Professional Documents
Culture Documents
Sl. No. Job Code Division Constituency Name of work Length Cost required
SH Page 1 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
SH Page 2 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
SH Page 3 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
SH Page 4 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
47 01-CRIDP-22- Tiruvannamal Tiruvannamal Widening from Two Lane to Four 1.60 2180.00
23-S-0047 ai ai Lane and Strengthening at km
104/2 - 105/8 of Cuddalore -
Chittoor Road including
Construction of Centre Median,
Construction of Drain and
Retaining Wall, Construction of
Culvert, Bus Lay Bye and
providing Paver blocks
48 01-CRIDP-22- Tiruvannamal Chengam Widening from Two Lane to Four 9.00 8000.00
23-S-0048 ai Lane and Strengthening at km
19/0 - 20/6, 22/0 - 24/4, 29/0 -
31/0 and 37/0 - 40/0 of
Thiruvannamalai - Arur road (Via)
Thanipadi including Construction
of Centre Median, Drain,
Retaining Wall, Reconstruction
and Widening of Culverts,
Junction Improvements and
Providing Paver Blocks.
SH Page 5 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
58 01-CRIDP-22- Tiruvannamal Kilpennathur Widening from Two Lane to Two 3.40 700.00
23-S-0058 ai Lane with Paved Shoulders and
Strengthening at km 13/4 - 16/8 of
Tiruvannamalai - Avalurpet road
including Reconstruction of
Culverts at Km 14/2, 15/8, 16/8(ii)
59 01-CRIDP-22- Tiruvannamal Tiruvannamal Widening from Two Lane to Two 4.80 1500.00
23-S-0059 ai ai Lane with Paved Shoulders and
Strengthening at km 1/2 - 6/0 of
Thiruvannamalai - Thiyagadurgam
Road including Reconstruction of
Culverts at Km 1/4, 2/6, 3/2, 3/6,
3/8(i), 3/8(ii), 5/4(i), 5/4(ii), 5/6.
and Construction of Drain and
Widening of Minor Bridge
60 01-CRIDP-22- Tiruvannamal Chengam Widening from Two Lane to Two 1.40 450.00
23-S-0060 ai Lane with Paved Shoulders and
Strengthening at km 43/6 - 45/0 of
Polur - Chengam road including
Reconstruction of culvert at km
44/2,widening of culvert at km
44/4 and construction of Drain.
61 01-CRIDP-22- Tiruvannamal Kilpennathur Widening from Two Lane to Two 2.20 650.00
23-S-0061 ai Lane with Paved Shoulders and
Strengthening at km 16/8 - 19/0 of
Tiruvannamalai - Avalurpet road
including Reconstruction of
Culverts at Km 16/10, 17/4,6,
18/6(i), 18/6(ii), 18/6 (iii), 18/8 (i),
18/8 (ii)
Strengthening/Improvements
7.30 2380.00
Total
66 01-CRIDP-22- Tiruvannamal Polur Construction of Well Protective wall 60.00
23-S-0066 ai at km 139/8 of Cuddalore -
Chittoor Road
Others Total 60.00
Tiruvannamalai Total 29.70 17170.40
SH Page 6 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
SH Page 7 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
76 01-CRIDP-22- Ranipet Sholingur Widening from Two Lane to Two 4.40 657.00
23-S-0076 Lane with Paved Shoulders and
Strengthening at km 6/6 - 7/8, 8/4
- 10/6, , Strengthening at km 5/0
- 6/0 of Ranipet Sholinghur Road
including Widening of Culvert at
Km 7/2 and Construction of
culvert at Km 8/6
77 01-CRIDP-22- Ranipet Arakkonam Widening from Two Lane to Two 4.60 698.00
23-S-0077 Lane with Paved Shoulders and
Strengthening at km 30/4 - 32/8,
33/6 - 35/0, , Strengthening at
km 32/8 - 33/6 of Thandalam -
Perampakkam - Thakkolam -
Arigilpadi Road
SH Page 8 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
90 01-CRIDP-22- Vellore Katpadi Widening from Two Lane to Two 2.40 520.00
23-S-0090 Lane with Paved Shoulders and
Strengthening at km 5/6 - 7/0,
15/4 - 16/4 of Ponnai -
Thiruvalam Road including Extra
Length of 174.00 Mtrs,
Reconstruction of Culvert at Km
5/8, 6/4, 6/6 & 16/4 and
Construction of Drain
91 01-CRIDP-22- Vellore Katpadi Widening from Two Lane to Two 2.00 629.00
23-S-0091 Lane with Paved Shoulders and
Strengthening at km 17/0 - 19/0 of
Ranipet - Ponnai Road including
Reconstruction of Culvert at Km
18/10, Widening of culvert at Km
17/10, Construction of Retaining
Wall at Km 17/2 and
Reconstruction of Minor Bridge at
17/8
92 01-CRIDP-22- Vellore Katpadi Widening from Two Lane with 2.20 1550.00
23-S-0092 Paved Shoulders to Four Lane and
Strengthening at km 7/8 - 10/0 of
Thiruvalam - Katpadi -
Venkatagirikottah Road including
reconstruction of culvert,
Construction of Drain and Paver
Block, Providing Bus Lay Bye
SH Page 9 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
93 01-CRIDP-22- Vellore Katpadi Widening from Two Lane to Two 1.85 294.50
23-S-0093 Lane with Paved Shoulders and
Strengthening at km 121/9 -
123/750 of Chennai - Chittoor
Bangalore Road (Abandoned NH 4)
(Thiruvalam portion) including
Reconstruction of Culvert at Km
122/6,8, 123/2, 123/4 and
construction of Retaining wall at
Km 122/6
Other Widening Total 9.65 3418.50
94 01-CRIDP-22- Vellore Katpadi Restoration to the Causeway at km 90.00
23-S-0094 5/4 - 5/8 of Chittoor - Thiruthani
Road
Flood Permanent Total 90.00
95 01-CRIDP-22- Vellore Vellore Reconstruction of Culvert at Km 250.00
23-S-0095 116/8 of Krishnagiri - Ranipet road
(Abandoned NH46)
SH Page 10 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
104 01-CRIDP-22- Thirupathur Tirupattur Widening from Two Lane to Four 1.20 600.00
23-S-0104 Lane and Strengthening at km
104/0 - 105/2 of Hogenakkal -
Pennagaram - Dharmapuri -
Thirupathur road including
reconstruction of Box culvert at km
104/10 and Construction of drain
at km 104/0 - 105/2.
105 01-CRIDP-22- Thirupathur Tirupattur Widening from Two Lane to Four 1.00 600.00
23-S-0105 Lane and Strengthening at km
100/0 - 101/0 of Hogenakkal -
Pennagaram - Dharmapuri -
Thirupathur road including
reconstruction of Box culvert at km
100/6 (i), 100/6 (ii), 100/8, 100/10
and Construction of Construction
of Median Kerb at 100/0 - 101/0
and contruction of retaining wall at
km 100/6,8 & 100/10
SH Page 11 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
SH Page 12 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
130 01-CRIDP-22- Kallakurichi Rishivandiya Widening from Two Lane to Two 1.60 320.00
23-S-0130 m Lane with Paved Shoulders and
Strengthening at km 72/4 - 74/0 of
Cuddalore - Tirukoilur -
Sankarapuram Road including
Reconstruction of Culvert at
Km.73/6
131 01-CRIDP-22- Kallakurichi Rishivandiya Widening from Two Lane to Two 2.60 590.00
23-S-0131 m Lane with Paved Shoulders and
Strengthening at km 74/0 - 76/60
of Cuddalore - Tirukoilur -
Sankarapuram Road including
Reconstruction of Culvert at
Km.75/2,75/4
132 01-CRIDP-22- Kallakurichi Rishivandiya Widening from Two Lane to Two 2.04 490.00
23-S-0132 m Lane with Paved Shoulders and
Strengthening at km 84/8 - 86/837
of Cuddalore - Tirukoilur -
Sankarapuram Road including
Reconstruction of Culvert at Km.
84/10, 86/4 and 86/6
133 01-CRIDP-22- Kallakurichi Tirukkoyilur Widening from Two Lane to Two 1.10 520.00
23-S-0133 Lane with Paved Shoulders and
Strengthening at km 69/9 - 71/0 of
Cuddalore - Chittoor Road
including Construction of Drain at
km 70/300-71/0, Construction of
Retaining wall at km 70/10 and
including providing Paver Block
SH Page 13 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
134 01-CRIDP-22- Kallakurichi Tirukkoyilur Widening from Two Lane to Two 0.60 285.00
23-S-0134 Lane with Paved Shoulders and
Strengthening at km 71/0 - 71/6 of
Cuddalore - Chittoor Road
including Reconstruction of Culvert
at Km.71/2 ,Construction of Drain
at km 71/0-71/6 and including
providing Paver Block
Strengthening/Improvements
2.82 342.00
Total
138 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 30.00
23-S-0138 m Km 84/2 of Cuddalore - Tirukoilur -
Sankarapuram Road
139 01-CRIDP-22- Kallakurichi Kallakurichi Reconstruction of Box Culvert at 50.00
23-S-0139 Km 8/4 of Kallakurichi -
Koothakudi road
Bridges/Culverts Total 80.00
Kallakurichi Total 15.16 3638.45
Tiruvannamalai Circle Total 81.46 34525.25
140 01-CRIDP-22- Villupuram Mailam Widening from Two Lane to Four 2.00 1600.00
23-S-0140 Lane and Strengthening at km
13/0 - 15/0 of Vellemedupettai -
Pondy road (via) Mailam including
Widening and Reconstruction of CD
works,RCC Drain Retaining Wall
and Providing Paver Block.
SH Page 14 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
143 01-CRIDP-22- Villupuram Vikravandi Widening from Two Lane to Two 1.40 400.00
23-S-0143 Lane with Paved Shoulders and
Strengthening at km 10/6 - 12/0 of
Mundiyampakkam-- Pondicherry
road including reconstruction of
box culvert at Km 10/8, 10/10,
11/4 (SH203)
144 01-CRIDP-22- Villupuram Tirukkoyilur Widening from Two Lane to Two 2.50 620.00
23-S-0144 Lane with Paved Shoulders and
Strengthening at km 57/2 - 58/0,
58/6 - 59/2, 64/1 - 65/2 of
Villupuram - Mambazhapattu -
Tirukoilur road including
Reconstruction of Box culverts
57/8, 64/2, 65/2 and Construction
of Retaining wall at km.57/4-58/0
and Construction of drain at
km.58/8-59/2
145 01-CRIDP-22- Villupuram Gingee Widening from Two Lane to Two 3.10 650.00
23-S-0145 Lane with Paved Shoulders and
Strengthening at km 21/0 - 23/3,
25/0 - 25/8 of Sanipoondy -
Kilpennathur - Avalurpet - Chetpet
road including reconstruction of
culvert at km 23/2, 25/2
147 01-CRIDP-22- Cuddalore Virudhachala Widening from Two Lane to Four 4.35 6700.00
23-S-0147 m Lane and Strengthening at km 0/0 -
4/350 of Vridhachalam Bypass
road including CD works,
Construction of additional Major
Bridge, Construction of Center
Median,Retaining Wall , Drain and
Providing Paver Block at the Built
up area and Improving Junctions,
Providing Bus lay bye (SH213)
SH Page 15 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
148 01-CRIDP-22- Ariyalur Jayankondam Widening from Two Lane to Four 8.00 6500.00
23-S-0148 Lane and Improvements of
Virudhachalam - Jayankondam -
Madhanathur road at Km 6/8 -
14/8 (SH-140) including Widening
of Minor bridge at
7/10,Reconstruction of Minor
bridge at km 8/10, Construction of
Centre Median and Widening of
Culverts
149 01-CRIDP-22- Ariyalur Jayankondam Widening from Two Lane to Four 6.20 6200.00
23-S-0149 Lane and Improvements of
Virudhachalam - Jayankondam -
Madhanathur road at Km 14/8 -
21/0 (SH-140) including Widening
of Minor bridge at km 19/10,
Construction of Drain,
Construction of Retaining wall,
Construction of Centre Median and
Widening & Reconstruction of
Culverts
150 01-CRIDP-22- Ariyalur Jayankondam Widening from Two Lane to Four 6.60 6300.00
23-S-0150 Lane and Improvements of
Virudhachalam - Jayankondam -
Madhanathur road at Km 21/0 -
27/6 (SH-140) including
Reconstruction of Minor bridge at
km 26/10, Construction of Drain,
Construction of Retaining wall,
Construction of Centre Median and
Widening of Culverts
Strengthening/Improvements
1.40 595.00
Total
Ariyalur Total 22.20 19635.00
153 01-CRIDP-22- Perambalur Perambalur Construction of Drain at km 39/0- 50.00
23-S-0153 39/4 of Thuraiyur - Perambalur
Road
Urban Improvements Total 50.00
Perambalur Total 50.00
Villupuram Circle Total 45.75 41165.00
154 01-CRIDP-22- Salem Salem West Providing Junction Improvement at 500.00
23-S-0154 km 2/2 of Jagir Ammapalayam -
Tharamangalam road including
providing service road on both
sides of the junction (only
widening)
SH Page 16 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
SH Page 17 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
172 01-CRIDP-22- Namakkal Rasipuram Widening from Two Lane to Four 1.20 600.00
23-S-0172 Lane and Strengthening at km
45/8 - 46/4, Widening from Two
Lane to Two Lane with Paved
Shoulders and Strengthening at km
46/4 - 47/0 of Malliakarai -
Rasipuram - Tiruchengodu - Erode
road including Widening Minor
Bridge at Km 46/10, Providing
Center Median, Construction of
Retaining Wall, Drain and CD
Works
SH Page 18 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
173 01-CRIDP-22- Namakkal Rasipuram Widening from Two Lane to Two 1.00 250.00
23-S-0173 Lane with Paved Shoulders and
Strengthening at km 47/0 - 48/0 of
Malliakarai - Rasipuram -
Tiruchengodu - Erode road
including Construction of Retaining
Wall, Drain and CD Works
174 01-CRIDP-22- Namakkal Tiruchengode Widening from Two Lane to Two 2.80 598.00
23-S-0174 Lane with Paved Shoulders and
Strengthening at km 1/0 - 2/0,
20/2 - 22/0 of Thiruchengodu -
Ariyanur Road including
Reconstruction of Culvert at Km
20/4 and Construction of Storm
water drain at Km 1/2, 1/6
Other Widening Total 6.80 2125.00
175 01-CRIDP-22- Namakkal Namakkal Providing Paver Block in shoulders 305.00
23-S-0175 at km 25/450-27/200 of
Tiruchengode - Namakkal road
SH Page 19 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
180 01-CRIDP-22- Tiruppur Tiruppur Widening from Two Lane to Four 0.50 475.00
23-S-0180 South Lane and Strengthening at km 0/0 -
0/5 of Tiruppur - Kangayam road
(SH172) including Construction of
Drain and Providing Centre Median
at Km 0/0 - 0/5
181 01-CRIDP-22- Tiruppur Perundurai Widening from Two Lane to Four 1.40 1320.00
23-S-0181 Lane and Strengthening at km
21/6 - 23/0 of Gobi - Uthukuli -
Padiyur road (SH - 81) including
Widening of Slab Culvert at Km
21/8, 22/4 & 22/6, Reconstruction
of Box Culvert at Km 21/8,
Construction of Drain at Km 21/6 -
23/0 and Providing Centre Median
at Km 21/6 - 23/0
182 01-CRIDP-22- Tiruppur Palladam Widening from Two Lane to Four 6.00 5800.00
23-S-0182 Lane and Strengthening at km 0/0 -
6/0 of Palladam - Dharapuram
road including CD
Works,Drain,Construction of
Retaining wall and Providing Center
Median
183 01-CRIDP-22- Tiruppur Palladam Widening from Two Lane to Four 5.80 5700.00
23-S-0183 Lane and Strengthening at km 6/0 -
11/8 of Palladam - Dharapuram
road including CD
Works,Drain,Construction of
Retaining wall and Providing center
median
CMRDP 4 Laning Total 13.70 13295.00
184 01-CRIDP-22- Tiruppur Tiruppur Construction of Drain at km 7/100- 60.00
23-S-0184 North 7/300 of Tirupur ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam
Urban Improvements Total 60.00
185 01-CRIDP-22- Tiruppur Tiruppur Providing Junction Improvement at 330.00
23-S-0185 North km 8/8 of Tirupur ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam
186 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 13.00
23-S-0186 at km 7/2,6 of
Kamanaickenpalayam - Annur
road
187 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50
23-S-0187 at km 7/8(i) of Palladam - Cochin
Frontier road
188 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50
23-S-0188 at km 7/8(ii) of Palladam - Avinashi
- Puliyampatti road
189 01-CRIDP-22- Tiruppur Perundurai Providing Metal Crash Barrier at 10.50
23-S-0189 km 8/8 of Tiruppur -
Vijayamangalam road
190 01-CRIDP-22- Tiruppur Perundurai Providing Metal Crash Barrier at 10.00
23-S-0190 km 20/8, 36/2, 40/8 of Gobi -
Uthukuli - Padiyur road
SH Page 20 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
SH Page 21 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
SH Page 22 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
220 01-CRIDP-22- Tiruppur Kangayam Widening from Two Lane to Two 1.20 225.00
23-S-0220 Lane with Paved Shoulders and
Strengthening at km 33/0 - 34/2 of
Erode - Dharapuram road
including Reconstruction of Box
culvert at km 34/2.
221 01-CRIDP-22- Tiruppur Tiruppur Widening from Two Lane to Two 0.60 610.00
23-S-0221 North Lane with Paved Shoulders and
Strengthening at km 4/8 - 5/4 of
Tirupur ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam (SH) including
Construction of Box Culvert at Km
5/2, Construction of Drain at Km
4/8 - 5/4, Providing Centre Median
at Km 4/8 - 5/4 and Providing
Paver Blocks at Km 4/8 -5/4.
Strengthening/Improvements
1.10 400.00
Total
223 01-CRIDP-22- Tiruppur Kangayam Reconstruction of Box Culvert at 45.00
23-S-0223 Km 51/2 of Erode - Perundurai -
Kangayam road including
Construction of Drain
224 01-CRIDP-22- Tiruppur Tiruppur Construction of Box Culvert at Km 50.00
23-S-0224 South 14/2 of Tirupur ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam
Bridges/Culverts Total 95.00
225 01-CRIDP-22- Tiruppur Avinashi Providing Cantilever Gantry board 32.75
23-S-0225 at km 15/8, 16/4, 22/10, 35/4,8
of Palladam - Avinashi -
Puliyampatti road
226 01-CRIDP-22- Tiruppur Avinashi Providing Cantilever Gantry board 13.00
23-S-0226 at km 8/2,6 of Avinashi -
Mettuppalayam road
227 01-CRIDP-22- Tiruppur Avinashi Providing Cantilever Gantry board 13.00
23-S-0227 at km 6/0 and 6/6 of Cheyur to
Erode-Sathy road
Others Total 58.75
Tiruppur Total 19.40 16051.10
228 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 21.00
23-S-0228 km 68/8-69/0 of Erode -
Dharapuram road
229 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 4.00
23-S-0229 m km 12/6 and 17/4 of Udumalpet -
Dharapuram road
230 01-CRIDP-22- Dharapuram Udumalaipett Providing Metal Crash Barrier at 7.36
23-S-0230 ai km 22/8-23/2 of Pollachi -
Dharapuram - Karur Road
SH Page 23 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
237 01-CRIDP-22- Dharapuram Kangayam Widening from Two Lane to Two 2.00 440.00
23-S-0237 Lane with Paved Shoulders and
Strengthening at km 14/0 - 16/0 of
Kangayam - Kodumudi road
including Reconstruction of Box
culvert in lieu of damaged pipe
culvert at km 14/2, 14/4, 14/8 &
15/2 and Construction of Retaining
wall at km 14/10 & 15/2 and
Widening of Slab culvert at km
15/6 and Dip raising at km 14/8
SH Page 24 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
239 01-CRIDP-22- Erode Erode West Urban Improvements - Widening 2.00 650.00
23-S-0239 from End to End and Strengthening
at km 8/0 - 8/60, Widening from
Two Lane to Two Lane with Paved
Shoulders and Strengthening at km
8/60 - 10/0 of Erode - Thingalur
road including widening of culvert
at Km 8/10, 9/6, Reconstruction of
culvert at Km 8/2, 8/4, 8/6, 8/8,
9/2, 9/4, 9/8 and construction of
drain at Km 8/0 - 8/6 (SH 173)
240 01-CRIDP-22- Erode Erode East Urban Improvements - Widening 0.80 660.00
23-S-0240 End to End and Strengthening at
km 2/8 - 3/6 of Erode - Perundurai
- Kangayam road including bus
layby at km 3/2,4 and construction
of storm water drain with footpath
SH Page 25 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
245 01-CRIDP-22- Erode Erode West Providing Metal Crash Barrier at 20.00
23-S-0245 km 87/2 of Thoppur - Mettur -
Bhavani - Erode Road including
(SH20)
Road Safety Total 75.00
246 01-CRIDP-22- Erode Modakurichi Widening from Two Lane to Two 2.05 475.00
23-S-0246 Lane with Paved Shoulders and
Strengthening at km 7/0 - 8/0,
11/7 - 11/9, 12/150 - 13/0 of
Karumandampalayam - Salaipudur
road (via) Malayampalayam,
Thamaraipalayam including
widening of culvert at Km 12/6 and
construction of Retaining wall at
Km 7/8, 7/10, 12/6, 12/8 & 12/10
(SH190)
247 01-CRIDP-22- Erode Modakurichi Widening from Two Lane to Two 2.80 616.00
23-S-0247 Lane with Paved Shoulders and
Strengthening at km 23/0 - 25/80
of Erode - Dharapuram road
including widening of culvert at Km
24/10 and Reconstruction of
culvert in lieu of existing pipe
culvert at Km 24/6 & 24/10 (SH83
A)
248 01-CRIDP-22- Erode Perundurai Widening from Two Lane to Two 2.40 570.00
23-S-0248 Lane with Paved Shoulders and
Strengthening at km 32/0 - 34/40
of Tirupur - Perumanallur -
Kunnathur - Perundurai road
including Reconstruction of culvert
at Km 33/2, 34/2, 34/4 widening
of culvert at Km 32/2 (SH 196)
SH Page 26 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
254 01-CRIDP-22- Karur Aravakurichi Widening from Two Lane to Two 3.00 700.00
23-S-0254 Lane with Paved Shoulders and
Strengthening at km 32/0 - 33/0,
34/0 - 36/0 of Thadicombu -
Pallapatty - Aravakurichi Road
including construction of culvert at
km 32/2, 34/6 and 35/8 in lieu of
existing damaged culvert
255 01-CRIDP-22- Karur Aravakurichi Widening from Two Lane to Two 2.00 450.00
23-S-0255 Lane with Paved Shoulders and
Strengthening at km 38/0 - 39/0,
40/0 - 41/0 of Thadicombu -
Pallapatty - Aravakurichi Road
including widening of culvert at km
40/4 and 40/10 in lieu of existing
damaged culvert
256 01-CRIDP-22- Karur Krishnarayap Widening from Two Lane to Two 1.60 410.00
23-S-0256 uram Lane with Paved Shoulders and
Strengthening at km 17/4 - 19/0 of
Vaiyampatty - Karur Road (via)
Mylampatty - Uppidamangalam
including Construction of slab
culvert at km 17/6 in lieu of
existing narrow culvert
257 01-CRIDP-22- Karur Krishnarayap Widening from Two Lane to Two 2.00 490.00
23-S-0257 uram Lane with Paved Shoulders and
Strengthening at km 19/0 - 21/0 of
Vaiyampatty - Karur Road (via)
Mylampatty - Uppidamangalam
including construction of slab
culvert at km 19/8 in lieu of
existing damaged narrow culvert
SH Page 27 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
263 01-CRIDP-22- Coimbatore Coimbatore Providing Over Head Gantry board 24.20
23-S-0263 North at km 5/8 of North Coimbatore -
Maruthamalai Road
264 01-CRIDP-22- Coimbatore Coimbatore Providing Over Head Gantry board 24.20
23-S-0264 South at km 3/4 of North Coimbatore -
Ramanathapuram - Chettipalayam
Road
265 01-CRIDP-22- Coimbatore Avinashi Providing Cantilever Gantry board 6.50
23-S-0265 at km 0/2 of Neelipalayam -
Sirumugai Road
266 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-S-0266 m at km 76/6 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road
267 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-S-0267 m at km 28/8 of Avinashi -
Mettuppalayam road
268 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 13.00
23-S-0268 m at km 2/2 of Karamadai -
Kariyaampalayam Road
Road Safety Total 105.10
269 01-CRIDP-22- Coimbatore Sulur Widening from Two Lane with 2.10 680.00
23-S-0269 Paved Shoulders to Four Lane and
Strengthening at km 24/4 - 26/0,
Improvements at km 23/9 - 24/4 of
Kamanaickenpalayam - Annur
road including widening,
Recnstruction of box culvert and
providing precasted crash barrier
type Centre median
270 01-CRIDP-22- Coimbatore Kavundampal Widening from Two Lane to Two 2.00 665.00
23-S-0270 ayam Lane with Paved Shoulders and
Strengthening at km 11/0 - 13/0 of
Coimbatore - Anaikatty Road
including Construction of culvert,
Drain and Retaining wall
271 01-CRIDP-22- Coimbatore Kavundampal Widening from Two Lane to Two 2.60 580.00
23-S-0271 ayam Lane with Paved Shoulders and
Strengthening at km 13/0 - 15/6 of
Coimbatore - Anaikatty Road
including Construction of Retaining
wall
SH Page 28 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
272 01-CRIDP-22- Coimbatore Kavundampal Widening from Two Lane to Two 2.60 570.00
23-S-0272 ayam Lane with Paved Shoulders and
Strengthening at km 15/6 - 18/2 of
Coimbatore - Anaikatty Road
including Construction of Retaining
wall
Other Widening Total 9.30 2495.00
273 01-CRIDP-22- Coimbatore Mettupalaya Strengthening at km 13/2 - 15/4 of 2.20 198.00
23-S-0273 m Neelipalayam - Sirumugai Road
Strengthening/Improvements
2.20 198.00
Total
274 01-CRIDP-22- Coimbatore Mettupalaya Rebuilding at km 58/0 - 58/2 of 0.20 90.00
23-S-0274 m Ooty - Kotagiri Mettupalayam -
Sathi - Gobi - Erode Road
Tourism Important Total 0.20 90.00
Coimbatore Total 13.70 28398.10
275 01-CRIDP-22- Pollachi Pollachi Urban Improvements - Widening 1.00 347.00
23-S-0275 from Two Lane to Two Lane with
Paved Shoulders and
Improvements at km 0/0 - 0/6,
1/2 - 1/6 of Pollachi - Valparai
Road including construction of
drain at Km 0/4 - 0/6 & 1/2 - 1/6
(BS)
276 01-CRIDP-22- Pollachi Udumalaipett Urban Improvements - Widening 1.40 180.00
23-S-0276 ai from Two Lane to Two Lane with
Paved Shoulders and
Improvements at km 2/2 - 3/6 of
Pollachi - Valparai Road including
construction of CC Drain Km 3/0-
3/6 (LS)
Urban Improvements Total 2.40 527.00
277 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 25.00
23-S-0277 km 28/10 of Pollachi - Valparai
Road including Culvert
278 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 60.00
23-S-0278 km 37/6 of Pollachi - Valparai
Road including Culvert
279 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 40.00
23-S-0279 km 39/10 of Pollachi - Valparai
Road including Culvert
280 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 40.00
23-S-0280 km 57/2 of Pollachi - Valparai
Road including Culvert
281 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 25.00
23-S-0281 km 39/2 of Pollachi - Valparai
Road including Culvert
282 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 30.00
23-S-0282 km 56/10 of Pollachi - Valparai
Road including Culvert
283 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 75.00
23-S-0283 km 62/8 of Pollachi - Valparai
Road including Culvert
284 01-CRIDP-22- Pollachi Valparai Providing Metal Crash Barrier at 49.00
23-S-0284 Km 37/4, 37/6, 38/8, 38/10,
39/4, and 39/6 of Pollachi Valparai
road (SH78)
SH Page 29 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
290 01-CRIDP-22- Pollachi Valparai Widening from Two Lane to Two 1.00 290.00
23-S-0290 Lane with Paved Shoulders and
Strengthening at km 87/4 - 88/4 of
Avinashi - Tiruppur - Palladam -
Pollachi - Cochin (Via) Meenkarai
Road including Reconstruction of
culvert at Km Km 88/4,6 &
Retaining wall
Other Widening Total 5.50 1485.00
291 01-CRIDP-22- Pollachi Valparai Strengthening at km 24/0-28/0 of 4.00 700.00
23-S-0291 Pollachi Valparai road including CC
Drain, Retaining wall at Km 24/2
and CD works at Km 25/4,8,10,
26/6, 27/2,6, and 27/8, including
DPR for flood Mitigation and Road
Safety audit in Ghat Section at Km
23/6-64/0 (SH78)
Strengthening/Improvements
7.60 1375.00
Total
Pollachi Total 15.50 3836.00
SH Page 30 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
293 01-CRIDP-22- Udhagai Udhagamand Widening from Intermediate Lane 1.00 395.00
23-S-0293 alam to Two Lane and Strengthening at
km 13/0 - 14/0 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road including CC Drain,
CD works and Protective works.
294 01-CRIDP-22- Udhagai Udhagamand Widening from Intermediate Lane 1.00 388.00
23-S-0294 alam to Two Lane and Strengthening at
km 17/0 - 18/0 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road including CC Drain,
CD works and Protective works
SH Page 31 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
SH Page 32 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
316 01-CRIDP-22- Trichy Manapparai Widening from Two Lane to Four 5.20 5000.00
23-S-0316 Lane and Strengthening at km
20/0 - 25/2 of Manapparai -
Thuvarankurichi Road including
widening of culverts, reconstruction
of box culverts, construction of
protective wall, construction of
drain and construction of centre
median (SH 71A).
320 01-CRIDP-22- Pudukottai Thirumayam Widening from Two Lane to Two 1.93 490.00
23-S-0320 Lane with Paved Shoulders and
Strengthening at km 55/475 -
57/40 of Thiruchirapalli -
Ramanathapuram Road
(Abandoned NH 210 Stretches in
Pudukottai) including
Reconstruction of box culvert at km
56/2,56/4,56/6 and including
vellaru bridge approach road on
both sides
Other Widening Total 2.33 630.00
321 01-CRIDP-22- Pudukottai Aranthangi Strengthening at km 93/0 - 93/6 of 0.60 95.00
23-S-0321 Thanjavur - Pattukottai -
Aranthangi - Karaikudi - Kallal -
Kalaiyarkoil- Maravamangalam -
Elayankudi - Paramakudi -
Mudukulathur - Sayalkudi Road
322 01-CRIDP-22- Pudukottai Thirumayam Strengthening at km 18/6 - 20/2, 2.60 300.00
23-S-0322 29/2 - 30/2 of Namanasamudram -
Ponnamaravathy road
Strengthening/Improvements
3.20 395.00
Total
Pudukottai Total 5.52 1025.00
SH Page 33 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
323 01-CRIDP-22- Tiruvarur Mannargudi Widening from Intermediate Lane 2.60 550.00
23-S-0323 to Two Lane and Strengthening at
km 35/0 - 37/6 of Tiruvarur -
Mannargudi - Muthupet road
including Construction of Retaining
wall at Km 35/4, 36/2,4,8, 37/4,6
324 01-CRIDP-22- Tiruvarur Thiruthuraipo Widening from Intermediate Lane 4.00 650.00
23-S-0324 ondi to Two Lane and Strengthening at
km 45/0 - 47/0, 48/0 - 50/0 of
Tiruvarur - Mannargudi - Muthupet
road including Construction of
Retaining wall at Km 45/4,8,
46/6,8,10, 49/8
325 01-CRIDP-22- Tiruvarur Mannargudi Widening from Intermediate Lane 2.40 505.00
23-S-0325 to Two Lane and Strengthening at
km 37/6 - 40/0 of Tiruvarur -
Mannargudi - Muthupet road
including Construction of Retaining
wall at Km 37/8,10, 38/4,6,
39/2,6,8,10
326 01-CRIDP-22- Tiruvarur Thiruthuraipo Widening from Intermediate Lane 2.40 481.00
23-S-0326 ondi to Two Lane and Strengthening at
km 40/0 - 42/0, 54/700 - 55/100
of Tiruvarur - Mannargudi -
Muthupet road including
Construction of Retaining wall at
Km 40/2,4,6,8,10, 41/2,8,10
SH Page 34 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
2.40 1028.00
Total
337 01-CRIDP-22- Nagapattinam Vedaranyam Reconstruction of Box Culvert at 40.00
23-S-0337 Km 99/6 of Thanjavur -
Mannargudy - Thiruthuraipoondi -
Vedaranyam - Kodiyakkari road
SH Page 35 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
345 01-CRIDP-22- Madurai Thiruparanku Widening from Two Lane with 0.60 374.00
23-S-0345 ndram Paved Shoulders to Four Lane and
Strengthening at km 5/8 - 6/4 of
Madurai - Tuticorin road including
Constrution of centre median and
protective wall & Reconstruction
Box culvert at Km 6/2 & 6/4 .
346 01-CRIDP-22- Madurai Thiruparanku Widening from Two Lane with 0.60 416.00
23-S-0346 ndram Paved Shoulders to Four Lane and
Strengthening at km 6/4 - 7/0 of
Madurai - Tuticorin road including
Constrution of centre median and
protective wall & Widening of
minor bridge at Km 6/10.
347 01-CRIDP-22- Madurai Madurai East Widening from Two Lane to Four 2.60 2500.00
23-S-0347 Lane and Strengthening at km 6/8 -
9/4 of Madurai Alagarkoil Melur
Road including CD Works and
Constructio of Retaining Wall
SH Page 36 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
353 01-CRIDP-22- Madurai Madurai East Urban Improvements - Widening 0.20 350.00
23-S-0353 from Four Lane to Six Lane and
Strengthening at km 0/0 - 0/2 of
Madurai - Natham road including
Widening of slab culverts at km
0/2 and Construction of Retaining
Wall
354 01-CRIDP-22- Madurai Madurai East Urban Improvements - Widening 0.20 505.00
23-S-0354 from Four Lane to Six Lane and
Strengthening at km 0/2 - 0/4 of
Madurai - Natham road including
Widening of minor bridge at km
0/4 and Construction of Retaining
Wall
Urban Improvements Total 2.20 2678.00
355 01-CRIDP-22- Madurai Madurai Providing Junction Improvement at 500.00
23-S-0355 Central km 4/8 of Madurai - Cochin Road
(NH 49 Extension Abandoned
portion)
(Madurai Town Reach) including
Providing Paver block,
Construction of Centre Median and
Storm water drain
Road Safety Total 500.00
SH Page 37 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
356 01-CRIDP-22- Madurai Madurai West Formation of Service road at km 0.40 465.00
23-S-0356 439/8 - 440/2 of Varanasi-
Kaniyakumari road (Abandoned
NH7) (Madurai-Dindigul Stretch)
(SHU100) including laying Paver
Block and consrtruction of drain
Strengthening/Improvements
0.40 465.00
Total
Madurai Total 7.20 7400.00
357 01-CRIDP-22- Theni Cumbum Providing Junction Improvement at 50.00
23-S-0357 km 0/2 of Uthamapalyam -
Bodenthirapuram road including
Widening the culvert
Road Safety Total 50.00
358 01-CRIDP-22- Theni Bodinayakan Widening from Two Lane to Two 2.30 490.00
23-S-0358 ur Lane with Paved Shoulders and
Strengthening at km 12/5 - 14/8 of
Theni - Chinnamanur (via)
Venkatachalapuram road including
widening the existing culvert at km
13/8 and Construction of Drain at
km 14/2 - 14/6 (SH227)
Strengthening/Improvements
10.95 1438.00
Total
SH Page 38 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
367 01-CRIDP-22- Theni Cumbum Providing Bus Lay Bye at km 2/6 of 50.00
23-S-0367 Abandoned NH 220 in Cumbum
Town Road
Others Total 50.00
Theni Total 13.25 2028.00
368 01-CRIDP-22- Dindigul Athoor Widening from Two Lane to Four 3.40 3200.00
23-S-0368 Lane and Strengthening at km 0/0-
3/4 of Mettur-Palakkanuthu-
Oddanchatram-Dharapuram-
Thiruppur Road (SH37) including
Re-Construction of Culvert,
widening the culvert, Widening
Minor bridge, Construction of
Retaining wall Construction of
Drain Construction of center
median, Junction Improvement and
Bus lay bye including Foot path
and paver block
369 01-CRIDP-22- Dindigul Vedasandur Widening from Two Lane to Four 2.40 2100.00
23-S-0369 Lane and Strengthening at km 8/0-
9/0, 10/0-11/0 and 12/0-12/4 of
Dindigul -Gujiliamparai - Karur
Road including Construction of
Bridge at km 8/2, 12/4 Re-
Construction of culvert km 8/4,
8/10, 12/4, Construction of
Drainat km 12/4 (SH-74)
370 01-CRIDP-22- Dindigul Athoor Widening from Two Lane to Four 2.50 2700.00
23-S-0370 Lane and Strengthening at km
16/2-18/0, 20/6-21/300 of Mettur-
Palakkanuthu-Oddanchatram-
Dharapuram-Thiruppur Road
(SH37) including Re-Construction
of Culvert, widening the culvert,
Widening Minor bridge,
Construction of Retaining wall
Construction of Drain Construction
of center median, Junction
Improvement and Bus lay bye
including Foot path and paver
block
CMRDP 4 Laning Total 8.30 8000.00
371 01-CRIDP-22- Dindigul Nilakkottai Urban Improvements - Widening 0.65 520.00
23-S-0371 from Two Lane to EndtoEnd and
Improvements at km 2/6 - 3/250 of
Abandoned NH 45-Extn in
Vathalagundu town including
Providing Paver Block,
Construction of Drain at km 2/6 -
3/250 and Reconstruction of
Culvert at km 2/10 (SHU45)
372 01-CRIDP-22- Dindigul Palani Construction of Drain at km 24/10, 45.00
23-S-0372 25/4,6,8,10 of Kodai Ghat Road
SH Page 39 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
10.13 1687.00
Total
Sivagangai Total 10.13 1687.00
380 01-CRIDP-22- Ramnad Tiruvadanai Widening from Two Lane to Four 5.00 4800.00
23-S-0380 Lane and Strengthening at km 2/0 -
7/0 of Ramanathapuram -
Nainarkoil - Andakudi - Elayankudi
- Sivagangai - Melur road including
Construction of Minor Bridge at km
4/10 and Construction of High
level Bridge at km 5/10 and CD
Works ,Centre Median and
Junction Improvements.
SH Page 40 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
382 01-CRIDP-22- Tirunelveli Tirunelveli Widening from Two Lane with 4.40 5100.00
23-S-0382 Paved Shoulders to Four Lane and
Strengthening at km 1/4 - 3/369,
4/071 - 4/6, 5/5 - 7/4 of
Tirunelveli Bypass Road. including
CD Works and Centre Median
386 01-CRIDP-22- Tirunelveli Tirunelveli Widening from Two Lane to Two 2.14 697.00
23-S-0386 Lane with Paved Shoulders and
Strengthening at km 4/0 - 5/0,
Improvements at km 2/865 - 4/0 of
Tirunelveli - Shenkottai - Kollam
Road Including CD Works
387 01-CRIDP-22- Tirunelveli Palayamkottai Widening from Four Lane to Four 0.72 310.00
23-S-0387 Lane with Paved Shoulders and
Strengthening at km 154/6 -
155/320 of Madurai -
Kanyakumari Road (Tirunelveli
Town Limit) (Abandoned NH 7)
including CD Works
388 01-CRIDP-22- Tirunelveli Ambasamudr Widening from Two Lane to Two 2.00 530.00
23-S-0388 am Lane with Paved Shoulders and
Strengthening at km 93/0 - 95/0 of
Tiruchanthur - Palayankottai -
Ambasamuthiram - Tenkasi -
Courtallam - Shenkottai road
including Reconstruction of culvert
at Km
93/2,93/10,94/4,94/6,94/10 and
widening of culvert at km 94/8.
389 01-CRIDP-22- Tirunelveli Radhapuram Widening from Two Lane to Two 2.75 524.00
23-S-0389 Lane with Paved Shoulders and
Strengthening at km 37/850 - 40/6
of Cheranmahadevi - Panagudy
Road Reconstruction & widening
culvert at km 39/10 & 40/2
SH Page 41 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
390 01-CRIDP-22- Tirunelveli Nanguneri Widening from Two Lane to Two 2.00 445.00
23-S-0390 Lane with Paved Shoulders and
Strengthening at km 14/0 - 16/0 of
Cheranmahadevi - Panagudy Road
including CD works
Strengthening/Improvements
2.40 274.00
Total
Tirunelveli Total 17.80 8474.00
393 01-CRIDP-22- Tenkasi Sankarankovi Urban Improvements - Widening 0.85 315.00
23-S-0393 l from Two Lane to EndtoEnd and
Strengthening at km 16/350 -
16/6, Widening from Two Lane to
Four Lane and Strengthening at km
16/6 - 17/2 of Puliyankudi -
Sankarankoil - Kalugumalai -
Nalattinputhur road including
Providing Paver Block,
Construction of Drain and Center
Median
394 01-CRIDP-22- Tenkasi Sankarankovi Urban Improvements - Widening 0.90 132.00
23-S-0394 l from Two Lane to EndtoEnd and
Strengthening at km 31/1 - 32/0 of
Rajapalayam - Sankarankovil -
Tirunelveli Road including
Construction of Drain
Urban Improvements Total 1.75 447.00
395 01-CRIDP-22- Tenkasi Kadayanallur Providing Cantilever Gantry board 6.47
23-S-0395 at km 12/6 of Shenkottai -
Pavoorchatram road (via) Surandai
396 01-CRIDP-22- Tenkasi Kadayanallur Providing Over Head Gantry board 12.12
23-S-0396 at km 3/6 of Shenkottai -
Pavoorchatram road (via) Surandai
SH Page 42 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
1.20 250.00
Total
Tenkasi Total 5.55 1416.02
408 01-CRIDP-22- Virudhunagar Sattur Reconstruction of Minor Bridge at 227.00
23-S-0408 Km 11/4 of Sivakasi - Alankulam
Road in lieu of Existing Causeway
including Protective works
SH Page 43 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
412 01-CRIDP-22- Tuticorin Kovilpatti Widening from Two Lane to Two 3.00 670.00
23-S-0412 Lane with Paved Shoulders and
Strengthening at km 120/0 -
120/550, Improvements at km
120/550 - 123/0 of Madurai -
Kanyakumari Road (urban NH 7)
including Construction of Drain at
Km 120/6-121/10
Other Widening Total 3.60 760.00
413 01-CRIDP-22- Tuticorin Vilathikulam Strengthening at km 78/0 - 79/2, 4.20 510.00
23-S-0413 83/0 - 86/0 of Paruvakudi -
Kovilpatti - Ettayapuram -
Vilathikulam - Vembar road
including CD Works at Km 78/2,
79/2, 83/8, 85/2, 85/8
414 01-CRIDP-22- Tuticorin Kovilpatti Strengthening at km 38/750 - 2.38 670.00
23-S-0414 41/130 of Paruvakudi - Kovilpatti -
Ettayapuram - Vilathikulam -
Vembar road including
Construction of Drain at Km 38/10-
39/10 & 40/8-41/2
415 01-CRIDP-22- Tuticorin Ottapidaram Strengthening at km 18/0 - 20/0, 7.40 695.00
23-S-0415 32/6 - 35/6, 36/0 - 36/7, 36/9 -
38/6 of Palayamkottai -
Kurukkusalai - Kulathur -
Vilathikulam - Nagalapuram -
Pandalkudi - Aruppukkottai Road
Strengthening/Improvements
13.98 1875.00
Total
416 01-CRIDP-22- Tuticorin Vilathikulam Reconstruction of Box Culvert at 92.00
23-S-0416 Km 46/6, 46/8, 48/8 of
Palayamkottai - Kurukkusalai -
Kulathur - Vilathikulam -
Nagalapuram - Pandalkudi -
Aruppukkottai Road
Bridges/Culverts Total 92.00
Tuticorin Total 17.58 2727.00
417 01-CRIDP-22- Nagercoil Killiyur Strengthening at km 12/2 - 15/8 of 3.60 200.00
23-S-0417 Paraseri - Monday Market -
Puthukadai Road
418 01-CRIDP-22- Nagercoil Kanyakumari Strengthening at km 11/0 - 17/0 of 6.00 600.00
23-S-0418 Aralvoimozhi - Nedumangadu Road
including CD works
Strengthening/Improvements
9.60 800.00
Total
SH Page 44 of 210
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
SH Page 45 of 210
CRIDP 2022 - 2023
LIST OF WORKS - MAJOR DISTRICT ROAD
Rs. in Lakhs
Sl. No. Job Code Division Constituency Name of work Length Cost required
421 01-CRIDP-22- Chennai City Tambaram Urban Improvements - Widening 1.32 260.00
23-M-0421 Roads End to End and Strengthening at
km 4/680 - 6/0 of Agaramthen -
Kovilanchery Road including
construction of Culvert at Km
4/10, 5/4 & 5/6
422 01-CRIDP-22- Chennai City Tambaram Construction of Drain at km 0/6 - 180.00
23-M-0422 Roads 0/7, 0/918 - 1/ 1 of Tambaram -
Somangalam - Nandambakkam
Road including Construction of box
culvert at km 0/9 & 1/4
423 01-CRIDP-22- Chennai City Tambaram Construction of Drain at km 6/030 - 455.00
23-M-0423 Roads 6/430 of Agaramthen -
Kovilanchery Road
Urban Improvements Total 1.32 895.00
424 01-CRIDP-22- Chennai City Tambaram Providing Paver Block in shoulders 300.00
23-M-0424 Roads at km 1/9 - 2/6 of Agaramthen -
Kovilanchery Road
426 01-CRIDP-22- Thiruvallur Gummidipoo Widening from Intermediate Lane 6.00 720.00
23-M-0426 ndi to Two Lane and Strengthening at
km 0/0 - 6/0 of Goonipalayam-
Placepalayam Road including
Reconstruction of Culverts
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
447 01-CRIDP-22- Chengalpattu Cheyyur Widening from Intermediate Lane 4.00 700.00
23-M-0447 to Two Lane and Strengthening at
km 15/6 - 19/6 of GST Road to
Cheyyur (via) Padalam including
Reconstruction of Box Culvert
Km.16/8 (ii),18/2(i),10 works
Strengthening/Improvements
1.00 170.00
Total
Kanchipuram Total 1.00 170.00
Chennai Circle Total 20.32 6242.00
452 01-CRIDP-22- Tiruvannamal Polur Widening from Two Lane to Four 15.50 13300.00
23-M-0452 ai Lane and Strengthening at km 2/2 -
17/7 of Arni - Ettivadi road
including Construction of Centre
median, Drain, Retaining wall,
Reconstruction & Widening of
Culverts, Construction & Widening
of Minor Bridges, Junction
improvements and Providing Paver
Blocks.
Sl. No. Job Code Division Constituency Name of work Length Cost required
454 01-CRIDP-22- Tiruvannamal Chengam Widening from Intermediate Lane 5.20 700.00
23-M-0454 ai to Two Lane and Strengthening at
km 5/2 - 10/4 of Chinniyampettai -
Elayankanni road (Via)
Perungalathur including
Reconstruction of culverts at km
5/6, 6/8, 7/4, 8/8, 9/4, 9/10,
10/4
Sl. No. Job Code Division Constituency Name of work Length Cost required
465 01-CRIDP-22- Vellore Katpadi Widening from Two Lane to Two 2.60 523.00
23-M-0465 Lane with Paved Shoulders and
Strengthening at km 17/0 - 19/6 of
Katpadi Vallimalai Road including
Reconstruction of Culvert at Km
17/6, 19/2 and Construction of
Retaining Wall at Km 17/6.
468 01-CRIDP-22- Cheyyar Cheyyar Widening from Intermediate Lane 3.00 360.00
23-M-0468 to Two Lane and Strengthening at
km 2/0 - 5/0 of Cheyyar Anaicut
road including reconstruction of
culvert at km 2/6, 4/2,6 and
Construction of Retaining wall at
km 2/4, 3/2, 3/6
469 01-CRIDP-22- Cheyyar Cheyyar Widening from Intermediate Lane 1.80 210.00
23-M-0469 to Two Lane and Strengthening at
km 7/4 - 9/2 of Thiruvathipuram
Arni road
470 01-CRIDP-22- Cheyyar Vandavasi Widening from Intermediate Lane 1.70 250.00
23-M-0470 to Two Lane and Strengthening at
km 31/4 - 31/9, 37/4 - 38/6 of
Arni Vandavasi road including
Reconstruction of culvert at km
38/2
471 01-CRIDP-22- Cheyyar Polur Widening from Intermediate Lane 0.90 175.00
23-M-0471 to Two Lane and Strengthening at
km 9/0 - 9/9 of Kozhapalur
Avaniyapuram road including
Reconstruction of Culvert at Km.
9/2, 9/4 & 9/8
CMRDP IL to DL Total 8.40 1212.00
472 01-CRIDP-22- Cheyyar Vandavasi Providing Junction Improvement at 110.00
23-M-0472 km 6/10 of Thellar Mazhayur road
and Km.0/2 of Kunagampoondi
Vedal Road including
Reconstruction of Box culvert at
Km.0/2 of Kunagampoondi Vedal
Road
473 01-CRIDP-22- Cheyyar Cheyyar Providing Cantilever Gantry board 7.00
23-M-0473 at km 11/10 of Thavasi Vallam
road
474 01-CRIDP-22- Cheyyar Vandavasi Providing Metal Crash Barrier at 50.00
23-M-0474 km 33/6-34/2 of Arni Vandavasi
road
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
486 01-CRIDP-22- Thirupathur Tirupattur Providing Over Head Gantry board 25.00
23-M-0486 at km 0/437 of Gowthampet Road
Strengthening/Improvements
1.90 294.00
Total
489 01-CRIDP-22- Thirupathur Jolarpet Construction of Box Culvert at 70.00
23-M-0489 0/10 of Yelagiri Hill Road
including Construction of Drain at
Km 0/10
490 01-CRIDP-22- Thirupathur Jolarpet Reconstruction of Box Culvert at 60.00
23-M-0490 Km 2/4, 2/6 and 4/2 of Yelagiri
Hill Road
Bridges/Culverts Total 130.00
Thirupathur Total 3.30 683.00
491 01-CRIDP-22- Kallakurichi Ulundurpettai Widening from Intermediate Lane 3.00 640.00
23-M-0491 to Two Lane and Strengthening at
km 3/3 - 6/0, Strengthening at
km 3/0 - 3/3 of Parikkal
Periyasevalai road including
Reconstruction of Box culvert at
km 4/10,5/2,5/4 , 5/8
Construction of Retaining wall at
Km.3/4,3/6,3/8,5/2
492 01-CRIDP-22- Kallakurichi Ulundurpettai Widening from Intermediate Lane 2.00 365.00
23-M-0492 to Two Lane and Strengthening at
km 6/0 - 8/0 of Parikkal
Periyasevalai road including
Reconstruction of Box culvert at
km 6/6,6/8(i),6/8(ii),7/4(i),(ii)
493 01-CRIDP-22- Kallakurichi Ulundurpettai Widening from Intermediate Lane 2.20 575.00
23-M-0493 to Two Lane and Strengthening at
km 19/6 - 21/8 of Kadampuliyur
Ulundurpet Road via
Perperiyankuppam Sendhanadu
Sendhamangalam Road including
Reconstruction of Box culvert at
km 19/10& 20/8,21/4,21/8
Sl. No. Job Code Division Constituency Name of work Length Cost required
494 01-CRIDP-22- Kallakurichi Ulundurpettai Widening from Intermediate Lane 2.20 560.00
23-M-0494 to Two Lane and Strengthening at
km 21/8 - 24/0 of Kadampuliyur
Ulundurpet Road via
Perperiyankuppam Sendhanadu
Sendhamangalam Road including
Construction of Side Drain at km
23/4-8
495 01-CRIDP-22- Kallakurichi Ulundurpettai Widening from Intermediate Lane 2.40 305.00
23-M-0495 to Two Lane and Strengthening at
km 24/0 - 26/4 of Kadampuliyur
Ulundurpet Road via
Perperiyankuppam Sendhanadu
Sendhamangalam Road
496 01-CRIDP-22- Kallakurichi Sankarapura Widening from Single Lane to Two 2.50 445.00
23-M-0496 m Lane and Strengthening at km
28/4 - 29/8, Widening from
Intermediate Lane to Two Lane and
Improvements at km 29/8 - 30/9 of
Kachirapalayam Vellimalai Road
including Reconstruction of Box
culvert at km 28/10 & 29/2 and
construction of retaining wall at km
28/6, km 29/4.
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
6.70 484.00
Total
509 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 30.00
23-M-0509 m Km 10/10 of Tirukoilur Manalurpet
road
510 01-CRIDP-22- Kallakurichi Sankarapura Reconstruction of Minor Bridge at 175.00
23-M-0510 m Km 30/10 of Kachirapalayam
Vellimalai Road
Bridges/Culverts Total 205.00
Kallakurichi Total 26.05 5206.60
Tiruvannamalai Circle Total 82.08 25336.60
511 01-CRIDP-22- Villupuram Tindivanam Widening from Intermediate Lane 4.00 700.00
23-M-0511 to Two Lane and Strengthening at
km 0/0 - 4/0 of Alankuppam-
Konerikuppam (via) Avanipur road
including reconstruction of Box
culvert at km 0/2,6,10(i),(ii),
1/2,6,10, 2/8, 3/6 & 3/10 and
construction of retaining wall at km
0/4 & 1/4.(MD748 )
512 01-CRIDP-22- Villupuram Vanur Widening from Intermediate Lane 0.60 228.00
23-M-0512 to Two Lane and Strengthening at
km 11/760 - 12/360 of
Brammadesam-Ranganathapuram
(via) Kiliyanur road including
Reconstruction of culvert at
Km.11/8, and Construction of
Drain at Km 11/8 - 11/10
(MD578).
Sl. No. Job Code Division Constituency Name of work Length Cost required
513 01-CRIDP-22- Villupuram Vanur Widening from Intermediate Lane 0.74 340.00
23-M-0513 to Two Lane and Strengthening at
km 12/360 - 13/1 of
Brammadesam -
Ranganathapuram (via) Kiliyanur
road including Reconstruction of
culvert at Km.12/8, 10, 13/100
(MD578)
514 01-CRIDP-22- Villupuram Gingee Widening from Single Lane to Two 2.40 450.00
23-M-0514 Lane and Strengthening at km
10/550 - 10/850 Widening from
Intermediate Lane to Two Lane and
Strengthening at km 11/3 - 11/6,
19/0 - 19/2, 19/4 - 21/0 of
Azhampoondy-Mazhavanthangal
road including Reconstruction of
Box culvert at km 11/6, 20/4,8
and Construction of Retaining wall
at km 20/8.
Strengthening/Improvements
2.00 470.00
Total
Villupuram Total 9.74 2388.00
518 01-CRIDP-22- Cuddalore Tittakudi Widening from Intermediate Lane 3.60 470.00
23-M-0518 to Two Lane and Strengthening at
km 28/0 - 31/6 of Thittagudi-
Sirupakam road (via) Avatti,
Ma.Pudaiyur road reconstruction of
culvert at Km 28/8, 29/10, 30/2 &
31/6
519 01-CRIDP-22- Cuddalore Panruti Widening from Intermediate Lane 3.40 430.00
23-M-0519 to Two Lane and Strengthening at
km 12/0 - 15/4 of Pudupettai -
Oraiyur - Karumbur - Paithambadi
road including Reconstruction of
Box Culvert at Km 12/8
520 01-CRIDP-22- Cuddalore Neyveli Widening from Intermediate Lane 1.05 160.00
23-M-0520 to Two Lane and Strengthening at
km 19/950 - 21/0 of
Kullanchavady-Kattugudalore road
521 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 3.00 490.00
23-M-0521 m to Two Lane and Strengthening at
km 0/0 - 3/0 of Nemam -
Devangudy road including
Reconstruction of Culvert at Km
0/2, 0/8, 0/10, 1/2, 1/10, 2/2,
2/8, 2/10
Sl. No. Job Code Division Constituency Name of work Length Cost required
522 01-CRIDP-22- Cuddalore Kurinjipadi Widening from Intermediate Lane 3.82 587.00
23-M-0522 to Two Lane and Strengthening at
km 2/330 - 2/5, 16/0 - 16/7,
17/046 - 20/0 of Kurinjipady-
Palur road including construction
of retaining wall at km 16/6 &
17/6 and side drain at km 18/0-
18/4
523 01-CRIDP-22- Cuddalore Neyveli Widening from Intermediate Lane 2.00 275.00
23-M-0523 to Two Lane and Strengthening at
km 14/0 - 16/0 of Kurinjipady-
Palur road including reconstruction
of culvert at km 14/10
524 01-CRIDP-22- Cuddalore Kurinjipadi Widening from Intermediate Lane 5.00 682.00
23-M-0524 to Two Lane and Strengthening at
km 0/0 - 5/0 of Kullanchavady-
Kattugudalore road including
reconstruction of culvert at Km 0/8
525 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 3.20 505.00
23-M-0525 m to Two Lane and Strengthening at
km 1/0 - 4/2 of Vridhachalam-
Palakollai road including
Reconstruction of Culvert at Km
2/8, 2/10
526 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 2.00 425.00
23-M-0526 m to Two Lane and Strengthening at
km 5/8 - 7/8 of Vridhachalam-
Palakollai road including
Reconstruction of Culvert at Km
6/2, 6/6, 6/8, 7/2, 7/8
527 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 2.70 526.00
23-M-0527 m to Two Lane and Strengthening at
km 7/8 - 10/5 of Vridhachalam-
Palakollai road including
Reconstruction of Culvert at Km
8/6, 9/2,4 and 10/4
528 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 3.90 600.00
23-M-0528 m to Two Lane and Strengthening at
km 3/0 - 6/900 of Nemam -
Devangudy road including
Reconstruction of Culvert at Km
3/6, 4/6, 4/10, 5/6, 5/8, 6/4, 6/6
529 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 2.10 280.00
23-M-0529 m to Two Lane and Strengthening of
Nemam-Devangudy Road at km
6/900-9/0 including
Reconstruction of Culvert at Km
8/6
CMRDP IL to DL Total 35.77 5430.00
530 01-CRIDP-22- Cuddalore Cuddalore Construction of Retaining wall at 700.00
23-M-0530 km 3/4, 3/6 of Kammiyampettai-
Gundusalai road (via)
Semmandalam
Road Safety Total 700.00
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
12.15 1121.00
Total
537 01-CRIDP-22- Cuddalore Panruti Temporary Restoration to Bridge at 1.00
23-M-0537 km 20/2 of Kurinjipady-Palur road
Sl. No. Job Code Division Constituency Name of work Length Cost required
544 01-CRIDP-22- Salem Gangavalli Widening from Intermediate Lane 2.20 270.00
23-M-0544 to Two Lane and Strengthening at
km 10/8 - 13/0 of Kattokottai-
Sadasivapuram-Thidavorr Road
including Reconstruction of Box
culvert at Km.10/10, 12/6 and
Construction of Well Protective
wall at Km.11/4, 12/2, 12/4
545 01-CRIDP-22- Salem Veerapandi Widening from Intermediate Lane 2.70 350.00
23-M-0545 to Two Lane and Strengthening at
km 2/0 - 4/7 of Nalikkalpatty-
Uthamasolapuram Road including
Reconstruction of Culvert at Km
2/4,3/2,4/4, and Construction of
Retaining Wall at km.3/8,3/10
546 01-CRIDP-22- Salem Gangavalli Widening from Intermediate Lane 2.40 270.00
23-M-0546 to Two Lane and Strengthening at
km 5/0 - 7/4 of Kattokottai-
Sadasivapuram-Thidavorr Road
547 01-CRIDP-22- Salem Gangavalli Widening from Intermediate Lane 3.92 425.00
23-M-0547 to Two Lane and Strengthening at
km 8/0 - 11/920 of Thalaivasal-
Govindampalayam road
549 01-CRIDP-22- Salem Salem North Urban Improvements - Widening 1.80 696.00
23-M-0549 End to End and Strengthening at
km 3/0 - 4/8 of Hasthampatti -
Kannankurichi Road including
construction of Storm water drain
at Km 2/6-4/8
550 01-CRIDP-22- Salem Salem West Urban Improvements - Widening 1.20 170.00
23-M-0550 from Two Lane to EndtoEnd and
Strengthening at km 3/4 - 4/6 of
Shevapet-Elampillai Road
Urban Improvements Total 4.28 1556.00
551 01-CRIDP-22- Salem Yercaud Strengthening at km 6/1 - 7/2 of 1.10 122.00
23-M-0551 Yercaud-Vaniyar Road
Strengthening/Improvements
1.10 122.00
Total
552 01-CRIDP-22- Salem Yercaud Construction of Retaining wall at 70.00
23-M-0552 km 4/6 of Kuppanur-Kottachedu-
Valavanthi Road including
construction of CC drain
Sl. No. Job Code Division Constituency Name of work Length Cost required
560 01-CRIDP-22- Namakkal Paramathi Widening from Intermediate Lane 1.00 160.00
23-M-0560 Velur to Two Lane and Strengthening at
km 11/0 - 12/0 of Paramathy-
Jedarpalayam road including
Construction of Retaining wall at
km 11/2-11/6
Sl. No. Job Code Division Constituency Name of work Length Cost required
561 01-CRIDP-22- Namakkal Rasipuram Widening from Intermediate Lane 2.42 393.00
23-M-0561 to Two Lane and Strengthening at
km 7/4 - 9/820 of Puthuchathiram-
Govintham palayam -Singalantha
puram road including
Construction of Well Protective
Wall, Retaining Wall, Drain and CD
Works
562 01-CRIDP-22- Namakkal Tiruchengode Widening from Intermediate Lane 2.40 260.00
23-M-0562 to Two Lane and Strengthening at
km 3/0 - 5/4 of Mallasamuthiram -
Vaiyappamalai road including
Reconstruction of culvert at Km
3/2
563 01-CRIDP-22- Namakkal Paramathi Widening from Intermediate Lane 2.03 242.00
23-M-0563 Velur to Two Lane and Strengthening at
km 10/250 - 12/0, Strengthening
at km 14/4 - 14/675 of
Vaiyappamalai - Velagoundampatti
road including widening of Culvert
at Km 10/4, 11/8, and
reconstruction of culvert at Km
11/10
564 01-CRIDP-22- Namakkal Namakkal Widening from Intermediate Lane 3.10 360.00
23-M-0564 to Two Lane and Strengthening at
km 0/0 - 1/6 & 5/9 - 7/4 of
Puthuchathiram- Govintham
palayam -Singalantha puram road
including Construction of drain,
Retaining wall, Well protective wall
and CD Works.
Sl. No. Job Code Division Constituency Name of work Length Cost required
571 01-CRIDP-22- Namakkal Tiruchengode Widening from Two Lane to Two 0.40 130.00
23-M-0571 Lane with Paved Shoulders and
Strengthening at km 3/0 - 3/4 of
Tiruchengode - Kokkarayanpettai
road Widening the culvert at Km
3/2 , Curve improvement and
construction of storm water drain.
Strengthening/Improvements
1.00 185.00
Total
573 01-CRIDP-22- Namakkal Senthamanga Strengthening at km 6/4 - 8/0, 2.60 325.00
23-M-0573 lam 14/0 - 15/0 of Kolli Hills ghat road
including Construction of Cement
Concrete surface Drain and
Protective walls in Hair pin Bends
575 01-CRIDP-22- Dharmapuri Pennagaram Widening from Intermediate Lane 4.60 680.00
23-M-0575 to Two Lane and Strengthening at
km 25/0 - 29/6 of Pennagaram -
Nagamarai road including
Construction of box culvert at KM
25/8, 27/4, 27/6, 28/4 and dip
raising at KM 25/8, 27/4, 27/6,
Construction of Retaining wall at
Km 25/150-300 (LS)
576 01-CRIDP-22- Dharmapuri Pappireddipp Widening from Intermediate Lane 0.24 154.00
23-M-0576 atti to Two Lane and Strengthening at
km 24/360 - 24/6 of
Pappireddipatti - Morappur road
(via) Pallipatti, Thenkaraikottai
including construction of Retaining
wall at km 24/4
Sl. No. Job Code Division Constituency Name of work Length Cost required
584 01-CRIDP-22- Krishnagiri Thalli Widening from Intermediate Lane 4.40 550.00
23-M-0584 to Two Lane and Strengthening at
km 12/6 - 17/0 of Denkanikottai-
Uddanapalli road (via)
Kelamangalam road including CD
works & Retaining wall
585 01-CRIDP-22- Krishnagiri Veppanahalli Widening from Intermediate Lane 4.20 550.00
23-M-0585 to Two Lane and Strengthening at
km 17/0 - 21/2 of Denkanikottai-
Uddanapalli road (via)
Kelamangalam road including CD
works & Retaining wall
Sl. No. Job Code Division Constituency Name of work Length Cost required
586 01-CRIDP-22- Tiruppur Tiruppur Widening from Intermediate Lane 1.80 695.00
23-M-0586 North to Two Lane and Strengthening at
km 1/6 - 3/4 of Anupparpalayam -
Vanjipalayam road (Via)
Kaniyampoondi (MD878) including
Construction of Drain
587 01-CRIDP-22- Tiruppur Palladam Widening from Intermediate Lane 4.60 699.00
23-M-0587 to Two Lane and Strengthening at
km 8/0 - 12/6 of Palladam -
Boomalur road including
Reconstruction of Box Culvert at
km 8/2, 8/4(i), 8/4(ii), 8/10,
9/2,6,10, 10/2,6, 11/2,8, 12/6
and Construction of Box Culvert at
km 10/10 and Construction of
Retaining Wall at km 9/10, 10/2.
588 01-CRIDP-22- Tiruppur Kangayam Widening from Intermediate Lane 2.40 270.00
23-M-0588 to Two Lane and Strengthening at
km 8/0 - 10/4 of Sivagiri -
Nathakadaiyur - Muthur road
including Reconstruction of Box
culvert at km 10/4 and
Construction of Retaining wall at
km 9/6,8,10 & 10/2.
589 01-CRIDP-22- Tiruppur Kangayam Widening from Intermediate Lane 1.20 146.00
23-M-0589 to Two Lane and Strengthening at
km 22/0 - 23/2 of Sivagiri -
Nathakadaiyur - Muthur road
including Reconstruction of Box
culvert at km 22/2, 22/10 and
Construction of Retaining wall at
km 22/4 & 22/6
590 01-CRIDP-22- Tiruppur Kangayam Widening from Intermediate Lane 5.20 464.00
23-M-0590 to Two Lane and Strengthening at
km 26/2 - 31/4 of Sivagiri -
Nathakadaiyur - Muthur road
including Reconstruction of Box
culvert at km 26/8, 27/6, 27/10,
28/8 and construction of Retaining
wall at km 29/8 , 30/6
591 01-CRIDP-22- Tiruppur Palladam Widening from Intermediate Lane 2.00 236.00
23-M-0591 to Two Lane and Strengthening at
km 22/4 - 24/4 of Kattampatty -
Koduvai road including
Reconstruction/ Construction of
Box Culvert at Km 23/4, 24/2
592 01-CRIDP-22- Tiruppur Avinashi Widening from Intermediate Lane 2.80 360.00
23-M-0592 to Two Lane and Strengthening at
km 0/20 - 3/0 of Karuvalur -
Kovilpalayam road including
Construction of box culvert at km
1/2, 2/2, 2/6 in lieu of existing
damaged pipe culverts,
Construction of Retaining walls at
km 2/2
CMRDP IL to DL Total 20.00 2870.00
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
3.00 307.00
Total
Dharapuram Total 5.00 897.97
627 01-CRIDP-22- Erode Modakurichi Widening from Intermediate Lane 2.00 330.00
23-M-0627 to Two Lane and Strengthening at
km 6/0 - 8/0 of Arachalur -
Thamaraipalayam road (M130)
including onstruction of Box culvet
at Km 6/4 (i) & 7/6(i) and widening
of culvert at Km 6/4(ii), 7/6 (ii),
7/6 (iii), and construction of
retaining wall at Km 7/10 (MD30)
628 01-CRIDP-22- Erode Gobichettipal Widening from Intermediate Lane 1.40 180.00
23-M-0628 ayam to Two Lane and Strengthening at
km 21/60 - 23/0 of Perunthalaiyur
- Kavundapadi - Gettiseviyur road
(MD657) including Reconstruction
of culvert at Km 22/4
629 01-CRIDP-22- Erode Modakurichi Widening from Intermediate Lane 1.00 130.00
23-M-0629 to Two Lane and Strengthening at
km 21/0 - 22/0 of Sivagiri -
Vadapalani road including
widening of culvert at Km 21/6
Sl. No. Job Code Division Constituency Name of work Length Cost required
638 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 3.80 467.00
23-M-0638 to Two Lane and Strengthening at
km 32/0 - 35/8 of Karur -
Esanatham - Koombur -
Viriyampatty Road including
construction of culvert at km 34/2,
34/6 & 34/8 in lieu of existing
damaged narrow Pipe culvert
639 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 1.80 195.00
23-M-0639 to Two Lane and Strengthening at
km 1/6 - 3/4 of Pallapatty -
Aravakurichy - Esanatham -
Gujiliamparai Road
640 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 3.60 380.00
23-M-0640 to Two Lane and Strengthening at
km 2/0 - 5/6 of
Chinnadharapuram - Kodumudi
Road
641 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 4.00 395.00
23-M-0641 to Two Lane and Strengthening at
km 0/8 - 2/0, 3/8 - 6/6 of
Aravakurichy - Pungampadi Road
642 01-CRIDP-22- Karur Krishnarayap Widening from Intermediate Lane 2.00 440.00
23-M-0642 uram to Two Lane and Strengthening at
km 20/0 - 21/0, 25/0 - 26/0 of
Mahadhanapuram - Mylampatty
Road (via) Palayajeyankondam -
Panchapatty Road including
Construction of box culvert at km
.20/10 (2.0M x 2.0M) in lieu of
existing damaged narrow pipe
culverts and Construction of
retaining wall at km.20/6,20/8 &
20/10
Sl. No. Job Code Division Constituency Name of work Length Cost required
643 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 5.00 665.00
23-M-0643 to Two Lane and Strengthening at
km 0/0 - 1/0, 4/2 - 7/0, 9/8 -
11/0 of Vairamadai -
Thoppampatty - Kuppam Road
including construction of well
protect wall at Km 6/10
644 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 3.80 490.00
23-M-0644 to Two Lane and Strengthening at
km 11/2 - 12/0, 13/0 - 16/0 of
Chinnadharapuram - Kodumudi
Road including Reconstruction Box
culvertat km 11/4 in lieu of
existing damaged Slab culvert and
Widening of Slab Culvert at km
13/10, 14/2, 14/8, 15/10(i), (ii)
645 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 3.60 475.00
23-M-0645 to Two Lane and Strengthening at
km 16/0 - 18/6, 20/0 - 21/0 of
Chinnadharapuram - Kodumudi
Road including widening of Slab
Culvert at km 16/8, 16/10, 17/6,
20/6 (i), 20/6 (ii), Construction Box
culvert at km 16/2 and
Construction of Retaining wall at
km 20/6
648 01-CRIDP-22- Karur Aravakurichi Widening from Two Lane to Two 3.40 635.00
23-M-0648 Lane with Paved Shoulders and
Strengthening at km 21/0 - 24/4 of
Velayuthampalayam - Noyyal Road
including Reconstruction of Box
culvert at km 22/8, 23/2, 23/4
Reconstruction of slab culvert at
km 22/2, 24/2
Sl. No. Job Code Division Constituency Name of work Length Cost required
649 01-CRIDP-22- Karur Aravakurichi Widening from Two Lane to Two 2.00 356.00
23-M-0649 Lane with Paved Shoulders and
Strengthening at km 24/6 - 26/6 of
Velayuthampalayam - Noyyal Road
including Reconstruction of Box
culvert at km 25/4 (i), 25/4 (ii),
25/8
Other Widening Total 7.60 1401.00
650 01-CRIDP-22- Karur Krishnarayap Construction of Minor Bridge at Km 80.00
23-M-0650 uram 0/8 of Mahadhanapuram -
Mylampatty Road (via)
Palayajeyankondam - Panchapatty
Road in lieu of Existing Damaged
Culvert
Bridges/Culverts Total 80.00
Karur Total 38.80 5598.00
Tiruppur Circle Total 38.80 5934.00
651 01-CRIDP-22- Coimbatore Sulur Widening from Intermediate Lane 3.00 340.00
23-M-0651 to Two Lane and Strengthening at
km 0/0 - 3/0 of Palladam Cochin
Frontier Road Appanaickenpatty
(via) Kallangal including
Reconstruction of box culvert and
Construction of retaining Wall at
Km.0/2
652 01-CRIDP-22- Coimbatore Sulur Widening from Intermediate Lane 3.00 280.00
23-M-0652 to Two Lane and Strengthening at
km 3/0 - 6/2 of Thennampalayam
Annur Road (via)
Vagarayampalayam
653 01-CRIDP-22- Coimbatore Kavundampal Widening from Intermediate Lane 1.60 180.00
23-M-0653 ayam to Two Lane and Strengthening at
km 0/4 - 2/0 of Kurumbapalayam -
Karichipalayam road including
widening of culverts and
construction of drain
Sl. No. Job Code Division Constituency Name of work Length Cost required
669 01-CRIDP-22- Coimbatore Kavundampal Providing Over Head Gantry board 12.10
23-M-0669 ayam at km 2/6 of Goundampalayam
Onappalayam
670 01-CRIDP-22- Coimbatore Kavundampal Providing Over Head Gantry board 24.20
23-M-0670 ayam at km 0/2 of Goundampalayam
Onappalayam
671 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-M-0671 m at km 12/2 of Pethikuttai -
Puliampatti road
672 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-M-0672 m at km 3/10 of Karamadai -
Tholampalayam road
673 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-M-0673 m at km 16/6 of Karamadai -
Tholampalayam road
674 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 13.00
23-M-0674 m at km 3/6 of Karamadai Sirumugai
Road
675 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-M-0675 m at km 10/10 of Karamadai -
Tholampalayam road
Road Safety Total 468.90
Sl. No. Job Code Division Constituency Name of work Length Cost required
676 01-CRIDP-22- Coimbatore Mettupalaya Widening from Two Lane to Two 2.50 370.00
23-M-0676 m Lane with Paved Shoulders and
Strengthening at km 7/0 - 8/3,
Strengthening at km 8/4 - 9/6 of
Karamadai Sirumugai Road
677 01-CRIDP-22- Coimbatore Mettupalaya Widening from Two Lane to Two 2.40 540.00
23-M-0677 m Lane with Paved Shoulders and
Strengthening at km 2/6 - 5/0 of
Karamadai Sirumugai Road
Other Widening Total 4.90 910.00
Coimbatore Total 13.23 2578.90
678 01-CRIDP-22- Pollachi Kinathukadav Widening from Intermediate Lane 4.90 532.00
23-M-0678 u to Two Lane and Strengthening at
km 0/0 - 4/9 of Vadachittur -
Chettipalayam Road. including
Construction of Retaining wall at
km 0/10
679 01-CRIDP-22- Pollachi Valparai Widening from Intermediate Lane 1.00 155.00
23-M-0679 to Two Lane and Strengthening at
km 11/0 - 12/0 of Anaimalai -
Poolankinar Road. Including
Reconstruction of Culvert at Km
11/4 & 11/8
680 01-CRIDP-22- Pollachi Valparai Widening from Intermediate Lane 4.20 665.00
23-M-0680 to Two Lane and Strengthening at
km 2/0 - 2/6, 5/0 - 6/6, 14/0 -
16/0 of Anaimalai - Poolankinar
Road. including Construction of
Culvert at Km 5/2, 5/4, 5/10, 6/4
and Construction of Retaining Wall
at Km 2/2
681 01-CRIDP-22- Pollachi Valparai Widening from Intermediate Lane 0.40 80.00
23-M-0681 to Two Lane and Strengthening at
km 13/0 - 13/4 of
Ambarampalayam - Sethumadai
Road. Including Construction of
Culvert at Km 13/2
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
7.80 1240.00
Total
Pollachi Total 18.30 3045.00
693 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 31.00
23-M-0693 alam km 4/4, 6/6, 8/4,8, 12/4 of
Doddabetta Iduhatty Kattabettu
road
694 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 28.00
23-M-0694 alam km 15/2,4,6,10 of Doddabetta
Iduhatty Kattabettu road
695 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 50.00
23-M-0695 alam km 2/4,6,8, 3/8, 7/4,6 of Udhagai -
Avalanchi - Kundah -Thaishola
road
696 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 16.80
23-M-0696 km 0/2,4 of Sholurmattam road
Sl. No. Job Code Division Constituency Name of work Length Cost required
706 01-CRIDP-22- Trichy Musiri Widening from Intermediate Lane 2.00 360.00
23-M-0706 to Two Lane and Strengthening at
km 10/0 - 12/0 of Thootiyam -
Kattuputhur Road including
construction of protectivewall at
km 9/10, 10/2, 11/10 , rasing the
existing protective wall at km
11/6,11/8 and constrution of well
protective wall at km 10/2,10/10
(MD487).
Sl. No. Job Code Division Constituency Name of work Length Cost required
707 01-CRIDP-22- Trichy Musiri Widening from Intermediate Lane 4.00 700.00
23-M-0707 to Two Lane and Strengthening at
km 0/0 - 4/0 of Musiri -Pulivalam
Road including construction of box
culvert at km 0/10, 1/2(i), 1/2(ii),
1/4, 1/10, 2/2, 2/10, 3/10 ,
construction of drain in km 0/320-
0/870 and construction of
protectivewall at km 0/10, 1/2,
1/10 (MD - 276).
708 01-CRIDP-22- Trichy Manachanall Widening from Intermediate Lane 3.60 580.00
23-M-0708 ur to Two Lane and Strengthening at
km 0/0 - 3/6 of Samayapuram -
Keelakannukulam Road
(Via)Manachanallur -Thiruppanjali
Road including Reconstruction of
Box Culvert at km
0/2,1/2,1/10,2/4,3/4 & 3/6 (MD -
823)
709 01-CRIDP-22- Trichy Manachanall Widening from Intermediate Lane 3.00 451.00
23-M-0709 ur to Two Lane and Strengthening at
km 8/0 - 11/0 of Samayapuram -
Keelakannukulam Road
(Via)Manachanallur -Thiruppanjali
Road including Reconstruction of
Box Culvert at km 8/10 &10/8
(MD-823)
710 01-CRIDP-22- Trichy Manachanall Widening from Intermediate Lane 1.40 227.00
23-M-0710 ur to Two Lane and Strengthening at
km 1/6 - 3/0 of Manachanallur -
Edumalai -Elanthalaipatty Road
including reconstruction of Box
culvert at km 1/8 & 2/10 (MD-244)
711 01-CRIDP-22- Trichy Manapparai Widening from Intermediate Lane 3.00 440.00
23-M-0711 to Two Lane and Strengthening at
km 0/0 - 1/0, Widening from
Intermediate Lane to Two Lane and
Improvements at km 4/0 - 6/0 of
Kovilpatty -Manapparai Road
including Reconstruction of Culvert
at Km 0/4, 5/6 & 5/10 (MD - 177)
712 01-CRIDP-22- Trichy Thiruverumb Widening from Intermediate Lane 2.00 485.00
23-M-0712 ur to Two Lane and Strengthening at
km 1/0 - 3/0 of Thiruverambur -
Sooriyur Road including
Reconstruction of Culvert at km
1/8 & 2/6 and Construction of
Protective wall at km 1/6,1/8 &
2/6 (MD 824)
Sl. No. Job Code Division Constituency Name of work Length Cost required
713 01-CRIDP-22- Trichy Thiruverumb Widening from Intermediate Lane 3.20 445.00
23-M-0713 ur to Two Lane and Strengthening at
km 1/0 - 3/2, Strengthening at
km 3/2 - 4/2 of Thriuverumbur -
Grandanaicut Road including
reconstruction of culvert at km 1/2
and construction of Protective wall
(MD 306)
714 01-CRIDP-22- Trichy Thiruverumb Widening from Intermediate Lane 3.20 460.00
23-M-0714 ur to Two Lane and Strengthening at
km 12/2 - 15/4 of Thiruverambur -
Sooriyur Road including
construction of protective wall at
km 15/2 & 15/4 (MD 824)
715 01-CRIDP-22- Trichy Thiruverumb Widening from Intermediate Lane 4.00 665.00
23-M-0715 ur to Two Lane and Strengthening at
km 7/0 - 11/0 of Thiruverambur -
Sooriyur Road including
Reconstruction of Box culvert at
km 10/8 and Construction of
Protective wall at km 9/6,9/8 &
9/10 (MD 824)
716 01-CRIDP-22- Trichy Lalgudi Widening from Intermediate Lane 2.40 365.00
23-M-0716 to Two Lane and Strengthening at
km 22/6 - 25/0 of Keelapalur-
Pullambady (Via)Thirumalappady
Road including Construction
protective wall km 23/4, 23/6
(MD608)
717 01-CRIDP-22- Trichy Lalgudi Widening from Intermediate Lane 3.00 435.00
23-M-0717 to Two Lane and Strengthening at
km 25/0 - 28/0 of Keelapalur-
Pullambady (Via)Thirumalappady
Road including Reconstruction of
culvert at km 25/6, 27/8 and
Construction of Drain at km 27/10,
28/2 (MD608)
718 01-CRIDP-22- Trichy Manapparai Widening from Intermediate Lane 3.00 700.00
23-M-0718 to Two Lane and Strengthening at
km 25/4 - 27/0, Widening from
Intermediate Lane to Two Lane and
Improvements at km 27/6 - 29/0 of
Vaiyambatti - Konnayur Road
including Reconstruction of
culverts at Km 25/6, 26/10 and
Widening culverts at Km 28/2 and
construction of Retaining wall at
km 25/6, 26/10,
27/8,28/2,28/4,28/10 (MD 729)
719 01-CRIDP-22- Trichy Manapparai Widening from Intermediate Lane 2.00 384.00
23-M-0719 to Two Lane and Strengthening at
km 29/0 - 31/0 of Vaiyambatti -
Konnayur Road including
Reconstruction of culvert at Km
29/4, construction of Retaining
wall at km 29/2,29/4,30/10 (MD
729)
Sl. No. Job Code Division Constituency Name of work Length Cost required
724 01-CRIDP-22- Pudukottai Pudukkottai Widening from Intermediate Lane 2.00 280.00
23-M-0724 to Two Lane and Strengthening at
km 9/2 - 9/6, 10/2 - 11/8 of
Vadavalam - Puduppatty road
reconstruction of box culvert at km
9/4(ii), 9/4(iii), 10/6
725 01-CRIDP-22- Pudukottai Gandarvakott Widening from Intermediate Lane 2.40 305.00
23-M-0725 ai to Two Lane and Strengthening at
km 0/4 - 0/8, 1/2 - 3/2 of
Vallamputhur - Thatchangurichi
road (v) Nattani
726 01-CRIDP-22- Pudukottai Gandarvakott Widening from Intermediate Lane 1.60 205.00
23-M-0726 ai to Two Lane and Strengthening at
km 14/0 - 15/6 of Thanjavur -
Karambakudi - Seethambalpuram
road
727 01-CRIDP-22- Pudukottai Gandarvakott Widening from Intermediate Lane 2.50 325.00
23-M-0727 ai to Two Lane and Strengthening at
km 21/7 - 24/2 of Keeranur -
Adhanakottai road reconstruction
of box culvert at Km 22/6, 23/6
and 24/2 [MD 825].
Sl. No. Job Code Division Constituency Name of work Length Cost required
728 01-CRIDP-22- Pudukottai Viralimalai Widening from Intermediate Lane 3.00 439.00
23-M-0728 to Two Lane and Strengthening at
km 32/0 - 35/0 of Pudukkottai -
Manapparai road reconstruction of
box culvert at Km32/2, 32/4 and
construction of retaining wall at
Km 34/8 (MD665)
729 01-CRIDP-22- Pudukottai Viralimalai Widening from Intermediate Lane 2.00 310.00
23-M-0729 to Two Lane and Strengthening at
km 35/0 - 37/0 of Pudukkottai -
Manapparai road widening slab
culvert at Km 35/4 and
construction of retaining wall at
Km 35/6 (MD665)
730 01-CRIDP-22- Pudukottai Viralimalai Widening from Intermediate Lane 1.00 133.00
23-M-0730 to Two Lane and Strengthening at
km 14/0 - 15/0 of Pudukkottai -
Manapparai road including
reconstruction of box culvert at Km
14/4 (MD665)
731 01-CRIDP-22- Pudukottai Viralimalai Widening from Intermediate Lane 3.40 395.00
23-M-0731 to Two Lane and Strengthening at
km 22/6 - 26/0 of Pudukkottai -
Manapparai road reconstruction of
box culvert at Km 25/4 (MD665)
732 01-CRIDP-22- Pudukottai Thirumayam Widening from Intermediate Lane 1.40 186.00
23-M-0732 to Two Lane and Strengthening at
km 0/0 - 1/4 of Perumanadu -
Konnaiyur road reconstruction of
box culvert at Km1/2 and 1/4
(MD827)
733 01-CRIDP-22- Pudukottai Pudukkottai Widening from Intermediate Lane 2.40 312.00
23-M-0733 to Two Lane and Strengthening at
km 27/0 - 27/4, 34/0 - 36/0 of
Pudukkottai - Pattukkottai road
reconstruction of box culvert at Km
27/4, 34/6 (MD372)
734 01-CRIDP-22- Pudukottai Thirumayam Widening from Intermediate Lane 2.00 250.00
23-M-0734 to Two Lane and Strengthening at
km 12/0 - 14/0 of Perumanadu -
Konnaiyur road reconstruction of
box culvert at km 13/8
735 01-CRIDP-22- Pudukottai Thirumayam Widening from Intermediate Lane 2.20 295.00
23-M-0735 to Two Lane and Strengthening at
km 14/0 - 16/2 of Perumanadu -
Konnaiyur road including
reconstruction of box culvert at km
15/4 & 16/2
736 01-CRIDP-22- Pudukottai Alangudi Widening from Intermediate Lane 5.00 676.00
23-M-0736 to Two Lane and Strengthening at
km 24/2 - 29/2 of Pattukkottai -
Peravurani - Aranthangi road
including reconstruction of Box
Culvert at Km 27/4,27/6,28/4
Sl. No. Job Code Division Constituency Name of work Length Cost required
737 01-CRIDP-22- Pudukottai Alangudi Widening from Intermediate Lane 1.40 185.00
23-M-0737 to Two Lane and Strengthening at
km 34/6 - 36/0 of Pattukkottai -
Peravurani - Aranthangi road
738 01-CRIDP-22- Pudukottai Aranthangi Widening from Intermediate Lane 1.00 155.00
23-M-0738 to Two Lane and Strengthening at
km 39/0 - 40/0 of Pattukkottai -
Peravurani - Aranthangi road
including reconstruction of culverts
at km 39/6
741 01-CRIDP-22- Tiruvarur Thiruvarur Widening from Intermediate Lane 1.00 195.00
23-M-0741 to Two Lane and Strengthening at
km 6/6 - 7/6 of Kodavasal -
Koradachery - Lakshmangudi -
Mavoor road including
Construction of Retaining wall at
Km.6/8
742 01-CRIDP-22- Tiruvarur Thiruvarur Widening from Intermediate Lane 3.60 605.00
23-M-0742 to Two Lane and Strengthening at
km 9/0 - 12/6 of Kodavasal -
Koradachery - Lakshmangudi -
Mavoor road including
Reconstruction of Culvert at
Km.10/4, Construction of Culvert
Body wall at Km.11/6 and
Retaining wall at Km.9/6,12/4
743 01-CRIDP-22- Tiruvarur Nannilam Widening from Intermediate Lane 0.80 150.00
23-M-0743 to Two Lane and Strengthening at
km 8/8 - 9/6 of Kodavasal -
Valangaiman - Papanasam road
including Reconstruction of Culvert
at Km.9/2 and Construction of
Retaining wall
744 01-CRIDP-22- Tiruvarur Thiruvarur Widening from Intermediate Lane 2.00 490.00
23-M-0744 to Two Lane and Strengthening at
km 16/0 - 18/0 of Thirunellikkaval
- Kolappadu - Karunganni road
including Construction of Retaining
wall at Km.16/2, 16/4, 16/6, 16/8,
16/10, 17/2, 17/4, 17/6, 17/8,
17/10
Sl. No. Job Code Division Constituency Name of work Length Cost required
745 01-CRIDP-22- Nagapattinam Vedaranyam Widening from Intermediate Lane 3.60 495.00
23-M-0745 to Two Lane and Strengthening at
km 23/2 - 24/4, 24/8 - 27/2 of
Velankanni - Vedaranyam Road
746 01-CRIDP-22- Nagapattinam Kilvelur Widening from Intermediate Lane 2.20 358.00
23-M-0746 to Two Lane and Improvements at
km 2/4 - 3/4 and 5/2 - 6/4 of
Akkaraipettai - Velankanni (Via)
Vadakkupoiyur Road
749 01-CRIDP-22- Nagapattinam Nagapattinam Widening from Intermediate Lane 1.40 219.00
23-M-0749 to Two Lane and Improvements at
km 8/0 - 9/4 of Poonthottam -
Karaikkal Road
CMRDP IL to DL Total 11.00 1843.00
750 01-CRIDP-22- Nagapattinam Vedaranyam Construction of Retaining wall at 316.00
23-M-0750 km 0/6,8 of Alangudi - Thalainayar
- Thalanthiruvasal Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
756 01-CRIDP-22- Mayiladuthur Sirkazhi Widening from Intermediate Lane 1.60 297.00
23-M-0756 ai to Two Lane and Strengthening at
km 1/4 - 3/0 of Sirkali -
Panakattangudy Road including
Reconstruction of culvert at km
1/8(i),1/8(ii) & 2/10
757 01-CRIDP-22- Mayiladuthur Sirkazhi Widening from Intermediate Lane 3.00 608.00
23-M-0757 ai to Two Lane and Strengthening at
km 3/0 - 5/0, 6/0 - 7/0 of Sirkali -
Thirumullaivasal - Koolaiyar Road
including Reconstruction of culvert
at km 3/10 and Construction of
retaining wall at km 6/8,6/10
758 01-CRIDP-22- Mayiladuthur Sirkazhi Widening from Intermediate Lane 4.13 699.00
23-M-0758 ai to Two Lane and Strengthening at
km 0/070 - 3/2, 4/2 - 4/6, 12/0 -
12/6 of Sattanathapuram -
Thiruvenkadu - Malaiyur Road
including Reconstruction of culvert
at km 0/6,1/6,1/10 & 2/6 and
Construction of retaining wall at
km 0/2, 0/4, 0/6
759 01-CRIDP-22- Mayiladuthur Mayiladuthur Widening from Intermediate Lane 0.70 120.00
23-M-0759 ai ai to Two Lane and Strengthening at
km 0/2 - 0/9 of Mayiladuthurai -
Pattavarthy Road
760 01-CRIDP-22- Mayiladuthur Poompuhar Widening from Intermediate Lane 2.00 350.00
23-M-0760 ai to Two Lane and Strengthening at
km 2/0 - 4/0 of Tharangambadi -
Manganallur - Aduthurai Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
765 01-CRIDP-22- Madurai Madurai East Strengthening at km 3/6 - 7/0 of 3.40 400.00
23-M-0765 Varichiyur-Sakkudi road including
Construction of Retaining Wall
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
780 01-CRIDP-22- Dindigul Athoor Widening from Intermediate Lane 2.20 695.00
23-M-0780 to Two Lane and Strengthening at
km 6/4 - 7/0, 7/4 - 9/0 of
Sitharevu - Chinnalapatty Road
including Re- Construction of
Culvert at km 7/10 & km 8/10 ,
widening culvert at km 8/2
,Construction of Drain at km 6/4-
7/0, Construction of Retaining wall
at km 8/0-9/0
781 01-CRIDP-22- Dindigul Nilakkottai Widening from Intermediate Lane 3.60 610.00
23-M-0781 to Two Lane and Strengthening at
km 22/0 - 25/6 of Natchikulam -
Sempatti Road including Re-
Construction of Culvert at km
22/8, 23/4,10, 24/6,10, 25/2 and
Construction of Retaining wall at
km 25/4 and Widening minor
bridge at km 25/4 (MD-643)
782 01-CRIDP-22- Dindigul Athoor Widening from Intermediate Lane 5.00 595.00
23-M-0782 to Two Lane and Strengthening at
km 0/0 - 5/0 of Veiladichampatti -
Palayakannivadi road including Re-
Construction of culvert at km
0/10,1/6,2/2,2/4,2/6,3/6,4/4 and
construction of Drain at km
2/6,2/10 and Protective wall at km
1/8(MD-967)
783 01-CRIDP-22- Dindigul Athoor Widening from Intermediate Lane 4.00 430.00
23-M-0783 to Two Lane and Strengthening at
km 5/0 - 9/0 of Veiladichampatti -
Palayakannivadi road including Re-
Construction of Culvert at km
5/2,7/8,8/4 and construction of
Drain(MD-967)
Sl. No. Job Code Division Constituency Name of work Length Cost required
793 01-CRIDP-22- Ramnad Mudukulathu Widening from Intermediate Lane 4.00 620.00
23-M-0793 r to Two Lane and Strengthening at
km 3/0 - 7/0 of Veneervaikkal -
Manjoor Road including CD works
794 01-CRIDP-22- Ramnad Mudukulathu Widening from Intermediate Lane 2.00 280.00
23-M-0794 r to Two Lane and Strengthening at
km 8/0 - 10/0 of Veneervaikkal -
Manjoor Road including CD works
795 01-CRIDP-22- Ramnad Ramanathap Widening from Intermediate Lane 3.00 500.00
23-M-0795 uram to Two Lane and Strengthening at
km 0/0 - 3/0 of Ettivayal -
Edambadal (Via) Uthiragosamangai
Road including CD Works and
Junction Improvements
796 01-CRIDP-22- Ramnad Ramanathap Widening from Intermediate Lane 3.00 500.00
23-M-0796 uram to Two Lane and Strengthening at
km 3/0 - 6/0 of Ettivayal -
Edambadal (Via) Uthiragosamangai
Road including CD Works and
Junction Improvements
797 01-CRIDP-22- Ramnad Ramanathap Widening from Intermediate Lane 2.00 300.00
23-M-0797 uram to Two Lane and Strengthening at
km 6/0 - 8/0 of Ettivayal -
Edambadal (Via) Uthiragosamangai
Road including CD Works and
Junction Improvements
Sl. No. Job Code Division Constituency Name of work Length Cost required
798 01-CRIDP-22- Ramnad Ramanathap Widening from Intermediate Lane 3.00 450.00
23-M-0798 uram to Two Lane and Strengthening at
km 21/0 - 24/0 of Devipattinam
Nainarkoil Road (via) Pottagavayal
including CD Works
799 01-CRIDP-22- Ramnad Paramakudi Widening from Intermediate Lane 3.00 510.00
23-M-0799 to Two Lane and Strengthening at
km 3/0 - 4/0, 5/0 - 7/0 of
Paramakudi - Keerandai Road
including CD works
800 01-CRIDP-22- Ramnad Paramakudi Widening from Intermediate Lane 2.20 440.00
23-M-0800 to Two Lane and Strengthening at
km 7/0 - 9/2 of Paramakudi -
Keerandai Road including CD
works
801 01-CRIDP-22- Ramnad Paramakudi Widening from Intermediate Lane 3.00 440.00
23-M-0801 to Two Lane and Strengthening at
km 18/0 - 21/0 of Devipattinam-
Nainarkoil Road (Via) Pottagavayal
including CD works
802 01-CRIDP-22- Ramnad Ramanathap Widening from Intermediate Lane 2.00 260.00
23-M-0802 uram to Two Lane and Strengthening at
km 18/0 - 20/0 of Thiruppullani -
Pirappanvalasai Road including CD
Works and Junction Improvements
805 01-CRIDP-22- Tirunelveli Nanguneri Widening from Intermediate Lane 3.40 388.00
23-M-0805 to Two Lane and Strengthening at
km 7/6 - 11/0 of Nanguneri -
Kalakad Road including CD works
at km 9/2
806 01-CRIDP-22- Tirunelveli Nanguneri Widening from Intermediate Lane 1.00 125.00
23-M-0806 to Two Lane and Strengthening at
km 36/0 - 37/0 of Reddiyarpatti -
Vijayanarayanam Road including
CD works
807 01-CRIDP-22- Tirunelveli Nanguneri Widening from Intermediate Lane 2.40 255.00
23-M-0807 to Two Lane and Strengthening at
km 10/0 - 12/0, 13/4 - 13/8 of
Nanguneri - Moolaikaraipatti Road.
Sl. No. Job Code Division Constituency Name of work Length Cost required
808 01-CRIDP-22- TirunelveliPalayamkottai Widening from Two Lane to Four 0.90 305.00
23-M-0808 Lane and Strengthening at km 0/1 -
1/0 of North High Ground Road.
including Center Median
809 01-CRIDP-22- Tirunelveli Tirunelveli Widening from Two Lane to Two 1.80 310.00
23-M-0809 Lane with Paved Shoulders and
Strengthening at km 0/0 - 1/5,
Improvements at km 1/5 - 1/8 of
Ramayanpatti Road. including CD
Works
Other Widening Total 2.70 615.00
810 01-CRIDP-22- Tirunelveli Radhapuram Strengthening at km 6/2 - 12/3 of 6.10 598.00
23-M-0810 Radhapuram - Irukkanthurai Road
including Providing CC Pavement at
km 9/6 - 10/0
Strengthening/Improvements
6.10 598.00
Total
Tirunelveli Total 19.00 2453.00
811 01-CRIDP-22- Tenkasi Tenkasi Widening from Intermediate Lane 3.20 390.00
23-M-0811 to Two Lane and Strengthening at
km 4/2 - 7/4 of Courtallam-
Mathalamparai road including
retaining wall at km 4/10 and box
culvert at km 5/8, 5/10, 6/8
820 01-CRIDP-22- Tenkasi Kadayanallur Strengthening at km 0/0 - 1/0, 4/0 2.60 225.00
23-M-0820 - 5/6 of Kulathupuzha-Chowkey
road
Strengthening/Improvements
3.60 311.00
Total
Tenkasi Total 6.80 745.71
Sl. No. Job Code Division Constituency Name of work Length Cost required
821 01-CRIDP-22- Tuticorin Kovilpatti Widening from Intermediate Lane 0.20 24.00
23-M-0821 to Two Lane and Strengthening at
km 22/8 - 23/0 of Kayathar-
Kalugumalai Road
822 01-CRIDP-22- Tuticorin Ottapidaram Widening from Intermediate Lane 2.20 320.00
23-M-0822 to Two Lane and Strengthening at
km 51/2 - 53/4 of Kovilpatti-
Ottapidaram-Pudukottai-Eral-
Mukkani Road including CD
Works at Km 53/2
823 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Intermediate Lane 3.80 376.00
23-M-0823 to Two Lane and Strengthening at
km 19/0 - 22/8 of
Meingnanapuram-Munanjipatti
Road including Cross Drainage
Works at Km 19/10, 20/6 (i), 20/6
(ii), 20/6 (iii)
824 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Intermediate Lane 6.20 600.00
23-M-0824 to Two Lane and Strengthening at
km 0/0 - 6/2 of Thailapuram -
Meignanapuram-Kayamozhi-
Gandhipuram road including
Cross Drainage Works at Km 1/2
825 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Intermediate Lane 2.00 197.00
23-M-0825 to Two Lane and Strengthening at
km 0/0 - 2/0 of Petmanagaram-
Vagaikulam Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
3.50 285.00
Total
832 01-CRIDP-22- Nagercoil Kanyakumari Construction of Retaining wall at 50.00
23-M-0832 km 0/6, 0/10 of Vellamadam-
Suchindram Road
833 01-CRIDP-22- Nagercoil Kanyakumari Construction of Retaining wall at 20.00
23-M-0833 km 0/8 of Vellamadam-
Chenbagaramanputhoor Road
Flood Permanent Total 70.00
834 01-CRIDP-22- Nagercoil Vilavancode Reconstruction of Culvert at Km 20.00
23-M-0834 0/6 of Kuzhithurai-
Thengapattinam Road
Bridges/Culverts Total 20.00
Nagercoil Total 6.10 655.00
Tirunelveli Circle Total 46.30 5672.71
Grand Total 551.39 108438.38
Sl. No. Job Code Division Constituency Name of work Length Cost required
835 01-CRIDP-22- Chennai City Tambaram Urban Improvements - Widening 1.10 670.00
23-O-0835 Roads End to End and Strengthening at
km 0/0 - 1/1 of Madambakkam
Road including construction of
Drain 0/525 - 1/1 (RS) & Km 0/8 -
1/1 (LS) and Culvert at Km 0/8
836 01-CRIDP-22- Chennai City Tambaram Urban Improvements - Widening 0.60 665.00
23-O-0836 Roads End to End and Strengthening at
km 1/1 - 1/7 of Madambakkam
Road including Construction of
Drain Km 1/1 - 1/7 (BS) and
Culvert at Km 1/6
Urban Improvements Total 1.70 1335.00
837 01-CRIDP-22- Chennai City Tambaram Strengthening at km 0/0 - 1/5 of 1.50 230.00
23-O-0837 Roads Rajendraprasad Road including
Providing Paver Block & Footpath
Strengthening/Improvements
1.50 230.00
Total
838 01-CRIDP-22- Chennai City Pallavaram Construction of Drain at km 0/557 - 215.00
23-O-0838 Roads 0/8, 1/157 - 1/307 of Pammal
Thiruneermalai Road including
Construction of Culvert at km 1/3
Sl. No. Job Code Division Constituency Name of work Length Cost required
853 01-CRIDP-22- Chengalpattu Thiruporur Widening from Single Lane to Two 4.00 505.00
23-O-0853 Lane and Strengthening at km 0/0 -
4/0 of Manampathy - Mullipakkam
Road including CD works
854 01-CRIDP-22- Chengalpattu Thiruporur Widening from Single Lane to Two 4.00 470.00
23-O-0854 Lane and Strengthening at km 4/0 -
8/0 of Manampathy - Mullipakkam
Road including CD works
855 01-CRIDP-22- Chengalpattu Chengalpattu Widening from Single Lane to Two 2.20 257.00
23-O-0855 Lane and Strengthening at km 0/0 -
0/2, 1/0 - 3/0 of GST Road to
Thirukatchur (via) Peramanur Road
including Reconstruction of Box
Culverts
CMRDP IL to DL Total 15.00 1922.00
856 01-CRIDP-22- Chengalpattu Thiruporur Widening from Single Lane to 1.00 128.00
23-O-0856 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Mangalam - Pattikattu Road
including reconstruction of culvert
at Km 0/4
Sl. No. Job Code Division Constituency Name of work Length Cost required
857 01-CRIDP-22- Chengalpattu Cheyyur Widening from Single Lane to 2.30 318.00
23-O-0857 Intermediate Lane and
Strengthening at km 4/4 - 6/7 of
Padalam - Cheyyur Road to
Neelamangalam Easur Road
including Reconstruction of Box
Culvert Km.4/6, 4/10, 5/2(i), 6/4,
6/6
858 01-CRIDP-22- Chengalpattu Cheyyur Widening from Single Lane to 3.20 340.00
23-O-0858 Intermediate Lane and
Strengthening at km 0/0 - 2/0, 4/2
- 5/4 of Vizhuthamangalam -
Nelvoy Road including
Reconstruction of Box Culvert
Km.0/6, 4/10
Other Widening Total 6.50 786.00
859 01-CRIDP-22- Chengalpattu Thiruporur Strengthening at km 0/4 - 0/750 of 0.35 22.00
23-O-0859 Siruchery H/C Road to
Thazhambur H/C and Karanai H/C
Road
860 01-CRIDP-22- Chengalpattu Chengalpattu Strengthening at km 2/6 - 3/5 of 0.90 175.00
23-O-0860 Villiyambakkam -
Sashthirambakkam Road including
Rebuilding & missing link 371 m
Strengthening/Improvements
1.25 197.00
Total
Chengalpattu Total 22.75 2905.00
861 01-CRIDP-22- Kanchipuram Kancheepura Widening from Intermediate Lane 2.20 329.00
23-O-0861 m to Two Lane and Strengthening at
km 0/0 - 2/2 of The Road
Branching Km.3/10 of
Abdullapuram - Moranam Road to
Kolivakkam Road including CD
works
862 01-CRIDP-22- Kanchipuram Sriperumbud Widening from Single Lane to Two 2.20 510.00
23-O-0862 ur Lane and Strengthening at km 0/2 -
2/4 of Somangalam Road
including CD works
863 01-CRIDP-22- Kanchipuram Sriperumbud Widening from Single Lane to Two 1.60 431.00
23-O-0863 ur Lane and Strengthening at km 1/6 -
3/2 of Vadakkupattu Road
including CD works
864 01-CRIDP-22- Kanchipuram Sriperumbud Widening from Single Lane to Two 2.00 450.00
23-O-0864 ur Lane and Strengthening at km 0/0 -
2/0 of Umayalparnacheri Road
including CD works
865 01-CRIDP-22- Kanchipuram Sriperumbud Widening from Intermediate Lane 1.60 250.00
23-O-0865 ur to Two Lane and Strengthening at
km 0/0 - 1/6 of Vadamangalam
Road including CD works
866 01-CRIDP-22- Kanchipuram Sriperumbud Widening from Single Lane to Two 1.60 660.00
23-O-0866 ur Lane and Strengthening at km 1/6 -
3/2 of Vadamangalam Road
including construction of retaining
wall, storm water drain and CD
works
CMRDP IL to DL Total 11.20 2630.00
Sl. No. Job Code Division Constituency Name of work Length Cost required
867 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 2.40 340.00
23-O-0867 Intermediate Lane and
Strengthening at km 0/0 - 2/4 of
Nerkundram Road including CD
works
868 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 1.60 270.00
23-O-0868 Intermediate Lane and
Strengthening at km 1/4 - 3/0 of
Salavakkam - Annathur -
Alapakkam Road including CD
works
869 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 1.55 240.00
23-O-0869 Intermediate Lane and
Strengthening at km 1/450 - 3/0 of
Arunkundram - Arumpuliyur -
Karumbakkam Road including CD
works
870 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 2.80 341.00
23-O-0870 Intermediate Lane and
Strengthening at km 11/6 - 14/4 of
Meyyur - Pinayur Road including
CD works
871 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 3.60 470.00
23-O-0871 Intermediate Lane and
Strengthening at km 0/0 - 3/60 of
Kaliyampoondi - Andithangal Road
including CD works
872 01-CRIDP-22- Kanchipuram Kancheepura Widening from Single Lane to 2.00 250.00
23-O-0872 m Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Iyangarkulam Road including CD
Works
873 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 2.00 300.00
23-O-0873 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
MCB road to Kuthirambakkam
Road including CD works
874 01-CRIDP-22- Kanchipuram Kancheepura Widening from Single Lane to 4.00 330.00
23-O-0874 m Intermediate Lane and
Strengthening at km 0/0 - 4/0 of
Mettukuppam - Perumbakkam
Road including CD works
Other Widening Total 19.95 2541.00
875 01-CRIDP-22- Kanchipuram Uthiramerur Strengthening at km 0/0 - 1/80 of 1.80 105.00
23-O-0875 Anambakkam Road including CD
works
Strengthening/Improvements
1.80 105.00
Total
876 01-CRIDP-22- Kanchipuram Uthiramerur Providing Slope Protection at 200.00
23-O-0876 Breached road stretch in high
embankment at km 1/6 of Magaral -
Kavanthandalam Road
877 01-CRIDP-22- Kanchipuram Uthiramerur Providing Slope Protection at 200.00
23-O-0877 Breached road stretch in high
embankment at km 1/8 of Magaral -
Kavanthandalam Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
883 01-CRIDP-22- Tiruvannamal Kalasapakka Widening from Single Lane to 4.80 525.00
23-O-0883 ai m Intermediate Lane and
Strengthening at km 0/0 - 1/2, 2/4
- 3/0, 4/0 - 7/0 of Pachal-
Periyakulam road (via) Nathavadi
including Reconstruction of
Culverts at Km. 0/2, 0/10, 1/2,
4/6, 5/10 & 6/6, Widening of
Culvert at Km 2/8
884 01-CRIDP-22- Tiruvannamal Kalasapakka Widening from Single Lane to 3.20 450.00
23-O-0884 ai m Intermediate Lane and
Strengthening at km 5/0 - 8/2 of
Agaram Sibbandhi Kanji road
including Reconstruction of
Culverts at Km 5/4, 6/4, 6/6,7/2,
7/4 & 7/10
885 01-CRIDP-22- Tiruvannamal Polur Widening from Single Lane to 3.20 530.00
23-O-0885 ai Intermediate Lane and
Strengthening at km 0/0 - 3/2 of
km 153/6 of Cuddalore - Chittoor
Road to Kalvasal Villankuppam
Road including Reconstruction of
Culverts at Km. 0/8, 0/10,1/2,1/6,
2/2(i),(ii), 2/4(i) (ii), 2/6, 2/8, 3/2,
Construction of Retaining Wall at
Km 2/8
886 01-CRIDP-22- Tiruvannamal Kalasapakka Widening from Single Lane to 2.00 270.00
23-O-0886 ai m Intermediate Lane and
Strengthening at km 5/0 - 7/0 of
Pachal-Nanthimangalam road
including Reconstruction of
culverts at km 5/2,6,8,10, 6/2,4
and construction of protective wall
at km 6/6 (well portion)
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
9.00 890.00
Total
890 01-CRIDP-22- Tiruvannamal Chengam Construction of Culvert at 0/10 of 30.00
23-O-0890 ai Pondy-Krishnagiri road to
Se.Agaram road including
Construction of Retaining Wall at
Km 1/4
891 01-CRIDP-22- Tiruvannamal Polur Reconstruction of Culvert at Km 65.00
23-O-0891 ai 0/4, 0/6, 1/4 of Kilpattu Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
907 01-CRIDP-22- Ranipet Arcot Widening from Single Lane to 3.20 450.00
23-O-0907 Intermediate Lane and
Strengthening at km 0/0 - 3/2 of
Valayathur Road including
Reconstruction of Box Culvert at
Km 0/4,10, 1/4,10, 2/2(i),2/2(ii)
and construction of Culvert at Km
2/10 and Construction of
Retaining Wall at Km 1/10
Sl. No. Job Code Division Constituency Name of work Length Cost required
908 01-CRIDP-22- Ranipet Arcot Widening from Single Lane to 2.00 230.00
23-O-0908 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Sathur Labbaipettai Road
including Reconstruction of Box
Culvert at Km 0/6, 1/6
909 01-CRIDP-22- Ranipet Arakkonam Widening from Single Lane to 6.00 560.00
23-O-0909 Intermediate Lane and
Strengthening at km 3/8 - 9/8 of
Banavaram Perunkanchi Road
including Reconstruction of culvert
at Km 6/4
Other Widening Total 15.40 1660.00
910 01-CRIDP-22- Ranipet Ranipet Strengthening at km 1/6 - 4/8 of 3.20 215.00
23-O-0910 Walajah Palar Anaicut Road
Strengthening/Improvements
3.20 215.00
Total
911 01-CRIDP-22- Ranipet Ranipet Construction of Drain at Km 1/0- 120.00
23-O-0911 1/6 of Vanapadi Branch Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
931 01-CRIDP-22- Cheyyar Cheyyar Widening from Single Lane to 2.80 395.00
23-O-0931 Intermediate Lane and
Strengthening at km 0/0 - 1/4, 2/4
- 2/8, 3/0 - 4/0 of Vembakkam -
Bokkasamauthiram Road
including reconstruction of culverts
at km 0/6, 0/8,0/8(ii), 0/10 and
Construction of drain at km 0/6-
1/0
932 01-CRIDP-22- Cheyyar Cheyyar Widening from Single Lane to 6.00 688.00
23-O-0932 Intermediate Lane and
Strengthening at km 0/0 - 6/0 of
Palanzur - Tirumpoondi Road
including Reconstruction of
Culverts at Km 0/2, 0/4, 0/6,
0/10, 2/2(i), 2/2(ii), 2/6, 2/8,
3/2(i), 3/2(ii), 3/4, 4/2(i), 4/2(ii),
5/2, 5/4, 5/8 and Construction of
Retaining wall at Km 0/4
933 01-CRIDP-22- Cheyyar Cheyyar Widening from Single Lane to 2.60 433.00
23-O-0933 Intermediate Lane and
Strengthening at km 10/0 - 12/6 of
Kancheepuram Thiruvathipuram
Road to Pudupadi – Vada Illuppai
Road including reconstruction of
culverts at km 10/2, 10/10, 11/4,
11/10, 12/6
934 01-CRIDP-22- Cheyyar Vandavasi Widening from Single Lane to 5.20 680.00
23-O-0934 Intermediate Lane and
Strengthening at km 0/0 - 5/2 of
Kilkodungalur road including
Reconstruction of Culvert at
Km.2/2 (i), 2/2 (ii), 2/4, 3/6(i),
3/6(ii), 4/2 and Construction of
Drain at Km.0/0-0/4
935 01-CRIDP-22- Cheyyar Vandavasi Widening from Single Lane to 2.60 280.00
23-O-0935 Intermediate Lane and
Strengthening at km 0/0 - 2/6 of
Arcot Tindivanam road to
Vengunam road including
Reconstruction of Culvert Km.0/8,
1/4(i), 1/4(ii), 2/4
936 01-CRIDP-22- Cheyyar Vandavasi Widening from Single Lane to 4.20 570.00
23-O-0936 Intermediate Lane and
Strengthening at km 1/0 - 5/2 of
Vazhur Marudadu road including
reconstruction of Culvert at Km
3/4, 3/8 & 4/2 and Construction
of Culvert at Km 4/6 and 4/10
Construction of Retaining Wall at
Km 2/4
Sl. No. Job Code Division Constituency Name of work Length Cost required
937 01-CRIDP-22- Cheyyar Arani Widening from Single Lane to 2.60 323.00
23-O-0937 Intermediate Lane and
Strengthening at km 8/4 - 9/0,
11/0 - 13/0 of Sevoor -
Vethajipuram Road (Via)
Mullandram including
Reconstruction of Culverts at Km
8/6, 9/2, 11/4, 11/6, 11/8, 12/2
(i) & (ii), 12/6, 12/8 and 12/10 (i)
& (ii) and Construction of Retaining
Wall at Km 12/6 and 12/8
938 01-CRIDP-22- Cheyyar Vandavasi Widening from Single Lane to 6.50 635.00
23-O-0938 Intermediate Lane and
Strengthening at km 0/0 - 2/0, 5/0
- 9/5 of Arcot Tindivanam road to
Mavalavady road including
Reconstruction of Culvert at
Km.1/6, 5/2
Other Widening Total 36.30 4414.00
939 01-CRIDP-22- Cheyyar Cheyyar Strengthening at km 13/2 - 14/2 of 1.00 135.00
23-O-0939 Vellakulam - Vada Illuppai Road
including reconstruction of culvert
at km 12/10, 13/6
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
11.40 868.00
Total
944 01-CRIDP-22- Cheyyar Cheyyar Reconstruction of Box Culvert at 37.00
23-O-0944 Km 8/8 of Vembakkam -
Bokkasamauthiram Road
945 01-CRIDP-22- Cheyyar Cheyyar Reconstruction of Box Culvert at 31.00
23-O-0945 Km 15/8 of Kancheepuram
Thiruvathipuram Road to
Pudupadi – Vada Illuppai Road
946 01-CRIDP-22- Cheyyar Vandavasi Construction of Box Culvert at Km 75.00
23-O-0946 2/6 of Cheyyur - Vandavasi - Polur
road to Thellar Mazhayur Road (via)
Venkatapuram Kadambai
Sl. No. Job Code Division Constituency Name of work Length Cost required
955 01-CRIDP-22- Thirupathur Jolarpet Widening from Intermediate Lane 2.90 585.00
23-O-0955 to Two Lane and Strengthening at
km 0/3 - 0/7, 0/8 - 1/0
Strengthening at km 0/0 - 0/3, 1/0
- 1/4, 2/0 - 3/4, 3/6 - 3/8 of
Jolarpet - Ambalur Road including
Construction of box culvert at km
1/2, 2/6, 3/8, and Widening of
culvert at km 1/4, 2/2 and
construction of Retaining wall at
1/2, 2/10, 3/2
956 01-CRIDP-22- Thirupathur Jolarpet Widening from Single Lane to Two 3.50 530.00
23-O-0956 Lane and Strengthening at km 0/7 -
0/8, 1/4 - 2/0, 3/4 - 3/6, 3/8 -
5/0 Strengthening at km 5/0 -
6/4 of Jolarpet - Ambalur Road
including Construction of Box
culvert at km 4/8, 5/8 and
Construction of retaining wall at
km 4/6, 4/8, 4/10
Sl. No. Job Code Division Constituency Name of work Length Cost required
972 01-CRIDP-22- Thirupathur Ambur Widening from Single Lane to 3.00 350.00
23-O-0972 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Km 24/6 of Gudiyatham -
Gadambur - Kailasagiri -
Vaniyambadi Road to Mittalam
(Via) Kuttakandur -
Vanniyanathapuram Road.
including construction of retaining
wall at km 0/2 and km 2/4
973 01-CRIDP-22- Thirupathur Ambur Widening from Single Lane to 2.00 400.00
23-O-0973 Intermediate Lane and
Strengthening at km 9/0 - 11/0 of
Arangaldurgam Road including
Construction of retaining wall at
km 1/10 , 4/4 4/6 , 7/10 , 8/6,
9/6 , 10/2 , 10/4 , 13/2 , 13/6 &
13/8
974 01-CRIDP-22- Thirupathur Jolarpet Widening from Single Lane to 1.40 290.00
23-O-0974 Intermediate Lane and
Strengthening at km 0/0 - 1/2 &
Strengthening at km 1/2 - 1/4 of
Annandapatti Road including
Construction of Box Culvert Km
0/2 (i),(ii), 0/4,8,10 and
construction of drain at km 0/4 -
0/8
Other Widening Total 9.80 1405.00
975 01-CRIDP-22- Thirupathur Vaniyambadi Construction of Retaining wall at 225.00
23-O-0975 km 10/10, 11/2 of Jaffrabad -
Velathigamanibenda Road.
Flood Permanent Total 225.00
976 01-CRIDP-22- Thirupathur Tirupattur Construction of Box Culvert at Km 38.00
23-O-0976 4/10, 5/8 of Tirupattur -
Jalagamparai Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
991 01-CRIDP-22- Kallakurichi Kallakurichi Widening from Single Lane to 2.20 285.00
23-O-0991 Intermediate Lane and
Strengthening at km 6/0 - 8/2 of
Rayappanur Vettiperumalagaram
Road Via Thagarai including
reconstruction of culvert at
km.7/2, 7/8 & 8/2 (ii) and
construction of retaining wall at
km.8/2.
992 01-CRIDP-22- Kallakurichi Sankarapura Widening from Single Lane to 1.00 147.00
23-O-0992 m Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Kachirapalayam Thavadipattu Road
including reconstruction of culvert
at km 0/10 (i) (ii).
993 01-CRIDP-22- Kallakurichi Sankarapura Widening from Single Lane to 3.60 530.00
23-O-0993 m Intermediate Lane and
Strengthening at km 5/6 - 9/2 of
Arasampattu Mottampatti Road
including Reconstruction of RCC
Box culverts Km 6/2, 6/10, 7/10.
8/6, 8/8, 8/10 & 9/2 Construction
of PCC Retainingwall at Km 6/10,
8/2 & 8/4
Strengthening/Improvements
4.52 373.00
Total
997 01-CRIDP-22- Kallakurichi Sankarapura Reconstruction of Box Culvert at 53.00
23-O-0997 m Km 1/10 of Sankarapuram
Puthirampattu Road
998 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 16.00
23-O-0998 m Km 3/2 of Ayyanarpalayam -
Melapazhangur
999 01-CRIDP-22- Kallakurichi Rishivandiya Construction of Box Culvert at Km 50.00
23-O-0999 m 6/2 of Thiyagadurgam
Sankarapuram Road
1000 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 20.00
23-O-1000 m Km 2/2 of Dhevaradiyarkuppam
Road
1001 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 35.00
23-O-1001 m Km 1/2 of Kazhumaram Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1009 01-CRIDP-22- Villupuram Vanur Widening from Intermediate Lane 1.50 635.00
23-O-1009 to Two Lane and Strengthening at
km 1/6 - 3/1 of Parangani-
Vazhudavur road including
Reconstruction of culvert at Km
1/8, 2/4(i) (ii), 2/8 & 2/10
1010 01-CRIDP-22- Villupuram Gingee Widening from Intermediate Lane 4.20 600.00
23-O-1010 to Two Lane and Strengthening at
km 4/0 - 8/2 of Thathikulam-
Melmalaiyanur road including
reconstruction of culvert at km
4/2,4/6,4/8,7/2,8/2
1011 01-CRIDP-22- Villupuram Gingee Widening from Intermediate Lane 2.00 280.00
23-O-1011 to Two Lane and Strengthening at
km 0/0 - 2/0 of Jayankondan-
Perani road
1012 01-CRIDP-22- Villupuram Villupuram Widening from Intermediate Lane 2.50 400.00
23-O-1012 to Two Lane and Strengthening at
km 0/0 - 2/5 of Valavanur-
Poovarasankuppam road including
including reconstruction of Box
culvert at Km 0/6,1/2,2/2 and
construction drain at km 0/2
1013 01-CRIDP-22- Villupuram Gingee Widening from Intermediate Lane 2.60 600.00
23-O-1013 to Two Lane and Strengthening at
km 2/0 - 4/0 and Single Lane to
Two Lane at km 4/0 - 4/6 of
Jayankondan-Perani road including
box culvert at km
2/8,2/10(i),(ii),3/2,3/4,3/6,3/8(i)(ii
),3/10, 4/6
Sl. No. Job Code Division Constituency Name of work Length Cost required
1024 01-CRIDP-22- Villupuram Vanur Widening from Single lane to 3.00 685.00
23-O-1024 Intermediate lane & Strengthening
of Puthurai road at km 0/0-3/0
including reconstruction of culverts
at Km 0/4, 0/6, 1/6,1/10, 2/4 ,
2/6 (i),(ii), 2/8, 2/10, construction
of Retaining wall at Km 0/4-
0/6,0/8-0/10 and construction of
Body Wall for Culvert at Km 1/8.
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
2.46 535.00
Total
Villupuram Total 22.96 5702.00
1027 01-CRIDP-22- Cuddalore Panruti Widening from Single Lane to Two 2.00 400.00
23-O-1027 Lane and Strengthening at km 0/0 -
2/0 of Kattiyampalayam-
Ammapettai road CD works at Km
0/6,0/8 & 1/8
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
30.81 2730.00
Total
1045 01-CRIDP-22- Cuddalore Cuddalore Temporary Restoration to Bridge at 13.00
23-O-1045 km 3/450 of Marudhadu -
Erandayiravilagam road
Flood Permanent Total 13.00
1046 01-CRIDP-22- Cuddalore Tittakudi Reconstruction of Box Culvert at 38.00
23-O-1046 Km 3/4 of S.Naraiyur road
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
1067 01-CRIDP-22- Ariyalur Ariyalur Widening from Single Lane to 1.00 151.00
23-O-1067 Intermediate Lane and
Strengthening at km 10/0 - 11/0 of
Poyyur - Sundakkudi road
including Reconstruction of Box
culvert at km 10/2,10/8,
construction of Retaining wall at
km 10/8
1068 01-CRIDP-22- Ariyalur Ariyalur Widening from Single Lane to 2.00 595.00
23-O-1068 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Keelakavettankurichi - Alambadi
Mettutheru road including
Reconstruction of Box culvert at
km 0/2, 0/4 (i), 0/4(ii), 0/8, 1/8,
1/10 Construction of drain at km
0/0- 0/8 & 0/10-2/0
1069 01-CRIDP-22- Ariyalur Jayankondam Widening from Single Lane to 4.00 675.00
23-O-1069 Intermediate Lane and
Strengthening at km 0/0 - 2/0, 5/0
- 6/0, 7/0 - 8/0 of Kallathur -
Pappakudi - Melanikuzhi road
including Reconstruction of Box
culvert at km 1/4, 5/6, 7/6 and
Construction of Retainingwall at
km 0/2,4,6,8,10, 1/2,8, 5/2,4
1070 01-CRIDP-22- Ariyalur Jayankondam Widening from Single Lane to 3.00 333.00
23-O-1070 Intermediate Lane and
Strengthening at km 6/0 - 7/0, 8/0
- 10/0 of Edayar -
Kaduvettankurichi road including
Reconstruction of Box culvert at
km 6/2, 6/8
Other Widening Total 11.80 2246.00
1071 01-CRIDP-22- Ariyalur Ariyalur Strengthening at km 1/0 - 5/2 of 4.20 484.00
23-O-1071 Poyyathanallur - Illuppaiyur road
including Reconstruction of Box
culvert at km 1/8, 2/2, 2/8, 3/4,
3/8, 4/8, 4/10, 5/2 Construction
of Retaining wall at km 1/2,
2/2,4,8, 3/4, 4/4, Protective wall
at km 2/2 - 2/6 and Construction
of Drain at km 3/8
Strengthening/Improvements
7.00 754.00
Total
1073 01-CRIDP-22- Ariyalur Jayankondam Construction of Box Culvert at Km 17.00
23-O-1073 1/6 of Andimadam - Kovil Valkai
road to Keelaneduvai road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1079 01-CRIDP-22- Perambalur Kunnam Widening from Single Lane to Two 2.60 395.00
23-O-1079 Lane and Strengthening at km 0/0 -
2/6 of KM 11/8 of Perambalur -
Manamadurai road to Othiyam
road including Reconstruction of
Box Culvert at Km 0/8, 1/2, 1/6,
1/10 (i) (ii), 2/2, 2/6
Sl. No. Job Code Division Constituency Name of work Length Cost required
1090 01-CRIDP-22- Perambalur Perambalur Widening from Single Lane to 1.20 110.00
23-O-1090 Intermediate Lane and
Strengthening at km 9/0 - 10/2 of
Arumbavur - A.Mettur -
Malayalapatti road including
Reconstruction of Box Culvert at
Km 9/4, Widening of Slab Culvert
at Km 9/2
1091 01-CRIDP-22- Perambalur Perambalur Widening from Single Lane to 2.00 215.00
23-O-1091 Intermediate Lane and
Strengthening at km 15/0 - 17/0 of
Ranjangudi - V.Kalathur -
Kaikalathur road including
Reconstruction of Box Culvert at
Km 15/2, 15/4, 16/2, 16/4, 16/6
1092 01-CRIDP-22- Perambalur Kunnam Widening from Single Lane to 3.40 350.00
23-O-1092 Intermediate Lane and
Strengthening at km 1/0 - 4/4 of
Kolakkanatham -
Garudamangalam road including
Reconstruction of Box culverts at
km 2/8, 2/10 (i) (ii), 3/4, 3/6, 3/8,
Construction of retaining wall at
Km 2/10, 3/2 and Protective wall
at Km 3/8
1093 01-CRIDP-22- Perambalur Perambalur Widening from Single Lane to 4.80 490.00
23-O-1093 Intermediate Lane and
Strengthening at km 3/8 - 8/6 of
Palaiyur - Anukkur -
Valikandapuram road including
Reconstruction of Box Culvert at
Km 4/4(i) (ii), 5/10, 6/4, 6/8,
6/10, 7/4, 8/4
Sl. No. Job Code Division Constituency Name of work Length Cost required
1094 01-CRIDP-22- Perambalur Perambalur Widening from Single Lane to 1.40 150.00
23-O-1094 Intermediate Lane and
Strengthening at km 4/6 - 6/0 of
Venganur - Poolambadi road [Via]
Periyammapalam including
Reconstruction of Box Culvert at
Km 5/6, 5/8 and Construction of
Protective Wall at km 5/4, 5/8,
5/10
1095 01-CRIDP-22- Perambalur Perambalur Widening from Single Lane to 5.40 615.00
23-O-1095 Intermediate Lane and
Strengthening at km 0/0 - 3/0, 4/6
- 7/0 of Esanai - Melapuliyur road
including Reconstruction of Box
Culvert at km 0/2, 0/8, 0/10, 1/4,
1/6, 2/2, 5/8 and Construction of
Retaining wall at Km 1/2, 1/4,
1/8, 2/4, 2/8, 2/10 and
Construction of Protective Wall at
Km 6/8
Sl. No. Job Code Division Constituency Name of work Length Cost required
1101 01-CRIDP-22- Salem Attur Widening from Single Lane to 1.32 130.00
23-O-1101 Intermediate Lane and
Strengthening at km 3/885 - 5/2 of
Attur - Paithur Road including
Widening of pipe culvert at
Km.4/10
Other Widening Total 9.32 1120.00
1102 01-CRIDP-22- Salem Yercaud Construction of Retaining wall at 300.00
23-O-1102 Km 2/8, 5/2, 5/6, 6/2, 6/4, 6/6 of
Vellakadai - Nallur (Via) Melur
Road including Construction of
Parapet wall at Km 0/2, 0/6, 0/10,
1/4, 1/8, 1/10, 2/2, 2/4, 2/8, 3/4,
3/6, 3/10, 4/2, 4/4, 4/6, 4/10,
5/2, 5/4, 5/6, 5/8, 5/10, 6/2, 6/4,
6/6, 6/8, 6/10, 7/2 and CC drain
at Km 0/4, 0/8, 0/10, 1/4, 1/6,
1/8, 1/10, 2/4, 2/10, 3/8, 3/10,
4/2, 4/4, 4/6, 5/2, 5/4, 5/6, 5/8,
5/10, 6/2, 6/4, 6/6, 6/8, 6/10,
7/2.
1104 01-CRIDP-22- Edappadi Mettur Widening from Intermediate Lane 5.40 640.00
23-O-1104 to Two Lane and Strengthening at
km 4/6 - 10/0 of Kolathur
Guruvareddiyur road including
Construction of Retaining Wall at
Km.4/8 & 4/10
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
1124 01-CRIDP-22- Edappadi Sankari Widening from Single Lane to 3.80 530.00
23-O-1124 Intermediate Lane and
Strengthening at km 0/0 - 2/6, 6/6
- 7/8 of Vaigundam -
Kozhikkalnatham Road including
Reconstruction of Box culvert at
km 0/4 (i) , 0/4 (iii), 1/6,10, 2/2(i),
2/2 (ii), 2/4, 6/10, 7/6 and
widening of Box culvert at km 0/4
(ii) Construction of Retaining wall
at km 0/6-1/0 and Construction of
drain at km 7/6
1125 01-CRIDP-22- Edappadi Sankari Widening from Single Lane to 3.00 408.00
23-O-1125 Intermediate Lane and
Strengthening at km 3/4 - 5/4, 6/0
- 7/0 of Alathur - Reddipalayam -
Thevur road including
Reconstruction of box culvert at km
4/4,5/2, 6/2, 6/4 (i), (ii), 6/6,
construction of well Protective wall
at km 5/2 and construction of
retaining wall at km 6/10
Strengthening/Improvements
2.80 165.00
Total
1127 01-CRIDP-22- Edappadi Omalur Reconstruction of Box Culvert at 50.00
23-O-1127 Km 3/6, 4/2 of Kuppur-
Kanjanaickanpatty road
1128 01-CRIDP-22- Edappadi Omalur Reconstruction of Box Culvert at 15.00
23-O-1128 8/2 of Tharamangalam- Vanavasi
road to Sedapatty (via) Ariyampatty-
S.Karattupatty road including
Construction of Drain at km.8/2
1130 01-CRIDP-22- Namakkal Namakkal Widening from Intermediate Lane 1.60 91.00
23-O-1130 to Two Lane and Strengthening at
km 0/0 - 1/6 of Kanavaipatty -
Thanneerpandal road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1131 01-CRIDP-22- Namakkal Senthamanga Widening from Single Lane to Two 1.00 180.00
23-O-1131 lam Lane and Strengthening at km
10/6 - 11/6 of Semmedu -
Sellipatti -Arapaleeswarar kovil
road. including Construction of
Retaining Wall at Km 10/10 and
construction of Culverts at Km
11/2 and Providing Paver Block in
Km 11/0-11/4.
1132 01-CRIDP-22- Namakkal Namakkal Widening from Intermediate Lane 4.60 600.00
23-O-1132 to Two Lane and Strengthening at
km 5/8 - 10/4 of Kalangani -
Thirumalaipatty road including
construction of Retaining wall, Well
protective wall and CD works
1133 01-CRIDP-22- Namakkal Senthamanga Widening from Intermediate Lane 1.40 112.00
23-O-1133 lam to Two Lane and Strengthening at
km 0/0 - 1/4 of Erumapatti loop
road including Construction of
Retaining wall at Km 1/2, 1/4 and
Reconstruction of culvert at Km
0/2.
Sl. No. Job Code Division Constituency Name of work Length Cost required
1145 01-CRIDP-22- Namakkal Namakkal Widening from Single Lane to 1.20 77.00
23-O-1145 Intermediate Lane and
Strengthening at km 0/0 - 1/2 of
VCC road to Thottipatti road
including Reconstruction of cut
stone culvert at Km 1/2
1146 01-CRIDP-22- Namakkal Senthamanga Widening from Single Lane to Two 1.60 290.00
23-O-1146 lam Lane and Strengthening at km 3/0 -
4/6 of Gandhipuram-Karavalli
road. including Reconstruction of
Culvert into box culvert at Km 3/4
(i) & (ii),3/6, 3/10,4/4,4/6 and
Widening of Culvert at Km 3/2
Construction of Retaining Wall 4/6.
1147 01-CRIDP-22- Namakkal Rasipuram Widening from Single Lane to 1.60 130.00
23-O-1147 Intermediate Lane and
Strengthening at km 0/0 - 1/6 of
Attaiyampatti - Masakalipatti road
to Minnakal Agraharam road
including Construction of Retaining
Wall, Drain and CD Works
1148 01-CRIDP-22- Namakkal Senthamanga Widening from Single Lane to 6.55 650.00
23-O-1148 lam Intermediate Lane and
Strengthening at km 0/0 - 4/040,
4/290 - 4/8, 5/0 - 7/0 of
Solakadu - Kulivalavu road
including Construction of CC
Drain, Retaining Wall and
Reconstruction of Culverts
1149 01-CRIDP-22- Namakkal Paramathi Widening from Single Lane to 1.20 78.00
23-O-1149 Velur Intermediate Lane and
Strengthening at km 1/2 - 2/4 of
Velur-Kabilarmalai road including
Widening of pipe culvert at km 2/2
1150 01-CRIDP-22- Namakkal Paramathi Widening from Single Lane to 5.00 360.00
23-O-1150 Velur Intermediate Lane and
Strengthening at km 0/0 - 5/0 of
Nallur - Kabilarmalai -
Pandamangalam road including
Reconstruction of box culvert in
lieu of existing pipe culvert,
Widening of pipe culvert, Widening
of slab culvert and Construction of
Retaining wall
Sl. No. Job Code Division Constituency Name of work Length Cost required
1151 01-CRIDP-22- Namakkal Tiruchengode Widening from Single Lane to 1.60 348.00
23-O-1151 Intermediate Lane and
Strengthening at km 8/0 - 9/6 of
Molasi road including
Construction of Well Protective
wall, Retaining wall and Toe wall,
Construction of Culvert at Km 8/2,
8/6 and Reconstruction of Culverts
8/10,9/2
1152 01-CRIDP-22- Namakkal Kumarapalay Widening from Single Lane to 1.20 152.00
23-O-1152 am Intermediate Lane and
Strengthening at km 1/0 - 2/2 of
Padaiveedu road including
Reconstruction of Culverts at Km
1/2(i)(ii),1/8,1/10(i)(ii),2/2
1153 01-CRIDP-22- Namakkal Tiruchengode Widening from Single Lane to 3.42 390.00
23-O-1153 Intermediate Lane and
Strengthening at km 7/8 - 11/220
of Vaikuntham - Kolikkalnatham
road including Construction of
Well protective wall and Retaining
wall, Construction of Culvert at 9/6
and Reconstruction of culverts at
Km
8/0(i)(ii),8/2,8/8,9/4,9/8,9/10,10/
4
1154 01-CRIDP-22- Namakkal Paramathi Widening from Single Lane to 3.20 220.00
23-O-1154 Velur Intermediate Lane and
Strengthening at km 9/0 - 10/2,
12/0 - 13/4, 15/4 - 16/0 of
Nallur - Kabilarmalai -
Pandamangalam road including CD
Works
Other Widening Total 29.77 2972.00
Namakkal Total 40.47 4273.40
1155 01-CRIDP-22- Dharmapuri Palacode Construction of Retaining wall at 100.00
23-O-1155 km 2/0-2/2 of Chinnar Reservior
Project road
1156 01-CRIDP-22- Dharmapuri Palacode Construction of Retaining wall at 254.00
23-O-1156 km 2/2-2/8 of Chinnar Reservior
Project road
Road Safety Total 354.00
1157 01-CRIDP-22- Dharmapuri Pappireddipp Widening from Single Lane to 1.00 85.00
23-O-1157 atti Intermediate Lane and
Strengthening at km 3/0 - 4/0 of
Kadathur - Thalanatam road
1158 01-CRIDP-22- Dharmapuri Pappireddipp Widening from Single Lane to 4.20 430.00
23-O-1158 atti Intermediate Lane and
Strengthening at km 3/8 - 8/0 of
Annasagaram - Kombi road
including Reconstruction of Box
culverts at km 3/10, 4/2,6,8,
5/2,8,10, 6/4, 7/2,10,
Construction of Well Protective Well
at Km 7/4
Sl. No. Job Code Division Constituency Name of work Length Cost required
1159 01-CRIDP-22- Dharmapuri Dharmapuri Widening from Single Lane to 1.40 400.00
23-O-1159 Intermediate Lane and
Strengthening at km 0/0 - 1/4 of
National Highways -7
Mukkalnaickanpatti (Via)
Eamakuttaiyur, Ettimarathupatti
road including Reconstruction of
Box culverts at km 0/4, 0/6(i), (ii),
1/2 Construction of Box culvert at
Km 0/2, 0/4(ii) and construction of
Retaining wall at km 0/320 - 0/600
(L/S) and Construction of Drain at
Km 0/0-0/320 (LS) & 0/6-0/8 (BS)
1160 01-CRIDP-22- Dharmapuri Palacode Widening from Single Lane to 0.20 25.00
23-O-1160 Intermediate Lane and
Strengthening at km 8/8 - 9/0 of
Ekkandahalli - Theertharapatti
road
1161 01-CRIDP-22- Dharmapuri Palacode Widening from Single Lane to 1.80 200.00
23-O-1161 Intermediate Lane and
Strengthening at km 5/2 - 6/0, 6/6
- 6/8, 7/2 - 7/6, 8/0 - 8/2, 12/4 -
12/6 of Begarahalli road to
National Highways -7 at joining at
KM 121/6 including Construction
of Box Culvert at km 12/6 In Lieu
of damaged pipe Culvert and
Construction of Retaining wall at
km 5/6-5/8
1162 01-CRIDP-22- Dharmapuri Dharmapuri Widening from Single Lane to 3.20 470.00
23-O-1162 Intermediate Lane and
Strengthening at km 1/4 - 1/8, 3/6
- 4/4, 5/0 - 5/2, 6/2 - 6/6
Strengthening at km 0/0 - 1/4 of
Nallampalli - Mittareddihalli (Via)
Laligam road including
Reconstruction of Box culvert at
Km 0/8, 5/2 and Construction of
Retaining wall at km 1/400 -1/800,
3/700-3/800
1163 01-CRIDP-22- Dharmapuri Dharmapuri Widening from Single Lane to 1.80 250.00
23-O-1163 Intermediate Lane and
Strengthening at km 1/0 - 1/6, 3/4
- 4/0, 5/2 - 5/8 of Annasagaram -
Komathampatti road including
Reconstruction of Box culverts at
km 1/4, 1/6 (i) (ii), 3/4, 3/8 and
and Construction of box culvert at
Km 1/2
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
5.00 270.00
Total
1166 01-CRIDP-22- Dharmapuri Palacode Construction of Box Culvert at Km 55.00
23-O-1166 4/2 of Gooliganur - Udayandahalli
road in lieu of damaged RR
Masonry slab culvert
Strengthening/Improvements
3.80 345.00
Total
Krishnagiri Total 20.76 2629.00
Salem Circle Total 108.74 13584.67
1173 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 8.00
23-O-1173 km 4/2, 4/6, 7/8 of Kallipalayam -
Vavipalayam road
1174 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 26.00
23-O-1174 km 1/6,8, 2/8,10, 4/6 of
Rayarpalayam - Ganapathypalayam
road (Via) Goundampalayam
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
1261 01-CRIDP-22- Dharapuram Madathukula Widening from Single Lane to 1.10 190.00
23-O-1261 m Intermediate Lane and
Strengthening at km 4/6 - 5/7 of
Kaniyur - Myvadi - Periyakottai
road. including Cross Drainage
Works and Retaining Wall Works.
Sl. No. Job Code Division Constituency Name of work Length Cost required
1262 01-CRIDP-22- Dharapuram Madathukula Widening from Single Lane to 1.40 268.00
23-O-1262 m Intermediate Lane and
Strengthening at km 0/6 - 2/0 of
Kaniyur - Kadathur road including
Cross Drainage Works and
Retaining Wall Works.
1263 01-CRIDP-22- Dharapuram Kangayam Widening from Single Lane to 2.00 340.00
23-O-1263 Intermediate Lane and
Strengthening at km 0/0 - 1/7,
Strengthening at km 1/7 - 2/0 of
Mylrangam - Velapanaickenvalasu
road including Construction of Box
culvert at km 0/10 and
Construction of Retaining wall at
km 0/8,10
1264 01-CRIDP-22- Dharapuram Kangayam Widening from Single Lane to 1.00 170.00
23-O-1264 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Kangayam - Kodumudi road to
Oodayam road including
Reconstruction of Box culvert in
lieu of Existing damaged Culverts
at km 0/2, 0/4
Other Widening Total 7.90 1350.00
1265 01-CRIDP-22- Dharapuram Madathukula Strengthening at km 0/0 - 2/2 of 2.20 190.00
23-O-1265 m Karatholuvu - Komaralingam road
to Amaravathi canal road including
Cross Drainage Works and
Retaining Wall Works.
1266 01-CRIDP-22- Dharapuram Kangayam Strengthening at km 22/0 - 22/450 0.45 50.00
23-O-1266 of Mullipuram -
Bhagavathipalayam -
Silambagoundanvalasu road
Strengthening/Improvements
2.65 240.00
Total
Dharapuram Total 10.55 2752.42
1267 01-CRIDP-22- Erode Erode West Widening from Single Lane to Two 0.60 120.00
23-O-1267 Lane and Strengthening at km 0/0 -
0/6 of Erode - Sathy road to
Sadayampalayam road including
construction of storm water drain
at Km 0/4,0/6 and reconstruction
of culvert at km 0/6
Sl. No. Job Code Division Constituency Name of work Length Cost required
1270 01-CRIDP-22- Erode Bhavani Widening from Single Lane to 1.40 180.00
23-O-1270 Intermediate Lane and
Strengthening at km 1/0 - 2/4 of
Singampettai - Guruvareddiyur
road including Reconstruction of
Box culvert at km 1/2,1/4(i) in
lieu of existing damaged cut stone
culvert and Reconstruction of Box
culvert at km 1/4(ii),1/8(i),18(ii) in
lieu of existing damaged pipe
culvert
1271 01-CRIDP-22- Erode Perundurai Widening from Single Lane to 5.00 420.00
23-O-1271 Intermediate Lane and
Strengthening at km 7/0 - 12/0 of
Thudupathy - Nadupatty road
including Reconstruction of culvert
at Km 7/4,8/8,9/6,9/10,10/6
1272 01-CRIDP-22- Erode Bhavani Widening from Single Lane to 3.00 320.00
23-O-1272 Intermediate Lane and
Strengthening at km 0/8 - 3/6, 4/0
- 4/2 of Nallipalayam road
including Reconstruction of Box
culvert at km 0/10 in lieu of
existing damaged cut stone culvert
and Reconstruction of Box culvert
at km 1/8,10, 2/2,4,8,10 and 3/2
in lieu of existing damaged Pipe
culvert.
Other Widening Total 10.20 1580.00
1273 01-CRIDP-22- Erode Modakurichi Reconstruction of Culvert at Km 17.00
23-O-1273 2/6 of Mullamparappu -
Mettupalayam road including lead
drain
1274 01-CRIDP-22- Erode Modakurichi Reconstruction of Box Culvert at 43.00
23-O-1274 Km 6/10, 8/8 of
Ganapathipalayam - Sivagiri road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1277 01-CRIDP-22- Karur Aravakurichi Widening from Single Lane to 1.20 95.00
23-O-1277 Intermediate Lane and
Strengthening at km 2/0 - 3/2 of
Thennilai - Mylrangam road
including construction of culvert at
km 2/4 in lieu of existing damaged
narrow pipe culvert
1278 01-CRIDP-22- Karur Aravakurichi Widening from Single Lane to 2.00 132.00
23-O-1278 Intermediate Lane and
Strengthening at km 5/0 - 7/0 of
Periyathirumangalam road
1279 01-CRIDP-22- Karur Kulithalai Widening from Single Lane to 2.60 250.00
23-O-1279 Intermediate Lane and
Strengthening at km 0/0 - 2/6 of
perur - Singapur
Road
Other Widening Total 9.80 867.00
1280 01-CRIDP-22- Karur Kulithalai Strengthening at km 0/0 - 2/0, 3/0 3.40 82.00
23-O-1280 - 4/0, 5/4 - 5/8 of Nangavaram -
Nachalur road
Strengthening/Improvements
3.40 82.00
Total
1281 01-CRIDP-22- Karur Kulithalai Construction of Box Culvert at Km 15.00
23-O-1281 0/2 of Panjapatty - Keeranur road
in lieu of Existing Pipe Culvert
1283 01-CRIDP-22- Coimbatore Kavundampal Widening from Intermediate Lane 2.00 230.00
23-O-1283 ayam to Two Lane and Strengthening at
km 2/6 - 4/6 of
Kondaiyampalayam- Keeranatham
road including widening of culverts
and construction of retaining wall
and Drain
1284 01-CRIDP-22- Coimbatore Kinathukadav Widening from Intermediate Lane 1.20 165.00
23-O-1284 u to Two Lane and Strengthening at
km 0/0 - 0/4, Strengthening at km
0/4 - 0/8 of Madukkarai Market to
Kurumbapalayam Road including
Construction of CD works at Km
0/2, 0/4 (i), (ii) & Km 0/8
Sl. No. Job Code Division Constituency Name of work Length Cost required
1291 01-CRIDP-22- Coimbatore Coimbatore Providing Over Head Gantry board 24.20
23-O-1291 South at km 0/2 of Km 349/4 of NGM
Road to Sivanantha Colony Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1312 01-CRIDP-22- Coimbatore Sulur Widening from Single Lane to 1.20 85.00
23-O-1312 Intermediate Lane and
Strengthening at km 0/0 - 1/2 of
Km 138/2 of Salem - Cochin Road
to Arasur including Construction of
culvert and retaining Wall
1313 01-CRIDP-22- Coimbatore Avinashi Widening from Single Lane to 1.00 60.00
23-O-1313 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Ellapalayam -
Kembanaickenpalayam road
including widening of culverts
Sl. No. Job Code Division Constituency Name of work Length Cost required
1314 01-CRIDP-22- Coimbatore Kinathukadav Widening from Single Lane to 2.00 210.00
23-O-1314 u Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Palathurai - Pachapalayam road
construction of CD works
1315 01-CRIDP-22- Coimbatore Avinashi Widening from Single Lane to 2.40 250.00
23-O-1315 Intermediate Lane and
Strengthening at km 0/0 - 2/4 of
Pongalur - Kanuvakarai road
Other Widening Total 8.80 785.00
1316 01-CRIDP-22- Coimbatore Kavundampal Strengthening at km 0/0 - 4/270 of 4.27 300.00
23-O-1316 ayam Km 7/10 of Thudialur -
Saravanampatty road to
Keeranatham road including
Construction of Retaining wall at
Km 2/10
1317 01-CRIDP-22- Coimbatore Kavundampal Strengthening at km 4/0 - 5/4 of 1.40 333.00
23-O-1317 ayam Km 150/0 of Salem Cochin road to
Villankurichi including
Construction of drain
Strengthening/Improvements
5.67 633.00
Total
Coimbatore Total 18.07 2172.00
1318 01-CRIDP-22- Pollachi Pollachi Widening from Intermediate Lane 1.00 125.00
23-O-1318 to Two Lane and Strengthening at
km 0/0 - 1/0 of Km.3/2 of Pollachi -
Nadupuni road to Thalakarai.
including CD works at Km 0/10
Sl. No. Job Code Division Constituency Name of work Length Cost required
1330 01-CRIDP-22- Pollachi Valparai Widening from Single Lane to 1.40 250.00
23-O-1330 Intermediate Lane and
Strengthening at km 2/6 - 4/0 of
Km.2/0 of Kottur road to
Thenkaiparai (Via) Ponkaliyur.
Including Reconstruction of Culvert
at Km 2/8, 3/10, 3/4, 3/6 and
Construction of Retaining wall at
Km 2/6
1331 01-CRIDP-22- Pollachi Valparai Widening from Single Lane to 1.65 180.00
23-O-1331 Intermediate Lane and
Strengthening at km 7/2 - 8/850 of
Km.5/4 of Kottur - Thenkaiparai
road to Vettaikaranpudur.
including Reconstruction of culvert
at Km 7/8, 7/10
1332 01-CRIDP-22- Pollachi Pollachi Widening from Single Lane to 2.80 335.00
23-O-1332 Intermediate Lane and
Strengthening at km 0/0 - 2/8 of
Km.11/4 of Pollachi - Palakkad
Road to join Uthukuli -
Thappattaikilavanpudur Road.
including Construction Culvert at
Km 0/6, 1/8, 2/2 and 2/6 and
construction of retaining Wall at
km 0/10
1333 01-CRIDP-22- Pollachi Udumalaipett Widening from Single Lane to 1.83 275.00
23-O-1333 ai Intermediate Lane and
Strengthening at km 4/0 - 5/830 of
Samathur - Devanurpudur road to
Mamarathupatti. including CD
works at Km 4/2, 4/4, 4/10, 5/2,
5/6, 5/8(i), 5/8(ii) and 5/830
Sl. No. Job Code Division Constituency Name of work Length Cost required
1334 01-CRIDP-22- Pollachi Sulur Widening from Single Lane to 3.00 290.00
23-O-1334 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Senjeri puthur -
Patchagoundanpalayam road.
including CD works at Km 2/6
Other Widening Total 18.88 2270.00
Pollachi Total 19.88 3092.00
1335 01-CRIDP-22- Gobi Gobichettipal Construction of Retaining wall at 70.00
23-O-1335 ayam km 3/10 of Road from Km 3/6 of
Arasur Market-Nambiyur Market
road to Sundakkampalayam road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1352 01-CRIDP-22- Gobi Erode West Providing Cantilever Gantry board 13.00
23-O-1352 at km 0/8 of Chithode-Perode road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1360 01-CRIDP-22- Gobi Anthiyur Widening from Single Lane to 0.40 55.00
23-O-1360 Intermediate Lane and
Strengthening at km 3/6 - 4/0 of
Perunthalaiyur to join @ km 138/8
of Ooty - Mettupalayam - Sathy -
Gobi - Erode road including
reconstruction of culvert at Km
3/10 & Construction of Retaining
wall Works.
1361 01-CRIDP-22- Gobi Perundurai Widening from Single Lane to 1.00 135.00
23-O-1361 Intermediate Lane and
Strengthening at km 5/4 - 6/2,
Improvements at km 6/2 - 6/4 of
Chithode-Perode road to Kanjikoil
road including reconstruction of
culvert at Km 5/8, 5/10 &
Construction of Retaining wall and
Drain Works.
1362 01-CRIDP-22- Gobi Bhavanisagar Widening from Single Lane to 2.40 290.00
23-O-1362 Intermediate Lane and
Strengthening at km 12/6 - 14/0,
19/0 - 20/0 of Thalavady-
Kongahally road including
Reconstruction of Culvert at km
19/4,19/6,Construction of
Retaining wall at km 19/6
1363 01-CRIDP-22- Gobi Bhavanisagar Widening from Single Lane to 2.50 440.00
23-O-1363 Intermediate Lane and
Strengthening at km 16/0 - 18/5 of
Thalavady-Kongahally road
including Reconstruction of
Culvert at km
16/2,16/6(i),16/6(ii),16/10,17/6,1
8/2,Construction of Retaining wall
at km 16/2 and Construction of
Drain at km 17/10
1364 01-CRIDP-22- Gobi Anthiyur Widening from Single Lane to 4.60 450.00
23-O-1364 Intermediate Lane and
Strengthening at km 1/4 - 4/6,
Strengthening at km 0/0 - 1/4 of
Thanneerpandalpudur road
including Reconstruction of culvert
at km 0/4, 1/2,1/4,1/6, 1/10 (i),
1/10 (ii), 4/2, 4/6, including
Construction of Retaining wall.
1365 01-CRIDP-22- Gobi Anthiyur Widening from Single Lane to 4.00 450.00
23-O-1365 Intermediate Lane and
Strengthening at km 0/0 - 4/0 of
Pudukkaraipudur-Vellankoil road
including reconstruction of Culvert
at Km 0/8 & 3/8, Construction of
Culvert at Km 0/10 including
Construction of Retaining wall.
Sl. No. Job Code Division Constituency Name of work Length Cost required
1366 01-CRIDP-22- Gobi Erode West Widening from Single Lane to 3.80 575.00
23-O-1366 Intermediate Lane and
Strengthening at km 1/6 - 5/4 of
Nasiyanur-Attaiyampalayam road
including Reconstruction of culvert
at Km 1/8 (i), (ii), 2/4 (i), (ii), 3/2
(i), (ii), 3/4, 4/4, 4/6, 4/8 (i), (ii),
5/4, construction of culvert at Km
3/6, construction of Retaining wall
& Drain Works.
1367 01-CRIDP-22- Gobi Bhavani Widening from Single Lane to 3.40 440.00
23-O-1367 Intermediate Lane and
Strengthening at km 3/0 - 5/4, 5/8
- 6/4, , Improvements at km 5/4 -
5/8 of Pavandagoundanur-
Vettukirai road including
Reconstruction of culvert at Km
3/2, 4/4 (i), (ii), 4/6, widening of
culvert at Km 5/2, Construction of
Retaining wall & Drain Works
1368 01-CRIDP-22- Gobi Anthiyur Widening from Single Lane to 3.60 360.00
23-O-1368 Intermediate Lane and
Strengthening at km 0/0 - 3/6 of
Kondayampalayam-
Kanakkampalayam road including
Reconstruction of Box Culvert at
Km 0/2, 0/6, 1/2, 1/6, 2/4 and
Retaining wall at Km 1/2, 2/6
1369 01-CRIDP-22- Gobi Gobichettipal Widening from Single Lane to 2.00 190.00
23-O-1369 ayam Intermediate Lane and
Strengthening at km 1/0 - 2/0,
Improvements at km 0/0 - 1/0 of
Vaniputhur-Gunderipallam road
including Constuction of Box
culvert at Km 0/2, 1/4
Reconstruction of Box culvert at
Km 0/10, 1/2, 1/6 and
Construction of Drain at Km 0/2
and Retaining wall at Km 1/4
1370 01-CRIDP-22- Gobi Bhavanisagar Widening from Single Lane to 1.00 100.00
23-O-1370 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Ariyappampalayam to Mettur road
(Via) Ayyanar amman koil
including Construction of Box
Culvert at Km 2/6 and Retaining
wall at Km 2/2
1371 01-CRIDP-22- Gobi Bhavanisagar Widening from Single Lane to 1.00 200.00
23-O-1371 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Ikkarai Thathapalli-
Velliyampalayam road including
Reconstruction of Culvert at km
0/4, km 0/6,km 0/8 km 0/10 (i),
km 0/10 (ii), Construction of
Retaining wall at km 0/4,0/6,0/8
and Construction of productive
wall at km 0/10,1/2
Sl. No. Job Code Division Constituency Name of work Length Cost required
1372 01-CRIDP-22- Gobi Bhavanisagar Widening from Single Lane to 1.00 110.00
23-O-1372 Intermediate Lane and
Strengthening at km 6/0 - 7/0 of
Road from km 4/0 of Thalavady -
Kongahally road to State limit via
Susaipuram - Metalvadi - Arulvadi
road
1373 01-CRIDP-22- Gobi Gobichettipal Widening from Single Lane to 3.80 400.00
23-O-1373 ayam Intermediate Lane and
Strengthening at km 0/0 - 3/8 of
E.Chettipalayam-Moonampalli-
chinnakosanam road including
including Construction of Retaining
wall and Reconstruction of culvert
at km 0/8 & 0/10
Strengthening/Improvements
9.60 1028.00
Total
1380 01-CRIDP-22- Gobi Gobichettipal Construction of Box Culvert at Km 15.00
23-O-1380 ayam 6/10 of Nadupalayam-
Thottathupalayam road
1381 01-CRIDP-22- Gobi Perundurai Reconstruction of Box Culvert at 14.00
23-O-1381 Km 5/4 of Kavandapady-
Moolakkadai road in lieu of existing
cut stone slab culvert.
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
6.40 631.00
Total
1410 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 35.00
23-O-1410 alam km 6/2 of Dhavani road
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
1441 01-CRIDP-22- Tanjavur Pattukkottai Widening from Single Lane to 2.40 365.00
23-O-1441 Intermediate Lane and
Strengthening at km 12/0 - 14/4 of
Pinnayur - Enathi road including
reconstruction of Culvert at Km
14/2 and construction of Retaining
wall at km 13/2, 13/4
1442 01-CRIDP-22- Tanjavur Thiruvaiyaru Widening from Single Lane to 1.20 190.00
23-O-1442 Intermediate Lane and
Strengthening at km 0/0 - 1/2 of
Puthukudi - Rayamundanpatti
road including Reconstruction of
box culvert at km 0/4 (i), 0/4 (ii),
0/6
1443 01-CRIDP-22- Tanjavur Papanasam Widening from Single Lane to 1.80 300.00
23-O-1443 Intermediate Lane and
Strengthening at km 5/4 - 7/2 of
Manalur - Veeramangudy -
Someshwarapuram road including
reconstruction of culvert at Km Km
5/6, 6/2(i), (ii), 7/2 and
construction of Retaining wall at
Km 6/2
1444 01-CRIDP-22- Tanjavur Thiruvidaima Widening from Single Lane to 1.40 220.00
23-O-1444 rudur Intermediate Lane and
Strengthening at km 0/0 - 1/4 of
Vannakudi Village road including
reconstruction of culvert at km
0/8, 1/4
1445 01-CRIDP-22- Tanjavur Thiruvidaima Widening from Single Lane to 1.80 270.00
23-O-1445 rudur Intermediate Lane and
Strengthening at km 0/0 - 1/8 of
Koothanur - Keelasooriyamulai
Road including reconstruction of
culvert at km 0/6, 0/8, 3/6
1446 01-CRIDP-22- Tanjavur Papanasam Widening from Single Lane to 1.00 100.00
23-O-1446 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Ayyampettai - Agaramangudy road
1447 01-CRIDP-22- Tanjavur Thiruvidaima Widening from Single Lane to 1.20 162.00
23-O-1447 rudur Intermediate Lane and
Strengthening at km 3/6 - 4/8 of
Nagarasampettai road including
Reconstruction of culvert at km
4/2, 4/4
1448 01-CRIDP-22- Tanjavur Thiruvaiyaru Widening from Single Lane to 1.20 217.00
23-O-1448 Intermediate Lane and
Strengthening at km 4/4 - 5/6 of
Mehalathur - Pathalapettai road
including Reconstruction Box
culvert at km 4/8, 5/2, 5/4 (i) and
Junction Improvement at km 5/4
Sl. No. Job Code Division Constituency Name of work Length Cost required
1449 01-CRIDP-22- Tanjavur Thiruvaiyaru Widening from Single Lane to 1.20 180.00
23-O-1449 Intermediate Lane and
Strengthening at km 3/2 - 4/4 of
Mehalathur - Pathalapettai road
including Reconstruction of Box
culvert at km 3/8, 4/4 (ii) and
Construction of Retaining wall at
km 3/4
1450 01-CRIDP-22- Tanjavur Orathanadu Widening from Single Lane to 0.80 185.00
23-O-1450 Intermediate Lane and
Strengthening at km 15/2 - 16/0 of
Grand anaicut canal bank road
including Junction improvement at
Km 15/6 and Construction of
Retaining wall at km 15/4 ,15/6,
15/8, 15/10
1451 01-CRIDP-22- Tanjavur Peravurani Widening from Single Lane to 2.00 330.00
23-O-1451 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Perumagalur - Athani road
including Reconstruction of Culvert
at km 0/2, 0/4(i),(ii), 1/2, 1/4,
1/10
1452 01-CRIDP-22- Tanjavur Peravurani Widening from Single Lane to 1.00 140.00
23-O-1452 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Perumagalur - Athani road
including Reconstruction of culvert
at km 2/2,2/8
1453 01-CRIDP-22- Tanjavur Orathanadu Widening from Single Lane to 0.80 200.00
23-O-1453 Intermediate Lane and
Strengthening at km 1/2 - 2/0 of
Akkaraivattam -
Dhakshnamoorthypuram road
including Reconstruction of Culvert
at km 1/4(i),(ii), 1/6, 1/10, and
Construction of retaining wall at
km 1/6,10
1454 01-CRIDP-22- Tanjavur Thiruvidaima Widening from Single Lane to 3.40 563.00
23-O-1454 rudur Intermediate Lane and
Strengthening at km 0/0 - 3/4 of
Thiruneelakkudy - Kadalangudy
road including Reconstruction of
Box Culvert at km 1/4, 3/2 (i),(ii),
3/4 (i), (ii), and Construction of
RCC Retaining Wall at km 0/10
1455 01-CRIDP-22- Tanjavur Thiruvaiyaru Widening from Single Lane to 4.84 815.00
23-O-1455 Intermediate Lane and
Strengthening at km 6/4 - 11/235
of Road branching from K.M 3/10
of Vallam - Kallaperambur road to
Singaperumalkulam Municipal
limit. including Reconstruction of
Culvert at km 6/6,6/8,7/2 (i),(ii),
7/6 ,7/8, 8/4, 8/6, 8/10, 9/8,
10/2, 10/6 and Construction of
Retaining Wall at km 8/6, 10/2 &
10/4
Sl. No. Job Code Division Constituency Name of work Length Cost required
1463 01-CRIDP-22- Pudukottai Pudukkottai Widening from Single Lane to 2.00 290.00
23-O-1463 Intermediate Lane and
Strengthening at km 10/0 - 12/0 of
Adhanakkottai - Alangudi road
including reconstruction of box
culvert at km 11/2 and
construction of retaining wall at
Km11/4, 11/6
Sl. No. Job Code Division Constituency Name of work Length Cost required
1464 01-CRIDP-22- Pudukottai Gandarvakott Widening from Single Lane to 1.00 200.00
23-O-1464 ai Intermediate Lane and
Strengthening at km 1/0 - 2/0 of
Thirukattuppalli - Sengipatti -
Pattukkottai road to
Kaliyaranviduthy road including
reconstruction of box culvert at
km1/2, 1/4, 1/6, 1/8 and
construction of retaining wall at
km 1/4
1465 01-CRIDP-22- Pudukottai Gandarvakott Widening from Single Lane to 2.00 250.00
23-O-1465 ai Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
T.S.P road to Ambukoil road
including reconstruction of box
culvert at km0/6, 1/4, 1/6
1466 01-CRIDP-22- Pudukottai Gandarvakott Widening from Single Lane to 1.00 215.00
23-O-1466 ai Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Paravettivayal road including
reconstruction of box culvert at Km
0/2,4,8
1467 01-CRIDP-22- Pudukottai Alangudi Widening from Single Lane to 1.00 120.00
23-O-1467 Intermediate Lane and
Strengthening at km 19/0 - 20/0 of
km 12/2 of Pudukkottai -
Pattukkottai road to Venkatakulam
road including reconstruction of
box culvert at Km 19/2
1468 01-CRIDP-22- Pudukottai Pudukkottai Widening from Single Lane to 1.00 100.00
23-O-1468 Intermediate Lane and
Strengthening at km 17/0 - 18/0 of
Adhanakkottai - Alangudi road
1469 01-CRIDP-22- Pudukottai Alangudi Widening from Single Lane to 3.00 399.00
23-O-1469 Intermediate Lane and
Strengthening at km 2/0 - 5/0 of
Alangudi - Alangadu road
including reconstruction of box
culvert at Km3/8, 3/10, 4/10
Other Widening Total 16.40 2424.00
1470 01-CRIDP-22- Pudukottai Thirumayam Strengthening at km 0/0 - 2/490 of 2.49 170.00
23-O-1470 Km 0/8 of Vairavanpatti road to
nallavanpatti road (v)
Vedathalampatti
Sl. No. Job Code Division Constituency Name of work Length Cost required
1479 01-CRIDP-22- Tiruvarur Nannilam Widening from Single Lane to 2.10 385.00
23-O-1479 Intermediate Lane and
Strengthening at km 6/0 - 8/1 of
Manakkal - Achuthamangalam -
Vayalur road including
Reconstruction of Box culvert at
Km.6/2, 7/2, 7/10 and Retaining
wall at Km.7/10
Strengthening/Improvements
1.40 96.00
Total
Tiruvarur Total 11.46 1689.00
1481 01-CRIDP-22- Nagapattinam Kilvelur Widening from Single Lane to 2.40 325.00
23-O-1481 Intermediate Lane and
Strengthening at km 1/6 - 4/0 of
Pirathabaramapuram Village Road
1482 01-CRIDP-22- Nagapattinam Vedaranyam Widening from Single Lane to 5.20 590.00
23-O-1482 Intermediate Lane and
Strengthening at km 2/0 - 7/2 of
Thalainayar - Umbalacherry Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
1.60 170.00
Total
1485 01-CRIDP-22- Nagapattinam Kilvelur Reconstruction of Box Culvert at 25.00
23-O-1485 Km 0/2 of Puthupalli Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1497 01-CRIDP-22- Madurai Thirumangala Widening from Single Lane to 2.80 414.00
23-O-1497 m Intermediate Lane and
Strengthening at km 0/2 - 3/0 of
Anuppapatti-Veerampatti (via)
Sorikkampatti road including
Reconstruction of culverts
1498 01-CRIDP-22- Madurai Usilampatti Widening from Single Lane to 2.70 325.00
23-O-1498 Intermediate Lane and
Strengthening at km 0/0 - 2/7 of
Sedapatti-Kethuvarpatti road (via)
Jambalapuram road including
Reconstruction of Culvert at km
0/6 and construction of drain
1499 01-CRIDP-22- Madurai Sholavandan Widening from Single Lane to 2.80 415.00
23-O-1499 Intermediate Lane and
Strengthening at km 0/0 - 2/8 of
Vadipatti Railway Feeder road
including Reconstruction of Culvert
at Km 1/2, 1/4, 1/6, 2/2, 2/4,
2/6, 2/8 and Construction of
Retaining Wall at Km 0/2.
Sl. No. Job Code Division Constituency Name of work Length Cost required
1500 01-CRIDP-22- Madurai Sholavandan Widening from Single Lane to 2.00 255.00
23-O-1500 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Kuruvithurai-Vallabarkoil road
including Reconstruction of Culvert
at Km 1/2 and Construction of
Drain at Km 0/4.
1501 01-CRIDP-22- Madurai Sholavandan Widening from Single Lane to 1.20 200.00
23-O-1501 Intermediate Lane and
Strengthening at km 0/6 - 1/8 of
Neerathan village road including
Reconstruction of Culvert at Km
0/10(i), 0/10(ii), 1/6.
1502 01-CRIDP-22- Madurai Madurai East Widening from Single Lane to 1.00 175.00
23-O-1502 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Andarkottaram-Sakkimangalam
road including CD Works and
Protective Works.
1503 01-CRIDP-22- Madurai Usilampatti Widening from Single Lane to 1.60 275.00
23-O-1503 Intermediate Lane and
Strengthening at km 0/0 -1/6 of
Buskkaranpatti - Kakkiveeranpatti
road including Reconstruction
Culverts at 0/4, 0/6, 0/6(ii).
1504 01-CRIDP-22- Madurai Madurai East Widening from Single Lane to 1.45 306.00
23-O-1504 Intermediate Lane and
Strengthening at km 1/8 - 3/0, 3/4
- 3/650 of Lakshmipuram-
Kidaripatti road including CD
Works and Protective Works.
Other Widening Total 18.55 2765.00
1505 01-CRIDP-22- Madurai Sholavandan Strengthening at km 0/0 - 2/4 of 2.40 195.00
23-O-1505 Vagaikulam road including
Construction of CD works
1506 01-CRIDP-22- Madurai Sholavandan Strengthening at km 0/0 - 1/2 of 1.20 102.00
23-O-1506 Vikkiramangalam-Narayanapuram
road
Strengthening/Improvements
3.60 297.00
Total
1507 01-CRIDP-22- Madurai Melur Reconstruction of Minor Bridge at 82.00
23-O-1507 Km 1/6 of Keeranur road
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
6.32 441.80
Total
1523 01-CRIDP-22- Theni Cumbum Reconstruction of Box Culvert at 10.00
23-O-1523 Km 0/2 of T.Mettupatty -
Sakkulatthu Mettu road
1524 01-CRIDP-22- Theni Bodinayakan Reconstruction of Box Culvert at 12.00
23-O-1524 ur Km 1/4 of Thimminaickanpatty -
Solaimanaickanpatty road (via)
Pudukottai
1525 01-CRIDP-22- Theni Andipatti Construction of Box Culvert at 67.00
23-O-1525 0/10 of Ethakovil - Maravapatty
road including Well Protective wall
at km 0/2 and Construction of
Drain
Bridges/Culverts Total 89.00
Theni Total 17.32 1826.60
1526 01-CRIDP-22- Dindigul Palani Providing Metal Crash Barrier at 100.00
23-O-1526 km 1/8,10, 2/2, 3/2, 4/4,8 of
Goshen - Kilavarai Road
1527 01-CRIDP-22- Dindigul Palani Providing Metal Crash Barrier at 100.00
23-O-1527 km 5/4, 6/4,6, 7/2,4,8 of Goshen -
Kilavarai Road
1528 01-CRIDP-22- Dindigul Palani Providing Metal Crash Barrier at 100.00
23-O-1528 km 8/8, 9/2,6 of Goshen -
Kilavarai Road
1529 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 45.00
23-O-1529 km 1/6 of Mannavanur Village
Road
1530 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 45.00
23-O-1530 km 5/2,4 of Vilpatti Village Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1536 01-CRIDP-22- Dindigul Natham Widening from Single Lane to 2.00 540.00
23-O-1536 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Avilipatti Road including
Construction of Retaining wall km
1/4,1/6 Re-Construction of culvert
at km 0/2,8,10, 1/4,6,8, and
Construction of Drain at km 0/4,6
1537 01-CRIDP-22- Dindigul Natham Widening from Single Lane to 1.00 270.00
23-O-1537 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Avilipatti Road including
Construction of Retaining wall at
km 2/4,2/6 , Construction of
Drain at km 2/8 and
Reconstruction of culvert at km
2/4(i), (ii), 2/6
Other Widening Total 3.00 810.00
1538 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 200.00
23-O-1538 km 17/2 of Periyakulam -
Kodaikkanal road (via) Adukkam
1539 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 30.00
23-O-1539 km 6/4,6 of Poolathur Village Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1554 01-CRIDP-22- Palani Palani Widening from Single Lane to 1.00 210.00
23-O-1554 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Ayakudi -Varathapattinam Road
including Construction of Culvert
at Km 0/2, 0/4(i), 0/4(ii), 0/4(iii),
0/6(i), 0/6 (ii), 0/6 (iii), 0/6 (iv)
including construction of Drain
1555 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 2.60 287.00
23-O-1555 m Intermediate Lane and
Strengthening at km 0/0 - 2/6 of
Vilvathampatti Road including
Construction of Culverts at Km
0/2, 0/4, 0/8, 1/6
1556 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 1.20 170.00
23-O-1556 m Intermediate Lane and
Strengthening at km 7/0 - 8/2 of
Kalanjipatti -Moonur Road
including Widening of Pipe culvert
at km 7/2, Construction of Drain
at km 7/8 and Construction of
retaining wall in the existing bridge
approaches at km 7/8
1557 01-CRIDP-22- Palani Vedasandur Widening from Single Lane to 2.60 245.00
23-O-1557 Intermediate Lane and
Strengthening at km 2/8 - 5/4 of
Kasipalayam- Koombur Road
including Reconstruction of Box
culvert at Km 3/4 & 3/6 and
Construction of Toe wall at Km
5/4.
Sl. No. Job Code Division Constituency Name of work Length Cost required
1558 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 2.20 340.00
23-O-1558 m Intermediate Lane and
Strengthening at km 0/0 - 2/2 of
Veeralapatti Village Road including
Reconstruction of Culvert at km
0/4, Widening of slab culvert at km
1/2 & 1/8, Construction of culvert
at km 2/2, and Construction of
Retaining wall at km 0/4, 0/6, 1/8
& 2/2 and Construction of Tank
Bund Protective wall at km 1/2
1559 01-CRIDP-22- Palani Vedasandur Widening from Single Lane to 3.00 335.00
23-O-1559 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Dindigul -Karur Road to
Servaikaranpatti Road (via)
Poosaripatti including
Reconstruction of Box culverts at
Km 0/4, 0/8(i), 0/8(ii), 1/6, 1/8 &
2/6 and Construction of Toe wall at
Km 2/6 and Providing CC
Pavement at Km 1/2.
1560 01-CRIDP-22- Palani Vedasandur Widening from Single Lane to 2.70 260.00
23-O-1560 Intermediate Lane and
Strengthening at km 12/0 - 13/0,
13/5 - 15/2 of Puliyampatti-
Koombur Road including
Reconstruction of Box culvert at
Km 13/8 and Construction of Toe
wall at Km 13/8.
1561 01-CRIDP-22- Palani Vedasandur Widening from Single Lane to 6.00 620.00
23-O-1561 Intermediate Lane and
Strengthening at km 0/0 - 6/0 of
D.Gudalore- Vellianai Road
including Reconstuction of
Boxculverts at Km 0/8, 2/4, 3/4,
3/8, 4/2, 4/8, 5/6 & 5/8 and
Construction of Toe wall at Km 0/4
and Construction of Well Protective
wall at Km 4/8.
1562 01-CRIDP-22- Palani Athoor Widening from Single Lane to 1.00 90.00
23-O-1562 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Kedaiyerambu -Palakkanuthu Road
1563 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 1.80 235.00
23-O-1563 m Intermediate Lane and
Strengthening at km 0/0 - 1/8 of
Markkampatti -Coimbatore District
Limit Road including
Reconstruction of culvert at km
0/4 and Construction of Drain at
km 0/2
1564 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 2.00 190.00
23-O-1564 m Intermediate Lane and
Strengthening at Km 3/0 - 5/0 of
Akkaraipatti - Thummalapatti
including Construction of Culvert
at Km 4/6
Sl. No. Job Code Division Constituency Name of work Length Cost required
1565 01-CRIDP-22- Palani Palani Widening from Single Lane to 1.60 205.00
23-O-1565 Intermediate Lane and
Strengthening at Km 0/0 - 1/6 of
Coimbatore -Dindigul Road to
Marappagoun danvalasu Road
including Construction of culverts
at Km 0/4 (i), (ii), 0/6, 0/8(i), (ii),
0/10
1566 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 1.60 170.00
23-O-1566 m Intermediate Lane and
Strengthening at Km 0/0 - 1/6 of
Devachinnampatty to Veriyapur
Road including Reconstruction of
Box culvert at km 0/2, Widening of
Pipe culvert at km 0/8, 0/10, 1/4
& 1/6, Construction of Drain at km
1/2 and Construction of Toe wall at
km 0/2, 0/8 & 1/6
Sl. No. Job Code Division Constituency Name of work Length Cost required
1582 01-CRIDP-22- Sivagangai Tirupattur Widening from Single Lane to 3.10 400.00
23-O-1582 Intermediate Lane and
Strengthening at km 4/0 - 7/1 of
Kanadukathan - Kadiyapatti road
including reconstruction of culverts
and construction of retainning wall
1583 01-CRIDP-22- Sivagangai Karaikudi Widening from Single Lane to 1.40 180.00
23-O-1583 Intermediate Lane and
Strengthening at km 2/0 - 3/4 of
Sakkottai - Paravayal road
including reconstruction of culverts
1584 01-CRIDP-22- Sivagangai Sivaganga Widening from Single Lane to 1.20 177.00
23-O-1584 Intermediate Lane and
Strengthening at km 5/0 - 5/2,
8/2 - 9/2 of Satharasankottai -
Sooranam road Including
Reconstruction of culvert
1585 01-CRIDP-22- Sivagangai Sivaganga Widening from Single Lane to 2.00 215.00
23-O-1585 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Solapuram - Idayamelur road
including Reconstruction of culvert
1586 01-CRIDP-22- Sivagangai Tirupattur Widening from Single Lane to 2.60 269.00
23-O-1586 Intermediate Lane and
Strengthening at km 2/4 - 3/0, 4/4
- 6/4 of V. Pudur - Palakkurichi
road including reconstruction of
culverts
1587 01-CRIDP-22- Sivagangai Manamadurai Widening from Single Lane to 2.00 235.00
23-O-1587 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Pudur - Vallakulam road including
Reconstruction of culvert
Sl. No. Job Code Division Constituency Name of work Length Cost required
1588 01-CRIDP-22- Sivagangai Tirupattur Widening from Single Lane to 2.40 259.00
23-O-1588 Intermediate Lane and
Strengthening at km 1/0 - 2/6,
5/2 - 6/0 of Singampunari -
Kumaripatti road including
reconstruction of culverts
1589 01-CRIDP-22- Sivagangai Karaikudi Widening from Single Lane to 3.20 400.00
23-O-1589 Intermediate Lane and
Strengthening at km 0/0 - 3/2 of
Madurai - Thondi road to
Sirunallur road including
Reconstruction of Culverts
1590 01-CRIDP-22- Sivagangai Manamadurai Widening from Single Lane to 1.60 160.00
23-O-1590 Intremediate Lane at km 0/0 - 1/6
of Keeladi to Parani Chamber road
including Reconstruction of
Culverts Km 0/2, Construction of
Retaining wall Km 0/8,10 and
construction of Drainage at Km 0/4
1592 01-CRIDP-22- Sivagangai Sivaganga Strengthening at km 2/0 - 2/4, 5/0 4.80 480.00
23-O-1592 - 5/4, 9/0 - 10/0, 11/0 - 12/0,
13/0 - 15/0 of Thanjakoor to
meet Thiruppuvanam - Pulvaikarai
road junction
Sl. No. Job Code Division Constituency Name of work Length Cost required
1603 01-CRIDP-22- Ramnad Tiruvadanai Widening from Single Lane to 1.40 270.00
23-O-1603 Intermediate Lane and
Strengthening at km 4/0 - 5/4 of
N.H.210 to Vilathur Road
including CD works
Other Widening Total 5.30 915.00
Ramnad Total 11.30 2125.00
Madurai Circle Total 113.39 17981.60
1604 01-CRIDP-22- Tirunelveli Ambasamudr Urban Improvements - Widening 2.00 300.00
23-O-1604 am from Two Lane to EndtoEnd and
Improvements at km 0/0 - 2/0 of
Cheranmahadevi River Road
including Reconstruction of Culvert
at km 1/4 ,1/8 and paver block.
1606 01-CRIDP-22- Tirunelveli Tirunelveli Widening from Two Lane to Two 0.80 253.00
23-O-1606 Lane with Paved Shoulders and
Strengthening at km 0/0 - 0/8 of
North Mount Road including CD
Works
1607 01-CRIDP-22- Tirunelveli Ambasamudr Widening from Single Lane to 3.00 288.00
23-O-1607 am Intermediate Lane and
Strengthening at km 3/0 - 6/0 of
Karisoolnthamangalam -
Kurangumadam Road
1608 01-CRIDP-22- Tirunelveli Tirunelveli Widening from Single Lane to 1.00 130.00
23-O-1608 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Thalaiyuthu - Rastha Road
including CD Works
Sl. No. Job Code Division Constituency Name of work Length Cost required
1609 01-CRIDP-22- Tirunelveli Nanguneri Widening from Single Lane to 2.93 310.00
23-O-1609 Intermediate Lane and
Strengthening at km 3/1 - 5/7,
Strengthening at km 5/7 - 6/032 of
Vallioor - Rajapudur Road
including CD works
1610 01-CRIDP-22- Tirunelveli Sankarankovi Widening from Single Lane to 2.00 208.00
23-O-1610 l Intermediate Lane and
Strengthening at km 19/0 - 21/0 of
Kalugumalai - Devarkulam Road
including CD works
Sl. No. Job Code Division Constituency Name of work Length Cost required
1626 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 0.60 63.00
23-O-1626 ur Intermediate Lane and
Strengthening at km 0/0 - 0/545,
Strengthening at km 0/545 - 0/6 of
Ariyanayagipuram -
Arunachalapuram road
1627 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 3.40 404.00
23-O-1627 ur Intermediate Lane and
Strengthening at km 0/0 - 3/4 of
Road branching from km 5/2 of
Sankarankovil - Veerasigamani
road to Alangulam road including
Reconstruction of Minor Bridge at
Km 3/2 and CD Works
1628 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 2.20 255.00
23-O-1628 ur Intermediate Lane and
Strengthening at km 0/8 - 1/0, 2/0
- 4/0 of Alangulam -
Veerasigamani road including CD
Works
1629 01-CRIDP-22- Tenkasi Alangulam Widening from Single Lane to 2.00 236.00
23-O-1629 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Andipatti road including box
culvert at km 0/2 , 1/2 ,1/8 and
retaining wall at km 1/8
1630 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 1.40 125.00
23-O-1630 ur Intermediate Lane and
Strengthening at km 1/8 - 3/0, 3/0
- 3/2 of Nelkattumseval - Patcheri -
Paraipatti road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1631 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 2.60 241.00
23-O-1631 ur Intermediate Lane and
Strengthening at km 0/0 - 2/6 of
Road branching from
Nelkattumseval-Ammankulam road
to Ramachandrapuram road
including CD Works
1632 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 1.40 155.00
23-O-1632 ur Intermediate Lane and
Strengthening at km 3/0 - 4/4 of
Nagaram - Sankarankovil road
including CD Works
1633 01-CRIDP-22- Tenkasi Tenkasi Widening from Single Lane to 3.60 412.00
23-O-1633 Intermediate Lane and
Strengthening at km 0/0 - 2/0,
Widening from Single Lane to
Intermediate Lane and
Improvements at km 2/4 - 3/6 ,
Improvements at km 2/0 - 2/4 of
Kulayaneri - Rettaikulam road
including CD Works
1634 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 2.65 291.00
23-O-1634 ur Intermediate Lane and
Strengthening at km 14/2 - 16/850
of Othakkadai -
Karivalamvanthanallur road
including CD Works
1635 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 2.00 194.00
23-O-1635 ur Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Naranapuram - Keelapudur road
including CD Works
1636 01-CRIDP-22- Tenkasi Alangulam Widening from Single Lane to 2.00 200.00
23-O-1636 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Alangulam - Thuthikulam Road
including CD works
Other Widening Total 26.25 2798.00
1637 01-CRIDP-22- Tenkasi Tenkasi Strengthening at km 0/0 - 2/0 of 2.00 190.00
23-O-1637 Tenkasi - Ayiraperi road including
paver block at km 0/2 and box
culvert at km 0/6, 0/10(i),0/10
(ii),0/10 (iii)and side drain at km
0/2
1638 01-CRIDP-22- Tenkasi Alangulam Strengthening at km 0/0 - 2/0 of 2.00 141.00
23-O-1638 Mahilvannanathapuram -
Mailappapuram road including
paver block at km 0/10 and box
culvert at km 1/4 ,1/8
1639 01-CRIDP-22- Tenkasi Tenkasi Strengthening at km 3/0 - 4/4 of 1.40 85.00
23-O-1639 Road branching from km 11/2 of
Athiyuthu - Surandai road to
Vadiyoor road
Strengthening/Improvements
5.40 416.00
Total
1640 01-CRIDP-22- Tenkasi Vasudevanall Construction of Minor Bridge at Km 122.00
23-O-1640 ur 2/4 of Nagaram -
Subramaniyapuram road
1641 01-CRIDP-22- Tenkasi Vasudevanall Construction of Minor Bridge at Km 122.00
23-O-1641 ur 3/10 of Devipattinam - Western
Ghat Km road
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
1665 01-CRIDP-22- Virudhunagar Tiruchuli Widening from Single Lane to 1.60 200.00
23-O-1665 Intermediate Lane and
Strengthening at km 0/0 - 1/6 of
Trichy-Tuticorin Road to
S.Kallupatty Road including CD
Works
Sl. No. Job Code Division Constituency Name of work Length Cost required
1666 01-CRIDP-22- Virudhunagar Sattur Widening from Single Lane to 6.63 645.00
23-O-1666 Intermediate Lane and
Strengthening at km 0/0 - 6/63 of
Thayilpatti -Vijayakarisalkulam
Road including Reconstruction of
culvert at Km
0/10,1/4,2/2,5/10,6/4 and
Construction of Culvert at Km
4/4,4/6 and Construction of Drain
at Km 3/130-3/480 and
Construction of Breast wall at Km
5/380-5/455 and Construction of
Retaining wall at Km 0/210-0/240
1667 01-CRIDP-22- Virudhunagar Aruppukkotta Widening from Single Lane to 2.00 200.00
23-O-1667 i Intermediate Lane and
Strengthening at km 5/0 - 7/0 of
Avudayapuram - Kottor Road
including CD works
1668 01-CRIDP-22- Virudhunagar Aruppukkotta Widening from Single Lane to 3.80 530.00
23-O-1668 i Intermediate Lane and
Strengthening at km 0/0 - 3/8 of
Melamadai - Palavanatham Road to
Kallupatti Road including CD work
Strengthening/Improvements
13.50 1352.00
Total
1674 01-CRIDP-22- Virudhunagar Tiruchuli Reconstruction of Box Culvert at 45.00
23-O-1674 Km 9/4(i), 9/4(ii), 9/6 of
Veeracholan- Kuraiyaravasithan
Road
1675 01-CRIDP-22- Virudhunagar Tiruchuli Reconstruction of Box Culvert at 65.00
23-O-1675 Km 0/2,8, 1/2,6,8 of
Kethanaickenpatti -Seneilaikudi
Road
1676 01-CRIDP-22- Virudhunagar Tiruchuli Reconstruction of Culvert at Km 35.00
23-O-1676 1/10 of Kethanaickenpatti -
Seneilaikudi Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1684 01-CRIDP-22- Tuticorin Vilathikulam Widening from Intermediate Lane 4.75 676.00
23-O-1684 to Two Lane and Strengthening at
km 9/850 - 10/4, 10/650 - 14/6,
, Strengthening at km 10/4 -
10/650 of Nagalapuram -
Melakaranthai - Masarpatti -
Rajapatti Road including CD
Works at Km 9/10, 10/8, 10/10,
11/4, 11/6, 12/2 (i), 12/2 (ii),
13/2, 14/2, 14/6 (i) & 14/6 (ii)
1685 01-CRIDP-22- Tuticorin Kovilpatti Widening from Single Lane to Two 2.20 330.00
23-O-1685 Lane and Strengthening at km
11/0 - 13/2 of Iyyanaroorthu road
including Reconstuction of Culvert
at Km 11/2 & 11/10
1686 01-CRIDP-22- Tuticorin Kovilpatti Widening from Single Lane to Two 1.20 260.00
23-O-1686 Lane and Strengthening at km 0/0 -
1/2 of Kalugumalai-Deverkulam
road including Reconstruction of
Culvert at Km 0/2, 0/10 & 1/2,
Construction of Drain at Km 0/0-
1/2
CMRDP IL to DL Total 10.64 1593.00
Sl. No. Job Code Division Constituency Name of work Length Cost required
1687 01-CRIDP-22- Tuticorin Tiruchendur Widening from Single Lane to 5.00 534.00
23-O-1687 Intermediate Lane and
Strengthening at km 0/0 - 1/2, 2/2
- 4/4 Strengthening at km 7/8 -
9/0, 10/8 - 11/2 of Kulasi-
Udangudi (Via) Thandavankadu
road including CD Works at Km
0/10
1688 01-CRIDP-22- Tuticorin Tiruchendur Widening from Single Lane to 3.40 365.00
23-O-1688 Intermediate Lane and
Strengthening at km 3/0 - 6/4 of
Authoor-Punnakayal road
including CD Works at Km 4/10,
6/2
1689 01-CRIDP-22- Tuticorin Tiruchendur Widening from Single Lane to 1.65 167.00
23-O-1689 Intermediate Lane and
Strengthening at km 0/0 - 0/650,
3/0 - 4/0 of Manadu-
Thanadapathu-Seerkatchi road
1690 01-CRIDP-22- Tuticorin Tiruchendur Widening from Single Lane to 2.20 223.00
23-O-1690 Intermediate Lane and
Strengthening at km 2/0 - 4/2 of
Road branching form km 21/8 of
Thisayanvilai-Udangudi road to join
at km 4/2 of Meingnapuram-
Kadatchapuram (via) Vagaivilai
road
1691 01-CRIDP-22- Tuticorin Vilathikulam Widening from Single Lane to 1.20 210.00
23-O-1691 Intermediate Lane and
Strengthening at km 13/0 - 14/2 of
Pillayarnatham-Eppodumvendran
road including CD Works at Km
13/8
1692 01-CRIDP-22- Tuticorin Vilathikulam Widening from Single Lane to 1.80 190.00
23-O-1692 Intermediate Lane and
Strengthening at km 1/8 - 3/6 of
Vilathikulam-Perunali road
including CD Works at Km 2/6,
3/4
1693 01-CRIDP-22- Tuticorin Ottapidaram Widening from Single Lane to 2.00 179.00
23-O-1693 Intermediate Lane and
Strengthening at km 5/0 - 6/0, 9/0
- 10/0 of Srivaikundam-Vallanadu
road
1694 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Single Lane to 1.00 186.00
23-O-1694 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Thoothukudi-Tiruchendur road
Kovankadu road including
construction of box culvert at km
1/8
1695 01-CRIDP-22- Tuticorin Tiruchendur Widening from Single Lane to 7.24 690.00
23-O-1695 Intermediate Lane and
Strengthening at km 0/0 - 1/4, 2/8
- 8/635 of Meignanapuram-
Kayamozhi-Therikudiyiruppu road
1696 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Single Lane to 1.60 213.00
23-O-1696 Intermediate Lane and
Strengthening at km 0/0 - 1/6 of
Melaseriyendur road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1697 01-CRIDP-22- Tuticorin Vilathikulam Widening from Single Lane to 3.40 650.00
23-O-1697 Intermediate Lane and
Strengthening at Km 11/6 - 15/0
of Uchinatham - Soorangudi Road
including CD works
1698 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Single Lane to 3.40 280.50
23-O-1698 Intermediate Lane and
Strengthening at Km 3/4-5/0 &
11/0-12/8 of Sathankulam -
Periyathalai road
Other Widening Total 33.89 3887.50
1699 01-CRIDP-22- Tuticorin Vilathikulam Strengthening at Km 0/0 - 1/8 of 1.80 75.00
23-O-1699 S.Kumarapuram Road
Strengthening/Improvements
21.30 1363.00
Total
1708 01-CRIDP-22- Tuticorin Thoothukudi Construction of Box Culvert at Km 18.00
23-O-1708 0/10 of Sankaraperi-
Ramanathapuram road
1709 01-CRIDP-22- Tuticorin Srivaikuntam Construction of Box Culvert at Km 12.00
23-O-1709 7/4 of Therkkukaraseri-
Sivanthipatti road
1710 01-CRIDP-22- Tuticorin Srivaikuntam Construction of Box Culvert at Km 35.00
23-O-1710 3/0 of Alwarthoppu-
Sirvaramamangalm road
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
3.00 480.00
Total
Thiruvallur Total 3.00 480.00
Chennai Circle Total 3.00 480.00
1738 01-CRIDP-22- Tiruvannamal Kilpennathur Widening from Single Lane to 4.00 460.00
23-P-1738 ai Intermediate Lane and
Strengthening at km 7/0 - 11/0 of
Usambadi Periyakilambadi road
including Reconstruction of
Culvert at Km 7/2, 7/4, 7/6, 8/4,
8/8, 9/4, 9/8, 10/4, 10/10
Other Widening Total 4.00 460.00
Tiruvannamalai Total 4.00 460.00
1739 01-CRIDP-22- Ranipet Arakkonam Widening from Single Lane to 3.00 290.00
23-P-1739 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Km 2/4 of Arakkonam Thiruvallur
Road to Chinnamosur Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1743 01-CRIDP-22- Cheyyar Vandavasi Widening from Single Lane to 3.00 390.00
23-P-1743 Intermediate Lane and
Strengthening at km 2/0 - 5/0 of
Arcot Tindivanam road to
Mavalavady road including
Reconstruction of Culvert at
Km.2/4, 2/6, 2/8, 3/2, 3/10 and
Construction of Culvert at Km.4/2
1747 01-CRIDP-22- Kallakurichi Sankarapura Widening from Single Lane to 1.00 191.00
23-P-1747 m Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Chinnasalem Pandiyankuppam
Road including construction of
retaining wall at km.2/2, 2/4, 2/6
& 2/8
1748 01-CRIDP-22- Kallakurichi Kallakurichi Widening from Single Lane to 2.60 378.00
23-P-1748 Intermediate Lane and
Strengthening at km 7/2 - 9/8 of
Chinnasalem V. Mamandhur Road
(via) Nainarpalayam including
reconstruction of culvert at km 8/4
(i), (ii), (iii) & construction of
retaining wall at km 7/10 & 8/2.
Sl. No. Job Code Division Constituency Name of work Length Cost required
1749 01-CRIDP-22- Cuddalore Tittakudi Widening from Single Lane to 3.60 420.00
23-P-1749 Intermediate Lane and
Strengthening at km 6/0 - 8/6,
Strengthening at km 8/6 - 9/6 of
Tholudur-Vadagarampoondi road
reconstruction of culvert at Km
6/2, 6/6, 7/6, 8/2, 8/4 & 8/6
Sl. No. Job Code Division Constituency Name of work Length Cost required
1755 01-CRIDP-22- Dharmapuri Harur Widening from Single Lane to 2.40 515.00
23-P-1755 Intermediate Lane and
Strengthening at km 2/6 - 5/0 of
Sitlingli - Velanur road including
reconstruction of culvert at Km
2/8, 3/4, 3/6 (i), (ii), 3/8, 3/10,
4/4, 4/6, 4/10 and construction of
retaining wall at km 4/6
1756 01-CRIDP-22- Dharmapuri Harur Widening from Single Lane to 2.00 218.00
23-P-1756 Intermediate Lane and
Strengthening at km 5/0 - 7/0 of
Andiyur - Ammapet road including
reconstruction of culvert at Km
5/2, 5/4
Other Widening Total 7.00 1123.00
Dharmapuri Total 7.00 1123.00
1757 01-CRIDP-22- Krishnagiri Bargur Widening from Single Lane to 2.00 300.00
23-P-1757 Intermediate Lane and
Strengthening at km 2/0 - 4/0 of
Pannadhur - Bandarahalli road to
DTV and Vadamangalam link road
(Road - A) including CD works and
Retaining Wall
Other Widening Total 2.00 300.00
Krishnagiri Total 2.00 300.00
Salem Circle Total 16.60 2358.00
1758 01-CRIDP-22- Tiruppur Avinashi Widening from Single Lane to 3.80 395.00
23-P-1758 Intermediate Lane and
Strengthening at km 8/0 - 11/8 of
Avinashi - Kootappalli road
including Construction of box
culverts at km 9/10 (i), (ii),11/4 in
lieu of existing damaged pipe
culverts
Other Widening Total 3.80 395.00
Tiruppur Total 3.80 395.00
1759 01-CRIDP-22- Dharapuram Dharapuram Widening from Single Lane to 4.00 310.00
23-P-1759 Intermediate Lane and
Strengthening at km 0/0 - 3/0, 4/0
- 5/0 of Dharapuram -
Mathukampalayam road. including
Reconstruction of Box Culvert at
Km 0/4, 0/10, 1/4, 1/8, 2/4, 2/6,
2/8(i), 2/10 & 4/10
1760 01-CRIDP-22- Dharapuram Madathukula Widening from Single Lane to 1.00 180.00
23-P-1760 m Intermediate Lane and
Strengthening at km 1/4 - 2/4 of
Kolumam - Kallapuram road.
including Cross Drainage Works
Other Widening Total 5.00 490.00
Dharapuram Total 5.00 490.00
Sl. No. Job Code Division Constituency Name of work Length Cost required
1761 01-CRIDP-22- Erode Erode West Widening from Single Lane to 1.40 215.00
23-P-1761 Intermediate Lane and
Strengthening at km 1/6 - 3/0 of
Kolathupalayam - Kongampalayam
road (via) Ellapalayam including
reconstruction of culvert at km
1/8,2/2,2/10, construction of
retaining wall at km 2/2,2/4 and
construction of drain at km
2/8,2/10
1762 01-CRIDP-22- Erode Anthiyur Widening from Single Lane to 1.40 275.00
23-P-1762 Intermediate Lane and
Strengthening at km 5/0 - 6/0
Strengthening at km 6/0 - 6/4 of
Vellitiruppur - Alampalayam road
including Reconstruction of
Culvert at km 5/2(i), (ii) & Km 5/8,
dip raising at Km 5/2,4 and
Construction of Drain at Km 5/0-
5/6
Other Widening Total 2.80 490.00
Erode Total 2.80 490.00
Tiruppur Circle Total 11.60 1375.00
1763 01-CRIDP-22- Pollachi Sulur Widening from Single Lane to 4.60 475.00
23-P-1763 Intermediate Lane and
Strengthening at km 0/0 - 4/6 of
Kattampatti - Koduvai road to
J.Krishnapuram. including
Reconstruction of Culvert at km
0/4, 3/8 Widening of Culvert at km
1/10
Other Widening Total 4.60 475.00
Pollachi Total 4.60 475.00
1764 01-CRIDP-22- Gobi Gobichettipal Widening from Single Lane to 3.00 300.00
23-P-1764 ayam Intermediate Lane and
Strengthening at km 2/0 - 5/0 of
Indranagar-Thoppuvinayagar road
including Reconstruction of Box
Culver at Km 2/4(i), 2/4(ii) 3/2,
3/10 and 4/2 and retaining wall at
Km 3/10, 4/2
Other Widening Total 3.00 300.00
Gobi Total 3.00 300.00
1765 01-CRIDP-22- Udhagai Coonoor Strengthening at km 3/2 - 9/0 of 5.80 490.00
23-P-1765 Kaikatty Kolacombai road including
CD works and Protective works.
Strengthening/Improvements
5.80 490.00
Total
Udhagai Total 5.80 490.00
Coimbatore Circle Total 13.40 1265.00
1766 01-CRIDP-22- Trichy Thuraiyur Widening from Single Lane to 1.80 260.00
23-P-1766 Intermediate Lane and
Strengthening at km 9/0 - 10/8 of
Pulivalam - Abinimangalam-
Edumalai Road including
Reconstruction of Box culverts at
km 9/2, 9/6 & 10/4 and Bus Lay
bye at km 9/6
Other Widening Total 1.80 260.00
Sl. No. Job Code Division Constituency Name of work Length Cost required
1769 01-CRIDP-22- Tanjavur Papanasam Widening from Single Lane to 2.00 335.00
23-P-1769 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Sathiamangalam - Valkkai road
including Reconstruction of Culvert
at Km 0/6, 0/10, 1/6(i), (ii), 1/10
and Construction of Retaining Wall
at Km 1/10
1770 01-CRIDP-22- Tanjavur Peravurani Widening from Single Lane to 2.00 322.00
23-P-1770 Intermediate Lane and
Strengthening at km 7/0 - 9/0 of
Alivalam - Nambivayal road
including Reconstruction of Culvert
at Km 7/6, 7/8(i), (ii), 8/4, 8/6,
8/8 & 8/10
1771 01-CRIDP-22- Tanjavur Pattukkottai Widening from Single Lane to 1.00 140.00
23-P-1771 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of 4
B Rajamadam road including
Reconstruction of Culvert 0/2
1773 01-CRIDP-22- Pudukottai Aranthangi Widening from Single Lane to 2.40 475.00
23-P-1773 Intermediate Lane and
Strengthening at km 2/6 - 5/0 of
Kanur - Thiruppunavasal road
including reconstruction of culvert
at Km 2/8, 2/10, 3/2, 3/4, 3/6,
3/8, 4/2(i), 4/2(ii), 4/4, 4/6(i),
4/6(ii), 4/10
Sl. No. Job Code Division Constituency Name of work Length Cost required
1774 01-CRIDP-22- Pudukottai Aranthangi Widening from Single Lane to 2.40 500.00
23-P-1774 Intermediate Lane and
Strengthening at km 4/0 - 5/4, 7/0
- 8/0 of Avudayarkoil -
Kottaipattinam road including
reconstruction of box culvert at Km
4/8, 5/4, 7/2,4 and construction of
retaining wall at Km 4/2,4,6,
7/2,8,10
Other Widening Total 5.80 1175.00
Pudukottai Total 5.80 1175.00
1775 01-CRIDP-22- Tiruvarur Thiruthuraipo Widening from Single Lane to 2.00 272.00
23-P-1775 ondi Intermediate Lane and
Strengthening at km 4/0 - 6/0 of
Vilakkudi - Manali road including
Reconstruction of Box culvert at
Km.4/6
1776 01-CRIDP-22- Tiruvarur Thiruvarur Widening from Single Lane to 4.20 633.00
23-P-1776 Intermediate Lane and
Strengthening at km 0/0 - 4/2 of
Mangudi - Nagalore -
Periyathumbur road
Other Widening Total 6.20 905.00
Tiruvarur Total 6.20 905.00
1777 01-CRIDP-22- Nagapattinam Nagapattinam Widening from Single Lane to 1.20 200.00
23-P-1777 Intermediate Lane and
Strengthening at km 4/0 - 5/2 of
Andipandal - Thirumarugal Road
including Reconstruction of Box
Culvert at Km 4/6, 4/10(i),
4/10(ii)
Other Widening Total 1.20 200.00
1778 01-CRIDP-22- Nagapattinam Nagapattinam Strengthening at km 0/0 - 2/2 of 2.20 215.00
23-P-1778 Manjakollai - Anthanapettai Road
including Reconstruction of box
culvert at km 0/2, 0/4, 1/8
Sl. No. Job Code Division Constituency Name of work Length Cost required
Strengthening/Improvements
6.33 490.00
Total
Theni Total 6.33 490.00
1787 01-CRIDP-22- Palani Palani Widening from Single Lane to 2.00 290.00
23-P-1787 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
K.C.Patty- Patchalur Road
including Widening of slab culvert
at km 0/8, Widening of Pipe culvert
at km 0/4 (i), 0/4 (II), 0/6 (I), 0/6
(II), 0/6 (III), 1/2, 1/4, 1/6 & 1/10
Construction of Drain at km 0/2 &
1/2 and Construction of retaining
wall at km 0/8, 0/10, 1/4 & 1/8
Sl. No. Job Code Division Constituency Name of work Length Cost required
1791 01-CRIDP-22- Tenkasi Sankarankovi Widening from Single Lane to 3.20 220.00
23-P-1791 l Intermediate Lane and
Strengthening at km 1/2 - 3/8,
10/0 - 10/6 of Kalugumalai -
Devarkulam road including CD
Works
1792 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 0.20 82.00
23-P-1792 ur Intermediate Lane and
Strengthening at km 2/4 - 2/6 of
Karivalamvanthanallur - Railway
Feeder road including Construction
of Retaining wall
1793 01-CRIDP-22- Tenkasi Sankarankovi Widening from Single Lane to 2.00 182.00
23-P-1793 l Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Nedungulam - Ramanathapuram
road including Construction of
Breast wall and CD works
1794 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 0.40 27.00
23-P-1794 ur Intermediate Lane and
Strengthening at km 0/0 - 0/4 of
Madathupatti - Puliyankudi road
Sl. No. Job Code Division Constituency Name of work Length Cost required
1799 01-CRIDP-22- Chennai City Madavaram Improvements to Riding Quality at 1.40 375.00
23-I-1799 Roads Km 9/0 -10/4 (Both Sides) of
Grand Northern Trunk Road
(SHU87)
1800 01-CRIDP-22- Chennai City Villivakkam Improvements to Riding Quality at 2.10 250.00
23-I-1800 Roads Km 11/2 - 13/3 (RS) of Inner Ring
Road (SH2)
1801 01-CRIDP-22- Chennai City Alandur Improvements to Riding Quality at 3.65 480.00
23-I-1801 Roads km 0/0 - 0/450, 0/9 - 1/4, 1/8 -
3/6, 3/6 - 4/5 of Southern
Sector of Inner Ring Road
1802 01-CRIDP-22- Chennai City Alandur Improvements to Riding Quality at 2.30 130.00
23-I-1802 Roads km 0/0 - 2/3 of Nanganallur Road
1803 01-CRIDP-22- Chennai City Alandur Improvements to Riding Quality at 0.70 50.00
23-I-1803 Roads km 0/0 - 0/7 of Chidambaram
Stores to SBI Colony Road
Chennai City Roads Total 10.15 1285.00
1804 01-CRIDP-22- Thiruvallur Gummidipoo Improvements to Riding Quality at 5.50 150.00
23-I-1804 ndi km 0/0 - 5/5 of K.S Road - N.M.
Kandigai Road
1805 01-CRIDP-22- Thiruvallur Gummidipoo Improvements to Riding Quality at 3.35 90.00
23-I-1805 ndi km 0/0 - 3/350 of Madarpakkam -
Sathiyavedu Road
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required
Sl. No. Job Code Division Constituency Name of work Length Cost required