Estimate

State Region Date of Bid


Sr.N Project Title Orgarisation Chain value of Contractor Name
Name Name Opening
Projects
AGC RSBIPL JV /M.S.Khurana
Engineering Limited/RAJ
Balance work of 4 laning of Khed Sinner Sec of
INFRASTRUCTURE DEVELOPMENT
NH-50 comprising of the stretches Khed Bypass
National Highways (INDIA) PRIVATE LIMITED/Relcon
km 42.00 to km 46.981 Manchar bypass and Western N/a Not 10/07/2020
1 Authority of India||RO- MH Infraproejcts Ltd/ROADWAY
linear length of Eklahre from km 60.100 to km MH Found 4:16:00 PM
Mumbai - NHAI SOLUTIONS INDIA INFRA
68.576 Total Length 14.137 km of Pune District
LIMITED/SHINDE DEVELOPERS PVT.
in the State of MH
LTD./T AND T INFRA LIMITED /V M
Matere Infrastructures India Pvt Ltd

Balance work of Rehabilitation and Ministry of Road Transport


Upgradation of Akola Akot section of NH-161A and Highways || P6 Delhi -
7/13/2020
2 (34.766 Km) Two lane with paved shoulders MoRTH||RO Mumbai - MH Vidharbha 1777194924 M/s.Prathmesh Construction
12:08:00
Configuration on EPC mode in the state of MoRTH||NH Division-
Maharashtra Nagpur - MoRTH

Ms. Deokar Earthmovers Sr. No. 56


Lane No. 1 Aaple ghar Soc. Pune-
Strengthening to road connecting NH-61 - Nagar Road
Ministry of Road Transport
Belhe - Alkuti - Devibhoyre - Nighoj - Shirur Pune , Maharashtra 411014
and Highways||P6 Delhi -
and terminating at NH753F in Pune District. Western 7/15/2020 Phone : +91 9823024303, +91
3 MoRTH||RO Mumbai - MH 163608808
NH761, section - Belhe - Shirur, km 0/00 to MH 12:33:00 9158141440
MoRTH||NH Division-Pune
48/019, in the State of Maharashtra under EPC E-mail :
- MoRTH
mode devkarearthmovers@rediffmail.com
Website :
www.deokarearthmovers.com
Ms. Deokar Earthmovers Sr. No. 56
Lane No. 1 Aaple ghar Soc. Pune-
Nagar Road
Ministry of Road Transport
Strengthening and Widening to km. 12/500 to Pune , Maharashtra 411014
and Highways||P6 Delhi -
14/00 of NH-65 Pune Solapur Hyderabad road Western 7/13/2020 Phone : +91 9823024303, +91
4 MoRTH||RO Mumbai - MH 44708808
in the State of Maharashtra Section Manjari MH 12:08:00 9158141440
MoRTH||NH Division-Pune
farm to Kawdipat toll plaza E-mail :
- MoRTH
devkarearthmovers@rediffmail.com
Website :
www.deokarearthmovers.com
Participant Name : CEIGALL INDIA
National Highways
Design and Construction of 4 Nos 3 LVUPs 1 7/17/2020 LIMITED MD Mr. Ramneek Sehgal
5 Authority of India||RO- MH Konkan
Flyover Standalone 6 L structures 12:43:00 0161-4623666 Mobile No
Mumbai - NHAI
9878500009
Eagle Infra India Ltd / Eagle Infra India
Ltd.
Rehabilitation and Upgradation of Aurangabad Ministry of Road Transport
Head Office:Eagle Nest, Behind
Sillod Ajanta Jalgaon, NH-753F from Km. and Highways||P6 Delhi -
Marathwad 7/15/2020 Chopra Court,
6 47/500 to Km. 54/500 (Design Chainage) to MoRTH||RO Mumbai - MH 562290000
a 15:41:00 Ulhasnager 421 003.
Four lane configuration In the state of MoRTH||NH Division-
Tel No.:2569901 - 08
Maharashtra On EPC Modea. on EPC mode. Aurangabad - MoRTH
Email ID:info@eagleinfraindialtd.com
/ career@eagleinfraindialtd.com

Strengthning to km 12/00 to km 18/00 and km


30/00 to km 40/00 of (NH-561) Ahmednagar - E5 Infrastructure Private Limited The
Kada -Aashti- Jamkhed road in the state of Western 7/31/2020 E5 Company, 6th Floor, M3M,
7 NHAI MH 990000000
Maharashtra (Working Chainage km 12/00 to MH 11:29:00 Urbana, Sector 67, 122001 Phone no
km 18/00 and km 30/00 to km 38/00 ) (Section 0124-4344300
Dhanore -Kada )
Construction of Vehicular Underpass Ch. 185
500 on Pune Nashik road NH-60 in Nashik
8 NHAI MH Khandesh 199605924 ########## M/S DEOPULKAR AND BROTHERS
District in the State of Maharashtra on EPC
mode
Construction of 8 lane access controlled
Expressway from Km 26.582 to Km 50.700 of
Main Expressway and Km 0.0 to Km 3.00 of
9 NHAI MH Konkan 2589 Cr ########## M/s G.R Infraprojects Limited
SPUR Shirsad to Masvan Section of Vadodara
Mumbai Expressway in the State of
Maharashtra on HAM under BMP Ph II Pkg XIII
Construction of 8 lane access controlled
Expressway from Km 50.70 to Km 77.00
Masvan to Ganjad Section of Vadodara
10 NHAI MH Konkan 1549 Cr ########## Montecarlo Limited
Mumbai Expressway in the State of
Maharashtra on Hybrid Annuity mode under
Bharatmala Pariyojana PhII Pkg XII.
M/s RKC INFRABUILT PRIVATE
Construction of 8 lane access controlled LIMITED, 4th Floor, Shree Panchdhara
Expressway from Km 77.00 to Km 103.40 Complex, Nr. Hotel Grand Bhagwati,
Ganjad to Talasari Section of Vadodara Mumbai S.G. Road, Bodakdev, Ahmedabad-380
11 NHAI MH Konkan 1260 Cr. ##########
Expressway in the State of Maharashtra on 054
Hybrid Annuity mode under Bharatmala E-mail : info@rkc.co.in
Pariyojana Phase II Pkg XI Contact : +91-79-710 44 001 Mr.
Rajdeep Bhai Assit Manager Contract

Improvement and Construction of Ahmednagar M/s GHV (India) PVT. Ltd First Floor,
National Highways
bypass Design Ch. 0.00 to Ch. 40.600 Existing AML Center 1, 8 Mahal Industries
Authority of India||Head 9/17/2020
12 Ch 163.400 of Sinnar Shirdi Ahmednagar NH- MH Khandesh 699.19 Cr Area, Off Mahakali Caves Rd, Andheri
Office - NHAI||Technical - 11:54:00
160 road to km 228.700 of NH-222 new NH-61 East, Mumbai, Maharashtra 400093
NHAI
in the State of Maharashtra on HAM 022 6725 0014

[Development and Maintenance of Inter Modal


Station at Ajni Railway Station Nagpur in the 9/21/2020
13 NHAI MH Vidharbha Not Disclosed M/s NCC Limited
State of Maharashtra on EPC 12:03:00
mode][NHAI/BM/IMS-Main/Nagpur/2019

RAJ INFRASTRUCTURE DEVELOPMENT


O and M of 4 laned Kagal Satara Km 592 240 to
(INDIA) PRIVATE LIMITED
Km 725 section of NH 4 New NH 48 in the State National Highways
Western 9/25/2020 Chatushringi Temple Walk Way,
14 of Maharashtra Design and Construction of Authority of India||RO- MH N/a
MH 11:55:00 Chattushringi, Gokhalenagar, Pune,
VUP at Indoli Phata Km 704 200 on Standalone Mumbai - NHAI
Maharashtra 411016 Phone No- 020
basis on EPC mode to eliminate Black spot
2563 5050

RAJ INFRASTRUCTURE DEVELOPMENT


O and M of 4 laned Kagal Satara Km 592 240 to
(INDIA) PRIVATE LIMITED
Km 725 section of NH 4 New NH 48 in the State
Western 9/29/2020 Chatushringi Temple Walk Way,
15 of Maharashtra Design and Construction of NHAI MH 53 Cr.
MH 13:18:00 Chattushringi, Gokhalenagar, Pune,
VUP at Masur Phata Km 697 800 on Standalone
Maharashtra 411016 Phone No- 020
basis on EPC mode to eliminate Black spot
2563 5050

BW under Phase-II for 4-laning of Khed Sinner


comprising of the stretches of Kalamb bypass
M/s V M Matere Infrastructures India
(km68.576 to km72.390) Linear length of Western 100 cr + (Not
16 NHAI MH ########## Pvt Ltd (9225561804) Jeetu Ingle
Bhatkalwadi (km89.550 to km90.400) and MH Disclosed)
Contract Team)
Alephata bypass (km 92.030 to km 96.000) in
Maharashtra on EPC Mode
Rehabilitation and Upgradation of existing
M/s PMA CONSTRUCTION CO.
carriageway to two lane with paved shoulder
Address Trimurti Nagar, Trimurti
standard in Arvi to Talegaon section of NH- 10/15/2020
17 Morth MH Vidharbha 605136000 Nagar, Nagpur - 440022 Phone No :-
347A from Km.99.700 to Km.86.000 Section of 14:52:00
712-2223777 <Mobile No
NH 347 in the State of Maharashtra on EPC
9422113537 /9422113535
Mode. Balance Work

Construction of Eight lane access controlled


Expressway from Km 103.400 to Km 128.000 of
M/s ROADWAY SOLUTIONS INDIA
Vadodara Mumbai Expressway (Talasari to 12/23/2020
18 NHAI MH Konkan INFRA LIMITED Project Co-Ordinator
Karvad Section) in the State of Gujarat UT of 11:18:00
Mr. Ram Mohan - 9110706281
DNH and Maharashtra on HAM under
Bharatmala Pariyojana (Phase IPackage X).

[4 Laning of Pangare to Waranga Phata sec


from Km 134.500 to Km 174.645 of NH-161
including additional lengths of 800 m from
Waranga Junction to Nanded and 700 m road Marathwad 569 Cr. RAJENDRA SINGH BHAMBOO INFRA
19 NHAI MH ##########
from Waranga Junction NH-161 to Mahagaon a Approx PVT. LTD
in the State of Maharashtra on EPC
mode][NHAI/Tech/MH/Pangare
WarangaPhata/PATSC/2019]
M/s ANISH INFRACON INDIA PVT. LTD.
Four laning of Ahmednagar-Mirajgaon Karmala-
Anish Infracon India Pvt. Ltd.
Tembhurni section of NH-516A (Package-II
Near Kadiwala Petrol Pump, Opp.
from design km 38.775 Ghogargaon to design 599.59 Cr.
20 NHAI MH Khandesh ########## R.T.O. Office
km 80.390 Ahmednagar-Solapur Border) in the
Vijapur Road, Himmatnagar(S.K.)
state of Maharashtra under Bharatmala
Gujarat. Director Arif Mobile No
Pariyojana on Hybrid Annuity Mode
9925234555 / 9925234550
M/s Kalthia Engineering and
[Four-Six Laning of Bodhre to Dhule section
Construction Ltd, .'Kalthia House', 193
from km 390.000 to km 457.231(Design
Satyagrah Chhavni,Opp. Iscon
Chainage) of NH-211 (New NH-52) (Design
Mall,S.G. Highway,Ahmedabad-
21 Length-67.231 km) in the State of Maharashtra NHAI MH Khandesh ##########
924 Cr 380015 Gujarat,India.
under Bharatmala Pariyojana on Hybrid
E-mail : info@kalthiagroup.co Mobile
Annuity Mode][NHAI/Tech/MH/ Bod-
No 9825603058 (mobile No Not
Dhule/2020]
virified)
4-Laning of existing 2-laning stretch from
Dharmapuri at km.117.000 to Lonand at
Western
22 km.166.400 (Pkg-IV) on Mohol-Alandi section NHAI MH Status Pending by NHAI
MH
(Design length 49.400 km) of NH-965 in the
state of Maharashtra on EPC Mode

[Four laning of Ahmednagar-Mirajgaon Karmala-


Tembhurni section of NH-516A (Package-I)
from Ahmednagar to Ghogargaon (from design
572 Cr.
24 Ch 0.000 to Ch 38.775) in the state of NHAI MH Khandesh ########## GHV (India) PVT. Ltd.
Maharashtra under Bharatmala Pariyojana on
Hybrid Annuity Mode][NHAI/Tech/MH/ Ahmd-
TBN(Pkg-I)/2020]
[Up-gradation to Four Lane with Paved
Shoulder configuration of the highway starting
from existing km 88.400 (Savali Vihir) to km
163.400 (start of Ahmednagar bypass) (Design
25 2021_NHAI_66903_1 MH Khandesh Signature Pending
Length-75.000 km) section of NH-160 in
Maharashtra under BMP on EPC
Mode][NHAI/Tech/MH/
Sav.Vih.Ahmednagar/2021]
[Four Lanning of NH-965G from km 83.500
(Indapur) to km 130.202 (Tondale) Design
Length 46.702 km and One time improvement Western
26 2020_NHAI_64281_1 MH Signature Pending
of selected stretches (Package-III) in the State MH
of Maharashtra under Bharatmala Pariyojna on
EPC mode][NHAI/Tech/MH/965G/Pkg-III/2020]

[Four Lanning of NH-965G from km 41.369


(Baramati) to km 83.500 (Indapur) Design
Length 42.131 km and One time improvement Western 3/25/2021
27 2020_NHAI_64279_1 MH 624 Cr Vijay Nirman Company Pvt Ltd
of selected stretches (Package-II) in the State of MH 11:55:00
Maharashtra under Bharatmala Pariyojna on
EPC Mode][NHAI/Tech/MH/965G/Pkg-II/2020]
[6-laning of Nashik Phata to Khed Pkg-II (from
Design Ch.24.230 km at Indrayani river to
Ch.42.000 km at village Chandoli-Khed) total
Western 3/25/2021
28 length 17.770 km on Pune-Nashik section of NH- 2020_NHAI_63437_1 MH 537 Cr Madhucon Projects Limited
MH 11:40:00
60 (Old NH-50) in the state of Maharashtra on
EPC Mode][NHAI/GM(T)/Mah/Indra River-
Khed/Pkg-II/HAM/2020]

[Up-gradation to Four Lane configuration with


Palkhi Marg of the highway starting from
Junction with NH-65 near Patas -Vasunde Phata- Western 3/25/2021
29 2020_NHAI_62809_1 MH 531 Cr Kalyan Toll Infrastructure Limted
Baramati (NH965G) and Partly Baramati Bypass MH 12:05:00
in the State of Maharashtra under BMP on EPC
mode [NHAI/TECH/MH/965G/Pkg-I/2020 ]
[Construction of Four lane Nagpur-Katol
Section of NH-353J from km 13.000 to km
3/25/2021 Joint stock Company Industrial
30 62.900 (Design Chainage) in the State of 2020_NHAI_61035_1 MH Vidharbha 590 Cr.
12:00:00 Association Vozrozhdenie
Maharashtra under NH (O) on EPC
Mode][NHAI/Tech/MH/ Nag-Katol/2020]
[Construction of Mitigation Measure structures
on CH-MH Border to Wainganga Bridge Section
of NH-6 (New NH-53) in the State of Western 3/26/2021
31 2020_NHAI_63764_1 MH 360.80 Cr Agrawal Global Infratech Pvt. Ltd.
Maharashtra under Bharatmala Pariyojana on MH 12:55:00
EPC Mode][NHAI/Tech/MH/NH-6/Mitigation
Str/2020]