Voltage Vacuum Interrupter Switchgear

16360 Unit Substation

16400 Low-Voltage Distribution

16400 Low-Voltage Distribution

16410 Enclosed Switches and Circuit Breaker

16415 Transient Voltage Surge Suppression

16420 Enclosed Controller

16425 Switchboards
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
MAIN DISTRIBUTION SWITCHBOARDS

Main distribution switchboards including all main and branch


circuit protective devices, all of them fixed type and instruments
contactors, digital instruments, instruments transformers, selector
switches, current limiters, surge protective device, complete as
specified and as shown on drawings

C04-MDB-1 No

C04-MDB-2 No

Air circuit breaker 4 x 2250AT/2500AF (IP50) No

16430 Low-Voltage Switchgear

16440 Switchboards, Panelboards and Control Centers

16442 Panelboards

DISTRIBUTION, POWER AND LIGHTING PANELBOARDS

Distribution, power and lighting panelboards including circuit


breakers, switches, relays, auxiliary equipment, instruments,
supports, complete; as specified and as shown on drawings

C04-SMDB-1 No

16443 Show and Television Power Panels

16450 Enclosed Bus Assemblies

16452 Grounding

16460 Low-Voltage Transformer

16470 Power Distribution Units

16476 Enclosed Circuit Breakers

16477 Fuses

16490 Low-Voltage Distribution Components and Accessories

16500 Lighting

16500 Lighting

16510 Interior Luminaries

16511 Interior Lighting

INTERIOR LIGHTING FIXTURES

Supply and install Interior lighting fixtures including lamps,


suspension rods, electronic, ballasts and starters for fluorescent
fixtures, built-in battery and chargers for maintained or non
maintained operation (as applicable) through wiring for continuous
rows, flexible conduit and heat resistant wiring to lighting point for
recess mounting fixtures and all necessary accessories, as specified
and as shown on drawings

A1 No.

B1 No

B2 No

16520 Exterior Luminaires


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Area Lighting

Aviation Lighting

Flood Lighting

Navigation Lighting

Parking Lighting

Roadway Lighting

Site Lighting

Sports Lighting

Walkway Lighting

16521(CE) Exterior Lighting

EXTERNAL LIGHTING FIXTURES

Allow for a provisional sum for Supply and install External


lighting fixtures including lamps, suspension rods, electronic,
ballasts and starters for fluorescent fixtures, built-in battery and
chargers for maintained or non maintained operation (as applicable)
through wiring for continuous rows, flexible conduit and heat
resistant wiring to lighting point for recess mounting fixtures and
all necessary accessories, PS = USD 80,000

PS

16530 Emergency Lighting

16540 Classified Location Lighting

16550 Special-Purpose Lighting

Detention Lighting

Display Lighting

Medical Lighting

Outline Lighting

Security Lighting

Theatrical Lighting

Underwater Lighting

Hazard Warning Lighting

16560 Signal Lighting

Obstruction Lighting

16700 Communications

16700 Communication

16710 Communications Circuit

16720 Telephone and Intercommunication Equipment

TELEPHONE SYSTEMS

Intermediate distribution frame, complete, including switches, as


specified and as shown on drawings

Rj 45 socket outlet for data No


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Voice outlet – single jack WP (WP DENOTES WATER PROOF)
No

RJ SOCKET OUTLET (TWIN JACK) FOR VOICE DATA No

APARTMENT CONSOLIDATION POINT No

INTERMEDIATE DISTRIBUTION FRAME No

RJ45 SOCKET OUTLET (TWIN JACK) FOR VOICE DATA,


TELEPHONE HOUSE IN WP RECESSED POINT No

TEB-PC05 No

TEB-PC05-MDF No

JUNCTION BOX FOR TELEPHONE No

VIDEOPHONE SYSTEMS
Supply, install and connect Videophone system complete with
conduits and wiring

Videophone No

4 way video No

8 way video No

13A SWITCHED FUSED SPUR OUTLET WITH NEON


INDICATOR No

DOOR LOCK RELEASE No

ENTRANCE PANEL No

CONTROLLER No

VIDEO SURVEILLANCE (682) Contractor to provide


console for computer and screen

CCTV system in security room, including main console, server,


monitors, data switches, PC computers, color photos printer and all
necessary conduits, cables and boxes between devices, complete
and consioles for computer screens, as specified and as shown on
the drawings
Item

BOX TYPE CAMERA CEILING WALL MOUNTED No

BOX TYPE CAMERA CEILING WALL MOUNTED WP No

FIXED DOME CAMERA CEILING RECESSED No

13A UNSWITCHED FUSED SPURED OUTLET No

13A SINGLE SWITCHED SOCKET OUTLET No

20 INCH MONITOR LCD SPORTVIEW No

16 CHANNEL DVR No

KEYBOARD No

16721 Fire Alarm System

16730 Clock and Program System

16740 Communication and Data Processing Equipment

16741 Telephone, Data & Nurse Call Pathways & Wiring

16745 Voice/Data Cabling

16762 Nurse Call System

16763 Visual Nurse Call System


Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

16770 Cable Transmission and Reception Equipment

16780 Broadcast Transmission and Reception Equipment

16781 Television Cabling

16790 Microwave Transmission and Reception Equipment

16800 Sound and Video

16800 Sound and Video

16810 Sound and Video Circuit

16820 Sound Reinforcement

16830 Broadcast Studio Audio Equipment

16840 Broadcast Studio Video Equipment

16850 Television Equipment

MASTER ANTENNA T.V. SYSTEM

Supply, install and connect master aerials UHF and VHF, TV


amplifiers, main TV splitter, conduits and wiring between splitter,
amplifier and mast and grounding of mast Item

Supply, install and connect lighting arresters for all coaxial TV


main feeders Item

Supply, install and connect satellite dish receiving system (3 units)


with all necessary equipments splitters grounding and connection
to head end amplifier Item

Supply, Install and Connect the following TV Splitter Units Bi-


directional Type including Outlet Boxes, Conduits and Wiring
between Units and to TV Amplifiers

MATV OUTLET TWIN RF (IF) No

POWER SUPPLY UNIT 230V. No

Junction Box for TV OUTLET No

4 POLE LMB No

13 A TWIN SWITCHED SOCKET OUTLET No

MULTISWITCH No

AMPLIFIER No

AMPLIFIER Rack No

Three dishes (Arabsat, Nilesat andHotbird) and all their necessary


accessories. item

Spare parts for electrical sytems Item

16880 Multimedia Equipment

16900 Radiant Heating

16920 Voice & Data Wiring & Cabling System

16950 Testing
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

ELECTRICAL
Division 16 - Price Additions and Omissions
The contractor shall include below the addition and omission
of all items not included within the BOQ but is identified within
the specifications and drawings.
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)
Project Name 41167 Job:
Scope: Bill Of Quantities BL03 Rev:
BILL NO. - BOQ - BUILDING NO

Div. Item Description of Material Unit Quantity Unit Cost Total Cost
No. (SDG) (SDG)

TOTAL ELECTRICAL

You might also like