KRC Infra Projects has 10 ongoing road construction and upgradation projects across various states in India. The projects are being undertaken for clients such as NHIDCL, NHAI, BRO and involve constructing new roads, expanding existing roads to multi-lane highways, and upgrading roads. The nature of work includes activities like road construction, tunnel development, bridge building and road widening. The project locations are spread across states like Arunachal Pradesh, Gujarat, Madhya Pradesh, Uttarakhand, Punjab.
KRC Infra Projects has 10 ongoing road construction and upgradation projects across various states in India. The projects are being undertaken for clients such as NHIDCL, NHAI, BRO and involve constructing new roads, expanding existing roads to multi-lane highways, and upgrading roads. The nature of work includes activities like road construction, tunnel development, bridge building and road widening. The project locations are spread across states like Arunachal Pradesh, Gujarat, Madhya Pradesh, Uttarakhand, Punjab.
KRC Infra Projects has 10 ongoing road construction and upgradation projects across various states in India. The projects are being undertaken for clients such as NHIDCL, NHAI, BRO and involve constructing new roads, expanding existing roads to multi-lane highways, and upgrading roads. The nature of work includes activities like road construction, tunnel development, bridge building and road widening. The project locations are spread across states like Arunachal Pradesh, Gujarat, Madhya Pradesh, Uttarakhand, Punjab.
Construction & of High Altitude Hill Road From Dembuen To Bruni From KM 0.000 To 36.300 1 KM In Anini Road works NHIDCL District of The State of Arunchal Pradesh On EPC Mode
Construction of 6- Lane access controlled
Greenfield highway from km 67+000 to km 99+000 of Rajasthan/Gujarat Border to Santalpur section of NH-754K as a part of 2 Road works NHAI Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RGBS- Package- 3)
Balance Work of Four Lanning of Gwalior
Shivpuri from Existing Ch. 215.000 (Design Chainage 100.757) to Existing Ch. 221.500 3 Road works NHAI (Design Ch. 107.350) Section of NH3 Passing Through Madhav National Park (Total Length 6.593 km) in MP on EPC Mode.
Development of Six lane access controlled
highway of Daat kali Tunnel Dehradun of Ganeshpur Dehradun section of NH72A from km 4 Road works NHAI 16.380 to km 19.785 Design Chainage in Uttarakhand under Bharatmala Pariyojana on EPC mode Package3
Construction And Upgradation Of Ditte Dimme-
Migging Road (Design Chainage From Km 129.31 To Km 152.81 And Existing Chainage 5 Road works BRO From Km 142.02 To Km 167.1) To 2-Lane With Hard Shoulders Under Project Brahmank In The State Of Arunachal Pradesh On Epc Mode
Construction of 3-lane new ROB at existing km
373+230 (design chainages 0+440) including widening, construction of VUP at existing km 373+190 (design chainages 0+400) & ramps at 6 Road works NHAI LHS & RHS and merging of alignment with PAP flyover at km 372+500 (design chainages 0+710) on Panipat Jalandhar Section of NH-44 (old NH- 01) in the State of Punjab on EPC basis Construction And Upgradation Of Ditte Dimme- Migging Road (Design Chainage From Km 152.81 To Km 173.34 And Existing Chainage 7 From Km 167.10 To Km 189.1) To 2-Lane With Road works BRO Hard Shoulders Under Project Brahmank In The State Of Arunachal Pradesh On Epc Mode Pack- 4
4 Laning of Amritsar Bypass GA from New Tarn
Taran Road-Ajnala Road from km 0.750- km.43.750 and Upgradation of existing Amritsar- 8 Road works NHAI Khemkaran Road to 4-Lane Config from Design km.71.496-km.78.440 Total 49.944 kms PKG-3 in Punjab under BMP on EPC mode
Rehabilitation and augmentation of New NH-354
of section Amritsar (airport junction) to Ramdas from Design Chainage km ASR 100.835 to 9 Design Chainage km 139.813 for Length of Road works NHAI 38.978 km into Four-Lane under Bharatmala scheme in the State of Punjab (Package-IV) under EPC Mode
Construction and Upgradation off Ditte Dimme-
Migging Road (Design chainage from Km 104.53 to Km 129.31 and Existing chainage from Km 10 Road works BRO 113.65 to Km 142.0) to 2-Lane with hard shoulders under Project Brahmank in the state of Arunachal Pradesh on EPC mode Pkg-2 rojects Value in lakh State