C. STRIPPING OF FORMS
WALL ON GROUND SQ.M. 0.50 0.25 0.20
WALL ABOVE 10' SQ.M. 2.58 1.29 1.03
BEAMS SQ.M. 2.06 1.03 0.82
COLUMNS SQ.M. 1.70 0.85 0.68
SUSPENDED SLAB SQ.M.
0 TO 18' SQ.M. 1.67 0.83 0.67
18' TO 36' UP SQ.M. 2.16 1.08 0.86
ELEVATED AND SHORED SLAB FORMING SQ.M.
STRIP OF FORMS SQ.M. 7.00 3.50 2.80
FLOOR SLAB AT GRADE STRIP OF FORMS SQ.M. 5.60 2.80 2.24
G. TINSMITHING WORK
CORR GI SHEETS:
https://www.coursehero.com/file/28295513/151591149ProductivityRateLaborEqpt4xls/ 4/9
10/21/2020 151591149ProductivityRateLaborEqpt (4).xls LABOR PRODUCTION TABLE ITEM NO A WORK DESCRIPTION M.H UNIT MANHOURS PER …
https://www.coursehero.com/file/28295513/151591149ProductivityRateLaborEqpt4xls/ 5/9
10/21/2020 151591149ProductivityRateLaborEqpt (4).xls LABOR PRODUCTION TABLE ITEM NO A WORK DESCRIPTION M.H UNIT MANHOURS PER …
Learn more about It with Course Hero's FREE study guides and infographics!
ENGINEERIN 101
ENGINEERIN 101
1 page 125621689-Broms-method-xls.xls
ENGINEERIN 101
https://www.coursehero.com/file/28295513/151591149ProductivityRateLaborEqpt4xls/ 6/9
10/21/2020 151591149ProductivityRateLaborEqpt (4).xls LABOR PRODUCTION TABLE ITEM NO A WORK DESCRIPTION M.H UNIT MANHOURS PER …
ENGINEERIN 101
notes
10 pages 81714875-Algbra-Trigo-Wkly-Exm-Solution.docx
ENGINEERIN 101
ENGINEERIN 101
View more
https://www.coursehero.com/file/28295513/151591149ProductivityRateLaborEqpt4xls/ 7/9
10/21/2020 151591149ProductivityRateLaborEqpt (4).xls LABOR PRODUCTION TABLE ITEM NO A WORK DESCRIPTION M.H UNIT MANHOURS PER …
세1
https://www.coursehero.com/file/28295513/151591149ProductivityRateLaborEqpt4xls/ 8/9
10/21/2020 151591149ProductivityRateLaborEqpt (4).xls LABOR PRODUCTION TABLE ITEM NO A WORK DESCRIPTION M.H UNIT MANHOURS PER …
세 11
125621689-Broms-method-xls.xls
세1
Review Progress.xlsx
https://www.coursehero.com/file/28295513/151591149ProductivityRateLaborEqpt4xls/ 9/9