G R INFRAPROJECTS LIMITED

Highways & Bridges Projects - Ongoing

Length (In
S.No. Project Name Details State Client Mode
KMs)
Construction of Four Lane
Elevated Road from Digha to
Deedarganj, from Dulli Ghat to
Nuruddin Ghat, from
1 Ganga Path Dharamshala Ghat to old NH-30 4.09 Bihar BSRDCL EPC
along with connectivity to Ashok
Rajpath at Kangan Ghat and
Patna Ghat with allied facilities
at Patna
NH-327 E: Galgalia-
2 Bahadurganj Section Four laning of the Highway 49 Bihar NHAI HAM
(Package 1)

NH-327 E:
3 Bahadurganj-Araria Four laning of the Highway 44.98 Bihar NHAI HAM
Section (Package 1)
NH-130A: Bilaspur -
Urga section
Four Laning of the Highway
(Lot-3/
4 from Dheka Village to Bhaisma 70.20 Chhattisgarh NHAI HAM
Chhattisgarh/Pkg-1,
Village
Raipur - Dhanbad
Economic Corridor)
Vadodara Mumbai Construction of Eight Lane
5 Expressway (Phase 1 Access-Control Expressway 36.93 Gujarat NHAI HAM
Package 6) from Ena to Kim section

Construction of Eight Lane


Vadodara Mumbai
Access-Control Expressway
6 Expressway (Phase 2, 27.12 Maharashtra NHAI HAM
from SPUR Shirsad to Masvan
Package 13)
Section
NH-754A: Amritsar-
Bathinda Greenfield Development of 6-lane from
Section of - Package 1 village Tiba on NE-5A to
7 39.00 Punjab NHAI HAM
(a part of Amritsar- junction with Moga Jalandhar
Jamnagar Economic road (NH-703) near Dharamkot
Corridor)
Construction of Four / Six lane
Greenfield Ludhiana –
Rupnagar Highway from
NH-205K: Greenfield
8 Junction with NE-5 Village near 37.70 Punjab NHAI HAM
Ludhiana – Rupnagar
to Manewal (Ludhiana) to
junction with NH-205 near
Bheora Village (Rupnagar)
Delhi – Construction of Eight Lane
Vadodara Greenfield Carriageway starting near Major
9 28.14 Rajasthan NHAI EPC
Alignment (NH-148N) - Bridge on Mej River to Junction
Package 12 to with SH-37A

NH - 709AD: Shamli to
Uttar
10 Muzaffarnagar - Upgradation of the Highway 42.87 NHAI EPC
Pradesh
Package 2

1
G R INFRAPROJECTS LIMITED
Highways & Bridges Projects – Yet to Commence

Length
S.No. Project Name Details State Client Mode
(In KMs)
Development of 6 Lane
Greenfield Varanasi-Ranchi-
1 Varanasi-Ranchi-Kokata Kolkata highway from 33.50 Bihar NAHI HAM
Anarbansalea village to
Sagrampur village

Development of 4/6 Lane


Belagavi Bypass on NH- bypass for Belagavi City from
2 34.48 Karnataka NHAI HAM
4; Package 1A Goa Side of NH-4A to Pune
Side of NH-4

Development of 4 lane with


Belgaum to Raichur paved shoulders from Design
3 section of NH 748A Ch. 182.300 to Design Ch. 46.20 Karnataka NHAI HAM
(Package 5) 228.500 in Belgaum - Hungund
- Raichur Section of NH748A

Development of 4 lane with


Belgaum to Raichur Paved Shoulders from Design
4 section of NH 748A Ch. 228.500 to Design Ch. 44.9 Karnataka NHAI HAM
(Package 6) 273.400 in Belgaum – Hungund
– Raichur Section of NH 748

Construction of Six Laning of


Surat Nashik Greenfield
Surat-Nashik- Ahmednagar -
stretch Surat-Nashik-
5 Solapur- MH/KNT Border 36.40 Maharashtra NHAI HAM
Ahmednagar-Solapur
Greenfeild stretch [Package -
(Package 14)
XIV from Hasapur to Badadal

Construction of 4 Lane Access


Controlled Greenfield Highway
Greenfield Highway
Section on NH163G (Warangal
Section on (Warangal –
6 – Khammam) from Venkatpur 39.41 Telangana NHAI HAM
Khammam) (Package-2
Village in Warangal to
on NH163G)
Thallasenkesa Village in
Mahabubabad District

Baranpur Kadipur Ichauli Construction of 4 lane highway


to Rampuriya Awwal of from Baranpur Kadipur Ichauli
7 38.25 Uttar Pradesh MoRTH HAM
NH-731A to Rampuriya Awwal (i/c
Yamuna Bridge)

NH 530B - Devinagar Four Laning of NH 530B: from


8 Bypass end to Kasganj Devinagar Bypass (NH 530B) 57.96 Uttar Pradesh NHAI HAM
Bypass to Kasganj Bypass (NH 530B)