S. No Constituency
Sanctioned Sanctioned
Works Works
ANANTHAPURAMU
1 Anantapur Urban 0 0
2 Dharmavaram 167.27 54
3 Guntakal 0 0
4 Hindupur 10.1 4.2
5 Kadiri 5.71 0
6 Kalyandurg 0 0
7 Madakasira (SC) 0 0
8 Penukonda 93.61 49
9 Puttaparthi 78.64 0
10 Raptadu 0 0
11 Rayadurg 0 0
12 Singanamala (SC) 0 0
13 Tadpatri 0 0
14 Uravakonda 0 0
Total 355.33 107.2
ct of 2014-19 DATABASE
Amount in Rs. Crores
RR
Database CRF Total Kms N os
Anantapuram Widening and Strengthening of the road from Km 7/0 to 23/2 of Penukonda Mudigubba
27 u
Dharmavara Puttaparthy Corenet Plan Road in Anantapuramu Dist
W&S 16.2 SH EnC SH ATMD049 6178
m
Anantapuram Providing CC road with central divider (within limits of Hindupur town) from Km 0/5 to 3/0
30 u
Dharmavara Hindupur Corenet Plan of Hindupur Bangalore road in Anantapuramu District.
W&S 2.5 SH EnC SH ATMD207 18161
m
Anantapuram Widening and Strengthening the road from km 9/0 to Km 22/0 up to Dharmavaram town MDR(U)
31 u
Dharmavara Dharmavram Corenet Plan limits of Damajipalli- Tadipatri road in Anantapuramu District-
W&S 13 SH EnC SH 58A
16233
m
Anantapuram Widening and Strengthening of Kadiri Hindupur road (Old Rajampeta Kadiri Tumkur
32 u
Dharmavara Puttaparthy Corenet Plan
road) from km 28/0 to 42/400 in Anantapur District in Andhra Pradesh
W&S 14.4 SH EnC SH ATMD204 10466
m
"Improvements to Somandepalli
to LGB Nagar (Via)
GO Rt No.103 T
Adadakulapalli road from Km
26 Ananthapuramu Dharmavaram Penugonda Plan Improvements 4.200 MDR CE/MDR ATOD045 R&B (R.III) Dept 0.00 2017-18 5.00 0.00 Estimate Stage
0/0 — 7/4 in Anantapuramu
Dt 27-03-2018
District (Working Reach from
Km 0/0 — 4/2)"
LIST OF WORKS SANCTIONED UNDER
2 Anantapuramu Dharmavaram Puttaparthi RIDF XIX Improvements to road from Km 0/0 to 4/0 Improvements 3.56
Phase 2 Talamarla-Danthalapalli (via)
Indlavenkatampalli road in Anantapur
District
3 Anantapuramu Dharmavaram Puttaparthi RIDF XX Improvements to road from Km 23/2 to 28/0 Widening & 4.70
of Penukonda-Mudigubba road in Anantapur Strengthening
district
11 Anantapuramu Dharmavaram Puttaparthi RIDF XXII Widening and strengthening of Widening & 4.60
Mohammadbad cross to CG Project road from Strengthening
Km 0/0 to 4/6 in Anantapur District
22 Anantapuramu Dharmavaram Puttaparthi RDF 2015- Improvements to road from Km 27/7 to 29/0 Improvements 1.30
16 of Mudigubba-Chinnakotla Road in
Ananthapur District
28 Anantapuramu Dharmavaram Dharmavaram RR PLAN Improvements to Dharmavaram- Improvements 2.60
2016-17 Krishnapuram road to K-D road (via)
Mallakalva , Thumparty Road from Km 0.000
to 2.600 in Ananthapuramu District
30 Anantapuramu Dharmavaram Dharmavaram RR PLAN Improvements to Gotluru to Goods Shed Improvements 2.40
2016-17 Kottla road (via) Ghattakindapalli from Km
11.700 to 14.100 connecting to NH-42 (via)
Subbaraopeta, Sangameswaram and
Jwalapuram in Ananthapuramu District
42 Anantapuramu Dharmavaram Penukonda RR PLAN Improvements to Somandepalli to LGB Nagar Improvements 2.98
2016-17 (via) Adadakulapalli from Km 11.400 to
14.380 in Ananthapuramu District
43 Anantapuramu Dharmavaram Penukonda RR PLAN Improvements to Somandepalli to LGB Nagar Improvements 4.00
2016-17 (via) Adadakulapalli from Km 7.400 to 11.400
in Anantapuramu District
46 Anantapuramu Dharmavaram Hindupur RR PLAN Improvements to K-A Road to Arumakulapalli Improvements 4.70
2016-17 (via) Thummalakunta from Km 1.000 to
5.700 in Ananthapuramu District
62 Anantapuramu Dharmavaram Dharmavaram RDF 2016- Ravulacheruvu to Obulaanavanapalli (via) Improvements 3.90
17 Ambativari Kottala road from Km 0/0 to 4/0
63 Anantapuramu Dharmavaram Hindupur RDF 2016- Improvements to Somaghatta State Border Improvements 3.90
17 Road to State Border (via)
Cheruvumundarapalli from km 0/0 to 5/6 in
Anantapur District
NCTIONED UNDER ODR (RR) 2014-19
MDR CE/RR ATMD124 G.O Rt No 694 Dated 2014-15 2.40 2.35 Work Completed. PAID
26.09.2014 of T,R&B(R.I) Final Bill Paid.
Dept.
MDR CE/RR ATMD206 G.O Rt No 54 Dated 2014-15 3.90 3.65 Work Completed. PAID
24.01.2015 of T,R&B(R.I) Final Bill Paid.
Dept.
MDR CE/RR ATMD086 G.O. Rt No. 609 Dated 2016-17 3.50 0.00 Addressed to NA
30.10.2016 of T,R&B government for
(R.I) Dept. alternate proposals
MDR CE/RR ATMD114 G.O.RT.No. 154, 6/ RDF/ 2014-15 2014-15 1.80 1.78 Work completed. PAID
TR&B(R.I) Dept, Dt 20.3.2015 FB paid.
dt.27.03.2015
MDR ATMD084
MDR ATMD120
MDR CE/RR ATMD175 G.O.Rt.No.106, 22/RDF/2015-16 2015-16 2.00 2.00 Work completed. PAID
TR&B(R.I) Dept, dt. 27. Dt 9.3.2016 FB paid.
02.2016
MDR CE/RR ATMD048 G.O.Rt.No.106, 2015-16 0.85 0.79 Work completed. PAID
TR&B(R.I) Dept, dt. 27. FB paid.
02.2016
MDR CE/RR ATMD122 G.O.Rt.No.106, 2015-16 1.35 1.25 Work completed. PAID
TR&B(R.I) Dept, dt. 27. FB paid.
02.2016
MDR ATMD082
MDR CE/RR ATMD121 G.O.Rt.No.106, 2015-16 0.85 0.87 Work completed. PAID
TR&B(R.I) Dept, dt. 27. FB paid.
02.2016
ODR CE/RR ATOD028 G.O.Rt.No.316, TR&B 2016-17 2.00 1.94 Work Completed. PAID
(RI) Dept Dt. 01.06.2016 Final Bill Paid.
ODR CE/RR ATOD030 G.O.Rt.No.316, TR&B 2016-17 2.00 1.95 Work Completed. PAID
(RI) Dept Dt. 01.06.2016 Final Bill Paid.
ODR CE/RR ATOD036 G.O.Rt.No.316, TR&B 2016-17 2.00 1.94 Work Completed. PAID
(RI) Dept Dt. 01.06.2016 Final Bill Paid.
ODR CE/RR ATOD036 G.O.Rt.No.316, TR&B 2016-17 2.00 1.91 Work Completed. PAID
(RI) Dept Dt. 01.06.2016 Final Bill Paid.
ODR CE/RR ATOD036 G.O.Rt.No.316, TR&B 2016-17 1.50 1.30 Work Completed. PAID
(RI) Dept Dt. 01.06.2016 Final Bill Paid.
MDR CE/RR ATMD205 G.O.Rt.No.316, TR&B 2016-17 2.00 1.86 Work Completed. PAID
(RI) Dept Dt. 01.06.2016 Final Bill Paid.
ODR CE/RR ATOD052 G.O.Rt.No.316, TR&B 2016-17 2.00 2.05 Work Completed. PAID
(RI) Dept Dt. 01.06.2016 Final Bill Paid.
ODR CE/RR ATOD045 G.O.Rt.No.316, TR&B 2016-17 2.00 2.04 Work Completed. PAID
(RI) Dept Dt. 01.06.2016 Final Bill Paid.
ODR CE/RR ATOD045 G.O.Rt.No.316, TR&B 2016-17 2.00 2.07 Work Completed. PAID
(RI) Dept Dt. 01.06.2016 Final Bill Paid.
ODR CE/RR ATOD038 G.O.Rt.No.316, TR&B 2016-17 2.00 1.91 Work Completed. TO BE PAID
(RI) Dept Dt. 01.06.2016 Final Bill to be
Paid.
ODR CE/RR ATOD031 G.O.Rt.No.6, TR&B(R.I) 2016-17 4.00 2.08 Work completed. FB to be paid.
Dept, dt.09.01.2017 FB to be paid.
ODR CE/RR ATOD027 G.O.Rt.No.6, TR&B(R.I) 2016-17 2.80 2.58 Work completed. FB to be paid.
Dept, dt.09.01.2017 FB to be paid.
ODR CE/RR ATOD039 G.O.Rt.No.6, TR&B(R.I) 2016-17 2.00 1.77 Work completed. FB to be paid.
Dept, dt.09.01.2017 FB to be paid.
Details of works Sanctioned June 2014-2018 (CRF)
orks Sanctioned June 2014-2018 (CRF)
ROBS IN PROGRESS (S
Nature
Assembly of Work
Sl No District Division Scheme Name of the Work
Constituency (W&S or
S)
June'201
8 ( LA
2013-14 / Does not
32.00 20.15 Progress Issue &
2014-15 arise CFMS
issue)