ALILA HOTEL - LOMBOK

TENDER FOR MAIN CONTRACT WORKS

MAIN SUMMARY IDR

Bill No. 1 - PRELIMINARIES -

Bill No. 2 - PREAMBLES Included

Bill No. 3 - PUBLIC AREA

3.1 BASEMENT [BUILDING 1 AND 3] 1,023,552,621

3.2 BUILDING 1 [RESTAURANT, MEETING ROOM & BOH] 49,279,950

3.3 BUILDING 2 [MEP AREA] -

3.4 BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM] -

Bill No. 4 - HOTEL GUESTROOMS

4.1 HOTEL ROOMS -

4.2 CIRCULATION/CORRIDOR AND SERVICE AREA -

Bill No. 5 - BEDROOM VILLAS

5.1 1 BEDROOM VILLA 1-7 [7 UNITS] 7 No -

5.2 1 BEDROOM VILLA 8-13 [6 UNITS] 6 No -

5.3 3 BEDROOM VILLA [1 UNITS] 1 No -

Bill No. 6 - EXTERNAL WORKS

6.1 GENERAL HARDSCAPING WORKS [INCL. OUTDOOR -


WALKWAYS AND DECKING]

6.2 MISCELLANEOUS OUTBUILDINGS -

6.3 SWIMMING POOLS -

6.4 RETENTION POND -

6.5 SOFTSCAPING Excluded

6.6 DRAINAGE WORKS

Bill No. 7 - PRIME COST AND PROVISIONAL SUMS 9,008,000,000

SUB-TOTAL 10,080,832,571

PPN 10% 1,008,083,257

TOTAL TO FORM OF TENDER : 11,088,915,828

file:///conversion/tmp/scratch/495999449.xlsx Page 1 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

1 SCOPE OF WORK 1 RUANG LINGKUP PEKERJAAN

A The scope of this contract includes the provision of A Ruang lingkup Kontrak ini meliputi penyediaan pekerjaan
temporary works, labour, materials and plant for the sementara, tenaga kerja, material dan peralatan untuk
construction of the Works, as described in the konstruksi pekerjaan, sebagaimana diuraikan dalam
Specifications and the Drawings for Main Contract Works Spesifikasi dan Gambar untuk Pekerjaan Kontrak Utama
proposed Alila Hotel, situated in Lombok. untuk Hotel Alila, yang berlokasi di Lombok.

The Scope of Works comprises the following Works: Ruang Lingkup Pekerjaan mencakup Pekerjaan sebagai
berikut:
(the following scope / description to be revised depending (ruang lingkup/uraian berikut ini akan direvisi tergantung
on actual contract scope of works and packaging) pada ruang lingkup kontrak pekerjaan dan paket - paket
pekerjaan)

A.1 Preliminaries; A.1 Pekerjaan Persiapan


A.2 Structural Works A.2 Pekerjaan Struktural
A.3 Architectural Works A.3 Pekerjaan Arsitektural
A.4 Hardscaping Works A.4 Pekerjaan Hardscaping
A.5 External Works A.5 Pekerjaan Luar
A.6 Direct Contractor Attendance & Coordination A.6 Koordinasi dan Pengawasan Kontraktor Langsung

The works are to be undertaken in a single stage: Pekerjaan akan dilaksanakan dalam satu tahap :

B. The Contractor shall note the following schedule: C. Kontraktor harus memperhatikan jadwal berikut ini:

Contract Start Date: 6 April 2020 Tanggal Mulai Kontrak : 6 April 2020
Date of Possession of the Site: 6 April 2020 Tanggal Masuk Lokasi : 6 April 2020

Time for Completion of the Works: 624 Calendar Days Waktu Penyelesaian dan Tanggal Penyelesaian
(Penyelesaian Praktis) untuk Pekerjaan: 624 hari
kalender
Completion Date : 21 December 2021 Tanggal Penyelesaian: 21 Desember 2021

2 NATURE OF CONTRACT 2 SIFAT KONTRAK

A. This Contract shall be executed in strict accordance with A. Kontrak ini dilaksanakan sesuai dengan Surat
the Letter of Acceptance, Form of Tender with Appendices, Penerimaan (Letter of Acceptance), Surat Penawaran
Contract Conditions, Drawings, Specifications and Bills of dengan Lampiran, Ketentuan Kontrak, Gambar,
Quantities. Spesifikasi dan Bill of Quantities.

3 DOCUMENTS 3 DOKUMEN

A. Contract Document shall include the following: A. Dokumen Kontrak meliputi:


Letter of Acceptance, Form of Tender, Contract Conditions, Surat Penerimaan (Letter of Acceptance), Surat
Drawings, Specifications, Bills of Quantities, Appendices / Penawaran, Ketentuan Kontrak, Gambar, Spesifikasi, Bill
Works Schedule to Form of Tender and all other relevant of Quantities, Lampiran/Jadwal Pekerjaan Surat
documents. penawaran dan seluruh dokumen relevan lainnya.

4 CONDITIONS OF TENDERING 4 KETENTUAN PELELANGAN

A. Each Tenderer will be provided with one copy of these Bills A. Setiap Peserta Lelang akan diberikan satu salinan Bill of
of Quantities and one copy of the Instructions to Quantities ini dan satu salinan Instruksi kepada Peserta
Tenderers. Lelang

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 2 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

4 CONDITIONS OF TENDERING (Cont'd) 4 KETENTUAN PELELANGAN (lanj)

B. One original and two copies of the Tender Form together B. Satu dokumen asli dan dua salinan dari Surat Penawaran
with all appendices are to be filled in completely, computer Harga dan semua lampiran harus diisi dengan komputer
typed, placed in a sealed envelope marked "Private and dan dimasukkan ke dalam amplop bersegel berlabel
Confidential – Main Contract Works for Alila Hotel, “Pribadi dan Rahasia – Tender untuk Pekerjaan
Lombok” and delivered to WT Partnership, CIBIS Nine Kontraktor Utama untuk Alila Hotel, Lombok“ dan diantar
Level 6, Jl. TB Simatupang No. 2, Cilandak, Jakarta 12560, ke WT Partnership, CIBIS Nine Level 6, Jl. TB
for the attention of Mr. Gavin Cox on or before 14.00 Friday Simatupang No. 2, Cilandak, Jakarta 12560, untuk
28 February 2020. perhatian Mr. Gavin Cox pada atau sebelum jam 14.00
WIB hari Jumat 28 Februari 2020.

C. The Tenderers are to note that the Employer reserves the C. Peserta Tender harus memperhatikan bahwa Pemberi
right not to accept the lowest or any Tender, and in no Tugas berhak untuk tidak menerima penawaran yang
case will any expenses incurred by any Tenderer in the terendah atau Tender, dan biaya yang dikeluarkan oleh
preparation of this Tender be allowed. Peserta Tender dalam penyusunan Tender ini sama
sekali tidak akan diperkenankan.

D. Tenderers shall submit with their tender a fully priced copy D. Peserta Tender harus menyerahkan bersama tender
of the Bills of Quantities. Refer also to further instruction mereka salinan harga penuh Bill of Quantities. Lihat juga
under Bill of Quantities' later in this document. instruksi selanjutnya di bawah Bill of Quantities dalam
dokumen ini.

E. The Tender will be checked for arithmetic errors by the E. Tender akan diperiksa untuk kesalahan aritmetika oleh
Quantity Surveyor, who will then submit a report to the Quantity Surveyor, yang kemudian akan menyerahkan
Employer before any Tender is accepted. laporan kepada Pemberi Tugas sebelum Tender diterima.

F. Tenderers shall note that they are required to submit with F. Peserta Tender harus memperhatikan bahwa mereka
their Tender a copy of their Surat Izin Usaha Jasa diwajibkan menyerahkan bersama Tender mereka
Konstruksi (S.I.U.J.K.). The validity of the S.I.U.J.K. shall salinan Surat Izin Usaha Jasa Konstruksi (SIUJK)
be maintained throughout the course of the works. The mereka. Keberlakuan SIUJK harus berlaku selama
Contractor shall indemnify the Employer against any loss jangka waktu pekerjaan. Kontraktor akan mengganti
or damage which he may suffer through the Contractor’s kerugian Pemberi Tugas terhadap setiap kerugian atau
failure to ensure that the S.I.U.J.K. is maintained valid. kerusakan yang mungkin dideritanya melalui kegagalan
Tenders received without a valid S.I.U.J.K. are liable to be Kontraktor memastikan SIUJK masih berlaku. Peserta
disqualified Tender yang diterima tanpa SIUJK yang berlaku wajib
didiskualifikasi.

G. The only recognized language for all tender and contract G. Satu-satunya bahasa yang diakui untuk seluruh dokumen
documents for this contract will be the English language. tender dan kontrak untuk kontrak ini adalah bahasa
Indonesia.

5 BILL OF QUANTITIES 5 BILL OF QUANTITIES

A. The rates and prices in the Bills of Quantities and A. Harga satuan dan harga dalam Bill of Quantities dan
Schedules of Rates for Labour, Plant and Building Works Daftar harga satuan untuk Tenaga Kerja, Peralatan dan
shall be used for valuing variations in accordance with the Pekerjaan Bangunan akan digunakan untuk menilai
relevant clauses of the Contract Conditions. perubahan sesuai dengan pasal yang relevan terhadap
Kondisi Kontrak.

B. No alterations or additions shall be made to the Bills of B. Tidak ada perubahan atau penambahan dilakukan atas
Quantities without the written consent or instruction of the Bill of Quantities tanpa persetujuan atau instruksi tertulis
Employer or delegated responsible person. dari Pemberi Tugas atau penanggung jawab yang
didelegasikan.

C. All items in the Bills shall be priced in detail, not grouped C. Seluruh item dalam Bill of Quantities ditetapkan harganya
together as total prices for any trade or section. secara rinci, tidak dikelompokkan bersama sebagai harga
total untuk sub bill atau bagian.

D. The quantities are taken absolutely net unless otherwise D. Kuantitas diambil benar-benar bersih kecuali jika
stated and these Bills of Quantities shall not be used as a dinyatakan lain dan Bill of Quantities ini tidak akan
material ordering list. digunakan sebagai daftar pemesanan material.

E. Throughout the Bills the following symbols shall be read E. Di seluruh Bill of Quantities, simbol berikut ini harus
as: dibaca sebagai:
m3 Cubic metre m3 Meter kubik
m2 Square metre m2 Meter persegi
m Linear metre m Meter
kg Kilogram kg Kilogram
No Number No Jumlah
t Tonnes t Ton

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 3 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

4 CONDITIONS OF TENDERING (Cont'd) 4 KETENTUAN PELELANGAN (lanj)

F. The priced copy of the Bills of Quantities to be available for F. Salinan harga Bill of Quantities harus tersedia untuk
use of for the purpose of valuing interim certificates, digunakan dengan tujuan penilaian sertifikat sementara,
variations, etc. occurring during currency of Contract and pekerjaan perubahan, dan lain-lain, yang terjadi selama
producing the statement of final account. Kontrak dan menyiapkani laporan perhitungan akhir.

G. The Contract Bills shall be treated as a confidential G. Rincian Biaya (Contract Bills) diperlakukan sebagai
document. dokumen rahasia.

H. All quantities given in these Bills of Quantities have been H. Seluruh kuantitas yang diberikan dalam Bill of Quantities
calculated from information supplied to the Tenderer by the ini telah dihitung dari informasi yang diberikan kepada
Project Manager, the Architect and Engineer. The Peserta Tender oleh Manajer Proyek, Arsitek dan
Contractor shall price every item for which he requires Engineer. Kontraktor harus menetapkan harga setiap
remuneration. If any item contained in the Bills are not item dimana diperukan biaya tambahan. Jika item yang
priced, it shall be deemed that either: tercantum dalam Bill of Quantities tidak ditetapkan
harganya, maka dianggap bahwa:

(a) The cost has been included elsewhere; or (a) Biaya telah dimasukkan di tempat lain; atau
(b)  No remuneration is required in respect of that item. (b) Tidak ada biaya tambahan diperlukan berkenaan
dengan item tersebut.

Space is provided within the Bills of Quantities for the Ruang disediakan dalam Bill of Quantities bagi Peserta
Tenderer to insert additional items or different quantities for Tender untuk memasukkan item tambahan atau kuantitas
Works they require payment. yang berbeda untuk Pekerjaan yang memerlukan
pembayaran.

6 SPECIFICATION, DRAWINGS AND BILL OF 6 SPESIFIKASI, GAMBAR DAN BILL OF QUANTITIES


QUANTITIES

A. The Bills of Quantities shall be read in conjunction with the A. Bill of Quantities harus dibaca bersama-sama dengan
Specifications and Drawings and any other information Spesifikasi dan Gambar dan informasi lainnya yang
included with these Contract Documents. The Contractor is dimasukkan dengan Dokumen Kontrak ini. Kontraktor
deemed to have priced for all items appearing in any one dianggap telah menetapkan harga untuk seluruh item
of the above documents whether or not the item appears in yang terdapat dalam dokumen di atas baik item tersebut
the documents in the context of this contract. No allowance terdapat dalam dokumen dalam konteks kontrak ini
will be made for non-compliance of any item due to lack of maupun tidak. Tidak ada biaya tambahan karena tidak
understanding. dipenuhinya item karena kurangnya pemahaman.

7 PRICES 7 HARGA

A. The sum of the amounts of all items of the Bills of A. Jumlah dari jumlah seluruh item Bill of Quantities yang
Quantities priced by the Tenderer shall truly represent the ditetapkan harganya oleh Peserta Tender harus benar-
Tender Amount for those items. benar mewakili nilai penawaran untuk item tersebut.

B. Rates and prices for all items in the Bills, unless expressly B. Harga satuan dan harga untuk seluruh item dalam Bill,
provided by the contrary, shall be held to include for all kecuali jika secara tegas ditetapkan sebaliknya, dianggap
necessary ordinary cutting, waste, labour, hoisting, tools, termasuk untuk seluruh pemotongan biasa yang
tackle, nails, screws, spikes, plugs, glue, putty, tar, solder, diperlukan, bahan tidka terpakai, tenaga kerja,
carting, hauling, transporting, unloading, storing, crating, pengangkatan, peralatan, paku, baut, steker, lem,
housing, raking, framing, fitting, fixing and setting complete dempul, ter, solder, pengangkutan, transportasi,
together with all supervision, profit, establishment charges pembongkaran, penyimpanan, pengepakan, perumahan,
and everything else necessary for the due and proper penggarukan, pemasangan kerangka, pemasangan,
completion of each item. perbaikan dan penyetelan lengkap bersama dengan
seluruh pengawasan, keuntungan, biaya pembentukan
dan segala hal lainnya yang diperlukan untuk
penyelesaian yang layak setiap item.

C. Rates and prices for Works and items described in the Bills C. Harga satuan dan harga untuk Pekerjaan dan item yang
include for: withholding tax (PPh), Contractor’s overheads diuraikan dalam Bill termasuk untuk: pajak penghasilan
and profit; fuel, and utility prices which from time to time (PPh), overhead dan keuntungan Kontraktor; harga
may increase significantly. bahan bakar, dan utilitas yang dari waktu ke waktu dapat
meningkat secara signifikan.

D. All rates and prices unless stated as being provisional D. Seluruh harga satuan dan harga kecuali jika dinyatakan
sums shall remain fixed for the duration of this contract. sebagai provisional sum akan tetap selama
berlangsungnya kontrak ini.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 4 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

6 SPECIFICATION, DRAWINGS AND BILL OF 6 SPESIFIKASI, GAMBAR DAN BILL OF QUANTITIES


QUANTITIES (Cont'd) (lanj.)

E. The basis of evaluating new rates shall be calculated by E. Dasar untuk mengevaluasi harga satuan baru dihitung
inference, pro‑rata or reference to other similar items in dengan membuat kesimpulan atas, secara pro-rata atau
these Bills of Quantities. mengacu pada item sejenis lainnya dalam Bill of
Quantities ini.

8 ERROR CORRECTIONS 8 KOREKSI KESALAHAN

A. Should the Contractor make any errors in his extensions A. Jika Kontraktor melakukan kesalahan dalam tambahan
and/or total, such errors shall be so rectified and adjusted dan/atau jumlah total, maka kesalahan tersebut harus
that, when correctly calculated, the total of the Final diperbaiki dan disesuaikan sehingga, apabila dihitung
Summary shall represent the same amount as that dengan benar, total Rekapitulasi Akhir akan mewakili
tendered by the Contractor on the Letter of Tender. The jumlah yang sama dengan yang ditenderkan oleh
net aggregate amount of such errors, whether a net Kontraktor pada Surat Penawaran. Jumlah keseluruhan
deduction or a net addition, will be calculated either: bersih kesalahan tersebut, baik pengurangan bersih
maupun penambahan bersih, akan diperhitungkan:

1. As a lump sum and adjusted against the preliminaries 1. Sebagai lump sum dan disesuaikan terhadap total
total or pekerjaan persiapan (preliminaries) atau
2.      As a percentage of the total of the Summary of Bills 2. Sebagai persentase dari total Rekapitulasi Bill of
of Quantities and all unit rates through out the Bills of Quantities dan seluruh harga satuan di seluruh Bill of
Quantities shall be subject to such percentage increase or Quantities tunduk pada peningkatan atau penurunan
decrease. persentase tersebut.

Provided always that Provisional or Prime Cost Sums shall Dengan ketentuan Provisional Cost atau Prime Cost Sum
be excluded from the calculation and shall not be subject to akan dikeluarkan dari perhitungan dan tidak tunduk pada
such percentage adjustment. The method employed shall penyesuaian persentase tersebut. Metode yang
be decided by the Project Manager. digunakan akan ditetapkan oleh Manajer Proyek.

9 INSPECTION OF DRAWINGS 9 PEMERIKSAAN GAMBAR

A. The Drawings for this Contract is those listed at the end of A. Gambar untuk Kontrak ini adalah gambar yang tercantum
the Tender Document and any further drawings that may pada akhir Dokumen Tender dan gambar selanjutnya
be issued in amplification thereof. The Contractor shall be yang dapat diterbitkan dalam penjelasan tambahannya.
deemed to have examined the Drawings prior to Kontraktor dianggap telah memeriksa Gambar sebelum
submission of his tender. No claim for extras consequent penyerahan tendernya. Klaim atas tambahan sebagai
for non-examination of Drawings will be considered. akibat tidak diperiksanya Gambar tidak akan
dipertimbangkan.

10 SITE CONDITION 10 KONDISI LOKASI

A. The site of the work is situated at at a vacant site in South A. Lokasi pekerjaan adalah sebuah area kosong di Lombok
Lombok Selatan.

B. The Tenderer is advised to visit all parts of the site and B. Peserta Tender disarankan mengunjungi semua bagian
fully acquaint himself with all the conditions likely to affect lokasi dan sepenuhnya mempelajari seluruh kondisi yang
the Works especially the nature of any Works to be kemungkinan mempengaruhi Pekerjaan terutama kondisi
demolished, water sources and levels, position of Works, asli pekerjaan yang akan digarap, sumber dan tinggi
site difficulties, means of access, etc. permukaan air, posisi Pekerjaan, kesulitan lokasi, sarana
akses, dan lain-lain.

C. Tenderers are referred to the Letter of Invitation to Tender C. Peserta Tender harus mengacu pada Surat Undangan
wherein details are provided with regard to arranging a site Tender di mana rincian diberikan mengenai pengaturan
visit. kunjungan lokasi.

D. The Contractor shall accept the site as found on the Date D. Kontraktor menerima lokasi sebagaimana terdapat pada
for Possession and at his own expense clear the site of Tanggal Surat Serah Terima Lahan dan atas biayanya
any debris or rubbish which may have been left. sendiri membersihkan lokasi dari puing-puing atau
sampah yang mungkin telah ditinggalkan.

11 RESPONSIBILITY 11 TANGGUNG JAWAB

A. Whether expressly stated or not in these Bills, all A. Baik secara tegas dinyatakan atau tidak dalam Bill ini,
descriptions, Specifications and Quantities are implied to seluruh deskripsi, Spesifikasi dan Kuantitas diartikan
be directed at or towards the Tenderer tendering for and ditujukan pada atau terhadap Peserta Tender yang
later awarded the Contract. No allowance will be made for mengajukan tender untuk dan kemudian diberikan
non‑compliance due to lack of under-standing of a clause. Kontrak. Tidak ada biaya akan dilakukan karena tidak
dipenuhinya karena kurangnya pemahaman mengenai
klausul.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 5 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

12 THE CONTRACT SUM 12 NILAI KONTRAK (CONTRACT SUM)

A. The Contract Sum will be adjusted only for: A. Nilai Kontrak (Contract Sum) akan disesuaikan hanya
untuk:
-  Alteration to the Contract Works as and when instructed - Perubahan atas Pekerjaan sebagaimana dan apabila
by the Project Manager or in accordance with the terms diinstruksikan oleh Manajer Proyek atau sesuai dengan
and conditions of the Contract. syarat dan ketentuan Kontrak.

13 SCHEDULE OF CONTRACT CLAUSES 13 SKEDUL KLAUSUL KONTRAK


A. The Contractor shall allow against each item set out below A. Kontraktor akan mempertimbangkan terhadap setiap item
for any cost involved in complying with the terms of the yang ditetapkan di bawah ini biaya yang melibatkan
Lump Sum Contract: dalam memenuhi ketentuan Kontrak Lump Sum:

Clause No. Klausul No.


1 Works 1. Pekerjaan
2 General Obligations 2. Kewajiban Umum
Delay and Extension of Time Due to Force Majeure 3. Keterlambatan dan Perpanjangan Waktu Karena
3
Keadaan Kahar (Force Majeure)
4 Liquidated Damages 4. Liquidated Damages
5 Variations 5. Perubahan
6 Payment 6. Pembayaran
7 Security 7. Jaminan
8 Liability and Insurance 8. Pertanggungan dan Asuransi
9 Default and Termination 9. Kelalaian dan Pengakhiran
10 Disputes 10. Perselisihan
11 Service of Communication 11. Layanan Komunikasi
12 Confidential Information 12. Informasi Rahasia
13 Publicity 13. Publisitas
14 Intellectual Property 14. Kekayaan Intelektual
15 Assignment 15. Pengalihan
16 Entire Agreement 16. Keseluruhan Perjanjian
17 Governing Law and Jurisdiction 17. Hukum Yang Mengatur dan Yurisdiksi
18 Interpretation 18. Interpretasi

14 CONTRACT PERIOD 14 JANGKA WAKTU KONTRAK


A. The Tenderer is to tender on the Employer's set time for A. Peserta Tender harus mengajukan tender pada waktu
completion, which is 624 calendar days commencing from yang ditetapkan Pemberi Tugas untuk penyelesaian,
the Date of Commencement, for the whole of the Works. yaitu 624 hari kalender terhitung dari Tanggal Mulai,
The Date for Practical Completion is therefore: 21 untuk seluruh Pekerjaan. Oleh karena itu, Tanggal untuk
Decemebr 2021. Penyelesaian Praktis adalah: 21 Desember 2021.

B. The Tenderer is to note that the Works to be completed in B. Peserta Tender harus memperhatikan bahwa Pekerjaan
a single stage diselesaikan dalam satu tahap.

C. Extension of the Contract Period for wet weather or Public C. Perpanjangan Jangka Waktu Kontrak untuk cuaca hujan
Holidays will not be allowed and such delays, if they occur, atau Hari Libur tidak akan diperkenankan dan penundaan
are deemed to be included in the overall Contract Period. tersebut, jika terjadi, dianggap dimasukkan dalam seluruh
Jangka Waktu Kontrak.

15 WORK PROGRAMME AND PERFORMANCE 15 PROGRAM KERJA DAN PELAKSANAAN

A. The Contractor shall provide a Construction programme A. Kontraktor akan memberikan program Konstruksi yang
showing all the various stages or parts of the work and menunjukkan seluruh berbagai tahap atau bagian
allow for conforming to the requirements of the Employer. pekerjaan dan memenuhi persyaratan Pemberi Tugas.

B. The Contractor shall regularly update the Construction B. Kontraktor secara teratur akan memperbarui Program
Programme for approval by the Project Manager indicating Konstruksi untuk disetujui oleh Manajer Proyek yang
all activities to be undertaken in the various parts of the menunjukkan seluruh kegiatan yang akan dilakukan di
building. berbagai bagian bangunan.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 6 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

15 WORK PROGRAMME AND PERFORMANCE (Cont'd) 15 PROGRAM KERJA DAN PELAKSANAAN (lanj.)

C. The construction programme with a working days log scale C. Program konstruksi dengan skala log hari kerja harus
shall show the following : menunjukkan hal berikut ini:

- sequence of Works, - urutan Pekerjaan,


- stages (or sections) of the Works, - tahap (atau bagian) Pekerjaan,
- work packages, including the Direct Contracts [refer 1 - - paket pekerjaan, termasuk Kontrak Langsung [lihat 1 –
Scope of Works] - N/A Ruang Lingkup Pekerjaan]- N/A
- periods within which stages or parts of the Works are to be - jangka waktu di mana tahapan atau bagian Pekerjaan
executed, akan dilaksanakan,
- critical paths of activities required to complete the Works, - jalur kritis kegiatan yang diperlukan untuk menyelesaikan
Pekerjaan,
- allowance for any holidays, - perhitungan hari libur,
- significant milestones for the stages of the Works, - peristiwa penting yang signifikan untuk tahapan
Pekerjaan,
- date(s) for Practical Completion of the Works. - tanggal untuk Penyelesaian Praktis Pekerjaan.

D. The Contractor must allow in his charts for the effects of D. Kontraktor harus mempertimbangkan dalam bagannya
inclement weather, public holidays and other efek cuaca buruk, hari libur resmi dan hal-hal tak terduga
contingencies. lainnya.

E. The Project Manager shall have the right to requests a E. Manajer Proyek berhak meminta jadwal harian jika perlu
daily schedule if necessary due to delays or other contract karena keterlambatan atau pelanggaran kontrak lainnya.
violations.

16 HOURS OF WORK 16 JAM KERJA

A. The Contractor shall, in respect of working hours for A. Kontraktor harus, berkenaan dengan jam kerja untuk
Employees, comply with all relevant labour Laws and Acts Pegawai, mematuhi seluruh Undang-Undang tenaga
of the Republic of Indonesia into operation throughout kerja yang relevan Republik Indonesia dalam operasi di
Indonesia. seluruh Indonesia.

B. The Contractor, if considered that it may be necessary to B. Kontraktor, jika dianggap perlu untuk menyebabkan para
cause the workmen to work overtime in order to complete pekerja bekerja lembur untuk menyelesaikan Pekerjaan
the Works or any section thereof by the corresponding atau bagiannya sebelum tanggal penyelesaian, akan
dates for completion, shall allow here for such overtime, menyediakan lembur tersebut, termasuk penyediaan
include for the provision of additional plant, equipment, peralatan, alat, fasilitas tambahan dan biaya tambahan
facilities and any other additional expenses in connection lainnya sehubungan dengan hal tersebut.
therewith.

C. Normal working hours are: 7am to 7pm Monday to C. Jam kerja normal adalah: 07:00 hingga 19:00 Senin
Saturday. However, due to the location being in an hingga Sabtu. Namun, karena lokasi berada di daerah
isolated area with no immediate neighbours there may be terpencil tanpa tetangga terdekat, mungkin ada peluang
an opportunity for the working hours to be extended. perpanjangan jam kerja.

D. Overtime allowance for in-house Construction Manager / D Biaya lembur pengawas lapangan inhouse / by owner.
by owner.

17 OVERTIME & SHIFTWORKS 17 LEMBUR & PEKERJAAN BERGILIR (SHIFTWORK)

A. The Contractor shall allow for sufficient resources of A. Kontraktor akan menyediakan sumber daya yang cukup
labour, materials, plant etc. to complete the Works within tenaga kerja, material, peralatan dan lain-lain untuk
the programme time and shall allow for overtime work in menyelesaikan Pekerjaan dalam waktu Program dan
order to complete the Works in accordance with his menyediakan kerja lembur untuk menyelesaikan
programme and completion dates. Pekerjaan sesuai dengan program dan tanggal
penyelesaiannya.

B. The Project Manager’s written approval prior to any B. Persetujuan tertulis Manajer Proyek untuk lembur dan
overtime and shift work must be obtained prior to overtime pekerjaan bergulir (shift work) harus diperoleh sebelum
work. kerja lembur.

18 BONUS AND LIQUIDATED DAMAGES 18 BONUS DAN LIQUIDATED DAMAGES

A. Liquidated Damages will be deducted from amounts due to A. Liquidated Damages akan dipotong dari jumlah yang
the Contractor in accordance with the Contract Conditions harus dibayar kepada Kontraktor sesuai dengan
at the rate stated in the Works Schedule to Contract Ketentuan Kontrak dengan tarif yang tercantum dalam
Conditions. Liquidated Damages shall be applicable to all Jadwal Pekerjaan Ketentuan Kontrak. Liquidated
Stages (Sections) of the Works as defined in the Tender Damages berlaku pada seluruh Tahap (Bagian)
Document. Pekerjaan sebagaimana didefinisikan dalam Dokumen
Tender.

B. Bonus payments will not be considered. B. Pembayaran bonus tidak akan dipertimbangkan.

C. The Certificate of Practical Completion will be issued by the C. Sertifikat Penyelesaian Praktis akan diterbitkan oleh
Project Manager and at his sole discretion. Manajer Proyek dan atas kebijaksanaan tunggalnya.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 7 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

19 DAMAGE TO EXISTING PROPERTY 19 KERUSAKAN PADA PROPERTI YANG ADA

A. The Contractor shall arrange for the conveyance of A. Kontraktor akan mengatur pengangkutan material,
materials, plant, etc., so as to cause a minimum of damage peralatan, dan lain-lain, sehingga menimbulkan
to existing roads and culverts. The Contractor shall be kerusakan minimal pada jalan dan parit yang ada.
responsible for any damage caused by his carriers or Kontraktor akan bertanggung jawab atas segala
workmen, to any existing roads, culverts, buildings, etc. kerusakan yang disebabkan oleh alat angkutan atau
from whatsoever cause arising and shall maintain, repair pekerja, pada jalan, parit, bangunan yang ada, dan lain-
and reinstate the same, to their original condition to the lain, dari penyebab apapun yang timbul dan akan
satisfaction of the Project Manager or alternatively shall memelihara, memperbaiki dan mengembalikannya, ke
bear the cost of such maintenance and restoration as a keadaannya semula secara memuaskan Manajer Proyek
deduction from money due to him under this Contract. atau sebagai alternatif akan menanggung biaya
pemeliharaan dan pemulihan tersebut sebagai potongan
dari uang yang harus dibayar kepadanya berdasarkan
Kontrak ini.

B. The Contractor is to maintain and protect public property B. Kontraktor akan memelihara dan melindungi properti
including that of drainage, electricity, highway and water publik termasuk properti publik otoritas drainase, listrik,
authorities and similar undertakings and is to make good or jalan raya dan air dan usaha sejenis dan akan
pay for the reinstatement of all damage thereto. memperbaiki atau membayar pemulihan segala
kerusakan.

20 RESTRICTED USE OF SITE 20 PENGGUNAAN SITUS DIBATASI

A. The Contractor shall be responsible for keeping all persons A. Kontraktor akan bertanggung jawab untuk menjaga
under his control (including those employed by his own seluruh orang yang berada di bawah kontrolnya
sub‑contractors and suppliers) within the boundaries of the (termasuk orang yang dipekerjakan oleh subkontraktor
site (refer to Site Condition – Clause 10). dan pemasoknya sendiri) di batas lokasi (lihat Kondisi
Lokasi - Klausul 10).

21 ADJACENT BUILDINGS 21 BANGUNAN BERDAMPINGAN

A. Before commencement of the Works the Contractor shall A. Sebelum dimulainya Pekerjaan, Kontraktor akan
take an adequate survey of any adjacent structures, which melakukan survei yang memadai mengenai bangunan
may likely be affected by the execution of the Works. Such yang berdampingan, yang kemungkinan akan
survey should include their conditions, record of defects, terpengaruh oleh pelaksanaan Pekerjaan. Survei
extent of basement and under‑slab structures and location tersebut mencakup kondisi, catatan cacat, luas bangunan
of existing utility services. basement dan di bawah slab dan lokasi layanan utilitas
yang ada.

B. The Contractor shall take colour photographs size 250mm B. Kontraktor akan mengambil foto berwarna ukuran 250
x 200mm of existing structures and/or buildings and mm x 200 mm bangunan yang ada dan/atau bangunan
roadways and embankments in the vicinity of the Site, dan jalan raya dan tanggul di sekitar Lokasi, sebelum
before commencement of the work to keep as record of dimulainya pekerjaan untuk disimpan sebagai catatan
evidence of the conditions of these existing structures bukti kondisi bangunan yang ada ini sebelum
and/or buildings before the execution of the work. These pelaksanaan pekerjaan. Foto ini akan dimasukkan dalam
photographs shall be fixed in hardcopy and soft copy (CD) hardcopy dan softcopy (CD) yang diberikan dalam 2
provided in 2 (two) sets to the Project Manager. (dua) set kepada Manajer Proyek.

C. Should damages to the existing structures, or adjoining C. Jika ditemukan kerusakan pada bangunan yang ada,
building be discovered during the execution of the work, atau bangunan berdampingan selama pelaksanaan
the Contractor shall be solely responsible for injury or pekerjaan, maka Kontraktor sendiri akan bertanggung
damage caused to adjacent property and shall reinstate jawab atas kerusakan yang ditimbulkan pada properti
and make good the damaged Works at his own expense yang berdampingan dan akan memulihkan dan
with materials and workmanship to match in every aspect memperbaiki Pekerjaan yang rusak atas biayanya sendiri
with the surrounding Works to the satisfaction and approval dengan material dan pengerjaan untuk menyesuaikan
of the Project Manager. dalam segala aspek dengan Pekerjaan sekitarnya untuk
kepuasan dan persetujuan Manajer Proyek.

D. Assistance or advice, that the Employer or the Project D. Bantuan atau saran, yang dapat diberikan oleh Pemberi
Manager may provide shall not absolve the Contractor of Tugas atau Manajer Proyek, tidak akan membebaskan
any of his responsibilities. He shall indemnify the Employer Kontraktor dari tanggung jawabnya. Dia akan mengganti
in respect of any claims due to subsidence, collapse or kerugian Pemberi Tugas berkenaan dengan klaim karena
other damage to adjacent buildings and facilities caused by amblas, runtuh atau kerusakan lainnya pada bangunan
or arising out of the Works in addition to providing and dan fasilitas yang berdampingan yang disebabkan oleh
maintaining such temporary shoring and/or safety atau timbul dari Pekerjaan selain memberikan dan
measures which he thinks fit. memelihara penyanggaan sementara dan/atau tindakan
keamanan yang dianggapnya layak.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 8 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

22 VISITORS TO SITE 22 PENGUNJUNG KE LOKASI

A. The Contractor shall not allow unauthorized visitors access A. Kontraktor tidak memperkenankan akses pengunjung
in the Works. All visitors shall have prior authorization from tidak sah di Pekerjaan. Seluruh pengunjung harus
the Project Manager. memiliki otorisasi sebelumnya dari Manajer Proyek.

23 CURRENCY FLUCTUATIONS, RISES AND FALLS OF 23 FLUKTUASI MATA UANG, NAIK TURUN BIAYA
COSTS

A. It is a condition of this Contract that the Employer shall not A. Merupakan ketentuan Kontrak ini bahwa Pemberi Tugas
become liable for a claim from the Contractor, or tidak bertanggung jawab atas klaim dari Kontraktor, atau
Sub‑Contractors and suppliers as a result of changes in Sub-Kontraktor dan pemasok sebagai akibat perubahan
the rate of exchange of Rupiah and / or United States nilai tukar Rupiah dan/atau Dolar Amerika Serikat ke
Dollars into other currencies, or rises and falls in the cost of mata uang lainnya, atau naik turun biaya material, tenaga
materials, labour, plant, overheads and also fuel and kerja, peralatan, overhead dan juga bahan bakar dan
electricity due to such changes. listrik karena perubahan tersebut.

24 PAYMENTS TO THE CONTRACTOR 24 PEMBAYARAN KEPADA KONTRAKTOR

A. The Contractor shall note that the Employer will make A. Kontraktor harus memperhatikan bahwa Pemberi Tugas
payments to him in Jakarta in Indonesian Rupiah. akan melakukan pembayaran kepadanya di Jakarta
dalam Rupiah Indonesia.

B. The Contractor shall prepare a detailed application for a B. Kontraktor akan menyiapkan permohonan rinci untuk
progress payment at intervals as stated in the Contract pembayaran kemajuan dengan interval sebagaimana
Conditions and on completion of the project and submit it tercantum dalam Ketentuan Kontrak dan atas
to the Project Manager for the Project Manager/Quantity penyelesaian proyek dan menyerahkannya kepada
Surveyor’s approval and preparation of Payment Manajer Proyek untuk persetujuan Manajer
Certificate. Proyek/Quantity Surveyor dan penyiapan Sertifikat
Pembayaran.

25 TEST AND SAMPLES 25 TES DAN CONTOH MATERIAL

A. After the signing of the Contract the Project Manager shall A. Setelah penandatanganan Kontrak, Manajer Proyek
be at liberty to call for the submission of samples of bebas meminta diserahkannya contoh material atau
materials or the execution of samples of workmanship for pelaksanaan contoh pengerjaan untuk persetujuan dan
approval and for any further samples as are required, until untuk contoh selanjutnya sebagaimana diperlukan,
the samples submitted or executed are, in his opinion, sampai contoh yang diserahkan atau dilaksanakan,
satisfactory. Samples after approval, shall indicate the menurut pendapatnya, memuaskan. contoh setelah
standard of materials and workmanship to be maintained in persetujuan, akan menunjukkan standar material dan
the execution of the Works. pengerjaan yang akan dipelihara dalam pelaksanaan
Pekerjaan.

B. The Contractor shall allow for testing of samples of key B. Kontraktor akan menyediakan pengujian contoh material
materials (eg. Roof and Wall Cladding) as specified. penting (misalnya Atap dan Cladding Dinding)
sebagaimana ditetapkan.

C. The Contractor shall arrange for tests of any materials to C. Kontraktor akan mengatur tes material yang akan
be carried out as and when the Project Manager may direct dilakukan sebagaimana dan apabila diperintahkan oleh
and at such laboratories as instructed. Manajer Proyek dan di laboratorium sebagaimana
diinstruksikan.

26 COST OF TESTS 26 BIAYA TES

A. The cost of performing any test shall be borne by the A. Biaya pelaksanaan tes ditanggung oleh Kontraktor jika
Contractor if such test is clearly intended by or provided for tes tersebut secara jelas dimaksudkan oleh atau diatur
in the Bills and Specifications. dalam Bill dan Spesifikasi.

If any test is ordered by the Project Manager which is Jika tes diperintahkan oleh Manajer Proyek yang
either

1. Not so intended by or provided for, or 1. Tidak dimaksudkan oleh atau diatur dalam, atau

2. Intended or provided for, is ordered by the Project 2. Dimaksudkan atau diatur dalam dokumen tersebut,
Manager to be carried out by an independent person at diperintahkan oleh Manajer Proyek untuk dilaksanakan
any place other than the site or the place of manufacture or oleh orang yang independen di tempat selain lokasi atau
fabrication of the material tested, then the cost of such test tempat pembuatan material yang diuji, maka biaya tes
shall be borne by the Contractor if the test shows the tersebut ditanggung oleh Kontraktor jika tes menunjukkan
workmanship or materials are not in accordance the pengerjaan atau material yang tidak sesuai instruksi
Project Manager's instruction but otherwise by the Manajer Proyek namun kalau tidak maka oleh Pemberi
Employer. Tugas.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 9 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

27 COST OF SAMPLES 27 BIAYA CONTOH

A. All samples shall be supplied by the Contractor at his own A. Seluruh contoh dipasok oleh Kontraktor atas biayanya
cost if the supply thereof is clearly intended by or provided sendiri jika pasokannya secara jelas dimaksudkan oleh
for in the Contract Documents if not, then at the cost of the atau diatur dalam Dokumen Kontrak jika tidak, maka atas
Employer. biaya Pemberi Tugas.

B. Approved samples shall be displayed on site as minimum B. Contoh yang disetujui akan ditunjukkan di lokasi sebagai
standards of materials and workmanship, which will be standar minimum material dan pengerjaan, yang akan
permitted for this Contract. Make due allowance of time for diizinkan untuk kontrak ini. Lakukan penyisihan waktu
presentation, inspection and possible rejection of samples. untuk presentasi, pemeriksaan dan penolakan yang
mungkin sampel.

28 COST OF MOCK-UP PANEL 28 BIAYA PANEL CONTOH (MOCK-UP)

A. The Contractor shall allow to provide a mock-up panel of A. Kontraktor memperkenankan memberikan panel contoh
finishes as directed and approved by the Project Manager. penyelesaian sebagaimana diperintahkan dan disetujui
oleh Manajer Proyek.

B. The Contractor shall allow to construct on-site mock-ups of B. Kontraktor memperkenankan membangun di lokasi
architectural finishes or if not practicably possible then to contoh penyelesaian arsitektur atau jika tidak
provide the sample material, all as specified or if not memungkinkan maka memberikan material sampel,
specified then at minimum of the following: semuanya sebagaimana ditetapkan atau jika tidak
ditetapkan maka minimal hal-hal berikut ini:

29 SITE MANAGEMENT AND ESTABLISHMENT COSTS 29 MANAJEMEN LAPANGAN DAN BIAYA PENDIRIAN

A. Provide for all on and off site management administration A. Menyediakan seluruh biaya pembentukan dan
and establishment costs. administrasi manajemen didalam dan diluar lokasi.

B. The Contractor shall submit to the Project Manager details B. Kontraktor akan menyerahkan kepada Manajer Proyek
of the Site Manager whom he proposes to employ for this rincian mengenai Site Manager yang diusulkannya untuk
project. dipekerjakan untuk proyek ini.

C. The Site Manager shall be employed on a full time basis on C. Site Manager akan dipekerjakan secara penuh waktu
this project after approval by the Project Manager pada proyek ini setelah disetujui oleh Manajer Proyek.

D. The Contractor shall maintain on site a person who is D. Kontraktor akan mengelola terus menerus di lokasi orang
fluent in both English and Indonesian. yang fasih baik berbahasa Inggris maupun Indonesia.

E. Provide and maintain Site Drawings and Drawing Register. E. Menyediakan dan mendetail terus menerus Gambar
Proyek (Site Drawing) dan Daftar Gambar (Drawing
Register).

30 DISMISSAL OF CONTRACTOR'S STAFF/EMPLOYEES 30 PEMBERHENTIAN STAF/PEGAWAI KONTRAKTOR

A. The Contractor shall by the written request of the Project A. Kontraktor, dengan permintaan tertulis Manajer Proyek
Manager or his representative on site, immediately dismiss atau wakilnya di lokasi, akan segera memberhentikan
from the work any person employed by him thereon who dari pekerjaan orang yang dipekerjakannya di lokasi yang
has in the opinion of the Project Manager, incompetent or menurut pendapat Manajer Proyek, tidak kompeten atau
has misconduct himself, such person shall not again be melakukan perbuatan tercela, orang tersebut tidak akan
employed on the work without the written consent of the dipekerjakan lagi pada pekerjaan tanpa persetujuan
Project Manager. tertulis Manajer Proyek.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 10 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

31 LABOUR ON COSTS 31 BIAYA TENAGA KERJA

A. Provide for all costs in respect of employment of workmen A. Menyediakan seluruh biaya berkenaan dengan
including whatever Government levy, Annual and Public dipekerjakannya pekerja termasuk pungutan Pemerintah
Holiday, travelling Time, Expenses, Fares and Transport, apapun juga, Hari Libur Tahunan dan Hari Libur Resmi,
Non-productive time and other expenses in connection with Waktu perjalanan, Biaya, Biaya Pengangkutan dan
overtime, incentives and bonus payments and any other Transportasi, waktu tidak produktif dan biaya lainnya
discrepancies arising from employment of labour. sehubungan dengan lembur, insentif dan pembayaran
bonus dan perbedaan lainnya yang timbul dari
dipekerjakannya tenaga kerja.

32 CONSTRUCTION PLANT 32 PERALATAN KONSTRUKSI

A. Provide all necessary hoists, cranes and other lifting plant, A. Menyediakan seluruh kerek, crane dan peralatan angkat
ladders, scaffolding, staging, tackle, tarpaulins, tools and lainnya, tangga, perancah, takal, terpal, alat dan
other small plant (mechanical or otherwise) and Plant peralatan kecil lainnya yang diperlukan (mekanikal atau
required for Specific trades and allow for all labour and lainnya) dan Peralatan yang diperlukan untuk
materials in installing, operating, moving, adapting and pertukangan yang Spesifik dan menyediakan seluruh
maintaining same as necessary. Provide all necessary tenaga kerja dan material dalam memasang,
transport to and from and around the site for labour, mengoperasikan, memindahkan, mengadaptasikan dan
materials, plant, etc., for the execution and completion of memelihara peralatan tersebut sebagaimana perlu.
the Works. Menyediakan seluruh transportasi yang diperlukan ke dan
dari dan di sekitar lokasi untuk tenaga kerja, material,
peralatan, dan lain-lain, untuk pelaksanaan dan
penyelesaian Pekerjaan.

B. Provide for all temporary Works including hoarding and B. Menyediakan seluruh Pekerjaan sementara termasuk
screens, protection to existing and new finishes and fittings penimbunan dan screen, perlindungan pada
and any other Works as required or shown on the penyelesaian yang ada dan baru dan perlengkapan dan
drawings. Pekerjaan lainnya sebagaimana disyaratkan atau
ditunjukkan pada gambar.

33 SUPPLY OF MATERIALS AND PLANT 33 PENYEDIAAN MATERIAL DAN PERALATAN

A. If the Contractor fails for any reason to supply any A. Jika Kontraktor untuk alasan apapun tidak dapat
materials or plant which he has contracted to supply or if menyediakan material atau peralatan di mana dia telah
he fails to supply any such materials or plant in sufficient dikontrak untuk menyediakan atau jika dia tidak dapat
time to enable the Contract to be completed by the agreed menyediakan material dan peralatan tersebut dalam
date for completion, then in either event the Employer may waktu yang cukup untuk memungkinkan Kontrak
supply any portion or all of such materials or plant, the diselesaikan pada tanggal penyelesaian yang disepakati,
expense for which shall be borne by the Contractor. maka dalam masing-masing peristiwa Pemberi Tugas
dapat menyediakan sebagian atau seluruh material atau
peralatan tersebut, di mana biayanya ditanggung oleh
Kontraktor.

B. The cost to be borne by the Contractor, as above detailed, B. Biaya yang harus ditanggung oleh Kontraktor,
shall be deducted from monies due, or to become due to sebagaimana dirinci di atas, akan dipotong dari uang
the Contractor under this Contract, and the Contract sum yang harus dibayar kepada Kontraktor berdasarkan
shall be adjusted accordingly by means of a variation Kontrak ini, dan nilai Kontrak (Contract sum) akan
order. Any variation order issued by virtue of this Clause disesuaikan dengan perintah perubahan. Perintah
shall not be taken into account when computing the final perubahan yang diterbitkan berdasarkan Klausul ini tidak
amount of this Contract on which the Retention Fund is akan diperhitungkan ketika menghitung jumlah akhir
based. Kontrak ini di mana Dana Retensi didasarkan.

34 PLANT, TOOLS, MATERIALS, LABOUR, ETC. 34 PERALATAN, ALAT, MATERIAL, TENAGA KERJA,
DAN LAIN-LAIN

A. Provide all necessary plant, tools, materials, labour, etc. A. Menyediakan seluruh peralatan, alat, material, tenaga
necessary for the proper execution of the Works. kerja, dan lain-lain yang diperlukan untuk pelaksanaan
Pekerjaan.

B. The Contractor is entirely responsible for all labour B. Kontraktor sepenuhnya bertanggung jawab atas seluruh
employed and shall indemnify the Employer against all tenaga kerja yang dipekerjakan dan membebaskan
obligations and risks. The Contractor must meet all labour Pemberi Tugas dari seluruh kewajiban dan risiko.
regulations in force in the area and provide necessary Kontraktor harus memenuhi seluruh peraturan
facilities during the whole period of the contract. ketenagakerjaan yang berlaku di daerah tersebut dan
menyediakan fasilitas yang diperlukan selama seluruh
jangka waktu kontrak.

C. The Contractor shall provide sufficient hoisting and lifting C. Kontraktor akan menyediakan peralatan angkat untuk
plant for proper execution of the Works within the pelaksanaan Pekerjaan dalam kendala program.
programme constraints.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 11 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

35 REPORTS TO THE PROJECT MANAGER 35 LAPORAN KEPADA MANAJER PROYEK

A. The Contractor is to submit to the Project Manager's site A. Kontraktor akan menyerahkan kepada kantor lokasi
office a weekly report with two (2) additional copies Manajer Proyek laporan mingguan dengan dua (2)
reporting on the progress of the Works. salinan tambahan yang melaporkan kemajuan Pekerjaan.

B. These reports should also include daily records of activities B. Laporan ini juga harus mencakup catatan harian kegiatan
on site and must include information on the following : di lokasi dan harus mencakup informasi mengenai hal-hal
berikut ini:

1.      Work completed 1. Pekerjaan yang diselesaikan


2.      Number and categories of workmen and site 2. Jumlah dan kategori pekerja dan lokasi yang
employed dipekerjakan
3.      Materials delivered 3. Material yang diserahkan
4.      Materials removed from site 4. Material yang dipindahkan dari lokasi
5.      Instructions and directions received 5. Instruksi dan petunjuk yang diterima
6.      Requests by the Contractor 6. Permintaan oleh Kontraktor
7.      Equipment used on site 7. Peralatan yang digunakan di lokasi
8.      Equipment removed from site 8. Peralatan yang dipindahkan dari lokasi
9.      Weather conditions (including actual recorded 9. Kondisi cuaca (termasuk jumlah tercatat aktual curah
amount of rainfall) hujan)
10.  Other relevant information as requested by the 10. Informasi yang relevan lainnya sebagaimana diminta
Project Manager oleh Manajer Proyek

C. These records must be entered daily and countersigned by C. Catatan ini harus dimasukkan setiap hari dan turut
the Employer's Project Manager or his authorized ditandatangani oleh Manajer Proyek Pemberi Tugas atau
representative on site. The progress reports shall be in a wakil berwenangnya di lokasi. Laporan kemajuan harus
format approved by the Project Manager. dalam format yang disetujui oleh Manajer Proyek.

D. The Contractor shall provide on site a rainfall gauge to D. Kontraktor harus menyediakan di lokasi pengukur curah
record, on a daily basis, rainfall in the site. The location of hujan untuk mencatat, setiap hari, curah hujan di lokasi.
the gauge shall be approved by the Project Manager. Lokasi pengukur tersebut harus disetujui oleh Manajer
Proyek.

E. The Contractor shall further provide a monthly progress E. Kontraktor selanjutnya harus memberikan laporan
report which shall include a power point presentation to the kemajuan bulanan yang mencakup presentasi power
Employer of the project status. The format of the report point kepada Pemberi Tugas mengenai status proyek.
shall be subject to the approval of the Project Manager. Format laporan tunduk pada persetujuan Manajer Proyek.

36 DIMENSIONS FOR CONSTRUCTION 36 DIMENSI UNTUK KONSTRUKSI

A. Figured dimensions on the drawings shall be followed in all A. Dimensi berangka pada gambar harus diikuti dalam
cases. Where omitted or where discrepancies are found segala hal. Apabila dihilangkan atau apabila ditemukan
the Contractor shall notify the Project Manager and seek perbedaan maka Kontraktor akan memberi tahu Manajer
his written direction. Proyek dan berupaya mendapatkan petunjuk tertulisnya.

B. The Contractor shall check the whole of the dimensions on B. Kontraktor akan memeriksa seluruh dimensi di lokasi dan
site and if any discrepancy is found between the drawings jika ditemukan perbedaan antara gambar dan kondisi di
and conditions on site, he shall notify the Project Manager lokasi, dia akan memberi tahu Manajer Proyek dengan
immediately and request instructions. The Project segera dan meminta instruksi. Manajer Proyek diberikan
Manager shall be allowed fourteen (14) days to provide waktu empat belas (14) hari untuk memberikan klarifikasi
clarification regarding such discrepancy. mengenai perbedaan tersebut.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 12 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

37 CO-ORDINATION OF DRAWINGS 37 KOORDINASI GAMBAR

A. The Contractor shall pre-plan the execution and completion A. Kontraktor akan merencanakan di muka pelaksanaan dan
of the Works and inter lease, co-ordinate and check for penyelesaian Pekerjaan dan antar sewa, mengoordinasi
discrepancy in or divergence between all the drawings dan memeriksa perbedaan dalam atau antara seluruh
issued to him prior to the execution of the Works. Only gambar yang diterbitkan kepadanya sebelum
competent technical personnel shall be designated to pelaksanaan Pekerjaan. Hanya tenaga teknis yang
execute the co-ordination of drawings and the Contractor kompeten akan ditunjuk untuk melaksanakan koordinasi
shall designate at least one competent technical personnel gambar dan Kontraktor akan menunjuk sekurang-
for each of the categories of Works or services. If the kurangnya satu tenaga teknis yang kompeten untuk
Contractor shall find any discrepancy or divergence or lack setiap kategori Pekerjaan atau jasa. Jika Kontraktor
of information or details for him to proceed with any work, menemukan perbedaan atau penyimpangan atau
he shall immediately give to the Project Manager a written kurangnya informasi atau rincian baginya untuk
notice specifying his "Request for Information". Providing melanjutkan pekerjaan, dia harus segera memberikan
always that such request shall has been given to the kepada Manajer Proyek pemberitahuan tertulis yang
Project Manager at least fourteen (14) days before such merinci “Permintaan Informasi”nya. Dengan ketentuan
information is due for him to proceed with the Works. permintaan tersebut harus telah diberikan kepada
Manajer Proyek sekurang-kurangnya empat belas (14)
hari sebelum informasi tersebut jatuh tempo baginya
untuk melanjutkan Pekerjaan.

B. The Contractor shall allow for all costs in connection with B. Kontraktor akan menyediakan seluruh biaya sehubungan
the aforementioned co-ordination and bear all costs due to dengan koordinasi tersebut di atas dan menanggung
failure to coordinate the various requirements or to make seluruh biaya karena kegagalan mengoordinasi berbagai
request for information in due time. persyaratan atau membuat permintaan informasi pada
waktunya.

38 DISCREPANCIES 38 PERBEDAAN

A. Before commencement of each part of the Structural A. Sebelum dimulainya setiap bagian Pekerjaan Struktural,
Works, the Contractor shall ensure that there are no Kontraktor akan memastikan bahwa tidak terdapat
discrepancies between the drawings. Any discrepancy perbedaan antara gambar. Setiap perbedaan harus
must be referred to the Project Manager immediately. Any segera diserahkan kepada Manajer Proyek. Pekerjaan
remedial work necessitated by the failure of the Contractor perbaikan yang diperlukan karena kegagalan Kontraktor
to ensure that there is no discrepancy between the memastikan tidak terdapat perbedaan antara gambar
aforesaid drawings shall be borne by the Contractor. tersebut di atas ditanggung oleh Kontraktor.

B. Should discrepancy be discovered in any of the documents B. Jika ditemukan perbedaan dalam dokumen yang terdapat
contained in this Contract, the Contractor shall immediately dalam Kontrak ini, Kontraktor segera menyerahkan hal
refer the matter to the Project Manager before the work is tersebut kepada Manajer Proyek sebelum pekerjaan
put in hand. The Project Manager will decide as to which dimulai. Manajer Proyek akan memutuskan mengenai
document take precedence and his decision will be final. dokumen mana yang lebih diutamakan dan
keputusannya bersifat final.

C. Any discrepancy which occurs in either the Drawings or the C. Setiap perbedaan yang terjadi baik dalam Gambar
Specification or in the existing levels and dimensions shall maupun Spesifikasi atau dalam tingkat dan dimensi yang
immediately be brought to the attention of the Project ada harus segera diberitahukan kepada Manajer Proyek.
Manager.

39 SAFE GUARDING THE WORKS 39 MELINDUNGI PEKERJAAN

A. Safe guard the Works, materials and plant against damage A. Melindungi Pekerjaan, material dan peralatan terhadap
or theft including all necessary watching and lighting for the kerusakan atau pencurian termasuk seluruh penjagaan
security of the Works, and protection of the public, provide dan penerangan yang diperlukan untuk keamanan
shelter for any watchman and/or security guards so Pekerjaan, dan perlindungan masyarakat, menyediakan
required. tempat bernaung bagi penjaga dan/atau petugas
keamanan sebagaimana diperlukan.

B. The Contractor shall be solely responsible for safety of all B. Kontraktor sendiri bertanggung jawab atas keselamatan
his own materials and the materials supplied by the seluruh materialnya sendiri dan material yang disediakan
Employer (but not of the Direct Contractors or Suppliers), oleh Pemberi Tugas (tapi bukan dari Kontraktor
fixed or unfixed, and all the materials of the Contractor or Langsung atau Pemasok), tetap maupun tidak tetap, dan
supplier which are under sub‑contract to the Contractor. seluruh material Kontraktor atau pemasok yang berada di
bawah sub-kontrak kepada Kontraktor.

C. The Employer shall be indemnified for any losses occurred C. Pemberi Tugas akan diganti kerugian yang terjadi atas
for works, materials and equipment within this Contract. pekerjaan, material dan peralatan dalam Kontrak ini.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 13 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

40 TRADE NAMES 40 NAMA DAGANG

A. Wherever Trade Names or Company Names are stated in A. Di manapun Nama Dagang atau Nama Perusahaan
the Specification and Bills of Quantities, the Contractor dinyatakan dalam Spesifikasi dan Bill of Quantities,
may substitute alternative Trade or Company Names Kontraktor dapat mengganti dengan Nama Dagang atau
provided they are equal in all respects to the Specification Nama Perusahaan alternatif dengan ketentuan nama
and the Project Manager's approval is obtained in writing tersebut sama dalam segala hal dengan Spesifikasi dan
before making any substitution. persetujuan Manajer Proyek diperoleh secara tertulis
sebelum melakukan penggantian.

B. All materials and/or fittings specified by trade or Company B. Seluruh material dan/atau perlengkapan yang ditetapkan
Names shall be supplied, fixed and used strictly in dengan nama dagang atau Nama Perusahaan harus
accordance with the manufacturer's written instructions and disediakan, ditetapkan dan digunakan secara ketat
all relevant By Laws. sesuai dengan instruksi tertulis pembuat dan seluruh
Peraturan yang relevan.

41 AVOIDING NUISANCE 41 MENGHINDARI GANGGUAN

A. The Contractor shall carry out the Works in such manner A. Kontraktor akan melaksanakan Pekerjaan dengan cara
so as to cause as little inconvenience and nuisance to yang menimbulkan sesedikit mungkin ketidaknyamanan
persons as possible. dan gangguan terhadap orang.

B. He shall not obstruct, as far as possible, the normal rights B. Dia tidak akan menghalangi, sejauh mungkin, hak normal
of way of the users of the public roads and where this is jalan para pengguna jalan umum dan apabila ini perlu
necessary and unavoidable, he shall provide barriers, dan tidak dapat dihindari, dia akan menyediakan
warning lights, etc., required for proper traffic control penghalang, lampu peringatan, dan lain-lain, yang
including getting the necessary permits from the Police diperlukan untuk kontrol lalu lintas yang layak termasuk
Department and other Local Authorities and paying all fees mendapatkan izin yang diperlukan dari Kepolisian dan
in connection therewith. Otoritas Lokal lainnya dan membayar seluruh biaya
sehubungan dengan hal tersebut.

C. He shall be responsible for clearing and cleaning all roads, C. Dia bertanggung jawab untuk membersihkan seluruh
drains, etc., when these are fouled as result of the Works, jalan, saluran air, dan lain-lain, apabila kotor akibat
at regular intervals, or when directed by the Project Pekerjaan, secara berkala, atau apabila diperintahkan
Manager. oleh Manajer Proyek.

42 PERMIT & LICENCES REQUIRED IN CONNECTION 42 IZIN & LISENSI YANG DIPERLUKAN SEHUBUNGAN
WITH THE WORKS DENGAN PEKERJAAN

A. The Contractor shall allow for and obtain all necessary A. Kontraktor akan menyediakan dan mendapatkan seluruh
permits, licenses and conform to the codes, ordinances, izin, lisensi yang diperlukan, dan memenuhi kode,
regulations and orders of all authorities having jurisdiction ordinasi, peraturan dan perintah semua otoritas yang
on the performance of the work. Should conflict arise memiliki yurisdiksi atas pelaksanaan pekerjaan. Jika
between on document or authority and another, obtain timbul pertentangan antara dokumen atau otoritas
clarifications from the Project Manager before proceeding dengan dokumen atau otoritas lainnya, mendapatkan
with the Works. klarifikasi dari Manajer Proyek sebelum melanjutkan
Pekerjaan.

B. The Employer however also shall arrange for and is B. Akan tetapi, Pemberi Tugas juga akan mengurus dan
responsible for obtaining the necessary building permit. bertanggung jawab untuk mendapatkan izin mendirikan
bangunan yang diperlukan.

43 TRANSPORTING MATERIALS 43 MENGANGKUT MATERIAL

A. Take care in loading and unloading materials for the work A. Berhati-hati dalam membongkar dan memuat material
that the streets and footpaths are not obstructed or the untuk pekerjaan agar jalan dan jalan setapak tidak
traffic impeded, and conform with police regulations for terhalang atau lalu lintas terhambat, dan mematuhi
carting, loading and unloading all materials plant, earth, peraturan kepolisian untuk pengangkutan, bongkar muat
etc., to or from the building site. seluruh material, peralatan, tanah, dan lain-lain, ke atau
dari lokasi bangunan.

B. Take all necessary precautions to prevent spillage along B. Melakukan segala tindakan pencegahan yang diperlukan
public roads. All washing of lorries, trucks and other untuk mencegah tumpahan sepanjang jalan umum.
construction equipment shall be done on properly Seluruh pencucian lori, truk dan peralatan konstruksi
constructed washing bays within the site. The Contractor lainnya dilakukan di tempat pencucian yang dibangun
shall indemnify the Employer against any claim, summons, dengan layak di lokasi. Kontraktor akan mengganti
and other code of the Authorities affecting the Works. kerugian Pemberi Tugas terhadap klaim, panggilan, dan
kode lain Otoritas yang mempengaruhi Pekerjaan.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 14 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

44 RESPONSIBILITY FOR THE WORKS 44 TANGGUNG JAWAB ATAS PEKERJAAN

A. The Contractor is responsible to keep all persons, including A. Kontraktor bertanggung jawab untuk menjaga semua
those employed by Sub-Contractors under control and orang, termasuk mereka yang dipekerjakan oleh Sub-
within the boundaries of the site, to be responsible for the Kontraktor di bawah kontrol dan dalam batas lokasi,
care of Works generally, and for all Works executed and bertanggung jawab atas pengawasan Pekerjaan
materials deposited on the site by the Contractor and umumnya, dan atas seluruh Pekerjaan yang
suppliers, together with all risks arising from carelessness dilaksanakan dan material yang disimpan di lokasi oleh
of his own operatives, damage or loss by theft or any other Kontraktor dan pemasok, beserta seluruh risiko yang
cause, and make good all such damage or loss, and allow timbul dari kecerobohan operatornya sendiri, kerusakan
for all necessary watching and protective lighting. atau kerugian karena pencurian atau penyebab lainnya,
dan memperbaiki seluruh kerusakan atau kerugian
tersebut, dan menyediakan seluruh penerangan
pelindung dan penjagaan.

45 SETTING OUT 45 SETTING OUT

A. The Contractor is to employ a registered surveyor A. Kontraktor akan mempekerjakan surveyor terdaftar yang
approved by the Project Manager to set out the Works. The disetujui oleh Manajer Proyek untuk me”set out”
Contractor is also required to set up leveling which must be Pekerjaan. Kontraktor juga diharuskan me”set up”
tied to an existing officially recognized datum level and perataan (leveling) yang harus diikat ke permukaan
shall use these levels to set out all the Works. datum yang diakui secara resmi yang ada dan akan
menggunakan permukaan ini untuk me”set out” seluruh
Pekerjaan.

B. The marking of level positions are to be decided on site B. Penandaan posisi permukaan akan diputuskan di lokasi
and approved by the Project Manager. Reference pegs dan disetujui oleh Manajer Proyek. Tanda dan pasak
and marks are to be provided as requested by the Project referensi akan disediakan sebagaimana diminta oleh
Manager. The Contractor shall maintain, protect and Manajer Proyek. Kontraktor akan memelihara,
reinstate such pegs and marks as required by the Project melindungi dan mengembalikan pasak dan tanda
Manager for the duration of this Contract. tersebut sebagaimana disyaratkan oleh Manajer Proyek
selama berlangsungnya Kontrak ini.

C. Two copies of all relevant information of setting out are to C. Dua salinan seluruh informasi yang relevan mengenai
be deposited with the Project Manager within seven (7) setting out akan disimpan pada Manajer Proyek dalam
days from the Contract Start Date. waktu tujuh (7) hari dari Tanggal Mulai Kontrak.

D. The Contractor will be responsible for the accuracy of all D. Kontraktor akan bertanggung jawab atas akurasi seluruh
setting out and establishing all levels accurately Any errors setting out dan mendirikan seluruh permukaan secara
in setting out and any consequential loss to the Employer akurat. Kesalahan dalam setting out dan kerugian ikutan
will be made good at the Contractor's expense and to the (consequential loss) pada Pemberi Tugas akan diperbaiki
satisfaction of the Project Manager. atas biaya Kontraktor dan secara memuaskan Manajer
Proyek.

46 SITE VERIFICATION OF DIMENSIONS 46 ​VERIFIKASI DIMENSI LOKASI

A. Contractor shall verify all dimensions on site, and resolve A. Kontraktor akan memverifikasi seluruh dimensi di lokasi,
all discrepancies with the Project Manager before dan menyelesaikan seluruh perbedaan dengan Manajer
beginning work. Proyek sebelum memulai pekerjaan.

47 TEMPORARY BUILDINGS 47 BANGUNAN SEMENTARA

A. Provide, erect and maintain on the site in adequate, secure A. Menyediakan, mendirikan dan memelihara di lokasi
and watertight temporary buildings within the allocated bangunan sementara yang memadai, aman dan kedap
compound area for use during the execution of this air di daerah yang dialokasikan untuk digunakan selama
Contract. pelaksanaan Kontrak ini.

B. The Contractor shall erect, maintain and remove upon B. Kontraktor akan mendirikan, memelihara dan
completion a site office for use solely by the Project memindahkan, setelah penyelesaian, site office untuk
Manager and the Consultants, and designed subject to digunakan hanya oleh Manajer Proyek dan Konsultan,
approval of the Project Manager as follows:- dan didesain dengan tunduk pada persetujuan Manajer
Proyek sebagai berikut:

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 15 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

45 TEMPORARY BUILDINGS (Cont'd) 45 BANGUNAN SEMENTARA (lanj)


Employer’s Office Kantor Pemberi Tugas
Construction Management's Site Office Kantor Lapangan Manajemen Konstruksi

A. Employer’s office provided by the Contractor to be clean, A. Kantor Pemberi Tugas yang disediakan oleh Kontraktor
dry, furnished, air conditioned, and fully functioned. harus bersih, kering, dilengkapi, memiliki alat pendingin
udara, dan sepenuhnya berfungsi.

i)     For approx. 6 persons. i) Untuk kurang lebih 6 orang.


ii) Office area 70 m2 including AC unit, bulletin board, ii) Luas kantor 70 m2 termasuk unit AC, papan tulis
white board, fingerprint detector, shoe selves, electical bulletin, white board, fingerprint detector, rak sepatu,
consent, etc. kelinstrikan, dll.
iii)   In addition to the office: iii) Sebagai tambahan untuk kantor:
a)      Desk with side table, drawers, chair with arm, a) Meja degan meja samping, laci, kursi dengan lengan,
drawing table, foldable chair, waste bin, etc. meja gambar, bangku lipat, tempat sampah, dll.

b)      Document / sample control 6m2 with steel frame b) Kontrol dokumen/sampel 6 m2 dengan rak besi dan
selves and book cabinets lemari buku.
c)      Small kitchen with cupboard & sink, water dispenser, c) Dapur kecil dengan lemari dapur & sink, water
electrical oven, electrical pot, tableware, cultery dispenser, oven elektrik, electrical pot, alat makan

d)      Toilet: d) Toilet:


Female : - 1 closet, 1 wash hand basin Perempuan: - 1 kloset, 1 wastafel
Male : - 1 Closet, 2 Urinals, 1 wash hand basin Pria: - 1 Kloset, 2 tempat buang air kecil, 1 wastafel
e) Meeting room for 15 persons including meeting e) Ruang rapat untuk 15 orangn termasuk meja, kursi,
tables, chairs, whiteboard, electrical consent on table whiteboard, colokan listrik meja
f) Mushollah 6m2 f) Musala 6 m2
iv)   Wi-Fi internet connection provided by Contractor iv) Koneksi internet Wi-Fi yang disediakan oleh
Kontraktor
v) Cleaning Service provided by Contractor. v) Layanan Kebersihan yang disediakan oleh Kontraktor.

vi)   4 No. handy talkie on the same frequency as the vi) 4 No. handy talkie pada frekuensi yang sama dengan
Contractor’s network. jaringan Kontraktor.
vii)   Land line telephone 2 lines including fax. vii) Telepon darat (landline phone) 2 saluran termasuk
faksimili.
viii)  Helmets and boots of assorted sizes (10 sets). viii) Helm dan sepatu bot berbagai ukuran (10 set).

The following temporary buildings if required shall be Bangunan sementara berikut ini jika diperlukan akan
constructed to a design approved by the Project Manager. dibangun menurut desain yang disetujui oleh Manajer
Proyek.
(a) Stores for cement and other perishable materials are (a) Gudang untuk semen dan material mudah rusak
to have a floor raised above ground level. lainnya yang memiliki lantai ditinggikan permukaan tanah.

(b) Sanitary accommodation (for all workers including (b) Akomodasi sanitasi (untuk seluruh pekerja termasuk
that of Direct Contractors). pekerja Kontraktor Langsung).
(c) Provide other such temporary buildings as may be (c) Menyediakan bangunan sementara lainnya
necessary for the Works for carpenters and bar benders, sebagaimana perlu untuk Pekerjaan untuk tukang kayu
etc. dan tukang bengkok baja tulangan, dan lain-lain.

(d) Guard houses. (d) Pos-pos jaga.


B. Except for the above no other temporary buildings will be B. Kecuali untuk di atas, tidak ada bangunan sementara
allowed unless with the written permission of Project lainnya akan diperkenankan kecuali dengan izin tertulis
Manager. Manajer Proyek.

C. Allow for all furniture, equipment, suppliers, consumables, C. Menyediakan seluruh perabotan, peralatan,
cleaning and maintenance for temporary buildings. perlengkapan, bahan habis pakai, pembersihan dan
pemeliharaan untuk bangunan sementara.

D. Make proper arrangements for and pay all charges in D. Membuat pengaturan yang layak untuk dan membayar
connection with conservancy. seluruh biaya sehubungan dengan pemeliharaan.

E. The above mentioned buildings, shall be erected by the E. Bangunan tersebut di atas akan didirikan oleh Kontraktor
Contractor and passed by the Project Manager within one dan disahkan oleh Manajer Proyek dalam waktu satu
week of occupation of the site and shall be removed, minggu pendudukan lokasi dan akan dipindahkan,
cleared away and their sites cleared, cleaned and dibersihkan dan lokasinya dibersihkan, dibersihkan dan
reinstated to their original condition within seven days of dikembalikan ke keadaan semula dalam waktu tujuh hari
receipt of orders for their removal from the Project sejak diterimanya perintah pemindahan bangunan
Manager. tersebut dari Manajer Proyek.

F. Workers are not allowed to be accommodated on site. F. Pekerja tidak diperkenankan diakomodasi di lokasi.
G. Direct contractors shall provide their own office and storage G. Kontraktor langsung akan menyediakan akomodasi
accommodation, on site in a location and design / penyimpanan dan kantor mereka sendiri, di lokasi dalam
specification to the approval of the Project Manager. lokasi dan desain/spesifikasi atas persetujuan Manajer
Proyek.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 16 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

48. SANITATION 48 SANITASI

A. Provide and erect in approved positions or make other A. Menyediakan dan mendirikan di posisi yang disetujui atau
arrangements for all necessary sanitary conveniences for melakukan pengaturan lainnya untuk seluruh sarana
all operatives, including the Direct Contractors, to the sanitasi yang diperlukan untuk seluruh operator,
Project Manager's approval. Sanitary conveniences shall termasuk Kontraktor Langsung, atas persetujuan Manajer
include port-a-loo equivalents and shall be provided around Proyek. Kenyamanan sanitasi harus mencakup yang
the site for the convenient use of all workers. Sanitary setara dengan toilet portabel dan harus disediakan di
conveniences shall be provided based on the proportion of sekitar lokasi untuk memudahkan penggunaan semua
one closet per 25 workers. pekerja. Fasilitas sanitasi harus disediakan berdasarkan
proporsi satu lemari per 25 pekerja.

B. Sanitary conveniences shall be provided at the Contract B. Fasilitas kebersihan harus diberikan pada Tanggal Mulai
Start Date. Kontrak.

C. Maintain these conveniences in a sanitary condition and C. Memelihara sarana ini dalam kondisi sanitasi dan
remove on completion of the Contract including cleaning memindahkan setelah diselesaikannya Kontrak termasuk
and reinstating the whole area. membersihkan dan memulihkan keseluruhan areal
tersebut.

49. TEMPORARY SCREENS 49 SCREEN SEMENTARA

A. Provide, erect and maintain all necessary temporary A. Menyediakan, mendirikan dan memelihara seluruh
screens, alter, shift and adapt from time to time as required screen sementara yang diperlukan, mengubah,
and remove from site on completion. memindahkan dan mengadaptasikan dari waktu ke waktu
sebagaimana disyaratkan dan memindahkan dari lokasi
atas penyelesaian.

50. MEANS OF ACCESS 50 SARANA AKSES

A. Provide at all times during the progress of the Works and A. Menyediakan pada setiap saat selama berlangsungnya
the defects liability period provide proper means of access Pekerjaan dan masa tanggung jawab atas cacat sarana
as shown on the drawings, etc., and the necessary akses yang layak sebagaimana ditunjukkan pada
attendance, to move and adapt as directed for the gambar, dan lain-lain, dan kehadiran yang diperlukan,
inspection or measurement of the Works by the Project untuk memindahkan dan mengadaptasikan sebagaimana
Manager or his representative or consultants. diperintahkan untuk pemeriksaan atau pengukuran
Pekerjaan oleh Manajer Proyek atau wakilnya atau
konsultan.

The Contractor is to construct temporary crossovers for Kontraktor akan membangun crossover (jalan) sementara
access that are to be demolished upon completion. untuk akses, yang akan dihancurkan setelah selesai.

51. TEMPORARY YARDS 51 LAPANGAN SEMENTARA (TEMPORARY YARD)

A. Arrange for and lease temporary yards as may be required A. Mengurus dan menyewa lapangan sementara (temporary
for the Works until such times as sheds and stores may be yard) sebagaimana diperlukan untuk Pekerjaan sampai
transferred to the site and sufficient working areas are waktu gudang dan tempat penyimpanan dapat
available on the site or lease temporary yards for the dipindahkan ke lokasi dan daerah kerja yang cukup
duration of the Contract whichever is considered the more tersedia di lokasi atau menyewa lapangan sementara
convenient. (temporary yard) selama berlangsungnya Kontrak, mana
yang dianggap lebih nyaman.

52. LIGHTING AND POWER 52 PENERANGAN DAN DAYA

A. Provide all adequate lighting and power for the Works, A. Menyediakan seluruh penerangan dan daya yang
limited to general lighting and power distribution for small memadai untuk Pekerjaan, terbatas pada penerangan
tools and the like only for use by others, with all temporary umum dan distribusi daya untuk peralatan kecil dan
wiring and alter, adapt and maintain as necessary. On sejenisnya hanya untuk digunakan oleh orang lain,
completion, disconnect and remove all temporary dengan seluruh jaringan kawat sementara dan
connections as required. mengubah, mengadaptasikan dan memelihara
sebagaimana perlu. Atas penyelesaian, memutuskan
dan memindahkan seluruh koneksi sementara
sebagaimana diperlukan.

B. Task specific lighting and power, whether for running major B. Daya dan penerangan spesifik tugas, baik untuk
equipment for the works or testing and commissioning of menjalankan peralatan utama untuk pekerjaan maupun
the Direct Contractors or Suppliers shall be provided by the pengujian dan commissioning Kontraktor Langsung atau
Direct Contractor or Supplier. Pemasok akan disediakan oleh Kontraktor Langsung
atau Pemasok.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 17 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

52. LIGHTING AND POWER (Cont'd) 52 PENERANGAN DAN DAYA (lanj.)

C. PLN power will not be supplied by the Employer. C. Listrik PLN tidak akan dipasok oleh Pemberi Tugas.

D. Temporary lighting throughout the site shall be minimum D. Penerangan sementara di seluruh lokasi harus minimal
100 lux. 100 lux.

E. Temporary lighting along perimeter fences shall be E. Penerangan sementara di sepanjang pagar keliling harus
minimum 100 lux. minimal 100 lux.

F. Provide lighting to the entire site boundary. - Not required F. Menyediakan penerangan ke seluruh batas lokasi. - Tidak
disyaratkan

53. WATER 53 AIR

A. Provide all necessary clean water for use on the Works A. Menyediakan seluruh air bersih yang diperlukan untuk
including for testing of air conditioning systems. Provide digunakan pada Pekerjaan termasuk untuk pengujian
temporary plumbing and storage; alter, adapt, and maintain sistem pendingin udara. Menyediakan pemipaan dan
as necessary and pay all charges in connection with it. tempat penyimpanan sementara; mengubah,
Upon completion, disconnect and remove all temporary mengadaptasikan, dan memelihara sebagaimana perlu
pipes, meters, taps and connections as required. dan membayar seluruh biaya sehubungan dengan hal
tersebut. Atas penyelesaian, memutuskan dan
memindahkan seluruh pipa, meteran, keran dan koneksi
sementara sebagaimana disyaratkan.

B. Water required for testing and commissioning for Works B. Air yang diperlukan untuk pengujian dan commissioning
relating the Direct Contractors or Suppliers shall be untuk Pekerjaan yang berhubungan dengan Kontraktor
provided by the Direct Contractors or Suppliers. Langsung atau Pemasok akan disediakan oleh
Kontraktor Langsung atau Pemasok.

54. TELEPHONE 54 TELEPON

A. The Contractor is to provide his own telephone and A. Kontraktor akan menyediakan saluran telepon dan
facsimile lines to the Contractor's site office and pay all faksimilinya sendiri ke site office Kontraktor dan
charges in connection with same for installation, and membayar seluruh biaya sehubungan dengan peralatan
expenses during execution of the Works. Arrange and pay tersebut untuk instalasi, dan biaya selama pelaksanaan
for disconnection and removal on completion of Contract. Pekerjaan. Mengurus dan membayar pemutusan dan
pemindahan atas diselesaikannya Kontrak.

55 SCAFFOLDING 55 PERANCAH

A. The Contractor shall provide and maintain all scaffolding A. Kontraktor akan menyediakan dan memelihara seluruh
including planks, battens, catwalks, gangways, ladders, perancah termasuk papan, catwalk, tangga tali, tangga,
etc., necessary for carrying out of this Contract. dan lain-lain, yang diperlukan untuk melaksanakan
Kontrak ini.

B. Scaffolding shall be of the type approved by the relevant B. Perancah haruslah jenis yang disetujui oleh otoritas yang
authorities at all times. relevan pada setiap saat.

C. Scaffolding shall be taken down and removed only on the C. Perancah diturunkan dan dipindahkan hanya atas
written instruction of the Project Manager. instruksi tertulis Manajer Proyek.

56. BARRICADES 56 BARIKADE

A. The Contractor shall erect and maintain fences, barricades A. Kontraktor akan mendirikan dan memelihara pagar,
and hoarding during the contract period and pay all barikade dan penimbunan selama jangka waktu kontrak
charges in connection therewith. This shall include a site dan membayar seluruh biaya sehubungan dengan hal
perimeter security fence along the main frontage of the tersebut. Ini harus mencakup pagar pengamanan keliling
site. lokasi di sepanjang bagian depan utama lokasi.

B. The Contractor shall erect and maintain a temporary B. Kontraktor akan mendirikan dan memelihara
barricade / fencing to prevent rocks, rubble, rubbish or the barikade/pagar sementara untuk mencegah batu, puing-
like from enteting the ocean. puing, sampah atau sejenisnya masuk ke laut.

C. Drawings for all barricades or fences shall be provided to C. Gambar untuk seluruh barikade atau pagar akan
the Project Manager for review / approval within two (2) diserahkan kepada Manajer Proyek untuk dikaji
weeks of the Commencement Date and thereafter, erected ulang/disetujui dalam waktu dua (2) minggu dari Tanggal
within four (4) weeks from the date of design approval by Mulai dan sesudahnya, yang didirikan dalam waktu
the Project Manager. empat (4) minggu dari tanggal persetujuan desain oleh
Manajer Proyek.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 18 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

56. BARRICADES (Cont'd) 56 BARIKADE (lanj.)

D. The barricades shall be maintained in a safe and secure D. Barikade akan dipelihara dengan cara yang aman pada
manner at all times. setiap saat.

E. On completion of the Contract remove the barricade E. Atas diselesaikannya Kontrak, memindahkan barikade
including grubbing up foundations and making good termasuk mencabut fondasi dan memperbaiki kondisi
ground conditions to the satisfaction of the Project tanah secara memuaskan Manajer Proyek.
Manager.

F. No advertisement, poster and the like shall be affixed or F. Tidak ada iklan, poster dan sejenisnya ditempelkan atau
exhibited on the hoardings unless otherwise authorised ditunjukkan mengenai penimbunan kecuali jika diotorisasi
and directed by Project Manager. dan diperintahkan lain oleh Manajer Proyek.

57. FENCING 57 PEMAGARAN

A. Any existing fencing of the neighboring properties shall be A. Pemagaran yang ada properti yang bertetangga akan
maintained in a safe and secure manner at all times. dipelihara dengan cara yang aman pada setiap saat.

58. PUMPING AND DRAINAGE 58 PEMOMPAAN DAN DRAINASE

A. Remove all water resulting from any source which may A. Menyingkirkan seluruh air yang berasal dari sumber
accumulate on the site from time to time by providing manapun yang dapat menggenang di lokasi dari waktu ke
sufficient drainage and/or pumping systems to the Project waktu dengan menyediakan sistem pemompaan dan/atau
Manager's approval. The Contractor at all times and at the drainase yang cukup atas persetujuan Manajer Proyek.
Contractor’s expense shall maintain the site in a dry Kontraktor pada setiap saat dan atas biaya Kontraktor
condition. akan memelihara lokasi dalam kondisi kering.

59. SITING OF TEMPORARY WORKS AND PERMANENT 59 PELOKASIAN PEKERJAAN SEMENTARA DAN
SPOIL DISPOSAL PEMBUANGAN SISA GALIAN PERMANEN

A. Notify the Project Manager and obtain his approval as to A. Memberi tahu Manajer Proyek dan mendapatkan
the siting of both temporary and permanent spoil disposal persetujuan mengenai pelokasian baik tempat
areas and temporary rubbish disposal areas, and the like. pembuangan sisa galian sementara maupun permanen
dan tempat pembuangan sampah sementara, dan
sejenisnya.

B. Provide a single collection point at the site for all site B. Menyediakan tempat pengumpulan tunggal di lokasi
rubbish, to which all Direct Contractors and Suppliers shall untuk seluruh sampah lokasi, di mana seluruh Kontraktor
be required to place their rubbish and arisings. Langsung dan Pemasok disyaratkan menaruh sampah
dan timbulan sampah mereka.

60. TEMPORARY FIRE EXTINGUISHERS 60 ALAT PEMADAM API SEMENTARA

A. The Contractor shall provide portable fire extinguishers as A. Kontraktor akan menyediakan alat pemadam api portabel
necessary, to be fixed at various locations to be decided by sebagaimana perlu, yang akan dipasang di berbagai
the Project Manager. The fire extinguishers shall be to the lokasi yang akan diputuskan oleh Manajer Proyek. Alat
approval of the Project Manager and fully charged and pemadam api harus atas persetujuan Manajer Proyek
ready for instant use at all times. The extinguishers are not dan terisi penuh dan siap untuk segera digunakan pada
to be removed unless with the Project Manager's setiap saat. Alat pemadam tidak akan dipindahkan
instructions. kecuali dengan instruksi Manajer Proyek.

B. The extinguishers shall remain the property of the B. Alat pemadam tetap menjadi milik Kontraktor.
Contractor.

C. When flammable combustible materials are to be stored or C. Apabila material mudah terbakar yang mudah terbakar
used the Contractor shall provide protective coverings and akan disimpan atau digunakan maka Kontraktor akan
to adhere strictly to any instructions given by the Project menyediakan penutup pelindung dan mematuhi secara
Manager concerning the storage of such combustible ketat setiap instruksi yang diberikan oleh Manajer Proyek
materials. mengenai penyimpanan material mudah terbakar
tersebut.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 19 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

61. TEMPORARY LIGHTNING PROTECTION 61 PENANGKAL PETIR SEMENTARA

A. The Contractor shall provide lightning protection to the site A. Kontraktor akan menyediakan penangkal petir di lokasi
until such time as the permanent lightning protection sampai waktu instalasi penangkal petir permanen
installation is completed. diselesaikan.

B. The temporary lightning protection shall be erected and B. Penangkal petir sementara akan didirikan dan melindungi
protect the site within 45 (forty five) days from the Contract lokasi dalam waktu 45 (empat puluh lima) hari dari
Start Date. Tanggal Mulai Kontrak.

62. SIGN BOARD 62 PAPAN NAMA

A. The Contractor will provide and erect a signboard (min. A. Kontraktor akan menyediakan dan mendirikan papan
10m2) for the project. The signboard shall indicate the nama (min. 10 m2) untuk proyek. Papan nama akan
name of the Employer, the Consultants and Contractor. menunjukkan nama Pemberi Tugas, Konsultan dan
The Contractor is to nominate a position, maintain, repair Kontraktor. Kontraktor akan mengusulkan letaknya,
and move as required by the Project Manager. Provide memelihara, memperbaiki dan memindahkan
power and lighting as required. sebagaimana disyaratkan oleh Manajer Proyek.
Menyediakan daya dan penerangan sebagaimana
disyaratkan.

B. Pay all taxes and fees associated with the signage. B. Membayar seluruh pajak dan biaya yang terkait dengan
rambu tersebut.

63. MAINTAIN EXISTING SERVICES 63 MEMELIHARA LAYANAN YANG ADA

A. Uphold, protect and maintain all existing drains, sewers, A. Memelihara, melindungi dan menjaga seluruh saluran air,
water mains, electric cables, telephone cables, and other selokan, pipa air utama, kabel listrik, kabel telepon, dan
property of a like nature and make good or pay for making properti lain sejenis yang ada dan memperbaiki atau
good all damage thereto and any consequential damage or membayar untuk memperbaiki kerusakan pada properti
loss arising out of such damage, including damage by tersebut dan kerusakan ikutan atau kerugian yang timbul
flooding. Delays to the Contract Period caused by such dari kerusakan tersebut, termasuk kerusakan karena
work shall not be deemed to require time extensions and banjir. Penangguhan terhadap Jangka Waktu Kontrak
shall be absorbed in the Contract Period. yang disebabkan oleh pekerjaan tersebut tidak akan
dianggap memerlukan perpanjangan waktu dan akan
diserap dalam Jangka Waktu Kontrak.

64. OPENING UP PUBLIC ROADS FOR THE LAYING OF 64 MEMBUKA JALAN UMUM UNTUK PEMASANGAN
PIPES, ETC PIPA, DAN LAIN-LAIN

A. In the event that the Contractor requires to open up A. Apabila Kontraktor perlu membuka jalan umum yang ada
existing public roads to carry out the Works, it is the untuk melaksanakan Pekerjaan, maka merupakan
Contractor's responsibility to apply and submit to the tanggung jawab Kontraktor untuk meminta dan
various government departments all the forms, fees and menyerahkan kepada berbagai departemen pemerintah
supervision necessary to carry out the Works. The seluruh formulir, biaya dan pengawasan yang diperlukan
Contractor is to ensure that his insurance company is untuk melaksanakan Pekerjaan. Kontraktor akan
informed of such work and ensure that his liabilities are memastikan bahwa perusahaan asuransinya diberi tahu
fully insured prior to undertaking such Works. The mengenai pekerjaan tersebut dan memastikan bahwa
Contractor is to note that the Authorities will not normally kewajibannya sepenuhnya diasuransikan sebelum
allow the disturbance of newly surfaced roads within a year melaksanakan Pekerjaan tersebut. Kontraktor harus
of surfacing. The Contractor shall however, not be relieved memperhatikan bahwa Otoritas biasanya tidak akan
of his responsibility of verifying with the relevant Authority memperkenankan gangguan jalan yang baru diratakan
having jurisdiction on this matter and shall allow for all permukaannya dalam waktu satu tahun sejak diratakan
additional costs and expenses arising therefrom. permukaannya. Akan tetapi, Kontraktor tidak akan
dibebaskan dari tanggung jawabnya untuk memverifikasi
dengan Otoritas yang relevan yang memiliki yurisdiksi
atas hal ini dan akan menyediakan seluruh biaya dan
ongkos tambahan yang timbul dari hal tersebut.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 20 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

65. INTERFERENCE TO TRAFFIC AND ADJOINING 65 GANGGUAN TERHADAP LALU LINTAS DAN
PROPERTY PROPERTI BERSEBELAHAN

A. All operations necessary for the execution of the Works A. Seluruh operasi yang diperlukan untuk pelaksanaan
and for the construction of any temporary Works shall, so Pekerjaan dan untuk konstruksi Pekerjaan sementara,
far as compliance with the requirements of the Contract sejauh memenuhi persyaratan izin Kontrak, harus
permits, shall be carried out so not to interfere dilakukan dengan tidak mengganggu kenyamanan
unnecessarily or improperly with the public convenience or masyarakat atau akses ke penggunaan dan pendudukan
the access to use and occupation of public or private roads jalan umum atau pribadi dan jalan setapak atau ke, atau
and footpaths or to, or of properties whether in the dari properti baik dalam pemilikan Pemberi Tugas atau
possession of the Employer of or any other person and the orang lain dan Kontraktor akan menanggung seluruh
Contractor shall bear all costs and expenses whatsoever biaya dan ongkos apapun juga yang timbul dari atau
arising out of or in relation to any such matters. sehubungan dengan hal tersebut.

66. SHORING AND STRUTTING 66 PENYANGGAAN DAN PENOPANGAN

A. Provide and maintain during the execution of the Works all A. Menyediakan dan memelihara selama pelaksanaan
shoring, strutting, needling and other supports and take all Pekerjaan seluruh penyanggaan, penopangan,
necessary steps to preserve the stability of adjoining pendorongan dan dukungan lainnya dan melakukan
buildings, the Works and of all other property including that segala langkah yang diperlukan untuk menjaga stabilitas
of adjoining Owners that may in any way be endangered or bangunan bersebelahan, Pekerjaan dan seluruh properti
affected by the Works required to be executed under this lainnya termasuk stabilitas Pemilik bersebelahan yang
Contract. The Contractor shall also protect adjoining mungkin dengan cara apapun terancam atau dipengaruhi
buildings against damage and/or settlement and no part of oleh Pekerjaan yang disyaratkan dilaksanakan
these protective measures shall be taken down or removed berdasarkan Kontrak ini. Kontraktor juga akan
until the Contractor is satisfied that such measures are no melindungi bangunan bersebelahan terhadap kerusakan
longer required. All Works involving risk of damage and/or dan/atau penyelesaian dan tidak ada bagian tindakan
settlement to the adjacent buildings is to be executed by perlindungan ini akan dikurangi atau dihilangkan sampai
the Contractor in such a way as to minimise all risk as far Kontraktor puas bahwa tindakan tersebut tidak lagi
as is reasonably possible. The Contractor shall indemnify diperlukan. Seluruh Pekerjaan yang melibatkan risiko
the Employer in respect of any claims arising out of kerusakan dan/atau penyelesaian terhadap bangunan
inadequate precautions and shall make good all damages bersebelahan akan dilaksanakan oleh Kontraktor
arising therefrom. sedemikian rupa untuk mengurangi segala risiko sejauh
memungkinkan. Kontraktor akan mengganti kerugian
Pemberi Tugas berkenaan dengan klaim yang timbul dari
tindakan pencegahan yang tidak memadai dan akan
memperbaiki segala kerusakan yang timbul dari hal
tersebut.

67. CLEANING OF SITE 67 PEMBERSIHAN LOKASI

A. Clear up and remove all rubbish and debris from the site at A. Membersihkan dan menyingkirkan seluruh sampah dan
regular intervals or as directed by the Project Manager. puing-puing dari lokasi secara berkala atau sebagaimana
diperintahkan oleh Manajer Proyek.

B. On completion of the work, clear up and remove from the B. Atas diselesaikannya pekerjaan, membersihkan dan
site all rubbish, debris, plant, surplus materials except menyingkirkan dari lokasi seluruh sampah, puing,
those materials ordered to be left on site. peralatan, sisa material kecuali material yang
diperintahkan untuk ditinggalkan di lokasi.

C. At all stages of the Works the Contractor shall be C. Pada seluruh tahap Pekerjaan Kontraktor bertanggung
responsible for maintaining the site in a clean and orderly jawab untuk memelihara lokasi dengan bersih dan tertib
fashion at all time which shall also include keeping clean pada setiap saat yang juga meliputi menjaga kebersihan
the Works of all Nominated / Direct Sub-Contractors and Pekerjaan seluruh Sub-Kontraktor Nominasi/Langsung
Nominated / Direct Suppliers. dan Pemasok Nominasi/Langsung.

D. The Contractor shall be responsible for the daily removal of D. Kontraktor bertanggung jawab atas penyingkiran setiap
all rubbish and debris resulting from the above from a hari seluruh sampah dan puing yang diakibatkan oleh hal
single collection point and he shall maintain a safe and tersebut di atas dari tempat pengumpulan tunggal dan dia
clean site for all workman at all times. akan memelihara kebersihan dan keamanan lokasi bagi
seluruh pekerja pada setiap saat.

E. Rubbish accumulating from the Works strewn over existing E. Sampah yang menumpuk dari Pekerjaan yang
properties, public paths and roads and other areas shall be berserakan di properti yang ada, jalan umum dan daerah
removed continuously at the Contractor's expense. Any lainnya akan disingkirkan secara terus-menerus atas
fines resulting from the Contractor's failure to remove the biaya Kontraktor. Denda akibat kegagalan Kontraktor
rubbish away from these places will be borne by him. menyingkirkan sampah dari tempat-tempat ini akan
ditanggung olehnya.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 21 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

67. CLEANING OF SITE (Cont'd) 67 PEMBERSIHAN LOKASI (lanj)

F. Should the Contractor fail to maintain the work in a timely F. Jika Kontraktor tidak dapat memelihara pekerjaan secara
and orderly manner to the detriment of the Works or to tepat waktu dan tertib sehingga merugikan Pekerjaan
standards acceptable, the Employer may employ such atau standar yang dapat diterima, maka Pemberi Tugas
persons considered necessary to clean up the Works, and dapat mempekerjakan orang yang dianggap perlu untuk
the cost of such persons together with the costs of all membersihkan Pekerjaan, dan biaya orang tersebut
necessary plant and equipment will be borne by the beserta biaya seluruh peralatan yang diperlukan akan
Contractor and deducted from monies due to the ditanggung oleh Kontraktor dan dipotong dari uang yang
Contractor in interim progress payment. harus dibayar kepada Kontraktor dalam pembayaran
kemajuan sementara.

68. CLEARING OF DEBRIS 68 PEMBERSIHAN PUING

A. On completion of all work, clear up and remove from the A. Atas diselesaikannya seluruh pekerjaan, membersihkan
site and all rubbish, debris, plant, surplus materials, except dan menyingkirkan dari lokasi seluruh sampah, puing,
those materials being the property (under this Contract) of peralatan, sisa material, kecuali material tersebut
the Employer or Direct Contractors or Suppliers or these merupakan milik (berdasarkan Kontrak ini) Pemberi
materials ordered to be left on site. Take down, dismantle Tugas atau Kontraktor Langsung atau Pemasok atau
or disconnect and remove from site all temporary services, material tersebut diperintahkan untuk ditinggalkan di
sheds, barriers, barricades, hoarding, scaffolding, screens lokasi. Mengambil, membongkar atau memutuskan dan
and the like required during the currency of the Contract memindahkan dari lokasi seluruh layanan, gudang,
and clean all polluted areas and leave in a condition as penghalang, barikade, penimbunan, perancah, screen
required by the Project Manager. sementara dan sejenisnya yang disyaratkan selama
berlangsungnya Kontrak dan membersihkan seluruh
areal yang tercemar dan meninggalkan dalam kondisi
sebagaimana disyaratkan oleh Manajer Proyek.

69. SHOP DRAWINGS 69 GAMBAR KERJA

A. Before commencing fabrication or manufacture of any A. Sebelum memulai pembuatan item yang dibuat di muka
prefabricated or off site manufactured item the Contractor atau dibuat di luar lokasi Kontraktor akan menyerahkan
shall submit shop drawings (3 sets) of the item indicating gambar kerja (shop drawing) (3 set) item yang
all details and dimensions in relation to the Approved menunjukkan seluruh rincian dan dimensi sehubungan
Construction drawings. dengan gambar Konstruksi yang Disetujui.

B. The Contractor shall not commence manufacture until the B. Kontraktor tidak akan dimulai pembuatan sampai gambar
shop drawings have been approved and signed by the kerja telah disetujui dan ditandatangani oleh Manajer
Project Manager, on approval and signing 2 sets shall be Proyek, atas persetujuan dan penandatanganan 2 set
returned to the Contractor. Such approval or otherwise akan dikembalikan kepada Kontraktor. Persetujuan
shall be made within 14 calendar days of receipt by the tersebut atau lainnya akan dilakukan dalam waktu 14 hari
Project Manager. kalender sejak diterima oleh Manajer Proyek.

C. The signing of such drawings by the Project Manager shall C. Penandatanganan gambar tersebut oleh Manajer Proyek
not relieve the Contractor of the responsibility for the tidak akan membebaskan Kontraktor dari tanggung jawab
correctness of all dimensions, errors and / or omissions atas kebenaran seluruh dimensi, kesalahan dan/atau
that may occur. kealpaan yang mungkin terjadi.

70. INSURANCE 70 ASURANSI

A. The Contractor shall take out and maintain the Contractor’s A. Kontraktor harus mengambil dan mempertahankan
All Risks and Third Party Liability Insurances in accordance Asuransi Semua Risiko Kontraktor dan Asuransi
with the Conditions of Contract. Kewajiban Pihak Ketiga sesuai dengan Ketentuan
Kontrak.

B. Evidence of other insurances (own equipment and vehicle B. Bukti asuransi lainnya (asuransi kendaraan dan peralatan
insurances, Jamsostek) shall be provided by the sendiri, Jamsostek) akan diberikan oleh Kontraktor.
Contractor.

C. All deductibles in relation to a claim against CAR or TPL C. Seluruh risiko sendiri (deductible) sehubungan dengan
shall be borne by the Contractor. klaim terhadap CAR atau TPL ditanggung oleh
Kontraktor.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 22 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

71. ORDERING MATERIALS 71 MEMESAN MATERIAL

A. Place order for specified materials at the earliest possible A. Mengadakan pesanan material yang ditetapkan pada
date after notification of award of this Contract or at such tanggal sedini mungkin setelah pemberitahuan
times as may be specifically stated elsewhere herein for pemberian Kontrak ini atau pada waktu sebagaimana
any particular materials. secara spesifik dinyatakan di tempat lain dalam dokumen
ini untuk material khusus.

72. CERTIFICATES AND PAYMENTS 72 SERTIFIKAT DAN PEMBAYARAN

A. The Contractor shall allow for the preparation and A. Kontraktor akan menyediakan penyusunan dan
submission to the Employer of claims for progress payment penyerahan kepada Pemberi Tugas klaim atas
of the value of Works executed in accordance with the pembayaran kemajuan nilai Pekerjaan yang dilaksanakan
Contract Conditions. sesuai dengan Ketentuan Kontrak.

B. The Contractor shall allow to attend and co-ordinate the B. Kontraktor akan melayani dan mengoordinasi permintaan
application for payment and valuation of all Nominated / pembayaran dan penilaian seluruh dari Kontraktor
Direct Contractors and Nominated / Direct Suppliers. Nominasi/Langsung dan Pemasok Nominasi/Langsung.

73. PROTECTION OF WORK 73 PERLINDUNGAN PEKERJAAN

A. Cover up and protect all the Works and materials from the A. Melindungi seluruh Pekerjaan dan material dari cuaca
weather and other possible damage and suspend all dan kerusakan lainnya yang mungkin dan menghentikan
operations during weather which, in the Project Manager's untuk sementara waktu seluruh operasi selama cuaca
opinion shall be detrimental to the Works. Case up, cover yang, menurut pendapat Manajer Proyek, merugikan
up and the like during the execution of the Works and Pekerjaan. Melindungi dan sejenisnya selama
make good any damage caused by such want of protection pelaksanaan Pekerjaan dan memperbaiki kerusakan
until the Employer takes possession after Practical yang disebabkan oleh kekurangan perlindungan tersebut
Completion and thereafter also until the Final Certificates is sampai Pemberi Tugas mengambil pemilikan setelah
issued if any damage is done by the Contractor's Penyelesaian Praktis dan sesudahnya juga sampai
employees or representatives. Extra care and caution to be Sertifikat Akhir diterbitkan jika kerusakan dilakukan oleh
exercised in regard to manufacturers or Specialists pegawai atau wakil Kontraktor. Perhatian dan kehati-
protective wrappings. Such wrapping shall only be hatian ekstra harus diberikan berkenaan dengan
removed at final cleaning up of the Building. pembungkus pelindung Spesialis atau pembuat.
Pembungkus tersebut hanya dilepaskan pada
pembersihan akhir Bangunan.

74. SITE MEETINGS 74 RAPAT LOKASI (SITE MEETING)


A. Pre-construction Meetings A. Rapat Pra-konstruksi

1. Within seven (7) days of the award of the Contract or such 1 Dalam waktu tujuh (7) hari dari pemberian Kontrak atau
date as directed by the Project Manager, a meeting shall tanggal sebagaimana diperintahkan oleh Manajer Proyek,
be held to discuss and resolve administrative procedures rapat akan diadakan untuk membahas dan
and responsibilities and scheduling. menyelesaikan prosedur administratif dan tanggung
jawab dan penjadwalan.

2. Senior Representatives of the Employer, Consultants and 2 Wakil Senior Pemberi Tugas, Konsultan dan Kontraktor
Contractor will be in attendance. akan hadir.

3. Establish time and location of meeting at the Employer’s 3 Menetapkan waktu dan lokasi rapat di tempat Pemberi
premises and notify parties concerned a minimum of two Tugas dan memberi tahu para pihak bersangkutan
(2) days before the meeting. minimal dua (2) hari sebelum rapat.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 23 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

74. SITE MEETINGS (Cont'd) 74 RAPAT LOKASI (SITE MEETING) (lanj.)


4. Agenda to include the following:- 4 Agenda mencakup hal berikut ini:

- Appointment of official representative of participants in the - Penunjukan wakil resmi peserta Pekerjaan.
Works.
- Schedule of work, progress scheduling. - Jadwal pekerjaan, penjadwalan kemajuan.
- Schedule of submission of shop drawings, samples, etc. - Jadwal penyerahan gambar kerja, sampel, dan lain-lain.

- Requirements for temporary facilities, offices, storage - Persyaratan fasilitas, kantor, tempat penyimpanan,
areas, utilities and their locations on site. utilitas sementara dan lokasinya di lokasi.
- Delivery schedule of specified equipment. - Jadwal penyerahan peralatan yang ditetapkan.
- Site security, hoarding, signboard. - Keamanan lokasi, penimbunan, papan nama.
- Take-over procedures, acceptances, warranties. - Prosedur pengambilalihan, penerimaan, jaminan.
- Monthly progress payment claims and administrative - Klaim pembayaran kemajuan bulanan dan prosedur
procedures. administrasi.
- Appointment of inspection and testing agencies or firms. - Penunjukan firma atau lembaga pemeriksaan dan
pengujian.
- Insurance, transcript of policies. - Asuransi, transkrip kebijakan.
- Demolition methodology. - Metodologi pembongkaran.
- Supply of concrete. - Pasokan beton.
- Others as directed by the Project Manager. - Lain-lain sebagaimana diperintahkan oleh Manajer
Proyek.

B. Periodic Site Meeting B. Rapat Lokasi Periodik (Periodic Site Meeting)


A site meeting for the purpose of programming and co- Rapat lokasi (site meeting) untuk tujuan memprogram
ordinating the works will be held at intervals as directed by dan mengoordinasi pekerjaan akan diadakan dengan
the Project Manager. Attend all site meetings and ensure interval sebagaimana diperintahkan oleh Manajer Proyek.
attendance by all sub-contractors as directed by the Menghadiri seluruh rapat lokasi (site meeting) dan
Project Manager. memastikan kehadiran seluruh sub-kontraktor
sebagaimana diperintahkan oleh Manajer Proyek.

C. Meetings will be chaired by the Project Manager and C. Rapat akan dipimpin oleh Manajer Proyek dan risalah
minutes will be taken and issued by the Project Manager. akan dibuat dan diterbitkan oleh Manajer Proyek.
The Contractor shall provide refreshments including Kontraktor akan menyediakan makanan dan minuman
doughnuts. termasuk donat.

75. CONTRACTOR'S SUBMISSIONS PRIOR TO 75 PENYERAHAN OLEH KONTRAKTOR SEBELUM


COMMENCEMENT OF WORK DIMULAINYA PEKERJAAN
A. Before commencement of any work on the site, the A. Sebelum dimulainya pekerjaan di lokasi, Kontraktor akan
Contractor shall submit to the Project Manager the menyerahkan kepada Manajer Proyek dokumen berikut
following documents for approval: ini untuk mendapatkan persetujuan:

1. The Performance Bond. 1. Jaminan Pelaksanaan.


2. The requisite Insurance Policies together with receipts of 2. Polis Asuransi yang disyaratkan beserta tanda terima
premium paid. premi yang dibayar.
3. The Works Programme as specified herein. 3. Program Pekerjaan sebagaimana ditetapkan dalam
dokumen ini.
4. Method statements together with diagrams, charts or other 4. Pernyataan metode beserta diagram, grafik atau ilustrasi
illustrations in respect of any complicated Works. lainnya berkenaan dengan Pekerjaan yang rumit.

5. Forecast of the number of workers (both skilled and 5. Perkiraan jumlah pekerja (baik terampil maupun tidak
unskilled) for various trades to be employed during the terampil) untuk berbagai pertukangan yang akan
Works. dipekerjakan selama Pekerjaan.
6. A Site Organization Chart of the Contractor's Site 6. Bagan Organisasi Lokasi personel Site Management
Management personnel together with their respective Kontraktor beserta resume kualifikasi dan pengalaman
resume of qualification and experience (see detailed mereka masing-masing (lihat persyaratan rinci Site
requirements of Site Management provided herein). Management yang ditetapkan dalam dokumen ini).

7. Letter stating actual date of intended site mobilization, to 7. Surat yang mencantumkan tanggal aktual mobilisasi
allow the Employer to prepare and monitor all activities. lokasi yang direncanakan, untuk memungkinkan Pemberi
Tugas menyiapkan dan memantau seluruh kegiatan.

8. Schedule of Construction Plant and Equipment such as 8. Skedul Peralatan Konstruksi seperti rig pancang,
piling rigs, excavators, dirt trucks, etc., together with a excavator, dirt truck, dan lain-lain, beserta rencana
deployment plan thereof. penggelarannya.
9. Schematic or shop diagrams of any temporary Works. 9. Diagram skematis atau diagram kerja Pekerjaan
sementara.
10. Layout plan of any temporary building or structures to be 10. Rencana tata letak bangunan sementara yang akan
erected within the site boundary. didirikan dalam batas lokasi.
11. Safety programme. 11. Program Keselamatan.
12. The submission of the above documents shall in no way 12. Penyerahan dokumen di atas sama sekali tidak
relieve the Contractor of his responsibilities under the membebaskan Kontraktor dari tanggung jawabnya
Contract. berdasarkan Kontrak.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 24 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

76. SITE CLEANLINESS 76 KEBERSIHAN LOKASI

A. The Contractor shall note that smoking; eating; littering or A. Kontraktor harus memperhatikan bahwa merokok;
urinating anywhere on the entire project site is strictly makan; membuang sampah atau buang air kecil di mana
prohibited. The "fines" listed below shall be imposed by the saja di seluruh lokasi proyek sangat dilarang. “Denda”
Project Manager. Names of persons caught will be yang tercantum di bawah ini akan dikenakan oleh
recorded and fines, for subsequent offences, significantly Manajer Proyek. Nama orang yang tertangkap akan
increased (Refer to the schedule below). All fines shall be dicatat dan denda, untuk pelanggaran berikutnya, akan
deducted from interim monthly progress payments. ditingkatkan secara signifikan (Lihat skedul di bawah ini).
Seluruh denda akan dipotong dari pembayaran kemajuan
bulanan sementara.

Eating or Smoking Fine Schedule: Skedul Denda Makan atau Merokok:


- Eating or smoking on site - First offense Fine: Rp. 500,000 - Makan atau merokok di lokasi - Pelanggaran pertama,
Denda: Rp. 500.000
- Eating or smoking on site - Second offense Fine: Rp. 1,000,000 - Makan atau merokok di lokasi - Pelanggaran kedua,
Denda: Rp. 1.000.000
- Eating or smoking on site - Third offense Fine: Rp. 5,000,000 - Makan atau merokok di lokasi - Pelanggaran ketiga,
Denda: Rp. 5.000.000

Littering Fine Schedule: Skedul Denda Membuang Sampah:


- Littering on site - First offense Fine: Rp. 100,000 - Membuang sampah di lokasi - Pelanggaran pertama,
Denda: Rp. 100.000
- Littering on site - Subsequent offense Fine: Rp. 250,000 - Membuang sampah di lokasi - Pelanggaran berikutnya,
Denda: Rp. 250.000

Urinating Fine Schedule: Skedul Denda Buang Air Kecil:


- Urinating on site - First offense Fine: Rp. 1,000,000 - Buang air kecil di lokasi - Pelanggaran pertama, Denda:
Rp. 1.000.000
- Urinating on site - Second offense Fine: Rp. 2,000,000 - Buang air kecil di lokasi - Pelanggaran kedua, Denda: Rp.
2.000.000
- Urinating on site - Third offense Fine: Rp. 8,000,000 - Buang air kecil di lokasi - Pelanggaran ketiga, Denda: Rp.
8.000.000

77 PHOTOGRAPHS 77 FOTO

A. Provide two (2) sets of progress colour photographs A. Menyerahkan dua (2) set foto berwarna kemajuan
(digitally taken with date) printed to postcard size, to be (diambil secara digital dengan tanggal) yang dicetak
submitted before commencement of the Works and dengan ukuran kartu pos, yang harus diserahkan
thereafter weekly. Each set to consist of minimum six (6) sebelum dimulainya Pekerjaan dan sesudahnya setiap
different views taken as directed by the Project Manager. minggu. Setiap set terdiri dari minimal enam (6)
The Contractor shall submit together with adequate albums pemandangan yang berbeda yang diambil sebagaimana
with indication of date and locations of photographs taken. diperintahkan oleh Manajer Proyek. Kontraktor harus
A CD of all photos taken shall be provided to the Employer menyerahkan beserta album memadai dengan indikasi
at the end of each week. tanggal dan lokasi foto yang diambil. CD seluruh foto
yang diambil diberikan kepada Pemberi Tugas pada
setiap akhir minggu.

B. The ownership and the copyright of all photographs and B. Pemilikan dan hak cipta seluruh foto dan negatifnya akan
negatives shall be vested in the Employer. berada pada Pemberi Tugas.

78 PARTICULARS OF SUB‑CONTRACTOR'S WORKS 78 KETERANGAN PEKERJAAN SUB-KONTRAKTOR

A. Ascertain from each Nominated / Direct Contractor / A. Memastikan dari setiap Kontraktor/Pemasok dan/atau
Supplier and/or Sub‑Contractor all particulars relating to his Sub-Kontraktor Nominasi/Langsung seluruh keterangan
work, with regard to the order of its execution and the yang berhubungan dengan pekerjaannya, mengenai
position in which chases, holes, mortices and similar items perintah pelaksanaannya dan posisi di mana alur, lubang,
shall be required before the work is put in hand, as no lubang pasak dan item sejenis disyaratkan sebelum
claim shall be allowed for the extra cost of cutting away pekerjaan dimulai, sebagaimana tidak ada klaim akan
work already executed in consequence of any neglect to diperkenankan atas biaya tambahan memotong
ascertain these particulars before hand. pekerjaan yang telah dilaksanakan akibat kelalaian
memastikan keterangan ini sebelumnya.

79 GUARANTEES 79 JAMINAN

A. On behalf of the Employer obtain written guarantees and A. Atas nama Pemberi Tugas mendapatkan jaminan tertulis
product/workmanship indemnities from all sub‑contractors dan ganti rugi produk/pengerjaan dari seluruh sub-
or suppliers and deliver such guarantees and kontraktor atau pemasok dan menyerahkan jaminan dan
product/workmanship indemnities to the Project Manager ganti rugi produk/pengerjaan tersebut kepada Manajer
before issue of the Certificate of Practical Completion. Proyek sebelum diterbitkannya Sertifikat Penyelesaian
Praktis.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 25 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

79 GUARANTEES (Cont'd) 79 JAMINAN (lanj.)

B. The guarantees and product/workmanship indemnities B. Jaminan dan ganti rugi produk/pengerjaan akan
shall cover the Employer against all faulty materials and/or menjamin Pemberi Tugas terhadap seluruh material
workmanship for the periods stated below. Where no dan/atau pengerjaan yang tidak sempurna untuk jangka
period is stated the period shall be one (1) year. All waktu yang dinyatakan di bawah ini. Apabila tidak ada
guarantee/indemnity periods shall commence from the jangka waktu yang dinyatakan maka jangka waktunya
date of the Certificate of Practical Completion. adalah satu (1) tahun. Seluruh jangka waktu
jaminan/ganti rugi dimulai sejak tanggal Sertifikat
Penyelesaian Praktis.

C. Works requiring Guarantees and Product/Workmanship C. Pekerjaan yang mensyaratkan Jaminan dan ganti rugi
indemnities are detailed in the technical specifications Produk/Pengerjaan dirinci dalam spesifikasi teknis yang
prepared by the Consultant(s). disusun oleh Konsultan.

D. The following guarantees and product/workmanship D. Jaminan dan ganti rugi produk/pengerjaan berikut ini
indemnities shall be submitted by the Contractor in akan diserahkan oleh Kontraktor sesuai dengan contoh
accordance with specimens annexed to Form of Tender as yang dilampirkan pada Surat Penawaran sebagai
Appendices : Lampiran:

Refer Specification Lihat Spesifikasi

80. CONTROL OF WORKERS 80 KONTROL PEKERJA


A. The Contractor must ensure that all workers employed by A. Kontraktor harus memastikan bahwa seluruh pekerja
him and the Nominated / Direct Sub-Contractors are strictly yang dipekerjakan olehnya dan Sub-Kontraktor
confined within the site areas. Nominasi/Langsung secara ketat ditempatkan di dalam
daerah lokasi.

B. The Contractor shall remove from the site any worker who B. Kontraktor akan memindahkan dari lokasi pekerja yang
in the opinion of the Project Manager misconduct’s himself menurut pendapat Manajer Proyek melakukan perbuatan
or is considered undesirable. tercela atau dianggap tidak diinginkan.

81 GENERAL ATTENDANCE UPON ALL TRADES 81 LAYANAN UMUM ATAS SELURUH PERTUKANGAN

A. Allow for the general attendance of one trade upon A. Menyediakan layanan umum pertukangan satu sama lain.
another.

82. NOMINATED SUB-CONTRACTORS AND SUPPLIERS 82 SUB-KONTRAKTOR DAN PEMASOK NOMINASI

A. The definition of the term “Nominated Sub-Contractor” or A. Definisi istilah “Sub-Kontraktor Nominasi” atau “Pemasok
“Nominated Supplier” shall be a Sub-Contractor nominated Nominasi” adalah Sub-Kontraktor yang dinominasikan
by the Project Manager and employed by the Contractor oleh Manajer Proyek dan dipekerjakan oleh Kontraktor
for the execution of work of a Specialist nature under the untuk pelaksanaan pekerjaan yang bersifat Spesialis di
direction of the Contractor. bawah arahan Kontraktor.

B. Tenderers are advised to visit the Project Manager's office B. Peserta Tender disarankan mengunjungi kantor Manajer
by prior appointment to study the Drawings and Proyek dengan janji sebelumnya untuk mempelajari
Specifications for the Nominated Sub-Contractors / Gambar dan Spesifikasi untuk pekerjaan Sub-
Suppliers work and thoroughly acquaint themselves with Kontraktor/Pemasok Nominasi dan mempelajari secara
said Conditions of Contract. seksama Ketentuan Kontrak tersebut.

83. DIRECT CONTRACTORS AND DIRECT SUPPLIERS 83 KONTRAKTOR LANGSUNG DAN PEMASOK
LANGSUNG

A. The definition of the term “Direct Contractor” or “Direct A. Definisi istilah “Kontraktor Langsung” atau “Pemasok
Supplier” shall be a Sub-Contractor nominated by the Langsung” adalah Sub-Kontraktor yang dinominasikan
Project Manager and employed by the Employer for the oleh Manajer Proyek dan dipekerjakan oleh Pemberi
execution of work of a Specialist nature under the direction Tugas untuk pelaksanaan pekerjaan yang bersifat
of the Employer. Spesialis di bawah arahan Pemberi Tugas.

B. Tenderers are advised to visit the Project Manager's office B. Peserta Tender disarankan mengunjungi kantor Manajer
by prior appointment to study the Drawings and Proyek dengan janji sebelumnya untuk mempelajari
Specifications for the Direct Contractors or Direct Suppliers Gambar dan Spesifikasi untuk pekerjaan Kontraktor
work and thoroughly acquaint themselves with said Langsung atau Pemasok Langsung dan mempelajari
Conditions of Contract. secara seksama Ketentuan Kontrak tersebut.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 26 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

84. ATTENDANCE UPON NOMINATED SUB 84 LAYANAN ATAS SUBKONTRAKTOR NOMINASI DAN
CONTRACTORS AND DIRECT CONTRACTORS / KONTRAKTOR/PEMASOK LANGSUNG - N/A
SUPPLIERS - N/A

A. Attend upon all Nominated Sub Contractors and Direct A. Melayani seluruh Sub-Kontraktor Nominasi dan
Contractors including verifying sizes, unloading, getting in, Kontraktor Langsung meliputi memverifikasi ukuran,
affording them free use of water, lighting and electric power membongkar, mendapatkan, mengupayakan bagi mereka
including power for testing, the use of scaffolding, screens, penggunaan secara bebas air, penerangan dan listrik
tarpaulins, covers, welfare facilities, storage termasuk listrik untuk pengujian, penggunaan perancah,
accommodation, etc., required by them for the proper screen, terpal, tempat berlindung, fasilitas kesejahteraan,
carrying out and completion of their Works and for the akomodasi penyimpanan, dan lain-lain, yang dibutuhkan
protection of the public. Attend upon all Nominated oleh mereka untuk pelaksanaan dan penyelesaian
Suppliers and Direct Suppliers including taking delivery, Pekerjaan mereka dan untuk perlindungan masyarakat.
unloading, getting in, checking and accepting delivery, Melayani seluruh Pemasok Nominasi dan Pemasok
returning empties, carriage paid, handling, storing and Langsung meliputi mengambil penyerahan, membongkar,
hoisting. Packing and carriage to site is included in the mendapatkan, memeriksa dan menerima penyerahan,
P.C. Sums unless specifically stated to the contrary. The mengembalikan sesuatu yang kosong, biaya
words 'attend' and 'attendance' in these Bills shall be read pengangkutan dibayar oleh pengirim barang,
to include all the foregoing items and such additional items penanganan, penyimpanan dan pengangkatan.
as may be referred to in the Prime Cost and Provisional Pengepakan dan pengangkutan ke lokasi dimasukkan
Sums. dalam P.C Sum kecuali jika secara spesifik dinyatakan
sebaliknya. Kata “melayani” dan “layanan” dalam Bill ini
harus dibaca mencakup seluruh item tersebut di atas dan
item tambahan sebagaimana disebutkan dalam Prime
Cost dan Provisional Sum.

B. The term 'Fix Only' throughout these Bills shall mean take B. Istilah “Fix Only” di seluruh Bill ini berarti mengambil
delivery, unload, store, protect same, return all chargeable penyerahan, membongkar, menyimpan, melindunginya,
packing and recover all appropriate credits, assemble, mengembalikan seluruh pengepakan yang dapat
hoist and fix in position as described, complete with all dibebankan dan memulihkan seluruh kredit yang layak,
necessary lugs and fixings unless otherwise described. memasang, mengangkat dan memperbaiki posisi
sebagaimana diuraikan, lengkap dengan seluruh pelat
sambung dan pengikatan yang diperlukan kecuali jika
diuraikan lain.

C. Confer with all Nominated Sub Contractors, Direct C. Berunding dengan seluruh Sub-Kontraktor Nominasi,
Contractors and Sub Contractors and properly co‑ordinate Kontraktor Langsung dan Sub-Kontraktor dan secara
all their Works with that of the Contractor in order that the layak mengoordinasi seluruh Pekerjaan mereka dengan
Works shall proceed with the greatest efficiency and the pekerjaan Kontraktor agar Pekerjaan akan berjalan
least trouble to all parties concerned. dengan efisiensi sebesar-besarnya dan masalah
sesedikit-dikitnya bagi seluruh pihak bersangkutan.

85. CONTRACTOR'S RELATIONSHIP TO NOMINATED AND 85 HUBUNGAN KONTRAKTOR DENGAN SUB-


DIRECT SUB-CONTRACTORS OR SUPPLIERS KONTRAKTOR ATAU PEMASOK NOMINASI DAN
LANGSUNG

A. The Contractor shall be fully responsible for the whole of A. Kontraktor sepenuhnya bertanggung jawab penuh atas
the Contract Works including work executed by Nominated seluruh Pekerjaan Kontrak termasuk pekerjaan yang
Sub-Contractors or Nominated Suppliers nominated by the dilaksanakan oleh Sub-Kontraktor Nominasi atau
Project Manager and employed by the Contractor. Pemasok Nominasi yang dinominasikan oleh Manajer
Proyek dan dipekerjakan oleh Kontraktor.

B. The Contractor shall not be responsible for the Works of B. Kontraktor tidak bertanggung jawab atas Pekerjaan Sub-
the Direct Sub-Contractors and Direct Suppliers, except to Kontraktor Langsung dan Pemasok Langsung, kecuali
the extent that the Contractor shall be responsible to sejauh Kontraktor bertanggung jawab untuk mengelola
manage and co-ordinate all Sub-Contractors and Direct dan mengoordinasi seluruh Sub-Kontraktor dan Pemasok
Suppliers and provide attendance which is defined Langsung dan memberikan layanan yang didefinisikan di
elsewhere in this Preliminaries. tempat lain dalam Persiapan (Preliminaries) ini.

C. The Contractor shall be responsible for ensuring that all C. Kontraktor bertanggung jawab untuk memastikan bahwa
Nominated and Direct Sub-Contract Works are properly seluruh Pekerjaan Sub-Kontrak Nominasi dan Langsung
programmed, executed and completed within the contract diprogram, dilaksanakan dan diselesaikan dengan layak
period for the Main Contract Works. dalam jangka waktu kontrak untuk Pekerjaan Kontrak
Utama.

No extensions of the contract period shall be allowable in Tidak ada perpanjangan jangka waktu kontrak akan
respect of delay by the Nominated and Direct Sub- diperkenankan berkenaan dengan keterlambatan oleh
Contractors or Suppliers for any reason whatsoever. Sub-Kontraktor atau Pemasok Nominasi dan Langsung
untuk alasan apapun juga.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 27 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

84. ATTENDANCE UPON NOMINATED SUB 84 LAYANAN ATAS SUBKONTRAKTOR NOMINASI DAN
CONTRACTORS AND DIRECT CONTRACTORS / KONTRAKTOR/PEMASOK LANGSUNG (lanj.)
SUPPLIERS (Cont'd)

D. All instructions given by the Project Manager to the D. Semua instruksi yang diberikan oleh Manajer Proyek
Contractor referring to the work of the the Nominated / kepada Kontraktor yang mengacu pada pekerjaan Sub-
Direct Sub-Contractor or Suppliers shall be forwarded Kontraktor atau Pemasok Nominasi/Langsung akan
directly to the Nominated / Direct Sub-Contractor or diteruskan secara langsung kepada Sub-Kontraktor atau
Suppliers without delay and the Contractor shall ensure Pemasok Nominasi/Langsung dengan segera dan
that the instructions are carried out promptly. Kontraktor akan memastikan bahwa instruksi tersebut
dilaksanakan dengan segera.

86. CONTRACTOR'S GENERAL ATTENDANCE UPON 86 LAYANAN UMUM KONTRAKTOR ATAS SUB-
NOMINATED SUB-CONTRACTORS OR SUPPLIERS KONTRAKTOR ATAU PEMASOK NOMINASI

A. The Contractor shall allow for providing the following A. Kontraktor akan memberikan layanan umum berikut ini
general attendance upon the Nominated Contractor's atas Pekerjaan Kontraktor Nominasi:
Works:

a) Access for, and facilitating the unloading and taking to a) Akses untuk, dan memfasilitasi pembongkaran dan
store of plant, materials and equipment, providing lock‑up pengambilan ke tempat penyimpanan peralatan, material
storage space and working space and facilitating the taking dan alat, menyediakan ruang penyimpanan penguncian
from store and distribution of materials and equipment dan ruang kerja dan memfasilitasi pengambilan dari
about the Works. tempat penyimpanan dan distribusi material dan
peralatan mengenai Pekerjaan.

b) Free and reasonable use of the Contractors plant, b) Penggunaan secara gratis dan wajar peralatan
particularly hoists and cranes, scaffolding, gantries, Kontraktor, khususnya kerek dan crane, perancah,
ladders, etc. jembatan kerek (gantry), tangga, dan lain-lain.

c) Power, lighting, water and other temporary facilities c) Listrik, penerangan, air dan fasilitas sementara lainnya
specifically required for the Nominated / Direct Sub- yang secara spesifik diperlukan untuk Pekerjaan Sub-
Contractors or Suppliers Works however, excluding for Kontraktor atau Pemasok Nominasi/Langsung namun
testing and commissioning. tidak termasuk untuk pengujian dan commissioning.

d) Planning and co‑ordinating and organising the execution of d) Merencanakan dan mengoordinasi dan mengorganisir
the Contractor's and all Nominated and Direct Sub- pelaksanaan Pekerjaan Kontraktor dan seluruh Sub-
Contractors or Suppliers Works so as to ensure the correct Kontraktor atau Pemasok Nominasi dan Langsung untuk
sequence and timing of all the operations and completion memastikan urutan yang benar dan waktu seluruh
of the Works on schedule. Nominated and Direct Sub- operasi dan penyelesaian Pekerjaan tepat pada
Contractors or Suppliers Works must inspect the waktunya. Pekerjaan Sub-Kontraktor atau Pemasok
Contractors programme and signify their agreement to its Nominasi dan Langsung harus memeriksa program
contents, in writing, having particular regard to the Kontraktor dan menyatakan persetujuan mereka atas
completion times shown for their own Sub‑Contract Works. isinya, secara tertulis, dengan memperhatikan waktu
penyelesaian yang ditunjukkan untuk Pekerjaan Sub-
Kontrak mereka sendiri.

e) The use of mess rooms, sanitary accommodation and e) Penggunaan ruang mes, akomodasi sanitasi dan
welfare facilities and the provision of site office fasilitas kesejahteraan dan penyediaan akomodasi site
accommodation. office.

f) Covering up and protecting all the Nominated and Direct f) Melindungi seluruh Pekerjaan Sub-Kontraktor atau
Sub-Contractors or Suppliers Works completed Works as Pemasok Nominasi dan Langsung yang diselesaikan
the Works proceed, watching and provising security ketika Pekerjaan berlangsung, menjaga dan memberikan
against theft and damage until the work is handed over to keamanan terhadap pencurian dan kerusakan sampai
the Employer. pekerjaan diserahterimakan kepada Pemberi Tugas.

g) Regular cleaning of the site. g) Pembersihan secara teratur lokasi.

f) Clearing away rubbish and the like as required during and h) Membersihkan sampah dan sejenisnya sebagaimana
upon completion of the Works. disyaratkan selama dan atas penyelesaian Pekerjaan.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 28 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

87. PAYMENTS TO NOMINATED SUB-CONTRACTORS OR 87 PEMBAYARAN KEPADA SUB-KONTRAKTOR ATAU


SUPPLIERS PEMASOK NOMINASI

A. At the time of every valuation of the Works, the Contractor A. Pada saat setiap penilaian Pekerjaan, Kontraktor akan
shall embody in or annex to their application for payment memasukkan dalam atau melampirkan pada permintaan
any representations of the Nominated Sub-Contractor or pembayaran mereka pernyataan Sub-Kontraktor atau
Supplier in regard to their said claim for payment. Pemasok Nominasi mengenai klaim mereka atas
pembayaran.

B. Within the period specified in the Contract Conditions, B. Dalam jangka waktu yang ditetapkan dalam Ketentuan
upon the receipt by the Contractor of payment from the Kontrak, atas diterimanya oleh Kontraktor pembayaran
Employer against any certificate from the Construction dari Pemberi Tugas terhadap sertifikat dari Manajer
Manager, the Contractor shall notify and pay the value Konstruksi, Kontraktor akan memberi tahu dan membayar
certified to the Nominated Sub-Contractor or Supplier. nilai yang disertifikasi kepada Sub-Kontraktor atau
Pemasok Nominasi.

88. PAYMENTS TO DIRECT CONTRACTORS OR 88 PEMBAYARAN KEPADA KONTRAKTOR ATAU


SUPPLIERS PEMASOK LANGSUNG
A. At the time of every valuation of the Works, the Contractor A. Pada saat setiap penilaian Pekerjaan, Kontraktor akan
shall review and sign the Direct Contractors or Suppliers' mengkaji ulang dan menandatangani aplikasi klaim
progress claim application before each of the Direct kemajuan Kontraktor atau Pemasok Langsung sebelum
Contractors or Suppliers submit their progress claim masing-masing Kontraktor atau Pemasok Langsung
application directly to the Construction Manager. menyerahkan aplikasi kemajuan klaim mereka secara
langsung kepada Manajer Konstruksi.

B. The progress claim application for payment of the Direct B. Aplikasi klaim kemajuan untuk pembayaran Kontraktor
Contractors or Suppliers will not be considered unless such atau Pemasok Langsung tidak akan dipertimbangkan
statement has been signed by the Contractor. kecuali jika pernyataan tersebut telah ditandatangani oleh
Kontraktor.

89. SPECIALIST PROCUREMENT CONTRACTS 89 KONTRAK PENGADAAN SPESIALIS

A. The supply of certain imported materials and equipment A. Pasokan peralatan dan material impor tertentu yang
required for certain Specialist Contract Works may be disyaratkan untuk Pekerjaan Kontrak Spesialis tertentu
arranged under Procurement Contracts entered into by the Works dapat diatur berdasarkan Kontrak Pengadaan
Nominated Sub-Contractor or Suppliers and the Employer yang diadakan oleh Sub-Kontraktor atau Pemasok
in order that facilities available to the Employer are Nominasi dan Pemberi Tugas agar fasilitas yang tersedia
obtained. The existance of such Procurement Contract bagi Pemberi Tugas diperoleh. Keberadaan Kontrak
shall not affect the Nominated Sub-Contractors or Pengadaan tersebut tidak akan mempengaruhi tanggung
Suppliers contractual obligation and responsibilities to the jawab dan kewajiban kontrak Sub-Kontraktor atau
Contractor. Pemasok Nominasi kepada Kontraktor.

B. The Employer undertakes to disclose to, and obtain the B. Pemberi Tugas berjanji akan mengungkapkan kepada,
agreement of, the Contractor to all relevant programming dan memperoleh persetujuan dari, Kontraktor seluruh
details in respect of Procurements Contract however, it is a rincian pemrograman yang relevan berkenaan dengan
condition of this Contract that the Employer shall not be Kontrak Pengadaan namun merupakan ketentuan
liable to the Contractor for any consequences arising out of Kontrak ini bahwa Pemberi Tugas tidak bertanggung
the Specialist Contractor's performance of Procurement jawab kepada Kontraktor atas konsekuensi yang timbul
Contracts. dari pelaksanaan Kontrak Pengadaan oleh Kontraktor
Spesialis.

90 DUTIES 90 PAJAK

A The Contractor is deemed to have included in his prices for A. Kontraktor dianggap telah memasukkan dalam harganya
all Government duties, royalties in force up to and including seluruh pajak, royalti Pemerintah yang berlaku sampai
the closing date of tender validity. Any gazettes variation to dengan dan termasuk tanggal penutupan keberlakuan
duties, etc., subsequent to the closing date of tender tender. Perubahan yang diumumkan atas pajak, dan lain-
validity which is proved to vary the basic prices of a lain, setelah tanggal penutupan keberlakuan tender yang
material shall permit the said price to be adjusted under the ternyata mengubah harga dasar material mengizinkan
terms of this Contract in and equitable manner in harga tersebut disesuaikan berdasarkan ketentuan
accordance with the gazettes duty or tariff amendment. Kontrak ini secara adil sesuai dengan perubahan pajak
atau tarif yang diumumkan.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 29 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

91 VALUE ADDED TAXES 91 PAJAK PERTAMBAHAN NILAI

A. The Contract Sum is deemed to include all value added A. Nilai Kontrak (Contract Sum) dianggap termasuk seluruh
taxes enforced under law for the duration of the contract. pajak pertambahan nilai yang diberlakukan berdasarkan
Indemnify the Employer against all claims for value added hukum selama jangka waktu kontrak. Mengganti
taxes. kerugian Pemberi Tugas terhadap seluruh klaim atas
pajak pertambahan nilai.

B. Evidence (“Bukti Potong”) of the due payment by the B. Bukti Potong pembayaran yang harus dibayar oleh
Contractor of value added tax shall be provided to the Kontraktor atas pajak pertambahan nilai akan diberikan
Project Manager if requested. kepada Manajer Proyek jika diminta.

92 CLEANING BUILDING ON COMPLETION 92 MEMBERSIHKAN BANGUNAN ATAS PENYELESAIAN

A. Clean thoroughly all floor, pavings and wall finishes, A. Membersihkan secara menyeluruh seluruh lantai,
windows, doors and glass (inside and out), touching up pelapisan jalan dan penyelesaian dinding, jendela, pintu
painted or polished work, sanitary fittings, , drains, dan kaca (dalam dan luar), pekerjaan perbaikan dicat
rainwater goods, replace and remove all damaged work atau dipoles, perlengkapan sanitasi, saluran air, barang
and leave the whole of the premises and surrounding air hujan, mengganti dan menyingkirkan seluruh
grounds upon issuance of the Certificate of Practical pekerjaan yang rusak dan meninggalkan seluruh tempat
Completion to the complete satisfaction of the Project dan tanah sekitarnya atas diterbitkannya Sertifikat
Manager. Penyelesaian Praktis secara memuaskan Manajer
Proyek.

B. Cleaning upon completion shall comprise the whole of the B. Membersihkan atas penyelesaian mencakup seluruh
Works including the Works of Nominated Sub-Contractors / Pekerjaan termasuk Pekerjaan Sub-Kontraktor/Pemasok
Suppliers and/or Direct Contractors/Suppliers. Nominasi dan/atau Kontraktor/Pemasok Langsung.

93 SAFETY 93 KESELAMATAN

A. The Contractor must provide on the site first aid equipment A. Kontraktor harus menyediakan di lokasi peralatan
for site personnel, consultants and such authorized visitors pertolongan pertama bagi personel lokasi, konsultan dan
who may be on site from time to time. pengunjung berwenang yang berada di lokasi dari waktu
ke waktu.

B. The Contractor must provide and fix temporary hoarding to B. Kontraktor harus menyediakan dan memperbaiki
ALL openings to prevent accidents. Such hoarding may be penimbunan sementara di SELURUH lubang untuk
dismantled and removed to allow for execution of work mencegah kecelakaan. Penimbunan tersebut dapat
within the lift shafts but it shall be the responsibility of the dibongkar dan dipindahkan untuk memungkinkan
Contractor to ensure that the hoarding are re‑fixed pelaksanaan pekerjaan dalam lift tetapi merupakan
whenever practical. tanggung jawab Kontraktor untuk memastikan bahwa
penimbunan diperbaiki kembali apabila memungkinkan.

C. All voids and openings must be covered with temporary C. Seluruh rongga dan lubang harus ditutup dengan papan
boards fixed to the slab. All such temporary coverings are sementara yang diikat ke slab. Seluruh penutupan
subject to review and approval by the Project Manager. sementara tersebut tunduk pada kaji ulang dan
persetujuan oleh Manajer Proyek.

D. The Contractor is to ensure that exits and escape route in D. Kontraktor akan memastikan bahwa rute keluar dan
the event of fire be kept clear of materials and obstructions melarikan diri jika terjadi kebakaran bersih dari material
at all times. dan rintangan pada setiap saat.

E. The Contractor is to provide for his workmen (including E. Kontraktor akan menyediakan bagi pekerjanya (termasuk
those employed by the Sub-Contractors) employed on the yang dipekerjakan oleh Sub-Kontraktor) yang
site approved safety helmets, safety belts and railed gang- dipekerjakan di lokasi helm pengaman, sabuk pengaman
ways. He shall also provide sufficient number of safety dan tangga tali yang disetujui. Dia juga akan
helmets for all supervisory staff, Consultants, Project menyediakan jumlah yang cukup helm pengaman untuk
Manager and other authorized personnel on site. seluruh staf pengawas, Konsultan, Manajer Proyek dan
personel berwenang lainnya di lokasi.

F. The Contractor is to ensure full compliance with relevant F. Kontraktor akan memastikan dipatuhinya peraturan
Government regulations and Safety Circulars published by Pemerintah yang relevan dan Surat Edaran Keselamatan
the relevant local authorities. yang diterbitkan oleh otoritas lokal yang relevan.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 30 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

93 SAFETY (Cont'd) 93 KESELAMATAN (Lanj.)

G. The Contractor is required to employ on a full-time basis G. Kontraktor disyaratkan mempekerjakan secara penuh
special safety officers whose job is to inspect the whole of waktu petugas keselamatan khusus yang tugasnya
the site and working areas and see to it that everybody on adalah memeriksa seluruh lokasi dan daerah kerja dan
site observes safety measures. memastikan bahwa setiap orang di lokasi mematuhi
tindakan keselamatan.

H. Notwithstanding the forgoing requirements, the Contractor H. Terlepas dari persyaratan tersebut di atas, Kontraktor
shall maintain safety precautions during the currency of the akan memelihara tindakan pencegahan keselamatan
contract strictly in accordance with the regulations of the selama berlangsungnya kontrak secara ketat sesuai
relevant authorities. dengan peraturan otoritas yang relevan.

I. The Contractor will be held responsible for any delays due I. Kontraktor akan bertanggung jawab atas keterlambatan
to stoppage of work on site by the Authorities for non- karena penghentian pekerjaan di lokasi oleh Otoritas
compliance with the above. karena tidak dipatuhinya hal tersebut di atas.

94 HEALTH AND WELFARE 94 KESEHATAN DAN KESEJAHTERAAN

A. Provide for all costs incurred by complying with all health A. Menyediakan seluruh biaya yang dikeluarkan karena
and welfare regulations including such regulations which mematuhi seluruh peraturan kesehatan dan
may be enforced from time to time during the currency of kesejahteraan termasuk peraturan yang dapat
the contract, pertaining to work sites and workpeople diberlakukan dari waktu ke waktu selama berlangsungnya
employed thereon. kontrak, yang berhubungan dengan lokasi pekerjaan dan
pekerja yang dipekerjakan di lokasi tersebut.

95 SECURITY 95 KEAMANAN

A. The Contractor shall provide sufficient uniformed guards to A. Kontraktor akan menyediakan penjaga berseragam yang
prevent vandalism, for safeguarding of materials and cukup untuk mencegah vandalisme, untuk melindungi
equipment on site, and providing general security of all material dan peralatan di lokasi, dan memberikan
Works, at all times. keamanan umum seluruh Pekerjaan, pada setiap saat.

B. Notwithstanding the provision of security guards as above- B. Terlepas dari penyediaan penjaga keamanan
mentioned, the Contractor shall remain solely responsible sebagaimana disebutkan di atas, Kontraktor tetap
for the safety of all his materials and equipment fixed or bertanggung jawab atas keselamatan seluruh material
unfixed including that of the Nominated Sub- dan peralatannya yang tetap atau tidak tetap termasuk
Contractors/Suppliers and/or Direct Contractors / material dan peralatan Sub-Kontraktor/Pemasok
Suppliers. Nominasi dan/atau Kontraktor/Pemasok Langsung.

C. The Contractor shall provide a high standard of perimeter C. Kontraktor akan memberikan standar tinggi keamanan
security, and specifically at all access / egress points to the keliling, dan secara spesifik di seluruh titik akses/jalan
site, until issuance of the Certificate of Practical keluar ke lokasi, sampai diterbitkannya Sertifikat
Completion. Penyelesaian Praktis.

D. The Contractor is responsible for mobilising sufficient D. Kontraktor bertanggung jawab untuk memobilisasi
security measures to adequately maintain effective security tindakan keamanan yang cukup untuk memelihara
across the entire site, including lighting, access control, keamanan yang efektif di seluruh lokasi, termasuk
CCTV. penerangan, kontrol akses, CCTV.

E. The Contractor is responsible for promptly coordinating and E. Kontraktor bertanggung jawab untuk segera
reporting all secuirty matters with the Employer's Head of mengoordinasi dan melaporkan seluruh masalah
Security. keamanan dengan Kepala Keamanan Pemberi Tugas.

F. The Contractor's Head of Security shall hold a weekly site F. Kepala Keamanan Kontraktor akan mengadakan
inspection followed by a security meeting with the pemeriksaan lokasi mingguan yang diikuti dengan rapat
Employee's Head of Security. The Employee's Head of keamanan dengan Kepala Keamanan Pegawai. Kepala
Security may request the Contractor to improve and / or Keamanan Pegawai dapat meminta Kontraktor
add additional security measures (persons) to ensure the meningkatkan dan/atau menambah tindakan keamanan
site security meets the required standards. tambahan (orang) untuk memastikan keamanan lokasi
memenuhi standar yang disyaratkan.

G. The Contractor's Head of Security will issue the following G. Kepala Keamanan Kontraktor akan menerbitkan laporan
reports to the Employee's Head of Security on a daily berikut ini kepada Kepala Keamanan Pegawai setiap hari.
basis. 1) daily security report 2) number of workers on site 1) laporan keamanan harian 2) jumlah pekerja di lokasi 3)
3) list of all contractors working on site 4) list of major daftar semua kontraktor yang bekerja di lokasi 4) daftar
equipments on site. peralatan utama di lokasi.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 31 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

95 SECURITY (Cont'd) 95 KEAMANAN (Lanjutan)

H. The Contractor agrees that all violations of the law, H. Kontraktor setuju bahwa semua pelanggaran hukum,
including stealing, theft, fighting, violence, threats, termasuk mencuri, pencurian, berkelahi, kekerasan,
intimidation, and other unlawful events will be immediately ancaman, intimidasi, dan peristiwa melanggar hukum
reported to the Employee's Head of Security, followed by lainnya akan segera dilaporkan kepada Kepala
reporting of such matters to the local law enforcement Keamanan Pegawai, diikuti dengan pelaporan hal-hal
office (police station). tersebut kepada kantor penegak hukum setempat (kantor
polisi).

I. The Contractor will strictly enforce a "NO ACCESS" policy I. Kontraktor secara ketat akan memberlakukan kebijakan
for all unauthorised individuals, allow only authorized “TIDAK ADA AKSES” bagi semua individu yang tidak
persons with proper identification to enter the site, maintain berwenang, hanya mengizinkan orang yang berwenang
a Visitor Log Book, and make such Log Book available to dengan identifikasi yang layak untuk masuk ke lokasi,
the Employee's Head of Security upon request. memelihara Buku Log Pengunjung, dan menyediakan
Buku Log tersebut kepada Kepala Keamanan Pegawai
atas permintaan.

J. The Contractor shall keep a record of all vehicles entering J. Kontraktor akan menyimpan catatan semua kendaraan
and leaving the site, as well as check and record that all yang masuk dan meninggalkan lokasi, serta memeriksa
vehicles have valid insurance prior to entering the site. dan mencatat bahwa semua kendaraan memiliki asuransi
yang berlaku sebelum memasuki lokasi.

K. The Contractor shall obtain from the Employee's Head of K. Kontraktor harus memperoleh dari Kepala Keamanan
Security prior approval for the removal of materials and / or Pegawai persetujuan sebelumnya untuk pemindahan
equipment from the site. material dan/atau peralatan dari lokasi.

L. The Contractor shall provide a security orientation briefing L. Kontraktor akan memberikan pengarahan orientasi
to all employees including employees of subcontractors, keamanan kepada seluruh pegawai termasuk pegawai
and direct contractors prior to their commencement on site. subkontraktor, dan kontraktor langsung sebelum
dimulainya mereka di lokasi.

M. The Contractor shall implement a color coded security M. Kontraktor akan mengimplementasikan sistem lencana
badge system for all employees working on site. All badges keamanan berkode warna bagi semua pegawai yang
should be numbered for identification of each worker. bekerja di lokasi. Semua lencana diberi nomor untuk
identifikasi setiap pekerja.

96 COMPLETION TESTS 96 TES PENYELESAIAN

A. In accordance with Contract, the Contractor shall execute A. Sesuai dengan Kontrak, Kontraktor akan melaksanakan
all required completion tests and to the satisfaction of the semua tes penyelesaian yang disyaratkan dan secara
Project Manager. memuaskan Manajer Proyek.

97 COMPLIANCE WITH LOCAL AUTHORITIES 97 KEPATUHAN TERHADAP OTORITAS LOKAL

A. The Contractor must strictly adhere to the health A. Kontraktor secara ketat harus mematuhi persyaratan
requirements, and shall allow here whatever cost involved kesehatan, dan akan menyediakan biaya apapun yang
for conforming to such requirements. terlibat untuk memenuhi persyaratan tersebut.

B. Any seepage exposed and/or created and all other B. Rembesan yang terekspos dan/atau tercipta dan semua
mosquito breeding places arising from the earth works tempat berkembang biak nyamuk lainnya yang timbul dari
and/or construction works should be drained or otherwise pekerjaan tanah dan/atau pekerjaan konstruksi harus
dealt with at the expense of the Contractor to the dikeringkan atau ditangani atas biaya Kontraktor secara
satisfaction of the Relevant authority. memuaskan otoritas yang relevan.

C. The Contractor is to conform to all other rules and C. Kontraktor akan memenuhi semua aturan dan
requirements as issued by the relevant local Authorities. persyaratan lainnya sebagaimana diterbitkan oleh
Otoritas lokal yang relevan.

98 POLLUTION CONTROL AND COMPLIANCE WITH 98 PENGENDALIAN PENCEMARAN DAN KEPATUHAN


ENVIRONMENTAL PUBLIC HEALTH DIVISION TERHADAP DIVISI KESEHATAN MASYARAKAT
LINGKUNGAN

A. Mechanical plant and equipment that omit excessive noise, A. Peralatan mesin yang menimbulkan kebisingan
water, smoke, fumes and/or obnoxious, gas, will not be berlebihan, air, asap, uap menyengat dan/atau
allowed to be used on site. menjengkelkan, gas, tidak akan diperkenankan
digunakan di lokasi.

B. The Project Manager has the final decision as and when B. Manajer Proyek memiliki keputusan akhir sebagaimana
he deems it necessary for the Contractor to take dan apabila dia memandang perlu bagi Kontraktor untuk
precautions, maintain or repair such plant and equipment melakukan tindakan pencegahan, memelihara atau
or order their removal from the site. memperbaiki peralatan tersebut atau memerintahkan
pemindahan peralatan tersebut dari lokasi.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 32 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

99 DUST PREVENTION 99 PENCEGAHAN DEBU

A. Make adequate provision by spraying, erecting screens or A. Melakukan persiapan yang memadai dengan
other suitable methods including regularly cleaning out all menyemprot, mendirikan screen atau metode yang
rubbish and debris at daily intervals against any nuisance sesuai lainnya termasuk secara teratur membersihkan
or damage by dust and debris to all Work under this semua sampah dan puing dengan interval harian
Contract or to persons and property in the vicinity and take terhadap gangguan atau kerusakan oleh debu dan puing-
responsibility for any complaints for damage or claim in puing pada seluruh Pekerjaan berdasarkan Kontrak ini
connection herewith. atau pada orang dan properti di sekitarnya dan
mengambil tanggung jawab atas setiap keluhan atas
kerusakan atau klaim sehubungan dengan hal tersebut.

100 AS BUILT DRAWINGS 100 GAMBAR PELAKSANAAN (AS BUILT DRAWING)

A. On or before the date for Practical Completion, the A. Pada atau sebelum tanggal untuk Penyelesaian Praktis,
Contractor shall submit to the Project Manager for review Kontraktor akan menyerahkan kepada Manajer Proyek
and approval one (1) master hardcopy plus three (3) untuk kaji ulang dan persetujuan satu (1) master
copies plus soft copies of the as built drawings in hardcopy ditambah tiga (3) salinan ditambah soft copy
accordance with the specifications which include all gambar pelaksanaan (as built drawing) sesuai dengan
deviations made during the execution of the Works. spesifikasi yang mencakup semua penyimpangan yang
dilakukan selama pelaksanaan Pekerjaan.

B. After approval by the Project Manager, the Contractor shall B. Setelah disetujui oleh Manajer Proyek, Kontraktor akan
issue copies as specified. menerbitkan salinan sebagaimana ditetapkan.

101 SERVICES MANUALS 101 MANUAL LAYANAN

A. On or before the required date of Practical Completion, A. Pada atau sebelum tanggal yang disyaratkan
provide line drawings of all services showing location of Penyelesaian Praktis, menyediakan gambar garis semua
valves, runs, etc., together with any service manuals of layanan yang menunjukkan lokasi katup, operasi, dan
equipment installed. Copies as specified of drawings and lain-lain, beserta manual layanan peralatan yang
manuals shall be forwarded to the Project Manager prior to dipasang. Salinan sebagaimana ditetapkan gambar dan
Practical Completion. manual akan diteruskan kepada Manajer Proyek sebelum
Penyelesaian Praktis

102 TENDER BOND 102 JAMINAN TENDER

A. Each Tenderer is required to submit a Tender Bond in the A. Setiap Peserta Tender disyaratkan menyerahkan
amount of Rp. 50,000,000 [refer Instructions to Tenderers] Jaminan Tender sebesar Rp. 50.000.000 [lihat Instruksi
in the form of a Bank Guarantee or Surety Bond (insurance kepada Peserta Tender] dalam bentuk Jaminan Bank
company) consistent with that provided at the relevant atau Jaminan Asuransi (perusahaan asuransi) sesuai
Appendix to Form of Tender. The validity of both the dengan yang ditetapkan dalam Lampiran yang relevan
Tender and Tender Bond shall be 90 days. Surat Penawaran. Masa berlaku baik Tender maupun
Jaminan Tender adalah 90 hari.

B. If the Tenderer withdraws his Tender during the period of B. Jika Peserta Tender menarik kembali Tendernya selama
tender validity, or when the Tender is accepted within the masa berlaku tender, atau apabila Tender diterima dalam
validity period and the Tenderer refuses to provide the masa berlaku dan Peserta Tender menolak memberikan
required Performance Security or refuses to sign the Jaminan Pelaksanaan yang disyaratkan atau menolak
Contract or to execute such further contractual obligations menandatangani Kontrak atau untuk melaksanakan
as may be required by the terms of the Tender Documents, kewajiban kontrak selanjutnya sebagaimana disyaratkan
upon the Employer’s first demand and without delay and oleh ketentuan Dokumen Tender, maka atas permintaan
not withstanding any objections of the Tenderer, the pertama Pemberi Tugas dan dengan segera dan tidak
aforesaid amount will be paid on first demand to the menahan keberatan Peserta Tender, jumlah tersebut di
Employer by the financial institution. atas akan dibayar atas permintaan pertama kepada
Pemberi Tugas oleh lembaga keuangan.

103 PERFORMANCE BOND 103 JAMINAN PELAKSANAAN

A. The Contractor shall provide a performance bond in A. Kontraktor akan memberikan jaminan pelaksanaan
accordance with the requirements of the Contract sesuai dengan persyaratan Ketentuan Kontrak.
Conditions.

104. WORK BY EMPLOYER'S FITTING-OUT CONTRACTORS 104 PEKERJAAN OLEH KONTRAKTOR PEMASANGAN
PEMBERI TUGAS

A. If so directed by the Project Manager, the Contractor shall A. Jika diperintahkan oleh Manajer Proyek, Kontraktor akan
allow access to the site by the respective Employer’s own menyediakan akses ke lokasi oleh Kontraktor
fitting out Contractors for the purposes of fitting out and pemasangan Pemberi Tugas sendiri masing-masing
installing furniture / loose equipment or the like in advance untuk tujuan pemasangan furnitur/peralatan yang lepas
of completion of the Works. atau sejenisnya sebelum penyelesaian Pekerjaan.

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 33 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

105. ENVIRONMENTAL MANAGEMENT PROGRAM 105 PROGRAM PENGELOLAAN LINGKUNGAN

A. The Contractor’s construction methodology / work methods A. Metodologi konstruksi/metode pekerjaan Kontraktor
shall include an environmental management programme mencakup program pengelolaan lingkungan yang meliputi
that shall include the following: berikut ini:
- Establishment of targets for water and energy usage; - Pendirian target untuk penggunaan air dan energi;
- Monitoring of energy and water usage; - Pemantauan penggunaan energi dan air;
- Waste management; - Pengelolaan limbah;
- Dust control; - Kontrol debu;
- Recycling. - Daur ulang.

B. The Contractor shall allow herein for any additional costs to B. Kontraktor akan menyediakan biaya tambahan untuk
comply with such activities and reporting same, which memenuhi kegiatan dan pelaporan hal tersebut, yang
should be separately indicated under the project secara terpisah ditunjukkan di bawah metode metodologi
construction methodology / work method. konstruksi proyek/metode pekerjaan.

106. SPECIAL CONDITIONS 106 KETENTUAN KHUSUS

A. The Contractor shall note the following special conditions A. Kontraktor harus memperhatikan ketentuan khusus
relating specifically to the subject project: berikut ini yang secara spesifik berhubungan dengan
proyek subyek:
-
- -
- -
- -
- -
- -

BILL NO. 1
Carried to Collection Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 34 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 1 - PRELIMINARIES Preliminaries
Rp.

COLLECTION

Page No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

BILL NO. 1
PRELIMINARIES
CARRIED TO MAIN SUMMARY Rp.

file:///conversion/tmp/scratch/495999449.xlsx Page 35 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES PENDAHULUAN

PREAMBLES APPLICABLE TO ALL TRADES PENDAHULUAN YANG BERLAKU UNTUK SEMUA


PERDAGANGAN
Standard Method of Measurement Metode Pengukuran Standar
A These Bill of Quantities has been measured in Bills of Quantities ini telah diukur sesuai dengan
accordance with 'PRINCIPLES OF MEASUREMENT 'PRINSIP-PRINSIP PENGUKURAN (INTERNATIONAL)'
(INTERNATIONAL)' FOR WORKS OF UNTUK PEKERJAAN KONSTRUKSI Juni 1979 yang
CONSTRUCTION June 1979 as issued by the Royal dikeluarkan oleh Royal Institution of Chartered Surveyors,
Institution of Chartered Surveyors, herein after referred selanjutnya disebut sebagai PM (I).
to as PM (I).

Preambles Generally Pendahuluan Secara Umum


B The following method of measurement and pricing Metode pengukuran berikut dan klausul harga akan
clauses shall apply to the whole of the Works regardless berlaku untuk seluruh Pekerjaan terlepas dari judul-judul
of the headings under which they have been described di mana mereka telah dijelaskan dan akan dibaca dalam
and shall be read in conjunction with the Specifications hubungannya dengan Spesifikasi dan Bills of Quantities
and accompanying Bills of Quantities. yang menyertainya.

C Unit rates for items in the accompanying Bills of Tarif Unit/satuan untuk item dalam Bills of Quantities yang
Quantities are deemed to include for the following menyertai dianggap termasuk untuk metode pengukuran
method of measurement and pricing clauses where berikut dan klausul harga bilamana berlaku.
applicable.

Work measured nett Pekerjaan yang diukur bersih


D Unless otherwise stated all work has been measured Kecuali dinyatakan lain semua Pekerjaan telah diukur
nett as fixed in its place. bersih sebagaimana ditetapkan di tempatnya.

E Unless otherwise stated all finishing and decoration Kecuali dinyatakan lain semua Pekerjaan finishing dan
works have been measured the nett area of structural dekorasi telah diukur daerah bersih permukaan struktural
surface covered. yang tertutup.

Order of dimensions. Urutan dimensi.


F In giving dimensions the order is consistent and Dalam dimensi tertentu urutannya konsisten dan
generally in the sequence of length, width and height. umumnya dalam urutan panjang, lebar dan tinggi.

Pricing Harga
G The items in the Bills of Quantities should be read in Item dalam Bills of Quantities harus dibaca dalam
conjunction with the Specification Clauses, Drawings hubungannya dengan Klausul Spesifikasi, Gambar dan
and the relevant Preamble Clauses set out hereunder. Klausul Pembukaan relevan yang ditetapkan di bawah ini.

H The Preambles and Specifications themselves shall not Pendahuluan dan Spesifikasi sendiri tidak akan diberikan
be priced. They shall be regarded as part of the harga. Mereka dianggap sebagai bagian dari deskripsi
description of the measured items in the Bills of item diukur dalam Bills of Quantities. Kecuali jika
Quantities. Unless otherwise described, the whole of the dijelaskan lain, seluruh Pekerjaan yang dijelaskan dalam
works described in these Bills of Quantities shall be Bills of Quantities ini harus dilaksanakan sesuai dengan
executed in strict accordance with the relevant Klausul Spesifikasi dan Gambar yang relevan dan
Specification Clauses and Drawings and prices are harganya akan dianggap termasuk didalamnya untuk
deemed to include for complying with same. mematuhi ketentuan klausul Spesifikasi dan Gambar
tersebut.

I The description given of each item shall, unless Deskripsi yang diberikan dari setiap item, kecuali
otherwise stated be held to include duties, landing dinyatakan lain akan dibuat untuk memasukkan bea,
charges, conveyance and delivery, unloading, storing, biaya pendaratan, alat angkut dan pengiriman, bongkar
hoisting, all labour setting, fitting and fixing in position, muat, penyimpanan, pengangkatan, semua pengaturan
all cutting and waste, return of packings, establishment tenaga kerja, perlengkapan dan penyesuaian pada posisi,
charges and profit and Contractors tendering must make semua sisa potongan dan limbah, pengembalian
due allowance in pricing for same. kemasan, beban biaya pendirian dan keuntungan serta
tender Kontraktor harus dialokasikan dengan tepat dalam
penentuan harga yang sama.

file:///conversion/tmp/scratch/495999449.xlsx 36 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES (Cont'd) PENDAHULUAN (Lanj.)

Allow Mengizinkan
A Whenever the word 'allow' occurs in these Bills of Setiap kali kata 'memungkinkan' terjadi di dalam Bills of
Quantities, the cost of the items shall be at the risk of Quantities ini, biaya item akan berada pada risiko
the Contractor and no adjustment will be made at the Kontraktor dan tidak ada penyesuaian akan dilakukan
settlement of accounts. In the absence of any price pada penyelesaian rekening. Dengan tidak adanya harga
against such items, the cost shall be deemed to be apapun terhadap item-item tersebut, maka biaya akan
included in the rates contained in the Bills hereinafter. dianggap termasuk dalam tarif yang terkandung dalam
Bills selanjutnya.

Making Good Perbaikan


B The term 'making good' shall be understood as including Istilah 'kelengkapan' harus dipahami sebagai termasuk
all labour and materials necessary to bring the disturbed semua tenaga kerja dan bahan yang diperlukan untuk
area to the same face, colour, texture including making membawa daerah yang terganggu pada permukaan,
good to penetrations, sleeves chasing to walls, etc. in warna, tekstur yang sama termasuk kelengkapan untuk
the same materials as the surrounding work, and shall penetrasi, lengan-lengan yang menjangkau dinding, dll
include for painting, colouring and/or varnishing any new dalam bahan yang sama sebagaimana pekerjaan
work to match the surrounding existing work to the disekitarnya, dan harus mencakup untuk pengecatan,
entire satisfaction of the Project Manager. pewarnaan dan / atau varnishing setiap pekerjaan baru
untuk mencocokkan dengan pekerjaan yang ada
disekitarnya untuk kepuasan Manajer Proyek secara
keseluruhan.

As Described Seperti yang dijelaskan


C The term 'as described' included in descriptions Istilah 'seperti yang dijelaskan' termasuk dalam deskripsi
contained in these Bills of Quantities refers to the yang terkandung dalam Bills of Quantities ini mengacu
materials and workmanship described in the relevant pada bahan dan pengerjaan yang dijelaskan dalam
Specification Clauses and in the Preambles Clauses Klausul Spesifikasi yang relevan dan di dalam Klausul
hereunder. Pendahuluan dibawah ini.

Approval Persetujuan
D Terms such as 'approved by', 'to approval', 'as directed' Istilah-istilah seperti 'disetujui oleh', 'persetujuan', 'seperti
and the like, refer to approval or directions given by the yang diarahkan' dan sejenisnya, merujuk pada
Project Manager. The Project Manager will consider persetujuan atau petunjuk yang diberikan oleh Manajer
alternative materials and methods that the Contractor Proyek. Manajer Proyek akan mempertimbangkan bahan
may propose. No such alternatives shall be adopted dan metode alternatif yang Kontraktor dapat ajukan. Tidak
without the prior approval of the Project Manager. ada alternatif tersebut yang harus diadopsi tanpa
Approved alternative materials or work will not qualify for persetujuan terlebih dahulu dari Manajer Proyek. Bahan
additional cost unless such additional costs are atau pekerjaan alternatif yang disetujui tidak akan
sanctioned before approval is given. Under no memenuhi syarat untuk mendapatkan biaya tambahan
circumstances shall approval relieve the Contractor of kecuali biaya tambahan tersebut diberikan sangsi
his responsibilities as set out in the Conditions of sebelum persetujuan diberikan. Dalam situasi apapun,
Contract. No approval will be binding until given in persetujuan tidak akan meringankan Kontraktor dari
writing. tanggung jawabnya sebagaimana diatur dalam Ketentuan
Kontrak. Tidak ada persetujuan akan mengikat sampai
diberikan secara tertulis.

E Approval shall not be deemed to relieve the Contractor Persetujuan tidak akan dianggap untuk meringankan
of any liability under the performance of this Contract. Kontraktor dari kewajiban apapun dalam pelaksanaan
Kontrak ini.

Allowance for Laps Penyisihan Untuk Pembuatan Laps


F No allowances for laps have been made in the Tidak ada penyisihan/tunjangan untuk pembuatan lap
quantities with exception of laps in steel reinforcement yang telah dibuat dalam bill of quantities pengecualian lap
bars, which shall be measured based on drawings or as dalam batang baja tulangan, yang harus diukur
per local codes. Materials such as fabric reinforcement, berdasarkan gambar atau sesuai kode lokal. Bahan
flexible sheet underlays and the like shall be lapped to seperti tulangan kain, underlay lembar fleksibel dan
the extent required and the prices shall include for this. sejenisnya harus dibuat sejauh diperlukan dan harga
harus mencakup untuk ini.

file:///conversion/tmp/scratch/495999449.xlsx 37 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES (Cont'd) PENDAHULUAN (Lanj.)

Equivalent Materials in Imperial Specification Bahan-bahan yang setara di dalam Spesifikasi Imperial

A If any of the materials required for this Contract are not Jika salah satu bahan yang dibutuhkan untuk kontrak ini
available in metric specification from any known source; tidak tersedia dalam spesifikasi metrik dari sumber yang
local or overseas, at the time the material is required for dikenal; lokal atau luar negeri, pada saat bahan tersebut
the Contract the Project Manager may, upon written diperlukan untuk kontrak oleh Project Manager, setelah
application from the Contractor, permit the use of an ada permohonan tertulis dari Kontraktor, akan
equivalent material in imperial specification as a mengizinkan penggunaan bahan yang setara dalam
substitute, provided that: spesifikasi yang hampir sama sebagai pengganti,
asalkan:

i) No statutory specification shall be altered except in i) Tidak ada spesifikasi hukum yang harus diubah kecuali
accordance with relevant legal provision, if any; sesuai dengan ketentuan hukum yang relevan, jika ada;

ii) The Project Manager is satisfied that the Contractor ii) Manajer Proyek puas bahwa Kontraktor telah berupaya
has made every effort reasonable to obtain the material secara wajar untuk mendapatkan bahan dalam spesifikasi
in metric specification; metrik;

iii) In the Project Manager's opinion, the substitute iii) Menurut pendapat Manajer Proyek, bahan pengganti
material complies with all the specification for the sesuai dengan semua spesifikasi untuk bahan yang
material substituted, allowing minor discrepancies diganti, sehingga perbedaan kecil antara yang ditentukan
between the specified metric measurements and the dalam pengukuran metrik dan sesuai pengukuran kisaran
corresponding imperial measurements of the substitute, pengganti, asalkan perbedaan tersebut dapat secara
provided that such discrepancies can be effectively and efektif diatasi dan memenuhi kompensasi;
satisfactorily compensated for;

iv) In the Project Manager's opinion, the substitute iv) Menurut Manajer Proyek, bahan pengganti cocok
material is suitable for the Works in all respect; untuk pekerjaan dalam segala hal;

v) All extra quantity of the material required for meeting v) Semua jumlah tambahan dari material yang dibutuhkan
design and specification requirements of the Works due untuk memenuhi desain dan spesifikasi persyaratan
to the use of subsitute shall be provided by the pekerjaan akibat penggunaan subsitute harus disediakan
Contractor at his own cost; oleh Kontraktor dengan biaya sendiri;

vi) If, on approval of the Project Manager's, the vi) Jika, atas persetujuan dari Manajer Proyek, bahan
substitute material is used any savings in cost shall be pengganti yang digunakan untuk penghematan biaya
passed to the Employer. Any extra cost, however, shall akan disampaikan kepada Majikan. Setiap biaya
be borne by the Contractor; tambahan, bagaimanapun, harus ditanggung oleh
Kontraktor;

vii) Every permission given by the Project Manager's vii) Setiap izin yang diberikan oleh Manajer Proyek harus
shall be confirmed in writing and; dikonfirmasi secara tertulis dan;

viii) No permission or refusal given by the Project viii) Tidak ada izin atau penolakan yang diberikan oleh
Manager shall relieve the Contractor from any of his Manajer Proyek yang akan membebaskan Kontraktor dari
obligations under this Contract nor shall the Contractor setiap kewajibannya berdasarkan Kontrak ini juga
be entitled to any claim whatsoever in respect of any Kontraktor tidak berhak atas klaim apapun sehubungan
permission or refusal. dengan izin atau penolakan.

Adjustment of P.C. Rates of Materials Delivered to Site Penyesuaian Tarif PC Bahan Yang Disampaikan ke
Lokasi Proyek
B Where prime cost rates of materials delivered to site are Bilamana tingkat biaya utama dari bahan yang dikirim ke
included in the description of items in these Bills of Lokasi Proyek yang termasuk dalam deskripsi item di Bills
Quantities, these prime cost rates are for the material of Quantities ini, tingkat biaya utama ini adalah untuk
cost of that item delivered to site only and the biaya bahan item yang dikirim ke Lokasi Proyek saja dan
Contractor should base his price on the prime cost as Kontraktor harus mendasarkan harganya pada biaya
stated and allow in addition for all waste, fixing, all utama sebagaimana yang dinyatakan dan memungkinkan
ancillary materials required for fixing such as mortar for selain untuk semua limbah, kelengkapan, semua bahan
bedding and jointing and all other similar items of a like tambahan yang dibutuhkan untuk penyesuaian seperti
nature. mortar untuk dasar dan penyambungan dan semua item
serupa lainnya dari sifatnya yang serupa.

file:///conversion/tmp/scratch/495999449.xlsx 38 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES (Cont'd) PENDAHULUAN (Lanj.)

A The contract rate will be adjusted by the net difference Tingkat harga kontrak akan disesuaikan dengan selisih
between the prime cost price and the actual price and bersih antara harga biaya utama dan harga sebenarnya
will be applied to the net quantity of the items measured dan akan diterapkan pada kuantitas bersih dari item yang
as fixed in position. diukur sebagai tetap pada posisinya.

SITEWORKS PEKERJAAN LOKASI PROYEK


Generally Secara Umum
B The Contractor is directed to visit the Site and assess Kontraktor diarahkan untuk mengunjungi Lokasi Proyek
for himself the scope of the demolition and alteration dan menilai sendiri lingkup pembongkaran dan perubahan
work and take his own measurements and notes as kerja dan melakukan pengukuran dan pencatatan sendiri
necessary in order to price each item. yang diperlukan untuk harga setiap item.

C All materials, debris and other items arising from Semua bahan, puing dan barang-barang lainnya yang
demolitions shall become the property of the Contractor timbul dari pembongkaran akan menjadi milik Kontraktor
unless specifically stated otherwise and due allowance kecuali bila dinyatakan lain dan penyisihan nilai kredit (jika
for the credit value (if any) of such materials etc. should ada) dari bahan-bahan seperti itu, dll harus dilakukan di
be made in the space provided at the end of the tempat yang disediakan di akhir bagian pembongkaran
Demolition Section of the Bills of Quantities. dari Bills of Quantities.

D The term 'making good' shall be understood as including Istilah 'memperbaiki harus dipahami sebagai kegiatan
all labours and material necessary to bring the disturbed yang termasuk semua tenaga kerja dan bahan yang
area to the same face, colour, texture, etc., in the same diperlukan untuk memperbaiki daerah yang terganggu
materials as the surrounding work. pada permukaan, warna, tekstur yang sama, dll, dengan
bahan yang sama sebagaimana Pekerjaan sekitarnya.

Method of Measurement - Siteworks Metode Pengukuran - Pekerjaan di Lokasi Proyek


E All sizes and dimensions stated in the descriptions of Semua ukuran dan dimensi yang dinyatakan dalam
work are approximate and the Contractor shall have deskripsi Pekerjaan adalah perkiraan dan Kontraktor
been deemed to have visited the Site and satisfied harus dianggap telah mengunjungi Lokasi Proyek dan
himself as to the validity of the items. Further, the value mengetahui sendiri validitas item itu. Selanjutnya, nilai
of the items of work shall not be subject to change item pekerjaan tidak akan berubah karena perbedaan
because of differences found before or after the yang ditemukan sebelum atau setelah dimulainya
commencement of the Works. Pekerjaan.

Prices - Siteworks Harga - Pekerjaan Lokasi Proyek


F Prices for all demolition and alteration works shall Harga untuk semua pkerjaan pembongkaran dan
include for:- perubahan meliputi untuk: -

i) Executing the work in such a way as to ensure the i) Pelaksanaan pekerjaan dengan cara ini harus menjamin
safety of, and cause as little inconvenience as possible keamanan, dan menyebabkan sedikit mungkin
to, adjoining properties and occupants, the public in ketidaknyamanan terhadap properti dan penghuni
general, passing vehicles and workmen. sebelah, masyarakat secara umum, kendaraan yang
melintas dan pekerja.

ii) Giving due notice of proposed demolition to the ii) Memberikan pemberitahuan pembongkaran yang
Electric and any other Public Utility Company or diusulkan untuk listrik dan lainnya Utilitas Publik
Government Department if their installations will be Perusahaan atau Departemen Pemerintah jika instalasi
affected and arranging for disconnection of services. mereka akan terpengaruh dan mengatur pemutusan
layanan.

iii) Removing all old materials, M&E cables, ducts, iii) Pemindahan semua bahan lama, kabel M & E, konduit,
sprinklers, etc., debris and other arisings off Site to a alat penyiram, dll, puing dan hal-hal lain yang timbul dari
store or dump to be provided by the Contractor. Lokasi Proyek ke tempat pembuangan atau penimbunan
yang akan disediakan oleh Kontraktor.

iv) Providing all necessary dust screens and similar and iv) Menyediakan semua penutup/penyaring debu yang
watering debris as necessary to reduce dust nuisance to diperlukan dan item sejenis dan penyiraman puing-puing
a minimum. yang diperlukan untuk mengurangi gangguan debu
seminimum mungkin.

file:///conversion/tmp/scratch/495999449.xlsx 39 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES (Cont'd) PENDAHULUAN (Lanj.)

A The prices for taking down plumbers pipework, drain Harga untuk layanan petugas pemipaan, pipa konduit dan
pipes and sanitary fittings shall include for all cutting out perlengkapan sanitasi harus mencakup untuk semua
of brackets and other fixings, removing sleeves, making pemotongan braket dan bahan kelengkapan lainnya,
good all disused holes or chases in or through floors, pembongkaran lengan-lengan, memperbaiki semua
walls and similar, and making good any other damage to lubang bekas atau chases di atau melalui lantai, dinding
existing surfaces. Prices for taking out tubing and pipes dan yang sejenis, dan memperbaiki kerusakan lainnya
are to include for sealing off remaining ends. pada permukaan yang ada. Harga pemasangan tabung
dan pipa yang mencakup untuk menutup ujung-ujung
yang tersisa.

B The prices for items described as 'set aside for re-use' Harga untuk item yang digambarkan sebagaimana yang
shall include for carefully removing, disconnecting, etc., 'disisihkan untuk digunakan kembali' harus mencakup
cleaning the item or materials and leaving safely stored untuk pemindahan secara hati-hati, pemutusan, dll,
on Site ready for subsequent re-use. membersihkan item atau bahan dan meninggalkan Lokasi
Proyek dengan aman yang siap untuk digunakan kembali
selanjutnya.

C The prices for shoring shall include for obtaining Harga untuk kelengkapannya harus mencakup untuk
licences and paying fees and providing all necessary memperoleh lisensi dan membayar biaya dan
nails, wedges, cramps and bolts. menyediakan semua item yang diperlukan seperti paku,
wedges, cramps dan baut.

EXCAVATION PENGGALIAN
Method of Measurement - Excavation Metode Pengukuran - Penggalian
D Measurements of excavation are those in ground and Pengukuran penggalian adalah penggalian tanah dan
filling are those after consolidation and no allowance pengurugan kembalinya setelah konsolidasi dan tidak ada
has been made for increase in bulk or compacting. tunjangan yang telah dibuat untuk peningkatan dalam
jumlah besar atau pemadatan.

E Unless otherwise stated all excavations have been Kecuali dinyatakan lain semua penggalian telah diukur
measured from existing ground level; and rates are to dari permukaan tanah yang ada; dan tarifnya harus
include for executing the work in any other sequence. termasuk untuk melaksanakan pekerjaan dalam urutan
lainnya.

Prices - Excavation Harga - Penggalian


F Prices shall be deemed to include for: levelling, grading, Harga akan dianggap termasuk untuk: meratakan,
trimming, compacting, scabbling and similar to faces of peninggian, pemangkasan, pemadatan, scabbling dan
excavations, keeping sides plumb, consolidating and pekerjaan sejenisnya sesuai dengan permukaan
keeping excavation free of water. penggalian, menjaga sisi saluran/plumb,
mengkonsolidasikan dan menjaga penggalian bebas dari
air.

G Prices for all excavation shall include for disposal of Harga untuk semua penggalian harus mencakup untuk
surplus excavated material to an off-site location. pembuangan kelebihan bahan yang digali ke lokasi
buangan/penimbunan.

H Prices shall also include for any neccessary additional Harga juga harus mencakup untuk setiap penggalian
excavation for working space required. tambahan yang diperlukan untuk ruang yang dibutuhkan
dalam pekerjaan.

I Prices shall include for backfill, unless noted or Harga harus mencakup untuk pengurukan kembali,
measured otherwise. kecuali untuk pencatatan atau pengukuran lain.

J Prices shall include for excavation in all kinds of Harga harus mencakup untuk penggalian di semua jenis
materials encountered including breaking up any bahan yang ditemui termasuk penghancuran beton dan
existing concrete and road paving, etc., encounted. jalan yang ada pavingnya, dll, yang harus dilakukan.

file:///conversion/tmp/scratch/495999449.xlsx 40 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES (Cont'd) PENDAHULUAN (Lanj.)

CONCRETE WORK PEKERJAAN BETON

POURED CONCRETE BETON TUANG


Method of Measurement Metode Pengukuran
A Notwithstanding clause C1.3 of the Principles of Terlepas Dari klausul K. 1.3 Prinsip Pengukuran,
Measurement, (International) for Works of Construction, (Internasional) untuk Pekerjaan Konstruksi, Juni 1979,
June 1979, no deductions have been made for voids tidak ada pengurangan yang telah dibuat untuk
less than 1.00 m2. pembatalan yang kurang dari 1,00 m2.

B In clarification of clause C2.1.9 of the Principles of Dalam klarifikasi klausul C2.1.9 Prinsip Pengukuran,
Measurement, (International) for Works of Construction, (Internasional) untuk Pekerjaan Konstruksi, Juni 1979,
June 1979, poured concrete to staircases shall include beton tuang ke tangga/staircases akan meliputi langkah-
for steps, strings and intermediate landings. langkah, pengikatan dan pendaratan segera.

C Expansion joints and construction joints where shown Sambungan ekspansi dan sambungan konstruksi di mana
on the drawings have been measured separately. ditunjukkan pada gambar tersebut telah diukur secara
terpisah.

Prices - Poured Concrete Harga - Beton Tuang


D Prices for concrete are to include for cutting grooves, Harga untuk beton meliputi untuk pemotongan alur,
chases, mortices, holes and making good for casting in chases, mortices, lubang dan perbaikan untuk casting
bolts, pipes, etc. and any other sundry item of a like pada baut, pipa, dll dan item sindry lainnya yang sifatnya
nature. Prices shall also include for all costs involved in sama. Harga juga harus mencakup semua biaya yang
curing, making good after removal of formwork and for terlibat dalam memperbaiki, membetulkan setelah
forming pour joints. pembongkaran bekisting dan untuk membentuk
sambungan tuang.

E Prices for concrete shall be deemed to include for: Harga untuk beton harus dianggap termasuk untuk:
placing in position; making good after removal of menempatkan di posisi; memperbaiki setelah
shuttering and casting in all required items; additional pembongkaran shuttering dan casting di semua item yang
concrete required to conform to structural and diperlukan; beton tambahan yang diperlukan untuk
excavated tolerances; pour joints and joints shown on penyesuaian dengan toleransi struktural dan yang digali;
the drawings that do not require formwork. sambungan tuang dan sambungan yang ditunjukan pada
gambar yang tidak memerlukan bekisting.

F Prices for concrete shall be deemed to include for: Harga untuk beton harus dianggap termasuk untuk: alas
temporary grounds, and for screeding off to a true sementara, dan untuk screeding hingga permukaan yang
surface ready to receive subsequent finishes. sebenarnya yang siap menerima pelapisan berikutnya.

G Prices for concrete shall be deemed to include for all Harga untuk beton harus dianggap termasuk untuk semua
surface finishes including broomed, troweled, scratched, penghalusan permukaan termasuk broomed, troweled,
floated finishes or the like; as specified. tergores, pelapisan floated atau sejenisnya; seperti yang
ditentukan.

REINFORCEMENT TULANGAN
Method of Measurement Metode Pengukuran
H Notwithstanding clause C3.5 of the Principles of Terlepas dari klausul C3.5 Prinsip Pengukuran
Measurement (International) for Works of Construction, (International) untuk Pekerjaan Konstruksi, Juni 1979
June 1979 bar reinforcement exceeding 12 metres in balok tulangan yang melebihi 12 meter panjangnya belum
length has not been given separately. diberikan secara terpisah.

I Quantities for steel reinforcement bars shall include Jumlah untuk batang baja tulangan meliputi panjang
development lengths, laps, splicing and hooks which pembangunan, lap, penyambungan dan kait yang harus
shall be measured. diukur.

file:///conversion/tmp/scratch/495999449.xlsx 41 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES (Cont'd) PENDAHULUAN (Lanj.)

Prices - Reinforcement Harga - Tulangan


A Prices shall be deemed to include for: cutting to lengths, Harga akan dianggap termasuk untuk: pemotongan
bending, cleaning, fabrication, placing, the provision of panjang, lentur, pembersihan, fabrikasi, penempatan,
all necessary temporary fixings and supports including penyediaan semua bahan kelengkapan sementara yang
tie wire and chair supports and rolling margins. Rates for diperlukan dan alat pendukung termasuk ikatan kawat
fabric reinforcement shall also include for extra material dan bantalan kursi dan margin rolling. Tarif untuk tulangan
at laps and for notching around obstructions. pabrik juga meliputi untuk bahan tambahan pada lap dan
bentukan sekitar penghalang.

B The weights of reinforcement have been calculated Bobot tulangan telah dihitung dengan menggunakan
using the following nominal weights and rates are to bobot nominal berikut dan tarifnya mencakup untuk setiap
include for any variation to these nominal weights : perubahan pada bobot nominal ini:

6 mm - 0.220 Kg per metre 6 mm - 0.220 Kg per meter


8 mm - 0.393 Kg per metre 8 mm - 0,393 Kg per meter
10 mm - 0.620 Kg per metre 10 mm - 0,620 Kg per meter
12 mm - 0.887 Kg per metre 12 mm - 0,887 Kg per meter
13 mm - 1.040 Kg per metre 13 mm - 1.040 Kg per meter
16 mm - 1.560 Kg per metre 16 mm - 1,560 Kg per meter
19 mm - 2.250 Kg per metre 19 mm - 2.250 Kg per meter
22 mm - 3.040 Kg per metre 22 mm - 3.040 Kg per meter
25 mm - 3.980 Kg per metre 25 mm - 3,980 Kg per meter
32 mm - 6.230 Kg per metre 32 mm - 6,230 Kg per meter
36 mm - 7.990 Kg per metre 36 mm - 7,990 Kg per meter

SHUTTERING PENUTUPAN
Method of Measurement Metode Pengukuran
C Notwithstanding clause C4.3 of the Principles of Terlepas dari ketentuan klausul C4.3 Prinsip Pengukuran
Measurement (International) for Works of Construction, (International) untuk Pekerjaan Konstruksi, Juni 1979
June 1979 all grooves, throats, rebates, chamfers or the semua alur, throath, rabat, chamfers atau sejenisnya
like have not been measured out. belum diukur.

Prices - Shuttering Harga - Penutupan


D Prices shall be deemed to include for : all necessary Harga akan dianggap termasuk untuk: semua boarding
boarding, supports, erecting, framing, temporary yang diperlukan, pendukung, pemancangan, pembuatan
cambering, cutting, perforations for reinforcing bars, rangka, cambering sementara, pemotongan, perforasi
bolts, straps, ties, hangers, pipes, and similar, angles, untuk memperkuat balok/batang, baut, tali pengikat,
removal, cleaning, wetting and treatment with separating gantungan, pipa, dan yang sejenis, pembuatan sudut,
agent before placing concrete, chamfering edges and pembongkaran, pembersihan, penyiraman dan perbaikan
splayed internal angles less or equal to 50mm wide on dengan memisahkan benda-benda lain sebelum
face, filling tie bolt holes, strutting left after removal of menempatkan beton, chamfering pada bagian ujung dan
shuttering. sudut internal yang lebarnya kurang atau sama dengan
50mm pada bagian permukaan, mengurug kembali
lubang baut pengikat, strutting setelah pembongkaran
shuttering.

E Where edge beams occur, formwork to sides of slabs Bilamana ada ujung balok, bekisting untuk sisi lembaran
has been included with the edge beam. telah disertakan dengan balok tepi.

SUNDRIES MACAM-MACAM BARANG


Method of Measurement Metode Pengukuran
F Notwithstanding clause C7.4 of the Principles of Terlepas dari ketentuan klausul C7.4 Prinsip Pengukuran
Measurement (International) for Works of Construction, (International) untuk Pekerjaan Konstruksi, Juni 1979
June 1979 all design joints, water stops, cast-in semua sambungan desain, penghentian air, saluran
channels or the like have not been measured out. tuang cor atau sejenisnya belum diukur.

MASONRY DINDING TEMBOK


Method of Measurement - Masonry Metode Pengukuran - Dinding tembok
G In clarification of clause D.2.1 of the Principles of Dalam klarifikasi klausul D.2.1 Prinsip Pengukuran
Measurement (international) cavity walls have been (internasional) dinding rongga telah diukur sebagai item
measured as a composite item. komposit.

file:///conversion/tmp/scratch/495999449.xlsx 42 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES (Cont'd) PENDAHULUAN (Lanj.)

A Notwithstanding clause D5.2 of the Principles of Terlepas dari ketentuan klausul D5.2 Prinsip Pengukuran
Measurement (international) expansion, control and (internasional) ekspansi, kontrol dan konstruksi
construction joints have not been measured separately sambungan belum diukur secara terpisah dan akan
and shall be deemed to be included in rates. dianggap dimasukkan dalam tarif.

Prices - Masonry Harga - Dinding tembok


B Prices shall be deemed to include for: forming cavities, Harga akan dianggap termasuk untuk: membentuk
fractional size blocks, plain and plain return blocks rongga, blok ukuran pecahan, blok yang polos dan blok
and similar blocks, stiffeners, all necessary machine yang sebaliknya polos dan blok yang sama, pengencang,
cutting, cutting to form bond, cutting or forming chases semua mesin pemotong yang diperlukan, pemotongan
for edges of floor slabs, cutting or leaving holes and untuk membentuk ikatan, pemotongan atau membentuk
openings as recesses for and building in pipes, ujung pelat lantai, pemotongan atau meninggalkan lubang
conduits, sleeves and similar as required for all trades; dan bukaan sebagai relung untuk dan dibuat di pipa,
leaving surfaces rough or raking out joints for plastering konduit, lengan dan yang sejenis yang diperlukan untuk
and flashings, knocking off angles in preparation for semua perdagangan; yang meninggalkan permukaan
plastering, bedding frames or plates, building in joists, yang kasar atau penyapuan sambungan untuk dilakukan
bearers, or similar, temporary supports to openings, plesteran dan flashings, merapihkan sudut dalam
templates, and for all necessary making good. persiapan untuk plesteran, kerangka alas atau piringan,
pemasangan balok, pengangkut, atau item serupa,
bantalan sementara untuk bukaan, cetakan, dan untuk
semua kelengkapan yang diperlukan.

C Prices are to include for angles, stiffener intersections, Harga termasuk juga untuk merapihkan sudut-sudut,
anchorages, squints, birdsmouths, wedging and kotak persimpangan pengencangan, jangkar, squints,
pinning up, cutting and pinning, building in pipes, bolts, birdsmouths, wedging dan penjepit, pemotongan dan
etc. pointing flashings, extra thick mortar beds, bedding penjepitan pada pipa, baut, dll ujung flashings, alas
and pointing frames and the like and for all straight and mortar ekstra tebal, pelindung dan ujung kerangka dan
raking cutting. Rates shall also include for extra labour sejenisnya dan untuk semua bagian yang lurus dan
in plumbing angles, in bonding to new walls of different pembersihan sisa pemotongan. Tarif juga harus
construction in corbeling, in eaves filling and raking out mencakup tenaga kerja tambahan pada bagian sudut
joints for flashing and the like. pipa, dalam pengikatan ke dinding konstruksi baru yang
berbeda pada corbeling, pengisian dari atas dan
pembersihan sambungan untuk flashing dan sejenisnya.

D Prices are to include for junctions with structural Harga juga termasuk untuk kotak persimpangan dengan
framework including any necessary flexible anchors, kerangka struktural termasuk jangkar fleksibel yang
steel straps, sealants, compressible fillers or the like, as diperlukan, tali baja, penyegel/sealant, pengisi
detailed on Structural Drawings. kompresibel atau sejenisnya, seperti yang dijelaskan
pada Gambar Struktural.

E Prices are to include for all reinforced concrete practical Harga termasuk jug semua beton kolom praktis bertulang,
columns, stiffeners, lintels and beams. pengencang, palang dan balok.

METALWORK PEKERJAAN LOGAM


Metals - Method of Measurement Pekerjaan Logam - Metode Pengukuran
F In clarification of clause E2.1 of the Principles of Dalam klarifikasi klausul E2.1 Prinsip Pengukuran,
Measurement, (International) for Works of Construction, (Internasional) untuk Pekerjaan Konstruksi, Juni 1979,
June 1979, structural connecting plates, loose struktur pelat menghubungkan, piringan sambungan
connection plates, welded attached plates, stiffeners longgar, piringan yang dilas melekat, pengencang dan
and purlin support plates have been measured as an pelat pendukung purlin telah diukur sebagai Item.
Item.

G Notwithstanding clause E2.6 of the Principles of Terlepas dari ketentuan klausul E2.6 Prinsip Pengukuran,
Measurement, (International) for Works of Construction, (Internasional) untuk Pekerjaan Konstruksi, Juni 1979,
June 1979, protective treatment has not been measured perbaikan pelindung belum diukur secara terpisah dan
separately and prices shall be deemed to include for all harga akan dianggap termasuk untuk semua perawatan
protective treatment, as specified. pelindung, seperti yang ditentukan.

file:///conversion/tmp/scratch/495999449.xlsx 43 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES (Cont'd) PENDAHULUAN (Lanj.)

Prices - Metalwork Harga - Logam


A Prices for all items shall include for setting in position, Harga untuk semua item harus mencakup untuk
building in tightening nuts and fitting and include for all menetapkan posisi, pembuatan mur pengencang dan
necessary concrete stiffeners. penyesuaian dan mencakup untuk semua pengencang
beton yang diperlukan.

B Prices for bolts shall include for nuts, washers etc. and
all necessary drilling in steel, aluminium, brick and Harga untuk baut harus mencakup untuk mur, washer dll
concrete. Prices shall further include for all necessary dan semua pengeboran yang diperlukan dalam baja,
cleaning down and shop prime coating of surfaces. aluminium, batu bata dan beton. Harga diatur lebih lanjut
termasuk untuk semua pembersihan yang diperlukan dan
pengerjaan lapisan utama permukaan.

C Prices for balustrades and handrails shall include for Harga balustrade dan pegangan tangan harus mencakup
ramps, knees, bends, stop ends, and fixing accessories untuk ramps, knee, belokan, penghentian ujung, dan
including base plates, grout, anchors and the like. kelengkapan aksesoris termasuk pelat dasar, nat, jangkar
dan sejenisnya.

WOODWORK PEKERJAAN PERKAYUAN


Prices - Woodwork Harga - Perkayuan
D Prices shall be deemed to include for: all labours in Harga akan dianggap termasuk untuk: semua tenaga
framing, notching and fitting around projections, pipes, kerja dalam pembuatan kerangka, mencetak dan
light fittings, hatches, grilles and similar complete with all penyetelan di sekitar proyeksi, pipa, fiting lampu, hatches,
cleats, packers, wedges and similar and all nails and kisi-kisi dan item serupa lengkap dengan semua cleat,
screws. pengepakan, wedges dan item serupa dan semua paku
dan sekrup.

E Prices shall also be deemed to include for: back


ploughing boards liable to warp, arrising edges of work Harga juga harus dianggap termasuk untuk: pelepasan
to receive paint or similar coatings, priming hidden kembali papan untuk warp, ujung pekerjaan yang timbul
surfaces of painted items, drilling for bolts or other untuk pengcatan atau pelapisan, priming permukaan yang
fixings. tersembunyi, pengecatan item, pengeboran untuk baut
atau bahan kelengkapan lainnya.

F Prices shall be deemed to include for framing the whole


work accurately, fitting all joints closely and rigidly Harga akan dianggap termasuk untuk membingkai
securing in place, sundry fixing, cleats, etc., punching in seluruh pekerjaan secara akurat, penyetelan semua
all nail heads in exposed timbers, and for all cutting, sambungan erat dan kaku yang aman di tempat,
grooving, mitreing, scribing, spiking and protecting. memperbaiki barang lainnya, cleat, dll, merapihkan
Rates shall also include for all short lengths, cut and semua kepala paku pada kayu terbuka, dan untuk semua
fitted ends, mitred angles, fair ends, fair return ends and pemotongan, pembuatan grooving, mitreing, pemotongan,
the like. spiking dan pelapisan pelindung. Tarif juga harus
mencakup untuk semua pemotongan panjang,
pemotongan pendek, dan penyetelan ujung, pemasangan
sudut, ujung yang sama, ujung yang rata dan sejenisnya.

G Prices for bolts are to include for nuts and washers and
for all necessary drilling. Harga untuk baut termasuk juga untuk mur dan washer
dan untuk semua pengeboran yang diperlukan.

H Prices for joinery shall be deemed to include for: all Harga untuk penyambungan harus dianggap termasuk
associated hardware. untuk semua perangkat keras yang terkait.

THERMAL AND MOISTURE PROTECTION PERLINDUNGAN PANAS DAN KELEMBABAN


Method of Measurement - Thermal and Mositure Metode Pengukuran - Perlindungan Panas dan
Protection Kelembaban
I In clarification of clause G1.2 of the Principles of Dalam klarifikasi klausul G1.2 Prinsip Pengukuran
Measurement (International) for Works of Construction, (International) untuk pekerjaan Konstruksi, Juni 1979
June 1979 curved, spherical and conical work has not pekerjaan lengkungan, bulatan dan kerucut belum diukur
been measured separately and prices shall be deemed secara terpisah dan harga akan dianggap termasuk
to include for them. untuknya.

file:///conversion/tmp/scratch/495999449.xlsx 44 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES (Cont'd) PENDAHULUAN (Lanj.)

Prices - Thermal and Moisture Protection Harga – Perlindungan Panas dan Kelembaban
A Prices for liquid applied or sheet membrane waterproof Harga untuk cairan yang diterapkan atau sistem tahan air
systems shall include for adhesives, primers, sealants, membran lembaran harus mencakup untuk perekat,
laps, asphalt control and expansion joints, per primer, sealant, lap, kontrol aspal dan sambungan
specifications and/or manufacturer's requirements. ekspansi, sesuai spesifikasi dan / atau persyaratan
pabrik.

B Prices for liquid applied or sheet membrane waterproof


systems shall further include for turn-ups to form Harga untuk cairan yang diterapkan atau sistem tahan air
skirtings including any sealants and trim, per membran lembaran akan diatur lebih lanjut termasuk
specifications and/or manufacturer's requirements. untuk turn-up untuk membentuk skirtings termasuk
sealant dan trim (segel dan pengeliman pinggir), sesuai
spesifikasi dan / atau persyaratan pabrik.

C Measurement and prices for aluminium windows and Pengukuran dan harga untuk jendela aluminium dan
curtain walls shall also be deemed to include for dinding tirai juga harus dianggap termasuk untuk
packing, anchor brackets, and structural fixings, all kemasan, braket jangkar, dan kelengkapan struktural,
aluminium trims. semua keliman aluminium.

FINISHES PELAPISAN PERMUKAAN


Method of Measurement - Finishes Metode Pengukuran – Pelapisan Permukaan
D In clarification of clause J4 of PM (I) non-slip inserts,
dividing strips, metal anglebeads and lathing at junction Dalam klarifikasi klausul J4 PM (I) sisipan non-slip, strip
of differing backgrounds shall be deemed to be included pembagi, anglebeads logam dan lathing di kotak
with the item in which they occur. persimpangan latar belakang yang berbeda akan
dianggap termasuk dengan item di mana mereka terjadi.

Prices - Finishes Harga – Pelapisan


E Prices shall be deemed to include for: temporary
Harga akan dianggap termasuk untuk: alas sementara,
grounds, screeds and similar; bedding, grouting and
screed dan item serupa; bantalan/alas, bahan-bahan
pointing materials; cutting and/or making good around
grouting dan pointing; pemotongan dan / atau
pipes, sanitary fixtures and similar; labour to internal
kelengkapan di sekitar pipa, perlengkapan sanitasi dan
angles; curing of finished work; cleaning down and
yang sejenis; tenaga kerja untuk sudut internal;
polishing; covering, protecting and masking surfaces.
perawatan pekerjaan pelapisan; pembersihan dan
pemolesan; penutupan, pelindung dan penutupan
permukaan.

F Prices shall be deemed to include for narrow widths, Harga akan dianggap termasuk untuk rak yang lebar,
hacking, raking out joints or other preparation of base hacking, sambungan keluar atau persiapan lainnya dari
surface, joints between different types of materials, permukaan dasar, sambungan antara berbagai jenis
internal and external ceiling and wall angle beads bahan, langit-langit internal dan eksternal dan hiasan
sudut dinding

G Prices for skirtings are to include for all internal and Harga skirtings mencakup semua sudut internal dan
external angles. eksternal.

H Prices for tiling shall include for screeds and bedding,


pointing, grout and any fixing accessories. Harga untuk keramik harus mencakup untuk screed dan
penutup, pointing, nat dan setiap kelengkapan aksesoris.

I Prices for gypsum ceilings shall include for taped and Harga untuk langit-langit gipsum harus mencakup untuk
sealed joints, suspension systems, furring channels and pita dan perkat sambungan, sistem suspensi, furring
framing, casing beads, angles and trim. channel dan pembuatan rangka, casing beads, perapihan
sudut dan pinggiran.

file:///conversion/tmp/scratch/495999449.xlsx 45 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES (Cont'd) PENDAHULUAN (Lanj.)

PAINTING AND DECORATING PENGECATAN DAN PENDEKORASIAN


Prices - Painting and Decorating Harga - Pengecatan dan Dekorasi
A Prices for painting shall be deemed to include for: the
provision, erection and removal of scaffolding, Harga untuk pengecatan dianggap termasuk untuk:
preparation, rubbing down between coats and similar penyediaan, pemancangan dan pembongkaran perancah,
work, the protection and/or masking of floors, fittings persiapan, pengosokan antara pelapisan dan pekerjaan
and similar work, removing and replacing door and serupa, perlindungan dan / atau pelapisan lantai,
window furniture and removing splash and spray marks. perlengkapan dan pekerjaan serupa, pembongkaran dan
Prices for painting pipes and handrails shall include for penggantian pintu dan furniture jendela dan
painting pipe and handrail brackets. pembongkaran tanda-tanda splash dan semprot. Harga
untuk pengecatan pipa dan pegangan tangan harus
mencakup untuk pengecatan pipa dan pegangan braket.

MECHANICAL SERVICES INCLUDING PLUMBING


AND FIRE PLUMBING SERVICES LAYANAN MEKANIK TERMASUK PLUMBING DAN
LAYANAN PLUMBING PEMADAM KEBAKARAN
Method of Measurement - Mechanical Sevices Metode Pengukuran – Layanan Teknik
B In accordance with clause Q.2.2 of the Principles of Sesuai dengan klausul Q.2.2 Prinsip Pengukuran
Measurement (International) pipework fittings, size (International) kelengkapan pekerjaan pipa, diameter
50mm diameter or less, have not been measured ukuran 50mm atau kurang, belum diukur secara terpisah,
separately, and prices for pipework are deemed to dan harga untuk pipa yang dianggap termasuk untuk alat
include for the fittings. kelengkapannya.

Prices - Mechanical Services Harga - Layanan Teknik


C Prices for pipework shall be deemed to include for:
Harga untuk pekerjaan pipa akan dianggap termasuk
sockets, running joints, connectors, back nuts, nipples,
untuk: soket, sambungan berjalan (running joint),
connections, incidental fittings, clips, saddles, brackets,
konektor, back-nuts, nipple, koneksi, kelengkapan
straps, hangers, screws, nails, explosive and low
insidental, klip, sadel, kurungan/braket, tali, gantungan,
velocity tool fasteners and other metal fastening
sekrup, paku, pengencang alat velositas ledakan dan
anchors and/or systems and fixing complete including
rendah dan angkur pengencang logam lainnya dan / atau
cutting and forming holes, supplying and building in
sistem dan fixing lengkap termasuk pemotongan dan
sleeves.
pembentukan lubang, penyediaan dan pembuatan
lengan-lengan.

D Prices for pipework shall be deemed to include for any Harga untuk pekerjaan pipa akan dianggap termasuk
capped ends for future connections. untuk penutupan bagian ujung (capped ends) untuk
koneksi di masa depan.

ELECTRICAL SERVICES LAYANAN LISTRIK


Prices - Electrical Services Harga - Layanan Listrik
E Prices shall include for: screws, nails, bolts, nuts,
nipples, standard cable fixing or support clips, saddles, Harga akan meliputi untuk: sekrup, paku, baut, mur,
brackets, straps, plugs and similar items and all nipple, perlengkapan kabel standar atau klip penyangga,
incidental accessories. sadel, kurungan/braket, tali, plug/colokan dan item serupa
dan semua aksesoris insidental.

F Prices for work laid in trenches shall include for: Harga untuk peletakan pekerjaan di parit meliputi untuk:
excavation, maintaining faces of excavation, backfilling, penggalian, menjaga permukaan penggalian,
compaction, termite treatment where appropriate, cable pengurugan, pemadatan, perbaikan anti rayap bilamana
covers, warning tape and disposal of surplus spoil. dianggap tepat, penutupan kabel, pita peringatan dan
pembuangan kelebihan tanah/puing.

G Prices for electrical conduits, fittings, equipment and Harga untuk konduit listrik, kelengkapan, peralatan dan
similar items shall include for: all fixings to various item sejenis harus meliputi untuk: semua bahan
building surfaces. kelengkapan untuk berbagai permukaan bangunan.

H Prices for switchboards, distribution boards or


distribution panels shall include for: interwiring and Harga switchboards, papan distribusi atau panel distribusi
connections between components and between harus meliputi untuk: interwiring (pengkabelan internal)
components and control gear within the board. dan hubungan antara komponen dan antara komponen
dengan perlengkapan kendali di dalam papan.

file:///conversion/tmp/scratch/495999449.xlsx 46 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 2 - PREAMBLES

Item Item Description Deskripsi Item Amount


No.

PREAMBLES (Cont'd) PENDAHULUAN (Lanj.)

A Prices for cable carriers including trunkings, trays, Harga pengangkut kabel termasuk trunkings, trays,
troughing, ladders or similar items shall include for: stop troughing, tangga atau item serupa harus mencakup
ends, bends, junctions, off sets, reducers and similar untuk: ujung penghentian (stop ends), lengkungan
fittings. (bends), Kotak persimpangan (junction), off set, reducer
dan peralatan sejenis.

B Prices for cable carriers shall further include for: cutting


Harga untuk pengangkut kabel harus mencakup lebih
and jointing cable for carriers at fittings together with
lanjut untuk: pemotongan dan penyambungan kabel untuk
cutting or forming openings in cable carriers for
pengangkutan kelengkapan bersama-sama dengan
conduits, entries from equipment and control gear and
pemotongan atau pembentukan bukaan pada pengangkut
similar items; cradles, pinracks for supporting cables
kabel untuk konduit, pemasukkan dari peralatan dan gir
and similar items and suitable earthing.
kontrol dan item serupa; cradles, pinracks untuk
mengganjal kabel dan item serupa serta pembumian yang
sesuai.

C Prices for conduits shall include for: standard junction Harga untuk saluran/conduits harus mencakup untuk:
boxes and fittings and fixing conduits to or through all kotak kotak persimpangan standar dan konduit
building surfaces. kelengkapan dan perbaikan ke atau melalui semua
permukaan bangunan.

D Prices for cables shall include for: all cable supports and Harga untuk kabel harus mencakup untuk: semua
fixings; providing draw wires, draw cables and similar bantalan kabel dan pemasangan; penyediaan kabel tarik,
items for drawing or hoisting cables. penarikan kabel dan item serupa untuk menarik atau
mengangkat kabel.

E Prices for all switches, socket outlets and accessories


shall include for: wall boxes and similar items. Harga untuk semua saklar, soket outlet dan aksesoris
harus termasuk untuk: kotak dinding dan item serupa.

PREAMBLES

file:///conversion/tmp/scratch/495999449.xlsx 47 of 442
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

GENERALLY

A The following Bills of Quantities are a guide only. It is the responsibility


of the Tenderer to satisfy themselves of the accuracy of the description
for works requiring payment. The descriptions provided herein are for a
guide only as to the required scope of Works which form part of this
Contract and should be cross-referenced with all drawings and
specifications. All quantities, except those denoted "Item" are subject to
a re-measure based on the approved "for construction" drawings and
as per relevant provisions of the conditions of contract. The format
provided in these Bills should be followed in order to assist in tender
evaluation. Within each trade or section of works space is provided for
Tenderer to insert additional works items which require payment.

GENERALLY -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 48 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

SITEWORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SITEWORKS

SITE CLEARANCE
D Allow to excavate oversite to remove existing rubble and rubbish and 875 m2 18,450 16,143,750.00
top 100mm (min) vegetable soil and dispose off-site.

EXCAVATION

Bulk excavation for basement including disposal of surplus material to


an off-site location.

E Bulk excavation for basement incl. for 1:1 batter excavation from 1,557 m3 69,075 107,549,775.00
existing ground level to required reduced level (QS ASSUME) at
basement area.

F Ditto; but to STP. 3,747 m3 69,075 258,824,025.00

G Dittto; but to fuel tank. 848 m3 69,075 58,575,600.00

H Ditto; but to boiler room. 785 m3 69,075 54,223,875.00

J Ditto; but to water tank. 332 m3 69,075 22,932,900.00

Detailed excavation from ground level; including backfill and disposal


off site all surplus material or store select material for re-use where
required;

K Pilecaps. 92 m3 3,378,737 310,843,808.88

L Tie beams. 26 m3 3,380,945 87,904,558.04

BATTER

M Maintain face of excavated batters including temporary drainage. (QS 2,022 m2 -


ASSUME)

COMPACTION

Compact sub-grade from fill as specified under the following.

N Basement area including under pilecaps dan tie beams. 253 m2 114,206 28,894,153.42

P STP. 356 m2 114,206 40,657,385.84

Q Fuel tank. 80 m2 114,206 9,136,491.20

file:///conversion/tmp/scratch/495999449.xlsx Public area / 49 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

R Boiler room. 74 m2 114,206 8,451,254.36

S Water tank. 170 m2 114,206 19,415,043.80

file:///conversion/tmp/scratch/495999449.xlsx Public area / 50 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

SITEWORKS (CONT'D)

Mengisi

Backfill; including compaction compacted standard; as specificed by


the Engineer.

A To face of reinforced concrete RC wall. 2,971 m3 -

Sand bed layer, spread, levelled, and compacted as specified.

B 100mm thick sand bed layer under basement ground slab including 253 m2 -
pilecaps dan tie beams.

C STP. 356 m2 -

D Fuel tank. 80 m2 -

E Boiler room. 74 m2 -

F Water tank. 170 m2 -

KONTROL RAYAP

Anti-termite protection including testing and inspections.

G To face of all concrete surfaces in contact with earth. 1,431 m2 -

CUTTING OFF PILE HEADS

Cut-off top of bored piles including disposal to an off-site location to the


following.

H 500mm diameter bored pile. 129 No -

DEWATERING

J Allow to keep groundworks free of surface water as required during 1 Item -


excavation works.

OTHER WORKS

Other Works; Tenderer to insert here:

K _________________________

L _________________________

M _________________________

TOTAL SITEWORKS : 1,023,552,620.54

file:///conversion/tmp/scratch/495999449.xlsx Public area / 51 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

CONCRETE WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

D Ground slabs including pilecaps and tie beams 47 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

E Isolated columns. 38 m3 -

F Pilecaps. 92 m3 -

G Tie beams. 27 m3 -

H 300mm thick ground slab. 158 m3 -

J 250mm thick ground slab. 39 m3 -

K 200mm thick ground slab [Tunnel]. 51 m3 -

L 150mm thick suspended slab. 10 m3 -

M 250mm thick suspended roof slab. 17 m3 -

N 200mm thick suspended roof slab. 11 m3 -

P Attached beams. 4 m3 -

Q Attached roof beams. 4 m3 -

R 350mm thick RC wall [W3] 160 m3 -

S 300mm thick RC wall [W2] 85 m3 -

T 250mm thick Tunnel walls [W1] 133 m3 -

U Stair flights, stair landing and step. 7 m3 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 52 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

A Isolated columns. 15.50 t -

B Pilecap. 13.57 t -

C Tie beams. 15.12 t -

D Ground slab. 22.75 t -

E Suspended slab. 0.88 t -

F Suspended roof slab. 3.00 t -

G Attached beams. 1.54 t -

H Attached roof beams. 1.51 t -

J RC wall. 35.26 t -

K Tunnel walls. 14.41 t -

L Stair flights, stair landings and step. 1.46 t -

SHUTTERING

Shuttering, as specified to the following.

M Faces of isolated columns. 428 m2 -

N Side of pilecap. 196 m2 -

P Side of tie beams. 196 m2 -

Q Soffits of suspended slab. 54 m2 -

R Soffits of suspended roof slab. 109 m2 -

S Soffits and sides of beams. 40 m2 -

T Soffits and sides of roof beams. 35 m2 -

U Soffit of stair flights. 19 m2 -

V Soffit of stair landings. 10 m2 -

W Faces of RC walls. 1,475 m2 -

X Faces of Tunnel walls. 949 m2 -

Y Edges of ground slabs; not exceeding 300mm high. 394 m -

Z Edges of suspended slabs; not exceeding 150mm high. 36 m -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 53 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

A Edges of suspended roof slabs; not exceeding 250mm high. 65 m -

B Edges of stair landing slab; not exceeding 200mm high. 15 m -

C Edges of stair stringers; not exceeding 400mm high. 16 m -

D Faces undercut of stair risers; not exceeding 200mm high. 49 m -

OTHER WORKS

Other works; Tenderer to insert here:

E ___________________________

F ___________________________

G ___________________________

TOTAL CONCRETE WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 54 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

NON STRUCTURAL METAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

NON STRUCTURAL METAL WORKS

BALUSTRADES AND HANDRAILS

Steel balustrade and handrails; comprising steel handrail, post and


intermediate rails (4 rows), including base plate, anchor bolts, paint
finish, fixing and accessories, as specified as drawing A70-01 and 02.

D 1000mm high balustrade and handrail to Service core stair #1 and #2. 14 m -

OTHER WORKS

Other works; Tenderer to insert here:

E ___________________________

F ___________________________

G ___________________________

TOTAL NON-STRUCTURAL METAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 55 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Internally

D 100mm thick masonry walls generally. 36 m2 -

E 200mm thick masonry walls generally. 120 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

F ___________________________

G ___________________________

H ___________________________

TOTAL MASONRY AND PARTITIONS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 56 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

THERMAL AND MOISTURE PROTECTION

WATERPROOFING - INTERNALLY

Integral waterproofing 3CC ex. Cementaid or equal approved concrete


waterproofing admixture; all as per manufacturer's specification; to the
following R.C structures;

D Ground slabs, ground beams and pile caps. 373 m3 -

E Ditto; but to Wall basement. 362 m3 -

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

F Top of concrete slab to Fuel tank and Boiler room, Water tank and STP. 584 m2 -

G Ditto; but to Service core corridors. 171 m2 -

H Face of concrete wall to Fuel tank and Boiler room [3550mm high] 234 m2 -

J Ditto; but 3000mm high to perimeter Service core corridor. 493 m2 -

K Ditto; but 1500mm high to Water tank. 78 m2 -

L Ditto; but 6000mm high to STP. 422 m2 -

M Top of concrete slab to Service core toilet. 4 m2 -

N 300mm high upstand to form skirting at bathrooms. 6 m -

OTHER WORKS

Other works; Tenderer to insert here:

P ___________________________

Q ___________________________

R ___________________________

file:///conversion/tmp/scratch/495999449.xlsx Public area / 57 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

TOTAL THERMAL AND MOISTURE PROTECTION : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 58 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

D Doors hardware measured separately in 'IRONMONGERY'. Note

DOORS AND WINDOWS

INTERNAL DOORS AND WINDOWS

FIRE RATED STEEL DOORS AND FRAMES

Fire rated steel door; comprising 40mm thick steel door ex. Bostinco or
Lion metal or equal approved, including 50x150x1.5mm thick
electrolyte galvanised steel frame, fire retardant paint finish to door
leaves and frames, etc., as specified.

E 1000 wide x 2400mm high single swing door (MD03) to Service core 2 No -
entry.

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

F 900 wide x 2350mm high single swing door (TD06) to Core toilet. 2 No -

Solid timber frame; including paint finish, fixing and accessories, as


specified.

G 150-200 wide x 40mm thick solid timber frame to timber doors. :[2 No] 12 m -

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to the


following doors.

INTERNAL DOORS

FIRE RATED STEEL DOORS


To suit single swing door type MD03, hardware HW10.1 :
H Lever handle. 2 Pair -
J Heavy duty butt hinges (4 nos per door leaves); size 102, 15mm dia. 8 No -
knuckle, 3mm thick flange stainless steel satin finish ex. Startec (ST).

K Heavy duty lockset; mortise grade 1, keyed with deadbolt, 630 satin 2 No -
chrome-plated ex. Hafele (HA).
L Kick plate; exterior side only, 4301 Hoju stainless steel brushed finish 2 No -
ex. Hafele (HA).

file:///conversion/tmp/scratch/495999449.xlsx Public area / 59 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

M Floor mounted door stopper; stainless steel half-dome with mandrel 2 No -


PVD graphite black ex. Hafele (HA).

file:///conversion/tmp/scratch/495999449.xlsx Public area / 60 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

TIMBER DOORS

To suit single swing door type TD06, hardware HW6.0 :

A Lever handle; internal side. 2 No -


B Push plate; external side only, stainless steel brass finish ex. Startec 2 No -
(ST).
C Butt hinges; DHB 1160 stainless steel satin finish (4 nos per door 8 No -
leaves) ex. Startec (ST).
D Heavy duty lockset; mortise grade 1, keyed with deadbolt, stainless 2 No -
steel brushed nickel ex. Hafele (HA).
E Overhead door closer; TS3000V, EN 1-4 with guide rail ex. Hafele (HA). 2 No -

OTHER WORKS

Other works; Tenderer to insert here:

F ___________________________

G ___________________________

H ___________________________

TOTAL DOORS AND WINDOWS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 61 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

FINISHES

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

FINISHES

FLOOR FINISHES - INTERNALLY

D Epoxy paint measured in "Painting and Decorations". Note

Ceramic floor tiles with polished/unpolished finish, including setting


bed/levelling screed, adhesive, grouting, as specified, to :

E 600 x 600mm ceramic floor tiles (TL01) to Service toilet. 4 m2 -

F 600 x 600mm ceramic floor tiles (TL03) to Boiler room, Fuel tank, and 584 m2 -
STP.

Levelling screed to receive Epoxy paint floor (measured separately), as


specified as drawing A91-01.

G 50mm thick levelling screed to Service corridor. 171 m2 -

H Ditto; but to Stair landing to Service stair #1 and #2. 10 m2 -

J Ditto; but to Stair treads and risers to above. 77 m -

WALL FINISHES - INTERNALLY

Ceramic wall tiles with polished finish, including backing, adhesive,


grouting, as specified, to :

K 600 x 600mm wall tiles (TL01) to Service core toilet. 18 m2 -

L 600 x 600mm wall tiles (TL03) to Boiler room, Fuel tank, and STP. 1,149 m2 -

15mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

M Masonry walls generally. 276 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

N Face of concrete columns and walls to Service corridor. 493 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 62 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

Microtopping wall finish (M05), including 20mm thick backing screed


(approx.), smooth finish, as specified, to :

P Water tank wall. 104 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 63 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

CEILING FINISHES - INTERNALLY

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

A Soffit of concrete slab to Service corridor, Toilet, Fuel tank, Boiler room, 616 m2 -
and STP.

B Sloping soffit of stair flights and landings at Stairs. 26 m2 -

C Faces of stair stringers; not exceeding 300mm high at Stairs. 13 m -

D Extra over for finishes to beam sides. 193 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

E ___________________________

F ___________________________

G ___________________________

TOTAL FINISHES : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 64 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

PAINTING AND DECORATIONS

FLOORS

Epoxy paint finish, as specified, to :

D Service corridor and lift lobbies. 171 m2 -

E Stair landing to Service stair #1 and #2. 10 m2 -

F 300mm wide stair treads. 36 m -

G 180mm high stair risers. 41 m -

H 300mm high skirting to above areas (as drawing A91-01). 200 m -

WALLS

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

J Rendered masonry walls and Skim coated concrete walls/columns. 769 m2 -

CEILINGS

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

K Skim coated ceilings (CF05). 835 m2 -

L Faces of stair stringers; not exceeding 300mm high at Stairs. 4 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

M ___________________________

N ___________________________

P ___________________________

TOTAL PAINTING AND DECORATIONS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 65 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

ACCESSORIES AND FITMENTS

D Measured in PROVISIONAL SUMS. Note

OTHER WORKS

Other works; Tenderer to insert here:

E ___________________________

F ___________________________

G ___________________________

TOTAL ACCESSORIES AND FITMENTS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 66 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

SANITARY FIXTURES AND FITTINGS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
TOTO or equal approved, including all associated fittings and
accessories.

Core toilet
D Wall hung toilet. 2 No -
E Lavatory with faucet. 2 No -
F Toilet paper holder. 2 No -
G Robe hook. 2 No -
H Floor drain. 2 No -

OTHER WORKS

Other works; Tenderer to insert here:

J ___________________________

K ___________________________

L ___________________________

TOTAL SANITARY FIXTURES AND FITTINGS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 67 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.1 - BASEMENT

No. Description Quantity Unit Rate Total

SUMMARY

A GENERALLY

B SITEWORKS 1,023,552,620.54

C CONCRETE WORKS -

D STRUCTURAL METAL WORKS N/A

E NON STRUCTURAL METAL WORKS -

F MASONRY AND PARTITIONS -

G THERMAL AND MOISTURE PROTECTION -

H DOORS AND WINDOWS -

J FINISHES -

K PAINTING AND DECORATIONS -

L ACCESSORIES AND FITMENTS INCL. PROV. SUM

M SANITARY FIXTURES AND FITTINGS -

TOTAL BASEMENT : 1,023,552,620.54

file:///conversion/tmp/scratch/495999449.xlsx Public area / 68 of 442


ANALISA HARGA SATUAN PEKERJAAN
DATA PEMBAHARUAN & PENYESUAIAN 2017-2018

No. Uraian Pekerjaan Sat. Koef. Harga Satuan Jumlah


(Rp) (Rp)
1 2 3 5 6
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi m2 1.000
Pekerja OH 0.100 85,500.00 8,550.00
Mandor OH 0.050 198,000.00 9,900.00
Jumlah 18,450.00
2 Galian Tanah Biasa Sedalam 1m m3 1.000

Pekerja OH 0.750 85,500.00 64,125.00


Mandor OH 0.025 198,000.00 4,950.00
Jumlah 69,075.00
3 Bekisting Untuk Pile Cap m2 1.000
Batako Ukuran 9 x 19 x 39 cm bh 14.000 2,300.00 32,200.00
Pasir Pasang m3 0.027 169,100.00 4,565.70
Semen PC Kg 7.500 1,200.00 9,000.00
Pekerja HO 0.320 85,500.00 27,360.00
Tukang Batu HO 0.100 109,300.00 10,930.00
Kepala Tukang Batu HO 0.010 133,200.00 1,332.00
Mandor/Pengawas HO 0.005 198,000.00 990.00
Jumlah 86,377.70
4 Bekisting Untuk Sloof, Kolom, Ring m2 1.000
Praktis
Kayu meranti papan (MC) m3 0.022 1,890,000.00 41,580.00
Kayu meranti usuk m3 0.002 3,498,000.00 6,996.00
Paku biasa 2"- 5" kg 0.300 15,900.00 4,770.00
Minyak Begesting ltr 0.100 7,100.00 710.00
Jumlah bahan 54,056.00
Pekerja OH 0.520 85,500.00 44,460.00
Tukang Kayu OH 0.260 109,300.00 28,418.00
Kepala Tukang Kayu OH 0.026 133,200.00 3,463.20
Mandor OH 0.026 198,000.00 5,148.00
Jumlah upah 81,489.20
Bahan 0.500 54,056.00 27,028.00
Begesting 2x
pakai
1.000 81,489.20 81,489.20

Jumlah begesting 2 x pakai 108,517.20


5 Beton Poer PC-2 m3 1.000
Beton K300 m3 1.000 1,021,595.92 1,021,595.92
5

Begesting m2 3.790 86,377.70 327,371.48


Besi beton polos U24 kg 57.750 12,930.04 746,709.81
Besi beton ulir U39 kg 96.871 13,245.04 1,283,059.84
Jumlah 3,378,737.05
6 Beton Sloof S-1 40/70 m3 1.000
Beton K300 m3 1.000 1,021,595.92 1,021,595.92
Begesting 2x pakai m2 5.000 108,517.20 542,586.00
Besi beton polos U24 kg 49.193 12,930.04 636,061.92
Besi beton ulir U39 kg 89.143 13,245.04 1,180,700.71
Jumlah 3,380,944.54
7 Urugan Tasirtu m3 1.000
Tasirtu m3 1.200 96,100.00 115,320.00
Sewa stemper hari 0.009 100,000.00 900.00
Pekerja OH 0.250 85,500.00 21,375.00
Mandor OH 0.025 198,000.00 4,950.00
Jumlah 142,545.00
8 Urugan Tanah Kembali m3 1.000
Pekerja OH 0.102 85,500.00 8,721.00
Mandor OH 0.019 198,000.00 3,762.00
Jumlah 12,483.00
9 Pasang Dinding Bata 1:3 1/2 Bata m2 1.000

Batu Bata Merah bh 70.000 700.00 49,000.00


Semen Portland 50 kg zak 0.287 61,100.00 17,560.14
Pasir Pasang m3 0.040 169,100.00 6,764.00
Pekerja OH 0.300 85,500.00 25,650.00
Tukang Batu OH 0.100 109,300.00 10,930.00
Kepala Tukang Batu OH 0.010 133,200.00 1,332.00
Mandor OH 0.015 198,000.00 2,970.00
Jumlah 114,206.14
Jumlah 1 m3 8.330 114,206.14 951,337.15
ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

GENERALLY

A The following Bills of Quantities are a guide only. It is the responsibility


of the Tenderer to satisfy themselves of the accuracy of the description
for works requiring payment. The descriptions provided herein are for a
guide only as to the required scope of Works which form part of this
Contract and should be cross-referenced with all drawings and
specifications. All quantities, except those denoted "Item" are subject to
a re-measure based on the approved "for construction" drawings and
as per relevant provisions of the conditions of contract. The format
provided in these Bills should be followed in order to assist in tender
evaluation. Within each trade or section of works space is provided for
Tenderer to insert additional works items which require payment.

TOTAL GENERALLY : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 71 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

SITEWORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SITEWORKS

SITE CLEARANCE
D Allow to excavate oversite to remove existing rubble and rubbish and 2,671 m2 18,450 49,279,950.00
top 100mm (min) vegetable soil and dispose off-site.

EXCAVATION

Detailed excavation from ground level; including backfill and disposal


off site all surplus material or store select material for re-use where
required.

E Pilecaps. 87 m3 -

F Ground slabs. 340 m3 -

G Tie beams. 69 m3 -

COMPACTION

Compact sub-grade from fill as specified under the following.

H Ground slabs including pilecaps and tie beams 2,257 m2 -

FILLING

Sand bed layer, spread, levelled, and compacted as specified.

J 100mm thick sand bed layer under ground slabs including pilecaps and 2,257 m2 -
tie beams

TERMITE CONTROL

Anti-termite protection including testing and inspections.

K To face of all concrete surfaces in contact with earth. 3,105 m2 -

CUTTING OFF BORED PILES

Cut-off top of bored piles including disposal to an off-site location to the


following.

L 500mm diameter bored pile. 144 No -

OTHER WORKS

Other Works; Tenderer to insert here:

M _________________________

file:///conversion/tmp/scratch/495999449.xlsx Public area / 72 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

N _________________________

P _________________________

TOTAL SITEWORKS : 49,279,950.00

file:///conversion/tmp/scratch/495999449.xlsx Public area / 73 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

CONCRETE WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

D Ground slabs including pilecaps and tie beams 113 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

F Isolated columns. 83 m3 -

G Pilecaps. 87 m3 -

H Tie beams. 69 m3 -

J 200mm thick ground slab. 26 m3 -

K 150mm thick ground slab. 248 m3 -

L 130mm thick ground slab. 62 m3 -

M 200mm thick suspended slab. 10 m3 -

N 150mm thick suspended slab. 30 m3 -

P 130mm thick suspended slab. 22 m3 -

Q 220mm thick suspended roof slab. 141 m3 -

R 200mm thick suspended roof slab. 256 m3 -

S Attached beams. 10 m3 -

T Attached roof beams. 92 m3 -

U 250mm thick Shearwall. 20 m3 -

V 250mm thick RC walls. 62 m3 -

W 150mm thick upstand and fascia walls (as drawing S3-01/B1; sect- 66 m3 -
E.1F) at roof.

X Stair flights, stair landing, beams and step to SC1 stair. 7 m3 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 74 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

A Isolated columns. 27.48 t -

B Pilecaps. 11.10 t -

C Tie beams. 26.56 t -

D Ground slab. 35.95 t -

E Suspended slab. 6.36 t -

F Suspended roof slab. 38.14 t -

G Attached beams. 4.59 t -

H Attached roof beams. 34.20 t -

J Shearwalls. 1.45 t -

K RC wall. 5.95 t -

L Upstand and fascia walls at roof. 9.04 t -

M Stair flights, stair landing, beams and step to SC1 stair. 1.61 t -

SHUTTERING

Shuttering, as specified to the following.

N Faces of isolated columns. 921 m2 -

P Side of pilecaps. 270 m2 -

Q Side of tiebeams. 532 m2 -

R Soffits of suspended slab. 372 m2 -

S Soffits of suspended roof slab. 1,733 m2 -

T Soffits and sides of beams. 114 m2 -

U Soffits and sides of roof beams. 902 m2 -

V Soffit of stair flight. 15 m2 -

W Soffit of stair landing and beams. 15 m2 -

X Faces of Shearwalls. 154 m2 -

Y Faces of RC walls. 495 m2 -

Z Faces of upstand and fascia walls at roof. 887 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 75 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

A Edges of ground slabs; not exceeding 200mm high. 224 m -

B Edges of suspended slabs and roof; not exceeding 220mm high. 324 m -

C Edges of stair stringers; not exceeding 400mm high. 25 m -

D Faces undercut of stair risers; not exceeding 180mm high. 44 m -

OTHER WORKS

Other works; Tenderer to insert here:

E ___________________________

F ___________________________

G ___________________________

TOTAL CONCRETE WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 76 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

NON STRUCTURAL METAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

NON STRUCTURAL METAL WORKS

BALUSTRADES AND HANDRAILS

Steel balustrade and handrails; comprising steel handrail, post and


intermediate rails (4 rows), including base plate, anchor bolts, paint
finish, fixing and accessories, as specified as drawing A70-01 and 02.

D 1000mm high balustrade and handrail to Service core stair #1. 7 m -

Timber and glazed balustrade; comprising 16mm thick clear tempered


glass railing, including 30 wide x 6mm thick rounded edge timber
handrail, copper finish railing insert, 240 high x 25mm thick timber
fascia with finish, support frame, U-channel stainless steel, sealants,
etc, as specified as drawing A71-01 and A82-01.

E 1270mm high balustrade to roof area. 78 m -

SKYLIGHT

Glazed skylight; comprising --mm thick double glazed skylight,


including support frame, structural steelwork, sealants, fixing and
accessories, as specified as drawing A41-01-01.

F 2100 x 2100mm wide skylight. 1 No -

G 3200 x 3500mm wide skylight. 1 No -

H 3900 x 3900mm wide skylight. 1 No -

PERGOLA

Pergola; comprising polycarbonate roof sheet, including spyder system


support, bamboo structure for beams, finishes, fixing and accessories,
as specified as drawing A51-01, to :

J Meeting room and Restaurant terrace. 192 m2 -

Sundries

K Extra over for 3450mm high bamboo columns to pergola support, 12 No -


including all associated works.

file:///conversion/tmp/scratch/495999449.xlsx Public area / 77 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

NON STRUCTURAL METAL WORKS (CONT'D)

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL NON-STRUCTURAL METAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 78 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Externally

D 100mm thick masonry walls generally. 75 m2 -

E 200mm thick masonry walls generally. 442 m2 -

F 300mm thick cavity masonry walls generally. 52 m2 -

Internally

G 100mm thick masonry walls generally. 954 m2 -

H 200mm thick masonry walls generally. 1,475 m2 -

J 300mm thick cavity masonry walls generally. 233 m2 -

K 1500 high x 200mm thick backwall to urinal and water closet (QS 17 m -
ASSUMED SIZE).

OTHER WORKS

Other works; Tenderer to insert here:

L ___________________________

M ___________________________

N ___________________________

TOTAL MASONRY AND PARTITIONS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 79 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Integral waterproofing 3CC ex. Cementaid or equal approved concrete


waterproofing admixture; all as per manufacturer's specification; to the
following R.C structures;

D Suspended roof slab (as drawing S2.03A/B1). 397 m3 -

Membrane waterproofing; comprising 1.2mm Uniroof Hypalon synthetic


membrane sheet or equal approved, including protective screed with
smooth finish and wiremesh (measured net - including laps), sand bed,
mastic, adhesives, primers, sealant etc. installed per manufacturer's
recommendations, to :

E Top of concrete roof slab. 1,796 m2 -

F Ditto; but to concrete slab at external terraces. 248 m2 -

G 150mm to 1350mm high roof upstand (as drawing A40-01-02). 664 m2 -

WATERPROOFING - INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

H Top of concrete slab to Kitchen, Changing rooms, Pump room, 1,114 m2 -


Electrical room, Gas, Telcom, Garbage area, Laundry, Goods and
Beverage.

J 300mm high upstand to form skirting (as drawing A91-01). 769 m -

K Face of concrete wall to Water tank [4625mm high]. 240 m2 -

L Ditto; but to Pump room [1800mm high] (PROVISIONAL QUANTITY). 149 m2 -

Cement based waterproofing, including primers etc. all as specified, to :

file:///conversion/tmp/scratch/495999449.xlsx Public area / 80 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

M Face of rendered masonry / concrete walls to shower room at Staff 41 m2 -


changing rooms [1800mm high].

file:///conversion/tmp/scratch/495999449.xlsx Public area / 81 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION (CONT'D)

INSULATION

Insulation; comprising 50mm thick expanded polystryene insulation,


including fixing and accessories, as specified, to :

A Top of concrete roof slab. 1,796 m2 -

GREEN ROOF SYSTEM

Green roof system; comprising drainage cell, geotextile layer, including


washed sand, growing media, membrane protection and root barrier,
insulation, fixing and accessories, as specified. (Note : Membrane to
roof measured separately)

B Top of concrete roof slab. 1,051 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

C ___________________________

D ___________________________

E ___________________________

TOTAL THERMAL AND MOISTURE PROTECTION : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 82 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

WOODWORK

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

WOODWORK

BALUSTRADE AND HANDRAILS

Timber balustrade; comprising decorative solid timber post, including


30 wide x 6mm thick rounded edge timber handrail, copper finish railing
insert, 240 high x 25mm thick timber fascia with finish, support frame,
U-channel stainless steel, sealants, etc, as specified as drawing A71-
01 and A82-01.

D 1270mm high balustrade to green roof area. 85 m -

ROOF TRELLIS

Roof timber trellis; comprising 60x150mm thick solid timber batten fixed
to wall, including support frame, finishes, fixing and accessories, as
specified as drawing A41-01-03, to :

E Roof covering terraces. 21 m2 -

SCREEN

Timber bar screen; comprising 20x50mm thick Ulin wood, including


30x60x150mm high Ulin wood batten pattern, 2mm thick copper
cladding and frame, metal plate connection, tenon, base track, fixing
and accessories, as specified as drawing A52-06 and A97-01 Detail 02
and 05.

F 5920 wide x 2350mm high screen (SF01) to Meeting room and 2 No -


Restaurant at Ground floor.

OTHER WORKS

Other works; Tenderer to insert here:

G ___________________________

H ___________________________

J ___________________________

TOTAL WOODWORK : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 83 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

D Doors hardware measured separately in 'IRONMONGERY'. Note

DOORS AND WINDOWS

EXTERNAL DOORS AND WINDOWS

FIRE RATED STEEL DOORS AND FRAMES

Fire rated steel door; comprising 40mm thick steel door ex. Bostinco or
Lion metal or equal approved, including 50x150x1.5mm thick
electrolyte galvanised steel frame, fire retardant paint finish to door
leaves and frames, etc., as specified.

E 1000 wide x 2400mm high single swing door (MD03) to Gas room, Stair 3 No -
#1 and Corridor entry at Ground floor.

F 2000 wide x 2400mm high double swing door (MD04) to Control room, 5 No -
Pump room, Garbage and Laundry at Ground floor.

GLAZED DOORS AND FIXED WINDOWS

Glazed door and fixed windows; comprising 8mm thick single clear
tempered glass panel, aluminium transom and mullion in bronze
powder coated finish, including sealants, fixing and accessories.

G Overall size, 6350 wide x 3200mm high fixed window to receive 3300 1 No -
wide x 3200mm high single sliding door (GD01) to Restaurant at
Ground floor.

GLAZED DOORS

Folding glazed door; comprising 8mm thick single clear tempered glass
panel, aluminium transom and mullion in bronze powder coated finish,
including sealants, fixing and accessories.

H Overall size, 15600 wide x 3200mm high folding glazed door (GD02) 1 No -
(12 nos of leaves) to Restaurant at Ground floor.

J Overall size, 8550 wide x 3200mm high folding glazed door (GD03) (8 1 No -
nos of leaves) to Meeting room at Ground floor.

file:///conversion/tmp/scratch/495999449.xlsx Public area / 84 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

K Overall size, 8550 wide x 3200mm high folding glazed door (GD04) (8 1 No -
nos of leaves) to Meeting room at Ground floor.

file:///conversion/tmp/scratch/495999449.xlsx Public area / 85 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

Glazed door; comprising 8mm thick single clear tempered glass panel,
aluminium transom and mullion in bronze powder coated finish,
including sealants, fixing and accessories.

A 1280 wide x 3200mm high single sliding door (GD05) to Restaurant 1 No -


entry at Ground floor.

WINDOW AND FRAMES

Fixed windows; comprising 8mm thick single clear tempered glass


panel, aluminium transom and mullion in bronze powder coated finish,
including sealants, fixing and accessories.

B 5950 wide x 3200mm high window (FG01) to Restaurant at Ground 1 No -


floor.

C Ditto; but type FG02 to Meeting room at Ground floor. 1 No -

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

D 900 wide x 2350mm high single swing door (TD05) to Toilet entry at 3 No -
Ground floor.

Solid timber frame; including paint finish, fixing and accessories, as


specified.

E 150-200 wide x 40mm thick solid timber frame to timber doors. :[1 No] 18 m -

INTERNAL DOORS AND WINDOWS

FIRE RATED STEEL DOORS AND FRAMES

Fire rated steel door; comprising 40mm thick steel door ex. Bostinco or
Lion metal or equal approved, including 50x150x1.5mm thick
electrolyte galvanised steel frame, fire retardant paint finish to door
leaves and frames, etc., as specified.

F 1000 wide x 2400mm high single swing door (MD03) to general BOH 34 No -
areas at Ground floor.

G 2000 wide x 2400mm high double swing door (MD04) to Good 2 No -


management and Laundry at Ground floor.

H 1500 wide x 2400mm high single sliding pocket door (MD07) to 2 No -


Meeting room service entry at Ground floor.

Fire rated steel door with viewing glass; comprising 40mm thick steel
door ex. Bostinco or Lion metal or equal approved, including 200 wide x
500 high x 8mm thick clear tempered viewing glass, 50x150x1.5mm
thick electrolyte galvanised steel frame, fire retardant paint finish to
door leaves and frames, sealants, etc., as specified.

J 1800 wide x 2400mm high double swing door (MD01) to Kitchen 2 No -


corridor and Garbage room at Ground floor.

file:///conversion/tmp/scratch/495999449.xlsx Public area / 86 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

K Ditto; but type MD06 to Kitchen corridor at Ground floor. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 87 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

A 900 wide x 2350mm high single swing door (TD06) to Core toilet at 1 No -
Ground floor.

B 1195 wide x 3150mm high single swing door (TD14L) to Meeting room 3 No -
door storage at Ground floor.

Solid timber frame; including paint finish, fixing and accessories, as


specified.

C 150-200 wide x 40mm thick solid timber frame to timber doors. :[3 No] 23 m -

SUNDRIES

D 3200mm ceiling height moveable partition to Meeting room, complete 14 m2 -


with finishes and hardware (PROVISIONAL QUANTITY).

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to the


following doors.

EXTERNAL DOORS

FIRE RATED STEEL DOORS

To suit single swing door type MD03, hardware HW10.1 :


E Lever handle. 3 Pair -
F Heavy duty butt hinges (4 nos per door leaves); size 102, 15mm dia. 12 No -
knuckle, 3mm thick flange stainless steel satin finish ex. Startec (ST).

G Heavy duty lockset; mortise grade 1, keyed with deadbolt, 630 satin 3 No -
chrome-plated ex. Hafele (HA).
H Kick plate; external side only, 4301 Hoju stainless steel brushed finish 3 No -
ex. Hafele (HA).
J Floor mounted door stopper; stainless steel half-dome with mandrel 3 No -
PVD graphite black ex. Hafele (HA).

To suit double swing door type MD04, hardware HW9.0 :


K Lever handle; RFID door lock combination; Vingcard flex ex. Assa 8 Set -
abloy (ASL).
L Heavy duty butt hinges (4 nos per door leaves); DHX1160HD flush 32 No -
type, stainless steel brushed finish ex. Hafele (HA).
M Hook bolt with mortise lock; Symo, nickel plated ex. Hafele (HA). 4 No -
N Flush bolt; top and bottom, square 285mm with folding lever bar 16 No -
connection M10,stainless steel matt finish ex. Hafele (HA).
P Kick plate; both side, 4301 Hoju stainless steel brushed finish ex. 8 No -
Hafele (HA).
Q Floor mounted door stopper; stainless steel half-dome with mandrel 8 No -
PVD graphite black ex. Hafele (HA).

To suit double swing door type MD04, hardware HW9.1 : (Garbage


room only)
R Lever handle; to be provided by metal door manufacturer. 2 Pair -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 88 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

S Heavy duty butt hinges (4 nos per door leaves); DHX1160HD flush 8 No -
type, stainless steel brushed finish ex. Hafele (HA).
T Hook bolt with mortise lock; Symo, nickel plated ex. Hafele (HA). 1 No -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 89 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

A Flush bolt; top and bottom, square 285mm with folding lever bar 4 No -
connection M10,stainless steel matt finish ex. Hafele (HA).
B Kick plate; external side only, 4301 Hoju stainless steel brushed finish 2 No -
ex. Hafele (HA).
C Door stopper; KWS model 1046, 120mm ex. Hafele (HA). 2 No -

GLAZED DOORS

To suit single sliding door type GD01 :


D Handle. 1 Pair -
E Lockcase. 1 No -
F Sliding track, L=6350mm. 1 Set -

To suit folding-sliding door type GD02 [12 no of leaves]:


G Handle. 1 Pair -
H Lockcase. 1 No -
J Sliding track, L=15000mm. 1 No -

To suit folding-sliding door type GD03 [8 no of leaves]:


K Handle. 1 Pair -
L Lockcase. 1 No -
M Sliding track, L=8550mm. 1 No -

To suit folding-sliding door type GD04 [8 no of leaves]:


N Handle. 1 Pair -
P Lockcase. 1 No -
Q Sliding track, L=8550mm. 1 No -

To suit single sliding door type GD05 :


R Handle. 1 Pair -
S Lockcase. 1 No -
T Sliding track, L=1280mm. 1 No -

TIMBER DOORS

To suit single swing door type TD05, hardware HW3.1 :


U Handle; internal side, Carlo 600mm stainless steel brass finish ex. 3 No -
Startec (ST).
V Push plate; external side, stainless steel brass finish ex. Startec (ST). 3 No -

W Concealed hinges (4 nos per door leaves); TE240 3D satin brass 047 12 No -
ex. Tectus (TE).
X Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 3 No -
heath (SH).

INTERNAL DOORS

FIRE RATED STEEL DOORS


To suit double swing door type MD01, hardware HW9.1 :
Y Lever handle; to be provided by metal door manufacturer. 4 Pair -
Z Heavy duty butt hinges (4 nos per door leaves); DHX1160HD flush 16 No -
type, stainless steel brushed finish ex. Hafele (HA).
AA Hook bolt with mortise lock; Symo, nickel plated ex. Hafele (HA). 2 No -
AB Flush bolt; top and bottom, square 285mm with folding lever bar 8 No -
connection M10,stainless steel matt finish ex. Hafele (HA).
AC Kick plate; external side only, 4301 Hoju stainless steel brushed finish 4 No -
ex. Hafele (HA).
AD Door stopper; KWS model 1046, 120mm ex. Hafele (HA). 4 No -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 90 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

To suit single swing door type MD03, hardware HW10.0 : (Goods


management entry and Fire-CCTV server room only)
A Lever handle with RFID door lock combination; Vingcard flex ex. Assa 2 Set -
abloy (ASL).
B Heavy duty hinges (4 nos per door leaves); DHX1160HD flush type, 8 No -
stainless steel brushed finish, ex. Startec (ST).
C Kick plate; both side, 4301 Hoju stainless steel brushed finish ex. 4 No -
Hafele (HA).
D Door closer; TS98 XEA GSR with guide rails EN1-6 ex. Dorma (DM). 2 No -

E Floor mounted door stopper; stainless steel half-dome with mandrel 2 No -


PVD graphite black ex. Hafele (HA).

To suit single swing door type MD03, hardware HW10.1 :


F Lever handle. 30 Pair -
G Heavy duty butt hinges (4 nos per door leaves); size 102, 15mm dia. 120 No -
knuckle, 3mm thick flange stainless steel satin finish ex. Startec (ST).

H Heavy duty lockset; mortise grade 1, keyed with deadbolt, 630 satin 30 No -
chrome-plated ex. Hafele (HA).
J Kick plate; external side only, 4301 Hoju stainless steel brushed finish 30 No -
ex. Hafele (HA).
K Floor mounted door stopper; stainless steel half-dome with mandrel 30 No -
PVD graphite black ex. Hafele (HA).

To suit double swing door type MD04, hardware HW9.0 :


L Lever handle; RFID door lock combination; Vingcard flex ex. Assa 2 Set -
abloy (ASL).
M Heavy duty butt hinges (4 nos per door leaves); DHX1160HD flush 16 No -
type, stainless steel brushed finish ex. Hafele (HA).
N Hook bolt with mortise lock; Symo, nickel plated ex. Hafele (HA). 2 No -
P Flush bolt; top and bottom, square 285mm with folding lever bar 8 No -
connection M10,stainless steel matt finish ex. Hafele (HA).
Q Kick plate; both side, 4301 Hoju stainless steel brushed finish ex. 8 No -
Hafele (HA).
R Floor mounted door stopper; stainless steel half-dome with mandrel 4 No -
PVD graphite black ex. Hafele (HA).

To suit single sliding door type MD07, hardware HW21.1 :


S Header track sliding system; PEMKO H44OA-OH finish by 2 Set -
manufacturer ex. Assa abloy (ASL).
T Door lock; RFID Vingcard flex ex. Assa abloy (ASL). 2 Set -
U Lockset for inactive door; PEMKO 1422 LaFonte lock, SIM150 lock with 2 No -
split key and edge pull, or mortise lock case with strike and pull 10B in
brass satin finish ex. Assa abloy (ASL) or Hafele (HA).

To suit double swing door type MD06, hardware HW11 :


V Push plate; stainless steel satin finish ex. Hafele (HA). 2 Pair -
W Double action floor spring with top pivot hinges; EN3 or EN4 ex. Startec 4 No -
(ST).
X Flush bolt; top and bottom, square 285mm with folding lever bar 2 No -
connection M10,stainless steel matt finish ex. Hafele (HA).
Y Kick plate; both side, 4301 Hoju stainless steel brushed finish ex. 4 No -
Hafele (HA).
Z Finger protection blinds; Swing guard A, Athmer ex. Hafele (HA). 2 No -

TIMBER DOORS

To suit single swing door type TD06, hardware HW6 :


AA Lever handle; internal side. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 91 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

AB Push plate; external side only, stainless steel brass finish ex. Startec 1 No -
(ST).
AC Butt hinges; DHB 1160 stainless steel satin finish (4 nos per door 4 No -
leaves) ex. Startec (ST).

file:///conversion/tmp/scratch/495999449.xlsx Public area / 92 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

A Heavy duty lockset; mortise grade 1, keyed with deadbolt, stainless 1 No -


steel brushed nickel ex. Hafele (HA).
B Overhead door closer; TS3000V, EN 1-4 with guide rail ex. Hafele 1 No -
(HA).

To suit single swing door type TD14, hardware HW8 :


C Rotary handle with mortise lock; CES 6037/31, satin brass finish ex. 3 Set -
Hafele (HA).
D Concealed hinges (4 nos per door leaves); TE340 3D satin brass finish 12 No -
#047 ex. Startec (ST).

OTHER WORKS

Other works; Tenderer to insert here:

E ___________________________

F ___________________________

G ___________________________

TOTAL DOORS AND WINDOWS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 93 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

FINISHES

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

FINISHES

FLOOR FINISHES - EXTERNALLY

D External floor finishes measured separately in "Shared external areas" Note


unless otherwise noted.

E Lavastone pebbles to roof measured separately in "External works". Note

Ceramic floor tiles with polished/unpolished finish, including setting


bed/levelling screed, adhesive, grouting, as specified, to :

F 600 x 600mm ceramic floor tiles (TL05) to Guest toilet terrace. 9 m2 -

FLOOR FINISHES - INTERNALLY

G Epoxy paint measured in "Painting and Decorations". Note

Ceramic floor tiles with polished/unpolished finish, including setting


bed/levelling screed, adhesive, grouting, as specified, to :

H 600 x 600mm ceramic floor tiles (TL01) to Service toilet. 3 m2 -

J Ditto; but to Staff changing room, Employee facilities and toilet. 344 m2 -

K 600 x 600mm ceramic floor tiles (TL02) to Garbage room and Kitchen. 192 m2 -

L 600 x 600mm ceramic floor tiles (TL04) to Pastry room. 30 m2 -

M 600 x 600mm ceramic floor tiles (TL05) to Guest toilet and Disable 53 m2 -
toilet.

N Ditto; but to Janitor. 1 m2 -

Microtopping (M04), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

P Meeting room and Restaurant. 416 m2 -

Levelling screed to receive Epoxy paint floor (measured separately), as


specified as drawing A91-01.

file:///conversion/tmp/scratch/495999449.xlsx Public area / 94 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

Q 50mm thick levelling screed to BOH area, MEP room and Service 1,172 m2 -
corridor.

file:///conversion/tmp/scratch/495999449.xlsx Public area / 95 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

FINISHES (CONTD')

A Ditto; but to Stair landing to Service core stair #1. 5 m2 -

B 300mm wide stair treads. 20 m -

C 180mm high stair risers. 22 m -

WALL FINISHES - EXTERNALLY

Stone wall tiles with polished finish (ST06), including backing,


adhesive, grouting, as specified, to :

D Guest toilet terrace wall. 26 m2 -

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

E Masonry walls generally. 543 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

F Face of concrete columns and walls to Service corridor. 329 m2 -

WALL FINISHES - INTERNALLY

Stone wall tiles with polished finish (ST05); comprising 15mm thick
stone, including backing, adhesive, grouting, as specified, to :

G Guest toilet and Disable toilet. 160 m2 -

H 200mm wide stone ledge to backwall. (PROVISIONAL SUM) 17 m -

Ceramic wall tiles with polished finish, including backing, adhesive,


grouting, as specified, to :

J 600 x 600mm wall tiles (TL01) to Service core toilet. 18 m2 -

K Ditto; but to Staff changing room and toilet. 488 m2 -

L 600 x 600mm wall tiles (TL07) to Kitchen. 114 m2 -

M Ditto; but to Display kitchen. 31 m2 -

15mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

N Masonry walls generally. 5,120 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

P Face of concrete columns and walls to general areas. 671 m2 -

Microtopping wall finish (M05), including backing screed (approx.),


smooth finish, as specified, to :

Q Garbage room. 207 m2 -

R Water tank. [4625mm high only] 240 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 96 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

CEILING FINISHES - EXTERNALLY

A No external ceiling finishes. Note

CEILING FINISHES - INTERNALLY

Flush gypsum board ceiling (CF01); 10mm thick gypsum board ceiling,
taped and sanded and prepare smooth to receive paint finish (paint
finish measured separately), including aluminium shadow line, metal
furring framing and fixing accessories, as specified, to :

B Meeting room and Restaurant. 416 m2 -

C Employee facilities. 99 m2 -

D Staff changing rooms. 125 m2 -

E Training room and HR office. 37 m2 -

F 300mm high bulkhead to Meeting rooms. 37 m -

G Extra over for cove light to Meeting rooms. 25 m -

Flush water resistant gypsum board ceiling (CF02); 12mm thick


gypsum board ceiling ex. Jayaboard or Knauf or equal approved, taped
and sanded and prepare smooth to receive paint finish (paint finish
measured separately), including aluminium shadow line, metal furring
framing and fixing accessories; all as specified, to : (Note : QS
ASSUME THICKNESS)

H Staff changing room and toilets. 80 m2 -

J Employee facilities toilet. 35 m2 -

K Guest toilet and Disable toilet. 53 m2 -

L Pastry room. 30 m2 -

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

M Soffit of concrete slab to BOH, Service core and MEP areas. 1,172 m2 -

N Ditto; but to Janitor. 1 m2 -

P Ditto; but to Kitchen. 143 m2 -

Q Sloping soffit of stair flights and landings at Stairs. 13 m2 -

R Faces of stair stringers; not exceeding 300mm high at Stairs. 7 m -

S Extra over for finishes to beam sides. 398 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

T ___________________________

U ___________________________

file:///conversion/tmp/scratch/495999449.xlsx Public area / 97 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

V ___________________________

TOTAL FINISHES : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 98 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

PAINTING AND DECORATIONS

FLOORS

Epoxy paint finish, as specified, to :

D BOH area, MEP room and Service corridor. 1,172 m2 -

E Stair landing to Service core stair #1. 5 m2 -

F 300mm wide stair treads. 20 m -

G 180mm high stair risers. 22 m -

H 300mm high skirting to above areas (as drawing A91-01). 829 m -

WALLS

Prepare smooth and apply textured weathershield paint finish-stucco


(PT01); in accordance with manufacturer's recommendations; as
specified.
J Rendered masonry walls and Skim coated concrete walls/columns. 872 m2 -

Prepare smooth and apply acrylic emulsion paint finish; in accordance


with manufacturer's recommendations; as specified.

K Painting type PT03 to rendered masonry walls and Skim coated 4,352 m2 -
concrete walls/columns.

L Painting type PT04 to rendered masonry walls and Skim coated 802 m2 -
concrete walls/columns.

M Painting type PT05 to rendered masonry walls and Skim coated 274 m2 -
concrete walls/columns.

CEILINGS

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

N Flush gypsum board ceilings (CF01). 677 m2 -

P Flush water resistant gypsum board ceilings (CF02). 198 m2 -

Q Bulkheads and cove lights (CF01). 17 m2 -

R Skim coated ceilings (CF05). 1,727 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 99 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

S Faces of stair stringers; not exceeding 300mm high at Stairs (CF05). 3 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 100 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS (CONT'D)

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL PAINTING AND DECORATIONS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 101 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

ACCESSORIES AND FITMENTS

D All sizes are QS assumption only. Note

VANITY BENCH

Supply and install vanity benches with opening to receive basin;


comprising steel construction complete with homogenous tile to counter
with 200mm high fascia, 18mm thick plywood, adhesive, support
framing, fixing accessories, as specified. (Note : all material and details
TBA)

E 2500 wide x 600 deep vanity bench to Female and male staff toilet. 2 No -

F 2950 wide x 600 deep vanity bench to Staff changing rooms. 2 No -

Supply and install vanity benches with opening to receive basin;


comprising steel construction complete with marble to counter with
200mm high fascia, 18mm thick plywood, adhesive, support framing,
fixing accessories, as specified. (Note : all material and details TBA)

G 2200 wide x 600 deep vanity bench to Guest male toilet. 1 No -

H 2340 wide x 600 deep vanity bench to Guest disable toilet. 1 No -

J 3960 wide x 600 deep vanity bench to Guest female toilet. 1 No -

MIRRORS

Mirrors; comprising 5mm thick clear mirror ex. Asahimas or equal


approved, with bevelled edge, including 20mm thick plywood backing,
adhesive, fixing and accessories, as specified. (Note : all material and
details TBA)

K 2500 wide x 1200mm high mirror to Female and male staff toilet. 2 No -

L 2950 wide x 1200mm high mirror to Staff changing rooms. 2 No -

M 2200 wide x 1200mm high mirror to Guest male toilet. 1 No -

N 2340 wide x 1200mm high mirror to Guest disable toilet. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 102 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

P 3960 wide x 1200mm high mirror to Guest female toilet. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 103 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS (CONT'D)

CUBICLES AND DOORS

Glazed cubicles system; comprising --mm thick laminated tempered


glass, including white colour PVB, angle bracket, 20mm diameter x
150mm high stainless steel pedestal, fixing and accessories, as
specified. (Note : all material and details TBA)

A 2200mm high glazed cubicle partition to Staff changing rooms. 52 m2 -

B 2400mm high glazed cubicle partition to Guest toilets. 22 m2 -

Glazed cubicles door; comprising --mm thick laminated tempered glass,


including white colour PVB, steel stainless latch, bumper, hinges,
handle, fixing and accessories, as specified. (Note : all material and
details TBA)

C 600 wide x 2200mm high single swing cubicle doors to shower room at 16 No -
Staff changing rooms.

D 600 wide x 2400mm high single swing cubicle doors to toilet at Guest 6 No -
toilets.

Panel cubicles system; comprising --mm thick hard panel, including


HPL finish, white colour PVB, angle bracket, 20mm diameter x 150mm
high stainless steel pedestal, fixing and accessories, as specified.
(Note : all material and details TBA)

E 2200mm high panel cubicle partition to Staff toilet and changing rooms. 35 m2 -

Panel cubicles door; comprising --mm thick hard panel door, including
HPL finish, white colour PVB, steel stainless latch, bumper, hinges,
handle, fixing and accessories, as specified. (Note : all material and
details TBA)

F 600 wide x 2200mm high single swing cubicle doors to toilet at Staff 10 No -
toilet and changing rooms.

SUNDRIES

G L-shape concrete bench, 5300mm girth x 600mm deep, with tile finish 1 No -
to counter top at Security office.

OTHER WORKS

Other works; Tenderer to insert here:

H ___________________________

J ___________________________

K ___________________________

TOTAL ACCESSORIES AND FITMENTS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 104 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

SANITARY FIXTURES AND FITTINGS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
TOTO or equal approved, including all associated fittings and
accessories.

Female and Male guest toilet


D Water closet with jet spray. 6 No -
E Lavatory with faucet. 6 No -
F Soap dispenser. 6 No -
G Robe hook. 6 No -
H Toilet paper holder. 6 No -
J Urinal. 3 No -
K Hand dryer. 2 No -
L Floor drain. 6 No -

Disable toilet
M Water closet with jet spray. 1 No -
N Lavatory with faucet. 1 No -
P Soap dispenser. 1 No -
Q Grab bar, L-shape. 1 No -
R Grab bar. 1 No -
S Robe hook. 1 No -
T Toilet paper holder. 1 No -
U Hand dryer. 1 No -
V Floor drain. 1 No -

Service core toilet


W Water closet with jet spray. 1 No -
X Lavatory with faucet. 1 No -
Y Robe hook. 1 No -
Z Toilet paper holder. 1 No -
AA Floor drain. 1 No -

Staff toilet
AB Water closet with jet spray. 4 No -
AC Lavatory with faucet. 6 No -
AD Soap dispenser. 6 No -
AE Robe hook. 4 No -
AF Toilet paper holder. 4 No -
AG Urinal. 2 No -
AH Floor drain. 4 No -

Staff changing rooms

file:///conversion/tmp/scratch/495999449.xlsx Public area / 105 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

AJ Water closet with jet spray. 6 No -


AK Lavatory with faucet. 6 No -
AL Soap dispenser. 6 No -
AM Toilet paper holder. 6 No -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 106 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

SANITARY FIXTURES AND FITTINGS (CONT'D)

A Robe hook. 6 No -
B Head shower with mixer. 16 No -
C Soap holder. 16 No -
D Towel hanger. 16 No -
E Urinal. 3 No -
F Floor drain. 22 No -

Kitchen (PROVISIONAL QUANTITY)


G Floor drain. 8 No -

Ablution to prayer rooms (PROVISIONAL QUANTITY)


H Faucet. 4 No -
J Floor drain. 4 No -

Janitor (PROVISIONAL QUANTITY)


K Faucet. 1 No -
L Floor drain. 1 No -

Garbage room (PROVISIONAL QUANTITY)


M Floor drain. 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

N ___________________________

P ___________________________

Q ___________________________

TOTAL SANITARY FIXTURES AND FITTINGS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 107 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

EXTERNAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

EXTERNAL WORKS

ROOF FINISHES

Loose pebbles (1); 50-100mm diameter lava stone (min 2 layers), as


specified as drawing STXH-203-2 :

D Roof covering. 654 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

E ___________________________

F ___________________________

G ___________________________

TOTAL EXTERNAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 108 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.2 - BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH]

No. Description Quantity Unit Rate Total

SUMMARY

A GENERALLY

B SITEWORKS 49,279,950.00

C CONCRETE WORKS -

D STRUCTURAL METAL WORKS N/A

E NON STRUCTURAL METAL WORKS -

F MASONRY AND PARTITIONS -

G THERMAL AND MOISTURE PROTECTION -

H WOODWORK -

J DOORS AND WINDOWS -

K FINISHES -

L PAINTING AND DECORATIONS -

M ACCESSORIES AND FITMENTS -

N SANITARY FIXTURES AND FITTINGS -

P EXTERNAL WORKS -

TOTAL BUILDING 1 [RESTAURANT, MEETING ROOM AND BOH] : 49,279,950.00

file:///conversion/tmp/scratch/495999449.xlsx Public area / 109 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

GENERALLY

A The following Bills of Quantities are a guide only. It is the responsibility


of the Tenderer to satisfy themselves of the accuracy of the description
for works requiring payment. The descriptions provided herein are for a
guide only as to the required scope of Works which form part of this
Contract and should be cross-referenced with all drawings and
specifications. All quantities, except those denoted "Item" are subject to
a re-measure based on the approved "for construction" drawings and
as per relevant provisions of the conditions of contract. The format
provided in these Bills should be followed in order to assist in tender
evaluation. Within each trade or section of works space is provided for
Tenderer to insert additional works items which require payment.

GENERALLY -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 110 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

SITEWORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SITEWORKS

SITE CLEARANCE
D Allow to excavate oversite to remove existing rubble and rubbish and 271 m2 -
top 600mm (min) vegetable soil and dispose off-site.

EXCAVATION

Detailed excavation from ground level; including backfill and disposal


off site all surplus material or store select material for re-use where
required;

E Pilecaps. 6 m3 -

F Ground slabs. 57 m3 -

G Tie beams. 7 m3 -

COMPACTION

Compact sub-grade from fill as specified under the following.

H Ground slabs including pilecaps and tie beams 270 m2 -

FILLING

Sand bed layer, spread, levelled, and compacted as specified.

J 100mm thick sand bed layer under basement ground slab including 270 m2 -
pilecaps dan tie beams.

TERMITE CONTROL

Anti-termite protection including testing and inspections.

K To face of all concrete surfaces in contact with earth. 364 m2 -

CUTTING OFF PILE HEADS

Cut-off top of bored piles including disposal to an off-site location to the


following.

L 500mm diameter bored pile. 15 No -

OTHER WORKS

Other Works; Tenderer to insert here:

M _________________________

N _________________________

file:///conversion/tmp/scratch/495999449.xlsx Public area / 111 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

P _________________________

TOTAL SITEWORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 112 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

CONCRETE WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

D Ground slabs including pilecaps and tie beams 14 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

E Isolated columns. 14 m3 -

F Pilecaps. 6 m3 -

G Tie beams. 7 m3 -

H 250mm thick ground slab. 23 m3 -

J 200mm thick ground slab. 29 m3 -

K 130mm thick ground slab. 5 m3 -

L 200mm thick suspended roof slab. 46 m3 -

M 150mm thick suspended roof slab. 6 m3 -

N Attached roof beams. 8 m3 -

P 150mm thick upstand walls at roof. 7 m3 -

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

Q Isolated columns. 6.86 t -

R Pilecaps. 0.82 t -

S Tie beams. 5.57 t -

T Ground slab. 6.59 t -

U Suspended roof slab. 4.99 t -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 113 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

V Attached roof beams. 2.95 t -

W Upstand walls at roof. 1.19 t -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 114 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

CONCRETE WORKS

SHUTTERING

Shuttering, as specified to the following.

A Faces of isolated columns. 143 m2 -

B Side of pilecaps. 23 m2 -

C Side of tiebeams. 54 m2 -

D Soffits of suspended roof slab. 239 m2 -

E Soffits and sides of roof beams. 89 m2 -

F Faces of upstand walls at roof. 94 m2 -

G Edges of ground slabs; not exceeding 250mm high. 81 m -

H Edges of suspended slabs and roof; not exceeding 200mm high. 90 m -

OTHER WORKS

Other works; Tenderer to insert here:

J ___________________________

K ___________________________

L ___________________________

TOTAL CONCRETE WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 115 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Externally

D 100mm thick masonry walls to exhaust shaft. 12 m2 -

E 200mm thick masonry walls generally. 358 m2 -

Internally

F 200mm thick masonry walls generally. 182 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

G ___________________________

H ___________________________

J ___________________________

TOTAL MASONRY AND PARTITIONS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 116 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Integral waterproofing 3CC ex. Cementaid or equal approved concrete


waterproofing admixture; all as per manufacturer's specification; to the
following R.C structures;

D Ground slabs, ground beams and pile caps. 52 m3 -

Membrane waterproofing; comprising 1.2mm Uniroof Hypalon synthetic


membrane sheet or equal approved, including protective screed with
smooth finish and wiremesh (measured net - including laps), sand bed,
mastic, adhesives, primers, sealant etc. installed per manufacturer's
recommendations, to :

E Top of concrete roof slab. 269 m2 -

F 265mm high upstand to form skirting (as drawing A41-01.04). 86 m -

G 300mm high upstand to form skirting (as drawing A41-01.04). 141 m -

WATERPROOFING - INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

H Top of concrete slab to MEP room areas (as drawing A20-01-01). 245 m2 -

J 300mm high upstand to form skirting. 146 m -

INSULATION

K No Insulation to soffit of concrete roof and Genset room. Note

OTHER WORKS

Other works; Tenderer to insert here:

L ___________________________

M ___________________________

N ___________________________

file:///conversion/tmp/scratch/495999449.xlsx Public area / 117 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

TOTAL THERMAL AND MOISTURE PROTECTION : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 118 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

D Doors hardware measured separately in 'IRONMONGERY'. Note

DOORS AND WINDOWS

EXTERNAL DOORS AND WINDOWS

FIRE RATED STEEL DOORS AND FRAMES

Fire rated steel door; comprising 40mm thick steel door ex. Bostinco or
Lion metal or equal approved, including 50x150x1.5mm thick
electrolyte galvanised steel frame, fire retardant paint finish to door
leaves and frames, etc., as specified.

E 2000 wide x 2400mm high double swing door (MD04) to PLN, Trafo 7 No -
and Genset room.

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to the


following doors.

EXTERNAL DOORS

FIRE RATED STEEL DOORS

To suit double swing door type MD04, hardware HW9.1 :


F Lever handle; RFID door lock combination; Vingcard flex ex. Assa 7 Set -
abloy (ASL).
G Heavy duty butt hinges (4 nos per door leaves); DHX1160HD flush 56 No -
type, stainless steel brushed finish ex. Hafele (HA).
H Hook bolt with mortise lock; Symo, nickel plated ex. Hafele (HA). 7 No -
J Flush bolt; top and bottom, square 285mm with folding lever bar 28 No -
connection M10,stainless steel matt finish ex. Hafele (HA).
K Kick plate; both side, 4301 Hoju stainless steel brushed finish ex. 28 No -
Hafele (HA).
L Floor mounted door stopper; stainless steel half-dome with mandrel 28 No -
PVD graphite black ex. Hafele (HA).

OTHER WORKS

Other works; Tenderer to insert here:

M ___________________________

N ___________________________

file:///conversion/tmp/scratch/495999449.xlsx Public area / 119 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

P ___________________________

TOTAL DOORS AND WINDOWS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 120 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

FINISHES

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

FINISHES

FLOOR FINISHES - EXTERNALLY

D Lavastone pebbles to roof measured separately in "External works". Note

FLOOR FINISHES - INTERNALLY

E Epoxy paint measured in "Painting and Decorations". Note

Levelling screed to receive Epoxy paint floor (measured separately), as


specified as drawing A91-01.

F 50mm thick levelling screed to PLN house, Genset and Trafo room. 245 m2 -

WALL FINISHES - EXTERNALLY

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

G Masonry walls generally. 305 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

H Face of concrete columns generally. 62 m2 -

WALL FINISHES - INTERNALLY

15mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

J Masonry walls generally. 635 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

K Face of concrete columns generally. 108 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 121 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

CEILING FINISHES - INTERNALLY

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

A Soffit of concrete slab to PLN house, Genset and Trafo room. 245 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

B ___________________________

C ___________________________

D ___________________________

TOTAL FINISHES : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 122 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

PAINTING AND DECORATIONS

FLOORS

Epoxy paint finish, as specified, to :

D PLN house, Genset and Trafo room. 245 m2 -

E 300mm high skirting to above areas (as drawing A91-01). 146 m -

WALLS

Prepare smooth and apply textured weathershield paint finish-stucco


(PT01); in accordance with manufacturer's recommendations; as
specified.

F Rendered masonry walls and Skim coated concrete walls/columns. 432 m2 -

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

G Rendered masonry walls and Skim coated concrete walls/columns. 743 m2 -

H Skim coated concrete walls and columns. 108 m2 -

CEILINGS

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

J Skim coated ceilings (CF05). 245 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

K ___________________________

L ___________________________

M ___________________________

file:///conversion/tmp/scratch/495999449.xlsx Public area / 123 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

TOTAL PAINTING AND DECORATIONS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 124 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

EXTERNAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

EXTERNAL WORKS

ROOF FINISHES

Loose pebbles (1); 50-100mm diameter lava stone (min 2 layers), as


specified as drawing STXH-203-2 :

D Roof covering. 245 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

E ___________________________

F ___________________________

G ___________________________

TOTAL EXTERNAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 125 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.3 - BUILDING 2 [MEP AREA]

No. Description Quantity Unit Rate Total

SUMMARY

A GENERALLY

B SITEWORKS -

C CONCRETE WORKS -

D STRUCTURAL METAL WORKS N/A

E NON STRUCTURAL METAL WORKS N/A

F MASONRY AND PARTITIONS -

G THERMAL AND MOISTURE PROTECTION -

H DOORS AND WINDOWS -

J FINISHES -

K PAINTING AND DECORATIONS -

L ACCESSORIES AND FITMENTS N/A

M SANITARY FIXTURES AND FITTINGS N/A

N EXTERNAL WORKS -

TOTAL BUILDING 2 [MEP AREA]: -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 126 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

GENERALLY

A The following Bills of Quantities are a guide only. It is the responsibility


of the Tenderer to satisfy themselves of the accuracy of the description
for works requiring payment. The descriptions provided herein are for a
guide only as to the required scope of Works which form part of this
Contract and should be cross-referenced with all drawings and
specifications. All quantities, except those denoted "Item" are subject to
a re-measure based on the approved "for construction" drawings and
as per relevant provisions of the conditions of contract. The format
provided in these Bills should be followed in order to assist in tender
evaluation. Within each trade or section of works space is provided for
Tenderer to insert additional works items which require payment.

GENERALLY -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 127 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

SITEWORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SITEWORKS

SITE CLEARANCE
D Allow to excavate oversite to remove existing rubble and rubbish and 1,086 m2 -
top 600mm (min) vegetable soil and dispose off-site.

EXCAVATION

Detailed excavation from ground level; including backfill and disposal


off site all surplus material or store select material for re-use where
required;

E Pilecaps. 34 m3 -

F Ground slabs. 161 m3 -

G Tie beams. 45 m3 -

COMPACTION

Compact sub-grade from fill as specified under the following.

H Ground slabs including pilecaps and tie beams 1,132 m2 -

FILLING

Sand bed layer, spread, levelled, and compacted as specified.

J 100mm thick sand bed layer under ground slabs including pilecaps and 1,132 m2 -
tie beams

file:///conversion/tmp/scratch/495999449.xlsx Public area / 128 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

SITEWORKS (CONT'D)

TERMITE CONTROL

Anti-termite protection including testing and inspections.

A To face of all concrete surfaces in contact with earth. 1,625 m2 -

CUTTING OFF PILE HEADS

Cut-off top of bored piles including disposal to an off-site location to the


following.

B 500mm diameter bored pile. 64 No -

OTHER WORKS

Other Works; Tenderer to insert here:

C _________________________

D _________________________

E _________________________

TOTAL SITEWORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 129 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

CONCRETE WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

D Ground slabs including pilecaps and tie beams 57 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

E Isolated columns. 50 m3 -

F Pilecaps. 34 m3 -

G Tie beams. 45 m3 -

H 200mm thick ground slab. 4 m3 -

J 150mm thick ground slab. 83 m3 -

K 130mm thick ground slab. 74 m3 -

L 200mm thick suspended slab. 116 m3 -

M 150mm thick suspended slab. 26 m3 -

N 130mm thick suspended slab. 60 m3 -

P 130mm thick suspended roof slab. 15 m3 -

Q Attached beams. 62 m3 -

R Attached roof beams. 7 m3 -

S 250mm thick Retaining walls. 51 m3 -

T 250mm thick parapet walls. 11 m3 -

U 150mm thick RC walls. 6 m3 -

V 150mm thick upstand walls. 17 m3 -

W Stair flights, stair landing, beams, column, upstand wall and step to 15 m3 -
SC2 and PA3 stair.

file:///conversion/tmp/scratch/495999449.xlsx Public area / 130 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

A Isolated columns. 23.73 t -

B Pilecaps. 4.05 t -

C Tie beams. 18.50 t -

D Ground slab. 17.40 t -

E Suspended slab. 23.88 t -

F Suspended roof slab. 1.61 t -

G Attached beams. 28.65 t -

H Attached roof beams. 1.45 t -

J Retaining walls. 5.32 t -

K Parapet Walls. 0.70 t -

L RC wall. 0.87 t -

M Upstand walls. 2.16 t -

N Stair flights, stair landing, upstand wall, step to SC2 and PA3 stair. 2.91 t -

SHUTTERING

Shuttering, as specified to the following.

P Faces of isolated columns. 519 m2 -

Q Side of pilecaps. 114 m2 -

R Side of tie beams. 350 m2 -

S Soffits of suspended slab. 1,028 m2 -

T Soffits of suspended roof slab. 94 m2 -

U Soffits and sides of beams. 576 m2 -

V Soffit of stair flight, landing and beams. 72 m2 -

W Face of column and upstand wall. 7 m2 -

X Faces of retaining walls. 404 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 131 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

A Faces of parapet walls. 83 m2 -

B Faces of RC walls. 75 m2 -

C Faces of upstand walls at roof. 221 m2 -

D Edges of ground slabs; not exceeding 200mm high. 143 m -

E Edges of suspended slabs and roof; not exceeding 220mm high. 202 m -

F Edges of stair stringers; not exceeding 400mm high. 54 m -

G Faces undercut of stair risers; not exceeding 200mm high. 129 m -

OTHER WORKS

Other works; Tenderer to insert here:

H ___________________________

J ___________________________

K ___________________________

TOTAL CONCRETE WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 132 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

STRUCTURAL METAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

STRUCTURAL METAL WORKS

ROOF FRAME

Fabricate, deliver to site and erect, the following structural steelwork


using methods complying with the requirement of SS 490 (340 MPA)
for material, construction, fabrication and erection including cutting,
welding, jointing as specified

Pergola 1

D Column -Cross 300x300x20 (91.06 kg/m2). 1.45 t -

E 20mm thick base plate (157kg/m2). 0.08 t -

F 20mm thick bottom plate (157kg/m2). 0.12 t -

Pergola 2

G Column -Cross 300x300x20 (91.06 kg/m). 1.45 t -

H 20mm thick base plate (157kg/m2). 0.08 t -

J 20mm thick bottom plate (157kg/m2). 0.12 t -

Pergola 3

K Column -Cross 300x300x20 (91.06 kg/m). 1.26 t -

L 20mm thick base plate (157kg/m2). 0.08 t -

M 20mm thick bottom plate (157kg/m2). 0.12 t -

Fabricate, deliver to site and erect, the following structural steelwork


using methods complying with the requirement of ST-37 (240 MPA) for
material, construction, fabrication and erection including cutting,
welding, jointing as specified

Pergola 1

N Beam -RH 250x150x10 (57 kg/m). 9.47 t -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 133 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

STRUCTURAL METAL WORKS (CONT'D)

A 14mm thick top plate (109.9kg/m2). 0.08 t -

B 10mm thick top plate (78.5kg/m2). 0.09 t -

C 10mm thick bottom plate (78.5kg/m2). 0.09 t -

Pergola 2

D Beam -RH 250x150x10 (57 kg/m). 6.79 t -

E 14mm thick top plate (109.9kg/m2). 0.08 t -

F 10mm thick top plate (78.5kg/m2). 0.06 t -

G 10mm thick bottom plate (78.5kg/m2). 0.06 t -

Pergola 3

H Beam -RH 250x150x10 (57 kg/m). 7.74 t -

J 14mm thick top plate (109.9kg/m2). 0.08 t -

K 10mm thick top plate (78.5kg/m2). 0.06 t -

L 10mm thick bottom plate (78.5kg/m2). 0.06 t -

Cast-in-anchor BJTD 400, including galvanized rings, bolts and


fastenings all as specified.

M 400mm long anchor bolt D19mm to Pergola 1. 8 No -

N Ditto; but to Pergola 2. 8 No -

P Ditto; but to Pergola 3. 8 No -

Portland cement based non-shrink grouting including cleaning contact


surface, as specified.

Q 25mm thick non-shrinkage grouting under plate to Pergola 1. 0.49 m2 -

R Ditto; but to pergola 2. 0.49 m2 -

S Ditto; but to pergola 3. 0.49 m2 -

Steelworks finishing, as specified

T Prepare and apply epoxy paint ex.HEMBEL to steel works at Pergola 1. 11.38 t -

U Ditto; but to pergola 2. 8.64 t -

V Ditto; but to pergola 3. 9.40 t -

OTHER WORKS

Other works; Tenderer to insert here:

W ___________________________

X ___________________________

Y ___________________________

file:///conversion/tmp/scratch/495999449.xlsx Public area / 134 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

TOTAL STRUCTURAL METAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 135 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

NON STRUCTURAL METAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

NON STRUCTURAL METAL WORKS

D Balustrade to Service core stair #2 at Level 1, measured in Note


"Circulation/corridor".

BALUSTRADES AND HANDRAILS

Wall mounted handrail; comprising steel handrail with black powder


coated finish, expansions screws with countersunk, fixed to masonry or
concrete wall, with paint finish, as specified as drawing A70-09.

E Wall mounted handrail to public stairs (S01 - S02). 46 m -

Frameless glazed balustrade; comprising 16mm thick clear tempered


glass balustrade, including support frame, sealants, fixing and
accessories, as specified as drawing A82-03.

F 660mm high balustrade to sunken seating at Level 1 (as drawing A41- 25 m -


02-01).

G 1030mm high balustrade to lobby access ramp at Level 1. 12 m -

LOBBY ROOF

H Structural metal works to Main roof measured separately. Note

J Ceiling finish to Lobby / Bridge roof measured separately in Note


"Woodwork".

Roof; comprising Kingspan insulated metal roof sheet, including solid


wood batten frame, 75x75mm galvanised roofing support, Ulin wood
shingles to cover roofing, 1010mm girth roof fascia with Stucco paint
finish (PT01), 380mm high Ulin timber fascia (W02), 140mm wide
timber capping, roof gutter, fixing and accessories, as specfied as
drawing A50-05-01, A50-05-02.

K Lobby roof at Level 1. 394 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 136 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

NON STRUCTURAL METAL WORKS (CONT'D)

ROOF PERGOLA

A Structural metal works to pergola measured separately. Note

Roof pergola with gutter; comprising 17.5mm thick laminated heat


strengthened glass, including support frame, sealants, 2mm thick pre-
fabricated aluminium gutter with insulation, 400 high x 50mm thick Ulin
timber fascia (W02), fixing and accessories, as specified as drawing
A96-02.

B Roof pergola 2 to luggage storage and toilet corridor at Level 1 (as 109 m2 -
drawing A51-04-01)

Roof pergola; comprising 17.5mm thick laminated heat strengthened


glass, including support frame, sealants, 400 high x 50mm thick Ulin
timber fascia (W02), fixing and accessories, as specified as drawing
A96-01.

C Roof pergola 1 to Drop-off area at Level 1 (as drawing A51-03-01). 179 m2 -

Roof pergola; comprising 17.5mm thick laminated heat strengthened


glass, including support frame, sealants, 400 high x 25mm thick Ulin
timber fascia (W02) on 10mm thick marine plywood backing, 165mm
girth timber edging, adhesive, fixing and accessories, as specified as
drawing A96-03.

D Roof pergola 3 to Lobby waiting area/sunken seating at Level 1 (as 144 m2 -


drawing A51-05-01).

Roof soffit finish; comprising laser cut aluminium panel with selected
pattern, including fixing and accessories, as specified as drawing A96-
04.

E Roof pergola 1 to Drop-off area at Level 1. 179 m2 -

F Roof pergola 2 to luggage storage and toilet corridor at Level 1. 109 m2 -

G Roof pergola 3 to Lobby waiting area at Level 1. 144 m2 -

Sundries

H 780 high x 17.5mm thick laminated heat strengthened glass hung from 51 m -
steel structure to Roof pergola 1 (as drawing A41-02-01).

OTHER WORKS

Other works; Tenderer to insert here:

J ___________________________

K ___________________________

L ___________________________

TOTAL NON-STRUCTURAL METAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 137 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Externally

D 200mm thick masonry walls generally. 264 m2 -

E 300mm thick cavity masonry walls generally. 232 m2 -

Internally

F 100mm thick masonry walls generally. 124 m2 -

G 200mm thick masonry walls generally. 299 m2 -

H 200mm thick cavity masonry walls generally. 111 m2 -

J 300mm thick cavity masonry walls generally. 109 m2 -

K 1500 high x 200mm thick backwall to urinal and water closet (QS 14 m -
ASSUMED SIZE).

OTHER WORKS

Other works; Tenderer to insert here:

L ___________________________

M ___________________________

N ___________________________

TOTAL MASONRY AND PARTITIONS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 138 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Integral waterproofing 3CC ex. Cementaid or equal approved concrete


waterproofing admixture; all as per manufacturer's specification; to the
following R.C structures;

D Suspended external and roof slab (as drawing S2.03A/B3). 210 m3 -

Membrane waterproofing; comprising 1.2mm Uniroof Hypalon synthetic


membrane sheet or equal approved, including protective screed with
smooth finish and wiremesh (measured net - including laps), sand bed,
mastic, adhesives, primers, sealant etc. installed per manufacturer's
recommendations, to :

E Top of concrete roof slab to Main lobby. 393 m2 -

F Ditto; but to green roof area and drop-off. 715 m2 -

G Ditto; but to Toilet room. 57 m2 -

H Face of upstand wall to Drop-off area at Level 1. [1100mm high] 52 m2 -

J 200mm high turns-up to form skirting to above areas (as drawing A40- 296 m -
02-03).

WATERPROOFING - INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

K Top of concrete slab to Toilet and Treatment rooms at Ground floor. 67 m2 -

L Ditto; but to Lobby toilet at Level 1. 22 m2 -

M 300mm high upstand to form skirting (as drawing A91-01). 95 m -

Cement based waterproofing, including primers etc. all as specified, to :

file:///conversion/tmp/scratch/495999449.xlsx Public area / 139 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

N Face of rendered masonry / concrete walls to shower room at 29 m2 -


Treatment rooms [1800mm high].

file:///conversion/tmp/scratch/495999449.xlsx Public area / 140 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION (CONT'D

INSULATION

Insulation; comprising 50mm thick expanded polystryene insulation,


including fixing and accessories, as specified, to :

A Top of concrete roof slab green roof and drop-off area only. 715 m2 -

GREEN ROOF SYSTEM

Green roof system; comprising drainage cell, geotextile layer, including


washed sand, growing media, membrane protection and root barrier,
insulation, fixing and accessories, as specified. (Note : Membrane and
insulation to roof measured separately)

B Top of concrete roof slab. 294 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

C ___________________________

D ___________________________

E ___________________________

TOTAL THERMAL AND MOISTURE PROTECTION : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 141 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

WOODWORK

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

WOODWORK

WALL FINISHES

Timber cladding; comprising solid timber cladding, including finishes,


support frame, fixing and accessories, as specified, to :

D 450mm high upstand wall timber cladding (T-01) to sunken seating at 31 m -


Level 1 (as drawing A41-02-01).

E 125 wide x 20mm thick timber cladding to pergola steel columns at 216 m -
Level 1 (as drawing A96-01).

CEILING FINISHES

Timber ceiling (CF-04); comprising 12mm thick timber panel with


finishes (T-02), including support frame and hanger, fixing and
accessories, as specified as drawing A50-05-02, to :

F Lobby roof at Level 1. 345 m2 -

SCREEN

Decorative timber screen; comprising 120 wide x 750 high x 30mm


thick perforated timber with copper frame, 30x60mm thick Ulin timber
element with direct fix clip system, copper sheet wrapped around
timber core, including fixing and accessories, as specified as drawing
A52-07 and A97-01.

G 1300mm high screen (SF01/02/03) to Lobby area at Level 1. 21 m2 -

H 2300mm high screen (SF02/03) to Corridor area at Level 1. 78 m2 -

J 2075mm high screen (SF01/02) to toilet corridor at Level 1. 8 m2 -


(PROVISIONAL SUM)

K 4680 wide x 3050mm high screen (SF02) to Gym at Ground floor. 1 No -

ROOF TRELLIS

Roof timber trellis; comprising 60x150mm thick solid timber batten fixed
to wall, including support frame, finishes, fixing and accessories, as
specified as drawing A11-02-02, to :

file:///conversion/tmp/scratch/495999449.xlsx Public area / 142 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

L Roof covering terraces. 32 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 143 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

WOODWORK (CONT'D)

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL WOODWORK : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 144 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

D Doors hardware measured separately in 'IRONMONGERY'. Note

DOORS AND WINDOWS

EXTERNAL DOORS AND WINDOWS

GLAZED DOORS AND FIXED WINDOWS

Glazed door and fixed windows; comprising 8mm thick single clear
tempered glass panel, aluminium transom and mullion in bronze
powder coated finish, including sealants, fixing and accessories.

E Overall size, 3200 wide x 3200mm high fixed window to receive 2100 2 No -
wide x 3200mm high double swing door (GD09) to Lobby/Lounge at
Ground floor.

F Overall size, 5225 wide x 3200mm high fixed window to receive 2050 1 No -
wide x 3200mm high double swing door (GD10) to Kids club at Ground
floor.

G Overall size, 5725 wide x 2700mm high fixed window to receive 2100 1 No -
wide x 2700mm high double swing door (GD11) to Gym at Ground
floor.

H Overall size, 9300 wide x 3200mm high fixed window to receive 2100 1 No -
wide x 3200mm high double swing door (GD08) to Lobby/Lounge at
Ground floor.

GLAZED DOORS

Glazed door; comprising 8mm thick single clear tempered glass panel,
aluminium transom and mullion in bronze powder coated finish,
including sealants, fixing and accessories.

J 1700 wide x 2700mm high double sliding door (GD14) to Executive 1 No -


office at Ground floor.

K 2100 wide x 2700mm high double swing door (GD12) to Spa reception 1 No -
at Ground floor.

L 3450 wide x 2700mm high double sliding door (GD13) to Executive 1 No -


office at Ground floor.

file:///conversion/tmp/scratch/495999449.xlsx Public area / 145 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

WINDOW AND FRAMES

Fixed windows; comprising 8mm thick single clear tempered glass


panel, aluminium transom and mullion in bronze powder coated finish,
including sealants, fixing and accessories.

A 3000 wide x 2700mm high window (FG03) to Gym at Ground floor. 1 No -

B 5400 wide x 2700mm high window (FG07) to Spa reception at Ground 1 No -


floor.

C 5700 wide x 2700mm high window (FG05) to Gym at Ground floor. 1 No -

D 6300 wide x 2700mm high window (FG04) to Gym at Ground floor. 1 No -

E 7500 wide x 2700mm high window (FG06) to Spa reception at Ground 1 No -


floor.

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

F 900 wide x 2350mm high single swing door (TD15) to Storage under 1 No -
stair at Ground floor.

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

G 900 wide x 2350mm high single swing door (TD07) to Toilet entry at 2 No -
Ground floor.

H 900 wide x 2350mm high single swing door (TD05) to Toilet entry at 2 No -
Ground floor.

Solid timber frame; including paint finish, fixing and accessories, as


specified.

J 150-200 wide x 40mm thick solid timber frame to timber doors. :5 No] 29 m -

INTERNAL DOORS AND WINDOWS

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

K 900 wide x 2350mm high single swing door (TD06) to Core toilet at 1 No -
Ground floor.

L 900 wide x 2350mm high single swing door (TD05) to Treatment 15 No -


rooms, Office and Service core at Ground floor.

Solid timber frame; including paint finish, fixing and accessories, as


specified.

file:///conversion/tmp/scratch/495999449.xlsx Public area / 146 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

M 150-200 wide x 40mm thick solid timber frame to timber doors. :[16 No] 92 m -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 147 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to the


following doors.

EXTERNAL DOORS

GLAZED DOORS

To suit double swing door type GD08 :


A Pull handle. 2 Pair -
B Lockcase. 1 No -
C Patch fitting. 2 No -
D Bottom fitting. 2 No -

To suit double swing door type GD09 :


E Pull handle. 4 Pair -
F Lockcase. 2 No -
G Patch fitting. 4 No -
H Bottom fitting. 4 No -

To suit double swing door type GD10 :


J Pull handle. 2 Pair -
K Lockcase. 1 No -
L Patch fitting. 2 No -
M Bottom fitting. 2 No -

To suit double swing door type GD11 :


N Pull handle. 2 Pair -
P Lockcase. 1 No -
Q Patch fitting. 2 No -
R Bottom fitting. 2 No -

To suit double swing door type GD12 :


S Pull handle. 2 Pair -
T Lockcase. 1 No -
U Patch fitting. 2 No -
V Bottom fitting. 2 No -

To suit double sliding door type GD13 :


W Handle. 1 Pair -
X Lockcase. 1 No -
Y Sliding track, L=3450mm. 1 No -

To suit double sliding door type GD14 :


Z Handle. 1 Pair -
AA Lockcase. 1 No -
AB Sliding track, L=1700mm. 1 No -

TIMBER DOORS

To suit single swing door type TD05, hardware HW3.1 :


AC Handle; internal side, Carlo 600mm stainless steel brass finish ex. 1 No -
Startec (ST).
AD Push plate; external side, stainless steel brass finish ex. Startec (ST). 1 No -

AE Concealed hinges (4 nos per door leaves); TE240 3D satin brass 047 4 No -
ex. Tectus (TE).
AF Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 1 No -
heath (SH).

file:///conversion/tmp/scratch/495999449.xlsx Public area / 148 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

To suit single swing door type TD05, hardware HW5.0 : (Luggage store
only)
A Handle. 1 Pair -
B Heavy duty lockset; mortise grade 1, keyed with deadbolt satin brass 1 No -
finish ex. Hafele (HA).
C Butt hinges (4 nos per door leaves); DHX 4120 stainless steel matt 4 No -
finish ex. Startec (ST).
D Door closer; hidden type, DCL33 EN2-4 matt black finish ex. Startec 1 No -
(ST).

To suit single swing door type TD07,hardware HW3.1:


E Handle; internal side, Carlo 600mm stainless steel brass finish ex. 2 No -
Startec (ST).
F Push plate; external side, stainless steel brass finish ex. Startec (ST). 2 No -

G Concealed hinges (4 nos per door leaves); TE240 3D satin brass 047 8 No -
ex. Tectus (TE).
H Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 2 No -
heath (SH).

To suit single swing door type TD15, hardware HW6.0 :


J Lever handle; internal side. 1 No -
K Push plate; external side only, stainless steel brass finish ex. Startec 1 No -
(ST).
L Butt hinges; DHB 1160 stainless steel satin finish (4 nos per door 4 No -
leaves) ex. Startec (ST).
M Heavy duty lockset; mortise grade 1, keyed with deadbolt, stainless 1 No -
steel brushed nickel ex. Hafele (HA).
N Overhead door closer; TS3000V, EN 1-4 with guide rail ex. Hafele 1 No -
(HA).

INTERNAL DOORS

FIRE RATED STEEL DOORS


To suit single swing door type MD03, hardware HW10.1 :
P Lever handle. 2 Pair -
Q Heavy duty butt hinges (4 nos per door leaves); size 102, 15mm dia. 8 No -
knuckle, 3mm thick flange stainless steel satin finish ex. Startec (ST).

R Heavy duty lockset; mortise grade 1, keyed with deadbolt, 630 satin 2 No -
chrome-plated ex. Hafele (HA).
S Kick plate; exterior side only, 4301 Hoju stainless steel brushed finish 2 No -
ex. Hafele (HA).
T Floor mounted door stopper; stainless steel half-dome with mandrel 2 No -
PVD graphite black ex. Hafele (HA).

TIMBER DOORS

To suit single swing door type TD05, hardware HW3.0 : (SPA area
only)
U Handle; internal side, Carlo 600mm stainless steel brass finish ex. 7 No -
Startec (ST).
V Push plate; external side, stainless steel brass finish ex. Startec (ST). 7 No -

W Concealed hinges (4 nos per door leaves); TE240 3D satin brass 047 28 No -
ex. Tectus (TE).
X Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 7 No -
heath (SH).

To suit single swing door type TD05, hardware HW2.0 : (Office, staff
access, BOH)

file:///conversion/tmp/scratch/495999449.xlsx Public area / 149 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

Y Lever handle with RFID lock combination; Vingcard flex ex. Assa abloy 7 Pair -
(ASL).
Z Flush hinges (4 nos per door leaves); DHX4120 stainless steel matt 28 No -
finish ex. Startec (ST).

file:///conversion/tmp/scratch/495999449.xlsx Public area / 150 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

A Door closer; hidden type, DCL 33, EN 2-4 matt black finish ex. Startec 7 No -
(ST).
B Floor mounted door stopper; square profile, stainless steel matt finish 7 No -
ex. Startec (ST).

To suit single swing door type TD05, hardware HW3.2 : (Disable toilet
only)
C Lever handle with mortise lock; FSB model 10 1035 satin brass finish 1 No -
ex. Assa abloy (ASL).
D Thumb turn cylinder; KB5 MK satin brass finish ex. Startec (ST). 1 No -
E Concealed hinges (4 nos per door leaves); TE240 3D satin brass 047 4 No -
ex. Tectus (TE).
F Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 1 No -
heath (SH).

To suit single swing door type TD06, hardware HW6.0 :


G Lever handle; internal side. 1 No -
H Push plate; external side, stainless steel brass finish ex. Startec (ST). 1 No -

J Butt hinges (4 nos per door leaves); DHB1160 stainless steel satin 4 No -
finish ex. Startec (ST).
K Heavy duty lockset; mortise grade 1, keyed with deadbolt, stainless 1 No -
steel brushed nickel finish ex. Hafele (HA).
L Door closer; overhead, TS3000V EN-14 with guide rail ex. Geze (GZ). 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

M ___________________________

N ___________________________

P ___________________________

TOTAL DOORS AND WINDOWS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 151 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

FINISHES

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

FINISHES

FLOOR FINISHES - EXTERNALLY

D Floor finishes to Drop-off, Ramp and Lobby entrance measured in Note


"Hardscaping and Landscape works".

E Floor finishes to Sunken seating measured in "Hardscaping and Note


Landscape works".

F Lavastone pebbles to roof measured separately in "Hardscaping Note


works".

Microtopping (M04), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

G Lobby / lounge terrace at Ground floor. 23 m2 -

FLOOR FINISHES - INTERNALLY

H Epoxy paint measured in "Painting and Decorations". Note

Ceramic floor tiles with polished/unpolished finish, including setting


bed/levelling screed, adhesive, grouting, as specified, to :

J 600 x 600mm ceramic floor tiles (TL01) to Service toilet at Ground floor. 3 m2 -

K 600 x 600mm ceramic floor tiles (TL05) to Lobby/lounge toilet at 28 m2 -


Ground floor.

L Ditto; but to Lobby toilet at Level 1. 26 m2 -

M 600 x 600mm ceramic floor tiles (TL06) to Office at Ground floor. 154 m2 -

N Ditto; but to Luggage store at Level 1. 12 m2 -

Microtopping (M04), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

P Gym, Spa treatments, Lobby/lounge at Ground floor. 578 m2 -

Levelling screed to receive Epoxy paint floor (measured separately), as


specified as drawing A91-01.

file:///conversion/tmp/scratch/495999449.xlsx Public area / 152 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

Q 50mm thick levelling screed to Service corridor. 116 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 153 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

WALL FINISHES - EXTERNALLY

Stone capping, including backing, adhesive, grouting, as specified, to :

A 600mm wide stone capping to sunken seating at Level 1 (as drawing 30 m -


A41-02-01).

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

B Masonry walls generally. 496 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

C Face of concrete columns and walls to general areas. 149 m2 -

WALL FINISHES - INTERNALLY

Stone wall tiles with polished finish (ST06); comprising 15mm thick
stone, including backing, adhesive, grouting, as specified, to :

D Lobby/lounge toilet at Ground floor. 76 m2 -

E Ditto; but to Level 1. 85 m2 -

F 200mm wide stone ledge to backwall. (PROVISIONAL SUM) 14 m -

Ceramic wall tiles with polished finish, including backing, adhesive,


grouting, as specified, to :

G 600 x 600mm wall tiles (TL01) to Service core toilet. [3000mm high] 17 m2 -

H 600 x 600mm wall tiles (TL09) to Spa treatment toilet and shower 118 m2 -
rooms. [2400mm high]

15mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

J Masonry walls generally. 1,420 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

K Face of concrete columns and walls to Service corridor. 230 m2 -

CEILING FINISHES - EXTERNALLY

L No external ceiling finishes. Note

CEILING FINISHES - INTERNALLY

Flush gypsum board ceiling (CF01); 10mm thick gypsum board ceiling,
taped and sanded and prepare smooth to receive paint finish (paint
finish measured separately), including aluminium shadow line, metal
furring framing and fixing accessories, as specified, to :

file:///conversion/tmp/scratch/495999449.xlsx Public area / 154 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

M Front office at Ground floor. 154 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 155 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

A Luggage store at Level 1. 12 m2 -

B Gym, Spa treatments, Lobby/lounge at Ground floor. 537 m2 -

C 150mm girth curtain pelmet to Gym and Spa reception (as drawing 26 m -
A12-02-01).

Flush water resistant gypsum board ceiling (CF02); 12mm thick


gypsum board ceiling ex. Jayaboard or Knauf or equal approved, taped
and sanded and prepare smooth to receive paint finish (paint finish
measured separately), including aluminium shadow line, metal furring
framing and fixing accessories; all as specified, to : (Note : QS
ASSUME THICKNESS)

D Lobby/lounge toilet at Ground floor. 28 m2 -

E Lobby toilet at Level 1. 26 m2 -

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

F Soffit of concrete slab to Spa BOH, Service core and MEP areas. 116 m2 -

G Ditto; but to Service toilet at Ground floor. 3 m2 -

H Extra over for finishes to beam sides. 36 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

J ___________________________

K ___________________________

L ___________________________

TOTAL FINISHES : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 156 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

PAINTING AND DECORATIONS

FLOORS

Epoxy paint finish, as specified, to :

D Spa BOH, Service core and MEP areas. 119 m2 -

E 300mm high skirting to above areas (as drawing A91-01). 120 m -

WALLS

Prepare smooth and apply textured weathershield paint finish-stucco


(PT01); in accordance with manufacturer's recommendations; as
specified.

F Rendered masonry walls and Skim coated concrete walls/columns. 645 m2 -

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

G Rendered masonry walls and Skim coated concrete walls/columns 1,106 m2 -


(PT03).

H Rendered masonry walls and Skim coated concrete walls/columns 360 m2 -


(PT05).

Prepare smooth and apply weathershield paint finish; in accordance


with manufacturer's recommendations; as specified.

J Rendered masonry walls and Skim coated concrete walls/columns 184 m2 -


(PT06).

CEILINGS

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

K Flush gypsum board ceilings (CF01). 703 m2 -

L Flush water resistant gypsum board ceilings (CF02). 54 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 157 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

M Bulkheads and cove lights. 4 m2 -

N Skim coated ceilings (CF05). 155 m2 -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 158 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS (CONT'D)

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL PAINTING AND DECORATIONS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 159 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

ACCESSORIES AND FITMENTS

D All sizes are QS assumption only. Note

VANITY BENCH

Supply and install vanity benches with opening to receive basin;


comprising steel construction complete with marble to counter with
200mm high fascia, 18mm thick plywood, adhesive, support framing,
fixing accessories, as specified. (Note : all material and details TBA)

E 950 wide x 600 deep vanity bench to Disable Lobby toilet at Level 1. 1 No -

F 1415 wide x 600 deep vanity bench to Male Lobby toilet at Level 1. 1 No -

G 1430 wide x 600 deep vanity bench to Female Lobby toilet at Level 1. 1 No -

H 1800 wide x 600 deep vanity bench to Female and male Lobby/lounge 2 No -
toilet at Ground floor.

J 1000 wide x 600 deep vanity bench to Spa treatment rooms. 4 No -

K 2095 wide x 600 deep vanity bench to Spa treatment rooms. 4 No -

MIRRORS

Mirrors; comprising 5mm thick clear mirror ex. Asahimas or equal


approved, with bevelled edge, including 20mm thick plywood backing,
adhesive, fixing and accessories, as specified. (Note : all material and
details TBA)

L 950 wide x 1200mm high mirror to Disable Lobby toilet at Level 1. 1 No -

M 1415 wide x 1200mm high mirror to Male Lobby toilet at Level 1. 1 No -

N 1430 wide x 1200mm high mirror to Female Lobby toilet at Level 1. 1 No -

P 1800 wide x 1200mm high mirror to Female and male Lobby/lounge 2 No -


toilet at Ground floor.

file:///conversion/tmp/scratch/495999449.xlsx Public area / 160 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

Q 2095 wide x 1200mm high mirror to Spa treatment rooms. 4 No -

R 950 wide x 1200mm high mirror to Service core toilet. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 161 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS (CONT'D)

CUBICLES AND DOORS

Glazed cubicles system; comprising --mm thick laminated tempered


glass, including white colour PVB, angle bracket, 20mm diameter x
150mm high stainless steel pedestal, fixing and accessories, as
specified. (Note : all material and details TBA)

S 2400mm high glazed cubicle partition to Public toilet and Spa treatment 53 m2 -
rooms.

Glazed cubicles door; comprising --mm thick laminated tempered glass,


including white colour PVB, steel stainless latch, bumper, hinges,
handle, fixing and accessories, as specified. (Note : all material and
details TBA)

T 600 wide x 2400mm high single swing cubicle doors to toilet at Public 7 No -
toilets.

U Ditto; but to Spa treatment room. 8 No -

OTHER WORKS

Other works; Tenderer to insert here:

V ___________________________

W ___________________________

X ___________________________

TOTAL ACCESSORIES AND FITMENTS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 162 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

SANITARY FIXTURES AND FITTINGS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
TOTO or equal approved, including all associated fittings and
accessories.

Lobby/lounge toilet @ Ground floor


D Water closet with jet spray. 4 No -
E Robe hook. 4 No -
F Toilet paper holder. 4 No -
G Lavatory with faucet. 4 No -
H Soap dispenser. 4 No -
J Urinal. 2 No -
K Hand dryer. 2 No -
L Floor drain. 4 No -

Lobby/lounge toilet @ Level 1


M Water closet with jet spray. 3 No -
N Robe hook. 3 No -
P Toilet paper holder. 3 No -
Q Lavatory with faucet. 2 No -
R Soap dispenser. 2 No -
S Urinal. 2 No -
T Hand dryer. 2 No -
U Floor drain. 2 No -

Disable toilet @ Level 1


V Water closet with jet spray. 1 No -
W Grab bar, L-shape. 1 No -
X Grab bar. 1 No -
Y Robe hook. 1 No -
Z Toilet paper holder. 1 No -
AA Lavatory with faucet. 1 No -
AB Soap dispenser. 1 No -
AC Hand dryer. 1 No -
AD Floor drain. 1 No -

Spa treatment toilet and shower


AE Water closet with jet spray. 4 No -
AF Robe hook. 4 No -
AG Toilet paper holder. 4 No -
AH Lavatory with faucet. 8 No -
AJ Soap dispenser. 8 No -
AK Shower set and mixer. 4 Set -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 163 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

AL Floor drain. 4 No -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 164 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

SANITARY FIXTURES AND FITTINGS (CONT'D)

Service core toilet


A Water closet with jet spray. 1 No -
B Wall hung lavatory with faucet. 1 No -
C Robe hook. 1 No -
D Toilet paper holder. 1 No -
E Floor drain. 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

F ___________________________

G ___________________________

H ___________________________

TOTAL SANITARY FIXTURES AND FITTINGS : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 165 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 3.4 - BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM]

No. Description Quantity Unit Rate Total

SUMMARY

A GENERALLY

B SITEWORKS -

C CONCRETE WORKS -

D STRUCTURAL METAL WORKS -

E NON STRUCTURAL METAL WORKS -

F MASONRY AND PARTITIONS -

G THERMAL AND MOISTURE PROTECTION -

H WOODWORK -

J DOORS AND WINDOWS -

K FINISHES -

L PAINTING AND DECORATIONS -

M ACCESSORIES AND FITMENTS -

N SANITARY FIXTURES AND FITTINGS -

TOTAL BUILDING 3 [LOBBY, SPA, KID'S CLUB AND GYM] : -

file:///conversion/tmp/scratch/495999449.xlsx Public area / 166 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

GENERALLY

A The following Bills of Quantities are a guide only. It is the responsibility


of the Tenderer to satisfy themselves of the accuracy of the description
for works requiring payment. The descriptions provided herein are for a
guide only as to the required scope of Works which form part of this
Contract and should be cross-referenced with all drawings and
specifications. All quantities, except those denoted "Item" are subject to
a re-measure based on the approved "for construction" drawings and
as per relevant provisions of the conditions of contract. The format
provided in these Bills should be followed in order to assist in tender
evaluation. Within each trade or section of works space is provided for
Tenderer to insert additional works items which require payment.

GENERALLY -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 167 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

SITEWORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SITEWORKS

SITE CLEARANCE

D Allow to excavate oversite to remove existing rubble and rubbish and 1,162 m2 -
top 600mm (min) vegetable soil and dispose off-site to Building 3.

E Ditto; but to Building 4. 1,018 m2 -

F Ditto; but to Building 5. 3,124 m2 -

G Ditto; but to Building 6. 2,092 m2 -

EXCAVATION

Detailed excavation from ground level; including backfill and disposal


off site all surplus material or store select material for re-use where
required;

Building 3
H Pilecap. 11 m3 -
J Tie beams. 11 m3 -
K Ground slab. 58 m3 -

Building 4
L Pilecap. 13 m3 -
M Tie beams. 16 m3 -
N Ground slab. 78 m3 -

Building 5
P Pilecap. 87 m3 -
Q Tie beams. 61 m3 -
R Ground slab. 256 m3 -

Building 6
S Pilecap. 57 m3 -
T Tie beams. 37 m3 -
U Ground slab. 170 m3 -

COMPACTION
Compact sub-grade from fill as specified under the following.

V Ground slab including pilecap and tie beams to Building 3. 384 m2 -

W Ditto; but to Building 4. 515 m2 -

X Ditto; but to Building 5. 1,746 m2 -

Y Ditto; but to Building 6. 1,290 m2 -

FILLING

Sand bed layer, spread, levelled, and compacted as specified.

Z 100mm thick sand bed layer under ground slab including pilecap and 384 m2 -
tie beams to Building 3.

AA Ditto; but to Building 4. 515 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 168 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

AB Ditto; but to Building 5. 1,746 m2 -

AC Ditto; but to Building 6. 1,290 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 169 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

SITEWORKS (CONT'D)

TERMITE CONTROL

Anti-termite protection including testing and inspections.

A To face of all concrete surfaces in contact with earth to Building 3. 530 m2 -

B Ditto; but to Building 4. 686 m2 -

C Ditto; but to Building 5. 2,572 m2 -

D Ditto; but to Building 6. 1,799 m2 -

CUTTING OFF PILE HEADS

Cut-off top of bored piles including disposal to an off-site location to the


following.

E 500mm diameter bored pile to Building 3. 23 No -

F Ditto; but to Building 4. 32 No -

G Ditto; but to Building 5. 140 No -

H Ditto; but to Building 6. 96 No -

OTHER WORKS

Other Works; Tenderer to insert here:

J _________________________

K _________________________

L _________________________

TOTAL SITEWORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 170 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

CONCRETE WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

D Ground slab including pilecap and tie beams to Building 3. 20 m3 -

E Ditto; but to Building 4. 26 m3 -

F Ditto; but to Building 5. 88 m3 -

G Ditto; but to Building 6. 65 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

Building 1

H Isolated columns. 23 m3 -

J 200mm thick suspended slab. 12 m3 -

K 150mm thick suspended slab. 183 m3 -

L Attached beams. 41 m3 -

M Roof beams 12 m3 -

N 250mm thick shearwall. 26 m3 -

P 130mm thick planter wall. 9 m3 -

Q 100mm thick fascia wall. 2 m3 -

Building 3

R Isolated columns. 18 m3 -

S Pilecap. 11 m3 -

T Tie beams. 11 m3 -

U 150mm thick ground slab. 58 m3 -

V 150mm thick suspended slab. 117 m3 -

W Attached beams. 21 m3 -

X Roof beams 7 m3 -

Y 250mm thick shearwall. 25 m3 -

Z 130mm thick planter wall. 7 m3 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 171 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

AA 100mm thick fascia wall. 2 m3 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 172 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

Building 4

A Isolated columns. 16 m3 -

B Pilecap. 13 m3 -

C Tie beams. 16 m3 -

D 150mm thick ground slab. 78 m3 -

E 150mm thick suspended slab. 76 m3 -

F Attached beams. 16 m3 -

G Roof beams 12 m3 -

H 130mm thick planter wall. 7 m3 -

J 100mm thick fascia wall. 2 m3 -

Building 5

K Isolated columns. 72 m3 -

L Pilecap. 87 m3 -

M Tie beams. 61 m3 -

N 150mm thick ground slab. 230 m3 -

P 120mm thick ground slab. 27 m3 -

Q 150mm thick suspended slab. 238 m3 -

R 120mm thick suspended slab. 8 m3 -

S Attached beams. 53 m3 -

T Roof beams 43 m3 -

U 130mm thick planter wall. 18 m3 -

V 100mm thick fascia wall. 4 m3 -

Building 6

W Isolated columns. 51 m3 -

X Pilecap. 57 m3 -

Y Tie beams. 37 m3 -

Z 150mm thick ground slab. 155 m3 -

AA 120mm thick ground slab. 16 m3 -

AB 150mm thick suspended slab. 159 m3 -

AC 120mm thick suspended slab. 6 m3 -

AD Attached beams. 35 m3 -

AE Roof beams 35 m3 -

AF 130mm thick planter wall. 13 m3 -

AG 100mm thick fascia wall. 4 m3 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 173 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

Building 1

A Isolated columns. 8.31 t -

B Suspended slab. 20.11 t -

C Attached beams. 12.48 t -

D Roof beams 1.98 t -

E Shearwalls. 1.93 t -

F Planter and fascia wall. 1.46 t -

Building 3

G Isolated columns. 6.26 t -

H Pilecaps. 1.31 t -

J Tie beams. 3.75 t -

K Ground slab. 6.02 t -

L Suspended slab. 12.26 t -

M Attached beams. 7.04 t -

N Roof beams 1.13 t -

P Shearwall. 2.56 t -

Q Planter and fascia wall. 1.25 t -

Building 4

R Isolated columns. 5.91 t -

S Pilecaps. 1.67 t -

T Tie beams. 5.84 t -

U Ground slab. 8.17 t -

V Suspended slab. 7.92 t -

W Attached beams. 5.18 t -

X Roof beams 1.72 t -

Y Planter and fascia wall. 1.18 t -

Building 5

Z Isolated columns. 29.35 t -

AA Pilecaps. 11.54 t -

AB Tie beams. 21.00 t -

AC Ground slab. 27.54 t -

AD Suspended slab. 25.75 t -

AE Attached beams. 18.30 t -

AF Roof beams 6.90 t -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 174 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

AG Planter and fascia wall. 3.20 t -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 175 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

Building 6

A Isolated columns. 21.00 t -

B Pilecaps. 7.70 t -

C Tie beams. 12.65 t -

D Ground slab. 18.04 t -

E Suspended slab. 17.26 t -

F Attached beams. 11.88 t -

G Roof beams 5.52 t -

H Planter and fascia wall. 2.38 t -

SHUTTERING

Shuttering, as specified to the following.

Building 1

J Faces of isolated columns. 277 m2 -

K Soffits of suspended slab. 1,105 m2 -

L Soffits and sides of suspended beams. 452 m2 -

M Soffits and sides of roof beams. 121 m2 -

N Face of shearwalls. 208 m2 -

P Face of planter walls. 124 m2 -

Q Face of fascia walls. 33 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 176 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

A Edges of suspended slabs; not exceeding 200mm high. 340 m -

B Edges of suspended roof slabs; not exceeding 150mm high. 340 m -

Building 3

C Faces of isolated columns. 233 m2 -

D Sides of pilecaps. 36 m2 -

E Sides of tie beams. 84 m2 -

F Soffits of suspended slab. 665 m2 -

G Soffits and sides of suspended beams. 231 m2 -

H Soffits and sides of roof beams. 59 m2 -

J Face of shearwalls. 195 m2 -

K Face of planter walls. 101 m2 -

L Face of fascia walls. 40 m2 -

M Edges of suspended slabs; not exceeding 150mm high. 168 m -

N Edges of suspended roof slabs; not exceeding 150mm high. 62 m -

Building 4

P Faces of isolated columns. 201 m2 -

Q Sides of pilecaps. 47 m2 -

R Sides of tie beams 107 m2 -

S Soffits of suspended slab. 426 m2 -

T Soffits and sides of suspended beams. 174 m2 -

U Soffits and sides of roof beams. 118 m2 -

V Face of planter walls. 101 m2 -

W Face of fascia walls. 23 m2 -

X Edges of suspended slabs; not exceeding 150mm high. 126 m -

Y Edges of suspended roof slabs; not exceeding 150mm high. 126 m -

Building 5

Z Faces of isolated columns. 1,008 m2 -

AA Sides of pilecaps. 271 m2 -

AB Sides of tie beams. 488 m2 -

AC Soffits of suspended slab. 1,369 m2 -

AD Soffits and sides of suspended beams. 601 m2 -

AE Soffits and sides of roof beams. 439 m2 -

AF Face of planter walls. 269 m2 -

AG Face of fascia walls. 75 m2 -

AH Edges of suspended slabs; not exceeding 150mm high. 483 m -

AJ Edges of suspended roof slabs; not exceeding 150mm high. 485 m -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 177 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

Building 6

A Faces of isolated columns. 704 m2 -

B Sides of pilecaps. 181 m2 -

C Sides of tie beams. 291 m2 -

D Soffits of suspended slab. 920 m2 -

E Soffits and sides of suspended beams. 391 m2 -

F Soffits and sides of roof beams. 342 m2 -

G Face of planter walls. 198 m2 -

H Face of fascia walls. 62 m2 -

J Edges of suspended slabs; not exceeding 150mm high. 252 m -

K Edges of suspended roof slabs; not exceeding 150mm high. 409 m -

OTHER WORKS

Other works; Tenderer to insert here:

L ___________________________

M ___________________________

N ___________________________

TOTAL CONCRETE WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 178 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

STRUCTURAL METAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

STRUCTURAL METAL WORKS

ROOF FRAME

Fabricate, deliver to site and erect, the following structural steelwork


using methods complying with the requirement of ST-37 for material,
construction, fabrication and erection including cutting, welding, jointing
as specified.

Building 1

D Column - WF 200x200x8x12 (49.9 kg/m). 0.32 t -

E Column - WF 150x150x7x10 (31.5 kg/m). 0.28 t -

F Rafter - WF 150x75x5x7 (14 kg/m). 3.23 t -

G Ring beam - C 150x75x6.5x9 (16.74 kg/m). 2.34 t -

H Truss - 2L 50x50x5 (7.54 kg/m). 1.18 t -

J Purlin - C 120x55x7x9 (13.4kg/m). 12.87 t -

K 16mm dia. deformed reinforced steel - wind bracing incl turn buckle 0.40 t -
(1.56kg/m).

L 10mm dia. sagrod for purlins (0.62kg/m). 0.11 t -

M 14mm thick base plate (109.9kg/m2). 0.09 t -

N 12mm thick base plate (94.2kg/m2). 0.07 t -

P 10mm thick joint plate (78.5kg/m2). 0.06 t -

Q 10mm thick gusset plate (78.5kg/m2). 0.06 t -

R 10mm thick top plate (78.5kg/m2). 0.12 t -

S 10mm thick stiffener plate (78.5kg/m2). 0.12 t -

T 8mm thick joint plate (62.8kg/m2). 0.33 t -

U 8mm thick gusset plate (62.8kg/m2). 0.13 t -

V 8mm thick stiffener plate (62.8kg/m2). 0.12 t -

Building 3

W Column - WF 200x200x8x12 (49.9 kg/m). 0.21 t -

X Column - WF 150x150x7x10 (31.5 kg/m). 0.14 t -

Y Rafter - WF 150x75x5x7 (14 kg/m). 1.45 t -

Z Ring beam - C 150x75x6.5x9 (16.74 kg/m). 0.94 t -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 179 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

AA Truss - 2L 50x50x5 (7.54 kg/m). 0.48 t -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 180 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

STRUCTURAL METAL WORKS (CONT'D)

A Purlin - C 120x55x7x9 (13.4kg/m). 7.72 t -

B 16mm dia. deformed reinforced steel - wind bracing incl turn buckle 0.22 t -
(1.56kg/m).

C 10mm dia. sagrod for purlins (0.62kg/m). 0.07 t -

D 14mm thick base plate (109.9kg/m2). 0.06 t -

E 12mm thick base plate (94.2kg/m2). 0.04 t -

F 10mm thick joint plate (78.5kg/m2). 0.03 t -

G 10mm thick gusset plate (78.5kg/m2). 0.03 t -

H 10mm thick top plate (78.5kg/m2). 0.07 t -

J 10mm thick stiffener plate (78.5kg/m2). 0.07 t -

K 8mm thick joint plate (62.8kg/m2). 0.15 t -

L 8mm thick gusset plate (62.8kg/m2). 0.05 t -

M 8mm thick stiffener plate (62.8kg/m2). 0.05 t -

Building 4

N Column - WF 200x200x8x12 (49.9 kg/m). 0.11 t -

P Column - WF 150x150x7x10 (31.5 kg/m). 0.14 t -

Q Rafter - WF 150x75x5x7 (14 kg/m). 1.29 t -

R Ring beam - C 150x75x6.5x9 (16.74 kg/m). 0.94 t -

S Truss - 2L 50x50x5 (7.54 kg/m). 0.48 t -

T Purlin - C 120x55x7x9 (13.4kg/m). 5.34 t -

U 16mm dia. deformed reinforced steel - wind bracing incl. turn buckle 0.16 t -
(1.56kg/m).

V 10mm dia. sagrod for purlins (0.62kg/m). 0.05 t -

W 14mm thick base plate (109.9kg/m2). 0.03 t -

X 12mm thick base plate (94.2kg/m2). 0.04 t -

Y 10mm thick joint plate (78.5kg/m2). 0.03 t -

Z 10mm thick gusset plate (78.5kg/m2). 0.03 t -

AA 10mm thick top plate (78.5kg/m2). 0.05 t -

AB 10mm thick stiffener plate (78.5kg/m2). 0.05 t -

AC 8mm thick joint plate (62.8kg/m2). 0.13 t -

AD 8mm thick gusset plate (62.8kg/m2). 0.05 t -

AE 8mm thick stiffener plate (62.8kg/m2). 0.05 t -

Building 5

AF Column - WF 200x200x8x12 (49.9 kg/m). 0.21 t -

AG Column - WF 150x150x7x10 (31.5 kg/m). 0.14 t -

AH Column - SL 60x60x6 (10.84 kg/m). 0.32 t -

AJ Rafter - WF 150x75x5x7 (14 kg/m). 1.92 t -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 181 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

AK Ring beam - C 150x75x6.5x9 (16.74 kg/m). 0.47 t -

AL Ring beam - 2L 50x50x5 (7.54 kg/m). 0.42 t -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 182 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

STRUCTURAL METAL WORKS (CONT'D)

A Truss - 2L 50x50x5 (7.54 kg/m). 0.24 t -

B Truss - 2L 60x60x6 (10.84 kg/m). 0.34 t -

C Purlin - C 120x55x7x9 (13.4kg/m). 7.72 t -

D 16mm dia. deformed reinforced steel - wind bracing incl. turn buckle 0.27 t -
(1.56kg/m).

E 10mm dia. sagrod for purlins (0.62kg/m). 0.07 t -

F 14mm thick base plate (109.9kg/m2). 0.06 t -

G 12mm thick base plate (94.2kg/m2). 0.04 t -

H 10mm thick base plate (78.5kg/m2). 0.02 t -

J 10mm thick joint plate (78.5kg/m2). 0.04 t -

K 10mm thick gusset plate (78.5kg/m2). 0.05 t -

L 10mm thick top plate (78.5kg/m2). 0.06 t -

M 10mm thick stiffener plate (78.5kg/m2). 0.05 t -

N 8mm thick joint plate (62.8kg/m2). 0.20 t -

P 8mm thick gusset plate (62.8kg/m2). 0.07 t -

Q 8mm thick stiffener plate (62.8kg/m2). 0.03 t -

Building 6

R Column - WF 200x200x8x12 (49.9 kg/m). 0.11 t -

S Column - WF 150x150x7x10 (31.5 kg/m). 0.14 t -

T Column - SL 60x60x6 (10.84 kg/m). 0.22 t -

U Rafter - WF 150x75x5x7 (14 kg/m). 1.28 t -

V Ring beam - C 150x75x6.5x9 (16.74 kg/m). 0.32 t -

W Ring beam - 2L 50x50x5 (7.54 kg/m). 0.28 t -

X Truss - 2L 50x50x5 (7.54 kg/m). 0.16 t -

Y Truss - 2L 60x60x6 (10.84 kg/m). 0.23 t -

Z Purlin - C 120x55x7x9 (13.4kg/m). 5.34 t -

AA 16mm dia. deformed reinforced steel - wind bracing incl. turn buckle 0.18 t -
(1.56kg/m).

AB 10mm dia. sagrod for purlins (0.62kg/m). 0.03 t -

AC 14mm thick base plate (109.9kg/m2). 0.03 t -

AD 12mm thick base plate (94.2kg/m2). 0.04 t -

AE 10mm thick base plate (78.5kg/m2). 0.02 t -

AF 10mm thick joint plate (78.5kg/m2). 0.03 t -

AG 10mm thick gusset plate (78.5kg/m2). 0.04 t -

AH 10mm thick top plate (78.5kg/m2). 0.04 t -

AJ 10mm thick stiffener plate (78.5kg/m2). 0.04 t -

AK 8mm thick joint plate (62.8kg/m2). 0.13 t -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 183 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

AL 8mm thick gusset plate (62.8kg/m2). 0.05 t -

AM 8mm thick stiffener plate (62.8kg/m2). 0.02 t -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 184 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

STRUCTURAL METAL WORKS (CONT'D)

Cast-in-anchor BJTD 400, including galvanized rings, bolts and


fastenings all as specified.

Building 1

A 313mm long anchor bolt D16mm. 24 No -

B 335mm long anchor bolt D13mm. 16 No -

C 285mm long anchor bolt D13mm. 32 No -

Building 3

D 313mm long anchor bolt D 16mm. 16 No -

E 335mm long anchor bolt D 13mm. 8 No -

F 285mm long anchor bolt D 13mm. 16 No -

Building 4

G 313mm long anchor bolt D 16mm. 8 No -

H 335mm long anchor bolt D 13mm. 8 No -

J 285mm long anchor bolt D 13mm. 16 No -

Building 5

K 313mm long anchor bolt D 16mm. 16 No -

L 335mm long anchor bolt D 13mm. 8 No -

M 285mm long anchor bolt D 13mm. 34 No -

Building 6

N 313mm long anchor bolt D 16mm. 8 No -

P 335mm long anchor bolt D 13mm. 8 No -

Q 285mm long anchor bolt D 13mm. 28 No -

High tensile strength hot dip galvanized bolts Grade ASTM A-325,
including rings, nuts, hole making and fastening; all as specified.

R D12 bolts at Building 1. 600 No -

S Ditto; but to Building 3. 252 No -

T Ditto; but to Building 4. 240 No -

U Ditto; but to Building 5. 396 No -

V Ditto; but to Building 6. 264 No -

Portland cement based non-shrink grouting including cleaning contact


surface, as specified.

W 25mm thick non-shrinkage grouting under plate to Building 1. 1.39 m2 -

X Ditto; but to Building 3. 0.82 m2 -

Y Ditto; but to Building 4. 0.57 m2 -

Z Ditto; but to Building 5. 1.03 m2 -

AA Ditto; but to Building 6. 0.71 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 185 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

STRUCTURAL METAL WORKS (CONT'D)

Steelworks finishing, as specified

A Prepare and apply epoxy paint ex.HEMBEL to steel works to Building 1. 21.83 t -

B Ditto; but to Building 3. 11.78 t -

C Ditto; but to Building 4. 8.97 t -

D Ditto; but to Building 5. 12.74 t -

E Ditto; but to Building 6. 8.73 t -

OTHER WORKS

Other works; Tenderer to insert here:

F ___________________________

G ___________________________

H ___________________________

TOTAL STRUCTURAL METAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 186 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

NON STRUCTURAL METAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

NON STRUCTURAL METAL WORKS

D Balustrade to Service core stair #2 at Level 1, measured in Note


"Circulation/corridor".

BALUSTRADES AND HANDRAILS

Frameless glazed balustrade; comprising 16mm thick clear tempered


glass balustrade, including 130 wide x 30mm thick solid timber
handrail, support frame, sealants, steel plate, fixing and accessories, as
specified as drawing A90-03, A71-01.

E 1250mm high balustrade type B to balcony at Building 1 (as drawing 47 m -


A41-01-02) .

F Ditto; but to Building 3. 41 m -

G Ditto; but to Building 4. 38 m -

H Ditto; but to balcony and entrance foyer at Building 5. 223 m -

J Ditto; but to balcony and entrance foyer at Building 6. 149 m -

ROOF

K Structural metal works to Main roof measured separately. Note

L Timber fascia and Timber shingles measured separately in Note


"Woodwork".

Insulated metal roof panel ex. Kingspan or equal approved, including


support frame, fixing and accessories, as specified as drawing A92-01,
A92-03, to :

M Roof covering to Building 1. 831 m2 -

N Ditto; but to Building 3. 495 m2 -

P Ditto; but to Building 4. 675 m2 -

Q Ditto; but to Building 5. 2,092 m2 -

R Ditto; but to Building 6. 1,351 m2 -

ROOF TRELLIS

Metal trellis roof (MS01); comprising metal bar welded to framing,


including wood cladded to metal bar, fixing and accessories, as
specified as drawing A83-02, A52-02.

S 1530 long x 1000mm wide roof trellis to balcony area at Building 1. 5 No -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 187 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

T Ditto; but to Building 3. 3 No -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 188 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

NON STRUCTURAL METAL WORKS (CONT'D)

A Ditto; but to Building 4. 4 No -

B Ditto; but to Building 5. 12 No -

C Ditto; but to Building 6. 12 No -

OTHER WORKS

Other works; Tenderer to insert here:

D ___________________________

E ___________________________

F ___________________________

TOTAL NON-STRUCTURAL METAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 189 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Building 1

Externally

D 100mm thick masonry walls generally. 236 m2 -

E 200mm thick masonry walls generally. 177 m2 -

F 250mm thick cavity masonry walls generally. 370 m2 -

Internally

G 100mm thick masonry walls generally. 323 m2 -

H 200mm thick masonry walls generally. 31 m2 -

J 250mm thick cavity masonry walls generally. 299 m2 -

K 1500 high x 200mm thick backwall to urinal and water closet (QS 15 m -
ASSUMED SIZE).

Building 3

Externally

L 100mm thick masonry walls generally. 196 m2 -

M 200mm thick masonry walls generally. 97 m2 -

N 250mm thick cavity masonry walls generally. 241 m2 -

Internally

P 100mm thick masonry walls generally. 256 m2 -

Q 200mm thick masonry walls generally. 43 m2 -

R 250mm thick cavity masonry walls generally. 345 m2 -

S 1500 high x 200mm thick backwall to urinal and water closet (QS 15 m -
ASSUMED SIZE).

Building 4 (2 No)

Externally

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 190 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

T 100mm thick masonry walls generally. 114 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 191 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS (CONT'D)

A 200mm thick masonry walls generally. 95 m2 -

B 250mm thick cavity masonry walls generally. 366 m2 -

Internally

C 100mm thick masonry walls generally. 108 m2 -

D 200mm thick masonry walls generally. 25 m2 -

E 250mm thick cavity masonry walls generally. 223 m2 -

F 1500 high x 200mm thick backwall to urinal and water closet (QS 12 m -
ASSUMED SIZE).

Building 5 (4 No)

Externally

G 100mm thick masonry walls generally. 470 m2 -

H 200mm thick masonry walls generally. 271 m2 -

J 250mm thick cavity masonry walls generally. 625 m2 -

Internally

K 100mm thick masonry walls generally. 396 m2 -

L 200mm thick masonry walls generally. 146 m2 -

M 250mm thick cavity masonry walls generally. 1,381 m2 -

N 1500 high x 200mm thick backwall to urinal and water closet (QS 47 m -
ASSUMED SIZE).

Building 6 (4 No)

Externally

P 100mm thick masonry walls generally. 314 m2 -

Q 200mm thick masonry walls generally. 367 m2 -

R 250mm thick cavity masonry walls generally. 462 m2 -

Internally

S 100mm thick masonry walls generally. 264 m2 -

T 200mm thick masonry walls generally. 97 m2 -

U 250mm thick cavity masonry walls generally. 949 m2 -

V 1500 high x 200mm thick backwall to urinal and water closet (QS 32 m -
ASSUMED SIZE).

PARTITIONS

Building 1

Sandwich panel ex. Kingspan or equal approved, including support


frame, fixing and accessories, as specified, to :.

W Front and rear wall section to Level 2 at Building 1 (as drawing A40-01- 227 m2 -
03, A41-01-02)

Calsium silicate board panel; comprising 2x12mm thick board panel,


including galvanised metal frames, fixing and accessories, as specified
as drawing A92-02 detail 02, to :

X Front and rear wall section to Level 2 at Building 1 (as drawing A40-01- 227 m2 -
03, A41-02-03)

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 192 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

Y 180mm wide wall list to rear section (as drawing A92-02 Detail 2). 58 m -

Z Internal front face wall to roof eaves Level 2 at Building 1 (as drawing 114 m2 -
A92-03).

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 193 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS (CONT'D)

Building 3

Sandwich panel ex. Kingspan or equal approved, including support


frame, fixing and accessories, as specified, to :.

A Front and rear wall section to Level 2 at Building 3 (as drawing A40-02- 137 m2 -
01, A41-02-03)

Calsium silicate board panel; comprising 2x12mm thick board panel,


including galvanised metal frames, fixing and accessories, as specified
as drawing A92-02 detail 02, to :

B Front and rear wall section to Level 2 at Building 3 (as drawing A40-02- 137 m2 -
01, A41-02-03)

C 180mm wide wall list to rear section (as drawing A92-02 Detail 2). 35 m -

D Internal front face wall to roof eaves Level 2 at Building 3 (as drawing 69 m2 -
A92-03).

Building 4 (2 No)

Sandwich panel ex. Kingspan or equal approved, including support


frame, fixing and accessories, as specified, to :.

E Front and rear wall section to Level 2 at Building 1 (as drawing A40-03, 181 m2 -
A41-03-01)

Calsium silicate board panel; comprising 2x12mm thick board panel,


including galvanised metal frames, fixing and accessories, as specified
as drawing A92-02 detail 02, to :

F Front and rear wall section to Level 2 at Building 3 (as drawing A40-03, 181 m2 -
A41-03-01)

G 180mm wide wall list to rear section (as drawing A92-02 Detail 2). 47 m -

H Internal front face wall to roof eaves Level 2 at Building 4 (as drawing 91 m2 -
A92-03).

Building 5 (4 No)

Sandwich panel ex. Kingspan or equal approved, including support


frame, fixing and accessories, as specified, to :.

J Front and rear wall section to Level 2 at Building 5 (as drawing A40-04, 543 m2 -
A41-04-01)

Calsium silicate board panel; comprising 2x12mm thick board panel,


including galvanised metal frames, fixing and accessories, as specified
as drawing A92-02 detail 02, to :

K Front and rear wall section to Level 2 at Building 5 (as drawing A40-04, 543 m2 -
A41-04-01)

L 180mm wide wall list to rear section (as drawing A92-02 Detail 2). 139 m -

M Internal front face wall to roof eaves Level 2 at Building 5 (as drawing 272 m2 -
A92-03).

Building 6 (4 No)

Sandwich panel ex. Kingspan or equal approved, including support


frame, fixing and accessories, as specified, to :.

N Front and rear wall section to Level 2 at Building 6 (as drawing A40-04, 362 m2 -
A41-04-01)

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 194 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS (CONT'D)

Calsium silicate board panel; comprising 2x12mm thick board panel,


including galvanised metal frames, fixing and accessories, as specified
as drawing A92-02 detail 02, to :

A Front and rear wall section to Level 2 at Building 6 (as drawing A40-04, 362 m2 -
A41-04-01)

B 180mm wide wall list to rear section (as drawing A92-02 Detail 2). 93 m -

C Internal front face wall to roof eaves Level 2 at Building 6 (as drawing 181 m2 -
A92-03).

OTHER WORKS

Other works; Tenderer to insert here:

D ___________________________

E ___________________________

F ___________________________

TOTAL MASONRY AND PARTITIONS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 195 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

D Top of concrete slab to balcony and entry foyer at Building 1. 289 m2 -

E Ditto; but to Building 3. 250 m2 -

F Ditto; but to Building 4. 232 m2 -

G Ditto; but to Building 5. 569 m2 -

H Ditto; but to Building 6. 380 m2 -

J 200mm high turns-up to form skirting to above areas (as drawing A40- 717 m -
02-03).

WATERPROOFING - INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

K Top of concrete slab to Toilet and shower room at Building 1. 220 m2 -

L Ditto; but to Building 3. 220 m2 -

M Ditto; but to Building 4. 176 m2 -

N Ditto; but to Building 5. 700 m2 -

P Ditto; but to Building 6. 467 m2 -

Q 300mm high upstand to form skirting (as drawing A91-01). 1,057 m -

Cement based waterproofing, including primers etc. all as specified, to :

R Face of rendered masonry / concrete walls to shower room at Building 104 m2 -


1 [1800mm high].

S Ditto; but to Building 3. 101 m2 -

T Ditto; but to Building 4. 83 m2 -

U Ditto; but to Building 5. 309 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 196 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

V Ditto; but to Building 6. 206 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 197 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION (CONT'D

INSULATION

Insulation; comprising 50mm thick fireproof mineral fibre rockwool


insulation, including fixing and accessories, as specified as drawing
A41-04-01 and A92-02, to :

A Between steel roof structure to Building 1. 831 m2 -

B Ditto; but to Building 3. 495 m2 -

C Ditto; but to Building 4. 675 m2 -

D Ditto; but to Building 5. 2,092 m2 -

E Ditto; but to Building 6. 1,351 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

F ___________________________

G ___________________________

H ___________________________

TOTAL THERMAL AND MOISTURE PROTECTION : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 198 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

WOODWORK

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

WOODWORK

ROOF FINISHES

Roof timber shingles (W01); comprising 4 layers of 20mm thick steam


bent Ulin timber shingles with 140mm wide overlap, including solid
wood batten, fixing and accessories, as specified as drawing A90-02
and Elevation drawings.

D Roof finish at Building 1. 831 m2 -

E Ditto; but to Building 3. 495 m2 -

F Ditto; but to Building 4. 675 m2 -

G Ditto; but to Building 5. 2,092 m2 -

H Ditto; but to Building 6. 1,351 m2 -

Ventilated roof ridge; comprising 10mm thick Ulin wood ridge, including
finishes, fixing and accessories, as specified as drawing A92-01.

J 200mm wide roof ridge at Building 1. 70 m -

K Ditto; but to Building 3. 78 m -

L Ditto; but to Building 4. 56 m -

M Ditto; but to Building 5. 166 m -

N Ditto; but to Building 6. 111 m -

BALUSTRADES AND HANDRAILS

Decorative timber stud balustrade; comprising 30x50mm thick timber


stud with decorative pattern, including finishes, fixing and accessories,
as specified as drawing A71-03, to :

P 1250mm high timber stud balustrade fixed to glazed balustrade at 47 m -


Building 1 (as drawing A41-01-02) .

Q Ditto; but to Building 3. 41 m -

R Ditto; but to Building 4. 38 m -

S Ditto; but to Building 5. 51 m -

T Ditto; but to Building 6. 34 m -

U 710mm high timber stud balustrade fixed to room daybed-balcony at 26 m -


Building 3.

V Ditto; but to Building 5. 102 m -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 199 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

W Ditto; but to Building 6. 68 m -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 200 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

WOODWORK (CONT'D)

WALL FINISHES

Timber wall shingles (W01); comprising 3 layers of 20mm thick Ulin


timber shingle with 140mm wide overlap, including solid wood batten,
fixing and accessories, as specified as drawing A90-02 and Elevation
drawings, to :

A Overall external wall facade at Building 1. 360 m2 -

B Ditto; but to Building 3. 227 m2 -

C Ditto; but to Building 4. 218 m2 -

D Ditto; but to Building 5. 343 m2 -

E Ditto; but to Building 6. 343 m2 -

Timber wall cladding (W02); comprising 150x2400mm wide Ulin timber


plank (W02) with 2mm wide gap, including solid wood batten, fixing and
accessories, as specified as Elevation drawings, to :

F Vaulted/Gable wall rear elevation to Building 1. 417 m2 -

G Ditto; but to Building 3. 302 m2 -

H Ditto; but to Building 4. 199 m2 -

J Ditto; but to Building 5. 595 m2 -

K Ditto; but to Building 6. 395 m2 -

Timber wall cladding (W05); comprising 150x2400mm wide Teak


timber plank (W05) with 2mm wide gap, including solid wood batten,
fixing and accessories, as specified as Elevation drawings, to :

L Vaulted/Gable wall front elevation to Building 1. 181 m2 -

M Ditto; but to Building 3. 69 m2 -

N Ditto; but to Building 4. 91 m2 -

P Ditto; but to Building 5. 272 m2 -

Q Ditto; but to Building 6. 181 m2 -

Balustrade fascia; comprising 25mm thick Ulin timber (W03), including


finishes, fixing and accessories, as specified as drawing A90-03.

R 75 wide x 240mm high fascia type B to balcony edge at Building 1. 47 m -

S 75 wide x 240mm high fascia type A to balcony edge at Building 3. 41 m -

T Ditto; but to Building 4. 38 m -

U Ditto; but to balcony and entry foyer at Building 5. 121 m -

V Ditto; but to balcony and entry foyer at Building 6. 81 m -

W 235+270mm high timber stud balustrade fixed to room daybed-balcony 26 m -


at Building 3 (as drawing A71-03).

X Ditto; but to Building 5. 102 m -

Y Ditto; but to Building 6. 68 m -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 201 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

WOODWORK (CONT'D)

Upper roof eaves fascia board; comprising Ulin timber fascia (W03),
including finishes, support frame, fixing and accessories, as specified
as drawing A92-02, to :

A 415mm wide roof eaves to front and rear elevation at Building 1. 213 m -

B Ditto; but to Building 3. 152 m -

C Ditto; but to Building 4. 178 m -

D Ditto; but to Building 5. 506 m -

E Ditto; but to Building 6. 356 m -

Lower roof eaves fascia board; comprising Teak timber fascia (W05),
including finishes, support frame, fixing and accessories, as specified
as drawing A92-03, to :

F 200mm wide roof eaves to front elevation at Building 1. 58 m -

G Ditto; but to Building 3. 35 m -

H Ditto; but to Building 4. 47 m -

J Ditto; but to Building 5. 139 m -

K Ditto; but to Building 5. 93 m -

CEILING FINISHES

Timber ceiling (CF-04); comprising 20mm thick Ulin timber plank with
finishes (T-02), including support frame and hanger, fixing and
accessories, as specified as drawing A92-03, to :

L Upper balcony roof at Building 1. 166 m2 -

M Ditto; but to Building 3. 100 m2 -

N Ditto; but to Building 4. 133 m2 -

P Ditto; but to Building 5. 400 m2 -

Q Ditto; but to Building 6. 267 m2 -

Timber bulkhead; comprising 6mm thick marine plywood backing,


25mm thick timber fascia, including 5mm thick adhesive, fixing and
accessories, as specified as drawing A71-03.

R 200mm high timber bulkhead to balcony at Building 1. 47 m -

S Ditto; but to Building 3. 55 m -

T Ditto; but to Building 4. 37 m -

U Ditto; but to Building 5. 109 m -

V Ditto; but to Building 6. 73 m -

SCREEN

Decorative timber trellis (SL-0); comprising 30x60mm thick Ulin timber


element with direct fix clip system, copper sheet wrapped around
timber core, including fixing and accessories, as specified as drawing
A83-02 and A97-01.

W 900 wide x 6275mm high timber trellis (SL01) to front elevation at 5 No -


Building 1.

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 202 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

X Ditto; but to Building 4. 4 No -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 203 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

WOODWORK (CONT'D)

A 900 wide x 6275mm high timber trellis (SL01/SL03) to front elevation at 12 No -


Building 5.

B Ditto; but to Building 6. 8 No -

C 900 wide x 6275mm high timber trellis (SL01/SL02) to front elevation at 3 No -


Building 3.

Decorative timber screen (S-0); comprising 120 wide x 750 high x


30mm thick perforated timber with copper frame, 30x60mm thick Ulin
timber element with direct fix clip system, copper sheet wrapped
around timber core, including fixing and accessories, as specified as
drawing A52-07 and A97-01.

D 1530 wide x 6275mm high timber screen (S02) to front elevation at 4 No -


Building 4.

E Ditto; but to Building 1. 5 No -

F 1530 wide x 6275mm high timber screen (S03/S05) to front elevation at 12 No -


Building 5.

G Ditto; but to Building 6. 8 No -

H 1530 wide x 6275mm high timber screen (S03/S04) to front elevation at 3 No -


Building 3.

J 1650 wide x 6275mm high timber screen (S01) to bathroom elevation 10 No -


at Building 1.

K Ditto; but to Building 3. 6 No -

L Ditto; but to Building 4. 8 No -

M Ditto; but to Building 5. 24 No -

N Ditto; but to Building 6. 16 No -

OTHER WORKS

Other works; Tenderer to insert here:

P ___________________________

Q ___________________________

R ___________________________

TOTAL WOODWORK : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 204 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

D Doors hardware measured separately in 'IRONMONGERY'. Note

DOORS AND WINDOWS

EXTERNAL DOORS AND WINDOWS

GLAZED DOORS AND FIXED WINDOWS

Glazed door and fixed windows; comprising 8mm thick single clear
tempered glass panel, aluminium transom and mullion in bronze
powder coated finish, including sealants, fixing and accessories.

E Overall size, 4550 wide x 2700mm high fixed window to receive 3100 10 No -
wide x 2700mm high folding door [3 no of leaves] (GD06) to Balcony at
Standard rooms - Building 1.

F Ditto; but to Building 3. 12 No -

G Ditto; but to Building 4. 8 No -

H Ditto; but to Building 5. 48 No -

J Ditto; but to Building 6. 32 No -

K Overall size, 9350 wide x 2700mm high fixed window to receive 7020 5 No -
wide x 2700mm high folding door [6 no of leaves] (GD07) to Balcony at
Suite rooms - Building 1.

L Ditto; but to Building 3. 3 No -

M Ditto; but to Building 4. 4 No -

WINDOW AND FRAMES

Fixed windows; comprising 8mm thick single clear tempered glass


panel, aluminium transom and mullion in bronze powder coated finish,
including sealants, fixing and accessories.

N 2000 wide x 1950mm high window (GW01) to Bathroom at Standard 10 No -


rooms - Building 1.

P Ditto; but to Building 3. 12 No -

Q Ditto; but to Building 4. 8 No -

R Ditto; but to Building 5. 48 No -

S Ditto; but to Building 6. 32 No -

T Ditto; but to Suite rooms - Building 1. 10 No -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 205 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

U Ditto; but to Building 3. 6 No -

V Ditto; but to Building 4. 8 No -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 206 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

A 1095 wide x 2650mm high single swing door (TD02) to Main entry at 110 No -
Standard rooms.

B Ditto; but to Building 3. 12 No -

C Ditto; but to Building 4. 8 No -

D Ditto; but to Building 5. 48 No -

E Ditto; but to Building 6. 32 No -

F Ditto; but to Suite rooms - Building 1. 5 No -

G Ditto; but to Building 3. 3 No -

H Ditto; but to Building 4. 4 No -

Solid timber frame; including paint finish, fixing and accessories, as


specified.

J 150-200 wide x 40mm thick solid timber frame to timber doors. :[122 793 m -
No]

Sundries

K Extra over for external shaft doors, complete with finishes. 134 No -
[PROVISIONAL QUANTITY]

INTERNAL DOORS

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

L 900 wide x 2650mm high single sliding door (TD04) to Bathroom at 24 No -


Suite rooms.

Solid timber frame; including paint finish, fixing and accessories, as


specified.

M 150-200 wide x 40mm thick solid timber frame to timber doors. :[24 No] 152 m -

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to the


following doors.
EXTERNAL DOORS

GLAZED DOORS

To suit folding-sliding door type GD06 [3 no of leaves]:


N Handle. 110 Pair -
P Lockcase. 110 No -
Q Sliding track, L=4550mm. 110 No -

To suit folding-sliding door type GD07 [6 no of leaves]:


R Handle. 12 Pair -
S Lockcase. 12 No -
T Sliding track, L=9350mm. 12 No -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 207 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

TIMBER DOORS

To suit single swing door type TD02, hardware HW01 :


A Lever handle with mortise lock; FSB model 10 1035 satin brass finish 122 Pair -
ex. Assa abloy (ASL).
B Invisible door lock; RFID Essence Vingcard ex. Assa abloy (ASL). 122 Set -
C Concealed hinges (4 nos per door leaves); TE340 3D satin brass finish 488 No -
#047 ex.Tectus (TE).
D Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 122 No -
heath (SH).
E Door viewer; door spy 200 brass finish chr 14mm ex. Startec (ST). 122 No -
F Floor mounted door stopper; M496 brass finish ex. Hoppe (HO). 122 No -
G Retracable drop-down sill seal; DDS12 ex. Startec (ST). 122 No -

To suit single swing shaft door : (QS ASSUMED)


H Recessed pull handle. 134 Pair -
J Stainless steel hinges (HW03) (3 nos per door leaves). 402 No -

INTERNAL DOORS

TIMBER DOORS

To suit single sliding door type TD04:


K Handle. 24 Pair -
L Lockcase. 24 No -
M Sliding track, L=950mm. 24 No -

OTHER WORKS

Other works; Tenderer to insert here:

N ___________________________

P ___________________________

Q ___________________________

TOTAL DOORS AND WINDOWS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 208 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

FINISHES

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

FINISHES

FLOOR FINISHES - EXTERNALLY

Microtopping (M01), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

D Balconies and entry foyer at Building 1. 289 m2 -

E Ditto; but to Building 3. 250 m2 -

F Ditto; but to Building 4. 232 m2 -

G Ditto; but to Building 5. 569 m2 -

H Ditto; but to Building 6. 380 m2 -

Stone skirting (ST08); comprising 25-50mm thick Lavastone skirting,


including backing, adhesive, grouting, as specified as drawing A90-02
and Elevation drawings.

J 100mm high skirting to external wall at Building 1. 15 m -

K Ditto; but to Building 3. 26 m -

L Ditto; but to Building 4. 90 m -

M Ditto; but to Building 5. 213 m -

N Ditto; but to Building 6. 119 m -

FLOOR FINISHES - INTERNALLY

P No skirting to internal rooms. Note

Microtopping (M01), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

Q Bedroom and bathrooms to Building 1. 829 m2 -

R Ditto; but to Building 3. 765 m2 -

S Ditto; but to Building 4. 663 m2 -

T Ditto; but to Building 5. 2,139 m2 -

U Ditto; but to Building 6. 1,426 m2 -

WALL FINISHES - EXTERNALLY

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 209 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

V Masonry walls generally at Building 1. 875 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 210 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

A Ditto; but to Building 3. 556 m2 -

B Ditto; but to Building 4. 643 m2 -

C Ditto; but to Building 5. 1,684 m2 -

D Ditto; but to Building 6. 1,282 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

E Face of concrete columns and walls to general areas at Building 1. 62 m2 -

F Ditto; but to Building 3. 204 m2 -

G Ditto; but to Building 4. 113 m2 -

H Ditto; but to Building 5. 306 m2 -

J Ditto; but to Building 6. 215 m2 -

WALL FINISHES - INTERNALLY

Stone wall tiles with polished finish (ST05); comprising 15mm thick
stone, including backing, adhesive, grouting, as specified, to :

K Toilet and shower room at Building 1. 413 m2 -

L Ditto; but to Building 3. 380 m2 -

M Ditto; but to Building 4. 330 m2 -

N Ditto; but to Building 5. 1,061 m2 -

P Ditto; but to Building 6. 708 m2 -

Q 200mm wide stone ledge to backwall to Building 1. (PROVISIONAL 15 m -


SUM)
R Ditto; but to Building 3. 15 m -

S Ditto; but to Building 4. 12 m -

T Ditto; but to Building 5. 47 m -

U Ditto; but to Building 6. 32 m -

15mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

V Masonry walls generally at Building 1. 1,592 m2 -

W Ditto; but to Building 3. 1,237 m2 -

X Ditto; but to Building 4. 865 m2 -

Y Ditto; but to Building 5. 3,899 m2 -

Z Ditto; but to Building 6. 2,812 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

AA Face of concrete columns and walls to general areas at Building 1. 51 m2 -

AB Ditto; but to Building 3. 51 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 211 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

AC Ditto; but to Building 4. 41 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 212 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

A Ditto; but to Building 5. 162 m2 -

B Ditto; but to Building 6. 108 m2 -

CEILING FINISHES - EXTERNALLY

Calsium silicate board ceiling (CF03); 2x10mm thick calsium silicate


board ceiling, taped and sanded and prepare smooth to receive paint
finish (paint finish measured separately), including aluminium shadow
line, metal furring framing and fixing accessories, as specified, to :

C Upper balcony roof eaves at Building 1. 38 m2 -

D Ditto; but to Building 3. 23 m2 -

E Ditto; but to Building 4. 30 m2 -

F Ditto; but to Building 5. 91 m2 -

G Ditto; but to Building 6. 61 m2 -

Calsium silicate board ceiling (CF03); 10mm thick calsium silicate


board ceiling, taped and sanded and prepare smooth to receive paint
finish (paint finish measured separately), including aluminium shadow
line, metal furring framing and fixing accessories, as specified, to :

H Lower balconies at Building 1. 96 m2 -

J Ditto; but to Building 3. 115 m2 -

K Ditto; but to Building 4. 77 m2 -

L Ditto; but to Building 5. 461 m2 -

M Ditto; but to Building 6. 307 m2 -

N Soffit slab of planter box area at Building 1. 28 m2 -

P Ditto; but to Building 3. 25 m2 -

Q Ditto; but to Building 4. 23 m2 -

R Ditto; but to Building 5. 67 m2 -

S Ditto; but to Building 6. 45 m2 -

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

T Soffit of concrete slab to Lower balconies at Building 1. 14 m2 -

U Ditto; but to Building 3. 17 m2 -

V Ditto; but to Building 4. 11 m2 -

W Ditto; but to Building 5. 65 m2 -

X Ditto; but to Building 6. 44 m2 -

CEILING FINISHES - INTERNALLY

Flush gypsum board ceiling (CF01); 10mm thick gypsum board ceiling,
taped and sanded and prepare smooth to receive paint finish (paint
finish measured separately), including aluminium shadow line, metal
furring framing and fixing accessories, as specified, to :

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 213 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

Y Bedroom at Building 1. 694 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 214 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

A Ditto; but to Building 3. 684 m2 -

B Ditto; but to Building 4. 555 m2 -

C Ditto; but to Building 5. 1,832 m2 -

D Ditto; but to Building 6. 1,221 m2 -

E 450mm high bulkhead between bathroom and bedroom at Building 1 92 m -


(as drawing A12-03-01).

F Ditto; but to Building 3. 56 m -

G Ditto; but to Building 4. 74 m -

H Ditto; but to Building 5. 217 m -

J Ditto; but to Building 6. 145 m -

K 150mm girth curtain box to Building 1 (as drawing A12-03-01). 92 m -

L Ditto; but to Building 3. 56 m -

M Ditto; but to Building 4. 74 m -

N Ditto; but to Building 5. 217 m -

P Ditto; but to Building 6. 145 m -

Flush water resistant gypsum board ceiling (CF02); 12mm thick


gypsum board ceiling ex. Jayaboard or Knauf or equal approved, taped
and sanded and prepare smooth to receive paint finish (paint finish
measured separately), including aluminium shadow line, metal furring
framing and fixing accessories; all as specified, to : (Note : QS
ASSUME THICKNESS)

Q Toilet and shower room at Building 1. 361 m2 -

R Ditto; but to Building 3. 330 m2 -

S Ditto; but to Building 4. 289 m2 -

T Ditto; but to Building 5. 907 m2 -

U Ditto; but to Building 6. 605 m2 -

V 600 x 600mm wide access panel to Building 1 (as drawing A12-03-01). 15 No -

W Ditto; but to Building 3. 15 No -

X Ditto; but to Building 4. 12 No -

Y Ditto; but to Building 5. 48 No -

Z Ditto; but to Building 6. 32 No -

AA Light cove to bathroom at Building 1 (as drawing A-12-03-01). 44 m -

AB Ditto; but to Building 3. 44 m -

AC Ditto; but to Building 4. 36 m -

AD Ditto; but to Building 5. 141 m -

AE Ditto; but to Building 6. 94 m -

OTHER WORKS

Other works; Tenderer to insert here:

AF ___________________________

AG ___________________________

AH ___________________________

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 215 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

TOTAL FINISHES : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 216 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

PAINTING AND DECORATIONS

WALLS

Prepare smooth and apply textured weathershield paint finish-stucco


(PT01); in accordance with manufacturer's recommendations; as
specified.

D Rendered masonry walls and Skim coated concrete walls/columns to 470 m2 -


Building 1.
E Ditto; but to Building 3. 409 m2 -

F Ditto; but to Building 4. 381 m2 -

G Ditto; but to Building 5. 1,093 m2 -

H Ditto; but to Building 6. 729 m2 -

Prepare smooth and apply acrylic emulsion paint finish; in accordance


with manufacturer's recommendations; as specified.

J Rendered masonry walls and Skim coated concrete walls/columns 1,643 m2 -


(PT05) to Building 1.
K Ditto; but to Building 3. 1,288 m2 -

L Ditto; but to Building 4. 906 m2 -

M Ditto; but to Building 5. 4,061 m2 -

N Ditto; but to Building 6. 2,812 m2 -

CEILINGS

Prepare smooth and apply weathershield paint finish; in accordance


with manufacturer's recommendations; as specified.

P Calsium silicate board ceiling to Building 1. 162 m2 -

Q Ditto; but to Building 3. 163 m2 -

R Ditto; but to Building 4. 130 m2 -

S Ditto; but to Building 5. 619 m2 -

T Ditto; but to Building 6. 413 m2 -

U Skim coated ceiling to Building 1. 14 m2 -

V Ditto; but to Building 3. 17 m2 -

W Ditto; but to Building 4. 11 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 217 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

X Ditto; but to Building 5. 65 m2 -

Y Ditto; but to Building 6. 44 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 218 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS (CONT'D)

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

A Flush gypsum board ceilings to Building 1. 694 m2 -

B Ditto; but to Building 3. 684 m2 -

C Ditto; but to Building 4. 555 m2 -

D Ditto; but to Building 5. 1,832 m2 -

E Ditto; but to Building 6. 1,221 m2 -

F 450mm high bulkhead between bathroom and bedroom at Building 1 92 m -


(as drawing A12-03-01).

G Ditto; but to Building 3. 56 m -

H Ditto; but to Building 4. 74 m -

J Ditto; but to Building 5. 217 m -

K Ditto; but to Building 6. 145 m -

L 150mm girth curtain box to Building 1 (as drawing A12-03-01). 92 m -

M Ditto; but to Building 3. 56 m -

N Ditto; but to Building 4. 74 m -

P Ditto; but to Building 5. 217 m -

Q Ditto; but to Building 6. 145 m -

R Flush moisture resistant gypsum board ceiling to Building 1. 361 m2 -

S Ditto; but to Building 3. 330 m2 -

T Ditto; but to Building 4. 289 m2 -

U Ditto; but to Building 5. 907 m2 -

V Ditto; but to Building 6. 605 m2 -

W 600 x 600mm wide access panel to Building 1 (as drawing A12-03-01). 15 No -

X Ditto; but to Building 3. 15 No -

Y Ditto; but to Building 4. 12 No -

Z Ditto; but to Building 5. 48 No -

AA Ditto; but to Building 6. 32 No -

AB Light cove to bathroom at Building 1 (as drawing A-12-03-01). 44 m -

AC Ditto; but to Building 3. 44 m -

AD Ditto; but to Building 4. 36 m -

AE Ditto; but to Building 5. 141 m -

AF Ditto; but to Building 6. 94 m -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 219 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS (CONT'D)

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL PAINTING AND DECORATIONS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 220 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

ACCESSORIES AND FITMENTS

D All sizes are QS assumption only. Note

VANITY BENCH

Supply and install vanity benches with opening to receive basin;


comprising steel construction complete with marble to counter with
200mm high fascia, 18mm thick plywood, adhesive, support framing,
fixing accessories, as specified. (Note : all material and details TBA)

E 3400 wide x 600 deep vanity bench to Suite rooms. 12 No -

F 2000 wide x 600 deep vanity bench to Sea view rooms. 110 No -

MIRRORS

Mirrors; comprising 5mm thick clear mirror ex. Asahimas or equal


approved, with bevelled edge, including 20mm thick plywood backing,
adhesive, fixing and accessories, as specified. (Note : all material and
details TBA)

G 500 wide x 1200mm high mirror to Sea view rooms (QS ASSUME 220 No -
SIZE).

H 2000 wide x 1200mm high mirror to Suite rooms (QS ASSUME SIZE). 12 No -

CUBICLES AND DOORS

Glazed cubicles system; comprising --mm thick laminated tempered


glass, including white colour PVB, angle bracket, 20mm diameter x
150mm high stainless steel pedestal, fixing and accessories, as
specified. (Note : all material and details TBA)

J 2400mm high glazed cubicle partition to Suite rooms. 39 m2 -

K Ditto; but to Sea view rooms. 349 m2 -

Glazed cubicles door; comprising --mm thick laminated tempered glass,


including white colour PVB, steel stainless latch, bumper, hinges,
handle, fixing and accessories, as specified. (Note : all material and
details TBA)

L 800 wide x 2400mm high single swing cubicle doors to toilet at Suite 24 No -
rooms.

M Ditto; but to Sea view rooms. 220 No -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 221 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS (CONT'D)

PLANTER BOXES

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

A Top of concrete slab to planter box at Building 1. 22 m2 -

B Ditto; but to Building 3. 20 m2 -

C Ditto; but to Building 4. 18 m2 -

D Ditto; but to Building 5. 52 m2 -

E Ditto; but to Building 6. 35 m2 -

F Face of concrete walls to planter box at Building 1. 49 m2 -

G Ditto; but to Building 3. 45 m2 -

H Ditto; but to Building 4. 40 m2 -

J Ditto; but to Building 5. 118 m2 -

K Ditto; but to Building 6. 79 m2 -

Timber wall cladding (T01); comprising 150x2400mm wide Ulin timber


plank with 2mm wide gap, including solid wood batten, fixing and
accessories, as specified as Elevation drawings, to :

L Planter walls at Building 1. 33 m2 -

M Ditto; but to Building 3. 34 m2 -

N Ditto; but to Building 4. 27 m2 -

P Ditto; but to Building 5. 79 m2 -

Q Ditto; but to Building 6. 53 m2 -

Stone capping; comprising 20mm thick stone, including backing,


adhesive, grouting, as specified as drawing A90-01.

R 215mm girth stone capping to planter box at Building 1. 40 m -

S Ditto; but to Building 3. 36 m -

T Ditto; but to Building 4. 27 m -

U Ditto; but to Building 5. 79 m -

V Ditto; but to Building 6. 53 m -

OTHER WORKS

Other works; Tenderer to insert here:

W ___________________________

X ___________________________

Y ___________________________

TOTAL ACCESSORIES AND FITMENTS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 222 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

SANITARY FIXTURES AND FITTINGS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
TOTO or equal approved, including all associated fittings and
accessories.

Sea view rooms


D Water closet with jet spray. 110 No -
E Robe hook. 110 No -
F Toilet paper holder. 110 No -
G Lavatory with faucet. 220 No -
H Soap dispenser. 220 No -
J Rain shower with mixer. 110 No -
K Soap holder. 110 No -
L Free-standing bathtub. 110 No -
M Bathtub mixer. 110 No -
N Towel hanger. 110 No -
P Floor drain. 220 No -
Q Floor drain - Balcony. 110 No -

Suite rooms
R Water closet with jet spray. 12 No -
S Robe hook. 12 No -
T Toilet paper holder. 12 No -
U Lavatory with faucet. 24 No -
V Soap dispenser. 24 No -
W Rain shower with mixer. 12 No -
X Soap holder. 12 No -
Y Free-standing bathtub. 12 No -
Z Bathtub mixer. 12 No -
AA Towel hanger. 12 No -
AB Floor drain. 24 No -
AC Floor drain - Balcony. 12 No -

OTHER WORKS

Other works; Tenderer to insert here:

AD ___________________________

AE ___________________________

AF ___________________________

TOTAL SANITARY FIXTURES AND FITTINGS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 223 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

EXTERNAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

EXTERNAL WORKS

ROOF FINISHES

Loose pebbles (1); 50-100mm diameter lava stone (min 2 layers), as


specified as drawing STXH-203-2 :

D Roof covering to Building 3 (as drawing STXH-301-7). 15 m2 -

E Ditto; but to Building 1. 24 m2 -

F Ditto; but to Building 4. 20 m2 -

G Ditto; but to Building 5. 149 m2 -

H Ditto; but to Building 6. 133 m2 -

PEBBLES DRAINS TO BUILDING 4, 5, 6 [STXH-302-4]

J Loose pebbles (F1); 30-50mm diameter grey river pebbles (2 layers). 33 m2 -

K 300mm wide steel grating with support frame, to drain. 108 m -

OTHER WORKS

Other works; Tenderer to insert here:

L ___________________________

M ___________________________

N ___________________________

TOTAL EXTERNAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 224 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.1 - HOTEL ROOMS

No. Description Quantity Unit Rate Total

SUMMARY

A GENERALLY

B SITEWORKS -

C CONCRETE WORKS -

D STRUCTURAL METAL WORKS -

E NON STRUCTURAL METAL WORKS -

F MASONRY AND PARTITIONS -

G THERMAL AND MOISTURE PROTECTION -

H WOODWORK -

J DOORS AND WINDOWS -

K FINISHES -

L PAINTING AND DECORATIONS -

M ACCESSORIES AND FITMENTS -

N SANITARY FIXTURES AND FITTINGS -

P EXTERNAL WORKS -

TOTAL BUILDING 4 [HOTEL ROOMS] : -

file:///conversion/tmp/scratch/495999449.xlsx 4.1 Hotel / 225 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

GENERALLY

A The following Bills of Quantities are a guide only. It is the responsibility


of the Tenderer to satisfy themselves of the accuracy of the description
for works requiring payment. The descriptions provided herein are for a
guide only as to the required scope of Works which form part of this
Contract and should be cross-referenced with all drawings and
specifications. All quantities, except those denoted "Item" are subject to
a re-measure based on the approved "for construction" drawings and
as per relevant provisions of the conditions of contract. The format
provided in these Bills should be followed in order to assist in tender
evaluation. Within each trade or section of works space is provided for
Tenderer to insert additional works items which require payment.

GENERALLY -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 226 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

SITEWORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SITEWORKS

SITE CLEARANCE

C Allow to excavate oversite to remove existing rubble and rubbish and 397 m2 -
top 600mm (min) vegetable soil and dispose off-site.

EXCAVATION

Detailed excavation from ground level; including backfill and disposal


off site all surplus material or store select material for re-use where
required;

D Pilecap. 82 m3 -
E Tie beams. 97 m3 -
F Ground slab. 18 m3 -

COMPACTION

Compact sub-grade from fill as specified under the following.

G Ground slabs including pilecaps and tie beams. 673 m2 -

FILLING

Sand bed layer, spread, levelled, and compacted as specified.

H 100mm thick sand bed layer under ground slabs including pilecaps and 673 m2 -
tie beams.

TERMITE CONTROL

Anti-termite protection including testing and inspections.

J To face of all concrete surfaces in contact with earth. 1,114 m2 -

CUTTING OFF PILE HEADS

Cut-off top of bored piles including disposal to an off-site location to the


following.

K 500mm diameter bored pile. 106 No -

OTHER WORKS

Other Works; Tenderer to insert here:

L _________________________

M _________________________

N _________________________

TOTAL SITEWORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 227 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

CONCRETE WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

D Ground slabs including pilecaps and tie beams. 34 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

E Isolated columns. 37 m3 -

F Pilecaps. 82 m3 -

G Tie beams. 18 m3 -

H 150mm thick ground slab. 35 m3 -

J 130mm thick ground slab. 28 m3 -

K 200mm thick suspended slab. 10 m3 -

L 150mm thick suspended slab. 32 m3 -

M 130mm thick suspended slab. 18 m3 -

N 150mm thick suspended roof slab. 8 m3 -

P 120mm thick suspended roof slab. 57 m3 -

Q Attached beams. 47 m3 -

R Roof beams 24 m3 -

S 200~220mm thick stair walls. 126 m3 -

T 150mm thick RC walls at building 1. 26 m3 -

U 150mm thick upstand walls building 5 and 6. 4 m3 -

V Stair flights, stair landing, beams, column, upstand wall and step to 13 m3 -
PA1, PA2 and external stair (grid as Y9'/X10").

W Stair landing, beams and step to cantilever stair. 33 m3 -

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

X Isolated columns. 15.73 t -

Y Pilecaps. 8.83 t -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 228 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

Z Tie beams 6.43 t -

AA Ground slab. 6.88 t -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 229 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

A Suspended slab. 6.42 t -

B Suspended roof slab. 7.72 t -

C Attached beams. 7.49 t -

D Roof beams 6.50 t -

E 200~220mm thick stair walls. 18.51 t -

F 150mm thick RC walls at building 1. 4.31 t -

G 150mm thick upstand walls building 5 and 6. 0.73 t -

H Stair flights, stair landing, beams, column, upstand wall and step to 2.64 t -
PA1, PA2 and external stair.

J Stair landing, beams and step to cantilever stair. 7.67 t -

SHUTTERING

Shuttering, as specified to the following.

K Faces of isolated columns. 445 m2 -

L Sides of pilecaps. 248 m2 -

M Sides of tie beams 145 m2 -

N Soffits of suspended slab. 393 m2 -

P Soffits of suspended roof slab. 523 m2 -

Q Soffits and sides of suspended beams. 591 m2 -

R Soffits and sides of roof beams 271 m2 -

S Faces of stair walls. 1,195 m2 -

T Face of RC walls at building 1. 337 m2 -

U Upstand walls building 5 and 6. 50 m2 -

V Soffit of stair flights, landing slab, side of beams and face of column to 73 m2 -
PA1, PA2 and external stair.

W Soffit of landing slab, side beams and step to cantilever stairs. 412 m2 -

X Edges of ground slabs; not exceeding 150mm high. 317 m -

Y Edges of suspended slabs; not exceeding 200mm high. 695 m -

Z Edges of suspended roof slabs; not exceeding 150mm high. 635 m -

AA Edges of stair stringers; not exceeding 300mm high to PA1, PA2 and 45 m -
external stair.

AB Faces undercut of stair risers; not exceeding 180mm high to PA1, PA2 120 m -
and external stair.

OTHER WORKS

Other works; Tenderer to insert here:

AC ___________________________

AD ___________________________

AE ___________________________

TOTAL CONCRETE WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 230 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

NON STRUCTURAL METAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

NON STRUCTURAL METAL WORKS

BALUSTRADES AND HANDRAILS

Steel balustrade and handrails; comprising steel handrail, post and


intermediate rails (4 rows), including base plate, anchor bolts, paint
finish, fixing and accessories, as specified as drawing A70-01 and 02.

D 1000mm high balustrade and handrail to Service core stair #1. 9 m -

E Ditto; but to Service core #2. 10 m -

Timber and glazed balustrade; comprising 16mm thick clear tempered


glass railing, including 30 wide x 6mm thick rounded edge timber
handrail, copper finish railing insert, 240 high x 25mm thick timber
fascia with finish, support frame, U-channel stainless steel, sealants,
etc, as specified as drawing A71-01 and A82-01.

F 1000mm high balustrade to Outdoor corridor - Level 1 at Building 3. 50 m -

G Ditto; but to Building 5 (as drawing A70-06). 135 m -

H Ditto; but to Building 6 (as drawing A70-06). 90 m -

OTHER WORKS

Other works; Tenderer to insert here:

J ___________________________

K ___________________________

L ___________________________

TOTAL NON-STRUCTURAL METAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 231 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Externally

D 200mm thick masonry walls to Service core #2 at Building 3. 69 m2 -

E Ditto; but to Service core #1 at Building 1. 73 m2 -

F Ditto; but to MEP room at Building 5. 21 m2 -

G Ditto; but to MEP room at Building 6. 21 m2 -

H Ditto; but to Room stair wall at Building 1. 87 m2 -

J Ditto; but to Room stair wall at Building 5. 209 m2 -

K Ditto; but to Room stair wall at Building 6. 139 m2 -

L Ditto; but to AC room at Building 4. 23 m2 -

Internally

M 100mm thick masonry walls to Service core #1 at Building 1. 18 m2 -

N Ditto; but to Service core #2 at Building 3. 10 m2 -

P Ditto; but to MEP room at Building 5. 27 m2 -

Q Ditto; but to MEP room at Building 6. 13 m2 -

R 200mm thick masonry walls to Service core #1 at Building 1. 6 m2 -

S Ditto; but to Service core #2 at Building 3. 6 m2 -

T Ditto; but to MEP room at Building 5. 7 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

U ___________________________

V ___________________________

W ___________________________

TOTAL MASONRY AND PARTITIONS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 232 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

D Top of concrete roof slab to Service core #1 53 m2 -

E Ditto; but to Service core #2. 48 m2 -

F Ditto; but to Room stair at Building 1. 34 m2 -

G Ditto; but to Building 3. 21 m2 -

H Ditto; but to Building 4. 27 m2 -

J Ditto; but to Building 5. 70 m2 -

K Ditto; but to Building 6. 47 m2 -

L Ditto; but to MEP room at Building 5. 125 m2 -

M Ditto; but to MEP room at Building 6. 125 m2 -

N Ditto; but to AC room at Building 4. 12 m2 -

P 250mm high turns-up to form skirting to above areas (as drawing A70- 677 m -
01 to 06).

Q Top of concrete suspended slab to Outdoor corridor Level 1 at Building 140 m2 -


1.

R Ditto; but to Building 3. 106 m2 -

S Top of concrete suspended stair landing to Room stair at Building 5. 65 m2 -

T Ditto; but to Building 6. 43 m2 -

WATERPROOFING - INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

U Top of concrete slab to Service core #1 toilet at Building 1. 3 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 233 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

V 300mm high upstand to form skirting (as drawing A91-01). 6 m -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 234 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION (CONT'D)

INSULATION

A No insulation to roof. Note

OTHER WORKS

Other works; Tenderer to insert here:

B ___________________________

C ___________________________

D ___________________________

TOTAL THERMAL AND MOISTURE PROTECTION : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 235 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

WOODWORK

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

WOODWORK

WALL FINISHES

Timber wall plank (T01); comprising 150x2400 x 20mm thick Ulin


timber plank in 2mm wide gap, including solid wood batten, fixing and
accessories, as specified as drawing A90-02 , A31-05, to :

D Wall facade covering MEP room at Building 5. 107 m2 -

E Ditto; but to Building 6. 121 m2 -

F 230mm wide wall list to MEP facade at Building 5. 104 m -

G Ditto; but to Building 6. 104 m -

Balustrade fascia; comprising 25mm thick timber, including finishes,


fixing and accessories, as specified as drawing A90-03.

H 75 wide x 240mm high fascia type A to stair landing edge at Building 5. 135 m -

J Ditto; but to Building 6. 90 m -

BALUSTRADES AND HANDRAILS

Decorative timber balustrade; comprising 30x50mm thick timber


balustrade with decorative pattern, including finishes, fixing and
accessories, as specified as drawing A71-03, to :

K 1000mm high timber balustrade to Room stairs at Building 1 (as 63 m -


drawing A70-03) .

L Ditto; but to Building 3 (as drawing A70-04). 43 m -

M Ditto; but to Building 4 (as drawing A70-05). 26 m -

N Ditto; but to Building 5 (as drawing A70-06). 63 m -

P Ditto; but to Building 6 (as drawing A70-06). 42 m -

SCREEN

Decorative timber screen (S-0); comprising 120 wide x 750 high x


30mm thick perforated timber with copper frame, 30x60mm thick Ulin
timber element with direct fix clip system, copper sheet wrapped
around timber core, including fixing and accessories, as specified as
drawing A52-03 and A97-01.

Q 13240 wide x 5960mm high timber screen (S06) to side elevation at 4 No -


Building 5.

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 236 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

R Ditto; but to Building 6. 4 No -

S Extra over for door to above areas, incl. finishes and hardware. 12 No -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 237 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

WOODWORK (CONT'D)

Timber screen; comprising Ulin timber screen, including metal framing,


fixing and accessories, as specified as drawing A50-07.

A 2720 wide x 1850mm high screen to AC room at Building 4. 4 No -

B Extra over for door to above areas, incl. finishes and hardware. 2 No -

OTHER WORKS

Other works; Tenderer to insert here:

C ___________________________

D ___________________________

E ___________________________

TOTAL WOODWORK : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 238 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

D Doors hardware measured separately in 'IRONMONGERY'. Note

DOORS AND WINDOWS

EXTERNAL DOORS AND WINDOWS

TIMBER DOOR AND FRAMES

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

E 900 wide x 2350mm high single swing door (TD05) to Service core #2 1 No -
entry at Building 3 - Level 1.

F Ditto; but to Service core #1 at Building 1 - Level 1. 1 No -

Solid timber frame; including paint finish, fixing and accessories, as


specified.

G 150-200 wide x 40mm thick solid timber frame to timber doors. :[2 No] 12 m -

INTERNAL DOORS

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

H 900 wide x 2350mm high single swing door (TD06) to Service Core #1 1 No -
toilet at Level 1.

Solid timber frame; including paint finish, fixing and accessories, as


specified.

J 150-200 wide x 40mm thick solid timber frame to timber doors. :[1 No] 6 m -

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to the


following doors.
EXTERNAL DOORS

TIMBER DOORS

To suit single swing door type TD05, hardware HW2.0 :


K Lever handle with RFID lock combination; Vingcard flex ex. Assa abloy 1 Pair -
(ASL).
L Flush hinges (4 nos per door leaves); DHX4120 stainless steel matt 4 No -
finish ex. Startec (ST).
M Door closer; hidden type, DCL 33, EN 2-4 matt black finish ex. Startec 1 No -
(ST).

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 239 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

N Floor mounted door stopper; square profile, stainless steel matt finish 1 No -
ex. Startec (ST).

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 240 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

INTERNAL DOORS

TIMBER DOORS

To suit single swing door type TD06, hardware HW6.0 :


A Lever handle; internal side. 1 No -
B Push plate; external side, stainless steel brass finish ex. Startec (ST). 1 No -

C Butt hinges (4 nos per door leaves); DHB1160 stainless steel satin 4 No -
finish ex. Startec (ST).
D Heavy duty lockset; mortise grade 1, keyed with deadbolt, stainless 1 No -
E steel
Door brushed nickel finish
closer; overhead, ex. Hafele
TS3000V (HA).
EN-14 with guide rail ex. Geze (GZ). 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

F ___________________________

G ___________________________

H ___________________________

TOTAL DOORS AND WINDOWS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 241 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

FINISHES

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

FINISHES

D External floor finishes to Outdoor corridor measured separately in Note


"External works".

FLOOR FINISHES - EXTERNALLY

Microtopping (M01), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

E Stair landing to Room stair at Building 5. 89 m2 -

F Ditto; but to Building 6. 59 m2 -

G 275mm wide stair treads to Building 1. 98 m -

H Ditto; but to Building 3. 59 m -

J Ditto; but to Building 4. 78 m -

K Ditto; but to Building 5. 238 m -

L Ditto; but to Building 6. 159 m -

M 140mm high stair risers to Building 1. 110 m -

N Ditto; but to Building 3. 66 m -

P Ditto; but to Building 4. 88 m -

Q Ditto; but to Building 5. 267 m -

R Ditto; but to Building 6. 178 m -

FLOOR FINISHES - INTERNALLY

Levelling screed to receive Epoxy paint floor (measured separately), as


specified as drawing A91-01.

S 50mm thick levelling screed to Service core #1. 21 m2 -

T Ditto; but to Service core #2. 16 m2 -

U Ditto; but to MEP room at Building 5. 102 m2 -

V Ditto; but to MEP room at Building 6. 109 m2 -

W Ditto; but to AC room at Building 4. 17 m2 -

X Ditto; but to Stair landing to Service core #1 stair. 5 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 242 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

Y Ditto; but to Stair landing to Service core #2 stair. 6 m2 -

Z Ditto; but to Stair treads and risers to above. 106 m -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 243 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

Ceramic floor tiles with polished/unpolished finish, including setting


bed/levelling screed, adhesive, grouting, as specified, to :

A 600 x 600mm ceramic floor tiles (TL01) to Service toilet - Service core 3 m2 -
#1.

WALL FINISHES - EXTERNALLY

Stone capping, including backing, adhesive, grouting, as specified, to :

B 200mm wide stone capping to stair roof at Building 5 (as drawing A41- 64 m -
04-02).

C Ditto; but to Building 6. 43 m -

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

D Masonry walls generally. 665 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

E Face of concrete columns and walls to general areas. 1,824 m2 -

WALL FINISHES - INTERNALLY

Stone wall tiles with polished finish (ST06); comprising 15mm thick
stone, including backing, adhesive, grouting, as specified, to :

F 200mm wide stone ledge to backwall. (PROVISIONAL QUANTITY) 2m -

Ceramic wall tiles with polished finish, including backing, adhesive,


grouting, as specified, to :

G 600 x 600mm wall tiles (TL01) to Service core toilet #1. 18 m2 -

15mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

H Masonry walls generally. 798 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

J Face of concrete columns and walls to general areas. 112 m2 -

CEILING FINISHES - EXTERNALLY

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

K Soffit of Room stair flights to Building 1. 98 m2 -

L Ditto; but to Soffit of Room stair flights to Building 3. 59 m2 -

M Ditto; but to Soffit of Room stair flights to Building 4. 78 m2 -

N Ditto; but to Soffit of Room stair landing and stair flights to Building 5. 326 m2 -

P Ditto; but to Soffit of Room stair landing and stair flights to Building 6. 218 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 244 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

CEILING FINISHES - INTERNALLY

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

A Soffit of concrete slab to Service core #1. 33 m2 -

B Ditto; but to Service core #2. 31 m2 -

C Ditto; but to MEP room at Building 5. 102 m2 -

D Ditto; but to MEP room at Building 6. 109 m2 -

E Ditto; but to AC room at Building 4. 11 m2 -

F Ditto; but to Service core toilet #1 at Building 1. 3 m2 -

G Ditto; but to Soffit of stair landing and stair flights to Service core #1 - 13 m2 -
Building 1.

H Ditto; but to Soffit of stair landing and stair flights to Service core #2 - 17 m2 -
Building 3.

J Extra over for finishes to beam sides. 83 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

K ___________________________

L ___________________________

M ___________________________

TOTAL FINISHES : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 245 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

PAINTING AND DECORATIONS

FLOORS

Epoxy paint finish, as specified, to :

D Service core #1. 21 m2 -

E Service core #2. 16 m2 -

F MEP room at Building 5. 102 m2 -

G MEP room at Building 6. 109 m2 -

H AC room at Building 4. 17 m2 -

J Stair landing to Service core #1 stair. 5 m2 -

K Stair landing to Service core #2 stair. 6 m2 -

L Stair treads and risers to above. 106 m -

M 300mm high skirting to above areas (as drawing A91-01). 335 m -

WALLS

Prepare smooth and apply textured weathershield paint finish-stucco


(PT01); in accordance with manufacturer's recommendations; as
specified.

N Rendered masonry walls and Skim coated concrete walls/columns. 2,429 m2 -

Prepare smooth and apply weathershield paint finish with Black colour
(PT07); in accordance with manufacturer's recommendations; as
specified.

P Skim coated concrete columns. 60 m2 -

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

Q Rendered masonry walls and Skim coated concrete walls/columns. 910 m2 -

CEILINGS

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

R Skim coated ceilings (CF05). 1,181 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 246 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

S Faces of stair stringers; not exceeding 300mm high at Service core 6 m2 -


stairs (CF05).

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 247 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS (CONT'D)

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL PAINTING AND DECORATIONS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 248 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

ACCESSORIES AND FITMENTS

D Measured in PROVISIONAL SUMS. Note

OTHER WORKS

Other works; Tenderer to insert here:

E ___________________________

F ___________________________

G ___________________________

TOTAL ACCESSORIES AND FITMENTS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 249 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

SANITARY FIXTURES AND FITTINGS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
TOTO or equal approved, including all associated fittings and
accessories.

Service Core #1 toilet


D Wall hung toilet. 1 No -
E Lavatory with faucet. 1 No -
F Toilet paper holder. 1 No -
G Robe hook. 1 No -
H Floor drain. 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

J ___________________________

K ___________________________

L ___________________________

TOTAL SANITARY FIXTURES AND FITTINGS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 250 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

EXTERNAL WORKS

PAVING AND SURFACING

Compact sub-grade as specified under the following :

D Entry pathways. 777 m2 -

Sub-base with hardcore stone, as specified as drawing STXH-401-2, to


:

E Entry pathways. 777 m2 -

Concrete floors; comprising concrete, reinforcement bars, shuttering,


as specified. (Note : detail drawing TBA, no structural drawing
provided).

F Entry pathways. 777 m2 -

Yellow rustic floor tiles (C1) with polished/unpolished finish; comprising


50mm thick stone, including setting bed/levelling screed, adhesive,
grouting, as specified, to :

G Outdoor corridor at Building 1. 140 m2 -

H Ditto; but to Building 3. 239 m2 -

J Ditto; but to Building 4. 53 m2 -

K Ditto; but to Building 5. 221 m2 -

L Ditto; but to Building 6. 124 m2 -

ROOF FINISHES

Loose pebbles (1); 50-100mm diameter lava stone (min 2 layers), as


specified as drawing STXH-203-2 :

M Roof covering to roof above Spa (as drawing STXH-301-7). 27 m2 -

WALLS, FENCES AND GATES

Yellow rustic wall tiles (C3) with polished/unpolished finish; comprising


30mm thick stone, including backing, adhesive, grouting, as specified
as drawing STXH-301-6, to :

N Planter wall at Building 1. 50 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

P ___________________________

Q ___________________________

R ___________________________

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 251 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

TOTAL EXTERNAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 252 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 4.2 - CIRCULATION/CORRIDOR AND SERVICE AREA

No. Description Quantity Unit Rate Total

SUMMARY

A GENERALLY

B SITEWORKS -

C CONCRETE WORKS -

D STRUCTURAL METAL WORKS N/A

E NON STRUCTURAL METAL WORKS -

F MASONRY AND PARTITIONS -

G THERMAL AND MOISTURE PROTECTION -

H WOODWORK -

J DOORS AND WINDOWS -

K FINISHES -

L PAINTING AND DECORATIONS -

M ACCESSORIES AND FITMENTS -

N SANITARY FIXTURES AND FITTINGS -

P EXTERNAL WORKS -

TOTAL BUILDING 4 [CIRCULATION/CORRIDOR AND SERVICE -


AREA] :

file:///conversion/tmp/scratch/495999449.xlsx 4.2 Hotel circ / 253 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

GENERALLY

A The following Bills of Quantities are a guide only. It is the responsibility


of the Tenderer to satisfy themselves of the accuracy of the description
for works requiring payment. The descriptions provided herein are for a
guide only as to the required scope of Works which form part of this
Contract and should be cross-referenced with all drawings and
specifications. All quantities, except those denoted "Item" are subject to
a re-measure based on the approved "for construction" drawings and
as per relevant provisions of the conditions of contract. The format
provided in these Bills should be followed in order to assist in tender
evaluation. Within each trade or section of works space is provided for
Tenderer to insert additional works items which require payment.

GENERALLY -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 254 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

SITEWORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SITEWORKS

SITE CLEARANCE

D Allow to excavate oversite to remove existing rubble and rubbish and 111 m2 -
top 600mm (min) vegetable soil and dispose off-site.

EXCAVATION

Detailed excavation from ground level; including backfill and disposal


off site all surplus material or store select material for re-use where
required;

E Shallow foundation. 34 m3 -

F Pilecaps. 5 m3 -

G Ground slabs to villa. 17 m3 -

H Ground slabs to pool and balancing tank. 101 m3 -

J Tie beams. 24 m3 -

COMPACTION

Compact sub-grade from fill as specified under the following.

K Shallow foundation. 23 m2 -

L Ground slabs including pilecap and tie beams. 118 m2 -

FILLING

Backfill with in layers not exceeding 300mm with existing material;


including compaction with 95% dry density compacted standard; as
specificed by the Engineer.

M To face of shallow foundation. 26 m3 -

Sand bed layer, spread, levelled, and compacted as specified.

N 100mm thick sand bed layer under shallow foundation. 23 m2 -

P Ditto to; ground slabs including pilecap and tie beams. 118 m2 -

TERMITE CONTROL

Anti-termite protection including testing and inspections.

Q To face of all concrete surfaces in contact with earth. 454 m2 -

OTHER WORKS

Other Works; Tenderer to insert here:

R _________________________

S _________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 255 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

T _________________________

TOTAL SITEWORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 256 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

CONCRETE WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

D Shallow foundation. 2 m3 -

E Ditto to; ground slabs including tie beams. 6 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

F Isolated columns. 6 m3 -

G Shallow foundation. 6 m3 -

H Pilecaps. 5 m3 -

J Tie beams 24 m3 -

K 250mm thick ground slab. 17 m3 -

L 130mm thick ground slab. 18 m3 -

M 150mm thick suspended roof slab. 19 m3 -

N 120mm thick suspended roof slab. 3 m3 -

P Roof beams 12 m3 -

Q 200mm thick RC wall to pool. 13 m3 -

R 150mm thick RC wall to balancing tank and concrete hob. 1 m3 -

S 150mm thick upstand wall to roof. 2 m3 -

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

T Isolated columns. 2.05 t -

U Shallow foundation. 0.55 t -

V Pilecaps. 0.46 t -

W Tie beams. 5.31 t -

X Ground slab. 3.85 t -

Y Suspended roof slab. 2.09 t -

Z Roof beams. 2.78 t -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 257 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

AA RC wall to pool, balancing tank and concrete hob. 2.36 t -

AB Upstand wall to roof. 0.21 t -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 258 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

SHUTTERING

Shuttering, as specified to the following.

A Faces of isolated columns. 86 m2 -

B Side of shallow foundation. 15 m2 -

C Side of pilecaps. 20 m2 -

D Sides of tie beams 162 m2 -

E Soffits of suspended roof slab. 112 m2 -

F Soffits and sides of roof beams 156 m2 -

G Face of RC walls. 134 m2 -

H Side of concrete hob and upstand wall; not exceeding 220mm high. 135 m -

J Edges of ground slabs; not exceeding 250mm high. 125 m -

K Edges of suspended roof slabs; not exceeding 150mm high. 64 m -

SUNDRIES

L 800 x 800mm mainhole. [PROVISIONAL QUANTITY] 3 No -

OTHER WORKS

Other works; Tenderer to insert here:

M ___________________________

N ___________________________

P ___________________________

TOTAL CONCRETE WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 259 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

STRUCTURAL METAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

STRUCTURAL METAL WORKS

PERGOLA ROOF FRAME

Fabricate, deliver to site and erect, the following structural steelwork


using methods complying with the requirement of SS 490 (340 MPA)
for material, construction, fabrication and erection including cutting,
welding, jointing as specified.

D Column-Cross 250x250x25 (94.2 kg/m). 1.55 t -

Fabricate, deliver to site and erect, the following structural steelwork


using methods complying with the requirement of ST-37 (240 MPA) for
material, construction, fabrication and erection including cutting,
welding, jointing as specified

E Footing -WF 250x250x9x14 (72.4 kg/m). 0.23 t -

F Beam -WF 150x150x7x10 (31.5 kg/m). 0.51 t -

G Beam -WF 150x75x5x7 (14 kg/m). 0.12 t -

H 16mm thick base plate (125.6kg/m2). 0.10 t -

J 14mm thick cover plate (109.9kg/m2). 0.28 t -

K 12mm thick joint plate (94.2kg/m2). 0.02 t -

L 8mm thick joint plate (62.8kg/m2). 0.01 t -

M 10mm thick stiffener plate (78.5kg/m2). 0.03 t -

N 7mm thick stiffener plate (55kg/m2). 0.01 t -

Cast-in-anchor BJTD 400, including galvanized rings, bolts and


fastenings all as specified.

P 400mm long anchor bolt D 16mm. 30 No -

Steelworks finishing, as specified

Q Prepare and apply epoxy paint ex.HEMBEL to steel works. 2.86 t -

OTHER WORKS

Other works; Tenderer to insert here:

R ___________________________

S ___________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 260 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

T ___________________________

TOTAL STRUCTURAL METAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 261 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Externally

D 100mm thick masonry walls generally. 15 m2 -

E 200mm thick masonry walls generally. 4 m2 -

F 250mm thick cavity masonry walls generally. 44 m2 -

G 550mm thick cavity masonry walls generally. 12 m2 -

Internally

H 100mm thick masonry walls generally. 19 m2 -

J 250mm thick cavity masonry walls generally. 15 m2 -

K 370mm thick cavity masonry walls generally. 15 m2 -

L 1500 high x 200mm thick backwall to water closet (QS ASSUMED 2 m -


SIZE).

OTHER WORKS

Other works; Tenderer to insert here:

M ___________________________

N ___________________________

P ___________________________

TOTAL MASONRY AND PARTITIONS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 262 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

D Top of concrete slab. 134 m2 -

E 185mm high turns-up to form skirting to above areas (as drawing A41- 29 m -
06-01).

F 200mm high turns-up to form skirting to above areas (as drawing A41- 48 m -
06-01).

G 485mm high turns-up to form skirting to above areas (as drawing A41- 30 m -
06-01).

WATERPROOFING - INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

H Top of concrete slab to Toilet and shower room. 8 m2 -

J 300mm high upstand to form skirting (as drawing A91-01). 6 m -

Cement based waterproofing, including primers etc. all as specified, to :

K Face of rendered masonry / concrete walls to shower room. 12 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 263 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION (CONT'D)

INSULATION

Insulation; comprising 50mm thick expanded polystryene insulation,


including fixing and accessories, as specified, to :

A Top of concrete roof slab. 134 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

B ___________________________

C ___________________________

D ___________________________

TOTAL THERMAL AND MOISTURE PROTECTION : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 264 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

WOODWORK

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

WOODWORK

WALL FINISHES

Timber wall cladding; comprising 150x2400mm wide Ulin timber plank


(W02) with 2mm wide gap, including solid wood batten, fixing and
accessories, as specified as Elevation drawings, to :

D Main entrance walls. 20 m2 -

Timber fascia board; comprising Ulin timber fascia (W03), including


finishes, fixing and accessories, as specified as drawing A92-04.

E 285mm high fascia board to Pool terrace. 17 m -

SCREEN

Decorative timber trellis (SV01); comprising 30x60mm thick Ulin timber


element with direct fix clip system, copper sheet wrapped around
timber core, including fixing and accessories, as specified as drawing
A83-03 and A97-01.

F 1830 wide x 2960mm high timber trellis to Main entrance. 1 No -

Timber trellis (SV-02); comprising 30x60mm thick Ulin timber trellis with
tenon hanger, including fixing and accessories, as specified as drawing
A83-03.

G 1400 wide x 3010mm high timber trellis to MEP area. 1 No -

H Extra over for single swing door to above. 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

J ___________________________

K ___________________________

L ___________________________

TOTAL WOODWORK : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 265 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

D Doors hardware measured separately in 'IRONMONGERY'. Note

DOORS AND WINDOWS

EXTERNAL DOORS AND WINDOWS

GLAZED DOORS AND FIXED WINDOWS

Glazed door and fixed windows; comprising 8mm thick single clear
tempered glass panel, aluminium transom and mullion in bronze
powder coated finish, including sealants, fixing and accessories.

E Overall size, L-shape, 9210 wide x 2700mm high fixed window to 1 No -


receive 2800 wide x 2700mm high folding-sliding door [3 no of leaves]
and 4600 wide x 2700mm high folding-sliding [5 no of leaves] (GD19)
to Living room.

F Overall size, 1860 wide x 2400mm high fixed window to receive 930 1 No -
wide x 2400mm high single sliding door (GD22) to Bathroom.

G Overall size, 2445 wide x 2400mm high fixed window to receive 1220 1 No -
wide x 2400mm high single sliding door (GD27) to Shower room.

GLAZED DOORS

Glazed door; comprising 8mm thick single clear tempered glass panel,
aluminium transom and mullion in bronze powder coated finish,
including sealants, fixing and accessories.

H Overall size, 3900 wide x 2700mm high folding glazed door (GD20) [4 1 No -
nos of leaves] to Bedroom.

J Overall size, 3900 wide x 2700mm high folding glazed door (GD21) [4 1 No -
nos of leaves] to Bedroom.

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

K 1100 wide x 2650mm high single swing door (TD10) to Main entry. 1 No -

Solid timber frame; including paint finish, fixing and accessories, as


specified.

L 150-200 wide x 40mm thick solid timber frame to timber doors. :[1 No] 7 m -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 266 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

INTERNAL DOORS

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

A 900 wide x 2650mm high single sliding door (TD09) to Bedroom. 4 No -

Solid timber frame; including paint finish, fixing and accessories, as


specified.

B 150-200 wide x 40mm thick solid timber frame to timber doors. :[4 No] 26 m -

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to the


following doors.
EXTERNAL DOORS

GLAZED DOORS

To suit folding-sliding door type GD15 [5 no of leaves]:


C Handle. 1 Pair -
D Lockcase. 1 No -
E Sliding track, L=4600mm. 1 No -

To suit sliding door type GD22 :


F Handle. 1 Pair -
G Lockcase. 1 No -
H Sliding track, L=1220mm. 1 No -

To suit sliding door type GD27 :


J Handle. 1 Pair -
K Lockcase. 1 No -
L Sliding track, L=1220mm. 1 No -

To suit sliding door type GD20 :


M Handle. 1 Pair -
N Lockcase. 1 No -
P Sliding track, L=3900mm. 1 No -

To suit sliding door type GD21 :


Q Handle. 1 Pair -
R Lockcase. 1 No -
S Sliding track, L=3900mm. 1 No -

TIMBER DOORS

To suit single swing door type TD10, hardware HW1.0 :


T Lever handle with mortise lock; FSB model 10 1035 satin brass finish 1 Pair -
ex. Assa abloy (ASL).
U Invisible door lock; RFID Essence Vingcard ex. Assa abloy (ASL). 1 Set -
V Concealed hinges (4 nos per door leaves); TE340 3D satin brass finish 4 No -
#047 ex.Tectus (TE).
W Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 1 No -
heath (SH).
X Door viewer; door spy 200 brass finish chr 14mm ex. Startec (ST). 1 No -
Y Floor mounted door stopper; M496 brass finish ex. Hoppe (HO). 1 No -
Z Retracable drop-down sill seal; DDS12 ex. Startec (ST). 1 No -

INTERNAL DOORS

TIMBER DOORS

To suit single sliding door type TD09:


AA Handle. 4 Pair -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 267 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

AB Lockcase. 4 No -
AC Sliding track, L=900mm. 4 No -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 268 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL DOORS AND WINDOWS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 269 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

FINISHES

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

FINISHES

FLOOR FINISHES - EXTERNALLY

D Loose pebbles to Roof measured separately in "External works". Note

E Timber floor to Terrace measured separately in "General Hardscaping Note


works".

F Stone floor to Main entrance measured separately in External works". Note

FLOOR FINISHES - INTERNALLY

G No skirting to internal rooms. Note

Microtopping (M02), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

H Bedroom and Living room. 55 m2 -

J Bathrom, including toilet and shower. 24 m2 -

Levelling screed to receive Epoxy paint floor (measured separately), as


specified as drawing A91-01.

K 50mm thick levelling screed to MEP area. 4 m2 -

WALL FINISHES - EXTERNALLY

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

L Masonry walls generally. 75 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

M Face of concrete columns and walls to general areas. 32 m2 -

WALL FINISHES - INTERNALLY

Stone wall tiles with polished finish (ST06); comprising 15mm thick
stone, including backing, adhesive, grouting, as specified, to :

N Bathroom, Toilet and shower room. 52 m2 -

P 200mm wide stone ledge to backwall. (PROVISIONAL SUM) 2m -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 270 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

15mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

Q Masonry walls generally. 116 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 271 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

A Face of concrete columns and walls to general areas. 12 m2 -

CEILING FINISHES - EXTERNALLY

Calsium silicate board ceiling (CF03); 10mm thick calsium silicate


board ceiling, taped and sanded and prepare smooth to receive paint
finish (paint finish measured separately), including aluminium shadow
line, metal furring framing and fixing accessories, as specified, to :

B Outdoor terrace. 16 m2 -

Flush water resistant gypsum board ceiling (CF02); 12mm thick


gypsum board ceiling ex. Jayaboard or Knauf or equal approved, taped
and sanded and prepare smooth to receive paint finish (paint finish
measured separately), including aluminium shadow line, metal furring
framing and fixing accessories; all as specified, to : (Note : QS
ASSUME THICKNESS)

C Main entry terrace. 3 m2 -

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

D Soffit of concrete slab to Main entry terrace and pool terrace. 16 m2 -

CEILING FINISHES - INTERNALLY

Flush gypsum board ceiling (CF01); 10mm thick gypsum board ceiling,
taped and sanded and prepare smooth to receive paint finish (paint
finish measured separately), including aluminium shadow line, metal
furring framing and fixing accessories, as specified, to :

F Living room and bedroom. 48 m2 -

G 300mm high bulkhead to Living room (as drawing A12-05-01). 13 m -

H 150mm girth curtain box to Living room (as drawing A12-05-01). 10 m -

Flush water resistant gypsum board ceiling (CF02); 12mm thick


gypsum board ceiling ex. Jayaboard or Knauf or equal approved, taped
and sanded and prepare smooth to receive paint finish (paint finish
measured separately), including aluminium shadow line, metal furring
framing and fixing accessories; all as specified, to : (Note : QS
ASSUME THICKNESS)

J Bathroom , Toilet and Shower room. 23 m2 -

K 600 x 600mm wide access panel. 2 No -

L Light cove to Toilet and Shower. 4 m -

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

M Soffit of concrete slab to MEP area. 4 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

N ___________________________

P ___________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 272 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

Q ___________________________

TOTAL FINISHES : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 273 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

PAINTING AND DECORATIONS

FLOORS

Epoxy paint finish, as specified, to :

D MEP area. 4 m2 -

E 300mm high skirting to above areas (as drawing A91-01). 5 m -

WALLS

Prepare smooth and apply textured weathershield paint finish-stucco


(PT01); in accordance with manufacturer's recommendations; as
specified.

F Rendered masonry walls and Skim coated concrete walls/columns. 87 m2 -

Prepare smooth and apply acrylic emulsion paint finish; in accordance


with manufacturer's recommendations; as specified.

G Rendered masonry walls and Skim coated concrete walls/columns 128 m2 -


(PT05).

CEILINGS

Prepare smooth and apply weathershield paint finish; in accordance


with manufacturer's recommendations; as specified.

H Calsium silicate board ceiling (CF03). 16 m2 -

J Flush water resistant gypsum board ceilings (CF02). 3 m2 -

K Skim coated ceilings (CF05). 16 m2 -

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

L Flush gypsum board ceilings (CF01). 48 m2 -

M Bulkheads and cove lights. 6 m2 -

N Flush water resistant gypsum board ceilings (CF02). 23 m2 -

P Cove lights. 1 m2 -

Q Skim coated ceilings (CF05). 4 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

R ___________________________

S ___________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 274 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

T ___________________________

TOTAL PAINTING AND DECORATIONS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 275 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

ACCESSORIES AND FITMENTS

D All sizes are QS assumption only. Note

VANITY BENCH

Supply and install vanity benches with opening to receive basin;


comprising steel construction complete with marble to counter with
200mm high fascia, 18mm thick plywood, adhesive, support framing,
fixing accessories, as specified. (Note : all material and details TBA)

E 3300 wide x 600 deep vanity bench to Bathroom. 1 No -

MIRRORS

Mirrors; comprising 5mm thick clear mirror ex. Asahimas or equal


approved, with bevelled edge, including 20mm thick plywood backing,
adhesive, fixing and accessories, as specified. (Note : all material and
details TBA)

F 3300 wide x 1200mm high mirror to Sea view rooms (QS ASSUME 1 No -
SIZE).

CUBICLES AND DOORS

Glazed cubicles system; comprising --mm thick laminated tempered


glass, including white colour PVB, angle bracket, 20mm diameter x
150mm high stainless steel pedestal, fixing and accessories, as
specified. (Note : all material and details TBA)

G 2400mm high glazed cubicle partition to Shower room. 1 m2 -

Glazed cubicles door; comprising --mm thick laminated tempered glass,


including white colour PVB, steel stainless latch, bumper, hinges,
handle, fixing and accessories, as specified. (Note : all material and
details TBA)

H 800 wide x 2400mm high single swing cubicle doors to toilet and 2 No -
shower room.

SUNDRIES

J Bathtub bench to Shower room. 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

K ___________________________

L ___________________________

M ___________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 276 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

TOTAL ACCESSORIES AND FITMENTS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 277 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

SANITARY FIXTURES AND FITTINGS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
TOTO or equal approved, including all associated fittings and
accessories.

Toilet
D Water closet with jet spray. 1 No -
E Robe hook. 1 No -
F Toilet paper holder. 1 No -
G Lavatory with faucet. 2 No -
H Soap dispenser. 2 No -
J Floor drain. 1 No -

Shower room
K Rain shower with mixer. 1 No -
L Soap holder. 1 No -
M Free-standing bathtub. 1 No -
N Bathtub mixer. 1 No -
P Towel hanger. 1 No -
Q Floor drain. 1 No -

Terrace
R Floor drain. 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

S ___________________________

T ___________________________

U ___________________________

TOTAL SANITARY FIXTURES AND FITTINGS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 278 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

EXTERNAL WORKS

D Softscaping measured separately in "Softscaping works". Note

PAVING AND SURFACING

Yellow rustic floor tiles (C1) with polished/unpolished finish; comprising


50mm thick stone, including setting bed/levelling screed, adhesive,
grouting, as specified, to :

E Main entrance courtyard. 7 m2 -

Yellow rustic granite floor with fine bush-hammered finish; comprising


50mm thick stone, including setting bed/levelling screed, adhesive,
grouting, as specified as drawing STXH-303-1, to :

F 300mm wide stair tread to Sunken lounge. 4 m -

G 175mm high stair riser to Sunken lounge. 5 m -

Yellow rustic granite capping (C4) with fine bush-hammered finish;


comprising 50mm thick stone, including setting bed/levelling screed,
adhesive, grouting, as specified as drawing STXH-303-1 and 303-3,
303-4, to :

H 300mm wide capping to timber deck edge. 18 m -

J 200mm wide capping to timber deck edge. 12 m -

Yellow rustic granite stepping stone (O3) with flamed finish; comprising
50mm thick stone, including setting bed/levelling screed, adhesive,
grouting, as specified as drawing STXH-303-1, to :

K 600 x 300mm stepping stone to Outdoor pool terrace. 3 No -

L Ditto; but to Outdoor cabana. 4 No -

M 600 x 600mm stepping stone to Outdoor cabana. 1 No -

N 900 x 300mm stepping stone to Outdoor pool terraace. 2 No -

P Ditto; but to Outdoor cabana. 10 No -

Q 900 x 900mm stepping stone to Pool. 4 No -

Timber deck (B); comprising 30mm thick Ulin timber deck, including
natural finish, 50mm thick support batten, 5mm thick stainless steel
edge, 100mm diameter concrete stump, fixing and accessories, as
specified..

R Pool deck. 25 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 279 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

S Sunken lounge. 4 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 280 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS (CONT'D)

Reinforced concrete curb (A3) fixed at to concrete slab, including


chamfered edge, dowel, grouting and fixing accessories, paint finish, as
specified, to :2

A 100 x 100 x 200mm thick kerb to Pool edge (as drawing STXH-303-1). 18 m -

ROOF FINISHES

Loose pebbles (1); 50-100mm diameter lava stone (min 2 layers), as


specified as drawing STXH-203-2 :

B Roof covering to Villa 1 (as drawing STXH-301-7). 134 m2 -

WALLS, FENCES AND GATES

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

C 250mm thick cavity wall to boundary. 29 m2 -

D 300mm thick cavity wall to boundary. 5 m2 -

Stone wall tiles with polished finish (ST07), including backing,


adhesive, grouting, as specified, to :

E Boundary walls 68 m2 -

Yellow rustic granite wall (C3) with fine bush hammered finish;
comprising 30mm thick stone, including backing, adhesive, grouting, as
specified as drawing STXH-303-3, to :

F 600 x 600mm stone wall to Sunken lounge wall. 5 m2 -

Stainless steel list wall; comprising 50mm wide stainless steel list
channel, including fixing and accessories, as specified as drawing
STXH-303-4 Section 07, and Detail 4, to :

G Boundary wall facing pool. 4 m -

BALANCING TANK

H Concrete work measured separately in "Concrete work". Note

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

J Top of concrete slab. 8 m2 -

K Faces of concrete walls. 20 m2 -

Levelling screed to receive Epoxy paint floor (measured separately), as


specified as drawing A91-01.

L 50mm thick levelling screed. 8 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

M Face of concrete walls. 20 m2 -

N Soffit of concrete roof slab. 8 m2 -

Epoxy paint finish, as specified, to :

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 281 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

P Pump room only. 5 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 282 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS (CONT'D)

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

A Face of concrete walls to Pump room only. 11 m2 -

B Skim coated ceiling. 8 m2 -

Sundries

C Extra over for 200 wide x 100mm high gutter to Pump room. 3 m -

CABANA [drawing A50-02-01]

Timber deck (B); comprising 25mm thick Ulin timber deck, including
natural finish, 50mm thick support batten, 5mm thick stainless steel
edge, 100mm diameter concrete stump, fixing and accessories, as
D Cabana deck. 12 m2 -
specified..

Pergola; comprising 75x75mm thick solid timber trellis, including


support frame, finishes, fixing and accessories, as specified.

E Roof pergola. 11 m2 -

F Pergola wall. 10 m2 -

Timber fascia; comprising 30mm thick timber board, including finishes,


fixing and accessories, as specified.

G 280mm high timber fascia to roof pergola. 10 m -

SWIMMING POOL [drawing A11-05-01, STXH 303-1 - 4]

H Concrete work measured separately in "Concrete work". Note

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

J Top of concrete slab. 50 m2 -

K Faces of concrete walls. 42 m2 -

L Pool overflow gutter. 15 m2 -

Mosaic tiles (E1) with flammed finish; comprising 10mm thick Sukabumi
mosaic tiles, including setting bed / backing, adhesive, grouting, as
specified as drawing STXH-303-1.

M 100 x 100mm mosaic tile to floor. 50 m2 -

N 100 x 100mm mosaic tile to walls. 42 m2 -

P 300mm wide capping to pool. 18 m -

Loose pebbles (F1); 30-50mm diameter grey river pebbles (2 layers),


as specified, to :

Q Pool overflow gutter 4 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).
R Top of concrete slab to overflow gutter. 4 m2 -

S Face of concrete walls to overflow gutter. 11 m2 -

Prepare smooth and apply weathershield paint finish; in accordance


with manufacturer's recommendations; as specified.

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 283 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

T To overflow gutter. 15 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 284 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS (CONT'D)

Sundries

A 300mm wide grating to pool overflow gutter (PROVISIONAL 18 m -


QUANTITY).

B Outdoor cabana (PROVISIONAL QUANTITY). 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

C ___________________________

D ___________________________

E ___________________________

TOTAL EXTERNAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 285 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.1 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

SUMMARY

A GENERALLY

B SITEWORKS -

C CONCRETE WORKS -

D STRUCTURAL METAL WORKS -

E NON-STRUCTURAL METAL WORKS N/A

F MASONRY AND PARTITIONS -

G THERMAL AND MOISTURE PROTECTION -

H WOODWORK -

J DOORS AND WINDOWS -

K FINISHES -

L PAINTING AND DECORATIONS -

M ACCESSORIES AND FITMENTS -

N SANITARY FIXTURES AND FITTINGS -

P EXTERNAL WORKS -

TOTAL BUILDING 5.1 [1 BEDROOM VILLA 1-7] : (1 VILLA ONLY) -

file:///conversion/tmp/scratch/495999449.xlsx 5.1 Villa 1 Bed / 286 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

GENERALLY

A The following Bills of Quantities are a guide only. It is the responsibility


of the Tenderer to satisfy themselves of the accuracy of the description
for works requiring payment. The descriptions provided herein are for a
guide only as to the required scope of Works which form part of this
Contract and should be cross-referenced with all drawings and
specifications. All quantities, except those denoted "Item" are subject to
a re-measure based on the approved "for construction" drawings and
as per relevant provisions of the conditions of contract. The format
provided in these Bills should be followed in order to assist in tender
evaluation. Within each trade or section of works space is provided for
Tenderer to insert additional works items which require payment.

GENERALLY -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 287 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

SITEWORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SITEWORKS

SITE CLEARANCE

D Allow to excavate oversite to remove existing rubble and rubbish and 111 m2 -
top 600mm (min) vegetable soil and dispose off-site.

EXCAVATION

Detailed excavation from ground level; including backfill and disposal


off site all surplus material or store select material for re-use where
required;

E Shallow foundation. 30 m3 -

F Ground slabs to villa. 13 m3 -

G Ground slabs to pool and balancing tank. 101 m3 -

H Tie beams. 6 m3 -

COMPACTION

Compact sub-grade from fill as specified under the following.

J Shallow foundation. 20 m2 -

K Ground slabs including pilecap and tie beams 200 m2 -

FILLING

Backfill with in layers not exceeding 300mm with existing material;


including compaction with 95% dry density compacted standard; as
specificed by the Engineer.

L To face of shallow foundation. 22 m3 -

Sand bed layer, spread, levelled, and compacted as specified.

M 100mm thick sand bed layer under shallow foundation. 20 m2 -

N Ditto to; ground slabs including pilecap and tie beams. 200 m2 -

TERMITE CONTROL

Anti-termite protection including testing and inspections.

P To face of all concrete surfaces in contact with earth. 319 m2 -

OTHER WORKS

Other Works; Tenderer to insert here:

Q _________________________

R _________________________

S _________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 288 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

TOTAL SITEWORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 289 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

CONCRETE WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

D Shallow foundation. 1 m3 -

E Ditto; but to ground slabs including tie beams 10 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

F Isolated columns. 6 m3 -

G Shallow foundation. 6 m3 -

H Pilecaps. 6 m3 -

J Tie beams 17 m3 -

K 250mm thick ground slab. 2 m3 -

L 130mm thick ground slab. 13 m3 -

M 150mm thick suspended roof slab. 19 m3 -

N 120mm thick suspended roof slab. 3 m3 -

P Roof beams 13 m3 -

Q 200mm thick RC wall to pool. 13 m3 -

R 150mm thick RC wall to balancing tank and concrete hob. 1 m3 -

S 150mm thick upstand wall to roof. 2 m3 -

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

T Isolated columns. 2.05 t -

U Shallow foundation. 0.47 t -

V Tie beams. 1.70 t -

W Ground slab. 2.71 t -

X Suspended roof slab. 2.09 t -

Y Roof beams 2.75 t -

Z RC wall to pool, balancing tank and concrete hob. 2.21 t -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 290 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

AA Upstand wall to roof. 0.21 t -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 291 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

SHUTTERING

Shuttering, as specified to the following.

A Faces of isolated columns. 86 m2 -

B Side of shallow foundation. 17 m2 -

C Sides of tie beams 42 m2 -

D Soffits of suspended roof slab. 110 m2 -

E Soffits and sides of roof beams 156 m2 -

F Face of RC walls. 134 m2 -

G Side of concrete hob and upstand wall; not exceeding 220mm high. 133 m -

H Edges of ground slabs; not exceeding 250mm high. 128 m -

J Edges of suspended roof slabs; not exceeding 150mm high. 64 m -

SUNDRIES

K 800 x 800mm mainhole. [PROVISIONAL QUANTITY] 3 No -

OTHER WORKS

Other works; Tenderer to insert here:

L ___________________________

M ___________________________

N ___________________________

TOTAL CONCRETE WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 292 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

STRUCTURAL METAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

STRUCTURAL METAL WORKS

PERGOLA ROOF FRAME

Fabricate, deliver to site and erect, the following structural steelwork


using methods complying with the requirement of SS 490 (340 MPA)
for material, construction, fabrication and erection including cutting,
welding, jointing as specified.

D Column-Cross 250x250x25 (94.2 kg/m). 1.55 t -

Fabricate, deliver to site and erect, the following structural steelwork


using methods complying with the requirement of ST-37 (240 MPA) for
material, construction, fabrication and erection including cutting,
welding, jointing as specified

E Footing -WF 250x250x9x14 (72.4 kg/m). 0.23 t -

F Beam -WF 150x150x7x10 (31.5 kg/m). 0.51 t -

G Beam -WF 150x75x5x7 (14 kg/m). 0.12 t -

H 16mm thick base plate (125.6kg/m2). 0.10 t -

J 14mm thick cover plate (109.9kg/m2). 0.28 t -

K 12mm thick joint plate (94.2kg/m2). 0.02 t -

L 8mm thick joint plate (62.8kg/m2). 0.01 t -

M 10mm thick stiffener plate (78.5kg/m2). 0.03 t -

N 7mm thick stiffener plate (55kg/m2). 0.01 t -

Cast-in-anchor BJTD 400, including galvanized rings, bolts and


fastenings all as specified.

P 400mm long anchor bolt D 16mm. 30 No -

Steelworks finishing, as specified

Q Prepare and apply epoxy paint ex.HEMBEL to steel works. 2.86 t -

OTHER WORKS

Other works; Tenderer to insert here:

R ___________________________

S ___________________________

T ___________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 293 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

TOTAL STRUCTURAL METAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 294 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Externally

D 100mm thick masonry walls generally. 15 m2 -

E 200mm thick masonry walls generally. 4 m2 -

F 250mm thick cavity masonry walls generally. 44 m2 -

G 550mm thick cavity masonry walls generally. 12 m2 -

Internally

H 100mm thick masonry walls generally. 19 m2 -

J 250mm thick cavity masonry walls generally. 15 m2 -

K 370mm thick cavity masonry walls generally. 15 m2 -

L 1500 high x 200mm thick backwall to water closet (QS ASSUMED 2 m -


SIZE).

OTHER WORKS

Other works; Tenderer to insert here:

M ___________________________

N ___________________________

P ___________________________

TOTAL MASONRY AND PARTITIONS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 295 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

D Top of concrete slab. 134 m2 -

E 185mm high turns-up to form skirting to above areas (as drawing A41- 29 m -
06-01).

F 200mm high turns-up to form skirting to above areas (as drawing A41- 48 m -
06-01).

G 485mm high turns-up to form skirting to above areas (as drawing A41- 30 m -
06-01).

WATERPROOFING - INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

H Top of concrete slab to Toilet and shower room. 8 m2 -

J 300mm high upstand to form skirting (as drawing A91-01). 6 m -

Cement based waterproofing, including primers etc. all as specified, to :

K Face of rendered masonry / concrete walls to shower room. 12 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 296 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION (CONT'D)

INSULATION

Insulation; comprising 50mm thick expanded polystryene insulation,


including fixing and accessories, as specified, to :

A Top of concrete roof slab. 134 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

B ___________________________

C ___________________________

D ___________________________

TOTAL THERMAL AND MOISTURE PROTECTION : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 297 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

WOODWORK

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

WOODWORK

WALL FINISHES

Timber wall cladding; comprising 150x2400mm wide Ulin timber plank


(W02) with 2mm wide gap, including solid wood batten, fixing and
accessories, as specified as Elevation drawings, to :

D Main entrance walls. 20 m2 -

Timber fascia board; comprising Ulin timber fascia (W03), including


finishes, fixing and accessories, as specified as drawing A92-04.

E 285mm high fascia board to Pool terrace. 17 m -

SCREEN

Decorative timber trellis (SV01); comprising 30x60mm thick Ulin timber


element with direct fix clip system, copper sheet wrapped around
timber core, including fixing and accessories, as specified as drawing
A83-03 and A97-01.

F 1830 wide x 2960mm high timber trellis to Main entrance. 1 No -

Timber trellis (SV-02); comprising 30x60mm thick Ulin timber trellis with
tenon hanger, including fixing and accessories, as specified as drawing
A83-03.

G 1400 wide x 3010mm high timber trellis to MEP area. 1 No -

H Extra over for single swing door to above. 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

J ___________________________

K ___________________________

L ___________________________

TOTAL WOODWORK : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 298 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

D Doors hardware measured separately in 'IRONMONGERY'. Note

DOORS AND WINDOWS

EXTERNAL DOORS AND WINDOWS

GLAZED DOORS AND FIXED WINDOWS

Glazed door and fixed windows; comprising 8mm thick single clear
tempered glass panel, aluminium transom and mullion in bronze
powder coated finish, including sealants, fixing and accessories.

E Overall size, L-shape, 9210 wide x 2700mm high fixed window to 1 No -


receive 2800 wide x 2700mm high folding-sliding door [3 no of leaves]
and 4600 wide x 2700mm high folding-sliding [5 no of leaves] (GD19)
to Living room.

F Overall size, 1860 wide x 2400mm high fixed window to receive 930 1 No -
wide x 2400mm high single sliding door (GD22) to Bathroom.

G Overall size, 2445 wide x 2400mm high fixed window to receive 1220 1 No -
wide x 2400mm high single sliding door (GD27) to Shower room.

GLAZED DOORS

Glazed door; comprising 8mm thick single clear tempered glass panel,
aluminium transom and mullion in bronze powder coated finish,
including sealants, fixing and accessories.

H Overall size, 3900 wide x 2700mm high folding glazed door (GD20) [4 1 No -
nos of leaves] to Bedroom.

J Overall size, 3900 wide x 2700mm high folding glazed door (GD21) [4 1 No -
nos of leaves] to Bedroom.

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

K 1100 wide x 2650mm high single swing door (TD10) to Main entry. 1 No -

Solid timber frame; including paint finish, fixing and accessories, as


specified.

L 150-200 wide x 40mm thick solid timber frame to timber doors. :[1 No] 7 m -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 299 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

INTERNAL DOORS

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

A 900 wide x 2650mm high single sliding door (TD09) to Bedroom. 4 No -

Solid timber frame; including paint finish, fixing and accessories, as


specified.

B 150-200 wide x 40mm thick solid timber frame to timber doors. :[4 No] 26 m -

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to the


following doors.
EXTERNAL DOORS

GLAZED DOORS

To suit folding-sliding door type GD15 [5 no of leaves]:


C Handle. 1 Pair -
D Lockcase. 1 No -
E Sliding track, L=4600mm. 1 No -

To suit sliding door type GD22 :


F Handle. 1 Pair -
G Lockcase. 1 No -
H Sliding track, L=1220mm. 1 No -

To suit sliding door type GD27 :


J Handle. 1 Pair -
K Lockcase. 1 No -
L Sliding track, L=1220mm. 1 No -

To suit sliding door type GD20 :


M Handle. 1 Pair -
N Lockcase. 1 No -
P Sliding track, L=3900mm. 1 No -

To suit sliding door type GD21 :


Q Handle. 1 Pair -
R Lockcase. 1 No -
S Sliding track, L=3900mm. 1 No -

TIMBER DOORS

To suit single swing door type TD10, hardware HW1.0 :


T Lever handle with mortise lock; FSB model 10 1035 satin brass finish 1 Pair -
ex. Assa abloy (ASL).
U Invisible door lock; RFID Essence Vingcard ex. Assa abloy (ASL). 1 Set -
V Concealed hinges (4 nos per door leaves); TE340 3D satin brass finish 4 No -
#047 ex.Tectus (TE).
W Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 1 No -
X heath (SH). door spy 200 brass finish chr 14mm ex. Startec (ST).
Door viewer; 1 No -
Y Floor mounted door stopper; M496 brass finish ex. Hoppe (HO). 1 No -
Z Retracable drop-down sill seal; DDS12 ex. Startec (ST). 1 No -

INTERNAL DOORS

TIMBER DOORS

To suit single sliding door type TD09:


AA Handle. 4 Pair -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 300 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

AB Lockcase. 4 No -
AC Sliding track, L=900mm. 4 No -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 301 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL DOORS AND WINDOWS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 302 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

FINISHES

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

FINISHES

FLOOR FINISHES - EXTERNALLY

D Loose pebbles to Roof measured separately in "External works". Note

E Timber floor to Terrace measured separately in "General Hardscaping Note


works".

F Stone floor to Main entrance measured separately in External works". Note

FLOOR FINISHES - INTERNALLY

G No skirting to internal rooms. Note

Microtopping (M02), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

H Bedroom and Living room. 55 m2 -

J Bathrom, including toilet and shower. 24 m2 -

Levelling screed to receive Epoxy paint floor (measured separately), as


specified as drawing A91-01.

K 50mm thick levelling screed to MEP area. 4 m2 -

WALL FINISHES - EXTERNALLY

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

L Masonry walls generally. 75 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

M Face of concrete columns and walls to general areas. 32 m2 -

WALL FINISHES - INTERNALLY

Stone wall tiles with polished finish (ST06); comprising 15mm thick
stone, including backing, adhesive, grouting, as specified, to :

N Bathroom, Toilet and shower room. 52 m2 -

P 200mm wide stone ledge to backwall. (PROVISIONAL SUM) 2m -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 303 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

15mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

Q Masonry walls generally. 116 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 304 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

A Face of concrete columns and walls to general areas. 12 m2 -

CEILING FINISHES - EXTERNALLY

Calsium silicate board ceiling (CF03); 10mm thick calsium silicate


board ceiling, taped and sanded and prepare smooth to receive paint
finish (paint finish measured separately), including aluminium shadow
line, metal furring framing and fixing accessories, as specified, to :

B Outdoor terrace. 16 m2 -

Flush water resistant gypsum board ceiling (CF02); 12mm thick


gypsum board ceiling ex. Jayaboard or Knauf or equal approved, taped
and sanded and prepare smooth to receive paint finish (paint finish
measured separately), including aluminium shadow line, metal furring
framing and fixing accessories; all as specified, to : (Note : QS
ASSUME THICKNESS)

C Main entry terrace. 3 m2 -

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

D Soffit of concrete slab to Main entry terrace and pool terrace. 16 m2 -

CEILING FINISHES - INTERNALLY

Flush gypsum board ceiling (CF01); 10mm thick gypsum board ceiling,
taped and sanded and prepare smooth to receive paint finish (paint
finish measured separately), including aluminium shadow line, metal
furring framing and fixing accessories, as specified, to :

E Living room and bedroom. 48 m2 -

F 300mm high bulkhead to Living room (as drawing A12-05-01). 13 m -

G 150mm girth curtain box to Living room (as drawing A12-05-01). 10 m -

Flush water resistant gypsum board ceiling (CF02); 12mm thick


gypsum board ceiling ex. Jayaboard or Knauf or equal approved, taped
and sanded and prepare smooth to receive paint finish (paint finish
measured separately), including aluminium shadow line, metal furring
framing and fixing accessories; all as specified, to : (Note : QS
ASSUME THICKNESS)

H Bathroom , Toilet and Shower room. 23 m2 -

J 600 x 600mm wide access panel. 2 No -

K Light cove to Toilet and Shower. 4 m -

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

L Soffit of concrete slab to MEP area. 4 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

M ___________________________

N ___________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 305 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

P ___________________________

TOTAL FINISHES : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 306 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

PAINTING AND DECORATIONS

FLOORS

Epoxy paint finish, as specified, to :

D MEP area. 4 m2 -

E 300mm high skirting to above areas (as drawing A91-01). 5 m -

WALLS

Prepare smooth and apply textured weathershield paint finish-stucco


(PT01); in accordance with manufacturer's recommendations; as
specified.

F Rendered masonry walls and Skim coated concrete walls/columns. 87 m2 -

Prepare smooth and apply acrylic emulsion paint finish; in accordance


with manufacturer's recommendations; as specified.

G Rendered masonry walls and Skim coated concrete walls/columns 128 m2 -


(PT05).

CEILINGS

Prepare smooth and apply weathershield paint finish; in accordance


with manufacturer's recommendations; as specified.

H Calsium silicate board ceiling (CF03). 16 m2 -

J Flush water resistant gypsum board ceilings (CF02). 3 m2 -

K Skim coated ceilings (CF05). 16 m2 -

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

L Flush gypsum board ceilings (CF01). 48 m2 -

M Bulkheads and cove lights. 6 m2 -

N Flush water resistant gypsum board ceilings (CF02). 23 m2 -

P Cove lights. 1 m2 -

Q Skim coated ceilings (CF05). 4 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

R ___________________________

S ___________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 307 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

T ___________________________

TOTAL PAINTING AND DECORATIONS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 308 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

ACCESSORIES AND FITMENTS

D All sizes are QS assumption only. Note

VANITY BENCH

Supply and install vanity benches with opening to receive basin;


comprising steel construction complete with marble to counter with
200mm high fascia, 18mm thick plywood, adhesive, support framing,
fixing accessories, as specified. (Note : all material and details TBA)

E 3300 wide x 600 deep vanity bench to Bathroom. 1 No -

MIRRORS

Mirrors; comprising 5mm thick clear mirror ex. Asahimas or equal


approved, with bevelled edge, including 20mm thick plywood backing,
adhesive, fixing and accessories, as specified. (Note : all material and
details TBA)

F 3300 wide x 1200mm high mirror to Sea view rooms (QS ASSUME 1 No -
SIZE).

CUBICLES AND DOORS

Glazed cubicles system; comprising --mm thick laminated tempered


glass, including white colour PVB, angle bracket, 20mm diameter x
150mm high stainless steel pedestal, fixing and accessories, as
specified. (Note : all material and details TBA)

G 2400mm high glazed cubicle partition to Shower room. 1 m2 -

Glazed cubicles door; comprising --mm thick laminated tempered glass,


including white colour PVB, steel stainless latch, bumper, hinges,
handle, fixing and accessories, as specified. (Note : all material and
details TBA)

H 800 wide x 2400mm high single swing cubicle doors to toilet and 2 No -
shower room.

SUNDRIES

J Bathtub bench to Shower room. 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

K ___________________________

L ___________________________

M ___________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 309 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

TOTAL ACCESSORIES AND FITMENTS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 310 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

SANITARY FIXTURES AND FITTINGS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
TOTO or equal approved, including all associated fittings and
accessories.

Toilet
D Water closet with jet spray. 1 No -
E Robe hook. 1 No -
F Toilet paper holder. 1 No -
G Lavatory with faucet. 2 No -
H Soap dispenser. 2 No -
J Floor drain. 1 No -

Shower room
K Rain shower with mixer. 1 No -
L Soap holder. 1 No -
M Free-standing bathtub. 1 No -
N Bathtub mixer. 1 No -
P Towel hanger. 1 No -
Q Floor drain. 1 No -

Terrace
R Floor drain. 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

S ___________________________

T ___________________________

U ___________________________

TOTAL SANITARY FIXTURES AND FITTINGS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 311 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

EXTERNAL WORKS

D Softscaping measured separately in "Softscaping works". Note

PAVING AND SURFACING

Yellow rustic floor tiles (C1) with polished/unpolished finish; comprising


50mm thick stone, including setting bed/levelling screed, adhesive,
grouting, as specified, to :

E Main entrance courtyard. 7 m2 -

Yellow rustic granite floor with fine bush-hammered finish; comprising


50mm thick stone, including setting bed/levelling screed, adhesive,
grouting, as specified as drawing STXH-303-1, to :

F 300mm wide stair tread to Sunken lounge. 4 m -

G 175mm high stair riser to Sunken lounge. 5 m -

Yellow rustic granite capping (C4) with fine bush-hammered finish;


comprising 50mm thick stone, including setting bed/levelling screed,
adhesive, grouting, as specified as drawing STXH-303-1 and 303-3,
303-4, to :

H 300mm wide capping to timber deck edge. 18 m -

J 200mm wide capping to timber deck edge. 12 m -

Yellow rustic granite stepping stone (O3) with flamed finish; comprising
50mm thick stone, including setting bed/levelling screed, adhesive,
grouting, as specified as drawing STXH-303-1, to :

K 600 x 300mm stepping stone to Outdoor pool terrace. 3 No -

L Ditto; but to Outdoor cabana. 4 No -

M 600 x 600mm stepping stone to Outdoor cabana. 1 No -

N 900 x 300mm stepping stone to Outdoor pool terraace. 2 No -

P Ditto; but to Outdoor cabana. 10 No -

Q 900 x 900mm stepping stone to Pool. 4 No -

Timber deck (B); comprising 30mm thick Ulin timber deck, including
natural finish, 50mm thick support batten, 5mm thick stainless steel
edge, 100mm diameter concrete stump, fixing and accessories, as
specified..

R Pool deck. 25 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 312 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

S Sunken lounge. 4 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 313 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS (CONT'D)

Reinforced concrete curb (A3) fixed at to concrete slab, including


chamfered edge, dowel, grouting and fixing accessories, paint finish, as
specified, to :2

A 100 x 100 x 200mm thick kerb to Pool edge (as drawing STXH-303-1). 18 m -

ROOF FINISHES

Loose pebbles (1); 50-100mm diameter lava stone (min 2 layers), as


specified as drawing STXH-203-2 :

B Roof covering to Villa 1 (as drawing STXH-301-7). 134 m2 -

WALLS, FENCES AND GATES

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

C 250mm thick cavity wall to boundary. 29 m2 -

D 300mm thick cavity wall to boundary. 5 m2 -

Stone wall tiles with polished finish (ST07), including backing,


adhesive, grouting, as specified, to :

E Boundary walls 68 m2 -

Yellow rustic granite wall (C3) with fine bush hammered finish;
comprising 30mm thick stone, including backing, adhesive, grouting, as
specified as drawing STXH-303-3, to :

F 600 x 600mm stone wall to Sunken lounge wall. 5 m2 -

Stainless steel list wall; comprising 50mm wide stainless steel list
channel, including fixing and accessories, as specified as drawing
STXH-303-4 Section 07, and Detail 4, to :

G Boundary wall facing pool. 4 m -

BALANCING TANK

H Concrete work measured separately in "Concrete work". Note

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

J Top of concrete slab. 8 m2 -

K Faces of concrete walls. 20 m2 -

Levelling screed to receive Epoxy paint floor (measured separately), as


specified as drawing A91-01.

L 50mm thick levelling screed. 8 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

M Face of concrete walls. 20 m2 -

N Soffit of concrete roof slab. 8 m2 -

Epoxy paint finish, as specified, to :

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 314 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

P Pump room only. 5 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 315 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS (CONT'D)

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

A Face of concrete walls to Pump room only. 11 m2 -

B Skim coated ceiling. 8 m2 -

Sundries

C Extra over for 200 wide x 100mm high gutter to Pump room. 3 m -

CABANA [drawing A50-02-01]

Timber deck (B); comprising 25mm thick Ulin timber deck, including
natural finish, 50mm thick support batten, 5mm thick stainless steel
edge, 100mm diameter concrete stump, fixing and accessories, as
specified..

D Cabana deck. 12 m2 -

Pergola; comprising 75x75mm thick solid timber trellis, including


support frame, finishes, fixing and accessories, as specified.

E Roof pergola. 11 m2 -

F Pergola wall. 10 m2 -

Timber fascia; comprising 30mm thick timber board, including finishes,


fixing and accessories, as specified.

G 280mm high timber fascia to roof pergola. 10 m -

SWIMMING POOL [drawing A11-05-01, STXH 303-1 - 4]

H Concrete work measured separately in "Concrete work". Note

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

J Top of concrete slab. 50 m2 -

K Faces of concrete walls. 42 m2 -

L Pool overflow gutter. 15 m2 -

Mosaic tiles (E1) with flammed finish; comprising 10mm thick Sukabumi
mosaic tiles, including setting bed / backing, adhesive, grouting, as
specified as drawing STXH-303-1.

M 100 x 100mm mosaic tile to floor. 50 m2 -

N 100 x 100mm mosaic tile to walls. 42 m2 -

P 300mm wide capping to pool. 18 m -

Loose pebbles (F1); 30-50mm diameter grey river pebbles (2 layers),


as specified, to :

Q Pool overflow gutter 4 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).
R Top of concrete slab to overflow gutter. 4 m2 -

S Face of concrete walls to overflow gutter. 11 m2 -

Prepare smooth and apply weathershield paint finish; in accordance


with manufacturer's recommendations; as specified.

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 316 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

T To overflow gutter. 15 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 317 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS (CONT'D)

Sundries

A 300mm wide grating to pool overflow gutter (PROVISIONAL 18 m -


QUANTITY).

B Outdoor cabana (PROVISIONAL QUANTITY). 1 No -

OTHER WORKS

Other works; Tenderer to insert here:

C ___________________________

D ___________________________

E ___________________________

TOTAL EXTERNAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 318 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.2 - 1 BEDROOM VILLA

No. Description Quantity Unit Rate Total

SUMMARY

A GENERALLY

B SITEWORKS -

C CONCRETE WORKS -

D STRUCTURAL METAL WORKS -

E NON-STRUCTURAL METAL WORKS N/A

F MASONRY AND PARTITIONS -

G THERMAL AND MOISTURE PROTECTION -

H WOODWORK -

J DOORS AND WINDOWS -

K FINISHES -

L PAINTING AND DECORATIONS -

M ACCESSORIES AND FITMENTS -

N SANITARY FIXTURES AND FITTINGS -

P EXTERNAL WORKS -

TOTAL BUILDING 5.1 [1 BEDROOM VILLA 1-7] : (1 VILLA ONLY) -

file:///conversion/tmp/scratch/495999449.xlsx 5.2 Villa 1 Bed / 319 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

GENERALLY

A The following Bills of Quantities are a guide only. It is the responsibility


of the Tenderer to satisfy themselves of the accuracy of the description
for works requiring payment. The descriptions provided herein are for a
guide only as to the required scope of Works which form part of this
Contract and should be cross-referenced with all drawings and
specifications. All quantities, except those denoted "Item" are subject to
a re-measure based on the approved "for construction" drawings and
as per relevant provisions of the conditions of contract. The format
provided in these Bills should be followed in order to assist in tender
evaluation. Within each trade or section of works space is provided for
Tenderer to insert additional works items which require payment.

GENERALLY -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 320 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

SITEWORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SITEWORKS

SITE CLEARANCE

D Allow to excavate oversite to remove existing rubble and rubbish and 422 m2 -
top 600mm (min) vegetable soil and dispose off-site.

EXCAVATION

Detailed excavation from ground level; including backfill and disposal


off site all surplus material or store select material for re-use where
required;

E Shallow foundation. 147 m3 -

F Ground slabs to villa. 51 m3 -

G Ground slabs to pool. 152 m3 -

H Ground slabs to balancing tank. 37 m3 -

J Tie beams. 23 m3 -

COMPACTION

Compact sub-grade from fill as specified under the following.

K Shallow foundation. 98 m2 -

L Ground slabs including tie beams 675 m2 -

FILLING

Backfill with in layers not exceeding 300mm with existing material;


including compaction with 95% dry density compacted standard; as
specificed by the Engineer.

M To face of shallow foundation. 115 m3 -

Sand bed layer, spread, levelled, and compacted as specified.

N 100mm thick sand bed layer under shallow foundation. 98 m2 -

P Ditto; but to ground slabs including tie beams. 675 m2 -

TERMITE CONTROL

Anti-termite protection including testing and inspections.

Q To face of all concrete surfaces in contact with earth. 1,041 m2 -

OTHER WORKS

Other Works; Tenderer to insert here:

R _________________________

S _________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 321 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

T _________________________

TOTAL SITEWORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 322 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

CONCRETE WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

D Shallow foundation. 5 m3 -

E Ditto; but to ground slabs including tie beams. 34 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

F Isolated columns. 21 m3 -

G Shallow foundation. 26 m3 -

H Tie beams 23 m3 -

J 250mm thick ground slab. 31 m3 -

K 130mm thick ground slab. 7 m3 -

L 100mm thick ground slab. 51 m3 -

M 150mm thick suspended roof slab. 38 m3 -

N 120mm thick suspended roof slab. 38 m3 -

P Roof beams 35 m3 -

Q 200mm thick RC wall to pool, balancing tank and concrete hob. 21 m3 -

R 150mm thick upstand wall to roof. 10 m3 -

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

S Isolated columns. 8.18 t -

T Shallow foundation. 2.61 t -

U Tie beam. 6.78 t -

V Ground slab. 6.43 t -

W Suspended roof slab. 9.28 t -

X Roof beams. 7.89 t -

Y RC wall to pool, balancing tank and concrete hob. 3.41 t -

Z Upstand wall to roof. 1.81 t -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 323 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

CONCRETE WORKS (CONT'D)

SHUTTERING

Shuttering, as specified to the following.

A Faces of isolated columns. 273 m2 -

B Side of shallow foundation. 66 m2 -

C Sides of tie beams 184 m2 -

D Soffits of suspended roof slab. 473 m2 -

E Soffits and sides of roof beams 353 m2 -

F Face of RC walls. 196 m2 -

G Side of concrete hobe and upstand wall; average 260mm high. 646 m -

H Edges of ground slabs; not exceeding 250mm high. 434 m -

J Edges of suspended roof slabs; not exceeding 150mm high. 199 m -

SUNDRIES

K 800 x 800 mainhole at balancing tank. [PROVISIONAL QUANTITY] 4 No -

OTHER WORKS

Other works; Tenderer to insert here:

L ___________________________

M ___________________________

N ___________________________

TOTAL CONCRETE WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 324 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

MASONRY AND PARTITIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Externally

D 200mm thick masonry walls generally. 177 m2 -

E 250mm thick cavity masonry walls generally. 149 m2 -

F 450mm thick cavity masonry walls generally. 11 m2 -

Internally

G 100mm thick masonry walls generally. 102 m2 -

H 200mm thick masonry walls generally. 10 m2 -

J 250mm thick cavity masonry walls generally. 48 m2 -

K 1500 high x 200mm thick backwall to water closet (QS ASSUMED 3 m -


SIZE).

OTHER WORKS

Other works; Tenderer to insert here:

L ___________________________

M ___________________________

N ___________________________

TOTAL MASONRY AND PARTITIONS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 325 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

D Top of concrete roof slab. 552 m2 -

E Ditto; but to decking floor at pool. 71 m2 -

F Ditto; but to bedroom terraces. 54 m2 -

G 300mm high turns-up to form skirting to above areas. 107 m -

H 220mm high turns-up to form skirting to roof. 231 m -

J Ditto; but to 250mm high. 11 m -

K Ditto; but to 330mm high. 22 m -

L Ditto; but to 480mm high. 79 m -

M Ditto; but to 550mm high. 31 m -

N Ditto; but to 800mm high. 25 m -

P Ditto; but to 1200mm high. 10 m -

WATERPROOFING - INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

Q Top of concrete slab to bathroom, toilet and shower room. 72 m2 -

R Ditto; but to pantry and corridor toilet living room. 18 m2 -

S 300mm high upstand to form skirting (as drawing A91-01). 92 m -

Cement based waterproofing, including primers etc. all as specified, to :

T Face of rendered masonry / concrete walls to shower room. 28 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 326 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

THERMAL AND MOISTURE PROTECTION (CONT'D)

INSULATION

Insulation; comprising 50mm thick expanded polystryene insulation,


including fixing and accessories, as specified, to :

A Top of concrete roof slab. 552 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

B ___________________________

C ___________________________

D ___________________________

TOTAL THERMAL AND MOISTURE PROTECTION : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 327 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

WOODWORK

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

WOODWORK

D Deck flooring at terrace bedroom measured separately in "External Note


works".

WALL FINISHES

Timber wall cladding (T01); comprising 150x2400mm wide Ulin timber


plank with 2mm wide gap, including solid wood batten, fixing and
accessories, as specified as Elevation drawings, to :

E External walls. 18 m2 -

Timber fascia board; comprising Ulin timber fascia, including finishes,


fixing and accessories, as specified as drawing A41-06-03

F 315mm high fascia board to terraces and generally. 88 m -

SCREEN

Decorative timber trellis (SV-04); comprising 30x60mm thick Ulin timber


element with direct fix clip system, feature timber batten with metal
tenon on base and top track, including fixing and accessories, as
specified as drawing A83-03 and A97-01.

G 2130 wide x 2650mm high timber trellis to terraces bedroom. 4 No -

Timber trellis; 30x60mm thick Ulin timber trellis, including finishing,


fixing and accessories, as specified.

H Timber trellis to external wall. 2 m -

OTHER WORKS

Other works; Tenderer to insert here:

J ___________________________

K ___________________________

L ___________________________

TOTAL WOODWORK : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 328 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

D Doors hardware measured separately in 'IRONMONGERY'. Note

DOORS AND WINDOWS

EXTERNAL DOORS AND WINDOWS

GLAZED DOORS

Glazed door; comprising 8mm thick single clear tempered glass panel,
aluminium transom and mullion in bronze powder coated finish,
including sealants, fixing and accessories.

E Overall size, 12040 wide x 2700mm high folding glazed door (GD23) 1 No -
[12 nos of leaves] to living room.

F Overall size, 6060 wide x 2700mm high folding glazed door (GD24) [6 1 No -
nos of leaves] to living room.

G Overall size, 4065 wide x 2700mm high folding glazed door (GD26) [4 3 No -
nos of leaves] to bedroom.

H 1250 wide x 2400mm high sliding glass door (GW04) to shower at 1 No -


masterbedroom.

TIMBER DOOR AND FIXED WINDOWS

Timber door and fixed windows; comprising 40mm thick hollow core
timber door (door frame separately) with 8mm thick single clear
tempered glass window with timber frame, including fixing and
accessories.

J Overall size, 2200 wide x 2700mm high fixed window to receive 1200 1 No -
wide x 2700mm high double-haft swing door (TD11) to Living room.

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

K 1165 wide x 2655mm high single swing door (TD12L) to bedroom and 2 No -
masterbedroom.

L 1165 wide x 2655mm high single swing door (TD12R) to bedroom. 1 No -

M 920 wide x 2360mm high single swing door (TD05L) to Maid room. 1 No -

Solid timber frame; including paint finish, fixing and accessories, as


specified.

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 329 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

N 150-200 wide x 40mm thick solid timber frame to timber doors. :[5 No] 30 m -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 330 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

WINDOWS

Fixed windows; comprising 8mm thick single clear tempered glass


panel, aluminium transom and mullion in bronze powder coated finish,
including sealants, fixing and accessories.

A 1000 wide x 2700mm high fix glass window (FG08) to pantry at living 1 No -
room.

B 1250 wide x 2700mm high fix glass window (FG09) to master bedroom. 1 No -

C 3055 wide x 2400mm high fix glass window (FG10) to bathroom at 1 No -


masterbedroom.

D 3010 wide x 2400mm high fix glass window (FG11) to bathroom at 1 No -


masterbedroom.

INTERNAL DOORS

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

E 1165 wide x 2655mm high single swing door (TD05R) to powder room. 1 No -

F 800 wide x 2400mm high single sliding door to toilet living room. (QS 1 No -
assumed)

G 1300 wide x 2400mm high single sliding door to maid's room toilet. (QS 1 No -
assumed)

Solid timber frame; including paint finish, fixing and accessories, as


specified.

H 150-200 wide x 40mm thick solid timber frame to timber doors. :[3 No] 18 m -

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to the


following doors.
EXTERNAL DOORS

GLAZED DOORS

To suit folding-sliding door type GD23 [12 no of leaves] to living room:

J Handle. 1 Pair -
K Lockcase. 1 No -
L Sliding track, L=12000mm. 1 No -

To suit folding-sliding door type GD24 [6 no of leaves] to living room:

M Handle. 1 Pair -
N Lockcase. 1 No -
P Sliding track, L=6000mm. 1 No -

To suit folding-sliding door type GD26 [4 no of leaves] to bedroom:

Q Handle. 3 Pair -
R Lockcase. 3 No -
S Sliding track, L=3900mm. 3 No -

To suit sliding door type GW04 to shower master bedroom :

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 331 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

T Handle. 1 Pair -
U Lockcase. 1 No -
V Sliding track, L=1300mm. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 332 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

TIMBER DOORS

To suit double-half swing door type TD11 to livingroom, hardware


HW7.0 :
A Lever handle with mortise lock; FSB model 10 1035 satin brass finish 2 Pair -
ex. Assa abbloy (ASL).
B Pivot hinges with floor closer; Rixson H40x587 center hung, stainless 4 No -
steel brass finish ex. Assa abloy.
C Floor mounted door stopper; M496 brass finish ex. Hoppe (HO). 1 No -

To suit single swing door type TD12L to bedroom and masterbedroom,


hardware HW1.0 :
D Lever handle with mortise lock; FSB model 10 1035 satin brass finish 2 Pair -
ex. Assa abloy (ASL).
E Invisible door lock; RFID Essence Vingcard ex. Assa abloy (ASL). 2 Set -
F Concealed hinges (4 nos per door leaves); TE340 3D satin brass finish 8 No -
#047 ex.Tectus (TE).
G Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 2 No -
heath (SH).
H Door viewer; door spy 200 brass finish chr 14mm ex. Startec (ST). 2 No -
J Floor mounted door stopper; M496 brass finish ex. Hoppe (HO). 2 No -
K Retracable drop-down sill seal; DDS12 ex. Startec (ST). 2 No -

To suit single swing door type TD12R to bedroom, hardware HW1.0 :

L Lever handle with mortise lock; FSB model 10 1035 satin brass finish 1 Pair -
ex. Assa abloy (ASL).
M Invisible door lock; RFID Essence Vingcard ex. Assa abloy (ASL). 1 Set -
N Concealed hinges (4 nos per door leaves); TE340 3D satin brass finish 4 No -
#047 ex.Tectus (TE).
P Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 1 No -
Q heath (SH). door spy 200 brass finish chr 14mm ex. Startec (ST).
Door viewer; 1 No -
R Floor mounted door stopper; M496 brass finish ex. Hoppe (HO). 1 No -
S Retracable drop-down sill seal; DDS12 ex. Startec (ST). 1 No -

To suit single swing door type TD05L to maid room, hardware HW3.0 :

T Lever handle with mortise lock; FSB model 10 1035 satin brass finish 1 Set -
ex. Assa abloy (ASL).
U Concealed hinges (4 nos per door leaves); TE240 3D ex. Tectus (TE). 4 No -

V Thumb turn cylinder; KB5 MK satin brass finish ex. Startec (ST). 1 No -
W Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 1 No -
heath (SH).
X Floor mounted door stopper; M496 brass finish ex. Hoppe (HO). 1 No -
Y Retracable drop-down sill seal; DDS12 ex. Startec (ST). 1 No -

INTERNAL DOORS

TIMBER DOORS

To suit single swing door type TD05R to powder room, hardware


HW3.1 :
Z Handle; internal side, Carlo 600mm stainless steel brass finish ex. 1 No -
Startec (ST).
AA Push plate; external side, stainless steel brass finish ex. Startec (ST). 1 No -

AB Concealed hinges (4 nos per door leaves); TE240 3D ex. Tectus (TE). 4 No -

AC Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 1 No -
heath (SH).

To suit sliding door to toilet living room :


AD Handle. 1 Pair -
AE Lockcase. 1 No -
AF Sliding track, L=800mm. 1 No -

To suit sliding door to maid room 's toilet :


AG Handle. 1 Pair -
AH Lockcase. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 333 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

AJ Sliding track, L=1300mm. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 334 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

DOORS AND WINDOWS (CONT'D)

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL DOORS AND WINDOWS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 335 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

FINISHES

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

FINISHES

FLOOR FINISHES - EXTERNALLY

D Loose pebbles to Roof measured separately in "External works". Note

E Timber floor to Terrace measured separately in "General Hardscaping Note


works".

F Stone floor to Main entrance measured separately in External works". Note

Microtopping (M02), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

G Entrance foyer. 20 m2 -

H MEP/Service area. 9 m2 -

Yellow rustic granite capping (C1) with fine bush-hammered finish;


comprising 50mm thick stone, including setting bed/levelling screed,
adhesive, grouting, as specified as drawing STXH-303-2 and 401-1, to :

J Covered walkway. 73 m2 -

FLOOR FINISHES - INTERNALLY

K No skirting to internal rooms. Note

Microtopping (M02), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

L Bedroom, master bedroom and living room. 170 m2 -

M Bathrom, including toilet and shower and powder room. 71 m2 -

Ceramic floor tiles (TL06); including setting bed, adhesive, grouting, as


specified to :

N Maid room. 8 m2 -

P Maid room toilet. 4 m2 -

WALL FINISHES - EXTERNALLY

Stone wall tiles with polished finish (ST07), including backing,


adhesive, grouting, as specified, to :

Q External walls at generally. 59 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 336 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

R Masonry walls generally. 337 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 337 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

A Face of concrete columns. 252 m2 -

B Face of concrete upstand walls at roof. 141 m2 -

WALL FINISHES - INTERNALLY

Stone wall tiles with polished finish (ST05); comprising 15mm thick
stone, including backing, adhesive, grouting, as specified, to :

C Bathroom (vanity area), Toilet and shower room. 127 m2 -

D 200mm wide stone ledge to backwall. (PROVISIONAL SUM) 3m -

Ceramic wall tiles with polished finish (TL01), including backing,


adhesive, grouting, as specified, to :

E Maid toilet. 20 m2 -

15mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

F Masonry walls generally. 482 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

G Face of concrete columns and walls to general areas. 28 m2 -

CEILING FINISHES - EXTERNALLY

Flush gypsum board ceiling (CF01); 10mm thick gypsum board ceiling,
taped and sanded and prepare smooth to receive paint finish (paint
finish measured separately), including aluminium shadow line, metal
furring framing and fixing accessories, as specified, to :

H Bedroom and masterbedroom terraces. 34 m2 -

J Courtyard terrace. 7 m2 -

Calsium silicate board ceiling (CF03); 10mm thick calsium silicate


board ceiling, taped and sanded and prepare smooth to receive paint
finish (paint finish measured separately), including aluminium shadow
line, metal furring framing and fixing accessories, as specified, to :

K Living room terrace. 36 m2 -

L Pedestrian area. 102 m2 -

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

M Soffit of concrete slab to around villas and edge roof slab. 113 m2 -

CEILING FINISHES - INTERNALLY

Flush gypsum board ceiling (CF01); 10mm thick gypsum board ceiling,
taped and sanded and prepare smooth to receive paint finish (paint
finish measured separately), including aluminium shadow line, metal
furring framing and fixing accessories, as specified, to :

N Living room. 60 m2 -

P Bedroom and master bedroom. 90 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 338 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

Q 300mm high bulkhead to Living room (as drawing A12-05-01). 14 m -

R 150mm girth curtain box to Living room (as drawing A12-05-01). 21 m -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 339 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

FINISHES (CONT'D)

Flush water resistant gypsum board ceiling (CF02); 12mm thick


gypsum board ceiling ex. Jayaboard or Knauf or equal approved, taped
and sanded and prepare smooth to receive paint finish (paint finish
measured separately), including aluminium shadow line, metal furring
framing and fixing accessories; all as specified, to : (Note : QS
ASSUME THICKNESS)

A Living room including pantry, corriodor toilet, powder room and toilet. 24 m2 -

B Bathroom including shower and toliets. 65 m2 -

C Maid room, including toilet. 11 m2 -

D 600 x 600mm wide access panel. 4 No -

E Light cove to Toilet and Shower. 9 m -

F 150mm girth curtain box to Master bathroom and shower. 6 m -

OTHER WORKS

Other works; Tenderer to insert here:

G ___________________________

H ___________________________

J ___________________________

TOTAL FINISHES : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 340 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

PAINTING AND DECORATIONS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

PAINTING AND DECORATIONS

WALLS

Prepare smooth and apply textured weathershield paint finish-stucco


(PT01); in accordance with manufacturer's recommendations; as
specified.

D Rendered masonry walls and Skim coated concrete walls/columns. 406 m2 -

E Skim coated concrete upstand walls at roof. 141 m2 -

Prepare smooth and apply acrylic emulsion paint finish; in accordance


with manufacturer's recommendations; as specified.

F Rendered masonry walls and Skim coated concrete walls/columns 291 m2 -


(PT05).

G Rendered masonry walls and Skim coated concrete walls/columns 19 m2 -


(PT06) to powder room.

H Rendered masonry walls and Skim coated concrete walls/columns 24 m2 -


(PT03) to maid room.

CEILINGS

Prepare smooth and apply weathershield paint finish; in accordance


with manufacturer's recommendations; as specified.

J Flush gypsum board ceilings (CF01). 41 m2 -

K Calsium silicate board ceiling (CF03). 138 m2 -

L Skim coated ceilings (CF05). 113 m2 -

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

M Flush gypsum board ceilings (CF01). 150 m2 -

N Bulkheads and curtain boxes. 12 m2 -

P Flush water resistant gypsum board ceilings (CF02). 100 m2 -

Q Bulkheads and Cove lights. 5 m2 -

OTHER WORKS

Other works; Tenderer to insert here:

R ___________________________

S ___________________________

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 341 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

T ___________________________

TOTAL PAINTING AND DECORATIONS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 342 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

ACCESSORIES AND FITMENTS

D All sizes are QS assumption only. Note

VANITY BENCH

Supply and install vanity benches with opening to receive basin;


comprising steel construction complete with marble to counter with
200mm high fascia, 18mm thick plywood, adhesive, support framing,
fixing accessories, as specified. (Note : all material and details TBA)

E 1000 wide x 600 deep vanity bench to Powder room. 1 No -

F 1730 wide x 600 deep vanity bench to Bathrooms. 2 No -

G 2925 wide x 600 deep vanity bench to Master bathroom. 1 No -

Supply and install vanity benches with opening to receive basin;


comprising steel construction complete with homogenouse tiles to
counter with 200mm high fascia, 18mm thick plywood, adhesive,
support framing, fixing accessories, as specified. (Note : all material
and details TBA)

H 1200 wide x 600 deep vanity bench to Maid room. 1 No -

MIRRORS

Mirrors; comprising 5mm thick clear mirror ex. Asahimas or equal


approved, with bevelled edge, including 20mm thick plywood backing,
adhesive, fixing and accessories, as specified. (Note : all material and
details TBA)

J 1000 wide x 1200mm high mirror to Powder room (QS ASSUME SIZE). 1 No -

K 1730 wide x 1200mm high mirror to Bathrooms. 2 No -

L 2925 wide x 1200mm high mirror to Master bathroom. 1 No -

CUBICLES AND DOORS

Glazed cubicles system; comprising --mm thick laminated tempered


glass, including white colour PVB, angle bracket, 20mm diameter x
150mm high stainless steel pedestal, fixing and accessories, as
specified. (Note : all material and details TBA)

M 2400mm high glazed cubicle partition to Shower rooms and Toilets. 5 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 343 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS (CONT'D)

Glazed cubicles door; comprising --mm thick laminated tempered glass,


including white colour PVB, steel stainless latch, bumper, hinges,
handle, fixing and accessories, as specified. (Note : all material and
details TBA)

A 750 wide x 2400mm high single swing cubicle doors to toilet and 4 No -
shower room.

SUNDRIES

B 2900 wide x 2700mm high curtain to master bathroom entry. 1 No -

C 2400 wide x 2700mm high curtain to bathroom entries. 2 No -

OTHER WORKS

Other works; Tenderer to insert here:

D ___________________________

E ___________________________

F ___________________________

TOTAL ACCESSORIES AND FITMENTS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 344 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

SANITARY FIXTURES AND FITTINGS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
TOTO or equal approved, including all associated fittings and
accessories.

Powder room
D Water closet with jet spray. 1 No -
E Robe hook. 1 No -
F Toilet paper holder. 1 No -
G Lavatory with faucet. 1 No -
H Soap dispenser. 1 No -
J Floor drain. 1 No -

Maid toilet
K Water closet with jet spray. 1 No -
L Robe hook. 1 No -
M Toilet paper holder. 1 No -
N Lavatory with faucet. 1 No -
P Soap dispenser. 1 No -
Q Floor drain. 1 No -

Bathrooms [2 No]
R Water closet with jet spray. 2 No -
S Robe hook. 2 No -
T Toilet paper holder. 2 No -
U Lavatory with faucet. 4 No -
V Soap dispenser. 4 No -
W Rain shower with mixer. 2 No -
X Soap holder. 2 No -
Y Free-standing bathtub. 2 No -
Z Bathtub mixer. 2 No -
AA Towel hanger. 2 No -
AB Floor drain. 2 No -
AC Floor drain to terrace. 2 No -

Master bathroom
AD Water closet with jet spray. 1 No -
AE Robe hook. 1 No -
AF Toilet paper holder. 1 No -
AG Lavatory with faucet. 2 No -
AH Soap dispenser. 2 No -
AJ Rain shower with mixer. 1 No -
AK Soap holder. 1 No -
AL Free-standing bathtub. 1 No -
AM Bathtub mixer. 1 No -
AN Towel hanger. 1 No -
AP Floor drain. 3 No -
AQ Floor drain to terrace. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 345 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

SANITARY FIXTURES AND FITTINGS

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL SANITARY FIXTURES AND FITTINGS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 346 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates for
this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

EXTERNAL WORKS

D Softscaping measured separately in "Softscaping works". Note

PAVING AND SURFACING

Granite stone floor with flamed finish (A2); comprising 50mm thick
stone, including setting bed/levelling screed, adhesive, grouting, as
specified as drawing STXH-303-2, to :

E 100 x 100mm stone floor to drop off. 48 m2 -

Yellow rustic granite stepping stone (O2) with fine bush-hammered


finish; comprising 50mm thick stone, including setting bed/levelling
screed, adhesive, grouting, as specified as drawing STXH-303-2, to :

F 600 x 1200mm stepping stone to outdoor pool terrace. 14 No -

G 900 x 1200mm stepping stone to outdoor pool terrace. 2 No -

H 950 x 1500mm stepping stone to drop off. 1 No -

J 600 x 1500mm stepping stone to drop off. 1 No -

Timber deck (B); comprising 30mm thick Ulin timber deck, including
natural finish, 50mm thick support batten, 5mm thick stainless steel
edge, 100mm diameter concrete stump, fixing and accessories, as
specified..

K Terraces living room. 38 m2 -

L Terraces bedrooms. 54 m2 -

M Pool deck. 71 m2 -

ROOF FINISHES

Loose pebbles (1); 50-100mm diameter lava stone (min 2 layers), as


specified as drawing STXH-203-2 :

N Roof covering to Villa 2. 545 m2 -

WALLS, FENCES AND GATES

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

P 200mm thick wall to boundary. 135 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 347 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

Q 250mm thick cavity wall to boundary. 7 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 348 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS (CONT'D)

Stone wall tiles with polished finish (ST07), including backing,


adhesive, grouting, as specified, to :

A Boundary walls 215 m2 -

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

B Masonry walls generally. 76 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

C Face of concrete walls. 8 m2 -

Prepare smooth and apply textured weathershield paint finish-stucco


(PT01); in accordance with manufacturer's recommendations; as
specified.

D Rendered masonry walls and Skim coated concrete walls/columns. 84 m2 -

Timber trellis (SD-03); 30x60mm thick Ulin timber trellis with tenon on
metal top and base track, including fixing and accessories, as specified
as drawing A83-03.

E 2055 wide x 2200mm high timber trellis to MEP area. 1 No -

Decorative timber screen and door; comprising 120 wide x 750 high x
30mm thick perforated timber with copper frame, 30x60mm thick Ulin
timber element with direct fix clip system, copper sheet wrapped
around timber core, including fixing and accessories, as specified as
drawing A83-03 and A97-01.

F Overall size, 4735 wide x 2700mm high timber trellis to receive 1620 1 No -
wide x 2700mm high double swing door (SD01) to drop off.

G 1220 wide x 2700mm high timber trellis single swing door (SD02) to 1 No -
MEP area.

Ironmongery to suit trellis double door type SD01 to drop off, hardware
HW20.0 :
H Lever handle with mortise lock; FSB model 10 1035 satin brass finish 1 Set -
ex. Assa abloy (ASL).
J Pivot hinges (4 nos per door leaves); double action for 250kg door 8 No -
Geze set, galvanised steel ex. Hafele (HA).

Ironmongery to suit trellis single door type SD02 to MEP area,


hardware HW20.0 :
K Lever handle with mortise lock; FSB model 10 1035 satin brass finish 1 Set -
ex. Assa abloy (ASL).
L Pivot hinges (4 nos per door leaves); double action for 250kg door 4 No -
Geze set, galvanised steel ex. Hafele (HA).

BALANCING TANK

M Concrete work measured separately in "Concrete work". Note

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

N Top of concrete slab. 14 m2 -

P Faces of concrete walls. 26 m2 -

Levelling screed to receive Epoxy paint floor (measured separately), as


specified as drawing A91-01.

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 349 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

Q 50mm thick levelling screed. 14 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 350 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS (CONT'D)

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

A Face of concrete walls. 26 m2 -

B Soffit of concrete roof slab. 14 m2 -

Epoxy paint finish, as specified, to :

C Pump room only. 6 m2 -

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

D Face of concrete walls to Pump room only. 12 m2 -

E Skim coated ceiling. 6 m2 -

Sundries

F Extra over for 200 wide x 100mm high gutter to Pump room. 4 m -

SWIMMING POOL [drawing A11-05-01, STXH 303-2, 303-5]

G Concrete work measured separately in "Concrete work". Note

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

H Top of concrete slab. 84 m2 -

J Faces of concrete walls. 56 m2 -

K Capping pool. 20 m2 -

L Pool overflow gutter. 39 m2 -

Mosaic tiles (E1) with flammed finish; comprising 10mm thick Sukabumi
mosaic tiles, including setting bed / backing, adhesive, grouting, as
specified as drawing STXH-303-1.

M 100 x 100mm mosaic tile to floor. 80 m2 -

N 100 x 100mm mosaic tile to walls. 56 m2 -

P 300mm wide capping to pool. 9 m -

Yellow rustic granite capping with fine bush-hammered finish;


comprising 50mm thick stone, including setting bed/levelling screed,
adhesive, grouting, as specified :

Q 300mm wide capping (C4) to edge timber deck. 33 m -

R 200mm wide capping (C3) at planter pool. 8 m -

S 900 x 1200mm wide stepping stone (C5) at pool. 1 No -

Loose pebbles (F1); 30-50mm diameter grey river pebbles (2 layers),


as specified, to :

T Pool overflow gutter. 10 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

U Top of concrete slab to overflow gutter. 7 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 351 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

V Face of concrete walls to overflow gutter. 32 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 352 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

EXTERNAL WORKS (CONT'D)

Sundries

A 300mm wide grating to pool overflow gutter (PROVISIONAL 33 m -


QUANTITY).

WATER FEATURE [drawing STXH 303-2, 303-4]

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

B Top of concrete slab. 4 m2 -

C Faces of concrete walls. 8 m2 -

Nero Absoluto granite with honed finish; comprising 30~80mm thick


stone, including setting bed/levelling screed, adhesive, grouting, as
specified :

D Overflow weir capping. 1 m2 -

E 500mm high wall. 2 m2 -

Loose pebbles (F1); 30-50mm diameter grey river pebbles (2 layers),


as specified, to :

F Overfloow gutter 1 m2 -

Prepare and apply skim coat finish; smooth to receive paint (measured
separately).

G Top of concrete slab to overflow gutter. 4 m2 -

H Face of concrete walls to overflow gutter. 3 m2 -

Sundries

J 300mm wide grating to pool overflow gutter (PROVISIONAL 5 m -


QUANTITY).

K 9mm thick Stainless steel plate/list (316) to gutter's perimeter. 5 m -

OTHER WORKS

Other works; Tenderer to insert here:

L ___________________________

M ___________________________

N ___________________________

TOTAL EXTERNAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 353 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 5.3 - 3 BEDROOM VILLA

No. Description Quantity Unit Rate Total

SUMMARY

A GENERALLY

B SITEWORKS -

C CONCRETE WORKS -

D STRUCTURAL METAL WORKS N/A

E NON-STRUCTURAL METAL WORKS N/A

F MASONRY AND PARTITIONS -

G THERMAL AND MOISTURE PROTECTION -

H WOODWORK -

J DOORS AND WINDOWS -

K FINISHES -

L PAINTING AND DECORATIONS -

M ACCESSORIES AND FITMENTS -

N SANITARY FIXTURES AND FITTINGS -

P EXTERNAL WORKS -

TOTAL BUILDING 5.1 [1 BEDROOM VILLA 1-7] : -

file:///conversion/tmp/scratch/495999449.xlsx 5.3 Villa 3 Bed / 354 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

GENERALLY

The following Bills of Quantities are a guide only. It is the


responsibility of the Tenderer to satisfy themselves of the accuracy
of the description for works requiring payment. The descriptions
provided herein are for a guide only as to the required scope of
Works which form part of this Contract and should be cross-
referenced with all drawings and specifications. All quantities,
except those denoted "Item" are subject to a re-measure based on
the approved "for construction" drawings and as per relevant
provisions of the conditions of contract. The format provided in these
Bills should be followed in order to assist in tender evaluation.
Within each trade or section of works space is provided for Tenderer
to insert additional works items which require payment.

GENERALLY -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 355 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

EXTERNAL WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates


for this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

6.1 GENERAL HARDSCAPING WORKS

D Waterproofing membrane to Drop-off and planter area measured in Note


"Thermal and Moisture protection - Building 3".

E Pergola to Drop-off area measured in "Non-structural metal works". Note

F Concrete works to walkways and corridor measured in "Hotel - Note


Circulation/Corridor, Concrete works".

PAVING AND SURFACING

Compact sub-grade as specified under the following :

G General walkway and driveways. 9,172 m2 -

Sub-base with hardcore stone, as specified as drawing STXH-401-


2, to :

H General walkway and driveways. 9,172 m2 -

Reinforced concrete curb (A3) fixed at to concrete slab, including


dowel, grouting and fixing accessories, paint finish, as specified, to :

J 100 x 100 x 200mm thick kerb to Drop-off area at Level 1 - Building 117 m -
3 (as drawing STXH-301-7).

K Ditto; but to entrance. 354 m -

Ash grey granite floor tiles (A2) with polished/unpolished finish;


comprising 50mm thick floor tiles, including compacted and levelled
hardcore, setting bed/levelling screed, adhesive, grouting, as
specified, to :

L 100 x 100mm floor tiles to Drop-off and ramp area at Level 1 - 463 m2 -
Building 3.

M Ditto; but to Driveway . 1,663 m2 -

Ash grey granite floor tiles (A1) with polished/unpolished finish;


comprising 30mm thick floor tiles, size range 150-600mm, including
compacted and levelled hardcore, setting bed/levelling screed,
adhesive, grouting, as specified, to :

N Pedestrian walkway. 831 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 356 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

P Driveway. 766 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 357 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.1 GENERAL HARDSCAPING WORKS (CONT'D)

Yellow rustic floor tiles (C1) with polished/unpolished finish;


comprising 50mm thick stone, including setting bed/levelling screed,
adhesive, grouting, as specified, to :
A Lobby at Level 1 - Building 3. 119 m2 -

B Ramp at Level 1 - Building 3. 23 m2 -

C 300mm wide stair treads to Lobby at Level 1 - Building 3. 34 m -

D 150mm high stair risers to Lobby at Level 1 - Building 3. 44 m -

E Pedestrian walkway. 3,103 m2 -

Yellow rustic stepping stone (O2) with polished/unpolished finish;


comprising 50mm thick stone, including setting bed/levelling screed,
adhesive, grouting, as specified as drawing STXH-301-7, to :

F 600 x 600mm stepping stone to Lobby at Level 1 - Building 3. 12 No -

G 600 x 900mm stepping stone to Lobby at Level 1 - Building 3. 2 No -

H 900 x 900mm stepping stone to Lobby at Level 1 - Building 3. 2 No -

Loose pebbles (F1); 30-50mm diameter grey river pebbles (2


layers), as specified, to :

J Corridor from Main lobby to Hotel at Building 3. 8 m2 -

Pure white sand floor (N) with geotextile layer, as specified, to :

K Sunken seating at Level 1 - Building 3. 80 m2 -

Asphalt (J) ; comprising asphalt layer, as specified, to :

L MEP area, driveways and parking. 817 m2 -

Compacted sand (D); compirising compacted sand, including cobra


header edging, as specified, to :

M Buggy path and parking to Villa areas. 1,410 m2 -

Sundries

N Extra over for maintenance access to Building 2 area. 2 No -

P Removable tree grating (L) to central walkways. 45 No -

LOBBY ACCESS RAMP - STRUCTURAL WORKS [S10.04]

Siteworks

Compact sub-grade from fill as specified under the following.

Q Ground slabs including pilecap and tie beams 281 m2 -

Sand bed layer, spread, levelled, and compacted as specified.

R 100mm thick sand bed layer under ground slabs including pilecap 281 m2 -
and tie beams

Anti-termite protection including testing and inspections.

S To face of all concrete surfaces in contact with earth. 270 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 358 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.1 GENERAL HARDSCAPING WORKS (CONT'D)

Concrete works

50mm thick lean concrete under the following;

A Ramp foundation. 2 m3 -

B Ground slabs including tie beams. 15 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

C Foundation. 10 m3 -

D Ground beams. 16 m3 -

E 200mm thick ground slab. 57 m3 -

F Ramp walls. 10 m3 -

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

G Foundation. 1.07 t -

H Ground beams. 3.60 t -

J Ground slab. 4.60 t -

K Ramp walls. 1.32 t -

Shuttering, as specified to the following.

L Sides of foundations. 20 m2 -

M Sides of ground beams. 126 m2 -

N Faces of walls. 80 m2 -

P Edges of ground slabs; not exceeding 200mm high. 106 m -

Sundries

Q L 50 x 50 x 5 steel angle (refer S10.04 blow up section). 6 m -

WALLS, FENCES AND GATES

Site boundary walls; comprising 200mm thick concrete wall with


bush hammered finish, including siteworks, 300mm thick gabion wall
with 8 or 10mm dia. wiremesh, pebbles to filled gabion backing,
foundation, fixing and accessories, as specified as drawing A53-01.

R 1800mm high boundary wall to site perimeter. 804 m -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 359 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.1 GENERAL HARDSCAPING WORKS (CONT'D)

Villa boundary walls; comprising 200mm thick masonry wall with


stone cladding finish (ST07), including siteworks, foundation,
30x60mm thick Ulin timber element with direct fix clip system,
copper sheet wrapped around timber core (SV03), fixing and
accessories, as specified as drawing A53-02.

A 2700mm high boundary wall to between Villas. 218 m -

MEP building boundary walls; comprising 200mm thick masonry wall


with render and weathershield paint finish, including siteworks,
foundation, fixing and accessories, as specified as drawing A40-01-
02 section 1. (Note : design TBA, no detail drawing)

B 4000mm high boundary wall to between MEP building and Villas. 53 m -

Entry gate; comprising decorative timber trellis, 120 wide x 750 high
x 30mm thick perforated timber with copper frame, 30x60mm thick
Ulin timber element with direct fix clip system, copper sheet
wrapped around timber core, including hardware, fixing and
accessories, as specified as drawing A53-01 - 03 and A97-01.

C 5700 wide x 1800mm high double sliding gate to Villa restaurant's 1 No -


service entry (QS assumed size).

D 8600 wide x 1800mm high double sliding gate to Service entry (QS 1 No -
assumed size).

E 12900 wide x 1800mm high double sliding gate to Villa compound 1 No -


entry.

F 13200 wide x 1800mm high double sliding gate to Main lobby entry. 1 No -

G 4500 wide x 2700mm high single sliding gate to connecting Villas. 6 No -

Timber balustrade; comprising decorative solid timber post,


including 30 wide x 6mm thick rounded edge timber handrail, copper
finish railing insert, 240 high x 25mm thick timber fascia with finish,
support frame, U-channel stainless steel, sealants, etc, as specified
as drawing A71-01 and A82-01.

H 1270mm high balustrade to drop-off area at Level 1 - Building 3. 55 m -

Prepare and apply skim coat finish; smooth to receive paint


(measured separately).

J Face of concrete columns and walls to ramp wall and lobby stair 32 m2 -
upstand wall at Level 1 - Building 3.

Prepare smooth and apply textured weathershield paint finish-


stucco (PT01); in accordance with manufacturer's
recommendations; as specified.

K Skim coated concrete walls/columns to Building 3. 32 m2 -

Seating wall; comprising siteworks, concrete works to walls,


foundation, including skimcoat/rendered walls, weathershield paint
finish, as specified as drawing STXH-301-2.

L 1000mm high walls. 9 m -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 360 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.1 GENERAL HARDSCAPING WORKS (CONT'D)

Beachfront wall; comprising siteworks, concrete works to walls,


foundation, including 300x300x30mm thick Yellow rustic granite
stone wall (C5), 600x200x50mm thick stone caping, adhesive,
grouting, as specified as drawing STXH-301-3.

A 800mm high walls. 106 m -

OUTDOOR SHOWER

Supply and install sanitary fixtures and fittings, as specified.

B Standing shower type Dream yatch ML ex. Inox style or equal 4 No -


approved (K) to Outdoor shower at Garden pools.

WATER FEATURE

G Structural works measured in PROVISIONAL SUMS. Note

Granite tiles (G01) with honed finish; comprising 30mm thick granite
floor ex. Nero absoluto or equal approved, including dry system
installation, adhesive, grouting, as specified, to :

H Fire water feature. 24 m2 -

Granite floor tiles (G02) with honed finish; comprising 50mm thick
granite floor ex. Nero absoluto or equal approved, including setting
bed/levelling screed/backing, adhesive, grouting, as specified, to :

J Linear water feature. 108 m2 -

Granite tiles (G05) with honed finish; comprising 30mm thick granite
floor ex. Nero absoluto or equal approved, including setting
bed/levelling screed/backing, adhesive, grouting, as specified, to :

K 300 x 300mm floor tiles to water feature at Drop-off lobby. 39 m2 -

L Ditto; but to walls. 24 m2 -

M 200mm wide capping to water feature at Drop-off lobby. 43 m -

N 300 x 300mm floor tiles to water feature at Arrival. 6 m2 -

P Ditto; but to walls. 9 m2 -

Q 200mm wide capping to water feature at Arrival. 13 m -

Black homogenous wall tiles with polished finish; comprising


homogenous tiles, including backing, adhesive, grouting, as
specified as drawing STXH-301-2 detail 1 and 2, to :

R Overflow gutter/drain floor and wall at Drop-off lobby. 27 m2 -

S Ditto; but to Linear water feature. 524 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 361 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.1 GENERAL HARDSCAPING WORKS (CONT'D)

Loose pebbles (F1); 30-50mm diameter grey river pebbles (2


layers), as specified, to :

A Water feature over flow at Drop-off lobby. 12 m2 -

B Ditto; but to fire water feature. 6 m2 -

C Ditto; but to Arrival water feature. 21 m2 -

Grates and grilles; comprising stainless steel grate, including


support frame, finishes, fixing and accessories, as specified as
drawing STXH 401-2.

D 200mm wide steel grating to drain at Fire water feature. 29 m -

E 300mm wide steel grating to drain at Drop-off lobby water feature. 40 m -

F 500 x 500mm wide steel grating to drain at Fire water feature. 3 No -

G Steel grating to overflow water feature at Arrival. 21 m2 -

POOL DECKING

H Allow to excavate oversite to remove existing rubble and rubbish included


and top 200mm (min) vegetable soil and dispose off-site.

Compact sub-grade from fill as specified under the following.

J Beach pool deck. 599 m2 -

K Garden pool deck. 493 m2 -

Sand bed layer, spread, levelled, and compacted as specified.

L 100mm thick sand bed layer under ground slabs at beach pool deck. 599 m2 -

M Ditto; but to garden pool deck. 493 m2 -

50mm thick lean concrete under the following;

N Beach pool ground slab. 30 m3 -

P Garden pool ground slab. 25 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

Q 200mm thick ground slab to beach pool deck. 2 m3 -

R 120mm thick ground slab to beach pool deck. 75 m3 -

S 100mm thick ground slab to garden pool deck. 54 m3 -

T 120mm thick upstand wall at beach pool deck. 3 m3 -

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

U Ground slab to beach pool deck. 4.62 t -

V Ground slab to garden pool deck. 4.21 t -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 362 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

W Upstand wall to beach pool deck. 0.65 t -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 363 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.1 GENERAL HARDSCAPING WORKS (CONT'D)

Shuttering, as specified to the following.

A Faces of upstand wall to beach pool deck. 49 m2 -

B Edge of ground slab to beach pool deck; not exeeding 200mm high. 59 m -

C Edge of ground slab to beach pool deck; not exeeding 120mm high. 224 m -

D Edge of ground slab to garden pool deck; not exeeding 100mm 598 m -
high.

Yellow rustic floor tiles (C1) with polished/unpolished finish;


comprising 50mm thick stone, including setting bed/levelling screed,
adhesive, grouting, as specified, to :

E Garden pool deck. 708 m2 -

Ulin timber; comprising 30mm thick Timber deck, ulin certified,


natural finished, treated with colourless waterproof sealant as
recommended by supplier / installer, stainless steel edge applies to
timber deck adjacent to plaint area/ pool area, 5mm thick stainless
steel edging to conceal sides of timber deck, edge of stainless steel
to be rounded, 50mm thick support batten size L treated with
colourless waterproof treatment as recommended by supplier /
installer, including 100mm dia. concrete stump, all as specified, to:

F Pool deck at Beach pool. 676 m2 -

GARDEN DECK [as drawing STXH 302-5]

Ulin timber deck; comprising 30mm thick Timber deck, ulin certified,
natural finished, treated with colourless waterproof sealant as
recommended by supplier / installer, stainless steel edge applies to
timber deck adjacent to plaint area/ pool area, 5mm thick stainless
steel edging to conceal sides of timber deck, edge of stainless steel
to be rounded, 50mm thick support batten size L treated with
colourless waterproof treatment as recommended by supplier /
installer, including 100mm dia. concrete stump, all as specified, to:

G Garden deck at building 4 , 5, 6. 28 m2 -

Roof trellis; comprising 30mm thick fluorocarbon aluminium hollow


trellis,structural steelworks to roof 100x100mm HDG steel hollow in
heavy duty outdoor paint and 150x150mm HDG columns cladded
with fluorocarbon aluminium, fixing and accessories, as specified, to
:

H Garden deck at Building 4, 5, 6. 29 m2 -

CONNECTING BRIDGE

J Structural works measured in PROVISIONAL SUMS. Note

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

K Top of concrete slab. 15 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 364 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.1 GENERAL HARDSCAPING WORKS (CONT'D)

Timber and glazed balustrade; comprising 16mm thick clear


tempered glass railing, including 30 wide x 6mm thick rounded edge
timber handrail, copper finish railing insert, 240 high x 25mm thick
timber fascia with finish, support frame, U-channel stainless steel,
sealants, etc, as specified as drawing A71-01 and A82-01.

A 1000mm high balustrade to Bridge. 15 m -

Yellow rustic floor tiles (C1) with polished/unpolished finish;


comprising 50mm thick stone, including setting bed/levelling screed,
adhesive, grouting, as specified, to :

B Bridge. 15 m2 -

SUNDRY IMPROVEMENT

C Flag poles. 1 No -

D Beachfront seat pod (STXH-301-14), complete finishes, concrete 7 No -


pad and sub grade.

E Fire hardstanding access. 1 Item -

F Planter boxes. 1 Item -

OTHER WORKS

Other works; Tenderer to insert here:

G ___________________________

H ___________________________

J ___________________________

TOTAL GENERAL HARDSCAPING WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 365 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates


for this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.


C Refer to the Preambles section for full details of Method of
Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

BUILDING 7 [WAITING AREA ON ARRIVAL]

SITEWORKS

SITE CLEARANCE
D Allow to excavate oversite to remove existing rubble and rubbish 123 m2 -
and top 200mm (min) vegetable soil and dispose off-site.

EXCAVATION
Detailed excavation from ground level; including backfill and
disposal off site all surplus material or store select material for re-
use where required.

E Pilecaps 11 m3 -

F Ground slabs 21 m3 -

COMPACTION
Compact sub-grade from fill as specified under the following.

G Ground slabs including pilecap and tie beams. 143 m2 -

FILLING
Backfill with in layers not exceeding 300mm with existing material;
including compaction with 95% dry density compacted standard; as
specificed by the Engineer.

H To faces of pilecaps in water feature. 3 m3 -

Sand bed layer, spread, levelled, and compacted as specified.

J 100mm thick sand bed layer under ground slabs including pilecap 143 m2 -
and tie beams
TERMITE CONTROL
Anti-termite protection including testing and inspections.

K To face of all concrete surfaces in contact with earth. 222 m2 -

CUTTING OFF BORED PILES


Cut-off top of bored piles including disposal to an off-site location to
the following.

L 500mm diameter bored pile. 10 No -

CONCRETE WORKS

POURED CONCRETE

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 366 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

50mm thick lean concrete under the following;

M Ground slabs including pilecap and tie beams 8 m3 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 367 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS

BUILDING 7 [WAITING AREA ON ARRIVAL] (CONT'D)

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

A Isolated columns including pedestal. 5 m3 -

B Pilecaps. 11 m3 -

C Tie beams 7 m3 -

D 200mm thick ground slab to water feature. 5 m3 -

E 130mm thick ground slab. 16 m3 -

F 150mm thick suspended roof slab. 27 m3 -

G Roof beams 9 m3 -

H 150mm thick water feature and upstand walls. 4 m3 -

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

J Isolated columns. 2.27 t -

K Pilecaps. 1.11 t -

L Tie beam 1.85 t -

M Ground slab. 2.43 t -

N Suspended roof slab. 2.32 t -

P Roof beams 2.17 t -

Q Water feature and upstand walls. 0.60 t -

SHUTTERING

Shuttering, as specified to the following.

R Faces of isolated columns. 43 m2 -

S Side of pilecaps. (rev 1) 33 m2 -

T Sides of tie beams 45 m2 -

U Soffits of suspended roof slab. 177 m2 -

V Soffits and sides of roof beams 80 m2 -

W Water feature and upstand walls. 50 m2 -

X Edges of suspended slabs; not exceeding 200mm high. 67 m -

Y Edges of suspended slabs; not exceeding 150mm high. 56 m -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 368 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS

BUILDING 7 [WAITING AREA ON ARRIVAL] (CONT'D)

STRUCTURAL METAL WORKS

PERGOLA ROOF FRAME

Fabricate, deliver to site and erect, the following structural steelwork


using methods complying with the requirement of SS 490 (340
A MPA)
Column for-Cross
material, construction,
250x250x20 fabrication
(75.36 kg/m). and erection including 1.42 t -
cutting, welding, jointing as specified
B 20mm thick base plate (157kg/m2). 0.06 t -

C 20mm thick bottom plate (157kg/m2). 0.12 t -

Fabricate, deliver to site and erect, the following structural steelwork


using methods complying with the requirement of ST-37 (240 MPA)
for material, construction, fabrication and erection including cutting,
welding, jointing as specified

D Beam -RH 250x150x10 (57 kg/m). 6.92 t -

E 14mm thick top plate (109.9kg/m2). 0.08 t -

F 10mm thick top plate (78.5kg/m2). 0.07 t -

G 10mm thick bottom plate (78.5kg/m2). 0.07 t -

Cast-in-anchor BJTD 400, including galvanized rings, bolts and


fastenings all as specified.

H 600mm long anchor bolt D 19mm. 8 No -

Portland cement based non-shrink grouting including cleaning


contact surface, as specified.

J 25mm thick non-shrinkage grouting under plate. 0.36 m2 -

Steelworks finishing, as specified

K Prepare and apply epoxy paint ex.HEMBEL to steel works. 8.74 t -

ROOF PERGOLA

L Structural metal works to pergola measured separately. Note

Roof pergola with gutter; comprising 17.5mm thick laminated heat


strengthened glass, including support frame, sealants, 2mm thick
pre-fabricated aluminium gutter with insulation, 400 high x 50mm
thick timber fascia, fixing and accessories, as specified as drawing
A96-02.

M Roof pergola 2 to Drop-off area at Level.1 (as drawing A51-04-01) 135 m2 -

Roof soffit finish; comprising laser cut aluminium panel with selected
pattern, including fixing and accessories, as specified as drawing
A96-04.

N Roof pergola to Drop-off area at Level 1. 135 m2 -

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Externally

P 300mm thick cavity masonry walls generally. 30 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 369 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

Q 200mm thick masonry walls generally. 51 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 370 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS

BUILDING 7 [WAITING AREA ON ARRIVAL] (CONT'D)

Internally

A 100mm thick masonry walls generally. 32 m2 -

B 70 thick x 1200mm high water closet backwall. 3 m -

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

C Top of concrete roof slab. 177 m2 -

D 200mm high turns-up to form skirting to above areas (as drawing 97 m -


A50-04).

E 500mm high turns-up to form skirting to above areas (as drawing 168 m -
A50-04).

WATERPROOFING INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

F Top of concrete slab to Toilet. 9 m2 -

G 300mm high upstand to form skirting (as drawing A91-01). 16 m -

INSULATION

Insulation; comprising 50mm thick expanded polystryene insulation,


including fixing and accessories, as specified, to :

H Top of concrete roof slab. 177 m2 -

WOODWORK

WALLS

Timber cladding; comprising 20mm thick Ulin timber cladding,


including finishes, fixing and accessories, as specified.

J Timber cladding to cover columns at Drop-off. 14 m2 -

SCREEN

Timber trellis (SVR01); comprising 30x60mm thick Ulin timber


element with direct fix clip system, copper sheet wrapped around
timber core, including fixing and accessories, as specified as
drawing A83-03 and A97-01.

K 850 wide x 3650mm high timber trellis to Restaurant. 1 No -

L 1400 wide x 3650mm high timber trellis to Restaurant. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 371 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

M 4125 wide x 3650mm high timber trellis to cover AC units. 1 No -

N 7850 wide x 3650mm high timber trellis to Restaurant. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 372 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS

BUILDING 7 [WAITING AREA ON ARRIVAL] (CONT'D)

CEILING FINISHES

Timber fascia; comprising 20mm thick Ulin timber fascia (W03),


including wood filler color to match timber color, fixing and
accessories, as specified.

A 285mm high timber fascia to Terrace. 46 m -

B 395mm high timber fascia to Drop off. 44 m -

DOORS AND WINDOWS

EXTERNAL DOORS AND WINDOWS

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

C 900 wide x 2350mm high single swing door (TD05) to Pantry. 1 No -

Solid timber frame; including paint finish, fixing and accessories, as


specified.

D 150-200 wide x 40mm thick solid timber frame to timber doors. 6 m -

INTERNAL DOORS AND WINDOWS

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

E 800 wide x 2350mm high single swing door (TD07) to Toilet entries. 2 No -

Solid timber frame; including paint finish, fixing and accessories, as


specified.

F 150-200 wide x 40mm thick solid timber frame to timber doors. 12 m -

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to


the following doors.

EXTERNAL DOORS

TIMBER DOORS

To suit single swing door type TD05, hardware HW3.1 :


G Handle; internal side, Carlo 600mm stainless steel brass finish ex. 1 No -
Startec (ST).
H Push plate; external side, stainless steel brass finish ex. Startec 1 No -
(ST).
J Concealed hinges (4 nos per door leaves); TE240 3D satin brass 4 No -
047 ex. Tectus (TE).
K Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 1 No -
heath (SH).

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 373 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS

BUILDING 7 [WAITING AREA ON ARRIVAL] (CONT'D)

INTERNAL DOORS

TIMBER DOORS

To suit single swing door type TD07, hardware HW3.1 :


A Handle; internal side, Carlo 600mm stainless steel brass finish ex. 2 No -
Startec (ST).
B Push plate; external side, stainless steel brass finish ex. Startec 2 No -
(ST).
C Concealed hinges (4 nos per door leaves); TE240 3D satin brass 8 No -
047 ex. Tectus (TE).
D Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 2 No -
heath (SH).

FINISHES

FLOOR FINISHES - EXTERNALLY

E Loose pebbles to Roof measured separately in "General Note


Hardscaping works".

F Timber floor to Terrace measured separately in "General Note


Hardscaping works".

G Stone floor to Main entrance measured separately in "General Note


Hardscaping works".

Microtopping (M04), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

H Waiting Area. 79 m2 -

FLOOR FINISHES - INTERNALLY

J No skirting to internal rooms. Note

Microtopping (M04), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

K Toilet. 14 m2 -

Ceramic floor tiles with polished/unpolished finish, including setting


bed/levelling screed, adhesive, grouting, as specified, to :

L 600x600 mm ceramic tiles (TL06) to Pantry. 15 m2 -

WALL FINISHES - EXTERNALLY

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

M Masonry walls generally. 117 m2 -

Prepare and apply skim coat finish; smooth to receive paint


(measured separately).

N Face of concrete columns. 19 m2 -

WALL FINISHES - INTERNALLY

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 374 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

Stone wall tiles with polished finish (ST05); comprising 15mm thick
stone, including backing, adhesive, grouting, as specified, to :

P Male and Female Toilet. 56 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 375 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS

BUILDING 7 [WAITING AREA ON ARRIVAL] (CONT'D)

Prepare and apply skim coat finish; smooth to receive paint


(measured separately).

A Face of concrete columns. 2 m2 -

CEILING FINISHES - EXTERNALLY

Flush water resistant gypsum board ceiling (CF03); 15 m thick


gypsum board ceiling ex. Jayaboard or Knauf or equal approved,
taped and sanded and prepare smooth to receive paint finish (paint
finish measured separately), including aluminium shadow line, metal
furring framing and fixing accessories; all as specified, to : (Note :
QS ASSUME THICKNESS)

B Waiting Area. 124 m2 -

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

C Soffit of concrete slab to Waiting Area 22 m2 -

CEILING FINISHES - INTERNALLY

Flush water resistant gypsum board ceiling (CF02); 12mm thick


gypsum board ceiling ex. Jayaboard or Knauf or equal approved,
taped and sanded and prepare smooth to receive paint finish (paint
finish measured separately), including aluminium shadow line, metal
furring framing and fixing accessories; all as specified, to : (Note :
QS ASSUME THICKNESS)

D Pantry. 23 m2 -

E 600 x 600mm wide access panel to Pantry. 1 No -

PAINTING AND DECORATIONS

WALLS

Prepare smooth and apply textured weathershield paint finish-


stucco (PT01); in accordance with manufacturer's
recommendations; as specified.

F Rendered masonry walls and Skim coated concrete walls/columns. 138 m2 -

G Skim coated concrete ceilings. 146 m2 -

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

H Rendered masonry walls and Skim coated concrete walls/columns. 61 m2 -

CEILINGS

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

J Calsium silicate board ceilings (CF02). 23 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 376 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

ACCESSORIES AND FITMENTS

K All sizes are QS assumption only. Note

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 377 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS

BUILDING 7 [WAITING AREA ON ARRIVAL] (CONT'D)

VANITY BENCH

Supply and install vanity benches with opening to receive basin;


comprising steel construction complete with marble to counter with
200mm high fascia, 18mm thick plywood, adhesive, support
framing, fixing accessories, as specified. (Note : all material and
details TBA)

A L Shape 600 wide x 3800mm long Pantry bench to Female and 1 No -


male toilet.

MIRRORS

Mirrors; comprising 5mm thick clear mirror ex. Asahimas or equal


approved, with bevelled edge, including 20mm thick plywood
backing, adhesive, fixing and accessories, as specified. (Note : all
material and details TBA)

B 1500 wide x 1200mm high mirror to Female and male toilet. 2 No -

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
Toto or equal approved, including all associated fittings and
accessories.

Female and Male toilet


C Water closet with jet spray. 2 No -
D Lavatory with faucet. 2 No -
E Soap dispenser. 2 No -
F Robe hook. 2 No -
G Toilet paper holder. 2 No -
H Floor drain. 2 No -

Kitchen (PROVISIONAL QUANTITY)


J Floor drain. 2 No -

EXTERNAL WORKS

K Water feature measured separately in "General Hardscaping Note


works".

DECK

Timber deck (B); comprising 30mm thick Ulin timber deck, including
natural finish, 50mm thick support batten, 5mm thick stainless steel
edge, 100mm diameter concrete stump, fixing and accessories, as
specified..

L Terrace deck. 123 m2 -

BUGGY PARK

Pergola; comprising 75x75mm thick solid timber trellis, including


support frame, finishes, fixing and accessories, as specified.

M Roof pergola. 24 m2 -

N Pergola wall. 26 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 378 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS

BUILDING 7 [WAITING AREA ON ARRIVAL] (CONT'D)

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL BUILDING 7 [WAITING AREA ON ARRIVAL] : -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 379 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS]

SITEWORKS

SITE CLEARANCE
A Allow to excavate oversite to remove existing rubble and rubbish 372 m2 -
and top 200mm (min) vegetable soil and dispose off-site.

EXCAVATION
Detailed excavation from ground level; including backfill and
disposal off site all surplus material or store select material for re-
use where required.

B Shallow foundation. 59 m3 -

C Ground slabs. 39 m3 -

D Tie beams. 11 m3 -

COMPACTION
Compact sub-grade from fill as specified under the following.

E Shallow foundation. 40 m2 -

F Ground slabs including tie beams 373 m2 -

FILLING
Backfill with in layers not exceeding 300mm with existing material;
including compaction with 95% dry density compacted standard; as
specificed by the Engineer.

G To face of shallow foundation. 37 m3 -

Sand bed layer, spread, levelled, and compacted as specified.

H 100mm thick sand bed layer under shallow foundation. 40 m2 -

J Ditto to; ground slabs including tie beams 373 m2 -

TERMITE CONTROL
Anti-termite protection including testing and inspections.

K To face of all concrete surfaces in contact with earth. 534 m2 -

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

L Shallow foundation. 2 m3 -

M Ditto to; ground slabs including tie beams 19 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

N Shallow foundations 9 m3 -

P Isolated columns. 13 m3 -

Q Pedestal columns. 1 m3 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 380 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

R Tie beams 11 m3 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 381 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS] (CONT'D)

A 100mm thick ground slab. 39 m3 -

B 150mm thick suspended roof slab. 34 m3 -

C Roof beams 17 m3 -

D 250mm thick upstand walls. 5 m3 -

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

E Shallow foundations 0.81 t -

F Isolated columns. 3.08 t -

G Pedestal columns. 0.29 t -

H Tie beam 2.89 t -

J Ground slab. 2.35 t -

K Suspended roof slab. 3.29 t -

L Roof beams 4.43 t -

M Upstand walls 0.57 t -

SHUTTERING

Shuttering, as specified to the following.

N Sides of shallow foundations 25 m3 -

P Faces of isolated columns. 173 m2 -

Q Faces of pedestal columns. 8 m2 -

R Sides of tie beams 85 m2 -

S Soffits of suspended roof slab. 223 m2 -

T Soffits and sides of roof beams 178 m2 -

U Edges of ground slabs; not exceeding 200mm high. 109 m -

V Edges of suspended roof slabs; not exceeding 150mm high. 166 m -

STRUCTURAL METAL WORKS

ROOF FRAME

Fabricate, deliver to site and erect, the following structural steelwork


using methods complying with the requirement of ST-37 for
material, construction, fabrication and erection including cutting,
welding, jointing as specified

W Truss - WF 250x250x9x14 (72.4 kg/m). 1.07 t -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 382 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS] (CONT'D)

A Truss - WF 200x200x8x12 (49.9 kg/m). 2.58 t -

B Truss - WF 200x100x5.5x8 (21.3 kg/m). 0.75 t -

C Purlin - C 200x90x8x13.5 (30.3kg/m). 4.49 t -

D 16mm dia. deformed reinforced steel - wind bracing incl turn buckle 0.11 t -
(1.56kg/m).

E 10mm dia. sagrod for purlins (0.62kg/m). 0.02 t -

F 14mm thick base plate (109.9kg/m2). 0.07 t -

G 14mm thick top plate (109.9kg/m2). 0.09 t -

H 14mm thick bottom plate (109.9kg/m2). 0.05 t -

J 14mm thick joint plate (109.9kg/m2). 0.02 t -

K 10mm thick joint plate (78.5kg/m2). 0.02 t -

L 10mm thick stiffener plate (78.5kg/m2). 0.15 t -

Cast-in-anchor BJTD-400, including galvanized rings, bolts and


fastenings all as specified.

M 420mm long anchor bolt D 16mm. 30 No -

High tensile strength hot dip galvanized bolts Grade ASTM A-325,
including rings, nuts, hole making and fastening; all as specified.

N D12 bolts. 48 No -

Portland cement based non-shrink grouting including cleaning


contact surface, as specified.
P 25mm thick non-shrinkage grouting under plate. 0.57 m2 -

Steelworks finishing, as specified

Q Prepare and apply epoxy paint ex.HEMBEL to steel works. 9.42 t -

NON STRUCTURAL METAL WORKS

ROOF

R Structural metal works to Main roof measured separately. Note

S Timber fascia and Timber shingles measured separately in Note


"Woodwork".

Insulated metal roof panel ex. Kingspan or equal approved,


including support frame, fixing and accessories, as specified as
drawing A92-04, to :

T Roof covering to vaulted roof. 190 m2 -

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Externally

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 383 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

U 200mm thick masonry walls generally. 163 m2 -

V 250mm thick cavity masonry walls generally. 154 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 384 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS] (CONT'D)

Internally

A 70mm thick masonry walls generally. 5 m2 -

B Ditto; but to 1200mm high water closet backwall. 3 m -

C 100mm thick masonry walls generally. 21 m2 -

D 200mm thick masonry walls generally. 101 m2 -

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

E Top of concrete roof slab. 219 m2 -

F 350mm high turns-up to form skirting to above areas (as drawing 75 m -


A40-05).

G 400mm high turns-up to form skirting to above areas (as drawing 168 m -
A40-05).

WATERPROOFING INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

H Top of concrete slab to Toilet, Kitchen, Pastry, BOH. 136 m2 -

J 300mm high upstand to form skirting (as drawing A91-01). 19 m -

INSULATION

Insulation; comprising 50mm thick expanded polystryene insulation,


including fixing and accessories, as specified, to :

K Top of concrete roof slab. 219 m2 -

Insulation; comprising 50mm thick fire-resistant mineral fibre


rockwool insulation, including fixing and accessories, as specified as
drawing A92-04, to :

L Between roof panel and structure to vaulted roof. 190 m2 -

WOODWORK

ROOF FINISHES

Roof timber shingles (W01); comprising 4 layers of 20mm thick


steam bent Ulin timber shingles with 140mm wide overlap, including
solid wood batten, fixing and accessories, as specified as drawing
A90-02 and Elevation drawings.

M Vaulted roof finish. 190 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 385 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

Ventilated roof ridge; comprising 10mm thick Ulin wood ridge,


including finishes, fixing and accessories, as specified as drawing
A92-01.

N 200mm wide roof ridge. 11 m -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 386 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS] (CONT'D)

WALL FINISHES

Timber wall shingles (W01); comprising 3 layers of 20mm thick


steam bent Ulin timber shingles with 140mm wide overlap, including
solid wood batten, fixing and accessories, as specified as drawing
A31-07.

A Shingles to walls. 72 m2 -

Upper roof eaves fascia board (W02); comprising 20mm thick Ulin
timber fascia, including finishes, support frame, fixing and
accessories, as specified as drawing A92-02, to :

B 415mm wide roof eaves to front elevation. 38 m -

Lower roof eaves fascia board; comprising Teak wood fascia board
(W05), including finishes, support frame, fixing and accessories, as
specified as drawing A92-04, to :

C 150 wide x 2400mm long fascia roof eaves panel to front and rear 38 m -
elevation.

SCREEN

Timber trellis (SVR01); comprising 30x60mm thick Ulin timber


element with direct fix clip system, copper sheet wrapped around
timber core, including fixing and accessories, as specified as
drawing A83-03 and A97-01.

D 1400 wide x 3000mm high timber trellis to Restaurant. 1 No -

E 1700 wide x 3000mm high timber trellis to Restaurant. 1 No -

F 4600 wide x 3000mm high timber trellis to cover AC units. 1 No -

G 5720 wide x 3000mm high timber trellis to Restaurant. 1 No -

CEILING FINISHES

Timber ceiling (CF-04); comprising 20mm thick Ulin timber plank


with finishes (T-02), including support frame and hanger, fixing and
accessories, as specified as drawing A41-05, to :

H External soffit of vaulted roof to terrace. 58 m2 -

DOORS AND WINDOWS

EXTERNAL DOORS AND WINDOWS

FIRE RATED STEEL DOORS AND FRAMES

Fire rated steel door; comprising 40mm thick steel door ex. Bostinco
or Lion metal or equal approved, including 50x150x1.5mm thick
electrolyte galvanised steel frame, fire retardant paint finish to door
leaves and frames, etc., as specified.

J 1000 wide x 2400mm high single swing door (MD03) to Kitchen 1 No -


entry.

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 387 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS] (CONT'D)

GLAZED DOORS AND FIXED WINDOWS

Glazed door and fixed windows; comprising 8mm thick single clear
tempered glass panel, aluminium transom and mullion in bronze
powder coated finish, including sealants, fixing and accessories.

A Overall size, 1700 wide x 3200mm high fixed window to receive 950 1 No -
wide x 3200mm high single swing door (GD18) to side terrace.

B Overall size, 2750 wide x 3200mm high fixed window to receive 1 No -


1600 wide x 3200mm high single slidng door (GD15) to Entry.

C Ditto; but type GD16. 1 No -

GLAZED DOORS

Folding glazed door; comprising 8mm thick single clear tempered


glass panel, aluminium transom and mullion in bronze powder
coated finish, including sealants, fixing and accessories.

D Overall size, 14750 wide x 3200mm high folding glazed door (GD17) 1 No -
(12 nos of leaves) to Restaurant.

WINDOW AND FRAMES

Fixed windows; comprising 8mm thick single clear tempered glass


panel, aluminium transom and mullion in bronze powder coated
finish, including sealants, fixing and accessories.

E 5720 wide x 3000mm high window (FG13) to Restaurant. 1 No -

F 1700 wide x 3000mm high window (FG14) to Restaurant. 1 No -

G 1400 wide x 3000mm high window (FG--) to Restaurant. 1 No -

H Glazed window above folding doors type GD17 and to other sides 64 m2 -
(gable windows).

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

J 900 wide x 2350mm high single swing door (TD05) to BOH entry. 1 No -

Solid timber frame; including paint finish, fixing and accessories, as


specified.

K 150-200 wide x 40mm thick solid timber frame to timber doors. :[1 6 m -
No]

INTERNAL DOORS AND WINDOWS

FIRE RATED STEEL DOORS AND FRAMES

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 388 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

Fire rated steel door with viewing glass; comprising 40mm thick
steel door ex. Bostinco or Lion metal or equal approved, including
200 wide x 500 high x 8mm thick clear tempered viewing glass,
50x150x1.5mm thick electrolyte galvanised steel frame, fire
retardant paint finish to door leaves and frames, sealants, etc., as
specified.

L 1800 wide x 2400mm high double swing door (MD06) to Kitchen 1 No -


entry.

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 389 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS] (CONT'D)

TIMBER DOORS AND TIMBER FRAME

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

A 800 wide x 2350mm high single swing door (TD07) to Storages and 6 No -
Toilets.

Solid timber frame; including paint finish, fixing and accessories, as


specified.

B 150-200 wide x 40mm thick solid timber frame to timber doors. 34 m -

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to


the following doors.

EXTERNAL DOORS

FIRE RATED STEEL DOORS

To suit single swing door type MD03, hardware HW1.0 :


C Lever handle. 1 Pair -
D Heavy duty butt hinges (4 nos per door leaves); size 102, 15mm dia. 4 No -
knuckle, 3mm thick flange stainless steel satin finish ex. Startec
(ST).
E Heavy duty lockset; mortise grade 1, keyed with deadbolt, 630 satin 1 No -
chrome-plated ex. Hafele (HA).
F Kick plate; external side only, 4301 Hoju stainless steel brushed 1 No -
finish ex. Hafele (HA).
G Floor mounted door stopper; stainless steel half-dome with mandrel 1 No -
PVD graphite black ex. Hafele (HA).

GLAZED DOORS

To suit single swing door type GD18 :


H Handle. 1 Pair -
J Lockcase. 1 No -
K Stainless steel hinges (4 nos per door leaves). 4 No -

To suit folding-sliding door type GD15 [2 no of leaves]:


L Handle. 1 Pair -
M Lockcase. 1 No -
N Stainless steel hinges (4 nos per door leaves). 8 No -
P Sliding track, L=1600mm. 1 Set -

To suit folding-sliding door type GD16 [2 no of leaves]:


Q Handle. 1 Pair -
R Lockcase. 1 No -
S Stainless steel hinges (4 nos per door leaves). 8 No -
T Sliding track, L=1600mm. 1 No -

To suit folding-sliding door type GD17 [12 no of leaves]:


U Handle. 1 Pair -
V Lockcase. 1 No -
W Stainless steel hinges (4 nos per door leaves). 48 No -
X Sliding track, L=14750mm. 1 No -

TIMBER DOORS

To suit single swing door type TD05, hardware HW2.0 :

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 390 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

Y Lever handle; RFID lock combination, Flex Vingcard ex. Assa abloy 1 Set -
(ASL).

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 391 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS] (CONT'D)

A Flush hinges (4 nos per door leaves); DHX4120 stainless steel matt 4 No -
finish ex. Startec (ST).
B Door closer; hidden type, DCL33 EN2-4 matt black finish ex. Startec 1 No -
(ST).
C Floor mounted door stopper; square profile stainless steel matt 1 No -
finish ex. Startec (ST).

INTERNAL DOORS

FIRE RATED STEEL DOORS

To suit double swing door type MD06, hardware HW11.0 :


D Push plate; stainless steel satin finish ex. Hafele (HA). 2 Pair -
E Double action floor spring with top pivot hinges; EN3 or EN4 ex. 8 No -
Startec (ST).
F Flush bolt; top and bottom, square 285mm with folding lever bar 8 No -
connection M10,stainless steel matt finish ex. Hafele (HA).
G Kick plate; both side, 4301 Hoju stainless steel brushed finish ex. 8 No -
Hafele (HA).
H Finger protection blinds; Swing guard A, Athmer ex. Hafele (HA). 4 No -

TIMBER DOORS

To suit single swing door type TD07, hardware HW3.1 :


J Handle; internal side, Carlo 600mm stainless steel brass finish ex. 6 No -
Startec (ST).
K Push plate; external side, stainless steel brass finish ex. Startec 6 No -
(ST).
L Concealed hinges (4 nos per door leaves); TE240 3D satin brass 24 No -
047 ex. Tectus (TE).
M Door closer; hidden type, Powermatic R100 brass finish ex. Samuel 6 No -
heath (SH).

FINISHES

FLOOR FINISHES - EXTERNALLY

N Loose pebbles to roof measured separately in "External works". Note

P Timber deck to terrace measured separately in "External works". Note

FLOOR FINISHES - INTERNALLY

Q No skirting to internal rooms. Note

Microtopping (M04), including 20m thick levelling screed (approx.),


smooth finish, as specified, to :

R Corridor. 150 m2 -

Ceramic floor tiles with polished/unpolished finish, including setting


bed/levelling screed, adhesive, grouting, as specified, to :

S 600 x 600mm ceramic floor tiles (TL02) to Villa BOH. 25 m2 -

T Ditto; but to Kitchen. 37 m2 -

U 600 x 600mm ceramic floor tiles (TL05) to Toilet. 10 m2 -

V 600 x 600mm ceramic floor tiles (TL07) to Kitchen and Pastry. 66 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 392 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS] (CONT'D)

WALL FINISHES - EXTERNALLY

Stone capping (ST--), including backing, adhesive, grouting, as


specified as drawing A41-06-02, to :

A 200mm wide stone capping to roof upstand. 6 m -

B 300mm wide stone capping to roof upstand. 166 m -

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

C Masonry walls generally. 317 m2 -

Prepare and apply skim coat finish; smooth to receive paint


(measured separately).

D Face of concrete columns. 107 m2 -

WALL FINISHES - INTERNALLY

Stone wall tiles with polished finish (ST05); comprising 15mm thick
stone, including backing, adhesive, grouting, as specified, to :

E Male and Female Toilet 54 m2 -

F 200mm wide removable stone ledge to backwall to Toilet. 3 m -

Ceramic wall tiles with polished finish, including backing, adhesive,


grouting, as specified, to :

G 600 x 600mm wall tiles (TL02) to Kitchen. 72 m2 -

H 600 x 600mm wall tiles (TL07) to Open kitchen. 77 m2 -

15mm thick cement render with smooth finish, including reveals to


receive paint (paint measured separately), as specified, to :

J Masonry walls generally. 362 m2 -

Prepare and apply skim coat finish; smooth to receive paint


(measured separately).

K Face of concrete columns. 42 m2 -

CEILING FINISHES - EXTERNALLY

L Ceiling to terrace deck measured separately in "Woodwork". Note

CEILING FINISHES - INTERNALLY

Flush gypsum board ceiling (CF01); 10mm thick gypsum board


ceiling, taped and sanded and prepare smooth to receive paint finish
(paint finish measured separately), including aluminium shadow line,
metal furring framing and fixing accessories, as specified, to :

M Kitchen to dining corridor. 64 m2 -

N Dining area. 112 m2 -

P 200mm high bulkhead to dining corridor (as drawing A41-05). 15 m -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 393 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

Q 300mm high bulkhead to kitchen (as drawing A41-05). 10 m -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 394 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS] (CONT'D)

Flush water resistant gypsum board ceiling (CF02); 12mm thick


gypsum board ceiling ex. Jayaboard or Knauf or equal approved,
taped and sanded and prepare smooth to receive paint finish (paint
finish measured separately), including aluminium shadow line, metal
furring framing and fixing accessories; all as specified, to : (Note :
QS ASSUME THICKNESS)

A Male and Female Toilet. 10 m2 -

B Kitchen and Pastry 66 m2 -

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

C Soffit of concrete slab to Kitchen BOH. 37 m2 -

D Ditto; but to Villa BOH. 25 m2 -

PAINTING AND DECORATIONS

WALLS

Prepare smooth and apply textured weathershield paint finish-


stucco (PT01); in accordance with manufacturer's
recommendations; as specified.

E Rendered masonry walls and Skim coated concrete walls/columns. 424 m2 -

Prepare smooth and apply acrylic emulsion paint finish; in


accordance with manufacturer's recommendations; as specified.

F Rendered masonry walls and Skim coated concrete walls/columns 138 m2 -


to BOH area and Kitchen (PT03).

G Rendered masonry walls and Skim coated concrete walls/columns 101 m2 -


to Dining area (PT05).

CEILINGS

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

H Flush gypsum board ceilings (CF01). 176 m2 -

J Bulkheads. 6 m2 -

K Flush water resistant gypsum board ceilings (CF02). 76 m2 -

L Skim coated ceilings (CF05). 62 m2 -

ACCESSORIES AND FITMENTS

M All sizes are QS assumption only. Note

VANITY BENCH

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 395 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

Supply and install vanity benches with opening to receive basin;


comprising steel construction complete with marble to counter with
200mm high fascia, 18mm thick plywood, adhesive, support
framing, fixing accessories, as specified. (Note : all material and
details TBA)

N 1500 wide x 600 deep vanity bench to Female and male toilet. 2 No -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 396 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS] (CONT'D)

MIRRORS

Mirrors; comprising 5mm thick clear mirror ex. Asahimas or equal


approved, with bevelled edge, including 20mm thick plywood
backing, adhesive, fixing and accessories, as specified. (Note : all
material and details TBA)

A 1500 wide x 1200mm high mirror to Female and male toilet. 2 No -

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
Toto or equal approved, including all associated fittings and
accessories.

Female and Male toilet


B Water closet with jet spray. 2 No -
C Lavatory with faucet. 2 No -
D Soap dispenser. 2 No -
E Robe hook. 2 No -
F Toilet paper holder. 2 No -
G Urinal. 1 No -
H Hand dryer. 2 No -
J Floor drain. 2 No -

Kitchen (PROVISIONAL QUANTITY)


K Floor drain. 2 No -

EXTERNAL WORKS

PAVING AND SURFACING

Loose pebbles (F1); 30-50mm diameter grey river pebbles (2


layers), as specified, to :

L Roof covering. 219 m2 -

Timber deck (B); comprising 30mm thick Ulin timber deck, including
natural finish, 50mm thick support batten, 5mm thick stainless steel
edge, 100mm diameter concrete stump, fixing and accessories, as
specified..

M Terrace deck. 57 m2 -

CABANA [drawing A50-03]

Timber deck (B); comprising 25mm thick Ulin timber deck, including
natural finish, 50mm thick support batten, 5mm thick stainless steel
edge, 100mm diameter concrete stump, fixing and accessories, as
specified..

N Cabana deck. 34 m2 -

Pergola; comprising 75x75mm thick solid timber trellis, including


support frame, finishes, fixing and accessories, as specified.

P Roof pergola. 3 m2 -

Sundries

Q Extra over for timber blind to cabanas. 53 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 397 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 8 [VILLA RESTAURANT AND CABANAS] (CONT'D)

OTHER WORKS

Other works; Tenderer to insert here:

A ___________________________

B ___________________________

C ___________________________

TOTAL BUILDING 8 [VILLA RESTAURANT AND CABANAS] : -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 398 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 9 [DRIVER'S SEATING AREA]

SITEWORKS

SITE CLEARANCE
A Allow to excavate oversite to remove existing rubble and rubbish 23 m2 -
and top 200mm (min) vegetable soil and dispose off-site.

EXCAVATION
Detailed excavation from ground level; including backfill and
disposal off site all surplus material or store select material for re-
use where required.

B Shallow foundation. 14 m3 -

C Ground slabs. 3 m3 -

D Tie beams. 2 m3 -

COMPACTION
Compact sub-grade from fill as specified under the following.

E Shallow foundation. 9 m2 -

F Ground slabs including tie beams 23 m2 -

FILLING
Backfill with in layers not exceeding 300mm with existing material;
including compaction with 95% dry density compacted standard; as
specificed by the Engineer.

G To face of shallow foundation. 10 m3 -

Sand bed layer, spread, levelled, and compacted as specified.

H 100mm thick sand bed layer under shallow foundation. 9 m2 -

J Ditto to; ground slabs including tie beams 23 m2 -

TERMITE CONTROL
Anti-termite protection including testing and inspections.

K To face of all concrete surfaces in contact with earth. 79 m2 -

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

L Shallow foundation. 1 m3 -

M Ground slabs including tie beams 2 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

N Shallow foundation. 3 m3 -

P Isolated columns. 1 m3 -

Q Tie beams 2 m3 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 399 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

R 130mm thick ground slab. 3 m3 -

S 150mm thick suspended roof slab. 7 m3 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 400 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 9 [DRIVER'S SEATING AREA] (CONT'D)

A Roof beams 3 m3 -

B 150mm thick upstand walls. 1 m3 -

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

C Shallow foundation. 0.19 t -

D Isolated columns. 0.17 t -

E Tie beam 0.32 t -

F Ground slab. 0.33 t -

G Suspended roof slab. 0.58 t -

H Roof beams 0.51 t -

J Upstand walls. 0.09 t -

SHUTTERING

Shuttering, as specified to the following.

K Sides of shallow foundation. 6 m2 -

L Faces of isolated columns. 13 m2 -

M Sides of tie beams 45 m2 -

N Soffits of suspended roof slab. 46 m2 -

P Soffits and sides of roof beams 80 m2 -

Q Edges of upstand walls. 9 m2 -

R Edges of ground slabs; not exceeding 130mm high. 19 m -

S Edges of suspended roof slabs; not exceeding 150mm high. 19 m -

SUNDRIES

T Allow for construction joint or the like as specified. 1 Item -

U Allow for all grooves, throats, rebates, chamfers or the like. 1 Item -

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Externally

V 200mm thick masonry walls generally. 14 m2 -

Internally

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 401 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

W 70 thick x 1200mm high water closet backwall. 2 m -

X 100mm thick masonry walls generally. 8 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 402 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 9 [DRIVER'S SEATING AREA] (CONT'D)

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

A Top of concrete roof slab. 46 m2 -

B 150mm high turns-up to form skirting to above areas (as drawing 45 m -


A50-04).

C 350mm high turns-up to form skirting to above areas (as drawing 19 m -


A50-04).

WATERPROOFING INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

D Top of concrete slab to Toilet. 8 m2 -

E 300mm high upstand to form skirting (as drawing A91-01). 13 m -

INSULATION

Insulation; comprising 50mm thick expanded polystryene insulation,


including fixing and accessories, as specified, to :

F Top of concrete roof slab. 46 m2 -

WOODWORK

WALL FINISHES

Timber fascia board (T02); comprising Ulin timber fascia, including


finishes, fixing and accessories, as specified as drawing A50-04
section 4.

G 200mm high fascia board. 21 m -

SCREEN

Timber trellis (SD); comprising 30x60mm thick standardized Ulin


timber, including tenon on metal top and base track, fixing and
accessories, as specified as drawing A83-03 and A97-01.

H 740 wide x 2200mm high timber trellis (SD1) to driver's seating 1 No -


area.

J 1640 wide x 2200mm high timber trellis (SD2) to driver's seating 1 No -


area.

K 2055 wide x 2200mm high timber trellis (SD3) to driver's seating 1 No -


area.

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 403 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 9 [DRIVER'S SEATING AREA] (CONT'D)

DOORS AND WINDOWS

INTERNAL DOORS AND WINDOWS

TIMBER DOORS

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (W02), fixing and
accessories, as specified.

A 740 wide x 2200mm high single sliding door (TD--) to Toilet entries. 1 No -

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to


the following doors.

INTERNAL DOORS

TIMBER DOORS

To suit single swing door type TD-- :


B Lever handle with lock (HW02). 1 Pair -
C Stainless steel hinges (HW03) (4 nos per door leaves). 4 No -

FINISHES

FLOOR FINISHES - EXTERNALLY

Loose pebbles (1); 50-100mm diameter lava stone (min 2 layers), as


specified as drawing STXH-203-2 :

D Roof covering. 46 m2 -

FLOOR FINISHES - INTERNALLY

E No skirting to internal rooms. Note

Homogenous floor tiles with polished/unpolished finish, including


setting bed/levelling screed, adhesive, grouting, as specified, to :

F 600 x 600mm floor tiles (TL05) to Toilet and seating area. 18 m2 -

WALL FINISHES - EXTERNALLY

25mm thick cement render with smooth finish including reveals to


receive paint (paint measured separately), as specified, to :

G Masonry walls generally. 14 m2 -

Prepare and apply skim coat finish; smooth to receive paint


(measured separately).

H Face of concrete columns/walls. 14 m2 -

WALL FINISHES - INTERNALLY

Homogenous wall tiles with polished/unpolished finish, including


backing, adhesive, grouting, as specified, to :

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 404 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

J 600 x 600mm floor tiles (TL05) to Toilet. 20 m2 -

K 200mm wide removable stone ledge to backwall to Toilet. 2 m -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 405 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 9 [DRIVER'S SEATING AREA] (CONT'D)

CEILING FINISHES - EXTERNALLY

Prepare and apply skim coat finish (CF05); smooth to receive paint
(measured separately).

A Soffit of concrete slab to perimeter roof overhang. 24 m2 -

B 350mm high skimcoat finish to roof edge. 28 m -

CEILING FINISHES - INTERNALLY

Calsium silicate board ceiling (CF02); 12mm thick calsium silicate


board ceiling ex. Jayaboard or Knauf or equal approved, taped and
sanded and prepare smooth to receive paint finish (paint finish
measured separately), including aluminium shadow line, metal
furring framing and fixing accessories; all as specified, to :

C Toilet and seating area. 27 m2 -

PAINTING AND DECORATIONS

WALLS

Prepare smooth and apply textured weathershield paint finish-


stucco (PT01); in accordance with manufacturer's
recommendations; as specified.

D Rendered masonry walls and Skim coated concrete walls/columns. 28 m2 -

E Skim coated concrete ceilings. 34 m2 -

CEILINGS

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

F Calsium silicate board ceilings (CF02). 27 m2 -

ACCESSORIES AND FITMENTS

G Refer drawing A54-06. Note

VANITY BENCH

Vanity benches with opening to receive basin; comprising steel


construction complete with 20mm thick stone to counter with 300mm
high fascia (ST10), 12mm thick plywood, adhesive, support framing,
fixing accessories, as specified.

H 1640 wide x 600 deep vanity bench to toilet. 1 No -

MIRRORS

Mirrors; comprising 6mm thick clear mirror ex. Asahimas or equal


approved, with 25x25mm wide stainless steel edge, including 20mm
thick plywood backing, adhesive, fixing and accessories, as
specified.

J 1350 wide x 990mm high mirror to toilet. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 406 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 9 [DRIVER'S SEATING AREA] (CONT'D)

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
Toto or equal approved, including all associated fittings and
accessories.

Toilet
A Water closet with jet spray. 1 No -
B Lavatory with faucet. 1 No -
C Soap dispenser. 1 No -
D Robe hook. 1 No -
E Toilet paper holder. 1 No -
F Floor drain. 1 No -

OTHER WORKS

Other Works; Tenderer to insert here:

G _________________________

H _________________________

J _________________________

TOTAL BUILDING 9 [DRIVER'S SEATING AREA] : -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 407 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 10 [BEACH POOL CHANGING ROOM]

SITEWORKS

SITE CLEARANCE
A Allow to excavate oversite to remove existing rubble and rubbish 55 m2 -
and top 200mm (min) vegetable soil and dispose off-site.

EXCAVATION
Detailed excavation from ground level; including backfill and
disposal off site all surplus material or store select material for re-
use where required.

B Generally. 91 m3 -

COMPACTION
Compact sub-grade from fill as specified under the following.

C Ground slabs. 55 m2 -

Sand bed layer, spread, levelled, and compacted as specified.

D 100mm thick sand bed layer under ground slabs. 55 m2 -

TERMITE CONTROL
Anti-termite protection including testing and inspections.

E To face of all concrete surfaces in contact with earth. 99 m2 -

CONCRETE WORKS

POURED CONCRETE

50mm thick lean concrete under the following;

F Ground slabs including pilecap and tie beams 3 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

G Isolated columns. 2 m3 -

H 250mm thick ground slab. 11 m3 -

J 200mm thick ground slab. 2 m3 -

K 100mm thick ground slab. 1 m3 -

L 150mm thick suspended roof slab. 4 m3 -

M Roof beams 1 m3 -

N 200mm thick walls. 11 m3 -

P 150mm thick walls. 5 m3 -

Q Flight of slab stair including concrete step. 1 m3 -

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 408 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

R Isolated columns. 0.39 t -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 409 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 10 [BEACH POOL CHANGING ROOM] (CONT'D)

A Ground slab. 1.04 t -

B Suspended roof slab. 0.44 t -

C Roof beams 0.28 t -

D Concrete walls. 1.86 t -

E Flight of slab stair including concrete step. 0.15 t -

SHUTTERING

Shuttering, as specified to the following.

F Faces of isolated columns. 27 m2 -

G Soffits of suspended roof slab. 22 m2 -

H Soffit of flight slab stair. 4 m2 -

J Soffits and sides of roof beams 14 m2 -

K Faces of walls. 167 m2 -

L Edges of suspended slabs; not exceeding 150mm high. 24 m -

M Edge of flights stair slab; not exeeding 300mm high. 7 m -

N 170mm high face of riser stair. 13 m -

MASONRY

Autoclaved aerated concrete blocks, laid in stretcher bond, including


practical columns, anchors, lintel beams, ties and control joints, as
specified.

Internally

P 70 thick x 1200mm high water closet backwall. 2 m -

Q 100mm thick masonry walls generally. 31 m2 -

R 200mm thick masonry walls generally. 8 m2 -

THERMAL AND MOISTURE PROTECTION

WATERPROOFING EXTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

S Top of concrete roof slab. 26 m2 -

T 275mm high turns-up to form skirting to above areas (as drawing 24 m -


A50-06-01).

U Face of concrete walls. 97 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 410 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 10 [BEACH POOL CHANGING ROOM] (CONT'D)

WATERPROOFING INTERNALLY

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

A Top of concrete slab to Shower and toilet. 19 m2 -

B 300mm high upstand to form skirting (as drawing A91-01). 29 m -

Cement based waterproofing, including primers etc. all as specified,


to :

C Face of rendered masonry / concrete walls to shower room. 13 m2 -

INSULATION

Insulation; comprising 50mm thick expanded polystryene insulation,


including fixing and accessories, as specified, to :

D Top of concrete roof slab. 26 m2 -

GREEN ROOF SYSTEM

Green roof system; comprising drainage cell, geotextile layer,


including washed sand, growing media, membrane protection and
root barrier, insulation, fixing and accessories, as specified. (Note :
Membrane and insulation to roof measured separately)

E Top of concrete roof slab. 26 m2 -

WOODWORK

PERGOLA

Pergola; comprising bamboo structure for treliis and beams,


finishes, fixing and accessories, as specified as drawing A50-06-01
and 02, to :

F Changing room terrace. 52 m2 -

G Extra over for 2400mm high bamboo columns to pergola support, 6 No -


including all associated works.

Timber pergola; comprising solid timber trellis, including finishes,


support frame, fixing and accessories, as specified as drawing A50-
06-01.

H 5300 long x 1200mm wide pergola to toilet corridor. 1 No -

DOORS AND WINDOWS

INTERNAL DOORS AND WINDOWS

TIMBER DOORS

Hollow core timber door; comprising 40mm thick hollow core timber
door, including door leaves with veneer finish (TM--), fixing and
accessories, as specified.

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 411 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

J 885 wide x 2400mm high single sliding door (TD--) to Toilet entries. 2 No -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 412 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 10 [BEACH POOL CHANGING ROOM] (CONT'D)

IRONMONGERIES

SUPPLY and INSTALL ironmongery and hardware, as specified to


the following doors.

INTERNAL DOORS

TIMBER DOORS

To suit single sliding door type TD-- :


A Handle. 2 Pair -
B Lockcase. 2 No -
C Sliding track, L=900mm. 2 Set -

FINISHES

FLOOR FINISHES - EXTERNALLY

D Stone floor to upper terrace measured separately in "General Note


hardscaping works".

FLOOR FINISHES - INTERNALLY

Micro cement resin finish (M04), including 20m thick levelling screed
(approx.), smooth finish, as specified, to :

E Changing area and corridor. 26 m2 -

F 300mm wide stair treads to toilet access stair. 12 m -

G 155mm high stair risers to toilet access stair. 14 m -

H Extra over for groove nosing to stairs. 12 m -

WALL FINISHES - EXTERNALLY

Prepare and apply skim coat finish; smooth to receive paint


(measured separately).

J Face of concrete columns/walls. 21 m2 -

WALL FINISHES - INTERNALLY

Stone wall tiles with polished finish (ST06), including backing,


adhesive, grouting, as specified, to :

K Male and Female toilet and changing rooms. 87 m2 -

L 200mm wide removable stone ledge to backwall to Toilet. 2 m -

15mm thick cement render with smooth finish (PT-05) including


reveals to receive paint (paint measured separately), as specified, to
:

M Masonry walls generally. 8 m2 -

Prepare and apply skim coat finish; smooth to receive paint


(measured separately).

N Face of concrete columns/walls. 22 m2 -

CEILING FINISHES - EXTERNALLY

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 413 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

P No external ceilings. Note

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 414 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 10 [BEACH POOL CHANGING ROOM] (CONT'D)

CEILING FINISHES - INTERNALLY

Calsium silicate board ceiling (CF02); 12mm thick calsium silicate


board ceiling ex. Jayaboard or Knauf or equal approved, taped and
sanded and prepare smooth to receive paint finish (paint finish
measured separately), including aluminium shadow line, metal
furring framing and fixing accessories; all as specified, to :

A Male and Female toilet and changing rooms. 20 m2 -

PAINTING AND DECORATIONS

WALLS

Prepare smooth and apply textured weathershield paint finish-


stucco (PT01); in accordance with manufacturer's
recommendations; as specified.

B Rendered masonry walls and Skim coated concrete walls/columns. 51 m2 -

CEILINGS

Prepare smooth and apply acrylic emulsion paint finish (PT03); in


accordance with manufacturer's recommendations; as specified.

C Calsium silicate board ceilings (CF02). 20 m2 -

ACCESSORIES AND FITMENTS

D Refer drawing A54-06. Note

VANITY BENCH

Vanity benches with opening to receive basin; comprising steel


construction complete with 20mm thick stone to counter with 300mm
high fascia (ST10), 12mm thick plywood, adhesive, support framing,
fixing accessories, as specified.

E 1200 wide x 600 deep vanity bench to Female and male toilet. 2 No -

MIRRORS

Mirrors; comprising 6mm thick clear mirror ex. Asahimas or equal


approved, with 25x25mm wide stainless steel edge, including 20mm
thick plywood backing, adhesive, fixing and accessories, as
specified.

F 1200 wide x 1205mm high mirror to Female and male toilet. 2 No -

BENCH

Benches; comprising steel construction complete with 20mm thick


stone to counter with 70mm high fascia (ST10), 12mm thick
plywood, adhesive, support framing fixed to wall, fixing accessories,
as specified.

G 1500 wide x 500mm deep bench to Male toilet. 1 No -

H 1470 wide x 500mm deep bench to Female toilet. 1 No -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 415 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 10 [BEACH POOL CHANGING ROOM] (CONT'D)

CUBICLES

Glazed cubicles system; comprising --mm thick laminated tempered


glass, including white colour PVB, angle bracket, 20mm diameter x
150mm high stainless steel pedestal, fixing and accessories, as
specified. (Note : all material and details TBA)

A 2400mm high glazed cubicle partition to shower rooms. 2 m2 -

Glazed cubicles door; comprising --mm thick laminated tempered


glass, including white colour PVB, steel stainless latch, bumper,
hinges, handle, fixing and accessories, as specified. (Note : all
material and details TBA)

B 700 wide x 2400mm high single swing cubicle doors to shower 2 No -


rooms.

Panel cubicles door; comprising --mm thick solid timber door,


including stained finish, waterproof finish to both sides, timber
frame, steel stainless latch, bumper, hinges, handle, fixing and
accessories, as specified. (Note : all material and details TBA)

C 800 wide x 2400mm high single swing cubicle doors to toilet at toilet 4 No -
and changing rooms.

SUNDRIES

D Extra over for counter, 3800 wide x 600 deep x 1300mm high to 1 No -
upper terrace.

SANITARY FIXTURES AND FITTINGS

SUPPLY and INSTALL the following sanitary wares and faucets ex.
Toto or equal approved, including all associated fittings and
accessories.
E Female and Male changing rooms
F Water closet with jet spray. 2 No -
G Lavatory with faucet. 2 No -
H Soap dispenser. 2 No -
J Robe hook. 2 No -
K Toilet paper holder. 2 No -
L Urinal. 1 No -
M Hand dryer. 2 No -
N Rain shower with mixer. 2 No -
P Soap holder. 2 No -
Q Towel hanger. 2 No -
R Floor drain. 4 No -

Terrace's changing room


S Floor drain. 1 No -

EXTERNAL WORKS

OUTDOOR SHOWER

Yellow rustic granite floor (C1) with fflamed finish; comprising 30mm
thick stone, including backing, adhesive, grouting, as specified as
drawing STXH-401-1, to :

T Outdoor shower terrace. 55 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 416 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

U Extra over for 150mm wide removable drain cover. 3 m -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 417 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUILDING 10 [BEACH POOL CHANGING ROOM] (CONT'D)

Yellow rustic granite wall (C5) with fine bush hammered finish;
comprising 30mm thick stone, including backing, adhesive, grouting,
as specified as drawing STXH-301-15, to :

A 300 x 150mm stone wall to Outdoor shower wall. 8 m2 -

Supply and install sanitary fixtures and fittings, as specified.

B Standing shower type Dream yatch ML ex. Inox style or equal 2 No -


approved (K) to Outdoor shower.

PLANTER BOX

C Allow for structural works to planter box, 10000 long x 650 wide x 1 No -
1300mm high.

D Skim coat finish to face of concrete planter walls. 15 m2 -

E Prepare smooth and apply textured weathershield paint finish- 15 m2 -


stucco (PT01) to planter walls.

OTHER WORKS

Other works; Tenderer to insert here:

F ___________________________

G ___________________________

H ___________________________

TOTAL BUILDING 10 [BEACH POOL CHANGING ROOM] : -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 418 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BEACH BAR

Siteworks and Concrete works measured in PROVISIONAL SUMS. Note

SITEWORKS

Allow to excavate oversite to remove existing rubble and rubbish 255 m2 -


and top 200mm (min) vegetable soil and dispose off-site.

TERMITE CONTROL

Anti-termite protection including testing and inspections.

To face of all concrete surfaces in contact with earth. 255 m2 -

WOODWORK

FLOORS

Timber deck (B); comprising 30mm thick Ulin timber deck, including
natural finish, 50mm thick support batten, 5mm thick stainless steel
edge, 100mm diameter concrete stump, fixing and accessories, as
specified.

Beach bar. 255 m2 -

200mm wide stair treads. 5 m -

180mm high stair risers. 7 m -

BAMBOO ROOF

Bamboo roof; comprising clear bamboo stems, including structure


for beams, finishes, fixing and accessories, as specified as drawing
A51-07, to :

Beach bar. 418 m2 -

Extra over for 2735mm high bamboo columns to pergola support, 25 No -


including all associated works.
FINISHES

Yellow rustic granite stepping stone (O3) with flamed finish;


comprising 50mm thick stone, including setting bed/levelling screed,
adhesive, grouting, as specified as drawing STXH-303-1, to :

Entry terrace. 27 m2 -

400 x 1500mm stepping stone to entry terrace. 4 No -

Yellow rustic granite floor with natural split finish; comprising 150mm
thick stone, including setting bed/levelling screed, adhesive,
grouting, as specified as drawing STXH-301-13, to :

Terrace facing beach. 63 m2 -

ACCESSORIES AND FITMENTS

Accessories and Fitments measured in PROVISIONAL SUMS. Note

OTHER WORKS

Other Works; Tenderer to insert here:

_________________________

_________________________

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 419 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

_________________________

TOTAL BEACH BAR : -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 420 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BEACH CABANAS [6 NO]

A Siteworks and Concrete works measured in PROVISIONAL SUMS. Note

SITEWORKS

B Allow to excavate oversite to remove existing rubble and rubbish 72 m2 -


and top 200mm (min) vegetable soil and dispose off-site.

TERMITE CONTROL

Anti-termite protection including testing and inspections.

C To face of all concrete surfaces in contact with earth. 72 m2 -

WOODWORK

FLOORS

Timber deck (B); comprising 30mm thick Ulin timber deck, including
natural finish, 50mm thick support batten, 5mm thick stainless steel
edge, 100mm diameter concrete stump, fixing and accessories, as
specified.

D Cabana type 1. 36 m2 -

E Cabana type 2. 36 m2 -

BAMBOO ROOF

Bamboo roof; comprising clear bamboo stems, including structure


for beams, finishes, fixing and accessories, as specified as drawing
A51-07, to :

F Cabana type 1. 46 m2 -

G Cabana type 2. 44 m2 -

H Extra over for 2200mm high bamboo columns to pergola support, 10 No -


including all associated works.

OTHER WORKS

Other works; Tenderer to insert here:

J ___________________________

K ___________________________

L ___________________________

TOTAL BEACH CABANAS [6 NO]: -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 421 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.2 MISCELLANEOUS OUTBUILDINGS (CONT'D)

BUGGY STATION

ROOF PERGOLA [drawing A51-02]

Glazed pergola; comprising 12mm thick clear tempered glazed


canopy, including 75x75mm thick solid timber trellis, support frame,
finishes, fixing and accessories, as specified.

Roof pergola. 43 m2 -

Pergola wall; comprising 75x75mm thick solid timber trellis, support


frame, finishes, fixing and accessories, as specified.

Pergola wall. 36 m2 -

Timber fascia; comprising 30mm thick timber board, including


finishes, fixing and accessories, as specified.

253mm high timber fascia to roof pergola. 27 m -

OTHER WORKS

Other works; Tenderer to insert here:

___________________________

___________________________

___________________________

TOTAL BUGGY STATION: -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 422 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.3 SWIMMING POOLS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates


for this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

GARDEN POOLS

SITEWORKS

D Allow to excavate oversite to remove existing rubble and rubbish 1,218 m2 -


and top 200mm (min) vegetable soil and dispose off-site.

Excavation; including backfill and disposal off site all surplus


material or store select material for re-use where required; as
specified.

E Generally 1,612 m3 -

Compact sub-grade from fill as specified under the following.

F Ground slabs. 1,218 m2 -

Sand bed layer, spread, levelled, and compacted as specified.

G 100mm thick sand bed layer under ground slabs. 1,218 m2 -

Anti-termite protection including testing and inspections.

H To face of all concrete surfaces in contact with earth. 1,218 m2 -

CONCRETE WORKS

50mm thick lean concrete under the following;

J Pool ground slabs. 61 m3 -

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

K 350mm thick pool ground slab. 392 m3 -

L 200mm thick ground slab to overflow. 37 m3 -

M 200mm thick pool walls including overflow. 78 m3 -

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

N Pool ground slab. 34.57 t -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 423 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

P Pool walls including overflow. 8.98 t -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 424 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.3 SWIMMING POOLS (CONT'D)

SHUTTERING

Shuttering, as specified to the following.

A Faces of pool wall and overflows. 777 m2 -

B Edge of pool ground slab; not exeeding 350mm high. 334 m -

C Edge of overflow ground slab; not exeeding 200mm high. 341 m -

THERMAL AND MOISTURE PROTECTION

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

D Top of concrete slab to pools. 1,027 m2 -

E Ditto; but to overflow gutter/drain. 101 m2 -

F Face of concrete walls to pools. 405 m2 -

G Ditto; but to overflow gutter/drain. 293 m2 -

NON-STRUCTURAL METALWORKS

Grates and grilles, including support frame, fixing and accessories,


etc.

H Extra over for 300mm wide grating to overflow gutter/drain (Note : 294 m -
Material TBA).

FINISHES

Mosaic tiles (E1); comprising 10mm thick Sukabumi tiles or equal


approved, flamed or natural split finished, rounded edge for all
exposed sides, including setting bed / backing, adhesive, grouting,
etc., as specified, to :

J 100 x 100mm floor tiles. 1,027 m2 -

K Ditto; but to Walls. 405 m2 -

Black homogenous wall tiles with polished finish; comprising


homogenous tiles, including backing, adhesive, grouting, as
specified as drawing STXH-301-2 detail 1 and 2, to :

L Overflow gutter/drain floor and wall. 394 m2 -

Stone capping (G3); comprising 70-50mm thick nero granite stone


or locally available equivalent, honed finished.

M 300mm wide capping to pool perimeter. 337 m -

Loose pebbles (F1); 30-50mm diameter grey river pebbles (2


layers), as specified, to :

N Loose pebbles to overflow gutter/drain. 89 m2 -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 425 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.3 SWIMMING POOLS (CONT'D)

Sundries

A Removable drain cover to gutter/drain, 300mm wide approx., 41 m -


including 3mm thick stainless steel 316 ray and frame, fixing and
accessories (Note : Material TBA).

B Allowance for finishes to floor and walls at Pool balacing tank. 1 Item -

BEACH POOL

SITEWORKS

C Allow to excavate oversite to remove existing rubble and rubbish 881 m2 -


and top 200mm (min) vegetable soil and dispose off-site.

Excavation; including backfill and disposal off site all surplus


material or store select material for re-use where required; as
specified.

D Generally. 1,160 m3 -

Compact sub-grade from fill as specified under the following.

E Ground slabs. 881 m2 -

Sand bed layer, spread, levelled, and compacted as specified.

F 100mm thick sand bed layer under ground slabs. 881 m2 -

Anti-termite protection including testing and inspections.

G To face of all concrete surfaces in contact with earth. 881 m2 -

CONCRETE WORKS

50mm thick lean concrete under the following;


-
H Beach pool ground slabs. 45 m3

F'c = 25 Mpa vibrated reinforced concrete (refers to specification) in

J 350mm thick beach pool ground slab. 293 m3 -

K 280mm thick ground slab to overflow. 18 m3 -

L 200mm thick ground slab to overflow. 6 m3 -

M 350mm thick suspended slab (refer section E-E). 8 m3 -

N 150~250mm thick pool walls including overflow. 44 m3 -

P 200mm thick planter walls. 5 m3 -

REINFORCEMENT

Grade fy = 400 MPa hot rolled deformed bar reinforcement and fy =


240 MPa plain bar reinforcement in the following, to ;

Q Pool ground slab. 24.29 t -

R Suspended slab. 0.59 t -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 426 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

S Pool walls including overflow. 6.44 t -

T Planter walls. 0.56 t -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 427 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.3 SWIMMING POOLS (CONT'D)

SHUTTERING

Shuttering, as specified to the following.

A Suspended slab (refer section E-E). 21 m2 -

B Pool walls including overflow. 415 m2 -

C Planter walls. 49 m2 -

D Edge of pool ground slab; not exeeding 350mm high. 178 m -

E Edge of overflow ground slab; not exeeding 280mm high. 128 m -

NON-STRUCTURAL METALWORKS

Stainless steel edging; comprising 5mm thick stainless steel 316,


including grouting, fixing and accessories, as specified as drawing
STXH-301-2 Detail 2, to :

F Between pool and timber deck to Lap pool section. 53 m -

Sundries

G Extra over for 300mm wide grating to overflow gutter/drain (Note : 35 m -


Material TBA).

THERMAL AND MOISTURE PROTECTION

Membrane waterproofing; comprising membrane sheet, including


protective screed with smooth finish and wiremesh (measured net -
including laps), sand bed, mastic, adhesives, primers, sealant etc.
installed per manufacturer's recommendations, to :

H Top of concrete slab to pool. 841 m2 -

J Ditto; but to overflow gutter/drain. 49 m2 -

K Face of concrete walls to pool. 158 m2 -

L Ditto; but to overflow gutter/drain. 66 m2 -

FINISHES

Mosaic tiles (E1); comprising 10mm thick Sukabumi tiles or equal


approved, flamed or natural split finished, rounded edge for all
exposed sides, including setting bed / backing, adhesive, grouting,
etc., as specified, to :

M 100 x 100mm floor tiles to floors. 841 m2 -

N Ditto; but to walls. 158 m2 -

Yellow rustic wall tiles (C2) with polished/unpolished finish;


comprising 50mm thick stone, including backing, adhesive, grouting,
as specified as drawing STXH-301-2 detail 1, to :

P Overflow facing wall (800mm high approx.) 52 m2 -

Q 200mm high upstand edge wall. 65 m -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 428 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.3 SWIMMING POOLS (CONT'D)

Stone capping (G3); comprising 70-50mm thick nero granite stone


or locally available equivalent, honed finished.

A 200mm wide capping to overflow gutter. 65 m -

B 300mm wide capping to overflow gutter. 65 m -

Black homogenous wall tiles with polished finish; comprising


homogenous tiles, including backing, adhesive, grouting, as
specified as drawing STXH-301-2 detail 1 and 2, to :

C Overflow gutter/drain floor and wall. 115 m2 -

Loose pebbles (F1); 30-50mm diameter grey river pebbles (2


layers), as specified, to :

D Loose pebbles to overflow gutter/drain. 39 m2 -

Sundries

E Removable drain cover to gutter/drain, 300mm wide approx., 35 m -


including 3mm thick stainless steel 316 ray and frame, fixing and
accessories (Note : Material TBA).

OTHER WORKS

Other works; Tenderer to insert here:

F ___________________________

G ___________________________

H ___________________________

TOTAL SWIMMING POOLS : -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 429 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.4 RETENTION PONDS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates


for this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

RETENTION PONDS

SITEWORKS

D Site clearance and bulk excavation incl. backfill to pond areas. 1,538 m2 -

E Geosynthetic clay liner/geomembrane (welded rubber) liner to pond 1,538 m2 -


base.

NON-STRUCTURAL METALWORKS

Grates and grilles, including support frame, fixing and accessories,


etc.

F Extra over for 300mm wide grating to overflow sump/drain (Note : 12 m -


Material TBA).

FINISHES

Pond boulders (M1); comprising 60-100mm dia. crusher run to


Landscape Architect's selection Internal boulders 300mm dia. as
berak-up tiers to be provided for slope area.

G 200mm thickboulders to internal pond area. 1,538 m2 -

Pond boulders (M2); comprising 300x300x300mm thick to


1500x1500x1500mm thick crusher run to Landscape Architect's
selections, to be provided for slope area.

H Boulders to pond edge. 152 m -

OTHER WORKS

Other works; Tenderer to insert here:

J ___________________________

K ___________________________

L ___________________________

TOTAL RETENTION PONDS : -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 430 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.5 SOFTSCAPING WORKS

GENERALLY

A Refer to the Preliminaries section and allow therein or in the rates


for this section for compliance.

B Refer to the Specifications for full descriptions of materials and


workmanship wherever applicable to the Works included hereunder.

MAIN CONTRACT

Method of Measurement and Prices.

C Refer to the Preambles section for full details of Method of


Measurement and Pricing Clauses and allow in the rates for this
section for compliance.

SOFTSCAPING WORKS

GENERAL AREAS

Supply and plant the following trees, palms, plants and shrubs
including soil mix, fertilizers, mulch and guying coconut fiber rope,
bamboo bar and stakes, protection, spraying and pruning, as
specified.

D Casuarina equisetifolio. 484 No Excluded

E Cocoloba uvifera. 3 No Excluded

F Cycas spp. 37 No Excluded

G Terminalia catappa. 41 No Excluded

H Bougenvilea spp. 1 No Excluded

J Bougenvilea spp - potted plant. 3 No Excluded

K Bucida bucaras. 39 No Excluded

HOTEL BLOCKS

Soil filling

Supply, deliver and fill imported soil mix as specified.

L 200mm thick lightweight soil to green roof. 21 m3 Excluded

M 350mm thick clear soil. 178 m3 Excluded

N 400mm thick clear soil. 156 m3 Excluded

P 450mm thick clear soil. 138 m3 Excluded

Supply and plant the following trees, palms, plants and shrubs
including soil mix, fertilizers, mulch and guying coconut fiber rope,
bamboo bar and stakes, protection, spraying and pruning, as
specified.

Q Lonicera japonica with lava stone base. 143 m2 Excluded

R Pandanus tectorius. 240 m2 Excluded

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 431 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

S Pedilanthus tithyma. 7 m2 Excluded

T Scaevola taccada. 172 m2 Excluded

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 432 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

6.5 SOFTSCAPING WORKS (CONT'D)

A Helianthus debilis. 176 m2 Excluded

B Casuarina equisetifolio. 186 m2 Excluded

C Cocoloba uvifera. 12 No Excluded

D Cycas spp. 340 No Excluded

E Delonix regia. 5 No Excluded

F Gliricidia sepium. 38 No Excluded

G Helianthus debilis. 40 No Excluded

H Hibiscus tilaceus. 9 No Excluded

J Scaevola taccada. 97 No Excluded

BEDROOM VILLAS

Supply and plant the following trees, palms, plants and shrubs
including soil mix, fertilizers, mulch and guying coconut fiber rope,
bamboo bar and stakes, protection, spraying and pruning, as
specified.

K Mix of cactus and succulent plants with pebbles/gravels beds (1). 329 m2 Excluded

L Bougenvillea spp (2). 129 m2 Excluded

M Agave spp. / Cycas spp. 125 No Excluded

N Hibiscus tiliaceus. 15 No Excluded

P Ipomea pes-caprae. 189 m2 Excluded

Q Casuarina equisetifolio. 182 m2 Excluded

R Zoysia tennifolia plant (as drawing STXH 301-5 and 303-2). 85 m2 Excluded

S Cocoloba uvifera. 1 No Excluded

OTHER WORKS

Other works; Tenderer to insert here:

T ___________________________

U ___________________________

V ___________________________

TOTAL SOFTSCAPING WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 433 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 6 - EXTERNAL WORKS

No. Description Quantity Unit Rate Total

SUMMARY

GENERAL HARDSCAPING WORKS -

MISCELLANEOUS OUTBUILDINGS :
BUILDING 7 [WAITING AREA ON ARRIVAL] -
BUILDING 8 [VILLA RESTAURANT AND CABANAS] -
BUILDING 9 [DRIVER'S SEATING AREA] -
BUILDING 10 [BEACH POOL CHANGING ROOM] -
BEACH BAR -
BEACH CABANAS [6 No] -
BUGGY STATION -

SWIMMING POOLS -

RETENTION PONDS -

SOFTSCAPING Excluded

TOTAL EXTERNAL WORKS : -

file:///conversion/tmp/scratch/495999449.xlsx 6. External areas / 434 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 7 - PROVISIONAL SUMS

Item Item Description Quantity Unit Rate Amount


No. Rp Rp

PRIME COST & PROVISIONAL SUMS

PRIME COST AND PROVISIONAL SUMS GENERALLY


A The following Prime Cost and Provisional Sums are for work which cannot be
entirely foreseen, defined or detailed. The Contractor is to include these
amounts in his tender. The amounts may be deducted or expended in part or
in full by the Employer.

NOTES
B The Words "Nominated Supplier" and or "Nominated Sub-Contractor" where
used in this Bill shall mean Specialist Firms to be selected by the Project
Manager and engaged DIRECTLY BY THE CONTRACTOR.

C Should the Employer choose to engage directly a Specialist Firm then said
Specialist Firm shall be referred to as a "Direct Contractor" or "Direct
Supplier". The roles and responsibilities of the Contractor with regard to the
provision of ATTENDANCE shall remain the same as is described in this Bill.

ATTENDANCE BY THE CONTRACTOR


D The Contractor shall Co-ordinate the execution of the Nominated or Direct
Contractors or Suppliers Works so as to ensure the correct sequence and
timing of all operations and completion of the Works on schedule. Nominated
/ Direct Contractors Suppliers' must inspect the Contractors program to
signify their agreement to its content, in writing having particular regard to the
completion times shown for their own Contract Works.

E The Contractor shall ensure that Nominated or Direct Contractors or


Suppliers comply with the Employer's requirements and specifications in
relation to health and safety, quality assurance, reporting and documentation
requirements and the like; at all times, for their own Works.

F The Contractor shall provide senior manager(s) to co-ordinate and manage


the works of all Nominated or Direct Contractors or Suppliers.

G The Contractor is responsible for and shall make available to the Nominated
or Direct Contractor the following facilities for the carrying out of the Sub-
Contract Works :

i) The provision, erection and removal of all scaffolding including special


scaffolding, staging and screens to all high ceiling areas where floor to floor
height exceeds 4.00 meters (except scaffolding and/or other temporary
working platform within the lift shaft).

ii) Allow access for, the unloading and taking to store of plant, materials and
equipment, and access for the taking from store and distribution of materials
and equipment about the Works. Allow access to and/or use of canteen,
toilets and other welfare facilities.

iii) Provision of reasonable space for the Sub-Contractor to build site office
and stores, in such locations where the possibility of damage being caused
to stored materials and equipment by the building works is kept to a
minimum.

file:///conversion/tmp/scratch/495999449.xlsx Page 435 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 7 - PROVISIONAL SUMS

Item Item Description Quantity Unit Rate Amount


No. Rp Rp

PRIME COST & PROVISIONAL SUMS (Cont'd)

iv) Free use of existing hoisting facilities (cranes and passenger hoists)
which the Contractor has installed for his own use. All lift equipment or parts
thereof will be hoisted by the Lift Sub-Contractor. Where hoisting is to be
done through the lift shaft, the casting of the lift machine room floor slab shall
be programmed and coordinated accordingly.

v) Free and reasonable use of the Contractor's plant including scaffolding,


gantries, ladders etc.

vi) Provision of temporary water supplies including water drawn from the
permanent systems for testing and commissioning of all equipment and
associated installations and systems covered under the Main Contract and
all Sub-Contracts, including :

a) making applications for the provision of temporary and permanent water


supplies.

b) opening of accounts for the provision of temporary and permanent water


supplies.

c) payment of all charges and fees associated with the provision of


temporary and permanent water supplies (excluding only the service
connection charges for permanent supplies payable to the relevant
Authority).

vii) Removal of rubbish from all locations reasonably designated by the


Contractor including final removal from the site.

viii) Provision of all setting out and survey information including giving all
necessary dimensions (However, before installation of the Sub-Contract
Works, the Sub-Contractor shall check all dimensions of relevant completed
builder's works on site and ascertain their compatibility with the Sub-Contract
Works).

ix) Programming and coordinating all the Sub-Contractor's works to ensure


the correct timing, sequencing and completion of all operations.

x) Provision of reasonable working space.

xi) Openings holes, mortices and the like which are to be formed or left in the
structure are to be executed by the Contractor including their subsequent
making good to the approval and satisfaction of the Project Manager.

xii) Where required, the Contractor is to build in or cast in inserts, bolts,


sleeves or other forms of suspension for pipes, ducts, trunking, guide rails,
equipment, etc. provided by and to locations ascertained by the Sub-
Contractor, including grouting around the inserts, bolts, sleeves, pipes, etc.
and making good to the approval and satisfaction of the Project Manager.

xiii) Provision of temporary lighting and power supplies from PLN or


Employer's supply or the Contractor's own generator sets including power
drawn from the new permanent system and/or new Building Power
Generation Plant for testing and commissioning of all equipment and
associated installation and systems covered under the Main Contract and all
Sub-Contracts, including :

file:///conversion/tmp/scratch/495999449.xlsx Page 436 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 7 - PROVISIONAL SUMS

Item Item Description Quantity Unit Rate Amount


No. Rp Rp

PRIME COST & PROVISIONAL SUMS (Cont'd)

a) making applications for the provision of temporary electricity supplies.

b) opening of accounts for the provision of temporary electricity supplies

c) payment of all charges and fees associated with the provision of


temporary electricity supplies.

xiv) Full responsibility subject only to the provisions of the Conditions of


Contract, for loss or damage to the Sub-Contract works properly completed
and handed over to the Contractor.

xv) Provision of all necessary grouting under the lift shaft entrance sills and
around doorways, hall button casings, car position indicator casings, hall
lantern casings, etc.

xvi) Provide temporary protection and security for all Works (and materials
and equipment on site to be incorporated into the Works) of the Nominated /
Direct Sub-Contractors or Suppliers including the prevention of theft until
such time as the Certificate of Substantial Completion is issued.

RESPONSIBILITIES OF THE SUB-CONTRACTOR (or Direct Contractor if


engaged directly by the Employer)

A The Sub-Contractor shall include in the sub-contract sum for all costs in
connection with the following :

i) Unloading, getting in, storing and all handling and lifting to a convenient
location, materials, plant and equipment etc. for hoisting by the Contractor.
When the materials, plant, equipment etc. have been hoisted to the nearest
level possible with the hoisting facilities by the Contractor, it shall be the
responsibility of the Sub-Contractor to lift or move them to the required
positions using his own facilities. The Lift Sub-Contractor shall be
responsible for hoisting lift equipment through the respective hoistways and
openings.

ii) The provision, erection, maintenance and removal of all his temporary
office and storage accommodation.

iii) Connection to temporary power supplies made available by the


Contractor. Supplying and running distribution cables, leads and electrical
equipment required.

iv) Provision of hoses and connection to water supply points.

v) Remove all waste and debris arising from the Sub-Contract Works to
locations designated by the Contractor.

vi) Provision of temporary artificial lighting in lift shaft.

vii) Full responsibility, subject only to the provisions of the Conditions of


Contract, for loss or damage to any materials or goods on site for the sub-
contract works until such materials and goods have been fully, finally and
properly incorporated into the works and such works have been properly
completed and handed over to the Contractor.

viii) Full responsibility for loss or damage to the Sub-Contractor's plant, tools
and equipment and other property on the site.

file:///conversion/tmp/scratch/495999449.xlsx Page 437 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 7 - PROVISIONAL SUMS

Item Item Description Quantity Unit Rate Amount


No. Rp Rp

PRIME COST & PROVISIONAL SUMS (Cont'd)

x) Protection and casing up of the Sub-Contract works, including


safeguarding against corrosion, mechanical damage, water damage,
inclement weather, dust, etc. until such works have been properly completed
and handed over to the Main Contractor.

xi) Steel framework for concrete inertia blocks shall be provided by the
respective Sub-Contractors.

xii) The respective Sub-Contractors shall be responsible for cutting chases in


brickwork for pipes, conduits, fittings and the like (subject to the approval of
Project Manager).

xiii) Provision of wiring to initiate the emergency operation of Lifts from the
fire alarm contractor panel and the Lift Switchboard to the Lift Control Panel
shall be undertaken by the Lift Contractor.

xiv) The provision, erection and removal of special scaffolding, staging and
screens including altering and adapting from time to time as necessary
(except high ceiling areas where floor to floor height exceeds 4.00 meters).

PROFIT AND ATTENDANCE ON PC SUMS

A The amounts inserted by the Contractor against the items for Profit and
Attendance shall include for all the Contractor's responsibilities including full
co-operation and co-ordination with all Nominated Sub-contractors and
suppliers to ensure maximum efficiency in the progress and completion of
the works in order to avoid delays.

B The amount priced for the attendance of the PC Sum items must include for
coordinating with several Nominated Sub-Contractors or Suppliers.

C The Contractor will be held responsible for whatever other expenses to which
he deems he is entitled. The profit shall be adjusted against the final PC
expenditures.

D Should the Contractor be awarded work under any PC Sum for which he has
tendered, the amount for profit and attendance allowed by him against the
PC Sum shall be deducted.

E Should works stated as a PC item be omitted from the Contract and the
Employer chooses to carry out such work as a direct contract then the
allowance for "profit and attendance" shall be omitted, save that any
attendance, required to be provided by the Contractor shall be valued by the
Quantity Surveyor as a variation in accordance with the Terms of the
Contract.

file:///conversion/tmp/scratch/495999449.xlsx Page 438 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 7 - PROVISIONAL SUMS

Item Item Description Quantity Unit Rate Amount


No. Rp Rp

PROVISIONAL SUMS GENERALLY

A The following Provisional Sums are for work which cannot be entirely
foreseen, defined or detailed. The Main Contractor is to include these
amounts in his tender. The amounts may be deducted or expended in part or
in full by the Employer.

PROVISIONAL SUMS

The following Provisional Sums are for works that shall be executed by the
Contractor, for which are not entirely foreseen, or detailed or defined at the
time of Tender.

STRUCTURAL WORKS

B Allow the Provisional Sum of Rp. 80,000,000 (say Eigthy million Rupiah) for 1 Item 80,000,000 80,000,000
structure to 600mm wide Pebbles drains at Building 4, 5-6, including
concrete works, reinforcement, shuttering, waterproofing, etc.

C Allow the Provisional Sum of Rp. 30,000,000 (say Thirty million Rupiah) for 1 Item 30,000,000 30,000,000
structure to overflow pool gutter at Villa 3 (as landscape drawing : STXH-
303-5 sect R-R').

D Allow the Provisional Sum of Rp. 8,000,000 (say Eight million Rupiah) for 1 Item 8,000,000 8,000,000
structure to pool stair at Villa 3 (as landscape drawing : STXH-303-5 sect Q-
Q').

ARCHITECTURAL WORKS

E Allow the Provisional Sum of Rp. 20,000,000 (say Twenty million Rupiah) for 1 Item 20,000,000 20,000,000
Vanity bench, Wall ledge, Mirrors to Service core toilet at Basement.

F Allow the Provisional Sum of Rp. 5,000,000 (say Five million Rupiah) for 1 Item 5,000,000 5,000,000
Balustrade to loading dock stair at Building 1.

G Allow the Provisional Sum of Rp. 5,000,000 (say Five milliom Rupiah) for 1 Item 5,000,000 5,000,000
Vanity bench, Wall ledge, Mirrors to Service core #1 toilet at Building 1.

EXTERNAL WORKS

H Allow the Provisional Sum of Rp. 6,000,000,000 (say Six billion Rupiah) for 1 Item 6,000,000,000 6,000,000,000
structure to external concrete driveways and pathways, including concrete
works, reinforcement, shuttering, etc.

J Allow the Provisional Sum of Rp. 25,000,000 (say Twenty Five million 1 Item 25,000,000 25,000,000
Rupiah) for structural works to Fire water feature to Center
walkways/pedestrian.

K Allow the Provisional Sum of Rp. 130,000,000 (say One hundred Thirty 1 Item 130,000,000 130,000,000
million Rupiah) for structural works to Linear water feature with stumps to
Center walkways/pedestrian.

L Allow the Provisional Sum of Rp. 50,000,000 (say Fifty million Rupiah) for 1 Item 50,000,000 50,000,000
structural works to Drop-off lobby water feature with stumps.

M Allow the Provisional Sum of Rp. 35,000,000 (say Thirty Five million Rupiah) 1 Item 35,000,000 35,000,000
for structural works to Arrival water feature with stumps.

N Allow the Provisional Sum of Rp. 50,000,000 (say Fifty million Rupiah) for 1 Item 50,000,000 50,000,000
structural works to connecting bridge.

P Allow the Provisional Sum of Rp. 100,000,000 (say One hundred million 1 Item 100,000,000 100,000,000
Rupiah) for Sitework and structural work to Beach bar.

file:///conversion/tmp/scratch/495999449.xlsx Page 439 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 7 - PROVISIONAL SUMS

Item Item Description Quantity Unit Rate Amount


No. Rp Rp

Q Allow the Provisional Sum of Rp. 250,000,000 (say Two hundred Fifty million 1 Item 250,000,000 250,000,000
Rupiah) for kitchen bar at Beach bar

file:///conversion/tmp/scratch/495999449.xlsx Page 440 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 7 - PROVISIONAL SUMS

Item Item Description Quantity Unit Rate Amount


No. Rp Rp

PROVISIONAL SUMS GENERALLY (CONT'D)

A Allow the Provisional Sum of Rp. 80,000,000 (say Eighty million Rupiah) for 1 Item 80,000,000 80,000,000
screen / blinds at Beach bar.

B Allow the Provisional Sum of Rp. 60,000,000 (say Sixty million Rupiah) for 1 Item 60,000,000 60,000,000
structural steelworks to roof pergola and columns - Buggy station.

C Allow the Provisional Sum of Rp. 50,000,000 (say Fifty million Rupiah) for 1 Item 50,000,000 50,000,000
structural works to Pool balancing tank at Garden pool and Beach pool.

D Allow the Provisional Sum of Rp. 30,000,000 (say Thirty million Rupiah) for 1 Item 30,000,000 30,000,000
concrete stump 600mm wide interval to Garden pool and Beach pool (as
drawing STXH-STXH-301-2 Detail 2 and 302-3 Detail 1).

E Allow the Provisional Sum of Rp. 2,000,000,000 (say Two Billion Rupiah) for 1 Item 2,000,000,000 2,000,000,000
all associated works to Retention pond - structural, MEP works, etc.

PROVISIONAL SUM Total : 9,008,000,000

PROFIT AND ATTENDANCE AND CO-ORDINATION WORKS

F
Allow the lump sum profit and attendance and co-ordination of Rp.
131,000,000,000 (say Once Hundred and Thirty One Billion Rupiah)
1 Item -
for the Direct Contractor Works; comprising MEP Works (Rp 100bn),
Intrior Works (Rp. 19.7bn), Landscape Works (Rp 11.3bn).

file:///conversion/tmp/scratch/495999449.xlsx Page 441 of 442


ALILA HOTEL - LOMBOK
TENDER FOR MAIN CONTRACT WORKS
BILL NO. 7 - PROVISIONAL SUMS

Item Item Description Quantity Unit Rate Amount


No. Rp Rp

SUMMARY

A PROVISIONAL SUM 9,008,000,000

B PROFIT AND ATTENDANCE AND CO-ORDINATION WORKS -

TOTAL BILL 6 - PROVISIONAL SUMS 9,008,000,000

file:///conversion/tmp/scratch/495999449.xlsx Page 442 of 442