You are on page 1of 4

Details of works Sanctioned since June 2014

Executing Agency
Length (CE/SH, CE/MDR,
Assembly Nature of Work Classification
Sl No District Division Scheme Name of the Work CE/RR, CE/NH, Road No PCU
Constituency (W&S or S) of Road
in Km CE/CRF, CE/RSW,
CE/APDRP)

1 2 3 4 5 6 7 8 9 10 11 12

Up gradiation of Anantapuram -
Tadipatri Bhogasamudram road 4 lane from KM 0/0 to
Anantapura Anantapura
1 TDP & SINGML Corenet Plan 67/270. Upgradation 67.25 MDR EnC SH SH 058
mu mu
Admn./Tech. Sanction,
G.O.Rt.No.69, Dt. 18.02.2009.

Strengthening of road from Km. 0/0 to 4/4 of Guntakal-


Anantapura Anantapura
2 Guntakal Corenet Plan Thungabhadra road in Anantapuramu Dist. Strengthening 4.40 SH EnC SH ATOD009
mu mu

Widening & strengthening of Damajipalli-Tadipatri road


Anantapura Anantapura
3 Dharmavram Corenet Plan from Km. 29/0 to 36/0 in Anantapuramu Dist. W&S SH EnC SH SH 058
mu mu 7.00

Construction of High Level Bridge across river Penna at


Anantapura Anantapura
4 Tadipatri Corenet Plan Km.57/0-0 of Anantapuramu - Tadipatri-Bhogasamudram HLB 0.00 SH EnC SH SH 28
mu mu
road in Anantapur District.

Construction of High Level Bridge across Sajjaladinne


Anantapura Anantapura ATMOD20
5 Tadipatri Corenet Plan vagu at 58/4-6 of Anantapuramu - Tadipatri- HLB 0.00 MDR EnC SH
mu mu 3
Bhogasamudram road in Anantapur District.

Construction of High Level Bridge across Kuthaleru at


Anantapura Anantapura 24/0-2 of Anantapuramu - Tadipatri-Bhogasamudram road, ATMOD20
6 Singanamala Corenet Plan HLB 0.00 MDR EnC SH
mu mu under the main work of Upgradation of ATB road to 4 lane 3
km 0/0 to 67/270 in Anantapur District.

Improvements to Guntakal-Uravakonda road from Km.


Anantapura Anantapura
7 UKD Corenet Plan 8/350 to 30/5 in Anantapuramu Dist. Improvements 22.15 MDR EnC SH ATMD185
mu mu

Widening & strengthening of Damajipalli-Tadipatri road


Anantapura Anantapura from Km. 38/0 to 49/0 and 53/7 to 60/4 in Anantapuramu ATMDO19
8 Guntakal Corenet Plan W&S 17.70 MDR EnC SH
mu mu Dist. 3

Widening & strengthening of Damajipalli-Tadipatri road


Anantapura Anantapura ATMDO19
9 Singanamala Corenet Plan from Km. 80/0 to 99/2 in Anantapuramu Dist. W&S 19.20 MDR EnC SH
mu mu 5

Sub work:- Construction of High Level Bridge of 28/8-10 of


Anantapura Anantapura Anantapuramu - Tadipatri-Bhogasamudram road in ATMDO20
10 Singanamala Corenet Plan HLB 0.00 MDR EnC SH
mu mu Anantapur District. 3
(Estt. Amount Rs.276.93.00)

Anantapura Anantapura Widening of HLB in A. Kondapuramu Village, limits in ATMDO20


11 Singanamala Corenet Plan HLB 0.00 MDR EnC SH
mu mu Km.42/2-4 of ATB road in Anantapuramu District 3

Widening & Strengthening the carriageway from Km.60/2 to


71/4 of Damajipalli - Tadipatri road (Nayanapalli Cross to
Anantapura Anantapura ATMDO19
12 Tadipatri Corenet Plan Ullikallu Vill) W&S 1.00 MDR EnC SH
mu mu 3
in Anantapuramu Dist.,

Widening & Strengthening to the road from Km. 0/0 to 20/4


Anantapura Anantapura
13 Guntakal Corenet Plan of Pamidi-Vajrakarur road in Anantapuramu District.G.O. W&S 0.00 MDR EnC SH ATMD184
mu mu
Rt. NO.605, Dt:28-10-2016
Anantapura Anantapura Sub-work:Providig Junction Boards& Village Name Boards
14 TDP & SINGML Corenet Plan RSI 0 RSI EnC SH
mu mu from km 0/0 to 67/270 of ATB Road
Anantapura Anantapura Sub-work:Providing 'W' Metl Beam Crash Barrierin ATB
15 TDP & SINGML Corenet Plan RSI 0 RSI EnC SH
mu mu Road from km 0/0 to 67/270 in ATP District.
Anantapura Anantapura Sub-workProviding 'W' Metal Beam Crash Barriers &
16 TDP & SINGML Corenet Plan RSI 0 RSI EnC SH
mu mu Saftey Interventions in ATB Road in ATP District .
Anantapura Anantapura Sub-workImprovements to road from Km.0/0 to 3/8 of ATB
17 TDP & SINGML Corenet Plan Improvements 3.8 MDR EnC SH ATMD199
mu mu Road in Ananthapuramu District.

Widening of four lane from km 95/6 to 99/6 of Anantapur-Kalyandurg-


18 Anantapuramu Kalynadurg Rayadurg Corenet Plan Rayadurg road in Rayadurg town limits in Anantapur District W&S 4.00 SH EnC SH

Widening and Strengthening of Nagasamudram-Perur road from Km.5/0 to


19 Anantapuramu Kalynadurg Rapthadu Corenet Plan 19/6 & 29/2 to 39/0 in Anantapur District. W&S 24.40 SH EnC SH 357

Widening of Anantapur-Kalyandurg-Rayadurg road from km 54/0 to 58/0 in


20 Anantapuramu Kalynadurg Kalyandurg Corenet Plan Kalyandurg town limits in Anantapur District. W&S 4.00 SH EnC SH ATMD002

Widening of four lane from km 95/6 to 99/6 of Anantapur-Kalyandurg-


21 Anantapuramu Kalynadurg Rayadurg Corenet Plan Rayadurg road in Rayadurg town limits in Anantapuramu District (Stage-I) W&S 4.00 SH EnC SH

Widening and Strengthening of roads from two lane to four lane in


22 Anantapuramu Kalynadurg Madakasira Corenet Plan Madakasira Town limits of Madakasira-Amarapuram road from km 0/0 to 3/4 W&S 3.40 SH EnC SH 375
in Anantapuramu District.
Widening and Strengthening of roads from two lane to four lane in
23 Anantapuramu Kalynadurg Madakasira Corenet Plan Madakasira Town limits ofHindupur-Madakasira-Tumkur road road from km W&S 6.00 SH EnC SH ATMD203
29/0 to 35/0 in Anantapuramu District.

Widening and Strengthening of roads from two lane to four lane in


24 Anantapuramu Kalynadurg Madakasira Corenet Plan Madakasira Town limits of Penukonda-Madakasira road from km 38/0 to W&S 2.40 SH EnC SH 383
40/4 in Anantapuramu District.

Widening and Strengthening of roads from two lane to four lane in


25 Anantapuramu Kalynadurg Madakasira Corenet Plan Madakasira Town limits of Kalyandurg-Madakasira road from km 72/4 to W&S 2.26 SH EnC SH 432
74/664 in Anantapuramu District.

Anantapuram Widening and Strengthening of Road from Km 24/625 to 37/625


26 u
Dharmavara Puttaparthy Corenet Plan of Bukkapatnam-Pulagampalli road in Anantapuramu Dist
W&S 13.00 SH EnC SH ATMD049 2363
m

Anantapuram Widening and Strengthening of the road from Km 7/0 to 23/2 of


27 u
Dharmavara Puttaparthy Corenet Plan Penukonda Mudigubba Road in Anantapuramu Dist
W&S 16.2 SH EnC SH ATMD049 6178
m

Widening and Strenthening of Mahammadabad Cross-


Anantapuram
28 u
Dharmavara Puttaparthy Corenet Plan Maralapalli-Balasamudram (CG Project) road from Km 0/0 to W&S 34.4 SH EnC SH ATMD086 3186
m 34/4 in Anantapuramu District.

Anantapuram Improvements to the road from Km 81/8 to 85/6 of Kadiri-


29 u
Dharmavara Hindupur Corenet Plan Hindupur road in Anantapuramu District.
W&S 3.8 SH EnC SH ATMD204 13123
m
Details of works Sanctioned since June 2014

Executing Agency
Length (CE/SH, CE/MDR,
Assembly Nature of Work Classification
Sl No District Division Scheme Name of the Work CE/RR, CE/NH, Road No PCU
Constituency (W&S or S) of Road
in Km CE/CRF, CE/RSW,
CE/APDRP)

Providing CC road with central divider (within limits of Hindupur


Anantapuram
30 u
Dharmavara Hindupur Corenet Plan town) from Km 0/5 to 3/0 of Hindupur Bangalore road in W&S 2.5 SH EnC SH ATMD207 18161
m Anantapuramu District.

Widening and Strengthening the road from km 9/0 to Km 22/0 up


Anantapuram MDR(U)
31 u
Dharmavara Dharmavram Corenet Plan to Dharmavaram town limits of Damajipalli- Tadipatri road in W&S 13 SH EnC SH 58A
16233
m Anantapuramu District-

Widening and Strengthening of Kadiri Hindupur road (Old


Anantapuram
32 Dharmavara Puttaparthy Corenet Plan Rajampeta Kadiri Tumkur road) from km 28/0 to 42/400 in W&S 14.4 SH EnC SH ATMD204 10466
u
m Anantapur District in Andhra Pradesh

Widening of four lane from km 94/6 to 95/6 of Anantapur-


33 Anantapuramu Kalynadurg Rayadurg Corenet Plan Kalyandurg-Rayadurg road in Rayadurg town limits in W&S 4.00 SH EnC SH
Anantapuramu District

Forming bypass road to Raydurg town from Km 0/0 to 6/0 on right side
34 Anantapuramu Kalynadurg Rayadurg Corenet Plan of Anantapuramu-Kalyandurg- Rayadurg road in Anantapuramu W&S 6.00 SH EnC SH ATMD001
District

35 Anantapur Anantapur Anantapur ppp Ananthapur Byepass ppp 27.14 SH EnC SH ---- 17765

Dharmavara Penukonda
36 Anantapur ppp Somandepalli - Thumukunta Road ppp 40.78 SH EnC SH ---- 8056
m Hindupur

Anantapur Pulivendula
Dharmavaram
37 Anantapur ppp Pulivendula -Damajipalli Road ppp 94.35 SH EnC SH ---- 4890
Tadipatri
Raptadu

Dharmavara Reconstruction of Culvert at Km 6/6 of Damajipalli-


Anantapura Dharmava
38
ram
Dharmavaram RSEW Tadipatri Reconstruction 1No SH EnC SH SH058 16233
m
road in Anantapuramu district
Improvements to curve from Km 27/0 to 28/0 of
Anantapura Dharmava
39
ram
Dharmavaram RSEW Damajipalli – curve improvement 1.00 SH EnC SH SH058 16233
m
Tadipatri road in Anantapuramu district
Improvements to curve at Km 5/2-6 & Km 8/4-8 of
Anantapura Dharmava
40
ram
Dharmavaram RSEW Dharmavaram – Kalyandurg road in Anantapuramu curve improvement 0.80 SH EnC SH SH049 5759
m
district

Anantapura Dharmava Improvements to curve in Km 88/4, 98/8 of


41
ram
Kadiri RSEW curve improvement 0.30 SH EnC SH SH060 7167
m Jammalamadugu-Kadiri road in Anantapuramu district

Anantapura Dharmava Improvements to curve from Km 95/2 to 95/8 of


42
ram
Kadiri RSEW curve improvement 0.60 SH EnC SH SH060 7167
m Jammalamadugu-Kadiri road in Anantapuramu district

Improvements to curve from Km 99/0 to 100/2 of


Anantapura Dharmava
43
ram
Kadiri RSEW Rajampeta- curve improvement 1.20 SH EnC SH SH-059 7246
m
Kadiri road in Anantapuramu district
Anantapura Dharmava Improvements to curve in Km 100/2 to 100/8 of
44
ram
Kadiri RSEW curve improvement 0.60 SH EnC SH SH-059 7246
m Rajampeta-Kadiri road in Anantapuramu district
Anantapura Dharmava Improvements to curve in Km 100/8 to 102/2 of
45
ram
Kadiri RSEW curve improvement 1.40 SH EnC SH SH-059 7246
m Rajampeta-Kadiri road in Anantapuramu district

Anantapura Dharmava Improvements to curve in Km 10/6 to 11/2 of Kadiri to


46
ram
Puttaparthi RSEW curve improvement 0.60 SH EnC SH SH061 10466
m Hindupur road in Anantapuramu district
rks Sanctioned since June 2014

For Completed
Year of AS Amount Expenditure in
A/s Reference T/S Reference Stage of Work works FB paid
Sanction (Rs.Crores) Rs.Crores
or not

13 14 15 16 17 18 19

GO No.69 TR&B(R-I) Dept., NO.43/CRN/APRDC 2008-19,


2008-09 305.00 219.64 Completed Paid
Dt:18-02-2009 Dt:24-02-2009

GO Ms.No.1166, TR&B(R.IV) CE/R&B/CRN/HYD,2013-14,


2013-14 0.90 0.96 Completed Paid
Dept., DT:18-02-2011 Dt16-12-2013

GO Ms.No.1001, TR&B(R.IV)
CE/R&B/CRN/HYD,2013-14,
Dept., 2013-14 5.25 4.78 Completed Paid
Dt:21-12-2013
DT:22-10-2013

ATR/PLAN/Executive
GO No.69 TR&B(R-I) Dept., Engineer R&B Division,
2008-09 22.35 23.08 Completed Paid
Dt:18-02-2009 Anantapuramu-2/DEE-9/AEE-
122-13, Dt: 08-02-2013

ATR/PLAN/Executive
GO No.69 TR&B(R-I) Dept., Engineer R&B Division,
2008-09 7.18 5.54 Completed Paid
Dt:18-02-2009 Anantapuramu-2/DEE-9/AEE-
122-13, Dt: 27-07-2013

ATR/PLAN/Executive
GO No.69 TR&B(R-I) Dept., Engineer R&B Division,
2008-09 3.90 3.70 Completed Paid
Dt:18-02-2009 Anantapuramu-2/DEE-9/AEE-
122-13, Dt: 27-06-2013

GO RT No.103, T (R&B) Dept., CRN/APMDAPRDC/2013-14,


2013-14 12.60 11.34 Completed Paid
Dt:22-1-2014 dt;25-02-2014

GO RT No.100, T (R&B) Dept., CRN/APMDAPRDC/2012-13,


2012-13 8.00 7.25 Completed Paid
Dt:22-10-2013 dt;07-01-2014

GO RT No.228, T (R&B) Dept., CRN/APMDAPRDC/2015-16,


2016-17 20.40 19.93 Completed Paid
Dt:16-04-2016 Dt:07-05-2016

GO No.69 TR&B(R-I) Dept., 43/CRN/APRDC/2008-09,


2008-09 3.35 3.04 Completed Paid
Dt:18-02-2009 Dt:24-02-2009

GO No.69 TR&B(R-I) Dept., MD/APRDC/CRN PLAN/2015-


2015-16 1.86 1.48 Completed Paid
Dt:18-02-2009 16, Dt: 16-12-2015

2016-17 2.50 0.00 In Progress Paid

GO No.605 TR&B(R-I) Dept., MD/APRDC/CRN PLAN/2017-


2016-17 21.00 0.00 In Progress Paid
Dt:28-10-2016 18, Dt: 16-11-2017

GO No.69 TR&B(R-I) Dept.,


23/2015-16, DT:24-03-2016 2015-16 0.50 0.50 In Progress Paid
Dt:18-02-2009
GO No.69 TR&B(R-I) Dept.,
06/2016-17, DT:09-05-2016 2016-17 0.50 0.52 In Progress Paid
Dt:18-02-2009
GO No.69 TR&B(R-I) Dept.,
- 2016-17 2.00 2.08 In Progress Paid
Dt:18-02-2009
GO No.69 TR&B(R-I) Dept.,
- 2016-17 15.50 0.53 In Progress Paid
Dt:18-02-2009

G.O. Rt. No.844, Memo No. Corenet Work/MD


T (R&B)
APRDC/2017-18Dt.31-10-2017 2014-15 9.10 0.00 In Progress NA
(R-IV) Dept Dt.19-12-2014

G.O.Rt.485, Dt .23.9.15 TR&B R.IV Dept 02/2015-16/28-01-2016 2015-16 25.50 19.38 Completed Not Paid

G.O.Rt.577, Dt .25.11.15 TR&B R.IV Dept 1/2015-16 Dt.28-01-2016 2015-16 17.50 8.99 In Progress NA

G.O.Rt.No.465,
T(R&B) R.14, 2015-16 4.59 4.33 In Progress NA
dated.18.2.2016
G.O. Rt. No.695 (R&B) Memo No. Corenet Work/MD
(R-IV) Dept
APRDC/2016-17 Dt.06-04-2017
2016-17 14.30 2.11 In Progress NA
Dt 26.12.2016
G.O. Rt. No.695 (R&B) Memo No. Corenet Work/MD
(R-IV) Dept
APRDC/2016-17 Dt.06-04-2017
2016-17 15.30 2.31 In Progress NA
Dt 26.12.2016

G.O. Rt. No.695 (R&B)


(R-IV) Dept 2016-17/06-04-2017 2016-17 6.15 2.86 In Progress NA
Dt 26.12.2016

G.O. Rt. No.695 (R&B)


(R-IV) Dept 2016-17/06-04-2017 2016-17 6.50 1.57 In Progress NA
Dt 26.12.2016

140716/MDAPRDC/Corenet
GO RT No 260 T (R&B) (R.IV)
Dept Dated 2-5-2016
Plan/BNP Road /2016-17 dt 2016-17 12.25 10.41 Completed Not Paid
25.7.2016

151116/MDAPRDC/Corenet
G.O.Rt.No. 270, T, R&B (R-IV)
Department, Dated: 05-05-2016
Plan/BNP Road /2016-17 dt 2016-17 12.50 9.38 In Progress Not Paid
23.11.2016

GO.TR NO .607 T (R&B) (R.IV) MDAPRDC/Corenet Plan/BNP


Dept dated 28.10.2016. Road /2016-17 dt 13.3.2017
2016-17 31.68 9.48 In Progress Not Paid

G.O.Rt.No. 483, T, R&B (R-IV) MDAPRDC/Corenet Plan/BNP


Department, Dated: 22-08-2016 Road /2016-17 dt 8.2.2017
2016-17 2.70 1.14 In Progress Not Paid
rks Sanctioned since June 2014

For Completed
Year of AS Amount Expenditure in
A/s Reference T/S Reference Stage of Work works FB paid
Sanction (Rs.Crores) Rs.Crores
or not

G.O.Rt.No. 446, T, R&B (R-I) MDAPRDC/Corenet Plan/BNP


Department, Dated: 10-08-2016 Road /2016-17 dt 9.2.2017
2016-17 7.40 0.00 In Progress Not Paid

G.O.Rt.No. 632, T, R&B (R-IV) MDAPRDC/Corenet Plan/BNP


Department, Dated: 08-11-2016. Road /2016-17 dt 30.5.2017
2016-17 28.00 17.35 In Progress Not Paid

RW/NH.17012/01/2015-AP/P.7 RW/NH.17012/01/2015-AP/P.7
dt. 25-5-2012 and 26-5-2015 dt. 25-5-2012 and 26-5-2015 2015-16 20.21 19.58 Completed Paid
JOB No.ISC-AP-2015-915 JOB No.ISC-AP-2015-915

T S. Memo No. /Core network/ MD, Agreement to be


GO Rt.N.329Dt.08-09-2017 APRDC/ 2017-18, Dt: 10-01-2018 2017-18 3.30 0.00
concluded
NA

GO Rt.N.437 Dt.27-11-2017 2017-18 7.7 0.00 Estimate stage NA

G.O.Ms. No. 60, T(R&B)


---- 2016-17 105.88 0.00 DPR ----
(R.V) Dept., dated 27.09.2016
G.O.Ms. No. 57, T(R&B)
---- 2016-17 93.61 0.00 DPR ----
(R.V) Dept., dated 27.09.2016

G.O.Ms. No. 61, T(R&B)


---- 2016-17 131.02 0.00 DPR ----
(R.V) Dept., dated 27.09.2016

T S Memo No. work in


G O Rt. 123, T, R&B (R.IV) Department 13/Corenetwork/SE(R&B),ATP/ATO/20 2018-19 0.50 progress
18-19

T S Memo No. work in


G O Rt. 123, T, R&B (R.IV) Department 24/Corenetwork/SE(R&B),ATP/ATO/20 2018-19 2.00 progress
18-19

T S Memo No. work in


G O Rt. 123, T, R&B (R.IV) Department 22/Corenetwork/SE(R&B),ATP/ATO/20 2018-19 0.50 progress
18-19

work in
G O Rt. 123, T, R&B (R.IV) Department D R No. 50/2018-19 2018-19 0.38 progress

T S Memo No. work in


G O Rt. 123, T, R&B (R.IV) Department 09/Corenetwork/SE(R&B),ATP/ATO/20 2018-19 1.40 progress
18-19

T S Memo No. work in


G O Rt. 123, T, R&B (R.IV) Department 10/Corenetwork/SE(R&B),ATP/ATO/20 2018-19 1.04 progress
18-19

T S Memo No. work in


G O Rt. 123, T, R&B (R.IV) Department 08/Corenetwork/SE(R&B),ATP/ATO/20 2018-19 0.95 progress
18-19
T S Memo No. work in
G O Rt. 123, T, R&B (R.IV) Department 07/Corenetwork/SE(R&B),ATP/ATO/20 2018-19 1.94 progress
18-19

T S Memo No. work in


G O Rt. 123, T, R&B (R.IV) Department 06/Corenetwork/SE(R&B),ATP/ATO/20 2018-19 2.00 progress
18-19

You might also like