You are on page 1of 210

CRIDP 2022 - 2023

LIST OF WORKS - STATE HIGHWAYS


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1 01-CRIDP-22- Chennai City Tambaram Linking Shanmugam Salai with Km 1000.00


23-S-0001 Roads 26/2 of Grand Southern Trunk
road including extension of existing
pedestrian subway and junction
improvements with land acquisition

Announcement Total 1000.00


2 01-CRIDP-22- Chennai City Virugampakk Construction of Drain at km 6/0 - 637.00
23-S-0002 Roads am 6/330 of Inner Ring Road

3 01-CRIDP-22- Chennai City Virugampakk Construction of Drain at km 6/350- 325.00


23-S-0003 Roads am 6/660 (LS) of Inner Ring Road

4 01-CRIDP-22- Chennai City Villivakkam Construction of Drain at km 11/2 150.00


23-S-0004 Roads (RS) of Inner Ring Road including
Culvert at Km 11/2
5 01-CRIDP-22- Chennai City Saidapet Construction of Drain at km 9/8 65.00
23-S-0005 Roads (LS) of Grand Southern Trunk Road

6 01-CRIDP-22- Chennai City Ambattur Urban Improvements - Widening 0.20 200.00


23-S-0006 Roads from End to End and Strengthening
at km 13/4 - 13/6 (RS) of Inner
Ring Road
Urban Improvements Total 0.20 1377.00
7 01-CRIDP-22- Chennai City Virugampakk Providing Junction Improvement at 200.00
23-S-0007 Roads am km 7/4 (RS) of Inner Ring Road

8 01-CRIDP-22- Chennai City Perambur Providing Junction Improvement at 100.00


23-S-0008 Roads km 5/2 and 5/6 of Grand Northern
Trunk Road
9 01-CRIDP-22- Chennai City Saidapet Providing Junction Improvement at 150.00
23-S-0009 Roads km 10/0 of Grand Southern Trunk
Road
Road Safety Total 450.00
10 01-CRIDP-22- Chennai City Tambaram Construction of Culvert at Km 4/4, 585.00
23-S-0010 Roads 4/6, 4/8, 7/1 of Medavakkam -
Mambakkam - Sembakkam Road

11 01-CRIDP-22- Chennai City Pallavaram Construction of Culvert at Km 2/3, 110.00


23-S-0011 Roads 2/8 of Pallavaram - Thoraipakkam
Road
12 01-CRIDP-22- Chennai City Thousand Construction of Culvert at Km 4/8 50.00
23-S-0012 Roads Lights (LS) of Grand Southern Trunk Road

13 01-CRIDP-22- Chennai City Alandur Construction of Culvert at Km 12/1 50.00


23-S-0013 Roads of Grand Southern Trunk Road

Bridges/Culverts Total 795.00


14 01-CRIDP-22- Chennai City Tambaram Providing Center Median at km 700.00
23-S-0014 Roads 10/0 - 11/8, 14/0 - 21/2 of
Marmalong Bridge - Irumbuliyur -
Vandalur - Mudichur - Orgadam -
Walajabad Road
15 01-CRIDP-22- Chennai City Alandur Landscaping at km 13/2-13/9 250.00
23-S-0015 Roads (Both sides), 16/3 (LS) of Grand
Southern Trunk Road (SHU88)

SH Page 1 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

16 01-CRIDP-22- Chennai City Perambur Improvements to footpath and 225.00


23-S-0016 Roads Providing MS Grills to the footpath
at km 5/2 - 6/7 (Both Sides) of
Grand Northern Trunk Road
(SHU87)
17 01-CRIDP-22- Chennai City Perambur Improvements to footpath and 225.00
23-S-0017 Roads Providing MS Grills to the footpath
at km 6/7 - 8/2 (Both Sides) of
Grand Northern Trunk Road
(SHU87)
18 01-CRIDP-22- Chennai City Alandur Providing Fountain, Sculpture 60.00
23-S-0018 Roads including Beautification
arrangements inside road side park
at Km 15/4 (RS) of Grand Southern
Trunk Road (SHU88)
Others Total 1460.00
Chennai City Roads Total 0.20 5082.00
19 01-CRIDP-22- Thiruvallur Poonamallee Widening from Two Lane to Four 11.40 11100.00
23-S-0019 Lane and Strengthening at km 7/0 -
18/4 of Korattur - Thinnanur -
Periyapalayam Road including
Construction of Minor bridges,
Storm water drain, Centre median
and Reconstruction of Culverts

CMRDP 4 Laning Total 11.40 11100.00


20 01-CRIDP-22- Thiruvallur Poonamallee Construction of Drain at km 22/0 - 360.00
23-S-0020 22/6 (LS) of Chennai - Chittoor -
Bangalore Road (Abandoned NH4)
(Poonamallee town limit)

21 01-CRIDP-22- Thiruvallur Avadi Construction of Drain at km 13/6 140.00


23-S-0021 (Missing Link) of Mount -
Poonamallee - Avadi Road
22 01-CRIDP-22- Thiruvallur Tiruttani Construction of Drain at km 84/4 - 50.00
23-S-0022 84/6 (RS) of Chennai - Thiruthani-
Renigunta Road (SHU91) (Missing
Link)
23 01-CRIDP-22- Thiruvallur Tiruttani Construction of Drain at Km 48/6 - 270.00
23-S-0023 48/935 (RS) and Providing Paver
Block at km 48/300 - 48/935 (LS
& RS) of Chittoor Tiruttani Road
(SH 54)
24 01-CRIDP-22- Thiruvallur Tiruttani Construction of Drain at Km 190.00
23-S-0024 83/620 - 84/0 (LS) and Providing
Paver Block at km 83/620 - 84/0
(LS & RS) of Chennai - Tiruttani -
Renigunta Road (SHU91)

25 01-CRIDP-22- Thiruvallur Tiruttani Construction of Drain at Km 140.00


23-S-0025 84/300 - 84/4 (RS) and Providing
Paver Block at km 84/0 - 84/4 (LS
& RS) of Chennai - Tiruttani -
Renigunta Road (SHU91)

26 01-CRIDP-22- Thiruvallur Gummidipoo Construction of Drain at km 420.00


23-S-0026 ndi 43/800 - 44/100 of
Gummidipoondi Bypass Road (Old
G.N.T.Road ) including
Reconstruction of Box Culvert at
Km 44/2

SH Page 2 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

27 01-CRIDP-22- Thiruvallur Tiruttani Construction of Drain at Km 104/6 370.00


23-S-0027 - 104/900 (R/S), 104/700 -
104/830 (LS) and Providing Paver
Block at km 104/6 - 105/4 (LS &
RS) of Sadras - Chengalpet -
Kanchipuram - Arakkonam -
Tiruttani Road (SH 58)

28 01-CRIDP-22- Thiruvallur Madavaram Construction of Drain at km 585.00


23-S-0028 17/250 - 17/750 (Both Sides) of
Grand Northern Trunk road
(Redhills Junction) including
providing paver blocks end to end

29 01-CRIDP-22- Thiruvallur Madavaram Construction of Drain at km 650.00


23-S-0029 17/750 - 18/200 of Grand
Northern Trunk road (Redhills
Junction) (Both sides) including
providing paver blocks end to end

30 01-CRIDP-22- Thiruvallur Madavaram Construction of Drain at km 18/2 - 545.00


23-S-0030 18/6 of Grand Northern Trunk
road (Redhills Junction) (Both
sides) including providing paver
blocks end to end
Urban Improvements Total 3720.00
31 01-CRIDP-22- Thiruvallur Poonamallee Providing Junction Improvement at 200.00
23-S-0031 km 47/3 of Chennai - Thiruthani -
Renigunda road (Abandoned NH
205) at Thiruvallur town limit

Road Safety Total 200.00


32 01-CRIDP-22- Thiruvallur Avadi Construction of Box Culvert at Km 35.00
23-S-0032 67/8 of Chennai - Tiruthani -
Renigunta Road
33 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 60.00
23-S-0033 Km 13/4 of R.K.Pettai - Pallipet
Road
34 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 40.00
23-S-0034 Km 11/6 of R.K.Pettai - Pallipet
Road
35 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 56.00
23-S-0035 Km 11/8 of R.K.Pettai - Pallipet
Road
36 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 59.00
23-S-0036 Km 27/2 of Chittoor-Thiruthani
Road
37 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 50.00
23-S-0037 Km 104/8 of Sadras -
Chengalpattu - Kanchipuram -
Arakkonam - Thiruthani Road
Bridges/Culverts Total 300.00
Thiruvallur Total 11.40 15320.00

SH Page 3 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

38 01-CRIDP-22- Chengalpattu Chengalpattu Urban Improvements - Widening 1.30 371.00


23-S-0038 from Four Lane to Four Lane with
Paved Shoulders and Strengthening
at km 60/3 - 61/6 of Chennai -
Tirchy - Dindugal Road (Abandoned
Portion of NH45) (Chengalpattu
Urban Limit) including widening
culvert at km 60/6 & 61/4

39 01-CRIDP-22- Chengalpattu Chengalpattu Construction of Drain at km 3/6 - 117.00


23-S-0039 4/2 of Vandalur - Mambakkam -
Kelambakkam Road
Urban Improvements Total 1.30 488.00
40 01-CRIDP-22- Chengalpattu Thiruporur Providing Junction Improvement at 550.00
23-S-0040 km 43/6 of Chennai -
Mamallapuram Road (via)
Thiruporur (Rajiv Gandhi Salai)
Road Safety Total 550.00
41 01-CRIDP-22- Chengalpattu Cheyyur Widening from Two Lane to Two 2.90 700.00
23-S-0041 Lane with Paved Shoulders and
Strengthening at km 33/8 - 36/7 of
Maduranthakam - Vennangupet
Road
Other Widening Total 2.90 700.00
42 01-CRIDP-22- Chengalpattu Thiruporur Providing Paver Block in shoulders 50.00
23-S-0042 at km 0/0 - 0/6 of
Thirukalukundram -
Mamallapuram Road
Tourism Important Total 50.00
43 01-CRIDP-22- Chengalpattu Thiruporur Reconstruction of Box Culvert at 53.00
23-S-0043 Km 50/6 of Chennai -
Mamallapuram Road (via)
Thiruporur (Rajiv Gandhi Salai)
44 01-CRIDP-22- Chengalpattu Thiruporur Construction of Box Culvert at 85.00
23-S-0044 33/6 of Chennai - Mamallapuram
Road (via) Thiruporur (Rajiv Gandhi
Salai) including Reconstruction of
Box culvert at Km.33/8

Bridges/Culverts Total 138.00


Chengalpattu Total 4.20 1926.00
45 01-CRIDP-22- Kanchipuram Sriperumbud Construction of Drain at km 2/2- 330.00
23-S-0045 ur 3/0 of Poonamallee - Kunrathur -
Pallavaram Road
Urban Improvements Total 330.00
46 01-CRIDP-22- Kanchipuram Kancheepura Curve Widening at km 51/2,8 and 50.00
23-S-0046 m 52/2 of Sadras - Chengalpattu -
Kanchipuram - Arakkonam -
Thiruthani Road
Road Safety Total 50.00
Kanchipuram Total 380.00
Chennai Circle Total 15.80 22708.00

SH Page 4 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

47 01-CRIDP-22- Tiruvannamal Tiruvannamal Widening from Two Lane to Four 1.60 2180.00
23-S-0047 ai ai Lane and Strengthening at km
104/2 - 105/8 of Cuddalore -
Chittoor Road including
Construction of Centre Median,
Construction of Drain and
Retaining Wall, Construction of
Culvert, Bus Lay Bye and
providing Paver blocks

48 01-CRIDP-22- Tiruvannamal Chengam Widening from Two Lane to Four 9.00 8000.00
23-S-0048 ai Lane and Strengthening at km
19/0 - 20/6, 22/0 - 24/4, 29/0 -
31/0 and 37/0 - 40/0 of
Thiruvannamalai - Arur road (Via)
Thanipadi including Construction
of Centre Median, Drain,
Retaining Wall, Reconstruction
and Widening of Culverts,
Junction Improvements and
Providing Paver Blocks.

CMRDP 4 Laning Total 10.60 10180.00


49 01-CRIDP-22- Tiruvannamal Tiruvannamal Construction of Drain at km 53/0 - 350.00
23-S-0049 ai ai 54/4 of Villupuram -
Tiruvannamalai road
50 01-CRIDP-22- Tiruvannamal Tiruvannamal Providing Paver Block in shoulders 500.00
23-S-0050 ai ai at Km 0/0 - 5/2 and Construction
of Drain at km 4/4 - 5/2 of Pondy
Krishnagiri road to Hill Round road

51 01-CRIDP-22- Tiruvannamal Chengam Construction of Drain at km 140/8 - 110.00


23-S-0051 ai 141/4 of Pondy Krishnagiri Road
(NH66 Abandoned stretch)

Urban Improvements Total 960.00


52 01-CRIDP-22- Tiruvannamal Kilpennathur Providing Metal Crash Barrier at 14.00
23-S-0052 ai km 18/2,4 of Sanipoondi -
Kilpennathur - Avalurpet - Chetpet
road
53 01-CRIDP-22- Tiruvannamal Chengam Providing Over Head Gantry board 25.00
23-S-0053 ai at km 18/2 of Thandrampet -
Kottakulam road
54 01-CRIDP-22- Tiruvannamal Chengam Providing Over Head Gantry board 25.00
23-S-0054 ai at km 39/10 of Thiruvannamalai -
Arur road (Via) Thanipadi

55 01-CRIDP-22- Tiruvannamal Chengam Providing Over Head Gantry board 15.00


23-S-0055 ai at km 44/10 of Polur - Chengam
road
56 01-CRIDP-22- Tiruvannamal Polur Providing Metal Crash Barrier at 11.40
23-S-0056 ai km 10/4,10 of Polur -
Jamunamarathur - Alangayam -
Vaniyambadi road
57 01-CRIDP-22- Tiruvannamal Kilpennathur Construction of Retaining wall at 200.00
23-S-0057 ai km 18/6 of Sanipoondi -
Kilpennathur - Avalurpet - Chetpet
road including Curve Straightening
at Km 18/6
Road Safety Total 290.40

SH Page 5 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

58 01-CRIDP-22- Tiruvannamal Kilpennathur Widening from Two Lane to Two 3.40 700.00
23-S-0058 ai Lane with Paved Shoulders and
Strengthening at km 13/4 - 16/8 of
Tiruvannamalai - Avalurpet road
including Reconstruction of
Culverts at Km 14/2, 15/8, 16/8(ii)

59 01-CRIDP-22- Tiruvannamal Tiruvannamal Widening from Two Lane to Two 4.80 1500.00
23-S-0059 ai ai Lane with Paved Shoulders and
Strengthening at km 1/2 - 6/0 of
Thiruvannamalai - Thiyagadurgam
Road including Reconstruction of
Culverts at Km 1/4, 2/6, 3/2, 3/6,
3/8(i), 3/8(ii), 5/4(i), 5/4(ii), 5/6.
and Construction of Drain and
Widening of Minor Bridge

60 01-CRIDP-22- Tiruvannamal Chengam Widening from Two Lane to Two 1.40 450.00
23-S-0060 ai Lane with Paved Shoulders and
Strengthening at km 43/6 - 45/0 of
Polur - Chengam road including
Reconstruction of culvert at km
44/2,widening of culvert at km
44/4 and construction of Drain.

61 01-CRIDP-22- Tiruvannamal Kilpennathur Widening from Two Lane to Two 2.20 650.00
23-S-0061 ai Lane with Paved Shoulders and
Strengthening at km 16/8 - 19/0 of
Tiruvannamalai - Avalurpet road
including Reconstruction of
Culverts at Km 16/10, 17/4,6,
18/6(i), 18/6(ii), 18/6 (iii), 18/8 (i),
18/8 (ii)

Other Widening Total 11.80 3300.00


62 01-CRIDP-22- Tiruvannamal Tiruvannamal Strengthening at km 110/0 - 2.90 1675.00
23-S-0062 ai ai 111/6, 112/7 - 114/0 of
Cuddalore - Chittoor Road
including Construction of Drain at
km 112/7-114/0, Providing Paver
Block at Km 110/0 - 111/6 &
112/7 - 114/0.
63 01-CRIDP-22- Tiruvannamal Tiruvannamal Strengthening at km 106/4 - 108/8 2.40 500.00
23-S-0063 ai ai of Pondy Krishnagiri Road (NH 66
Abandoned stretch) including
Providing Paver Block at Km 106/4 -
108/8
64 01-CRIDP-22- Tiruvannamal Chengam Strengthening at km 2/6 - 3/6 of 1.00 105.00
23-S-0064 ai Thiruvannamalai - Arur road (Via)
Thanipadi
65 01-CRIDP-22- Tiruvannamal Chengam Strengthening at km 5/0 - 6/0 of 1.00 100.00
23-S-0065 ai Thandrampet - Kottakulam road

Strengthening/Improvements
7.30 2380.00
Total
66 01-CRIDP-22- Tiruvannamal Polur Construction of Well Protective wall 60.00
23-S-0066 ai at km 139/8 of Cuddalore -
Chittoor Road
Others Total 60.00
Tiruvannamalai Total 29.70 17170.40

SH Page 6 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

67 01-CRIDP-22- Ranipet Arcot Urban Improvements - Widening 0.75 330.00


23-S-0067 from End to End and Strengthening
at km 10/0 - 10/750 of Arcot -
Kannamangalam Road Widening
of Culvert at Km 10/6 and
Construction of Drain at Km 10/4,
10/6 providing Paver Block.

68 01-CRIDP-22- Ranipet Ranipet Urban Improvements - Widening 1.46 690.00


23-S-0068 End to End and Strengthening at
km 137/2 - 137/3, Widening from
Two Lane to Four Lane and
Strengthening at km 137/3 -
138/0, Strengthening at km 130/6 -
131/260 of Krishnagiri - Ranipet
road
(Abandoned NH46) including
Construction of Retaining Wall at
Km 137/8,10 and Construction of
drain at Km 137/4,10, Widening
of Culvert at Km 137/10 and
providing Paver Block and
Construction of Center Median at
Km 137/2 - 138/0

Urban Improvements Total 2.21 1020.00


69 01-CRIDP-22- Ranipet Arcot Reconstruction of Box Culvert at 35.00
23-S-0069 Km 0/2 of Arcot-Villupuram road

70 01-CRIDP-22- Ranipet Ranipet Reconstruction of Box Culvert at 50.00


23-S-0070 Km 2/10 of Arcot -
Kannamangalam Road
71 01-CRIDP-22- Ranipet Sholingur Providing Cantilever Gantry board 7.00
23-S-0071 at km 29/6 of Sholinghur -
Kaveripakkam Road
72 01-CRIDP-22- Ranipet Ranipet Curve Widening at km 144/0- 200.00
23-S-0072 144/300 of Krishnagiri - Ranipet
road
(Abandoned NH46) including
Construction of Center Median,
Reconstruction of Culvert at Km
144/2 and Construction of
Retaining Wall at Km 144/2 &
144/4.
73 01-CRIDP-22- Ranipet Arcot Providing Cantilever Gantry board 26.50
23-S-0073 at km 0/10, 10/10, 11/2, 14/8,
21/2 of Kalavai - Valapandal Road

74 01-CRIDP-22- Ranipet Arcot Providing Over Head Gantry board 12.50


23-S-0074 at km 0/2 of Kalavai - Valapandal
Road
Road Safety Total 331.00
75 01-CRIDP-22- Ranipet Sholingur Widening from Two Lane to Two 3.00 698.00
23-S-0075 Lane with Paved Shoulders and
Strengthening at km 0/0 - 3/0 of
Sholinghur - Kaveripakkam Road
Construction of drain at Km 0/0-
0/4 and Reconstruction of Culverts
at Km 0/6, 0/8, 0/10, 1/2, 1/6 &
1/10

SH Page 7 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

76 01-CRIDP-22- Ranipet Sholingur Widening from Two Lane to Two 4.40 657.00
23-S-0076 Lane with Paved Shoulders and
Strengthening at km 6/6 - 7/8, 8/4
- 10/6, , Strengthening at km 5/0
- 6/0 of Ranipet Sholinghur Road
including Widening of Culvert at
Km 7/2 and Construction of
culvert at Km 8/6

77 01-CRIDP-22- Ranipet Arakkonam Widening from Two Lane to Two 4.60 698.00
23-S-0077 Lane with Paved Shoulders and
Strengthening at km 30/4 - 32/8,
33/6 - 35/0, , Strengthening at
km 32/8 - 33/6 of Thandalam -
Perampakkam - Thakkolam -
Arigilpadi Road

Other Widening Total 12.00 2053.00


78 01-CRIDP-22- Ranipet Ranipet Strengthening at km 0/0 - 0/8 of 0.80 280.00
23-S-0078 Ranipet Sholinghur Road including
Construction of Drain at Km 3/8-
4/2
Strengthening/Improvements
0.80 280.00
Total
79 01-CRIDP-22- Ranipet Sholingur Construction of Drain at km 12/8, 205.00
23-S-0079 12/10, 13/2 of Sholinghur -
Kaveripakkam Road including
Reconstruction of Culvert at Km
13/2 and Re-Construction of
Retaining Wall at Km 7/2
Flood Permanent Total 205.00
Ranipet Total 15.01 3889.00
80 01-CRIDP-22- Vellore Anaikattu Urban Improvements - Widening 2.10 995.00
23-S-0080 from Two Lane with Paved
Shoulders to Four Lane and
Strengthening at km 5/9 - 8/0 of
Vellore - Usoor Road including
Widening of Culvert at Km 6/8,
Junctiion Improvement, providing
Paver Blocks and Construction of
Drain & Centre Median

81 01-CRIDP-22- Vellore Anaikattu Construction of Drain at km 192.00


23-S-0081 11/150-11/350, 12/900-13/100,
18/150-18/450, 25/850-26/150,
28/148-28/220 of Abdullapuram -
Asanampattu - Alangayam -
Thirupathur Road
82 01-CRIDP-22- Vellore Anaikattu Construction of Drain at km 0/8- 145.00
23-S-0082 1/050 of Pallikonda - Palamaneri
Road
83 01-CRIDP-22- Vellore gudiyattam Urban Improvements - Widening 1.20 575.00
23-S-0083 from Two lane to End to End and
Strengthening at Km 8/0-8/4 &
8/6-9/4 of Pallikonda Palamaneri
Road including Reconstruction of
Box Culvert at Km 8/10, 9/2,
Construction of Drain and
Providing Paver Block
Urban Improvements Total 3.30 1907.00

SH Page 8 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

84 01-CRIDP-22- Vellore Anaikattu Providing Cantilever Gantry board 29.00


23-S-0084 at km 18/6,23/10,24/2 of
Abdullapuram - Asanampattu -
Alangayam - Thirupathur Road
including Metal Crash Barrier at
Km 0/8 & 0/10
85 01-CRIDP-22- Vellore Katpadi Providing Metal Crash Barrier at 16.00
23-S-0085 km 122/350-122/450 of Chennai -
Chittoor Bangalore Road
(Abandoned NH 4) (Thiruvalam
portion)
86 01-CRIDP-22- Vellore Katpadi Providing Cantilever Gantry board 14.00
23-S-0086 at km 11/4, 16/4 of Ponnai -
Thiruvalam Road
87 01-CRIDP-22- Vellore Kilvaithinank Providing Cantilever Gantry board 50.00
23-S-0087 uppam at km 25/2 of Pallikonda -
Palamaneri Road including Metal
Crash Barrier at Km 24/2,4,6,
28/4,6
88 01-CRIDP-22- Vellore Kilvaithinank Providing Metal Crash Barrier at 42.00
23-S-0088 uppam km 6/8, 7/10, 9/10, 18/2,4 of
Chittoor - Gudiyatham Road
Road Safety Total 151.00
89 01-CRIDP-22- Vellore Anaikattu Widening from Two Lane to Two 1.20 425.00
23-S-0089 Lane with Paved Shoulders and
Strengthening at km 9/8 - 10/0,
16/4, 27/2 - 28/0 of Abdullapuram
- Asanampattu - Alangayam -
Thirupathur Road including
reconstruction of culverts at Km
27/4 & 27/10 including Extra
length of 90M at Km 10/0

90 01-CRIDP-22- Vellore Katpadi Widening from Two Lane to Two 2.40 520.00
23-S-0090 Lane with Paved Shoulders and
Strengthening at km 5/6 - 7/0,
15/4 - 16/4 of Ponnai -
Thiruvalam Road including Extra
Length of 174.00 Mtrs,
Reconstruction of Culvert at Km
5/8, 6/4, 6/6 & 16/4 and
Construction of Drain
91 01-CRIDP-22- Vellore Katpadi Widening from Two Lane to Two 2.00 629.00
23-S-0091 Lane with Paved Shoulders and
Strengthening at km 17/0 - 19/0 of
Ranipet - Ponnai Road including
Reconstruction of Culvert at Km
18/10, Widening of culvert at Km
17/10, Construction of Retaining
Wall at Km 17/2 and
Reconstruction of Minor Bridge at
17/8
92 01-CRIDP-22- Vellore Katpadi Widening from Two Lane with 2.20 1550.00
23-S-0092 Paved Shoulders to Four Lane and
Strengthening at km 7/8 - 10/0 of
Thiruvalam - Katpadi -
Venkatagirikottah Road including
reconstruction of culvert,
Construction of Drain and Paver
Block, Providing Bus Lay Bye

SH Page 9 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

93 01-CRIDP-22- Vellore Katpadi Widening from Two Lane to Two 1.85 294.50
23-S-0093 Lane with Paved Shoulders and
Strengthening at km 121/9 -
123/750 of Chennai - Chittoor
Bangalore Road (Abandoned NH 4)
(Thiruvalam portion) including
Reconstruction of Culvert at Km
122/6,8, 123/2, 123/4 and
construction of Retaining wall at
Km 122/6
Other Widening Total 9.65 3418.50
94 01-CRIDP-22- Vellore Katpadi Restoration to the Causeway at km 90.00
23-S-0094 5/4 - 5/8 of Chittoor - Thiruthani
Road
Flood Permanent Total 90.00
95 01-CRIDP-22- Vellore Vellore Reconstruction of Culvert at Km 250.00
23-S-0095 116/8 of Krishnagiri - Ranipet road
(Abandoned NH46)

Bridges/Culverts Total 250.00


Vellore Total 12.95 5816.50
96 01-CRIDP-22- Cheyyar Arani Widening from Two Lane to Four 0.60 286.00
23-S-0096 Lane and Strengthening at km
16/0 - 16/6 of Kannamangalam -
Arni road Reconstruction of
Culvert at Km 16/2 and
Construction of Centre Median at
Km 16/0 - 16/6
CMRDP 4 Laning Total 0.60 286.00
97 01-CRIDP-22- Cheyyar Cheyyar Providing Cantilever Gantry board 7.00
23-S-0097 at km 6/6 of Kanchipuram -
Vandavasi Road
98 01-CRIDP-22- Cheyyar Cheyyar Providing Cantilever Gantry board 7.00
23-S-0098 at km 0/4 of Thiruvathipuram
Byepass road
99 01-CRIDP-22- Cheyyar Vandavasi Providing Cantilever Gantry board 7.00
23-S-0099 at km 49/6 of Cheyyur - Vandavasi
- Polur Road
100 01-CRIDP-22- Cheyyar Vandavasi Providing Cantilever Gantry board 7.00
23-S-0100 at km 43/4 of Cheyyur - Vandavasi
- Polur Road
Road Safety Total 28.00
101 01-CRIDP-22- Cheyyar Vandavasi Strengthening at km 42/660 - 1.85 165.00
23-S-0101 44/505 of Cheyyur - Vandavasi -
Polur Road
Strengthening/Improvements
1.85 165.00
Total

SH Page 10 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

102 01-CRIDP-22- Cheyyar Cheyyar Restoration to the Causeway at km 395.00


23-S-0102 24/8 of Pudupadi- Illuppai-
Vadailluppai- Perumpakkam-
Vishar- Kancheepuram road
Flood Permanent Total 395.00
Cheyyar Total 2.45 874.00
103 01-CRIDP-22- Thirupathur Tirupattur Widening from Two Lane to Four 1.00 600.00
23-S-0103 Lane and Strengthening at km
100/0 - 101/0 of Hogenakkal -
Pennagaram - Dharmapuri -
Thirupathur road including
reconstruction of Box culvert at km
100/6 (i), 100/6 (ii), 100/8, 100/10
and contruction of retaining wall at
km 100/6,8 & 100/10

104 01-CRIDP-22- Thirupathur Tirupattur Widening from Two Lane to Four 1.20 600.00
23-S-0104 Lane and Strengthening at km
104/0 - 105/2 of Hogenakkal -
Pennagaram - Dharmapuri -
Thirupathur road including
reconstruction of Box culvert at km
104/10 and Construction of drain
at km 104/0 - 105/2.
105 01-CRIDP-22- Thirupathur Tirupattur Widening from Two Lane to Four 1.00 600.00
23-S-0105 Lane and Strengthening at km
100/0 - 101/0 of Hogenakkal -
Pennagaram - Dharmapuri -
Thirupathur road including
reconstruction of Box culvert at km
100/6 (i), 100/6 (ii), 100/8, 100/10
and Construction of Construction
of Median Kerb at 100/0 - 101/0
and contruction of retaining wall at
km 100/6,8 & 100/10

CMRDP 4 Laning Total 3.20 1800.00


106 01-CRIDP-22- Thirupathur Ambur Construction of Drain at km 2/2- 170.00
23-S-0106 2/5, 6/7 - 6/10 of Ambur -
Sathgur Road
Urban Improvements Total 170.00
107 01-CRIDP-22- Thirupathur Ambur Construction of Retaining wall at 30.00
23-S-0107 km 1/4 of Ambur - Sathgur Road

108 01-CRIDP-22- Thirupathur Ambur Providing Junction Improvement at 200.00


23-S-0108 km 27/4, 29/2 of Gudiyatham -
Gadambur - Kailasagiri -
Vaniyambadi Road (Widening Only)

109 01-CRIDP-22- Thirupathur Vaniyambadi Providing Cantilever Gantry board 6.80


23-S-0109 at km 41/8 of Abdullapuram -
Asanampattu - Alangayam -
Thirupathur Road
110 01-CRIDP-22- Thirupathur Vaniyambadi Providing Cantilever Gantry board 6.80
23-S-0110 at km 54/6 of Polur -
Jamunamarthur - Alangayam -
Vaniambadi Road
111 01-CRIDP-22- Thirupathur Ambur Providing Cantilever Gantry board 6.80
23-S-0111 at km 19/6 of Gudiyatham -
Gadambur - Kailasagiri -
Vaniyambadi Road

SH Page 11 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

112 01-CRIDP-22- Thirupathur Ambur Providing Cantilever Gantry board 6.80


23-S-0112 at km 9/8 of Ambur - Sathgur
Road
113 01-CRIDP-22- Thirupathur Tirupattur Providing Over Head Gantry board 12.50
23-S-0113 at km 107/4 of Hogenakkal -
Pennagaram - Dharmapuri -
Thirupathur road
114 01-CRIDP-22- Thirupathur Tirupattur Providing Cantilever Gantry board 13.60
23-S-0114 at km 75/2, 79/5 of Abdullapuram -
Asanampattu - Alangayam -
Thirupathur Road
115 01-CRIDP-22- Thirupathur Tirupattur Providing Over Head Gantry board 12.50
23-S-0115 at km 7/10 of Bargur -
Thirupathur road
116 01-CRIDP-22- Thirupathur Tirupattur Providing Cantilever Gantry board 6.80
23-S-0116 at km 7/4 of Thirupathur -
Singarapet Road
117 01-CRIDP-22- Thirupathur Tirupattur Providing Cantilever Gantry board 6.80
23-S-0117 at km 95/4 of Hogenakkal -
Pennagaram - Dharmapuri -
Thirupathur road
Road Safety Total 309.40
118 01-CRIDP-22- Thirupathur Vaniyambadi Widening from Two Lane to Two 3.00 580.00
23-S-0118 Lane with Paved Shoulders and
Strengthening at km 72/0 - 75/0 of
Polur - Jamunamarthur -
Alangayam - Vaniambadi Road
including construction of retaining
wall at km 73/2 & construction of
Box culvert at km 74/8

Other Widening Total 3.00 580.00


119 01-CRIDP-22- Thirupathur Vaniyambadi Construction of Retaining wall at 20.00
23-S-0119 km 49/6 of Krishnagiri - Ranipet
road (Abandoned NH 46)
(Natrampalli, Vaniyambadi and
Ambur portions)
Flood Permanent Total 20.00
120 01-CRIDP-22- Thirupathur Tirupattur Construction of Box Culvert at 110.00
23-S-0120 79/4 of Abdullapuram -
Asanampattu - Alangayam -
Thirupathur Road including
Construction of Drain at Km 79/2 -
79/5
121 01-CRIDP-22- Thirupathur Tirupattur Reconstruction of Minor Bridge at 135.00
23-S-0121 Km 13/6 of Thirupathur -
Singarapet Road
Bridges/Culverts Total 245.00
122 01-CRIDP-22- Thirupathur Tirupattur Providing Over Head Gantry board 12.50
23-S-0122 at km 16/4 of Thirupathur -
Singarapet Road
Others Total 12.50
Thirupathur Total 6.20 3136.90
123 01-CRIDP-22- Kallakurichi Rishivandiya Construction of Drain at km 140.00
23-S-0123 m 24/536-25/00 of Thiruvannamalai -
Thiyagadurgam Road

Urban Improvements Total 140.00

SH Page 12 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

124 01-CRIDP-22- Kallakurichi Rishivandiya Providing Junction Improvement at 150.00


23-S-0124 m km 24/6 and 32/6 of
Thiruvannamalai - Thiyagadurgam
Road
125 01-CRIDP-22- Kallakurichi Ulundurpettai Providing Metal Crash Barrier at 6.65
23-S-0125 km km 14/6 (RS) 15/8 (LS) of
Thirukoilur - Asanur road
126 01-CRIDP-22- Kallakurichi Ulundurpettai Providing Metal Crash Barrier at 4.30
23-S-0126 km 22/3 of Virudhachalam -
Ulundurpet - Villupuram road
127 01-CRIDP-22- Kallakurichi Rishivandiya Providing Metal Crash Barrier at 15.00
23-S-0127 m km 11/2,4,6,8 of Thirukoilur -
Asanur road
128 01-CRIDP-22- Kallakurichi Rishivandiya Providing Metal Crash Barrier at 15.50
23-S-0128 m km 41/4, 43/6, 45/2, 50/6 of
Thiruvannamalai - Thiyagadurgam
Road
Road Safety Total 191.45
129 01-CRIDP-22- Kallakurichi Rishivandiya Widening from Two Lane to Two 4.40 680.00
23-S-0129 m Lane with Paved Shoulders and
Strengthening at km 95/0 - 97/0,
Strengthening at km 92/6 - 95/0 of
Cuddalore - Tirukoilur -
Sankarapuram Road including
Reconstruction of RCC Box culverts
at Km. 95/2 (i) (ii) & 96/10

130 01-CRIDP-22- Kallakurichi Rishivandiya Widening from Two Lane to Two 1.60 320.00
23-S-0130 m Lane with Paved Shoulders and
Strengthening at km 72/4 - 74/0 of
Cuddalore - Tirukoilur -
Sankarapuram Road including
Reconstruction of Culvert at
Km.73/6
131 01-CRIDP-22- Kallakurichi Rishivandiya Widening from Two Lane to Two 2.60 590.00
23-S-0131 m Lane with Paved Shoulders and
Strengthening at km 74/0 - 76/60
of Cuddalore - Tirukoilur -
Sankarapuram Road including
Reconstruction of Culvert at
Km.75/2,75/4
132 01-CRIDP-22- Kallakurichi Rishivandiya Widening from Two Lane to Two 2.04 490.00
23-S-0132 m Lane with Paved Shoulders and
Strengthening at km 84/8 - 86/837
of Cuddalore - Tirukoilur -
Sankarapuram Road including
Reconstruction of Culvert at Km.
84/10, 86/4 and 86/6
133 01-CRIDP-22- Kallakurichi Tirukkoyilur Widening from Two Lane to Two 1.10 520.00
23-S-0133 Lane with Paved Shoulders and
Strengthening at km 69/9 - 71/0 of
Cuddalore - Chittoor Road
including Construction of Drain at
km 70/300-71/0, Construction of
Retaining wall at km 70/10 and
including providing Paver Block

SH Page 13 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

134 01-CRIDP-22- Kallakurichi Tirukkoyilur Widening from Two Lane to Two 0.60 285.00
23-S-0134 Lane with Paved Shoulders and
Strengthening at km 71/0 - 71/6 of
Cuddalore - Chittoor Road
including Reconstruction of Culvert
at Km.71/2 ,Construction of Drain
at km 71/0-71/6 and including
providing Paver Block

Other Widening Total 12.34 2885.00


135 01-CRIDP-22- Kallakurichi Kallakurichi Strengthening at km 6/2 - 6/4, 2.20 210.00
23-S-0135 19/0 - 20/0, 21/0 - 22/0 of
Kallakurichi - Koothakudi road
136 01-CRIDP-22- Kallakurichi Tirukkoyilur Strengthening at km 0/0 - 0/120 of 0.12 22.00
23-S-0136 Pennaiyar Bridge Approach Road

137 01-CRIDP-22- Kallakurichi Rishivandiya Strengthening at km 29/150 - 0.50 110.00


23-S-0137 m 29/650 of Thiruvannamalai -
Thiyagadurgam Road including
Construction of Retaining wall at
km 29/4,29/6 (Bridge Approaches)

Strengthening/Improvements
2.82 342.00
Total
138 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 30.00
23-S-0138 m Km 84/2 of Cuddalore - Tirukoilur -
Sankarapuram Road
139 01-CRIDP-22- Kallakurichi Kallakurichi Reconstruction of Box Culvert at 50.00
23-S-0139 Km 8/4 of Kallakurichi -
Koothakudi road
Bridges/Culverts Total 80.00
Kallakurichi Total 15.16 3638.45
Tiruvannamalai Circle Total 81.46 34525.25
140 01-CRIDP-22- Villupuram Mailam Widening from Two Lane to Four 2.00 1600.00
23-S-0140 Lane and Strengthening at km
13/0 - 15/0 of Vellemedupettai -
Pondy road (via) Mailam including
Widening and Reconstruction of CD
works,RCC Drain Retaining Wall
and Providing Paver Block.

CMRDP 4 Laning Total 2.00 1600.00


141 01-CRIDP-22- Villupuram Vikravandi Widening from Two Lane to Two 1.40 250.00
23-S-0141 Lane with Paved Shoulders and
Strengthening at km 53/1 - 54/5 of
Villupuram - Mambazhapattu -
Tirukoilur road including
Reconstruction of Box culvert at
km 53/4,8
142 01-CRIDP-22- Villupuram Tirukkoyilur Widening from Two Lane to Two 2.00 460.00
23-S-0142 Lane with Paved Shoulders and
Strengthening at km 54/0 - 56/0 of
Cuddalore - Tirukoilur -
Sankarapuram Road including
Reconstruction of Culvert at km
54/2 & construction of Culvert at
km 55/8 (SH68)

SH Page 14 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

143 01-CRIDP-22- Villupuram Vikravandi Widening from Two Lane to Two 1.40 400.00
23-S-0143 Lane with Paved Shoulders and
Strengthening at km 10/6 - 12/0 of
Mundiyampakkam-- Pondicherry
road including reconstruction of
box culvert at Km 10/8, 10/10,
11/4 (SH203)
144 01-CRIDP-22- Villupuram Tirukkoyilur Widening from Two Lane to Two 2.50 620.00
23-S-0144 Lane with Paved Shoulders and
Strengthening at km 57/2 - 58/0,
58/6 - 59/2, 64/1 - 65/2 of
Villupuram - Mambazhapattu -
Tirukoilur road including
Reconstruction of Box culverts
57/8, 64/2, 65/2 and Construction
of Retaining wall at km.57/4-58/0
and Construction of drain at
km.58/8-59/2

145 01-CRIDP-22- Villupuram Gingee Widening from Two Lane to Two 3.10 650.00
23-S-0145 Lane with Paved Shoulders and
Strengthening at km 21/0 - 23/3,
25/0 - 25/8 of Sanipoondy -
Kilpennathur - Avalurpet - Chetpet
road including reconstruction of
culvert at km 23/2, 25/2

Other Widening Total 10.40 2380.00


Villupuram Total 12.40 3980.00
146 01-CRIDP-22- Cuddalore Virudhachala Widening from Two Lane to Four 6.80 10800.00
23-S-0146 m Lane and Strengthening at km 0/0 -
6/8 of Road branching from km
6/8 of Vridhachalam-Tholudur
road to Madhanathur (via)
Jayankondam including Widening
and Reconstruction of CD works,
Construction of Additional Major
Bridge, Construction of Center
Median, Retaining Wall,
Construction of Drain, Paver Block
at Builtup area, Improving
Junctions and Buslay bye (SH-140)

147 01-CRIDP-22- Cuddalore Virudhachala Widening from Two Lane to Four 4.35 6700.00
23-S-0147 m Lane and Strengthening at km 0/0 -
4/350 of Vridhachalam Bypass
road including CD works,
Construction of additional Major
Bridge, Construction of Center
Median,Retaining Wall , Drain and
Providing Paver Block at the Built
up area and Improving Junctions,
Providing Bus lay bye (SH213)

CMRDP 4 Laning Total 11.15 17500.00


Cuddalore Total 11.15 17500.00

SH Page 15 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

148 01-CRIDP-22- Ariyalur Jayankondam Widening from Two Lane to Four 8.00 6500.00
23-S-0148 Lane and Improvements of
Virudhachalam - Jayankondam -
Madhanathur road at Km 6/8 -
14/8 (SH-140) including Widening
of Minor bridge at
7/10,Reconstruction of Minor
bridge at km 8/10, Construction of
Centre Median and Widening of
Culverts
149 01-CRIDP-22- Ariyalur Jayankondam Widening from Two Lane to Four 6.20 6200.00
23-S-0149 Lane and Improvements of
Virudhachalam - Jayankondam -
Madhanathur road at Km 14/8 -
21/0 (SH-140) including Widening
of Minor bridge at km 19/10,
Construction of Drain,
Construction of Retaining wall,
Construction of Centre Median and
Widening & Reconstruction of
Culverts
150 01-CRIDP-22- Ariyalur Jayankondam Widening from Two Lane to Four 6.60 6300.00
23-S-0150 Lane and Improvements of
Virudhachalam - Jayankondam -
Madhanathur road at Km 21/0 -
27/6 (SH-140) including
Reconstruction of Minor bridge at
km 26/10, Construction of Drain,
Construction of Retaining wall,
Construction of Centre Median and
Widening of Culverts

CMRDP 4 Laning Total 20.80 19000.00


151 01-CRIDP-22- Ariyalur Jayankondam Construction of Drain at km 13/0- 40.00
23-S-0151 13/4 of Kodukkur - Kaduvetti road

Urban Improvements Total 40.00


152 01-CRIDP-22- Ariyalur Kunnam Strengthening at km 20/2 - 21/6 of 1.40 595.00
23-S-0152 Ariyalur - Jayankondam road (via)
Sendurai including construction of
drain and providing paver block

Strengthening/Improvements
1.40 595.00
Total
Ariyalur Total 22.20 19635.00
153 01-CRIDP-22- Perambalur Perambalur Construction of Drain at km 39/0- 50.00
23-S-0153 39/4 of Thuraiyur - Perambalur
Road
Urban Improvements Total 50.00
Perambalur Total 50.00
Villupuram Circle Total 45.75 41165.00
154 01-CRIDP-22- Salem Salem West Providing Junction Improvement at 500.00
23-S-0154 km 2/2 of Jagir Ammapalayam -
Tharamangalam road including
providing service road on both
sides of the junction (only
widening)

Road Safety Total 500.00

SH Page 16 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

155 01-CRIDP-22- Salem Veerapandi Strengthening in Km.4/4-5/0 of 0.60 125.00


23-S-0155 Salem - Cochin - Kanyakumari
Road (Abandoned NH 47)
Kondalampatty Village Road
including Reconstruction of culvert
at Km.4/2 (SHU120)
156 01-CRIDP-22- Salem Salem South Strengthening in Km.0/9-1/6 of 0.70 140.00
23-S-0156 Salem - Cochin - Kanyakumari
Road (Abandoned from NH47)
including Providing kerb Type
Centre median at Km.0/9-1/6
(SHU78)
Strengthening/Improvements
1.30 265.00
Total
157 01-CRIDP-22- Salem Yercaud Construction of Retaining wall at 230.00
23-S-0157 km 19/870 of Salem Junction to
Yercadu Road including
construction of CC drain
Flood Permanent Total 230.00
158 01-CRIDP-22- Salem Yercaud Construction of Drain at km 30/4- 100.00
23-S-0158 30/6 of Salem Junction to Yercadu
Road including construction of
protective works and providing
footpath to Yercaud lake at Km
30/4&30/6
Tourism Important Total 100.00
Salem Total 1.30 1095.00
159 01-CRIDP-22- Edappadi Sankari Widening from Two Lane to Four 0.62 403.00
23-S-0159 Lane and Strengthening at km
42/980 - 43/200 and 44/8 - 45/2
of Omalur - Sankari -
Thiruchengode - Paramathi Road
including Reconstruction of Box
Culvert km 43/2, Construction of
Drain at km 43/2, Construction of
well protective wall at km 43/2,
Providing RCC Center median.

CMRDP 4 Laning Total 0.62 403.00


160 01-CRIDP-22- Edappadi Mettur Urban Improvements - Widening 1.00 200.00
23-S-0160 from Two Lane to EndtoEnd and
Strengthening at km 0/0 - 1/0 of
Thermal Power Plant Road
including Construction of Storm
Water Drain at Km.0/2-1/0 (LS)
and Providing Paver block.
Urban Improvements Total 1.00 200.00
161 01-CRIDP-22- Edappadi Sankari Providing Metal Crash Barrier at 1.98
23-S-0161 km 41/8 of Omalur - Sankari -
Thiruchengode - Paramathi Road

162 01-CRIDP-22- Edappadi Edappadi Providing Metal Crash Barrier at 33.00


23-S-0162 km 0/4,6, 2/6, 3/4 and 5/8 of
Edappady Byepass road
163 01-CRIDP-22- Edappadi Mettur Providing Metal Crash Barrier at 62.00
23-S-0163 km 24/2-29/4 of Mettur - Palar
Road
164 01-CRIDP-22- Edappadi Mettur Providing Metal Crash Barrier at 7.95
23-S-0164 km 164/6 of Varanasi -
Kanyakumari Road (Abandoned
NH7) (Chaniage No.1000-2000)

SH Page 17 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

Road Safety Total 104.93


165 01-CRIDP-22- Edappadi Salem West Strengthening at km 11/5 - 14/3 of 2.80 505.00
23-S-0165 Jagirammapalayam -
Tharamangalam Road
166 01-CRIDP-22- Edappadi Sankari Strengthening at km 14/3 - 17/5 of 3.20 535.00
23-S-0166 Jagirammapalayam -
Tharamangalam Road
167 01-CRIDP-22- Edappadi Omalur Strengthening at km 1/2 - 4/0 of 2.80 288.00
23-S-0167 Tharamangalam-Jalagandapuram
Road
Strengthening/Improvements
8.80 1328.00
Total
Edappadi Total 10.42 2035.93
168 01-CRIDP-22- Namakkal Rasipuram Urban Improvements - Widening 0.75 500.00
23-S-0168 from Two Lane to EndtoEnd and
Strengthening at km 41/550 - 42/3
of Malliakarai - Rasipuram -
Tiruchengodu - Erode road
including Construction of Drain,
CD Works and Providing Paver
Block
169 01-CRIDP-22- Namakkal Paramathi Urban Improvements - Widening 0.60 335.00
23-S-0169 Velur from Two Lane to Four Lane and
Strengthening at km 64/6 - 65/2 of
Komarapalayam - Pallipalayam -
Jedarpalayam - Pandamangalam -
Velur road including
Reconstruction of box culvert in
lieu of existing pipe culvert,
Providing center median and
construction of drain
Urban Improvements Total 1.35 835.00
170 01-CRIDP-22- Namakkal Rasipuram Providing Metal Crash Barrier at 15.60
23-S-0170 km 39/8-40/2 of Malliakarai -
Rasipuram - Tiruchengodu - Erode
road
Road Safety Total 15.60
171 01-CRIDP-22- Namakkal Namakkal Widening from Two Lane to Two 1.80 677.00
23-S-0171 Lane with Paved Shoulders and
Strengthening at km 23/0 - 24/8 of
Mohanur - Namakkal -
Sendamangalam - Rasipuram road
including Construction of Retaining
wall, Construction of Drain and
Reconstruction of Culvert

172 01-CRIDP-22- Namakkal Rasipuram Widening from Two Lane to Four 1.20 600.00
23-S-0172 Lane and Strengthening at km
45/8 - 46/4, Widening from Two
Lane to Two Lane with Paved
Shoulders and Strengthening at km
46/4 - 47/0 of Malliakarai -
Rasipuram - Tiruchengodu - Erode
road including Widening Minor
Bridge at Km 46/10, Providing
Center Median, Construction of
Retaining Wall, Drain and CD
Works

SH Page 18 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

173 01-CRIDP-22- Namakkal Rasipuram Widening from Two Lane to Two 1.00 250.00
23-S-0173 Lane with Paved Shoulders and
Strengthening at km 47/0 - 48/0 of
Malliakarai - Rasipuram -
Tiruchengodu - Erode road
including Construction of Retaining
Wall, Drain and CD Works

174 01-CRIDP-22- Namakkal Tiruchengode Widening from Two Lane to Two 2.80 598.00
23-S-0174 Lane with Paved Shoulders and
Strengthening at km 1/0 - 2/0,
20/2 - 22/0 of Thiruchengodu -
Ariyanur Road including
Reconstruction of Culvert at Km
20/4 and Construction of Storm
water drain at Km 1/2, 1/6
Other Widening Total 6.80 2125.00
175 01-CRIDP-22- Namakkal Namakkal Providing Paver Block in shoulders 305.00
23-S-0175 at km 25/450-27/200 of
Tiruchengode - Namakkal road

Others Total 305.00


Namakkal Total 8.15 3280.60
176 01-CRIDP-22- Dharmapuri Pennagaram Construction of Box culvert at Km 25.00
23-S-0176 19/8 of Palacode - Nagadasampatty
road
Bridges/Culverts Total 25.00
Dharmapuri Total 25.00
177 01-CRIDP-22- Krishnagiri Hosur Widening from Two Lane to Four 4.85 4200.00
23-S-0177 Lane and Strengthening at km 0/0 -
4/850 of Hosur inner Ring Road
including Providing Median, Drain,
construction of Retaining wall &
CD works
178 01-CRIDP-22- Krishnagiri Thalli Widening from Two Lane to Four 8.10 6400.00
23-S-0178 Lane and Strengthening at km 0/7 -
1/4, 2/4 - 3/8, 5/6 - 6/4, 7/2 -
10/0, 12/0 - 14/4 of Hosur -
Denkanikottai (via) Thally road
including Providing Median, Drain,
Construction of Retaining wall and
CD works
179 01-CRIDP-22- Krishnagiri Thalli Widening from Two lane to Four 11.28 8000.00
23-S-0179 lane and Strengthening at km 17/0
- 20/2, Widening from Multi lane to
Four lane and Strengthening at km
21/6-26/0, 33/4-36/0, 37/8-38/0,
38/2-38/4, 39/320-39/8 and
widening from Multi lane to Four
lane at km 38/0-38/2 of Rayakottai
Athipalli Road including providing
Median, Drain CD works &
Retaining wall (SH-85)

CMRDP 4 Laning Total 24.23 18600.00


Krishnagiri Total 24.23 18600.00
Salem Circle Total 44.10 25036.53

SH Page 19 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

180 01-CRIDP-22- Tiruppur Tiruppur Widening from Two Lane to Four 0.50 475.00
23-S-0180 South Lane and Strengthening at km 0/0 -
0/5 of Tiruppur - Kangayam road
(SH172) including Construction of
Drain and Providing Centre Median
at Km 0/0 - 0/5

181 01-CRIDP-22- Tiruppur Perundurai Widening from Two Lane to Four 1.40 1320.00
23-S-0181 Lane and Strengthening at km
21/6 - 23/0 of Gobi - Uthukuli -
Padiyur road (SH - 81) including
Widening of Slab Culvert at Km
21/8, 22/4 & 22/6, Reconstruction
of Box Culvert at Km 21/8,
Construction of Drain at Km 21/6 -
23/0 and Providing Centre Median
at Km 21/6 - 23/0

182 01-CRIDP-22- Tiruppur Palladam Widening from Two Lane to Four 6.00 5800.00
23-S-0182 Lane and Strengthening at km 0/0 -
6/0 of Palladam - Dharapuram
road including CD
Works,Drain,Construction of
Retaining wall and Providing Center
Median
183 01-CRIDP-22- Tiruppur Palladam Widening from Two Lane to Four 5.80 5700.00
23-S-0183 Lane and Strengthening at km 6/0 -
11/8 of Palladam - Dharapuram
road including CD
Works,Drain,Construction of
Retaining wall and Providing center
median
CMRDP 4 Laning Total 13.70 13295.00
184 01-CRIDP-22- Tiruppur Tiruppur Construction of Drain at km 7/100- 60.00
23-S-0184 North 7/300 of Tirupur ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam
Urban Improvements Total 60.00
185 01-CRIDP-22- Tiruppur Tiruppur Providing Junction Improvement at 330.00
23-S-0185 North km 8/8 of Tirupur ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam
186 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 13.00
23-S-0186 at km 7/2,6 of
Kamanaickenpalayam - Annur
road
187 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50
23-S-0187 at km 7/8(i) of Palladam - Cochin
Frontier road
188 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50
23-S-0188 at km 7/8(ii) of Palladam - Avinashi
- Puliyampatti road
189 01-CRIDP-22- Tiruppur Perundurai Providing Metal Crash Barrier at 10.50
23-S-0189 km 8/8 of Tiruppur -
Vijayamangalam road
190 01-CRIDP-22- Tiruppur Perundurai Providing Metal Crash Barrier at 10.00
23-S-0190 km 20/8, 36/2, 40/8 of Gobi -
Uthukuli - Padiyur road

SH Page 20 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

191 01-CRIDP-22- Tiruppur Tiruppur Providing Metal Crash Barrier at 24.50


23-S-0191 North km 12/6 and 13/8 of Tirupur ring
road (Via) Thirumuruganpoondi -
Nallur - 15,Velampalayam

192 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 35.80


23-S-0192 km 22/4, 26/2,6, 27/8 of Tirupur
ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam
193 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 8.00
23-S-0193 km 21/8 of Avinashi - Tiruppur -
Palladam - Pollachi - Cochin (Via)
Meenkarai Road
194 01-CRIDP-22- Tiruppur Tiruppur Providing Cantilever Gantry board 13.00
23-S-0194 South at km 21/2, 27/10 of Tirupur ring
road (Via) Thirumuruganpoondi -
Nallur - 15,Velampalayam

195 01-CRIDP-22- Tiruppur Avinashi Providing Metal Crash Barrier at 13.00


23-S-0195 km 7/8 of Cheyur to Erode-Sathy
road
196 01-CRIDP-22- Tiruppur Tiruppur Providing Cantilever Gantry board 26.00
23-S-0196 North at km 11/2,10, 12/2 and 14/2 of
Tirupur - Perumanallur -
Kunnathur - Perundhurai Road
197 01-CRIDP-22- Tiruppur Perundurai Providing Cantilever Gantry board 6.50
23-S-0197 at km 21/2 of Tirupur -
Perumanallur - Kunnathur -
Perundhurai Road
198 01-CRIDP-22- Tiruppur Tiruppur Providing Cantilever Gantry board 13.00
23-S-0198 North at km 106/2 of Salem - Cochin
road (NH 47) (Abandoned stretches)
Perumanallur town
199 01-CRIDP-22- Tiruppur Tiruppur Providing Cantilever Gantry board 6.50
23-S-0199 South at km 7/6 of Tiruppur - Kangayam
road
200 01-CRIDP-22- Tiruppur Avinashi Providing Junction Improvement at 175.00
23-S-0200 km 6/4 of Cheyur to Erode-Sathy
road including construction of
Drain
201 01-CRIDP-22- Tiruppur Kangayam Providing Cantilever Gantry board 6.50
23-S-0201 at km 15/6 of Tiruppur -
Kangayam road
202 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 13.00
23-S-0202 at km 2/4, 8/4 of Tirupur -
Somanur road
203 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 13.00
23-S-0203 at km 3/8 of Tirupur - Somanur
road
204 01-CRIDP-22- Tiruppur Tiruppur Providing Cantilever Gantry board 6.50
23-S-0204 North at km 5/2 of Tirupur ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam
205 01-CRIDP-22- Tiruppur Kangayam Providing Metal Crash Barrier at 12.00
23-S-0205 km 16/8,10, 18/4,6 & 18/8 of
Tiruppur - Kangayam road

SH Page 21 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

206 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 13.00


23-S-0206 at km 31/6 and 31/10 of Tirupur
ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam
207 01-CRIDP-22- Tiruppur Kangayam Providing Metal Crash Barrier at 4.00
23-S-0207 km 41/8 of Erode - Dharapuram
road
208 01-CRIDP-22- Tiruppur Perundurai Providing Cantilever Gantry board 13.00
23-S-0208 at km 11/6 , 15/4 of Tiruppur -
Vijayamangalam road
209 01-CRIDP-22- Tiruppur Kangayam Providing Metal Crash Barrier at 4.00
23-S-0209 km 6/2 of Kangayam - Kodumudi
road
210 01-CRIDP-22- Tiruppur Perundurai Providing Cantilever Gantry board 13.00
23-S-0210 at km 29/6 and 29/8 of Gobi -
Uthukuli - Padiyur road
211 01-CRIDP-22- Tiruppur Perundurai Providing Cantilever Gantry board 13.00
23-S-0211 at km 21/2 and 21/8 of Gobi -
Uthukuli - Padiyur road
212 01-CRIDP-22- Tiruppur Perundurai Providing Cantilever Gantry board 13.00
23-S-0212 at km 0/6 and 0/8 of Salem -
Cochin - Kanniyakumari road (NH-
47) (Abandoned Stretches)
Chengappalli town road

213 01-CRIDP-22- Tiruppur Perundurai Providing Cantilever Gantry board 6.50


23-S-0213 at km 35/6 of Gobi - Uthukuli -
Padiyur road
214 01-CRIDP-22- Tiruppur Tiruppur Providing Metal Crash Barrier at 8.80
23-S-0214 South km 6/10, 12/2 of Kovilvazhi -
Karappalayam road
215 01-CRIDP-22- Tiruppur Kangayam Providing Cantilever Gantry board 7.00
23-S-0215 at km 43/4 of Erode - Perundurai -
Kangayam road
216 01-CRIDP-22- Tiruppur Kangayam Providing Cantilever Gantry board 13.00
23-S-0216 at km 30/6 & 47/4 of Erode -
Dharapuram road
217 01-CRIDP-22- Tiruppur Tiruppur Providing Cantilever Gantry board 20.00
23-S-0217 South at km 17/6, 18/10, 21/0 of
Tirupur ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam
218 01-CRIDP-22- Tiruppur Perundurai Reconstruction of Box Culvert in 34.25
23-S-0218 km 0/2 in lieu of existing narrow
damaged cut stone culvert in
abanded NH-47 Chengapalli town
road branching at km 0/8
Chengapalli - Muthampalayam
road

Road Safety Total 911.35


219 01-CRIDP-22- Tiruppur Avinashi Widening from Two Lane to Two 2.80 396.00
23-S-0219 Lane with Paved Shoulders and
Strengthening at km 4/0 - 6/2, 6/4
- 7/0 of Cheyur to Erode-Sathy
road including Construction of box
culvert at km 4/6, Construction of
Retaining wall at km 5/10

SH Page 22 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

220 01-CRIDP-22- Tiruppur Kangayam Widening from Two Lane to Two 1.20 225.00
23-S-0220 Lane with Paved Shoulders and
Strengthening at km 33/0 - 34/2 of
Erode - Dharapuram road
including Reconstruction of Box
culvert at km 34/2.
221 01-CRIDP-22- Tiruppur Tiruppur Widening from Two Lane to Two 0.60 610.00
23-S-0221 North Lane with Paved Shoulders and
Strengthening at km 4/8 - 5/4 of
Tirupur ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam (SH) including
Construction of Box Culvert at Km
5/2, Construction of Drain at Km
4/8 - 5/4, Providing Centre Median
at Km 4/8 - 5/4 and Providing
Paver Blocks at Km 4/8 -5/4.

Other Widening Total 4.60 1231.00


222 01-CRIDP-22- Tiruppur Tiruppur Strengthening at km 0/5 - 1/2, 1/6 1.10 400.00
23-S-0222 South - 2/0 of Tiruppur - Kangayam road
(SH 172) including Construction of
Drain at Km 0/5 - 1/2, 1/6 - 2/0
and Providing Paver Blocks at Km
0/5 - 1/2, 1/6 - 2/0

Strengthening/Improvements
1.10 400.00
Total
223 01-CRIDP-22- Tiruppur Kangayam Reconstruction of Box Culvert at 45.00
23-S-0223 Km 51/2 of Erode - Perundurai -
Kangayam road including
Construction of Drain
224 01-CRIDP-22- Tiruppur Tiruppur Construction of Box Culvert at Km 50.00
23-S-0224 South 14/2 of Tirupur ring road (Via)
Thirumuruganpoondi - Nallur -
15,Velampalayam
Bridges/Culverts Total 95.00
225 01-CRIDP-22- Tiruppur Avinashi Providing Cantilever Gantry board 32.75
23-S-0225 at km 15/8, 16/4, 22/10, 35/4,8
of Palladam - Avinashi -
Puliyampatti road
226 01-CRIDP-22- Tiruppur Avinashi Providing Cantilever Gantry board 13.00
23-S-0226 at km 8/2,6 of Avinashi -
Mettuppalayam road
227 01-CRIDP-22- Tiruppur Avinashi Providing Cantilever Gantry board 13.00
23-S-0227 at km 6/0 and 6/6 of Cheyur to
Erode-Sathy road
Others Total 58.75
Tiruppur Total 19.40 16051.10
228 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 21.00
23-S-0228 km 68/8-69/0 of Erode -
Dharapuram road
229 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 4.00
23-S-0229 m km 12/6 and 17/4 of Udumalpet -
Dharapuram road
230 01-CRIDP-22- Dharapuram Udumalaipett Providing Metal Crash Barrier at 7.36
23-S-0230 ai km 22/8-23/2 of Pollachi -
Dharapuram - Karur Road

SH Page 23 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

231 01-CRIDP-22- Dharapuram Kangayam Providing Metal Crash Barrier at 8.00


23-S-0231 km 11/6 & 15/6 of Vellakovil -
Mulanur road (via) Akkaraipalayam
road
232 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 1.25
23-S-0232 km 72/2 of Pollachi - Dharapuram -
Karur Road
233 01-CRIDP-22- Dharapuram Udumalaipett Providing Junction Improvement at 200.00
23-S-0233 ai km 4/4-4/8 of Udumalpet -
Dharapuram road
Road Safety Total 241.61
234 01-CRIDP-22- Dharapuram Dharapuram Widening from Two Lane to Two 2.30 471.00
23-S-0234 Lane with Paved Shoulders and
Strengthening at km 45/8 - 48/1 of
Pollachi - Dharapuram - Karur
Road
235 01-CRIDP-22- Dharapuram Dharapuram Widening from Two Lane to Two 1.00 220.00
23-S-0235 Lane with Paved Shoulders and
Strengthening at km 65/6 - 66/6 of
Erode - Dharapuram road
including reconstruction of culvert
at km 66/4
236 01-CRIDP-22- Dharapuram Dharapuram Widening from Two Lane to Two 1.70 400.00
23-S-0236 Lane with Paved Shoulders and
Strengthening at km 66/0 - 67/0,
67/8 - 68/0, 72/0 - 72/5 of
Pollachi - Dharapuram - Karur
Road including Reconstruction of
box culvert in lieu of damaged pipe
culvert at Km 66/2, & 66/10

237 01-CRIDP-22- Dharapuram Kangayam Widening from Two Lane to Two 2.00 440.00
23-S-0237 Lane with Paved Shoulders and
Strengthening at km 14/0 - 16/0 of
Kangayam - Kodumudi road
including Reconstruction of Box
culvert in lieu of damaged pipe
culvert at km 14/2, 14/4, 14/8 &
15/2 and Construction of Retaining
wall at km 14/10 & 15/2 and
Widening of Slab culvert at km
15/6 and Dip raising at km 14/8

Other Widening Total 7.00 1531.00


Dharapuram Total 7.00 1772.61
238 01-CRIDP-22- Erode Modakurichi Widening from Two Lane to Four 0.60 450.00
23-S-0238 Lane and Strengthening at km
11/0 - 11/6 of Erode -
Dharapuram road including
Reconstruction of box culvert in
existing narrow pipe culvert at km
11/4 (i)(ii)(iii) and Construction of
Protective wall at km 11/2, 11/4,
11/6 (SH83A)
CMRDP 4 Laning Total 0.60 450.00

SH Page 24 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

239 01-CRIDP-22- Erode Erode West Urban Improvements - Widening 2.00 650.00
23-S-0239 from End to End and Strengthening
at km 8/0 - 8/60, Widening from
Two Lane to Two Lane with Paved
Shoulders and Strengthening at km
8/60 - 10/0 of Erode - Thingalur
road including widening of culvert
at Km 8/10, 9/6, Reconstruction of
culvert at Km 8/2, 8/4, 8/6, 8/8,
9/2, 9/4, 9/8 and construction of
drain at Km 8/0 - 8/6 (SH 173)

240 01-CRIDP-22- Erode Erode East Urban Improvements - Widening 0.80 660.00
23-S-0240 End to End and Strengthening at
km 2/8 - 3/6 of Erode - Perundurai
- Kangayam road including bus
layby at km 3/2,4 and construction
of storm water drain with footpath

241 01-CRIDP-22- Erode Erode East Construction of Drain at km 3/4 of 28.00


23-S-0241 Erode - Dharapuram road
including foot path, Hard bed
(SH83A)
242 01-CRIDP-22- Erode Erode East Urban Improvements - Widening 2.10 650.00
23-S-0242 from Two Lane with Paved
Shoulders to Four Lane and
Improvements at km 0/8 - 2/9 of
Erode - Dharapuram road
including Construction of storm
water drain with foot path at Km
0/10, 1/2, providing Paver block
(SH83A)
243 01-CRIDP-22- Erode Anthiyur Urban Improvements - Widening 0.40 350.00
23-S-0243 from Two Lane to Four Lane and
Improvements at km 16/2 - 16/6 of
Bhavani - Anthiyur -
Chellampalayam road including
Reconstruction of culvert, at Km
16/6, Construction of Drain at Km
16/4,6 and providing Paver block
(SH175)
Urban Improvements Total 5.30 2338.00
244 01-CRIDP-22- Erode Anthiyur Providing Metal Crash Barrier at 55.00
23-S-0244 km 29/4-39/2 of Sathy - Athani -
Bhavani road (SH82)

SH Page 25 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

245 01-CRIDP-22- Erode Erode West Providing Metal Crash Barrier at 20.00
23-S-0245 km 87/2 of Thoppur - Mettur -
Bhavani - Erode Road including
(SH20)
Road Safety Total 75.00
246 01-CRIDP-22- Erode Modakurichi Widening from Two Lane to Two 2.05 475.00
23-S-0246 Lane with Paved Shoulders and
Strengthening at km 7/0 - 8/0,
11/7 - 11/9, 12/150 - 13/0 of
Karumandampalayam - Salaipudur
road (via) Malayampalayam,
Thamaraipalayam including
widening of culvert at Km 12/6 and
construction of Retaining wall at
Km 7/8, 7/10, 12/6, 12/8 & 12/10
(SH190)

247 01-CRIDP-22- Erode Modakurichi Widening from Two Lane to Two 2.80 616.00
23-S-0247 Lane with Paved Shoulders and
Strengthening at km 23/0 - 25/80
of Erode - Dharapuram road
including widening of culvert at Km
24/10 and Reconstruction of
culvert in lieu of existing pipe
culvert at Km 24/6 & 24/10 (SH83
A)
248 01-CRIDP-22- Erode Perundurai Widening from Two Lane to Two 2.40 570.00
23-S-0248 Lane with Paved Shoulders and
Strengthening at km 32/0 - 34/40
of Tirupur - Perumanallur -
Kunnathur - Perundurai road
including Reconstruction of culvert
at Km 33/2, 34/2, 34/4 widening
of culvert at Km 32/2 (SH 196)

Other Widening Total 7.25 1661.00


249 01-CRIDP-22- Erode Bhavani Strengthening at km 48/0 - 52/8 of 4.80 675.00
23-S-0249 Sathy - Athani - Bhavani road
(SH82)
Strengthening/Improvements
4.80 675.00
Total
250 01-CRIDP-22- Erode Perundurai Construction of Box Culvert at 0/4 20.00
23-S-0250 of Vijiyamangalam Town bypass
Road including construction of
drain at Km 0/4 (SHU113)

251 01-CRIDP-22- Erode Bhavani Construction of Box Culvert at 150.00


23-S-0251 46/6 of Sathy - Athani - Bhavani
road including Construction of
Drain at km 46/0-47/0 (SH82)
252 01-CRIDP-22- Erode Modakurichi Reconstruction of Box Culvert at 15.00
23-S-0252 Km 23/10 of Erode - Karur road
(SH 84)
Bridges/Culverts Total 185.00
Erode Total 17.95 5384.00
253 01-CRIDP-22- Karur Aravakurichi Construction of Retaining wall at 150.00
23-S-0253 km 28/4,8,10, 29/2 of Thadicombu
- Pallapatty - Aravakurichi Road

Road Safety Total 150.00

SH Page 26 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

254 01-CRIDP-22- Karur Aravakurichi Widening from Two Lane to Two 3.00 700.00
23-S-0254 Lane with Paved Shoulders and
Strengthening at km 32/0 - 33/0,
34/0 - 36/0 of Thadicombu -
Pallapatty - Aravakurichi Road
including construction of culvert at
km 32/2, 34/6 and 35/8 in lieu of
existing damaged culvert

255 01-CRIDP-22- Karur Aravakurichi Widening from Two Lane to Two 2.00 450.00
23-S-0255 Lane with Paved Shoulders and
Strengthening at km 38/0 - 39/0,
40/0 - 41/0 of Thadicombu -
Pallapatty - Aravakurichi Road
including widening of culvert at km
40/4 and 40/10 in lieu of existing
damaged culvert

256 01-CRIDP-22- Karur Krishnarayap Widening from Two Lane to Two 1.60 410.00
23-S-0256 uram Lane with Paved Shoulders and
Strengthening at km 17/4 - 19/0 of
Vaiyampatty - Karur Road (via)
Mylampatty - Uppidamangalam
including Construction of slab
culvert at km 17/6 in lieu of
existing narrow culvert

257 01-CRIDP-22- Karur Krishnarayap Widening from Two Lane to Two 2.00 490.00
23-S-0257 uram Lane with Paved Shoulders and
Strengthening at km 19/0 - 21/0 of
Vaiyampatty - Karur Road (via)
Mylampatty - Uppidamangalam
including construction of slab
culvert at km 19/8 in lieu of
existing damaged narrow culvert

Other Widening Total 8.60 2050.00


258 01-CRIDP-22- Karur Kulithalai Construction of Box Culvert at Km 75.00
23-S-0258 183/4 of Nagapatinam - Gudalor -
Mysore Road (Abandoned NH 67)
Krishnarayapuram (5x5m) in Lieu
of Existing Damaged Narrow
Culvert

Bridges/Culverts Total 75.00


Karur Total 8.60 2275.00
Tiruppur Circle Total 52.95 25482.71
259 01-CRIDP-22- Coimbatore Coimbatore Formation of Western Ring Road to 25000.00
23-S-0259 North Coimbatore City with Four Lane
divided carriageway including
construction of two vehicular
underpass, minor bridges and
Junction improvement at Km 0/0 -
11/8 in Phase-I

Announcement Total 25000.00

SH Page 27 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

260 01-CRIDP-22- Coimbatore Thondamuth Urban Improvements - Widening 1.00 200.00


23-S-0260 ur from Four Lane to Four Lane with
Paved Shoulders and
Improvements at km 162/0 -
163/0 of Salem - Cochin -
Kanyakumari Road (Abandoned
from NH47)
261 01-CRIDP-22- Coimbatore Coimbatore Urban Improvements - Widening 1.00 310.00
23-S-0261 South from Four Lane to Four Lane with
Paved Shoulders and
Improvements at km 0/6 - 1/6 of
Valangulam ByePass Road
Urban Improvements Total 2.00 510.00
262 01-CRIDP-22- Coimbatore Coimbatore Providing Over Head Gantry board 24.20
23-S-0262 South at km 1/4 of North Coimbatore -
Maruthamalai Road

263 01-CRIDP-22- Coimbatore Coimbatore Providing Over Head Gantry board 24.20
23-S-0263 North at km 5/8 of North Coimbatore -
Maruthamalai Road

264 01-CRIDP-22- Coimbatore Coimbatore Providing Over Head Gantry board 24.20
23-S-0264 South at km 3/4 of North Coimbatore -
Ramanathapuram - Chettipalayam
Road
265 01-CRIDP-22- Coimbatore Avinashi Providing Cantilever Gantry board 6.50
23-S-0265 at km 0/2 of Neelipalayam -
Sirumugai Road
266 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-S-0266 m at km 76/6 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road
267 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-S-0267 m at km 28/8 of Avinashi -
Mettuppalayam road
268 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 13.00
23-S-0268 m at km 2/2 of Karamadai -
Kariyaampalayam Road
Road Safety Total 105.10
269 01-CRIDP-22- Coimbatore Sulur Widening from Two Lane with 2.10 680.00
23-S-0269 Paved Shoulders to Four Lane and
Strengthening at km 24/4 - 26/0,
Improvements at km 23/9 - 24/4 of
Kamanaickenpalayam - Annur
road including widening,
Recnstruction of box culvert and
providing precasted crash barrier
type Centre median
270 01-CRIDP-22- Coimbatore Kavundampal Widening from Two Lane to Two 2.00 665.00
23-S-0270 ayam Lane with Paved Shoulders and
Strengthening at km 11/0 - 13/0 of
Coimbatore - Anaikatty Road
including Construction of culvert,
Drain and Retaining wall

271 01-CRIDP-22- Coimbatore Kavundampal Widening from Two Lane to Two 2.60 580.00
23-S-0271 ayam Lane with Paved Shoulders and
Strengthening at km 13/0 - 15/6 of
Coimbatore - Anaikatty Road
including Construction of Retaining
wall

SH Page 28 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

272 01-CRIDP-22- Coimbatore Kavundampal Widening from Two Lane to Two 2.60 570.00
23-S-0272 ayam Lane with Paved Shoulders and
Strengthening at km 15/6 - 18/2 of
Coimbatore - Anaikatty Road
including Construction of Retaining
wall
Other Widening Total 9.30 2495.00
273 01-CRIDP-22- Coimbatore Mettupalaya Strengthening at km 13/2 - 15/4 of 2.20 198.00
23-S-0273 m Neelipalayam - Sirumugai Road

Strengthening/Improvements
2.20 198.00
Total
274 01-CRIDP-22- Coimbatore Mettupalaya Rebuilding at km 58/0 - 58/2 of 0.20 90.00
23-S-0274 m Ooty - Kotagiri Mettupalayam -
Sathi - Gobi - Erode Road
Tourism Important Total 0.20 90.00
Coimbatore Total 13.70 28398.10
275 01-CRIDP-22- Pollachi Pollachi Urban Improvements - Widening 1.00 347.00
23-S-0275 from Two Lane to Two Lane with
Paved Shoulders and
Improvements at km 0/0 - 0/6,
1/2 - 1/6 of Pollachi - Valparai
Road including construction of
drain at Km 0/4 - 0/6 & 1/2 - 1/6
(BS)
276 01-CRIDP-22- Pollachi Udumalaipett Urban Improvements - Widening 1.40 180.00
23-S-0276 ai from Two Lane to Two Lane with
Paved Shoulders and
Improvements at km 2/2 - 3/6 of
Pollachi - Valparai Road including
construction of CC Drain Km 3/0-
3/6 (LS)
Urban Improvements Total 2.40 527.00
277 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 25.00
23-S-0277 km 28/10 of Pollachi - Valparai
Road including Culvert
278 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 60.00
23-S-0278 km 37/6 of Pollachi - Valparai
Road including Culvert
279 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 40.00
23-S-0279 km 39/10 of Pollachi - Valparai
Road including Culvert
280 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 40.00
23-S-0280 km 57/2 of Pollachi - Valparai
Road including Culvert
281 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 25.00
23-S-0281 km 39/2 of Pollachi - Valparai
Road including Culvert
282 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 30.00
23-S-0282 km 56/10 of Pollachi - Valparai
Road including Culvert
283 01-CRIDP-22- Pollachi Valparai Construction of Retaining wall at 75.00
23-S-0283 km 62/8 of Pollachi - Valparai
Road including Culvert
284 01-CRIDP-22- Pollachi Valparai Providing Metal Crash Barrier at 49.00
23-S-0284 Km 37/4, 37/6, 38/8, 38/10,
39/4, and 39/6 of Pollachi Valparai
road (SH78)

SH Page 29 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

285 01-CRIDP-22- Pollachi Valparai Providing Metal Crash Barrier at 45.00


23-S-0285 Km 52/4, 52/6, 52/8, 53/2, 53/6,
53/8, 54/2 and 54/4 of Pollachi
Valparai road (SH78)
286 01-CRIDP-22- Pollachi Valparai Providing Metal Crash Barrier at 35.00
23-S-0286 Km55/4, 55/8, 55/10, 56/2, 56/4,
57/2 and 57/4 of Pollachi Valparai
road (SH78)
287 01-CRIDP-22- Pollachi Valparai Providing Metal Crash Barrier at 25.00
23-S-0287 Km 59/4, 59/6, 59/8, 59/10 and
60/2 of Pollachi Valparai road (SH
78)
Road Safety Total 449.00
288 01-CRIDP-22- Pollachi Pollachi Widening from Two Lane to Two 1.90 525.00
23-S-0288 Lane with Paved Shoulders and
Strengthening at km 51/0 - 51/4,
52/0 - 53/2, 57/1 - 57/4 of
Avinashi - Tiruppur - Palladam -
Pollachi - Cochin (Via) Meenkarai
Road including Construction of
Retaining wall at km 51/2 and
51/4
289 01-CRIDP-22- Pollachi Valparai Widening from Two Lane to Two 2.60 670.00
23-S-0289 Lane Paved Shoulders and
Strengthening at km 7/4 - 10/0 of
Pollachi - Valparai Road including
Reconstruction of Culvert at Km
8/10, 9/8, 9/10 and Widening of
RCC Bridge at Km.8/4

290 01-CRIDP-22- Pollachi Valparai Widening from Two Lane to Two 1.00 290.00
23-S-0290 Lane with Paved Shoulders and
Strengthening at km 87/4 - 88/4 of
Avinashi - Tiruppur - Palladam -
Pollachi - Cochin (Via) Meenkarai
Road including Reconstruction of
culvert at Km Km 88/4,6 &
Retaining wall
Other Widening Total 5.50 1485.00
291 01-CRIDP-22- Pollachi Valparai Strengthening at km 24/0-28/0 of 4.00 700.00
23-S-0291 Pollachi Valparai road including CC
Drain, Retaining wall at Km 24/2
and CD works at Km 25/4,8,10,
26/6, 27/2,6, and 27/8, including
DPR for flood Mitigation and Road
Safety audit in Ghat Section at Km
23/6-64/0 (SH78)

292 01-CRIDP-22- Pollachi Valparai Strengthening at km 28/0-30/6, 3.60 675.00


23-S-0292 57/4-58/4 of Pollachi Valparai road
including CC Drain, Retaining wall
at Km 57/8, CD works at Km
30/4, 57/6, 57/8, 57/10, 58/2,
58/4 (SH78)

Strengthening/Improvements
7.60 1375.00
Total
Pollachi Total 15.50 3836.00

SH Page 30 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

293 01-CRIDP-22- Udhagai Udhagamand Widening from Intermediate Lane 1.00 395.00
23-S-0293 alam to Two Lane and Strengthening at
km 13/0 - 14/0 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road including CC Drain,
CD works and Protective works.

294 01-CRIDP-22- Udhagai Udhagamand Widening from Intermediate Lane 1.00 388.00
23-S-0294 alam to Two Lane and Strengthening at
km 17/0 - 18/0 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road including CC Drain,
CD works and Protective works

CMRDP IL to DL Total 2.00 783.00


295 01-CRIDP-22- Udhagai coonoor Providing Metal Crash Barrier at 26.00
23-S-0295 km 19/8, 25/6, 34/10, 38/6 of
Ooty - Kotagiri Mettupalayam -
Sathi - Gobi - Erode Road
296 01-CRIDP-22- Udhagai gudalur Providing Metal Crash Barrier at 24.00
23-S-0296 km 96/8, 97/4, 98/4,8, 99/10 of
Calicut Vythiri Gudalur road
297 01-CRIDP-22- Udhagai Gudalur Providing Metal Crash Barrier at 26.00
23-S-0297 km 101/2, 101/4, 103/6, 109/6 of
Calicut Vythiri Gudalur road
298 01-CRIDP-22- Udhagai Gudalur Providing Metal Crash Barrier at 20.00
23-S-0298 km 120/8, 121/2,6, 122/8 of
Calicut Vythiri Gudalur road
299 01-CRIDP-22- Udhagai Gudalur Providing Metal Crash Barrier at 22.00
23-S-0299 km 123/6, 124/4, 128/6 of Calicut
Vythiri Gudalur road
300 01-CRIDP-22- Udhagai Gudalur Providing Metal Crash Barrier at 20.00
23-S-0300 km 127/4, 128/10, 131/2 of
Calicut Vythiri Gudalur road
301 01-CRIDP-22- Udhagai Gudalur Providing Metal Crash Barrier at 18.00
23-S-0301 km 107/6, 108/6, 109/2 of Calicut
- Nilambur - Gudalur road

302 01-CRIDP-22- Udhagai Gudalur Providing Metal Crash Barrier at 20.00


23-S-0302 km 1/2, 4/4,6,8,10, 5/2 of
Gudalur - Sulthanbathery road
Road Safety Total 176.00
303 01-CRIDP-22- Udhagai Udhagamand Strengthening at km 2/0 - 3/0 of 1.00 100.00
23-S-0303 alam Ooty - Kotagiri Mettupalayam -
Sathi - Gobi - Erode Road including
CC Drain
304 01-CRIDP-22- Udhagai Gudalur Strengthening at km 123/2 - 127/0 3.80 460.00
23-S-0304 of Calicut Vythiri Gudalur road
including Protective works
305 01-CRIDP-22- Udhagai Gudalur Strengthening at km 127/0 - 130/0 3.00 390.00
23-S-0305 of Calicut Vythiri Gudalur road
including Protective works
306 01-CRIDP-22- Udhagai Gudalur Strengthening at km 130/0 - 133/4 3.40 430.00
23-S-0306 of Calicut Vythiri Gudalur road
including protective works
307 01-CRIDP-22- Udhagai Gudalur Strengthening at km 1/0 - 3/6 of 2.60 390.00
23-S-0307 Gudalur - Sulthanbathery road
including Protective works

SH Page 31 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

308 01-CRIDP-22- Udhagai Gudalur Strengthening at km 3/6 - 6/0 of 2.40 320.00


23-S-0308 Gudalur - Sulthanbathery road
including protective works
Strengthening/Improvements
16.20 2090.00
Total
309 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 40.00
23-S-0309 alam km 7/4 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road
310 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 50.00
23-S-0310 alam km 16/2 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road
311 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 40.00
23-S-0311 alam km 17/8 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road
312 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 30.00
23-S-0312 km 33/10 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road
Flood Permanent Total 160.00
313 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 587.00
23-S-0313 km 19/4, 30/6, 32/2,6,8,
33/2,4,6, 41/10 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road including Widening
Culvert at km 19/2 and providing
paver block at Km 26/10, 27/2 and
27/4
314 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 65.00
23-S-0314 km 39/8, 10 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road including CC Drain
Others Total 652.00
Udhagai Total 18.20 3861.00
Coimbatore Circle Total 47.40 36095.10
315 01-CRIDP-22- Trichy Manapparai Widening from Two Lane to Four 6.00 6500.00
23-S-0315 Lane and Strengthening at km
14/0 - 20/0 of Manapparai -
Thuvarankurichi Road including
widening of culverts, reconstruction
of box culverts, construction of
protective wall, construction of
drain and construction of centre
median (SH 71A).

SH Page 32 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

316 01-CRIDP-22- Trichy Manapparai Widening from Two Lane to Four 5.20 5000.00
23-S-0316 Lane and Strengthening at km
20/0 - 25/2 of Manapparai -
Thuvarankurichi Road including
widening of culverts, reconstruction
of box culverts, construction of
protective wall, construction of
drain and construction of centre
median (SH 71A).

CMRDP 4 Laning Total 11.20 11500.00


Trichy Total 11.20 11500.00
317 01-CRIDP-22- Tanjavur Kumbakonam Widening from Two Lane to Two 0.40 98.00
23-S-0317 Lane with Paved Shoulders and
Strengthening at km 8/8 - 9/2 of
Kumbakonam - Mannargudy -
Adirampattinam road
Other Widening Total 0.40 98.00
318 01-CRIDP-22- Tanjavur Kumbakonam Strengthening at km 46/0 - 46/950 0.95 130.00
23-S-0318 of Nagoor- Nannilam - Nachiyarkoil
Road
Strengthening/Improvements
0.95 130.00
Total
Tanjavur Total 1.35 228.00
319 01-CRIDP-22- Pudukottai Pudukkottai Widening from Two Lane to Two 0.40 140.00
23-S-0319 Lane with Paved Shoulders and
Strengthening at km 50/2 - 50/6 of
Thiruchirapalli - Ramanathapuram
Road (Abandoned NH 210 Stretches
in Pudukottai) including
Reconstruction of culverts at
km50/6 and Providing paver
blocks at Km 50/2-50/6

320 01-CRIDP-22- Pudukottai Thirumayam Widening from Two Lane to Two 1.93 490.00
23-S-0320 Lane with Paved Shoulders and
Strengthening at km 55/475 -
57/40 of Thiruchirapalli -
Ramanathapuram Road
(Abandoned NH 210 Stretches in
Pudukottai) including
Reconstruction of box culvert at km
56/2,56/4,56/6 and including
vellaru bridge approach road on
both sides
Other Widening Total 2.33 630.00
321 01-CRIDP-22- Pudukottai Aranthangi Strengthening at km 93/0 - 93/6 of 0.60 95.00
23-S-0321 Thanjavur - Pattukottai -
Aranthangi - Karaikudi - Kallal -
Kalaiyarkoil- Maravamangalam -
Elayankudi - Paramakudi -
Mudukulathur - Sayalkudi Road
322 01-CRIDP-22- Pudukottai Thirumayam Strengthening at km 18/6 - 20/2, 2.60 300.00
23-S-0322 29/2 - 30/2 of Namanasamudram -
Ponnamaravathy road

Strengthening/Improvements
3.20 395.00
Total
Pudukottai Total 5.52 1025.00

SH Page 33 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

323 01-CRIDP-22- Tiruvarur Mannargudi Widening from Intermediate Lane 2.60 550.00
23-S-0323 to Two Lane and Strengthening at
km 35/0 - 37/6 of Tiruvarur -
Mannargudi - Muthupet road
including Construction of Retaining
wall at Km 35/4, 36/2,4,8, 37/4,6

324 01-CRIDP-22- Tiruvarur Thiruthuraipo Widening from Intermediate Lane 4.00 650.00
23-S-0324 ondi to Two Lane and Strengthening at
km 45/0 - 47/0, 48/0 - 50/0 of
Tiruvarur - Mannargudi - Muthupet
road including Construction of
Retaining wall at Km 45/4,8,
46/6,8,10, 49/8

325 01-CRIDP-22- Tiruvarur Mannargudi Widening from Intermediate Lane 2.40 505.00
23-S-0325 to Two Lane and Strengthening at
km 37/6 - 40/0 of Tiruvarur -
Mannargudi - Muthupet road
including Construction of Retaining
wall at Km 37/8,10, 38/4,6,
39/2,6,8,10

326 01-CRIDP-22- Tiruvarur Thiruthuraipo Widening from Intermediate Lane 2.40 481.00
23-S-0326 ondi to Two Lane and Strengthening at
km 40/0 - 42/0, 54/700 - 55/100
of Tiruvarur - Mannargudi -
Muthupet road including
Construction of Retaining wall at
Km 40/2,4,6,8,10, 41/2,8,10

CMRDP IL to DL Total 11.40 2186.00


327 01-CRIDP-22- Tiruvarur Thiruthuraipo Widening from Two Lane to Two 1.40 340.00
23-S-0327 ondi Lane with Paved Shoulders and
Strengthening at km 52/6 - 54/0 of
Thanjavur - Mannargudy -
Thiruthuraipoondi - Vedaranyam -
Kodiyakkari road including
Construction of Drain
328 01-CRIDP-22- Tiruvarur Thiruthuraipo Widening from Two Lane to Two 2.20 530.00
23-S-0328 ondi Lane with Paved Shoulders and
Strengthening at km 54/0 - 56/2 of
Thanjavur - Mannargudy -
Thiruthuraipoondi - Vedaranyam -
Kodiyakkari road including
Construction of Drain
Other Widening Total 3.60 870.00
329 01-CRIDP-22- Tiruvarur Nannilam Strengthening at km 25/2 - 30/0 of 4.80 550.00
23-S-0329 Kumbakonam - Karaikal Road

330 01-CRIDP-22- Tiruvarur Nannilam Strengthening at km 30/0 - 32/0, 2.70 300.00


23-S-0330 39/0 - 39/7 of Kumbakonam -
Karaikal Road
Strengthening/Improvements
7.50 850.00
Total
Tiruvarur Total 22.50 3906.00

SH Page 34 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

331 01-CRIDP-22- Nagapattinam Nagapattinam Urban Improvements - Widening 0.80 400.00


23-S-0331 from Two Lane to End to End and
Strengthenin at Km 0/0 - 0/8 of
Nagoor - Nannilam - Nachiyarkoil
Road including Providing Paver
block and Construction of Drain
Km 0/0 - 0/8 and widening of
culverts at Km 0/4, 0/6, 0/8

332 01-CRIDP-22- Nagapattinam Nagapattinam Urban Improvements - Widening 0.80 391.00


23-S-0332 from Two Lane to End to End and
Strengthening at Km 0/8 - 1/6 of
Nagoor - Nannilam - Nachiyarkoil
Road including Providing Paver
block and Construction of Drain
Km 0/8 - 1/6 and widening of
culvert at Km 1/4

Urban Improvements Total 1.60 791.00


333 01-CRIDP-22- Nagapattinam Nagapattinam Curve Widening at km 2/2 of 50.00
23-S-0333 Nagoor- Nannilam - Nachiyarkoil
Road
334 01-CRIDP-22- Nagapattinam Nagapattinam Curve Widening at km 2/6 of 50.00
23-S-0334 Nagore - Vettar Road

Road Safety Total 100.00


335 01-CRIDP-22- Nagapattinam Nagapattinam Strengthening at km 8/0 - 10/0 of 2.00 368.00
23-S-0335 Nagore - Vettar Road

336 01-CRIDP-22- Nagapattinam Vedaranyam Construction of C.C.Pavement at 0.40 660.00


23-S-0336 km 95/6 - 96/0 of Thanjavur -
Mannargudy - Thiruthuraipoondi -
Vedaranyam - Kodiyakkari road
including Construction of Drain
and Box Culvert at km 95/8(i),
95/8(ii), 95/8(iii), 95/8(iv), 95/10

Strengthening/Improvements
2.40 1028.00
Total
337 01-CRIDP-22- Nagapattinam Vedaranyam Reconstruction of Box Culvert at 40.00
23-S-0337 Km 99/6 of Thanjavur -
Mannargudy - Thiruthuraipoondi -
Vedaranyam - Kodiyakkari road

338 01-CRIDP-22- Nagapattinam Vedaranyam Reconstruction of Box Culvert at 35.00


23-S-0338 Km 106/2 of Thanjavur -
Mannargudy - Thiruthuraipoondi -
Vedaranyam - Kodiyakkari road

Bridges/Culverts Total 75.00


Nagapattinam Total 4.00 1994.00
339 01-CRIDP-22- Mayiladuthur Mayiladuthur Urban Improvements - Widening 0.60 310.00
23-S-0339 ai ai from Two Lane to EndtoEnd and
Improvements at km 100/2 -
100/8 of Grandanaicut -
Cauveripattinam road including
providing paver block and
construction of drain at Km.100/2-
100/8
Urban Improvements Total 0.60 310.00

SH Page 35 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

340 01-CRIDP-22- Mayiladuthur Mayiladuthur Construction of Retaining wall at 128.00


23-S-0340 ai ai km 95/4-95/8 of Grandanaicut -
Cauveripattinam road

Road Safety Total 128.00


341 01-CRIDP-22- Mayiladuthur Mayiladuthur Widening from Two Lane to Two 1.12 380.00
23-S-0341 ai ai Lane with Paved Shoulders and
Strengthening at km 28/478 - 29/6
of Kumbakonam - Sirkali road
including Construction of Retaining
wall at Km.28/6, 29/2
Other Widening Total 1.12 380.00
342 01-CRIDP-22- Mayiladuthur Poompuhar Reconstruction of Box Culvert at 50.00
23-S-0342 ai km 9/2 of Mayiladuthurai -
Thiruthuraipoondi Road including
Construction of Retaining wall

343 01-CRIDP-22- Mayiladuthur Poompuhar Reconstruction of Box Culvert at 50.00


23-S-0343 ai km 9/4 of Mayiladuthurai -
Thiruthuraipoondi Road including
Construction of Retaining wall

Bridges/Culverts Total 100.00


Mayiladuthurai Total 1.72 918.00
Trichy Circle Total 46.30 19571.00
344 01-CRIDP-22- Madurai Thiruparanku Widening from Two Lane with 0.80 467.00
23-S-0344 ndram Paved Shoulders to Four Lane and
Strengthening at km 5/0 - 5/8 of
Madurai - Tuticorin road including
Constrution of centre median and
protective wall & Reconstruction
Box culvert at Km 5/2 & 5/8.

345 01-CRIDP-22- Madurai Thiruparanku Widening from Two Lane with 0.60 374.00
23-S-0345 ndram Paved Shoulders to Four Lane and
Strengthening at km 5/8 - 6/4 of
Madurai - Tuticorin road including
Constrution of centre median and
protective wall & Reconstruction
Box culvert at Km 6/2 & 6/4 .

346 01-CRIDP-22- Madurai Thiruparanku Widening from Two Lane with 0.60 416.00
23-S-0346 ndram Paved Shoulders to Four Lane and
Strengthening at km 6/4 - 7/0 of
Madurai - Tuticorin road including
Constrution of centre median and
protective wall & Widening of
minor bridge at Km 6/10.

347 01-CRIDP-22- Madurai Madurai East Widening from Two Lane to Four 2.60 2500.00
23-S-0347 Lane and Strengthening at km 6/8 -
9/4 of Madurai Alagarkoil Melur
Road including CD Works and
Constructio of Retaining Wall

CMRDP 4 Laning Total 4.60 3757.00


348 01-CRIDP-22- Madurai Madurai Urban Improvements Widening 0.60 405.00
23-S-0348 North from Four Lane to Six Lane and
Strengthening at km 0/4 - 1/0 of
Madurai - Natham road including
Junction improvements at km 0/6

SH Page 36 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

349 01-CRIDP-22- Madurai Madurai Urban Improvements - Widening 0.70 655.00


23-S-0349 North from Four Lane to Six Lane and
Strengthening at km 1/5 - 2/2 of
Madurai - Natham road including
Widening of slab culvert, Junction
improvements at km 1/8,
Construction of Centre median and
Construction of drain.

350 01-CRIDP-22- Madurai Melur Construction of Drain at km 97/4- 210.00


23-S-0350 99/0 of Trichy - Viralimalai -
Melur - Madurai -Aruppukkottai-
Tuticorin road (Abandoned stretch
of NH 45B) (Melur Town Reach)

351 01-CRIDP-22- Madurai Sholavandan Providing Paver Block in Sholders 50.00


23-S-0351 at km 415/4 of Varanasi -
Kanyakumari Road (Abandoned
NH7) (Vadipatti Town Reach)
including Widening of Culvert and
Construction of Drain.

352 01-CRIDP-22- Madurai Madurai Urban Improvements - Widening 0.50 503.00


23-S-0352 North from Four Lane to Six Lane and
Strengthening at km 1/0 - 1/5 of
Madurai - Natham road including
Widening of Slab culvert and
construction of centre median

353 01-CRIDP-22- Madurai Madurai East Urban Improvements - Widening 0.20 350.00
23-S-0353 from Four Lane to Six Lane and
Strengthening at km 0/0 - 0/2 of
Madurai - Natham road including
Widening of slab culverts at km
0/2 and Construction of Retaining
Wall
354 01-CRIDP-22- Madurai Madurai East Urban Improvements - Widening 0.20 505.00
23-S-0354 from Four Lane to Six Lane and
Strengthening at km 0/2 - 0/4 of
Madurai - Natham road including
Widening of minor bridge at km
0/4 and Construction of Retaining
Wall
Urban Improvements Total 2.20 2678.00
355 01-CRIDP-22- Madurai Madurai Providing Junction Improvement at 500.00
23-S-0355 Central km 4/8 of Madurai - Cochin Road
(NH 49 Extension Abandoned
portion)
(Madurai Town Reach) including
Providing Paver block,
Construction of Centre Median and
Storm water drain
Road Safety Total 500.00

SH Page 37 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

356 01-CRIDP-22- Madurai Madurai West Formation of Service road at km 0.40 465.00
23-S-0356 439/8 - 440/2 of Varanasi-
Kaniyakumari road (Abandoned
NH7) (Madurai-Dindigul Stretch)
(SHU100) including laying Paver
Block and consrtruction of drain
Strengthening/Improvements
0.40 465.00
Total
Madurai Total 7.20 7400.00
357 01-CRIDP-22- Theni Cumbum Providing Junction Improvement at 50.00
23-S-0357 km 0/2 of Uthamapalyam -
Bodenthirapuram road including
Widening the culvert
Road Safety Total 50.00
358 01-CRIDP-22- Theni Bodinayakan Widening from Two Lane to Two 2.30 490.00
23-S-0358 ur Lane with Paved Shoulders and
Strengthening at km 12/5 - 14/8 of
Theni - Chinnamanur (via)
Venkatachalapuram road including
widening the existing culvert at km
13/8 and Construction of Drain at
km 14/2 - 14/6 (SH227)

Other Widening Total 2.30 490.00


359 01-CRIDP-22- Theni Bodinayakan Strengthening at km 0/0 - 1/0 of 1.00 150.00
23-S-0359 ur Abandoned NH 220 in Theni Town
Road (SHU 220)
360 01-CRIDP-22- Theni Cumbum Strengthening at km 0/0 - 2/0 of 2.00 223.00
23-S-0360 Uthamapalayam - Surulipatti Road
including Construction of Retaining
wall
361 01-CRIDP-22- Theni Bodinayakan Strengthening at km 10/0 - 11/2, 2.45 222.00
23-S-0361 ur 11/950 - 13/2 of Uthamapalyam -
Bodenthirapuram road including
Reconstruction of slab culvert at
km.10/4

362 01-CRIDP-22- Theni Andipatti Strengthening at km 29/6 - 30/6 1.00 135.00


23-S-0362 of Devadanapatti - Varusanadu
Road
363 01-CRIDP-22- Theni Cumbum Strengthening at km 0/6 - 1/0, 3/2 1.40 178.00
23-S-0363 - 4/2 of Palayam - Bodi Road
including Providing Bus lay bye
and Curve Improvements
364 01-CRIDP-22- Theni Bodinayakan Strengthening at km 6/2 - 6/6 of 0.40 116.00
23-S-0364 ur Theni - Chinnamanur (via)
Venkatachalapuram road including
Constructions of Drain at km 6/2 -
6/6 ( SH227)
365 01-CRIDP-22- Theni Bodinayakan Strengthening at km 24/0 - 24/9, 1.70 242.00
23-S-0365 ur 31/0 - 31/8 of Palayam - Bodi
Road including Providing Paver
block for berms at km 30/4 and
Construction of Drain at km 29/4,
29/6,30/2,30/4.
366 01-CRIDP-22- Theni Cumbum Strengthening at km 15/4 - 16/4 of 1.00 172.00
23-S-0366 Palayam - Bodi Road including
Junction Improvements .

Strengthening/Improvements
10.95 1438.00
Total

SH Page 38 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

367 01-CRIDP-22- Theni Cumbum Providing Bus Lay Bye at km 2/6 of 50.00
23-S-0367 Abandoned NH 220 in Cumbum
Town Road
Others Total 50.00
Theni Total 13.25 2028.00
368 01-CRIDP-22- Dindigul Athoor Widening from Two Lane to Four 3.40 3200.00
23-S-0368 Lane and Strengthening at km 0/0-
3/4 of Mettur-Palakkanuthu-
Oddanchatram-Dharapuram-
Thiruppur Road (SH37) including
Re-Construction of Culvert,
widening the culvert, Widening
Minor bridge, Construction of
Retaining wall Construction of
Drain Construction of center
median, Junction Improvement and
Bus lay bye including Foot path
and paver block
369 01-CRIDP-22- Dindigul Vedasandur Widening from Two Lane to Four 2.40 2100.00
23-S-0369 Lane and Strengthening at km 8/0-
9/0, 10/0-11/0 and 12/0-12/4 of
Dindigul -Gujiliamparai - Karur
Road including Construction of
Bridge at km 8/2, 12/4 Re-
Construction of culvert km 8/4,
8/10, 12/4, Construction of
Drainat km 12/4 (SH-74)

370 01-CRIDP-22- Dindigul Athoor Widening from Two Lane to Four 2.50 2700.00
23-S-0370 Lane and Strengthening at km
16/2-18/0, 20/6-21/300 of Mettur-
Palakkanuthu-Oddanchatram-
Dharapuram-Thiruppur Road
(SH37) including Re-Construction
of Culvert, widening the culvert,
Widening Minor bridge,
Construction of Retaining wall
Construction of Drain Construction
of center median, Junction
Improvement and Bus lay bye
including Foot path and paver
block
CMRDP 4 Laning Total 8.30 8000.00
371 01-CRIDP-22- Dindigul Nilakkottai Urban Improvements - Widening 0.65 520.00
23-S-0371 from Two Lane to EndtoEnd and
Improvements at km 2/6 - 3/250 of
Abandoned NH 45-Extn in
Vathalagundu town including
Providing Paver Block,
Construction of Drain at km 2/6 -
3/250 and Reconstruction of
Culvert at km 2/10 (SHU45)
372 01-CRIDP-22- Dindigul Palani Construction of Drain at km 24/10, 45.00
23-S-0372 25/4,6,8,10 of Kodai Ghat Road

373 01-CRIDP-22- Dindigul Dindigul Construction of Drain at km 0/8- 40.00


23-S-0373 1/8 of Dindigul - Vathalagundu -
Periyakulam - Theni - Cumbum
Kumuli Road

SH Page 39 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

374 01-CRIDP-22- Dindigul Dindigul Construction of Drain at km 377/8- 90.00


23-S-0374 378/500 of Varanasi -
Kanniyakumari Road (Abandoned
NH-7 part) (Dindigul)

Urban Improvements Total 0.65 695.00


375 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 125.00
23-S-0375 km 11/8, 12/2, 15/4, 23/10 of
Kodai Ghat Road including
Reconstruction of Culvert at km
11/8 & 15/4
Flood Permanent Total 125.00
Dindigul Total 8.95 8820.00
376 01-CRIDP-22- Sivagangai Tirupattur Strengthening at km 28/0 - 28/4, 3.00 549.00
23-S-0376 29/0 - 31/6 of Melur-
Thiruppathur road including
reconstruction of culverts
377 01-CRIDP-22- Sivagangai Tirupattur Strengthening at km 83/6 - 85/8 of 2.20 349.00
23-S-0377 Dindigul - Natham - Singampunari -
Thiruppathur - Devakottai Rastha
Road including reconstruction of
culverts

378 01-CRIDP-22- Sivagangai Tirupattur Strengthening at km 0/0 - 3/0 of 3.00 460.00


23-S-0378 Kummankudi - Kovilur road (via)
Pillayarpatti road including curve
improvements at km 2/2, 2/8 and
providing bus lay bye at km 2/10

379 01-CRIDP-22- Sivagangai Tirupattur Strengthening at km 3/0 - 4/930 of 1.93 329.00


23-S-0379 Kummankudi - Kovilur road (via)
Pillayarpatti road including curve
improvements at km 3/2, 3/6,
providing bus lay bye at km 4/6
and Reconstruction of drain at km
4/2

Strengthening/Improvements
10.13 1687.00
Total
Sivagangai Total 10.13 1687.00
380 01-CRIDP-22- Ramnad Tiruvadanai Widening from Two Lane to Four 5.00 4800.00
23-S-0380 Lane and Strengthening at km 2/0 -
7/0 of Ramanathapuram -
Nainarkoil - Andakudi - Elayankudi
- Sivagangai - Melur road including
Construction of Minor Bridge at km
4/10 and Construction of High
level Bridge at km 5/10 and CD
Works ,Centre Median and
Junction Improvements.

CMRDP 4 Laning Total 5.00 4800.00


381 01-CRIDP-22- Ramnad Mudukulathu Curve Widening and Strengthening 225.00
23-S-0381 r at km 32/6 -33/2 of Parthibanur -
Kamuthi - Aruppukottai road

Road Safety Total 225.00


Ramnad Total 5.00 5025.00
Madurai Circle Total 44.53 24960.00

SH Page 40 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

382 01-CRIDP-22- Tirunelveli Tirunelveli Widening from Two Lane with 4.40 5100.00
23-S-0382 Paved Shoulders to Four Lane and
Strengthening at km 1/4 - 3/369,
4/071 - 4/6, 5/5 - 7/4 of
Tirunelveli Bypass Road. including
CD Works and Centre Median

CMRDP 4 Laning Total 4.40 5100.00


383 01-CRIDP-22- Tirunelveli Palayamkottai Construction of Drain at km 2/613- 50.00
23-S-0383 3/0 of Palayamkottai -
Thoothukudi Road (Tirunelveli
Town Limit) (Abandoned NH 7A)
Urban Improvements Total 50.00
384 01-CRIDP-22- Tirunelveli Tirunelveli Renovation of Two tier Bridge at 204.00
23-S-0384 Km 0/8 of Tirunelveli - Shenkottai -
Kollam Road
Road Safety Total 204.00
385 01-CRIDP-22- Tirunelveli Ambasamudr Widening from Two Lane to Two 1.40 340.00
23-S-0385 am Lane with Paved Shoulders and
Strengthening at km 96/6 - 98/0 of
Tiruchanthur - Palayankottai -
Ambasamuthiram - Tenkasi -
Courtallam - Shenkottai road
including Reconstruction of Minor
bridge at Km 96/8

386 01-CRIDP-22- Tirunelveli Tirunelveli Widening from Two Lane to Two 2.14 697.00
23-S-0386 Lane with Paved Shoulders and
Strengthening at km 4/0 - 5/0,
Improvements at km 2/865 - 4/0 of
Tirunelveli - Shenkottai - Kollam
Road Including CD Works

387 01-CRIDP-22- Tirunelveli Palayamkottai Widening from Four Lane to Four 0.72 310.00
23-S-0387 Lane with Paved Shoulders and
Strengthening at km 154/6 -
155/320 of Madurai -
Kanyakumari Road (Tirunelveli
Town Limit) (Abandoned NH 7)
including CD Works
388 01-CRIDP-22- Tirunelveli Ambasamudr Widening from Two Lane to Two 2.00 530.00
23-S-0388 am Lane with Paved Shoulders and
Strengthening at km 93/0 - 95/0 of
Tiruchanthur - Palayankottai -
Ambasamuthiram - Tenkasi -
Courtallam - Shenkottai road
including Reconstruction of culvert
at Km
93/2,93/10,94/4,94/6,94/10 and
widening of culvert at km 94/8.

389 01-CRIDP-22- Tirunelveli Radhapuram Widening from Two Lane to Two 2.75 524.00
23-S-0389 Lane with Paved Shoulders and
Strengthening at km 37/850 - 40/6
of Cheranmahadevi - Panagudy
Road Reconstruction & widening
culvert at km 39/10 & 40/2

SH Page 41 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

390 01-CRIDP-22- Tirunelveli Nanguneri Widening from Two Lane to Two 2.00 445.00
23-S-0390 Lane with Paved Shoulders and
Strengthening at km 14/0 - 16/0 of
Cheranmahadevi - Panagudy Road
including CD works

Other Widening Total 11.01 2846.00


391 01-CRIDP-22- Tirunelveli Radhapuram Strengthening at km 39/6 - 41/6 of 2.00 232.00
23-S-0391 Nanguneri - Eruvadi - Vallioor -
Vijayapathy Road
392 01-CRIDP-22- Tirunelveli Ambasamudr Strengthening at km 6/6 - 7/0 of 0.40 42.00
23-S-0392 am Cheranmahadevi - Panagudy Road

Strengthening/Improvements
2.40 274.00
Total
Tirunelveli Total 17.80 8474.00
393 01-CRIDP-22- Tenkasi Sankarankovi Urban Improvements - Widening 0.85 315.00
23-S-0393 l from Two Lane to EndtoEnd and
Strengthening at km 16/350 -
16/6, Widening from Two Lane to
Four Lane and Strengthening at km
16/6 - 17/2 of Puliyankudi -
Sankarankoil - Kalugumalai -
Nalattinputhur road including
Providing Paver Block,
Construction of Drain and Center
Median
394 01-CRIDP-22- Tenkasi Sankarankovi Urban Improvements - Widening 0.90 132.00
23-S-0394 l from Two Lane to EndtoEnd and
Strengthening at km 31/1 - 32/0 of
Rajapalayam - Sankarankovil -
Tirunelveli Road including
Construction of Drain
Urban Improvements Total 1.75 447.00
395 01-CRIDP-22- Tenkasi Kadayanallur Providing Cantilever Gantry board 6.47
23-S-0395 at km 12/6 of Shenkottai -
Pavoorchatram road (via) Surandai

396 01-CRIDP-22- Tenkasi Kadayanallur Providing Over Head Gantry board 12.12
23-S-0396 at km 3/6 of Shenkottai -
Pavoorchatram road (via) Surandai

397 01-CRIDP-22- Tenkasi Kadayanallur Providing Cantilever Gantry board 6.47


23-S-0397 at km 10/2 of Tenkasi - Panpozhi -
Thirumalaikovil road
398 01-CRIDP-22- Tenkasi Tenkasi Providing Metal Crash Barrier at 7.76
23-S-0398 km 56/2,4 of Tirunelveli -
Shenkottai - Kollam Road
399 01-CRIDP-22- Tenkasi Tenkasi Providing Metal Crash Barrier at 4.05
23-S-0399 km 130/10 of Tiruchanthur -
Palayankottai - Ambasamuthiram -
Tenkasi - Courtallam - Shenkottai
road
400 01-CRIDP-22- Tenkasi Sankarankovi Providing Metal Crash Barrier at 1.30
23-S-0400 l km 22/6, 33/8 of Rajapalayam -
Sankarankovil - Tirunelveli Road
401 01-CRIDP-22- Tenkasi Sankarankovi Providing Metal Crash Barrier at 7.80
23-S-0401 l km 15/2 - 15/6 of Paruvakudi -
Kovilpatti - Ettayapuram -
Vilathikulam - Vembar road

SH Page 42 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

402 01-CRIDP-22- Tenkasi Sankarankovi Providing Metal Crash Barrier at 4.70


23-S-0402 l km 13/6 and 13/8 of Puliyankudi -
Sankarankoil - Kalugumalai -
Nalattinputhur road

403 01-CRIDP-22- Tenkasi Sankarankovi Providing Metal Crash Barrier at 6.25


23-S-0403 l km 13/6 and 13/8 of Paruvakudi -
Kovilpatti - Ettayapuram -
Vilathikulam - Vembar road
404 01-CRIDP-22- Tenkasi Sankarankovi Providing Metal Crash Barrier at 5.60
23-S-0404 l km 22/4 - 22/8 of Athiyuthu -
Sendamaram (via) Surandai road

405 01-CRIDP-22- Tenkasi Sankarankovi Providing Cantilever Gantry board 6.50


23-S-0405 l at km 22/8 of Athiyuthu -
Sendamaram (via) Surandai road

Road Safety Total 69.02


406 01-CRIDP-22- Tenkasi Tenkasi Widening from Two Lane to Four 2.60 650.00
23-S-0406 Lane and Strengthening at km
13/4 - 14/2, Widening from Two
Lane to Two Lane with Paved
Shoulders and Improvements at km
14/2 - 16/0 of Athiyuthu -
Sendamaram (via) Surandai road
including CD Works
Other Widening Total 2.60 650.00
407 01-CRIDP-22- Tenkasi Alangulam Strengthening at km 35/4 - 36/0, 1.20 250.00
23-S-0407 Providing Paver Block at km 36/0 -
36/6 of Tirunelveli - Pottalpudur
road including CD works and
Construction of side drain.

Strengthening/Improvements
1.20 250.00
Total
Tenkasi Total 5.55 1416.02
408 01-CRIDP-22- Virudhunagar Sattur Reconstruction of Minor Bridge at 227.00
23-S-0408 Km 11/4 of Sivakasi - Alankulam
Road in lieu of Existing Causeway
including Protective works

Causeway to HLB Total 227.00


409 01-CRIDP-22- Virudhunagar Sattur Forming Footpath and providing 1400.00
23-S-0409 basic amenities to the pilgrims of
Irukkankudi
Mariamman Temple in km 1/0 -
6/0 of Sattur - Nenmeni -
Nagalapuram road

SH Page 43 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

410 01-CRIDP-22- Virudhunagar Aruppukkotta Forming Footpath and providing 1600.00


23-S-0410 i basic amenities to the pilgrims of
Irukkankudi
Mariamman Temple in km 6/0 -
9/0 of Sattur - Nenmeni -
Nagalapuram road
Announcement Total 3000.00
Virudhunagar Total 3227.00
411 01-CRIDP-22- Tuticorin Ottapidaram Widening from Four Lane to Four 0.60 90.00
23-S-0411 Lane with Paved Shoulders and
Strengthening at km 130/4 - 131/0
of Madurai - Tuticorin road

412 01-CRIDP-22- Tuticorin Kovilpatti Widening from Two Lane to Two 3.00 670.00
23-S-0412 Lane with Paved Shoulders and
Strengthening at km 120/0 -
120/550, Improvements at km
120/550 - 123/0 of Madurai -
Kanyakumari Road (urban NH 7)
including Construction of Drain at
Km 120/6-121/10
Other Widening Total 3.60 760.00
413 01-CRIDP-22- Tuticorin Vilathikulam Strengthening at km 78/0 - 79/2, 4.20 510.00
23-S-0413 83/0 - 86/0 of Paruvakudi -
Kovilpatti - Ettayapuram -
Vilathikulam - Vembar road
including CD Works at Km 78/2,
79/2, 83/8, 85/2, 85/8
414 01-CRIDP-22- Tuticorin Kovilpatti Strengthening at km 38/750 - 2.38 670.00
23-S-0414 41/130 of Paruvakudi - Kovilpatti -
Ettayapuram - Vilathikulam -
Vembar road including
Construction of Drain at Km 38/10-
39/10 & 40/8-41/2
415 01-CRIDP-22- Tuticorin Ottapidaram Strengthening at km 18/0 - 20/0, 7.40 695.00
23-S-0415 32/6 - 35/6, 36/0 - 36/7, 36/9 -
38/6 of Palayamkottai -
Kurukkusalai - Kulathur -
Vilathikulam - Nagalapuram -
Pandalkudi - Aruppukkottai Road

Strengthening/Improvements
13.98 1875.00
Total
416 01-CRIDP-22- Tuticorin Vilathikulam Reconstruction of Box Culvert at 92.00
23-S-0416 Km 46/6, 46/8, 48/8 of
Palayamkottai - Kurukkusalai -
Kulathur - Vilathikulam -
Nagalapuram - Pandalkudi -
Aruppukkottai Road
Bridges/Culverts Total 92.00
Tuticorin Total 17.58 2727.00
417 01-CRIDP-22- Nagercoil Killiyur Strengthening at km 12/2 - 15/8 of 3.60 200.00
23-S-0417 Paraseri - Monday Market -
Puthukadai Road
418 01-CRIDP-22- Nagercoil Kanyakumari Strengthening at km 11/0 - 17/0 of 6.00 600.00
23-S-0418 Aralvoimozhi - Nedumangadu Road
including CD works

Strengthening/Improvements
9.60 800.00
Total

SH Page 44 of 210
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

419 01-CRIDP-22- Nagercoil Kanyakumari Construction of Retaining wall at 20.00


23-S-0419 km 12/8 of Aralvoimozhi -
Nedumangadu Road
420 01-CRIDP-22- Nagercoil Kanyakumari Reconstruction of Culvert at Km 18.00
23-S-0420 16/2 of Aralvoimozhi -
Nedumangadu Road
Flood Permanent Total 38.00
Nagercoil Total 9.60 838.00
Tirunelveli Circle Total 50.53 16682.02
Grand Total 428.82 246225.61
Grand Total 428.82 246225.61

SH Page 45 of 210
CRIDP 2022 - 2023
LIST OF WORKS - MAJOR DISTRICT ROAD
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

421 01-CRIDP-22- Chennai City Tambaram Urban Improvements - Widening 1.32 260.00
23-M-0421 Roads End to End and Strengthening at
km 4/680 - 6/0 of Agaramthen -
Kovilanchery Road including
construction of Culvert at Km
4/10, 5/4 & 5/6
422 01-CRIDP-22- Chennai City Tambaram Construction of Drain at km 0/6 - 180.00
23-M-0422 Roads 0/7, 0/918 - 1/ 1 of Tambaram -
Somangalam - Nandambakkam
Road including Construction of box
culvert at km 0/9 & 1/4
423 01-CRIDP-22- Chennai City Tambaram Construction of Drain at km 6/030 - 455.00
23-M-0423 Roads 6/430 of Agaramthen -
Kovilanchery Road
Urban Improvements Total 1.32 895.00
424 01-CRIDP-22- Chennai City Tambaram Providing Paver Block in shoulders 300.00
23-M-0424 Roads at km 1/9 - 2/6 of Agaramthen -
Kovilanchery Road

Others Total 300.00


Chennai City Roads Total 1.32 1195.00
425 01-CRIDP-22- Thiruvallur Tiruttani Widening from Intermediate Lane 3.40 562.00
23-M-0425 to Two Lane and Strengthening at
km 9/4 - 12/8 of Nochilli Road

426 01-CRIDP-22- Thiruvallur Gummidipoo Widening from Intermediate Lane 6.00 720.00
23-M-0426 ndi to Two Lane and Strengthening at
km 0/0 - 6/0 of Goonipalayam-
Placepalayam Road including
Reconstruction of Culverts

CMRDP IL to DL Total 9.40 1282.00


427 01-CRIDP-22- Thiruvallur Ambattur Construction of Drain at km 7/6 - 240.00
23-M-0427 8/2 (LS) of Thiruverkadu -
Ambattur road
428 01-CRIDP-22- Thiruvallur Tiruttani Construction of Drain at km 0/0 - 30.00
23-M-0428 0/2 of Ma.Po.Si.Road

429 01-CRIDP-22- Thiruvallur Gummidipoo Construction of Drain at km 11/0 - 370.00


23-M-0429 ndi 11/7 of Puduvoyal - Periyapalayam
Road
430 01-CRIDP-22- Thiruvallur Gummidipoo Construction of Drain at km 210.00
23-M-0430 ndi 22/770 - 23/200 of Medur -
Gummidipoondi Road
Urban Improvements Total 850.00
431 01-CRIDP-22- Thiruvallur Maduravoyal Strengthening at km 0/0 - 0/4 of 0.40 125.00
23-M-0431 Valasaravakkam-Ramapuram (Via)
Valluvar nagar
Strengthening/Improvements
0.40 125.00
Total
432 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 59.00
23-M-0432 Km 0/8 of Nochilli Road

433 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 59.00


23-M-0433 Km 1/2 of Nochilli Road

MDR Page 46 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

434 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 51.00


23-M-0434 Km 2/8 of Nochilli Road

435 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 35.00


23-M-0435 Km 4/6 of Nochilli Road

436 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 49.00


23-M-0436 Km 10/2 of C.T.Road to
Mahankalikapuram Road (Via)
Veeramangalam Road
437 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 43.00
23-M-0437 Km 4/6 of C.T.Road to
Mahankalikapuram Road (Via)
Veeramangalam Road
438 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 44.00
23-M-0438 Km 4/8 of Nochilli Road

439 01-CRIDP-22- Thiruvallur Ponneri Reconstruction of Culvert at Km 140.00


23-M-0439 0/2, 1/8, 2/8, 4/8, 7/10 of Medur-
Gummidipoondi Road
440 01-CRIDP-22- Thiruvallur Thiruvallur Reconstruction of Box Culvert at 50.00
23-M-0440 Km 11/2 of Thiruvallur-Arakkonam
Road
441 01-CRIDP-22- Thiruvallur Thiruvallur Reconstruction of Box Culvert at 50.00
23-M-0441 Km 15/6 of Thiruvallur-Arakkonam
Road
442 01-CRIDP-22- Thiruvallur Thiruvallur Reconstruction of Box Culvert at 30.00
23-M-0442 Km 9/10 of Kanagammachatiram-
Thakkolam Road

443 01-CRIDP-22- Thiruvallur Thiruvallur Reconstruction of Box Culvert at 30.00


23-M-0443 Km 11/10 of Kanagammachatiram-
Thakkolam Road

444 01-CRIDP-22- Thiruvallur Thiruvallur Reconstruction of Box Culvert at 50.00


23-M-0444 Km 4/6 of Kanagammachatiram-
Thakkolam Road
445 01-CRIDP-22- Thiruvallur Thiruvallur Reconstruction of Box Culvert at 50.00
23-M-0445 Km 5/6 of Kanagammachatiram-
Thakkolam Road
Bridges/Culverts Total 740.00
Thiruvallur Total 9.80 2997.00
446 01-CRIDP-22- Chengalpattu Cheyyur Widening from Intermediate Lane 2.20 400.00
23-M-0446 to Two Lane and Strengthening at
km 26/6 - 28/8 of Mudukarai -
Kadalore Road including
construction of storm water drain

MDR Page 47 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

447 01-CRIDP-22- Chengalpattu Cheyyur Widening from Intermediate Lane 4.00 700.00
23-M-0447 to Two Lane and Strengthening at
km 15/6 - 19/6 of GST Road to
Cheyyur (via) Padalam including
Reconstruction of Box Culvert
Km.16/8 (ii),18/2(i),10 works

CMRDP IL to DL Total 6.20 1100.00


448 01-CRIDP-22- Chengalpattu Cheyyur Widening from Two Lane to Two 2.00 350.00
23-M-0448 Lane with Paved Shoulders and
Strengthening at km 5/8 - 7/8 of
Mudukarai - Kadalore Road
Other Widening Total 2.00 350.00
449 01-CRIDP-22- Chengalpattu Cheyyur Restoration to Damaged Causeway 250.00
23-M-0449 at km 37/2 - 37/8 of
Thirumukkudal - Nelvoy -
Thirukalukundram
Flood Permanent Total 250.00
450 01-CRIDP-22- Chengalpattu Cheyyur Reconstruction of Box Culvert at 180.00
23-M-0450 Km 0/4 (i), (ii) of South Arcot-
Frontier Road
Bridges/Culverts Total 180.00
Chengalpattu Total 8.20 1880.00
451 01-CRIDP-22- Kanchipuram Madurantaka Strengthening at km 15/5 - 16/5 of 1.00 170.00
23-M-0451 m Uthiramerur - Kammalampoondi -
Acharapakkam road including CD
works

Strengthening/Improvements
1.00 170.00
Total
Kanchipuram Total 1.00 170.00
Chennai Circle Total 20.32 6242.00
452 01-CRIDP-22- Tiruvannamal Polur Widening from Two Lane to Four 15.50 13300.00
23-M-0452 ai Lane and Strengthening at km 2/2 -
17/7 of Arni - Ettivadi road
including Construction of Centre
median, Drain, Retaining wall,
Reconstruction & Widening of
Culverts, Construction & Widening
of Minor Bridges, Junction
improvements and Providing Paver
Blocks.

CMRDP 4 Laning Total 15.50 13300.00


453 01-CRIDP-22- Tiruvannamal Chengam Widening from Intermediate Lane 5.20 700.00
23-M-0453 ai to Two Lane and Strengthening at
km 0/0 - 5/2 of Chinniyampettai -
Elayankanni road (Via)
Perungalathur including
Reconstruction of culverts at km
0/2, 0/6, 0/8, 1/8, 2/8, 4/8, 5/2

MDR Page 48 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

454 01-CRIDP-22- Tiruvannamal Chengam Widening from Intermediate Lane 5.20 700.00
23-M-0454 ai to Two Lane and Strengthening at
km 5/2 - 10/4 of Chinniyampettai -
Elayankanni road (Via)
Perungalathur including
Reconstruction of culverts at km
5/6, 6/8, 7/4, 8/8, 9/4, 9/10,
10/4

CMRDP IL to DL Total 10.40 1400.00


455 01-CRIDP-22- Tiruvannamal Kalasapakka Reconstruction of Minor Bridge at 150.00
23-M-0455 ai m Km 11/4 of N.C.Veeralore road in
lieu of existing Causeway

Causeway to HLB Total 150.00


456 01-CRIDP-22- Tiruvannamal Tiruvannamal Strengthening at km 1/0 - 1/6 of 0.60 420.00
23-M-0456 ai ai Peigopuram Street road including
Construction of Drain at km 1/0 -
1/4 and Providing Paver Block at
Km 1/0 - 1/6
Strengthening/Improvements
0.60 420.00
Total
457 01-CRIDP-22- Tiruvannamal Tiruvannamal Providing paver block in shoulders 230.00
23-M-0457 ai ai at km 0/5 - 2/4 of Tiruvannamalai
Kanji road
Others Total 230.00
Tiruvannamalai Total 26.50 15500.00
458 01-CRIDP-22- Ranipet Sholingur Providing Cantilever Gantry board 20.00
23-M-0458 at km 0/2 (RS), 9/2 (LS), 9/4(RS),
17/8 (RS) of Kilveethi Minnal
Ameerpet Road
459 01-CRIDP-22- Ranipet Sholingur Providing Cantilever Gantry board 14.00
23-M-0459 at km 12/2 (LS) and 12/4 (RS) of
Banavaram Sendhamangalam
Ganapathipuram Road

460 01-CRIDP-22- Ranipet Arcot Providing Metal Crash Barrier at 68.00


23-M-0460 km 0/8 - 1/2 & 1/4 - 2/0 of
Delhigate Road
461 01-CRIDP-22- Ranipet Arcot Providing Cantilever Gantry board 15.00
23-M-0461 at km 5/4 (Both sides) of Timiri
Kalavai Road
Road Safety Total 117.00
462 01-CRIDP-22- Ranipet Sholingur Restoration to the Culvert at km 40.00
23-M-0462 9/10 of Panapakkam
Ganapathipuram Thakkolam Road

Flood Permanent Total 40.00


Ranipet Total 157.00
463 01-CRIDP-22- Vellore Kilvaithinank Construction of Drain at km 0/4 of 9.00
23-M-0463 uppam Thiruvalam Katpadi Venkatagiri
Kottah Road (via) Virinjipuram
Seduvalai Road
Urban Improvements Total 9.00
464 01-CRIDP-22- Vellore Katpadi Providing Cantilever Gantry board 7.00
23-M-0464 at km 5/10 of Jaffrabath Road

Road Safety Total 7.00

MDR Page 49 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

465 01-CRIDP-22- Vellore Katpadi Widening from Two Lane to Two 2.60 523.00
23-M-0465 Lane with Paved Shoulders and
Strengthening at km 17/0 - 19/6 of
Katpadi Vallimalai Road including
Reconstruction of Culvert at Km
17/6, 19/2 and Construction of
Retaining Wall at Km 17/6.

Other Widening Total 2.60 523.00


466 01-CRIDP-22- Vellore Kilvaithinank Restoration to the Causeway at km 128.00
23-M-0466 uppam 3/10 of Thiruvalam Katpadi
Venkatagiri Kottah Road (via)
Virinjipuram Seduvalai Road
Flood Permanent Total 128.00
Vellore Total 2.60 667.00
467 01-CRIDP-22- Cheyyar Cheyyar Widening from Intermediate Lane 1.00 217.00
23-M-0467 to Two Lane and Strengthening at
km 11/0 - 12/0 of Thavasi Vallam
road including reconstruction of
culvert at km 4/2, 11/8

468 01-CRIDP-22- Cheyyar Cheyyar Widening from Intermediate Lane 3.00 360.00
23-M-0468 to Two Lane and Strengthening at
km 2/0 - 5/0 of Cheyyar Anaicut
road including reconstruction of
culvert at km 2/6, 4/2,6 and
Construction of Retaining wall at
km 2/4, 3/2, 3/6

469 01-CRIDP-22- Cheyyar Cheyyar Widening from Intermediate Lane 1.80 210.00
23-M-0469 to Two Lane and Strengthening at
km 7/4 - 9/2 of Thiruvathipuram
Arni road
470 01-CRIDP-22- Cheyyar Vandavasi Widening from Intermediate Lane 1.70 250.00
23-M-0470 to Two Lane and Strengthening at
km 31/4 - 31/9, 37/4 - 38/6 of
Arni Vandavasi road including
Reconstruction of culvert at km
38/2

471 01-CRIDP-22- Cheyyar Polur Widening from Intermediate Lane 0.90 175.00
23-M-0471 to Two Lane and Strengthening at
km 9/0 - 9/9 of Kozhapalur
Avaniyapuram road including
Reconstruction of Culvert at Km.
9/2, 9/4 & 9/8
CMRDP IL to DL Total 8.40 1212.00
472 01-CRIDP-22- Cheyyar Vandavasi Providing Junction Improvement at 110.00
23-M-0472 km 6/10 of Thellar Mazhayur road
and Km.0/2 of Kunagampoondi
Vedal Road including
Reconstruction of Box culvert at
Km.0/2 of Kunagampoondi Vedal
Road
473 01-CRIDP-22- Cheyyar Cheyyar Providing Cantilever Gantry board 7.00
23-M-0473 at km 11/10 of Thavasi Vallam
road
474 01-CRIDP-22- Cheyyar Vandavasi Providing Metal Crash Barrier at 50.00
23-M-0474 km 33/6-34/2 of Arni Vandavasi
road

MDR Page 50 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

475 01-CRIDP-22- Cheyyar Vandavasi Providing Cantilever Gantry board 7.00


23-M-0475 at km 20/8 of Arni Vandavasi road

476 01-CRIDP-22- Cheyyar Vandavasi Providing Cantilever Gantry board 7.00


23-M-0476 at km 8/2 of Thellar Mazhayur
road
Road Safety Total 181.00
477 01-CRIDP-22- Cheyyar Arani Widening from Two Lane to Two 0.20 40.00
23-M-0477 Lane with Paved Shoulders and
Strengthening at km 0/2 - 0/4 of
Arni - Ettivadi road
478 01-CRIDP-22- Cheyyar Arani Widening from Two Lane to Two 1.60 260.00
23-M-0478 Lane with Paved Shoulders and
Strengthening at km 28/6 - 30/2 of
Thiruvathipuram Arni road
including Widening of Culverts at
Km 28/8 (i), (ii) & (iii), 29/2 (i) &
(ii), 29/6 and 29/10 and
Construction of Retaining wall at
Km 29/6
Other Widening Total 1.80 300.00
479 01-CRIDP-22- Cheyyar Cheyyar Strengthening at km 17/9 - 6.03 600.00
23-M-0479 20/870, 21/195 - 24/250 of
Abdullapuram Moranam road
including Reconstruction of culvert
at Km 21/6 and construction of
culvert at Km 22/8

480 01-CRIDP-22- Cheyyar Polur Strengthening at km 12/0 - 13/6, 3.40 355.00


23-M-0480 13/8 - 15/0, 15/2 - 15/8 of Arni
Vandavasi road including
Reconstruction of culvert at Km
12/6 & 14/8
481 01-CRIDP-22- Cheyyar Vandavasi Strengthening at km 16/0 - 20/0 of 4.00 400.00
23-M-0481 Arni Vandavasi road including
Reconstruction of culvert at Km
17/6 & 19/6
Strengthening/Improvements
13.43 1355.00
Total
482 01-CRIDP-22- Cheyyar Vandavasi Reconstruction of Culvert at Km 35.00
23-M-0482 22/6 of Arni Vandavasi road

483 01-CRIDP-22- Cheyyar Arani Reconstruction of Box Culvert at 40.00


23-M-0483 Km 2/8, 6/6 of Arni Vandavasi
road
Bridges/Culverts Total 75.00
Cheyyar Total 23.63 3123.00
484 01-CRIDP-22- Thirupathur Tirupattur Construction of Drain at km 0/6 - 40.00
23-M-0484 0/8 of Thirupathur - Natrampalli
Road including construction of
sump to drain out flood water from
railway subway

Urban Improvements Total 40.00


485 01-CRIDP-22- Thirupathur Jolarpet Providing Center Median at km 0/0- 29.00
23-M-0485 0/8 of Yelagiri Hill Road

MDR Page 51 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

486 01-CRIDP-22- Thirupathur Tirupattur Providing Over Head Gantry board 25.00
23-M-0486 at km 0/437 of Gowthampet Road

Road Safety Total 54.00


487 01-CRIDP-22- Thirupathur Vaniyambadi Widening from Single Lane to 1.40 165.00
23-M-0487 Intermediate Lane and
Strengthening at km 1/60 - 3/0 of
Thumberi - Diguvapalayam (Via)
Sankarapuram Road. including
construction of retaining wall at km
1/8
Other Widening Total 1.40 165.00
488 01-CRIDP-22- Thirupathur Jolarpet Strengthening at km 12/50 - 14/40 1.90 294.00
23-M-0488 of Yelagiri Hill Road including
Construction of Box Culvert at Km
13/8 and reconstruction of box
culvert at km 12/6, 13/2

Strengthening/Improvements
1.90 294.00
Total
489 01-CRIDP-22- Thirupathur Jolarpet Construction of Box Culvert at 70.00
23-M-0489 0/10 of Yelagiri Hill Road
including Construction of Drain at
Km 0/10
490 01-CRIDP-22- Thirupathur Jolarpet Reconstruction of Box Culvert at 60.00
23-M-0490 Km 2/4, 2/6 and 4/2 of Yelagiri
Hill Road
Bridges/Culverts Total 130.00
Thirupathur Total 3.30 683.00
491 01-CRIDP-22- Kallakurichi Ulundurpettai Widening from Intermediate Lane 3.00 640.00
23-M-0491 to Two Lane and Strengthening at
km 3/3 - 6/0, Strengthening at
km 3/0 - 3/3 of Parikkal
Periyasevalai road including
Reconstruction of Box culvert at
km 4/10,5/2,5/4 , 5/8
Construction of Retaining wall at
Km.3/4,3/6,3/8,5/2
492 01-CRIDP-22- Kallakurichi Ulundurpettai Widening from Intermediate Lane 2.00 365.00
23-M-0492 to Two Lane and Strengthening at
km 6/0 - 8/0 of Parikkal
Periyasevalai road including
Reconstruction of Box culvert at
km 6/6,6/8(i),6/8(ii),7/4(i),(ii)

493 01-CRIDP-22- Kallakurichi Ulundurpettai Widening from Intermediate Lane 2.20 575.00
23-M-0493 to Two Lane and Strengthening at
km 19/6 - 21/8 of Kadampuliyur
Ulundurpet Road via
Perperiyankuppam Sendhanadu
Sendhamangalam Road including
Reconstruction of Box culvert at
km 19/10& 20/8,21/4,21/8

MDR Page 52 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

494 01-CRIDP-22- Kallakurichi Ulundurpettai Widening from Intermediate Lane 2.20 560.00
23-M-0494 to Two Lane and Strengthening at
km 21/8 - 24/0 of Kadampuliyur
Ulundurpet Road via
Perperiyankuppam Sendhanadu
Sendhamangalam Road including
Construction of Side Drain at km
23/4-8

495 01-CRIDP-22- Kallakurichi Ulundurpettai Widening from Intermediate Lane 2.40 305.00
23-M-0495 to Two Lane and Strengthening at
km 24/0 - 26/4 of Kadampuliyur
Ulundurpet Road via
Perperiyankuppam Sendhanadu
Sendhamangalam Road

496 01-CRIDP-22- Kallakurichi Sankarapura Widening from Single Lane to Two 2.50 445.00
23-M-0496 m Lane and Strengthening at km
28/4 - 29/8, Widening from
Intermediate Lane to Two Lane and
Improvements at km 29/8 - 30/9 of
Kachirapalayam Vellimalai Road
including Reconstruction of Box
culvert at km 28/10 & 29/2 and
construction of retaining wall at km
28/6, km 29/4.

CMRDP IL to DL Total 14.30 2890.00


497 01-CRIDP-22- Kallakurichi Kallakurichi Urban Improvements - Widening 1.30 700.00
23-M-0497 from Two Lane with Paved
Shoulders to Four Lane and
Strengthening at km 1/2 - 2/5 of
Kallakurichi Sankarapuram Road
(via) Kachirapalayam including
construction of Drain (RS), Center
Median, Paver Block and
Reconstruction of culvert at km
1/6
498 01-CRIDP-22- Kallakurichi Rishivandiya Construction of Drain at km 269.00
23-M-0498 m 21/972-22/900 (LS), 21/972-
22/725 (RS) of Thirukoilur
Thiyagadurgam road
Urban Improvements Total 1.30 969.00
499 01-CRIDP-22- Kallakurichi Ulundurpettai Providing Metal Crash Barrier at 2.60
23-M-0499 km at km 11/6 (RS) of
Rishivandhiyam Nemili Road via
Eraiyur Palayam
500 01-CRIDP-22- Kallakurichi Sankarapura Construction of Retaining wall at 29.00
23-M-0500 m km 22/8 of Kallakurichi
Sankarapuram Road Via
Kachirapalayam
501 01-CRIDP-22- Kallakurichi Rishivandiya Providing Metal Crash Barrier at 14.00
23-M-0501 m km 19/6, 20/2, 23/4, 28/4 of
Thirukoilur Thiyagadurgam road
502 01-CRIDP-22- Kallakurichi Kallakurichi Providing Metal Crash Barrier at 13.00
23-M-0502 km 2/10, 14/4,8 of Thiyagadurgam
Adari Road
503 01-CRIDP-22- Kallakurichi Sankarapura Construction of Retaining wall at 50.00
23-M-0503 m km 11/8-15/0 of Kachirapalayam
Vellimalai Road

MDR Page 53 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

504 01-CRIDP-22- Kallakurichi Sankarapura Construction of Retaining wall at 50.00


23-M-0504 m km 0/0-2/0 of Vellimalai
Moolakadu Pudhur road
Road Safety Total 158.60
505 01-CRIDP-22- Kallakurichi Kallakurichi Widening from Two Lane to Two 3.75 500.00
23-M-0505 Lane with Paved shoulder at Km
10/0 - 10/170, 11/220 - 11/4 &
15/0 - 18/4 of Thiyagadurgam -
Adari Road including
Reconstruction of RCC Box culvert
at Km 11/2, 15/6, 16/2, 17/2 &
17/8 and Widening of RCC Box
culvert at Km 15/8 & 15/10

Other Widening Total 3.75 500.00


506 01-CRIDP-22- Kallakurichi Sankarapura Strengthening at km 9/6 - 10/3 of 0.70 137.00
23-M-0506 m Chinnasalem Kachirapalayam Road

507 01-CRIDP-22- Kallakurichi Sankarapura Strengthening at km 9/0 - 13/0 of 4.00 176.00


23-M-0507 m Kachirapalayam Vellimalai Road

508 01-CRIDP-22- Kallakurichi Rishivandiya Strengthening at km 14/2 - 16/2 of 2.00 171.00


23-M-0508 m Thirukoilur Thiyagadurgam road

Strengthening/Improvements
6.70 484.00
Total
509 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 30.00
23-M-0509 m Km 10/10 of Tirukoilur Manalurpet
road
510 01-CRIDP-22- Kallakurichi Sankarapura Reconstruction of Minor Bridge at 175.00
23-M-0510 m Km 30/10 of Kachirapalayam
Vellimalai Road
Bridges/Culverts Total 205.00
Kallakurichi Total 26.05 5206.60
Tiruvannamalai Circle Total 82.08 25336.60
511 01-CRIDP-22- Villupuram Tindivanam Widening from Intermediate Lane 4.00 700.00
23-M-0511 to Two Lane and Strengthening at
km 0/0 - 4/0 of Alankuppam-
Konerikuppam (via) Avanipur road
including reconstruction of Box
culvert at km 0/2,6,10(i),(ii),
1/2,6,10, 2/8, 3/6 & 3/10 and
construction of retaining wall at km
0/4 & 1/4.(MD748 )

512 01-CRIDP-22- Villupuram Vanur Widening from Intermediate Lane 0.60 228.00
23-M-0512 to Two Lane and Strengthening at
km 11/760 - 12/360 of
Brammadesam-Ranganathapuram
(via) Kiliyanur road including
Reconstruction of culvert at
Km.11/8, and Construction of
Drain at Km 11/8 - 11/10
(MD578).

MDR Page 54 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

513 01-CRIDP-22- Villupuram Vanur Widening from Intermediate Lane 0.74 340.00
23-M-0513 to Two Lane and Strengthening at
km 12/360 - 13/1 of
Brammadesam -
Ranganathapuram (via) Kiliyanur
road including Reconstruction of
culvert at Km.12/8, 10, 13/100
(MD578)
514 01-CRIDP-22- Villupuram Gingee Widening from Single Lane to Two 2.40 450.00
23-M-0514 Lane and Strengthening at km
10/550 - 10/850 Widening from
Intermediate Lane to Two Lane and
Strengthening at km 11/3 - 11/6,
19/0 - 19/2, 19/4 - 21/0 of
Azhampoondy-Mazhavanthangal
road including Reconstruction of
Box culvert at km 11/6, 20/4,8
and Construction of Retaining wall
at km 20/8.

CMRDP IL to DL Total 7.74 1718.00


515 01-CRIDP-22- Villupuram Vanur Reconstruction of Box Culvert at 200.00
23-M-0515 Km 12/10 of Mailam-Karattai road
in lieu of Existing causeway

Causeway to HLB Total 200.00


516 01-CRIDP-22- Villupuram Vanur Providing Junction Improvement at 350.00
23-M-0516 Km 17/0 of Cuddalore-
Pallineliyanur road (only widening)

517 01-CRIDP-22- Villupuram Mailam Strengthening at km 13/0 - 15/0 of 2.00 120.00


23-M-0517 Vallam - GST road

Strengthening/Improvements
2.00 470.00
Total
Villupuram Total 9.74 2388.00
518 01-CRIDP-22- Cuddalore Tittakudi Widening from Intermediate Lane 3.60 470.00
23-M-0518 to Two Lane and Strengthening at
km 28/0 - 31/6 of Thittagudi-
Sirupakam road (via) Avatti,
Ma.Pudaiyur road reconstruction of
culvert at Km 28/8, 29/10, 30/2 &
31/6
519 01-CRIDP-22- Cuddalore Panruti Widening from Intermediate Lane 3.40 430.00
23-M-0519 to Two Lane and Strengthening at
km 12/0 - 15/4 of Pudupettai -
Oraiyur - Karumbur - Paithambadi
road including Reconstruction of
Box Culvert at Km 12/8

520 01-CRIDP-22- Cuddalore Neyveli Widening from Intermediate Lane 1.05 160.00
23-M-0520 to Two Lane and Strengthening at
km 19/950 - 21/0 of
Kullanchavady-Kattugudalore road

521 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 3.00 490.00
23-M-0521 m to Two Lane and Strengthening at
km 0/0 - 3/0 of Nemam -
Devangudy road including
Reconstruction of Culvert at Km
0/2, 0/8, 0/10, 1/2, 1/10, 2/2,
2/8, 2/10

MDR Page 55 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

522 01-CRIDP-22- Cuddalore Kurinjipadi Widening from Intermediate Lane 3.82 587.00
23-M-0522 to Two Lane and Strengthening at
km 2/330 - 2/5, 16/0 - 16/7,
17/046 - 20/0 of Kurinjipady-
Palur road including construction
of retaining wall at km 16/6 &
17/6 and side drain at km 18/0-
18/4

523 01-CRIDP-22- Cuddalore Neyveli Widening from Intermediate Lane 2.00 275.00
23-M-0523 to Two Lane and Strengthening at
km 14/0 - 16/0 of Kurinjipady-
Palur road including reconstruction
of culvert at km 14/10

524 01-CRIDP-22- Cuddalore Kurinjipadi Widening from Intermediate Lane 5.00 682.00
23-M-0524 to Two Lane and Strengthening at
km 0/0 - 5/0 of Kullanchavady-
Kattugudalore road including
reconstruction of culvert at Km 0/8

525 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 3.20 505.00
23-M-0525 m to Two Lane and Strengthening at
km 1/0 - 4/2 of Vridhachalam-
Palakollai road including
Reconstruction of Culvert at Km
2/8, 2/10
526 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 2.00 425.00
23-M-0526 m to Two Lane and Strengthening at
km 5/8 - 7/8 of Vridhachalam-
Palakollai road including
Reconstruction of Culvert at Km
6/2, 6/6, 6/8, 7/2, 7/8

527 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 2.70 526.00
23-M-0527 m to Two Lane and Strengthening at
km 7/8 - 10/5 of Vridhachalam-
Palakollai road including
Reconstruction of Culvert at Km
8/6, 9/2,4 and 10/4

528 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 3.90 600.00
23-M-0528 m to Two Lane and Strengthening at
km 3/0 - 6/900 of Nemam -
Devangudy road including
Reconstruction of Culvert at Km
3/6, 4/6, 4/10, 5/6, 5/8, 6/4, 6/6

529 01-CRIDP-22- Cuddalore Virudhachala Widening from Intermediate Lane 2.10 280.00
23-M-0529 m to Two Lane and Strengthening of
Nemam-Devangudy Road at km
6/900-9/0 including
Reconstruction of Culvert at Km
8/6
CMRDP IL to DL Total 35.77 5430.00
530 01-CRIDP-22- Cuddalore Cuddalore Construction of Retaining wall at 700.00
23-M-0530 km 3/4, 3/6 of Kammiyampettai-
Gundusalai road (via)
Semmandalam
Road Safety Total 700.00

MDR Page 56 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

531 01-CRIDP-22- Cuddalore Tittakudi Strengthening at km 12/0 - 13/4 of 1.40 106.00


23-M-0531 Eraiyur - Kandappankurichi -
Nallur road reconstruction of
culvert at Km 13/4

532 01-CRIDP-22- Cuddalore Kattumannar Strengthening at km 10/4 - 13/4 of 3.00 285.00


23-M-0532 koil Veeranam Tank Bund road

533 01-CRIDP-22- Cuddalore Bhuvanagiri Strengthening at km 12/6 - 13/6 of 1.00 100.00


23-M-0533 Keerapalayam-Sethiyathope road

534 01-CRIDP-22- Cuddalore Kattumannar Strengthening at km 3/0 - 4/0 of 1.00 135.00


23-M-0534 koil Puthur road

535 01-CRIDP-22- Cuddalore Bhuvanagiri Strengthening at km 9/4 - 10/0, 2.20 210.00


23-M-0535 12/4 - 14/0 of Chidambaram-
Veeranam Tank Bund road (via)
Keelnatham
536 01-CRIDP-22- Cuddalore Neyveli Strengthening at km 16/0 - 18/4 & 3.55 285.00
23-M-0536 18/8 - 19/950 of Kullanchavady-
Kattugudalore road

Strengthening/Improvements
12.15 1121.00
Total
537 01-CRIDP-22- Cuddalore Panruti Temporary Restoration to Bridge at 1.00
23-M-0537 km 20/2 of Kurinjipady-Palur road

Flood Permanent Total 1.00


538 01-CRIDP-22- Cuddalore Tittakudi Reconstruction of Box Culvert at 42.00
23-M-0538 Km 4/8 of Thittagudi-Sirupakam
road (via) Avatti, Ma.Pudaiyur road

539 01-CRIDP-22- Cuddalore Kattumannar Reconstruction of Box Culvert at 40.00


23-M-0539 koil Km 4/10 of Puthur road

540 01-CRIDP-22- Cuddalore Panruti Reconstruction of Minor Bridge at 210.00


23-M-0540 Km 6/4 of Pudupettai - Oraiyur -
Karumbur - Paithambadi road

Bridges/Culverts Total 292.00


Cuddalore Total 47.92 7544.00
541 01-CRIDP-22- Ariyalur Jayankondam Reconstruction of Box Culvert at 42.00
23-M-0541 Km 38/2 of Sendurai -
Udaiyarpalayram - Annaikarai
road in lieu of existing pipe culvert

542 01-CRIDP-22- Ariyalur Kunnam Construction of Retaining wall at 160.00


23-M-0542 km 12/2,4,10 of Sendurai -
Anganur - Agaram - Seegore -
Thirumandurai road
Road Safety Total 202.00
543 01-CRIDP-22- Ariyalur Kunnam Providing Cantilever Gantry board 24.00
23-M-0543 at km 7/8, 8/4, 14/6,8 of Sendurai
- Anganur - Agaram - Seegore -
Thirumandurai road
Others Total 24.00
Ariyalur Total 226.00
Villupuram Circle Total 57.66 10158.00

MDR Page 57 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

544 01-CRIDP-22- Salem Gangavalli Widening from Intermediate Lane 2.20 270.00
23-M-0544 to Two Lane and Strengthening at
km 10/8 - 13/0 of Kattokottai-
Sadasivapuram-Thidavorr Road
including Reconstruction of Box
culvert at Km.10/10, 12/6 and
Construction of Well Protective
wall at Km.11/4, 12/2, 12/4

545 01-CRIDP-22- Salem Veerapandi Widening from Intermediate Lane 2.70 350.00
23-M-0545 to Two Lane and Strengthening at
km 2/0 - 4/7 of Nalikkalpatty-
Uthamasolapuram Road including
Reconstruction of Culvert at Km
2/4,3/2,4/4, and Construction of
Retaining Wall at km.3/8,3/10

546 01-CRIDP-22- Salem Gangavalli Widening from Intermediate Lane 2.40 270.00
23-M-0546 to Two Lane and Strengthening at
km 5/0 - 7/4 of Kattokottai-
Sadasivapuram-Thidavorr Road

547 01-CRIDP-22- Salem Gangavalli Widening from Intermediate Lane 3.92 425.00
23-M-0547 to Two Lane and Strengthening at
km 8/0 - 11/920 of Thalaivasal-
Govindampalayam road

CMRDP IL to DL Total 11.22 1315.00


548 01-CRIDP-22- Salem Salem North Urban Improvements - Widening 1.28 690.00
23-M-0548 from Two Lane to EndtoEnd and
Strengthening at km 0/0 - 1/275 of
Town railway station Road
including construction of Storm
water drain and construction of
Culvert at Km 0/4

549 01-CRIDP-22- Salem Salem North Urban Improvements - Widening 1.80 696.00
23-M-0549 End to End and Strengthening at
km 3/0 - 4/8 of Hasthampatti -
Kannankurichi Road including
construction of Storm water drain
at Km 2/6-4/8
550 01-CRIDP-22- Salem Salem West Urban Improvements - Widening 1.20 170.00
23-M-0550 from Two Lane to EndtoEnd and
Strengthening at km 3/4 - 4/6 of
Shevapet-Elampillai Road
Urban Improvements Total 4.28 1556.00
551 01-CRIDP-22- Salem Yercaud Strengthening at km 6/1 - 7/2 of 1.10 122.00
23-M-0551 Yercaud-Vaniyar Road

Strengthening/Improvements
1.10 122.00
Total
552 01-CRIDP-22- Salem Yercaud Construction of Retaining wall at 70.00
23-M-0552 km 4/6 of Kuppanur-Kottachedu-
Valavanthi Road including
construction of CC drain

MDR Page 58 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

553 01-CRIDP-22- Salem Yercaud Construction of Retaining wall at 100.00


23-M-0553 km 4/8 of Kuppanur-Kottachedu-
Valavanthi Road including
construction of Breast wall and CC
drain
554 01-CRIDP-22- Salem Yercaud Construction of Retaining wall at 200.00
23-M-0554 km 5/4 of Kuppanur-Kottachedu-
Valavanthi Road including
reconstruction of culvert at Km 5/4
and construction of breast wall &
CC Drain

Flood Permanent Total 370.00


555 01-CRIDP-22- Salem Salem West Construction of Drain at km 3/0- 450.00
23-M-0555 4/0 of Shevapet-Elampillai Road

556 01-CRIDP-22- Salem Salem West Construction of Drain at km 4/0- 320.00


23-M-0556 4/8 of Shevapet-Elampillai Road

Others Total 770.00


Salem Total 16.60 4133.00
557 01-CRIDP-22- Edappadi Edappadi Widening from Intermediate Lane 3.40 600.00
23-M-0557 to Two Lane and Strengthening at
km 7/2 - 10/6 of Moolapathai
Chinnappampatti road (via)
Panikkanur including
Reconstruction of Culvert at km
7/6,7/10, 8/2, 8/4, 8/10, 9/4 &
10/2 and Construction of Retaining
wall at km 8/2, 8/4, 8/8, 8/10,
9/4, 9/6 & 9/8.
558 01-CRIDP-22- Edappadi Mettur Widening from Intermediate Lane 3.00 580.00
23-M-0558 to Two Lane and Strengthening at
km 0/0 - 3/0 of Malligundam-
Koonandiyur Road including
Construction of Box Culvert at
0/10, 1/4 & 2/6, Construction of
Storm Water Drain at Km.0/4-0/10
[RS] & 0/8-0/10 [L/s] &
Construction of Retaining Wall at
Km.1/2 [RS] & 1/4 [RS]

CMRDP IL to DL Total 6.40 1180.00


Edappadi Total 6.40 1180.00
559 01-CRIDP-22- Namakkal Rasipuram Widening from Intermediate Lane 2.20 350.00
23-M-0559 to Two Lane and Strengthening at
km 2/8 - 5/0 of Rasipuram-
Pattanam-Pudupatti road
including Construction of Retaining
Wall, Drain and CD Works

560 01-CRIDP-22- Namakkal Paramathi Widening from Intermediate Lane 1.00 160.00
23-M-0560 Velur to Two Lane and Strengthening at
km 11/0 - 12/0 of Paramathy-
Jedarpalayam road including
Construction of Retaining wall at
km 11/2-11/6

MDR Page 59 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

561 01-CRIDP-22- Namakkal Rasipuram Widening from Intermediate Lane 2.42 393.00
23-M-0561 to Two Lane and Strengthening at
km 7/4 - 9/820 of Puthuchathiram-
Govintham palayam -Singalantha
puram road including
Construction of Well Protective
Wall, Retaining Wall, Drain and CD
Works

562 01-CRIDP-22- Namakkal Tiruchengode Widening from Intermediate Lane 2.40 260.00
23-M-0562 to Two Lane and Strengthening at
km 3/0 - 5/4 of Mallasamuthiram -
Vaiyappamalai road including
Reconstruction of culvert at Km
3/2

563 01-CRIDP-22- Namakkal Paramathi Widening from Intermediate Lane 2.03 242.00
23-M-0563 Velur to Two Lane and Strengthening at
km 10/250 - 12/0, Strengthening
at km 14/4 - 14/675 of
Vaiyappamalai - Velagoundampatti
road including widening of Culvert
at Km 10/4, 11/8, and
reconstruction of culvert at Km
11/10

564 01-CRIDP-22- Namakkal Namakkal Widening from Intermediate Lane 3.10 360.00
23-M-0564 to Two Lane and Strengthening at
km 0/0 - 1/6 & 5/9 - 7/4 of
Puthuchathiram- Govintham
palayam -Singalantha puram road
including Construction of drain,
Retaining wall, Well protective wall
and CD Works.

CMRDP IL to DL Total 13.15 1765.00


565 01-CRIDP-22- Namakkal Rasipuram Construction of Drain at km 2/4 - 104.00
23-M-0565 2/8 of Rasipuram Pattanam
Pudupatty Road Including CD
works
Urban Improvements Total 104.00
566 01-CRIDP-22- Namakkal Namakkal Providing Metal Crash Barrier at 20.00
23-M-0566 km 2/4,8, 3/8 of Valayapatti -
Andapuram road
567 01-CRIDP-22- Namakkal Namakkal Providing Metal Crash Barrier at 44.00
23-M-0567 km 2/2,4,6,8,10 and 6/0 of
Mohanur-Oruvandur road
568 01-CRIDP-22- Namakkal Namakkal Construction of Retaining wall at 16.00
23-M-0568 km 4/8 of Mohanur-Oruvandur
road
569 01-CRIDP-22- Namakkal Rasipuram Providing Metal Crash Barrier at 16.50
23-M-0569 km 1/10, 2/2,10, 3/4 of
Namagiripettai-Ariyagoundampatti-
Kalkurichi privu road

570 01-CRIDP-22- Namakkal Rasipuram Providing Metal Crash Barrier at 30.00


23-M-0570 km 5/6,8,10 of Rasipuram Byepass
road
Road Safety Total 126.50

MDR Page 60 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

571 01-CRIDP-22- Namakkal Tiruchengode Widening from Two Lane to Two 0.40 130.00
23-M-0571 Lane with Paved Shoulders and
Strengthening at km 3/0 - 3/4 of
Tiruchengode - Kokkarayanpettai
road Widening the culvert at Km
3/2 , Curve improvement and
construction of storm water drain.

Other Widening Total 0.40 130.00


572 01-CRIDP-22- Namakkal Tiruchengode Strengthening at km 0/0 - 1/0 of 1.00 185.00
23-M-0572 Mallasamuthiram - Vaiyappamalai
road including Construction of
Drain at Km 0/0-0/8 and
reconstruction of culvert at Km 0/2

Strengthening/Improvements
1.00 185.00
Total
573 01-CRIDP-22- Namakkal Senthamanga Strengthening at km 6/4 - 8/0, 2.60 325.00
23-M-0573 lam 14/0 - 15/0 of Kolli Hills ghat road
including Construction of Cement
Concrete surface Drain and
Protective walls in Hair pin Bends

Tourism Important Total 2.60 325.00


Namakkal Total 17.15 2635.50
574 01-CRIDP-22- Dharmapuri Pennagaram Widening from Intermediate Lane 2.00 625.00
23-M-0574 to Two Lane and Strengthening at
km 0/0 - 2/0 of Pennagaram -
Mudugampatti -Malaiyanur road
and including Construction of box
culvert at KM 0/4, 0/6, 1/4, 1/8 (i)
(ii) (iii), Construction of Retaining
wall at KM 0/10, 1/2 and
construction storm water drain at
KM 0/040-0/325 (RS), KM 0/255-
0/325 (LS)

575 01-CRIDP-22- Dharmapuri Pennagaram Widening from Intermediate Lane 4.60 680.00
23-M-0575 to Two Lane and Strengthening at
km 25/0 - 29/6 of Pennagaram -
Nagamarai road including
Construction of box culvert at KM
25/8, 27/4, 27/6, 28/4 and dip
raising at KM 25/8, 27/4, 27/6,
Construction of Retaining wall at
Km 25/150-300 (LS)

576 01-CRIDP-22- Dharmapuri Pappireddipp Widening from Intermediate Lane 0.24 154.00
23-M-0576 atti to Two Lane and Strengthening at
km 24/360 - 24/6 of
Pappireddipatti - Morappur road
(via) Pallipatti, Thenkaraikottai
including construction of Retaining
wall at km 24/4

CMRDP IL to DL Total 6.84 1459.00


577 01-CRIDP-22- Dharmapuri Pappireddipp Construction of Drain at km 15/10 50.00
23-M-0577 atti of Pappireddipatti - Mallapuram
road including construction of
culvert at KM 15/10 and dip
raising at KM 15/8 & 15/10

MDR Page 61 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

Urban Improvements Total 50.00


578 01-CRIDP-22- Dharmapuri Dharmapuri Construction of Retaining wall at 70.00
23-M-0578 km 16/2, 16/4 of Bommidi RS -
Thoppaiyar road including
widening of Slab culverts at Km
16/2, 16/4
Road Safety Total 70.00
579 01-CRIDP-22- Dharmapuri Palacode Widening from Two Lane to Two 1.20 262.00
23-M-0579 Lane with Paved Shoulders and
Strengthening at km 31/2 - 32/4 of
Morappur - Marandahalli road
including Construction of Box
culvert at Km 31/8 in Lieu of
damaged pipe culvert
580 01-CRIDP-22- Dharmapuri Palacode Widening from Two Lane to Two 1.00 220.00
23-M-0580 Lane with Paved Shoulders and
Strengthening at km 38/4 - 39/2,
39/6 - 39/8 of Morappur -
Marandahalli road including New
Construction of Box Culvert at Km
38/10.
581 01-CRIDP-22- Dharmapuri Pappireddipp Widening from Single Lane to 0.36 180.00
23-M-0581 atti Intermediate Lane and
Strengthening at km 24/0 - 24/360
of Pappireddipatti - Morappur road
(via) Pallipatti, Thenkaraikottai
including construction of Retaining
wall at km 24/2 & 24/4

Other Widening Total 2.56 662.00


582 01-CRIDP-22- Dharmapuri Pappireddipp Strengthening at km 12/3 - 13/0 of 0.70 280.00
23-M-0582 atti Mallapuram - Mookanur road
including Construction of Drain at
km 11/8-12/6
Strengthening/Improvements
0.70 280.00
Total
Dharmapuri Total 10.10 2521.00
583 01-CRIDP-22- Krishnagiri Thalli Widening from Intermediate Lane 5.40 680.00
23-M-0583 to Two Lane and Strengthening at
km 1/0 - 3/4, 6/0 - 9/0 of
Denkanikottai - Anchetty -
Natrampalayam road including
Retaining Wall and Drain.

584 01-CRIDP-22- Krishnagiri Thalli Widening from Intermediate Lane 4.40 550.00
23-M-0584 to Two Lane and Strengthening at
km 12/6 - 17/0 of Denkanikottai-
Uddanapalli road (via)
Kelamangalam road including CD
works & Retaining wall

585 01-CRIDP-22- Krishnagiri Veppanahalli Widening from Intermediate Lane 4.20 550.00
23-M-0585 to Two Lane and Strengthening at
km 17/0 - 21/2 of Denkanikottai-
Uddanapalli road (via)
Kelamangalam road including CD
works & Retaining wall

CMRDP IL to DL Total 14.00 1780.00


Krishnagiri Total 14.00 1780.00
Salem Circle Total 64.24 12249.50

MDR Page 62 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

586 01-CRIDP-22- Tiruppur Tiruppur Widening from Intermediate Lane 1.80 695.00
23-M-0586 North to Two Lane and Strengthening at
km 1/6 - 3/4 of Anupparpalayam -
Vanjipalayam road (Via)
Kaniyampoondi (MD878) including
Construction of Drain

587 01-CRIDP-22- Tiruppur Palladam Widening from Intermediate Lane 4.60 699.00
23-M-0587 to Two Lane and Strengthening at
km 8/0 - 12/6 of Palladam -
Boomalur road including
Reconstruction of Box Culvert at
km 8/2, 8/4(i), 8/4(ii), 8/10,
9/2,6,10, 10/2,6, 11/2,8, 12/6
and Construction of Box Culvert at
km 10/10 and Construction of
Retaining Wall at km 9/10, 10/2.

588 01-CRIDP-22- Tiruppur Kangayam Widening from Intermediate Lane 2.40 270.00
23-M-0588 to Two Lane and Strengthening at
km 8/0 - 10/4 of Sivagiri -
Nathakadaiyur - Muthur road
including Reconstruction of Box
culvert at km 10/4 and
Construction of Retaining wall at
km 9/6,8,10 & 10/2.

589 01-CRIDP-22- Tiruppur Kangayam Widening from Intermediate Lane 1.20 146.00
23-M-0589 to Two Lane and Strengthening at
km 22/0 - 23/2 of Sivagiri -
Nathakadaiyur - Muthur road
including Reconstruction of Box
culvert at km 22/2, 22/10 and
Construction of Retaining wall at
km 22/4 & 22/6

590 01-CRIDP-22- Tiruppur Kangayam Widening from Intermediate Lane 5.20 464.00
23-M-0590 to Two Lane and Strengthening at
km 26/2 - 31/4 of Sivagiri -
Nathakadaiyur - Muthur road
including Reconstruction of Box
culvert at km 26/8, 27/6, 27/10,
28/8 and construction of Retaining
wall at km 29/8 , 30/6

591 01-CRIDP-22- Tiruppur Palladam Widening from Intermediate Lane 2.00 236.00
23-M-0591 to Two Lane and Strengthening at
km 22/4 - 24/4 of Kattampatty -
Koduvai road including
Reconstruction/ Construction of
Box Culvert at Km 23/4, 24/2

592 01-CRIDP-22- Tiruppur Avinashi Widening from Intermediate Lane 2.80 360.00
23-M-0592 to Two Lane and Strengthening at
km 0/20 - 3/0 of Karuvalur -
Kovilpalayam road including
Construction of box culvert at km
1/2, 2/2, 2/6 in lieu of existing
damaged pipe culverts,
Construction of Retaining walls at
km 2/2
CMRDP IL to DL Total 20.00 2870.00

MDR Page 63 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

593 01-CRIDP-22- Tiruppur Tiruppur Construction of Drain at km 0/4 of 50.00


23-M-0593 North Anupparpalayam - Vanjipalayam
road (Via) Kaniyampoondi

Urban Improvements Total 50.00


594 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 3.00
23-M-0594 km 15/6 of Kattampatty - Koduvai
road
595 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 26.00
23-M-0595 at km 14/10, 15/4, 25/2,8 of
Kattampatty - Koduvai road
596 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 13.00
23-M-0596 at km 4/2, 5/10 of Veerapandi -
Ugayanur road
597 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50
23-M-0597 at km 3/4 of Pongalur - Mettukadai
(Via) Kengamanaickenpalayam road

598 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50


23-M-0598 at km 3/8 of Karaipudhur -
Valaithottathu Ayyan Kovil road
599 01-CRIDP-22- Tiruppur Tiruppur Providing Cantilever Gantry board 6.50
23-M-0599 South at km 0/2 of Kuppandampalayam -
Singanur road (Via)
Ganapathipalayan
600 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50
23-M-0600 at km 6/10 of Kuppandampalayam -
Singanur road (Via)
Ganapathipalayan
601 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50
23-M-0601 at km 7/10 of Koduvai -
Nachipalayam road.
602 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50
23-M-0602 at km 5/4 of Andipalayam -
Attaiyampalayam road
603 01-CRIDP-22- Tiruppur Perundurai Providing Cantilever Gantry board 6.50
23-M-0603 at km 7/2 of Vavipalayam -
Uthukuli road
604 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 6.20
23-M-0604 km 12/4, 13/4 of Koduvai -
Nachipalayam road.
605 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 14.50
23-M-0605 km 4/2, 5/10 of
Kuppandampalayam - Singanur
road (Via) Ganapathipalayan
606 01-CRIDP-22- Tiruppur Kangayam Providing Cantilever Gantry board 26.00
23-M-0606 at km Km 15/4,6, 24/10 & 25/2 of
Sivagiri - Nathakadaiyur - Muthur
road
607 01-CRIDP-22- Tiruppur Kangayam Providing Cantilever Gantry board 7.00
23-M-0607 at km 0/2 of Uthiyur -
Dhasanaickenpatty road
608 01-CRIDP-22- Tiruppur Kangayam Providing Cantilever Gantry board 7.00
23-M-0608 at km 0/2 of Uthiyur - Kundadam
road
609 01-CRIDP-22- Tiruppur Kangayam Providing Cantilever Gantry board 13.00
23-M-0609 at km 0/2 & 7/4 of Nathakadaiyur -
Uthamapalayam road

MDR Page 64 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

610 01-CRIDP-22- Tiruppur Kangayam Providing Cantilever Gantry board 7.00


23-M-0610 at km 0/2 of Thanneerpandal -
Kambaliampatty -
Lakkamanaickenpatty Road

Road Safety Total 168.20


611 01-CRIDP-22- Tiruppur Kangayam Reconstruction of Box Culvert at 48.00
23-M-0611 km 0/2 of Kangayam Bye Pass road
(Via) Ayyasamy Colony including
Reconstruction of Drain

Bridges/Culverts Total 48.00


612 01-CRIDP-22- Tiruppur Avinashi Providing Cantilever Gantry board 7.15
23-M-0612 at km 0/4 of Karuvalur -
Kovilpalayam road
Others Total 7.15
Tiruppur Total 20.00 3143.35
613 01-CRIDP-22- Dharapuram Kangayam Widening from Intermediate Lane 2.00 300.00
23-M-0613 to Two Lane and Strengthening at
km 15/0 - 17/0 of Uthiyur -
Dhasanaickenpatti including
Construction of Retaining wall at
Km 15/8 , 15/10 & 16/2 and Dip
rising at km 16/2

CMRDP IL to DL Total 2.00 300.00


614 01-CRIDP-22- Dharapuram Dharapuram Construction of Box Culvert at Km 160.00
23-M-0614 22/8 of Dharapuram - Poolavadi
road in lieu of existing causeway

Causeway to HLB Total 160.00


615 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 1.70
23-M-0615 km 21/2 of Dharapuram -
Poolavadi road
616 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 2.00
23-M-0616 m km 14/10 of Dhali - Komaralingam
road
617 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 30.00
23-M-0617 m km 0/6,8 of Karatholuvu -
Komaralinga salai
618 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 33.00
23-M-0618 m km 4/2,4 of Karatholuvu -
Komaralinga salai
619 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 8.84
23-M-0619 m km 9/2, 10/4, 25/10 of Udumalpet
- Chinnar road
620 01-CRIDP-22- Dharapuram Kangayam Providing Metal Crash Barrier at 20.00
23-M-0620 km 9/4,6 & 13/8 of Uthiyur -
Dhasanaickenpatti
621 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 7.36
23-M-0621 m km 7/6, 19/4 of Udumalpet -
Thirumoorthy salai
622 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 10.92
23-M-0622 km 10/2,6 of Mulanur -
Chinniyagoundanvalasu road (via)
Kilangundal Moolakadai
623 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 2.95
23-M-0623 m km 3/10 and 15/6 of Udumalpet -
Chinnar road - Amaravathi nagar
road

MDR Page 65 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

624 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 4.06


23-M-0624 km 3/4, 4/2 of Uthur - Anankur
road
625 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 10.14
23-M-0625 km 17/2 and 18/0 of
Soundirapuram Anankur -
Kannivadi road
Road Safety Total 130.97
626 01-CRIDP-22- Dharapuram Udumalaipett Strengthening at km 18/0 - 21/0 of 3.00 307.00
23-M-0626 ai Udumalpet - Senjeri hills road

Strengthening/Improvements
3.00 307.00
Total
Dharapuram Total 5.00 897.97
627 01-CRIDP-22- Erode Modakurichi Widening from Intermediate Lane 2.00 330.00
23-M-0627 to Two Lane and Strengthening at
km 6/0 - 8/0 of Arachalur -
Thamaraipalayam road (M130)
including onstruction of Box culvet
at Km 6/4 (i) & 7/6(i) and widening
of culvert at Km 6/4(ii), 7/6 (ii),
7/6 (iii), and construction of
retaining wall at Km 7/10 (MD30)

628 01-CRIDP-22- Erode Gobichettipal Widening from Intermediate Lane 1.40 180.00
23-M-0628 ayam to Two Lane and Strengthening at
km 21/60 - 23/0 of Perunthalaiyur
- Kavundapadi - Gettiseviyur road
(MD657) including Reconstruction
of culvert at Km 22/4

629 01-CRIDP-22- Erode Modakurichi Widening from Intermediate Lane 1.00 130.00
23-M-0629 to Two Lane and Strengthening at
km 21/0 - 22/0 of Sivagiri -
Vadapalani road including
widening of culvert at Km 21/6

CMRDP IL to DL Total 4.40 640.00


630 01-CRIDP-22- Erode Anthiyur Providing Metal Crash Barrier at 200.00
23-M-0630 km 10/4-24/4 of Chellampalayam -
Burgur - Kollegal road (MD1045)

Road Safety Total 200.00


Erode Total 4.40 840.00
Tiruppur Circle Total 29.40 4881.32
631 01-CRIDP-22- Erode Erode West Providing junction improvements at 180.00
23-M-0631 Km 1/10 of Erode - Chennimalai
road (MD108)
Road Safety Total 180.00
Erode Total 180.00
Tirupur Circle Total 180.00
632 01-CRIDP-22- Erode Anthiyur Widening of Minor Bridge at Km 153.00
23-M-0632 0/6 of Anthiyur - Athani road
(MD29)
633 01-CRIDP-22- Erode Erode East Construction of Culvert at Km 0/2 20.00
23-M-0633 of Erode - Muthur road (MD110)

MDR Page 66 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

634 01-CRIDP-22- Erode Anthiyur Reconstruction & Construction of 123.00


23-M-0634 Box Culvert at 0/2 and 0/4 of
Anthiyur - Athani road (MD29)
including Construction of Drain at
Km 0/2,4
635 01-CRIDP-22- Erode Modakurichi Construction of Box Culvert at Km 10.00
23-M-0635 11/4 of Pasur R.S - Vellodu road
(MD885)
636 01-CRIDP-22- Erode Bhavani Construction of Box Culvert at Km 30.00
23-M-0636 4/8 of Anthiyur - Ammapettai road
(MD28)
Bridges/Culverts Total 336.00
Erode Total 336.00
637 01-CRIDP-22- Karur Krishnarayap Widening from Intermediate Lane 2.80 360.00
23-M-0637 uram to Two Lane and Strengthening at
km 5/2 - 6/0, 11/0 - 13/0 of
Karur - Esanatham - Koombur -
Viriyampatty Road including
Construction of Retaining wall at
km 11/4

638 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 3.80 467.00
23-M-0638 to Two Lane and Strengthening at
km 32/0 - 35/8 of Karur -
Esanatham - Koombur -
Viriyampatty Road including
construction of culvert at km 34/2,
34/6 & 34/8 in lieu of existing
damaged narrow Pipe culvert

639 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 1.80 195.00
23-M-0639 to Two Lane and Strengthening at
km 1/6 - 3/4 of Pallapatty -
Aravakurichy - Esanatham -
Gujiliamparai Road
640 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 3.60 380.00
23-M-0640 to Two Lane and Strengthening at
km 2/0 - 5/6 of
Chinnadharapuram - Kodumudi
Road
641 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 4.00 395.00
23-M-0641 to Two Lane and Strengthening at
km 0/8 - 2/0, 3/8 - 6/6 of
Aravakurichy - Pungampadi Road

642 01-CRIDP-22- Karur Krishnarayap Widening from Intermediate Lane 2.00 440.00
23-M-0642 uram to Two Lane and Strengthening at
km 20/0 - 21/0, 25/0 - 26/0 of
Mahadhanapuram - Mylampatty
Road (via) Palayajeyankondam -
Panchapatty Road including
Construction of box culvert at km
.20/10 (2.0M x 2.0M) in lieu of
existing damaged narrow pipe
culverts and Construction of
retaining wall at km.20/6,20/8 &
20/10

MDR Page 67 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

643 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 5.00 665.00
23-M-0643 to Two Lane and Strengthening at
km 0/0 - 1/0, 4/2 - 7/0, 9/8 -
11/0 of Vairamadai -
Thoppampatty - Kuppam Road
including construction of well
protect wall at Km 6/10

644 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 3.80 490.00
23-M-0644 to Two Lane and Strengthening at
km 11/2 - 12/0, 13/0 - 16/0 of
Chinnadharapuram - Kodumudi
Road including Reconstruction Box
culvertat km 11/4 in lieu of
existing damaged Slab culvert and
Widening of Slab Culvert at km
13/10, 14/2, 14/8, 15/10(i), (ii)

645 01-CRIDP-22- Karur Aravakurichi Widening from Intermediate Lane 3.60 475.00
23-M-0645 to Two Lane and Strengthening at
km 16/0 - 18/6, 20/0 - 21/0 of
Chinnadharapuram - Kodumudi
Road including widening of Slab
Culvert at km 16/8, 16/10, 17/6,
20/6 (i), 20/6 (ii), Construction Box
culvert at km 16/2 and
Construction of Retaining wall at
km 20/6

CMRDP IL to DL Total 30.40 3867.00


646 01-CRIDP-22- Karur Aravakurichi Urban Improvements - Widening 0.80 250.00
23-M-0646 End to End and Strengthening at
km 0/0 - 0/8 of Aravakurichy -
Pungampadi Road including
widening of culvert at km 0/2 &
Construction of culvert at km 0/4
and 0/6 in lieu of existing damaged
narrow culvert and including
junction improvements at km 0/2

Urban Improvements Total 0.80 250.00


647 01-CRIDP-22- Karur Aravakurichi Widening from Two Lane to Two 2.20 410.00
23-M-0647 Lane with Paved Shoulders and
Strengthening at km 18/8 - 21/0 of
Velayuthampalayam - Noyyal Road
including Reconstruction of Box
culvert at km 18/10 and
Reconstruction of slab culvert at
km 20/4, 20/10

648 01-CRIDP-22- Karur Aravakurichi Widening from Two Lane to Two 3.40 635.00
23-M-0648 Lane with Paved Shoulders and
Strengthening at km 21/0 - 24/4 of
Velayuthampalayam - Noyyal Road
including Reconstruction of Box
culvert at km 22/8, 23/2, 23/4
Reconstruction of slab culvert at
km 22/2, 24/2

MDR Page 68 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

649 01-CRIDP-22- Karur Aravakurichi Widening from Two Lane to Two 2.00 356.00
23-M-0649 Lane with Paved Shoulders and
Strengthening at km 24/6 - 26/6 of
Velayuthampalayam - Noyyal Road
including Reconstruction of Box
culvert at km 25/4 (i), 25/4 (ii),
25/8
Other Widening Total 7.60 1401.00
650 01-CRIDP-22- Karur Krishnarayap Construction of Minor Bridge at Km 80.00
23-M-0650 uram 0/8 of Mahadhanapuram -
Mylampatty Road (via)
Palayajeyankondam - Panchapatty
Road in lieu of Existing Damaged
Culvert
Bridges/Culverts Total 80.00
Karur Total 38.80 5598.00
Tiruppur Circle Total 38.80 5934.00
651 01-CRIDP-22- Coimbatore Sulur Widening from Intermediate Lane 3.00 340.00
23-M-0651 to Two Lane and Strengthening at
km 0/0 - 3/0 of Palladam Cochin
Frontier Road Appanaickenpatty
(via) Kallangal including
Reconstruction of box culvert and
Construction of retaining Wall at
Km.0/2

652 01-CRIDP-22- Coimbatore Sulur Widening from Intermediate Lane 3.00 280.00
23-M-0652 to Two Lane and Strengthening at
km 3/0 - 6/2 of Thennampalayam
Annur Road (via)
Vagarayampalayam
653 01-CRIDP-22- Coimbatore Kavundampal Widening from Intermediate Lane 1.60 180.00
23-M-0653 ayam to Two Lane and Strengthening at
km 0/4 - 2/0 of Kurumbapalayam -
Karichipalayam road including
widening of culverts and
construction of drain

CMRDP IL to DL Total 7.60 800.00


654 01-CRIDP-22- Coimbatore Kinathukadav Widening from Two Lane to Four 0.73 400.00
23-M-0654 u Lane and Strengthening at km 2/0 -
2/725 of Kurichi -
Kanamanaickanur road (Via)
Nachipalayam including Paver
Block, Construction of drain at Km
2/0 - 2/725
Urban Improvements Total 0.73 400.00
655 01-CRIDP-22- Coimbatore Thondamuth Curve Widening at km 4/8 of 85.00
23-M-0655 ur Coimbatore Thondamuthur
Narasipuram Road including
Reconstruction of Box Culvert
656 01-CRIDP-22- Coimbatore Coimbatore Construction of Retaining wall at 215.00
23-M-0656 North km 0/0-0/8 of Ganapathy Kanuvai
Road (via) Maniyakaranpalayam
and Kasinanjegoundanpudur Road
including Reconstruction of Box
culvert at km 0/2,4

657 01-CRIDP-22- Coimbatore Kinathukadav Providing Cantilever Gantry board 13.00


23-M-0657 u at km 7/6 of Madukkarai
Chettipalayam Road

MDR Page 69 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

658 01-CRIDP-22- Coimbatore Kinathukadav Providing Metal Crash Barrier at 6.00


23-M-0658 u km 1/6 of Kanthagoundan Savady
Valanthavalum Road
659 01-CRIDP-22- Coimbatore Kavundampal Providing Metal Crash Barrier at 10.00
23-M-0659 ayam km 6/10 of Saravanampatty
Thennampalayam Road
660 01-CRIDP-22- Coimbatore Kavundampal Providing Metal Crash Barrier at 5.00
23-M-0660 ayam km 7/2 of Saravanampatty
Thennampalayam Road
661 01-CRIDP-22- Coimbatore Kavundampal Providing Metal Crash Barrier at 10.00
23-M-0661 ayam km 11/6 of Saravanampatty
Thennampalayam Road
662 01-CRIDP-22- Coimbatore Thondamuth Providing Cantilever Gantry board 6.50
23-M-0662 ur at km 12/2 of Coimbatore Siruvani
Road
663 01-CRIDP-22- Coimbatore Kavundampal Providing Metal Crash Barrier at 5.00
23-M-0663 ayam km 11/8 of Saravanampatty
Thennampalayam Road
664 01-CRIDP-22- Coimbatore Thondamuth Providing Cantilever Gantry board 6.50
23-M-0664 ur at km 18/6 of Coimbatore Siruvani
Road
665 01-CRIDP-22- Coimbatore Thondamuth Providing Cantilever Gantry board 6.50
23-M-0665 ur at km 19/8 of Coimbatore Siruvani
Road
666 01-CRIDP-22- Coimbatore Thondamuth Providing Over Head Gantry board 12.10
23-M-0666 ur at km 28/6 of Coimbatore Siruvani
Road
667 01-CRIDP-22- Coimbatore Thondamuth Providing Cantilever Gantry board 6.50
23-M-0667 ur at km 10/2 of Coimbatore
Thondamuthur Narasipuram Road

668 01-CRIDP-22- Coimbatore Thondamuth Providing Cantilever Gantry board 6.50


23-M-0668 ur at km 10/4 of Coimbatore
Thondamuthur Narasipuram Road

669 01-CRIDP-22- Coimbatore Kavundampal Providing Over Head Gantry board 12.10
23-M-0669 ayam at km 2/6 of Goundampalayam
Onappalayam
670 01-CRIDP-22- Coimbatore Kavundampal Providing Over Head Gantry board 24.20
23-M-0670 ayam at km 0/2 of Goundampalayam
Onappalayam
671 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-M-0671 m at km 12/2 of Pethikuttai -
Puliampatti road
672 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-M-0672 m at km 3/10 of Karamadai -
Tholampalayam road
673 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-M-0673 m at km 16/6 of Karamadai -
Tholampalayam road
674 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 13.00
23-M-0674 m at km 3/6 of Karamadai Sirumugai
Road
675 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-M-0675 m at km 10/10 of Karamadai -
Tholampalayam road
Road Safety Total 468.90

MDR Page 70 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

676 01-CRIDP-22- Coimbatore Mettupalaya Widening from Two Lane to Two 2.50 370.00
23-M-0676 m Lane with Paved Shoulders and
Strengthening at km 7/0 - 8/3,
Strengthening at km 8/4 - 9/6 of
Karamadai Sirumugai Road
677 01-CRIDP-22- Coimbatore Mettupalaya Widening from Two Lane to Two 2.40 540.00
23-M-0677 m Lane with Paved Shoulders and
Strengthening at km 2/6 - 5/0 of
Karamadai Sirumugai Road
Other Widening Total 4.90 910.00
Coimbatore Total 13.23 2578.90
678 01-CRIDP-22- Pollachi Kinathukadav Widening from Intermediate Lane 4.90 532.00
23-M-0678 u to Two Lane and Strengthening at
km 0/0 - 4/9 of Vadachittur -
Chettipalayam Road. including
Construction of Retaining wall at
km 0/10
679 01-CRIDP-22- Pollachi Valparai Widening from Intermediate Lane 1.00 155.00
23-M-0679 to Two Lane and Strengthening at
km 11/0 - 12/0 of Anaimalai -
Poolankinar Road. Including
Reconstruction of Culvert at Km
11/4 & 11/8
680 01-CRIDP-22- Pollachi Valparai Widening from Intermediate Lane 4.20 665.00
23-M-0680 to Two Lane and Strengthening at
km 2/0 - 2/6, 5/0 - 6/6, 14/0 -
16/0 of Anaimalai - Poolankinar
Road. including Construction of
Culvert at Km 5/2, 5/4, 5/10, 6/4
and Construction of Retaining Wall
at Km 2/2

681 01-CRIDP-22- Pollachi Valparai Widening from Intermediate Lane 0.40 80.00
23-M-0681 to Two Lane and Strengthening at
km 13/0 - 13/4 of
Ambarampalayam - Sethumadai
Road. Including Construction of
Culvert at Km 13/2

CMRDP IL to DL Total 10.50 1432.00


682 01-CRIDP-22- Pollachi Valparai Providing Metal Crash Barrier at 40.00
23-M-0682 Km3/6, 3/10, 4/2, 4/4, 4/8, 4/10,
5/2, 5/4, 5/6, and 5/8 of
Anaimalai Loop road (MD23)
683 01-CRIDP-22- Pollachi Valparai Providing Metal Crash barrier at 45.00
23-M-0683 Km 1/2, 1/4, 1/8, 1/10, 2/4, 2/6,
and 2/10 of Permanent Diversion
road from old valparai to State
border connecting Pollachi main
road (MD354)
684 01-CRIDP-22- Pollachi Valparai Providing Metal Crash barrier at 40.00
23-M-0684 Km 3/4, 3/6, 3/8, 3/10, 4/2, 4/4,
4/6 and 4/8 of Permanent
Diversion road from old valparai to
State border connecting Pollachi
main road (MD354)
685 01-CRIDP-22- Pollachi Valparai Providing Metal Crash barrier at 40.00
23-M-0685 Km 8/2, 8/4, 8/6, 8/10, 9/2, 9/4,
9/6 and 9/10 of Permanent
Diversion road from old Valparai to
State border connecting Pollachi
main road (MD354)

MDR Page 71 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

686 01-CRIDP-22- Pollachi Valparai Providing Metal Crash barrier at 40.00


23-M-0686 Km 10/2, 10/4, 10/8, 11/4, 11/6,
11/8, 12/2, 12/4, and 12/6 of
Permanent Diversion road from Old
Valparai to State border connecting
Pollachi main road (MD354)

687 01-CRIDP-22- Pollachi Valparai Providing Metal Crash barrier at 46.00


23-M-0687 Km 13/6, 15/2, 15/6, 16/6,
16/10, 17/4, 17/8 and 17/10 of
Permanent Diversion road from Old
Valparai to State border connecting
Pollachi main road (MD354)

688 01-CRIDP-22- Pollachi Valparai Providing Metal Crash barrier at 49.00


23-M-0688 Km 2/6, 2/8, 2/10, 3/2, 3/4 and
3/6 of Valparai -
Manikkakurangumudi road
689 01-CRIDP-22- Pollachi Valparai Providing Metal Crash Barrier at 48.00
23-M-0689 Km 0/2, 0/4, 0/6, 0/8, 1/6, 1/10,
2/2, 2/6, and 3/2 of Anaimalai
Loop road (MD23)
690 01-CRIDP-22- Pollachi Valparai Providing Metal Crash Barrier at 25.00
23-M-0690 Km 6/2, 6/4, 6/6, 7/2, 7/4, and
7/6 of Anaimalai Loop road
(MD23)
Road Safety Total 373.00
691 01-CRIDP-22- Pollachi Valparai Strengthening at km 0/0-3/8 of 3.80 605.00
23-M-0691 Anaimalai Loop road including CC
drain, and CD works at Km 0/6,
1/2, 1/6, 2/6, 2/8 and 3/2
(MD23)
692 01-CRIDP-22- Pollachi Valparai Strengthening at km 3/8-7/8 of 4.00 635.00
23-M-0692 Anaimalai Loop road including CC
drain,Retaining wall at Km 4/6
and CD works at Km 4/4,4/8,5/8,
6/2,7/2, and 7/6 (MD23)

Strengthening/Improvements
7.80 1240.00
Total
Pollachi Total 18.30 3045.00
693 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 31.00
23-M-0693 alam km 4/4, 6/6, 8/4,8, 12/4 of
Doddabetta Iduhatty Kattabettu
road
694 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 28.00
23-M-0694 alam km 15/2,4,6,10 of Doddabetta
Iduhatty Kattabettu road
695 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 50.00
23-M-0695 alam km 2/4,6,8, 3/8, 7/4,6 of Udhagai -
Avalanchi - Kundah -Thaishola
road
696 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 16.80
23-M-0696 km 0/2,4 of Sholurmattam road

697 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 12.00


23-M-0697 km 6/6, 7/4 of Coonoor Kattabettu
road
698 01-CRIDP-22- Udhagai Gudalur Providing Metal Crash Barrier at 30.00
23-M-0698 km 12/8, 13/4, 14/6,8, 22/2 of
Thalaikundah Kallatty Theppakadu
road

MDR Page 72 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

Road Safety Total 167.80


699 01-CRIDP-22- Udhagai Udhagamand Strengthening at km 1/0 - 2/0, 1.20 300.00
23-M-0699 alam 12/6 - 12/8 of Udhagai -
Avalanchi - Kundah -Thaishola
road including Protective works, CC
Drain and CD works
Strengthening/Improvements
1.20 300.00
Total
700 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 35.00
23-M-0700 km 12/8 of Coonoor Kattabettu
road
Flood Permanent Total 35.00
701 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 350.00
23-M-0701 alam km 4/6,8, 13/8,10 & 17/10 of
Udhagai - Avalanchi - Kundah -
Thaishola road including CC Drain

702 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 170.00


23-M-0702 alam km 19/2,4 & 26/10 of Coonoor
Kundah road Including Widening
Culvert.
703 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 267.00
23-M-0703 km 3/8, 4/8, 5/2 & 5/4 of Coonoor
Kattabettu road including CC Drain

704 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 200.00


23-M-0704 alam km 0/8, 15/4, 34/10 & 35/2 of
Udhagai - Avalanchi - Kundah -
Thaishola road including CC Drain

Others Total 987.00


Udhagai Total 1.20 1489.80
Coimbatore Circle Total 32.73 7113.70
705 01-CRIDP-22- Trichy Musiri Widening from Intermediate Lane 1.00 275.00
23-M-0705 to Two Lane and Strengthening at
km 4/0 - 5/0 of Seeplaputhur -
Kattuputhur - Namakkal Road
including reconstruction of box
culvert at km 4/8, widening of
culvert at km 4/10 and
construction of protective wall at
km 4/8,10 (MD416).

706 01-CRIDP-22- Trichy Musiri Widening from Intermediate Lane 2.00 360.00
23-M-0706 to Two Lane and Strengthening at
km 10/0 - 12/0 of Thootiyam -
Kattuputhur Road including
construction of protectivewall at
km 9/10, 10/2, 11/10 , rasing the
existing protective wall at km
11/6,11/8 and constrution of well
protective wall at km 10/2,10/10
(MD487).

MDR Page 73 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

707 01-CRIDP-22- Trichy Musiri Widening from Intermediate Lane 4.00 700.00
23-M-0707 to Two Lane and Strengthening at
km 0/0 - 4/0 of Musiri -Pulivalam
Road including construction of box
culvert at km 0/10, 1/2(i), 1/2(ii),
1/4, 1/10, 2/2, 2/10, 3/10 ,
construction of drain in km 0/320-
0/870 and construction of
protectivewall at km 0/10, 1/2,
1/10 (MD - 276).

708 01-CRIDP-22- Trichy Manachanall Widening from Intermediate Lane 3.60 580.00
23-M-0708 ur to Two Lane and Strengthening at
km 0/0 - 3/6 of Samayapuram -
Keelakannukulam Road
(Via)Manachanallur -Thiruppanjali
Road including Reconstruction of
Box Culvert at km
0/2,1/2,1/10,2/4,3/4 & 3/6 (MD -
823)

709 01-CRIDP-22- Trichy Manachanall Widening from Intermediate Lane 3.00 451.00
23-M-0709 ur to Two Lane and Strengthening at
km 8/0 - 11/0 of Samayapuram -
Keelakannukulam Road
(Via)Manachanallur -Thiruppanjali
Road including Reconstruction of
Box Culvert at km 8/10 &10/8
(MD-823)

710 01-CRIDP-22- Trichy Manachanall Widening from Intermediate Lane 1.40 227.00
23-M-0710 ur to Two Lane and Strengthening at
km 1/6 - 3/0 of Manachanallur -
Edumalai -Elanthalaipatty Road
including reconstruction of Box
culvert at km 1/8 & 2/10 (MD-244)

711 01-CRIDP-22- Trichy Manapparai Widening from Intermediate Lane 3.00 440.00
23-M-0711 to Two Lane and Strengthening at
km 0/0 - 1/0, Widening from
Intermediate Lane to Two Lane and
Improvements at km 4/0 - 6/0 of
Kovilpatty -Manapparai Road
including Reconstruction of Culvert
at Km 0/4, 5/6 & 5/10 (MD - 177)

712 01-CRIDP-22- Trichy Thiruverumb Widening from Intermediate Lane 2.00 485.00
23-M-0712 ur to Two Lane and Strengthening at
km 1/0 - 3/0 of Thiruverambur -
Sooriyur Road including
Reconstruction of Culvert at km
1/8 & 2/6 and Construction of
Protective wall at km 1/6,1/8 &
2/6 (MD 824)

MDR Page 74 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

713 01-CRIDP-22- Trichy Thiruverumb Widening from Intermediate Lane 3.20 445.00
23-M-0713 ur to Two Lane and Strengthening at
km 1/0 - 3/2, Strengthening at
km 3/2 - 4/2 of Thriuverumbur -
Grandanaicut Road including
reconstruction of culvert at km 1/2
and construction of Protective wall
(MD 306)

714 01-CRIDP-22- Trichy Thiruverumb Widening from Intermediate Lane 3.20 460.00
23-M-0714 ur to Two Lane and Strengthening at
km 12/2 - 15/4 of Thiruverambur -
Sooriyur Road including
construction of protective wall at
km 15/2 & 15/4 (MD 824)

715 01-CRIDP-22- Trichy Thiruverumb Widening from Intermediate Lane 4.00 665.00
23-M-0715 ur to Two Lane and Strengthening at
km 7/0 - 11/0 of Thiruverambur -
Sooriyur Road including
Reconstruction of Box culvert at
km 10/8 and Construction of
Protective wall at km 9/6,9/8 &
9/10 (MD 824)
716 01-CRIDP-22- Trichy Lalgudi Widening from Intermediate Lane 2.40 365.00
23-M-0716 to Two Lane and Strengthening at
km 22/6 - 25/0 of Keelapalur-
Pullambady (Via)Thirumalappady
Road including Construction
protective wall km 23/4, 23/6
(MD608)

717 01-CRIDP-22- Trichy Lalgudi Widening from Intermediate Lane 3.00 435.00
23-M-0717 to Two Lane and Strengthening at
km 25/0 - 28/0 of Keelapalur-
Pullambady (Via)Thirumalappady
Road including Reconstruction of
culvert at km 25/6, 27/8 and
Construction of Drain at km 27/10,
28/2 (MD608)

718 01-CRIDP-22- Trichy Manapparai Widening from Intermediate Lane 3.00 700.00
23-M-0718 to Two Lane and Strengthening at
km 25/4 - 27/0, Widening from
Intermediate Lane to Two Lane and
Improvements at km 27/6 - 29/0 of
Vaiyambatti - Konnayur Road
including Reconstruction of
culverts at Km 25/6, 26/10 and
Widening culverts at Km 28/2 and
construction of Retaining wall at
km 25/6, 26/10,
27/8,28/2,28/4,28/10 (MD 729)

719 01-CRIDP-22- Trichy Manapparai Widening from Intermediate Lane 2.00 384.00
23-M-0719 to Two Lane and Strengthening at
km 29/0 - 31/0 of Vaiyambatti -
Konnayur Road including
Reconstruction of culvert at Km
29/4, construction of Retaining
wall at km 29/2,29/4,30/10 (MD
729)

MDR Page 75 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

CMRDP IL to DL Total 40.80 6972.00


720 01-CRIDP-22- Trichy Thuraiyur Strengthening at km 14/2 - 14/4 of 0.20 47.00
23-M-0720 Eragudy - Alathudaiyanpatty -
Puliyancholai Road with Paver
block at Km 14/350-14/400
including Construction of
Protective wall at km 14/4 (MD -
1123)

Tourism Important Total 0.20 47.00


721 01-CRIDP-22- Trichy Srirangam Reconstruction of Box Culvert at 279.00
23-M-0721 3/4(i), 3/6, 3/8(i), 3/8(ii), 4/2, 4/4
& 4/10 of Konnarchathiram -
Kulumani road via
Pandamangalam, Perur including
construction of Protective wall at
km 2/8, 2/10, 3/8 & 3/10
(MD461A)
Bridges/Culverts Total 279.00
Trichy Total 41.00 7298.00
722 01-CRIDP-22- Pudukottai Alangudi Widening from Intermediate Lane 1.80 234.00
23-M-0722 to Two Lane and Strengthening at
km 0/0 - 0/8, 2/0 - 3/0 of
Alangudi - Maramadakki -
Kurumbur road Reconstruction of
Box culvert at Km 0/8 & 2/10 (MD
1006)
723 01-CRIDP-22- Pudukottai Thirumayam Widening from Intermediate Lane 3.00 390.00
23-M-0723 to Two Lane and Strengthening at
km 3/0 - 6/0 of Thirumayam -
Virachialai - Panayapatti road
Reconstruction of box culvert at
3/4,4/6,5/8 and construction of
retaining wall at km 3/4 and
4/6(MD 1007)

724 01-CRIDP-22- Pudukottai Pudukkottai Widening from Intermediate Lane 2.00 280.00
23-M-0724 to Two Lane and Strengthening at
km 9/2 - 9/6, 10/2 - 11/8 of
Vadavalam - Puduppatty road
reconstruction of box culvert at km
9/4(ii), 9/4(iii), 10/6

725 01-CRIDP-22- Pudukottai Gandarvakott Widening from Intermediate Lane 2.40 305.00
23-M-0725 ai to Two Lane and Strengthening at
km 0/4 - 0/8, 1/2 - 3/2 of
Vallamputhur - Thatchangurichi
road (v) Nattani
726 01-CRIDP-22- Pudukottai Gandarvakott Widening from Intermediate Lane 1.60 205.00
23-M-0726 ai to Two Lane and Strengthening at
km 14/0 - 15/6 of Thanjavur -
Karambakudi - Seethambalpuram
road

727 01-CRIDP-22- Pudukottai Gandarvakott Widening from Intermediate Lane 2.50 325.00
23-M-0727 ai to Two Lane and Strengthening at
km 21/7 - 24/2 of Keeranur -
Adhanakottai road reconstruction
of box culvert at Km 22/6, 23/6
and 24/2 [MD 825].

MDR Page 76 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

728 01-CRIDP-22- Pudukottai Viralimalai Widening from Intermediate Lane 3.00 439.00
23-M-0728 to Two Lane and Strengthening at
km 32/0 - 35/0 of Pudukkottai -
Manapparai road reconstruction of
box culvert at Km32/2, 32/4 and
construction of retaining wall at
Km 34/8 (MD665)

729 01-CRIDP-22- Pudukottai Viralimalai Widening from Intermediate Lane 2.00 310.00
23-M-0729 to Two Lane and Strengthening at
km 35/0 - 37/0 of Pudukkottai -
Manapparai road widening slab
culvert at Km 35/4 and
construction of retaining wall at
Km 35/6 (MD665)

730 01-CRIDP-22- Pudukottai Viralimalai Widening from Intermediate Lane 1.00 133.00
23-M-0730 to Two Lane and Strengthening at
km 14/0 - 15/0 of Pudukkottai -
Manapparai road including
reconstruction of box culvert at Km
14/4 (MD665)

731 01-CRIDP-22- Pudukottai Viralimalai Widening from Intermediate Lane 3.40 395.00
23-M-0731 to Two Lane and Strengthening at
km 22/6 - 26/0 of Pudukkottai -
Manapparai road reconstruction of
box culvert at Km 25/4 (MD665)

732 01-CRIDP-22- Pudukottai Thirumayam Widening from Intermediate Lane 1.40 186.00
23-M-0732 to Two Lane and Strengthening at
km 0/0 - 1/4 of Perumanadu -
Konnaiyur road reconstruction of
box culvert at Km1/2 and 1/4
(MD827)
733 01-CRIDP-22- Pudukottai Pudukkottai Widening from Intermediate Lane 2.40 312.00
23-M-0733 to Two Lane and Strengthening at
km 27/0 - 27/4, 34/0 - 36/0 of
Pudukkottai - Pattukkottai road
reconstruction of box culvert at Km
27/4, 34/6 (MD372)

734 01-CRIDP-22- Pudukottai Thirumayam Widening from Intermediate Lane 2.00 250.00
23-M-0734 to Two Lane and Strengthening at
km 12/0 - 14/0 of Perumanadu -
Konnaiyur road reconstruction of
box culvert at km 13/8

735 01-CRIDP-22- Pudukottai Thirumayam Widening from Intermediate Lane 2.20 295.00
23-M-0735 to Two Lane and Strengthening at
km 14/0 - 16/2 of Perumanadu -
Konnaiyur road including
reconstruction of box culvert at km
15/4 & 16/2

736 01-CRIDP-22- Pudukottai Alangudi Widening from Intermediate Lane 5.00 676.00
23-M-0736 to Two Lane and Strengthening at
km 24/2 - 29/2 of Pattukkottai -
Peravurani - Aranthangi road
including reconstruction of Box
Culvert at Km 27/4,27/6,28/4

MDR Page 77 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

737 01-CRIDP-22- Pudukottai Alangudi Widening from Intermediate Lane 1.40 185.00
23-M-0737 to Two Lane and Strengthening at
km 34/6 - 36/0 of Pattukkottai -
Peravurani - Aranthangi road

738 01-CRIDP-22- Pudukottai Aranthangi Widening from Intermediate Lane 1.00 155.00
23-M-0738 to Two Lane and Strengthening at
km 39/0 - 40/0 of Pattukkottai -
Peravurani - Aranthangi road
including reconstruction of culverts
at km 39/6

CMRDP IL to DL Total 38.10 5075.00


739 01-CRIDP-22- Pudukottai Pudukkottai Providing Junction Improvement at 220.00
23-M-0739 km 8/8 of Vadavalam -
Puduppatty road
Road Safety Total 220.00
Pudukottai Total 38.10 5295.00
740 01-CRIDP-22- Tiruvarur Mannargudi Widening from Intermediate Lane 1.20 157.00
23-M-0740 to Two Lane and Strengthening at
km 0/0 - 1/2 of Mannargudi -
Thiruthuraipoondi road

741 01-CRIDP-22- Tiruvarur Thiruvarur Widening from Intermediate Lane 1.00 195.00
23-M-0741 to Two Lane and Strengthening at
km 6/6 - 7/6 of Kodavasal -
Koradachery - Lakshmangudi -
Mavoor road including
Construction of Retaining wall at
Km.6/8
742 01-CRIDP-22- Tiruvarur Thiruvarur Widening from Intermediate Lane 3.60 605.00
23-M-0742 to Two Lane and Strengthening at
km 9/0 - 12/6 of Kodavasal -
Koradachery - Lakshmangudi -
Mavoor road including
Reconstruction of Culvert at
Km.10/4, Construction of Culvert
Body wall at Km.11/6 and
Retaining wall at Km.9/6,12/4

743 01-CRIDP-22- Tiruvarur Nannilam Widening from Intermediate Lane 0.80 150.00
23-M-0743 to Two Lane and Strengthening at
km 8/8 - 9/6 of Kodavasal -
Valangaiman - Papanasam road
including Reconstruction of Culvert
at Km.9/2 and Construction of
Retaining wall

744 01-CRIDP-22- Tiruvarur Thiruvarur Widening from Intermediate Lane 2.00 490.00
23-M-0744 to Two Lane and Strengthening at
km 16/0 - 18/0 of Thirunellikkaval
- Kolappadu - Karunganni road
including Construction of Retaining
wall at Km.16/2, 16/4, 16/6, 16/8,
16/10, 17/2, 17/4, 17/6, 17/8,
17/10

CMRDP IL to DL Total 8.60 1597.00


Tiruvarur Total 8.60 1597.00

MDR Page 78 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

745 01-CRIDP-22- Nagapattinam Vedaranyam Widening from Intermediate Lane 3.60 495.00
23-M-0745 to Two Lane and Strengthening at
km 23/2 - 24/4, 24/8 - 27/2 of
Velankanni - Vedaranyam Road

746 01-CRIDP-22- Nagapattinam Kilvelur Widening from Intermediate Lane 2.20 358.00
23-M-0746 to Two Lane and Improvements at
km 2/4 - 3/4 and 5/2 - 6/4 of
Akkaraipettai - Velankanni (Via)
Vadakkupoiyur Road

747 01-CRIDP-22- Nagapattinam KilvelurWidening from Intermediate Lane 3.20 688.00


23-M-0747 to Two Lane and Improvements at
km 0/6 - 2/8 and 14/0 - 15/0 of
Keevalur - Katchanam Road
including Reconstruction of Box
Culvert at Km 0/8, 0/10, 1/8,
1/10, 2/2, 2/4, 2/8 and
Construction of Retaining wall at
Km 14/8
748 01-CRIDP-22- Nagapattinam Vedaranyam Widening from Intermediate Lane 0.60 83.00
23-M-0748 to Two Lane and Strengthening at
km 8/0 - 8/6 of Sengathalai Bridge
- Vedaranyam Road

749 01-CRIDP-22- Nagapattinam Nagapattinam Widening from Intermediate Lane 1.40 219.00
23-M-0749 to Two Lane and Improvements at
km 8/0 - 9/4 of Poonthottam -
Karaikkal Road
CMRDP IL to DL Total 11.00 1843.00
750 01-CRIDP-22- Nagapattinam Vedaranyam Construction of Retaining wall at 316.00
23-M-0750 km 0/6,8 of Alangudi - Thalainayar
- Thalanthiruvasal Road

751 01-CRIDP-22- Nagapattinam Kilvelur Providing Junction Improvement at 50.00


23-M-0751 km 12/4 of Thirunellikaval -
Kolappadu - Karunganni Road
752 01-CRIDP-22- Nagapattinam Kilvelur Providing Junction Improvement at 50.00
23-M-0752 km 0/2 of Keevalur - Katchanam
Road
753 01-CRIDP-22- Nagapattinam Vedaranyam Curve Widening at km 13/100 - 50.00
23-M-0753 13/400 of Sengathalai Bridge -
Vedaranyam Road
Road Safety Total 466.00
Nagapattinam Total 11.00 2309.00
754 01-CRIDP-22- Mayiladuthur Mayiladuthur Widening from Intermediate Lane 1.70 350.00
23-M-0754 ai ai to Two Lane and Strengthening at
km 0/0 - 1/7 of Kuthalam -
Pandanallur Road including
Reconstruction of Box culvert at
Km.1/4, 1/8
755 01-CRIDP-22- Mayiladuthur Poompuhar Widening from Intermediate Lane 2.00 360.00
23-M-0755 ai to Two Lane and Strengthening at
km 15/0 - 17/0 of Tharangambadi -
Mayiladuthurai Road including
Reconstruction of Box culvert at
Km.15/4

MDR Page 79 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

756 01-CRIDP-22- Mayiladuthur Sirkazhi Widening from Intermediate Lane 1.60 297.00
23-M-0756 ai to Two Lane and Strengthening at
km 1/4 - 3/0 of Sirkali -
Panakattangudy Road including
Reconstruction of culvert at km
1/8(i),1/8(ii) & 2/10

757 01-CRIDP-22- Mayiladuthur Sirkazhi Widening from Intermediate Lane 3.00 608.00
23-M-0757 ai to Two Lane and Strengthening at
km 3/0 - 5/0, 6/0 - 7/0 of Sirkali -
Thirumullaivasal - Koolaiyar Road
including Reconstruction of culvert
at km 3/10 and Construction of
retaining wall at km 6/8,6/10

758 01-CRIDP-22- Mayiladuthur Sirkazhi Widening from Intermediate Lane 4.13 699.00
23-M-0758 ai to Two Lane and Strengthening at
km 0/070 - 3/2, 4/2 - 4/6, 12/0 -
12/6 of Sattanathapuram -
Thiruvenkadu - Malaiyur Road
including Reconstruction of culvert
at km 0/6,1/6,1/10 & 2/6 and
Construction of retaining wall at
km 0/2, 0/4, 0/6

759 01-CRIDP-22- Mayiladuthur Mayiladuthur Widening from Intermediate Lane 0.70 120.00
23-M-0759 ai ai to Two Lane and Strengthening at
km 0/2 - 0/9 of Mayiladuthurai -
Pattavarthy Road

760 01-CRIDP-22- Mayiladuthur Poompuhar Widening from Intermediate Lane 2.00 350.00
23-M-0760 ai to Two Lane and Strengthening at
km 2/0 - 4/0 of Tharangambadi -
Manganallur - Aduthurai Road

CMRDP IL to DL Total 15.13 2784.00


761 01-CRIDP-22- Mayiladuthur Mayiladuthur Construction of Drain at km 27/6- 200.00
23-M-0761 ai ai 28/2 of Tharangambadi -
Mayiladuthurai Road
Urban Improvements Total 200.00
762 01-CRIDP-22- Mayiladuthur Sirkazhi Providing Junction Improvement at 100.00
23-M-0762 ai km 0/0- 0/070 of
Sattanathapuram - Thiruvenkadu -
Malaiyur Road
Road Safety Total 100.00
Mayiladuthurai Total 15.13 3084.00
Trichy Circle Total 113.83 19583.00
763 01-CRIDP-22- Madurai Sholavandan Widening from Intermediate Lane 1.00 150.00
23-M-0763 to Two Lane and Strengthening at
km 26/0 - 27/0 of Melakkal-
Peranai road including Widening of
Culvert at Km 26/8.

CMRDP IL to DL Total 1.00 150.00


764 01-CRIDP-22- Madurai Madurai Strengthening at km 0/0 - 0/8 of 0.80 180.00
23-M-0764 Central East Velli Street road

MDR Page 80 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

765 01-CRIDP-22- Madurai Madurai East Strengthening at km 3/6 - 7/0 of 3.40 400.00
23-M-0765 Varichiyur-Sakkudi road including
Construction of Retaining Wall

766 01-CRIDP-22- Madurai Thirumangala Strengthening at km 5/8 - 7/8 of 2.00 314.00


23-M-0766 m B.C.C.road to Thirumal road
including Reconstruction of Minor
Bridge at km 5/10
767 01-CRIDP-22- Madurai Usilampatti Strengthening at km 0/0 - 3/0 of 3.00 435.00
23-M-0767 Mangalrewu-Elumalai road
including Widening, Reconstruction
of Culverts and Construction of
Drainage

MDR Page 81 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

768 01-CRIDP-22- Madurai Usilampatti Strengthening at km 3/0 - 5/0 of 2.00 300.00


23-M-0768 Mangalrewu-Elumalai road
including Widening, Reconstruction
of Culverts and Construction of
Drainage
Strengthening/Improvements
11.20 1629.00
Total
769 01-CRIDP-22- Madurai Melur Widening of Culvert at Km 6/10 of 75.00
23-M-0769 Melur-Thiruppuvanam (via)
Poovanthi road
Bridges/Culverts Total 75.00
Madurai Total 12.20 1854.00
770 01-CRIDP-22- Theni Bodinayakan Construction of Retaining wall at 5.00
23-M-0770 ur km 10/2 of Veerapandi -
Nagalapuram Road
771 01-CRIDP-22- Theni Bodinayakan Providing Metal Crash Barrier at 20.00
23-M-0771 ur km 2/075-2/335 of Kottur -
Kamatchipuram road
772 01-CRIDP-22- Theni Bodinayakan Providing Metal Crash Barrier at 20.00
23-M-0772 ur km 6/4-9/0 of Bodi - Kurangani
Road
773 01-CRIDP-22- Theni Andipatti Providing Metal Crash Barrier at 6.20
23-M-0773 km 2/2, 10/8, 17/10 of Andipatti -
Velapparkovil Road
774 01-CRIDP-22- Theni Bodinayakan Construction of Retaining wall at 44.15
23-M-0774 ur km 13/10 of Bodi - Kurangani
Road
Road Safety Total 95.35
775 01-CRIDP-22- Theni Periyakulam Strengthening at km 8/0 - 8/680, 1.03 123.00
23-M-0775 8/850 - 9/2 of Varadharajanagar -
Renganathapuram Road including
providing paver block at Km.8/680-
8/850, construction of drain (MD
732)

776 01-CRIDP-22- Theni Cumbum Strengthening at km 1/5 - 4/050 of 2.55 221.00


23-M-0776 Cumbum - Cumbummettu Road
including Construction of Retaining
wall
777 01-CRIDP-22- Theni Andipatti Strengthening at km 1/6 - 3/0, 1.90 172.20
23-M-0777 12/5 - 13/0 of Kanniyappapillai
patti - Gandamanur (via)
Usilampatti road including
construction of retaining wall
778 01-CRIDP-22- Theni Bodinayakan Strengthening at km 9/6 - 12/0 of 2.40 167.00
23-M-0778 ur Bodi - Kurangani Road including
Raising the Concrete shoulder at
km 9/6-12/0
Strengthening/Improvements
7.88 683.20
Total
779 01-CRIDP-22- Theni Andipatti Reconstruction of Box Culvert at 20.00
23-M-0779 Km 11/4 of Sittharpatti vilakku -
Ambasamuthiram road (via)
Ganesapuram
Bridges/Culverts Total 20.00
Theni Total 7.88 798.55

MDR Page 82 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

780 01-CRIDP-22- Dindigul Athoor Widening from Intermediate Lane 2.20 695.00
23-M-0780 to Two Lane and Strengthening at
km 6/4 - 7/0, 7/4 - 9/0 of
Sitharevu - Chinnalapatty Road
including Re- Construction of
Culvert at km 7/10 & km 8/10 ,
widening culvert at km 8/2
,Construction of Drain at km 6/4-
7/0, Construction of Retaining wall
at km 8/0-9/0

781 01-CRIDP-22- Dindigul Nilakkottai Widening from Intermediate Lane 3.60 610.00
23-M-0781 to Two Lane and Strengthening at
km 22/0 - 25/6 of Natchikulam -
Sempatti Road including Re-
Construction of Culvert at km
22/8, 23/4,10, 24/6,10, 25/2 and
Construction of Retaining wall at
km 25/4 and Widening minor
bridge at km 25/4 (MD-643)

782 01-CRIDP-22- Dindigul Athoor Widening from Intermediate Lane 5.00 595.00
23-M-0782 to Two Lane and Strengthening at
km 0/0 - 5/0 of Veiladichampatti -
Palayakannivadi road including Re-
Construction of culvert at km
0/10,1/6,2/2,2/4,2/6,3/6,4/4 and
construction of Drain at km
2/6,2/10 and Protective wall at km
1/8(MD-967)

783 01-CRIDP-22- Dindigul Athoor Widening from Intermediate Lane 4.00 430.00
23-M-0783 to Two Lane and Strengthening at
km 5/0 - 9/0 of Veiladichampatti -
Palayakannivadi road including Re-
Construction of Culvert at km
5/2,7/8,8/4 and construction of
Drain(MD-967)

CMRDP IL to DL Total 14.80 2330.00


784 01-CRIDP-22- Dindigul Athoor Urban Improvements - Widening 1.16 650.00
23-M-0784 from Intermediate Lane to
EndtoEnd and Strengthening at km
18/8 - 19/960 of Sitharevu -
Chinnalapatty Road including
Construction of Drain at Km 18/8-
19/960, Providing paver block and
Widening culvert at km 19/6

Urban Improvements Total 1.16 650.00


785 01-CRIDP-22- Dindigul Palani Providing Metal Crash Barrier at 100.00
23-M-0785 km 1/6, 3/4,6, 6/10, 7/2, 9/6 of
Kodai Palani Ghat Road
786 01-CRIDP-22- Dindigul Palani Providing Metal Crash Barrier at 100.00
23-M-0786 km 10/4, 11/2, 12/2, 13/4, 23/10
of Kodai Palani Ghat Road
787 01-CRIDP-22- Dindigul Palani Construction of Breast wall at km 70.00
23-M-0787 10/4 of Pannaikadu
Mangalamcombu Road including
Construction of Retaining wall at
km 6/8, 7/2, 9/10, 10/4 (MD325)

MDR Page 83 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

788 01-CRIDP-22- Dindigul Athoor Construction of Retaining wall at 165.00


23-M-0788 km 21/10, 38/2 of Vathalagundu -
Thandigudi road
Road Safety Total 435.00
789 01-CRIDP-22- Dindigul Athoor Construction of Retaining wall at 70.00
23-M-0789 km 11/4 of Dharumathupatty -
Adalur - Thandigudi Road
Flood Permanent Total 70.00
Dindigul Total 15.96 3485.00
790 01-CRIDP-22- Palani Oddanchatra Reconstruction of Culvert at Km 50.00
23-M-0790 m 3/2, 7/2 (i), 7/2(ii) & 8/8 of
Ambilikkai - Kuthilippai road
Road Safety Total 50.00
Palani Total 50.00
791 01-CRIDP-22- Sivagangai Tirupattur Construction of Minor Bridge at Km 100.00
23-M-0791 14/6 of Thiruppathur - Alangudi
road in lieu of existing causeway

Causeway to HLB Total 100.00


Sivagangai Total 100.00
792 01-CRIDP-22- Ramnad Mudukulathu Widening from Intermediate Lane 2.80 420.00
23-M-0792 r to Two Lane and Strengthening at
km 0/0 - 2/8 of Veneervaikkal -
Manjoor Road including CD works

793 01-CRIDP-22- Ramnad Mudukulathu Widening from Intermediate Lane 4.00 620.00
23-M-0793 r to Two Lane and Strengthening at
km 3/0 - 7/0 of Veneervaikkal -
Manjoor Road including CD works

794 01-CRIDP-22- Ramnad Mudukulathu Widening from Intermediate Lane 2.00 280.00
23-M-0794 r to Two Lane and Strengthening at
km 8/0 - 10/0 of Veneervaikkal -
Manjoor Road including CD works

795 01-CRIDP-22- Ramnad Ramanathap Widening from Intermediate Lane 3.00 500.00
23-M-0795 uram to Two Lane and Strengthening at
km 0/0 - 3/0 of Ettivayal -
Edambadal (Via) Uthiragosamangai
Road including CD Works and
Junction Improvements

796 01-CRIDP-22- Ramnad Ramanathap Widening from Intermediate Lane 3.00 500.00
23-M-0796 uram to Two Lane and Strengthening at
km 3/0 - 6/0 of Ettivayal -
Edambadal (Via) Uthiragosamangai
Road including CD Works and
Junction Improvements

797 01-CRIDP-22- Ramnad Ramanathap Widening from Intermediate Lane 2.00 300.00
23-M-0797 uram to Two Lane and Strengthening at
km 6/0 - 8/0 of Ettivayal -
Edambadal (Via) Uthiragosamangai
Road including CD Works and
Junction Improvements

MDR Page 84 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

798 01-CRIDP-22- Ramnad Ramanathap Widening from Intermediate Lane 3.00 450.00
23-M-0798 uram to Two Lane and Strengthening at
km 21/0 - 24/0 of Devipattinam
Nainarkoil Road (via) Pottagavayal
including CD Works

799 01-CRIDP-22- Ramnad Paramakudi Widening from Intermediate Lane 3.00 510.00
23-M-0799 to Two Lane and Strengthening at
km 3/0 - 4/0, 5/0 - 7/0 of
Paramakudi - Keerandai Road
including CD works

800 01-CRIDP-22- Ramnad Paramakudi Widening from Intermediate Lane 2.20 440.00
23-M-0800 to Two Lane and Strengthening at
km 7/0 - 9/2 of Paramakudi -
Keerandai Road including CD
works
801 01-CRIDP-22- Ramnad Paramakudi Widening from Intermediate Lane 3.00 440.00
23-M-0801 to Two Lane and Strengthening at
km 18/0 - 21/0 of Devipattinam-
Nainarkoil Road (Via) Pottagavayal
including CD works

802 01-CRIDP-22- Ramnad Ramanathap Widening from Intermediate Lane 2.00 260.00
23-M-0802 uram to Two Lane and Strengthening at
km 18/0 - 20/0 of Thiruppullani -
Pirappanvalasai Road including CD
Works and Junction Improvements

CMRDP IL to DL Total 30.00 4720.00


803 01-CRIDP-22- Ramnad Mudukulathu Construction of Box Culvert at Km 80.00
23-M-0803 r 8/10 of Mudukulathur -
Uthiragosamangai Road in lieu of
Existing Causeway
Causeway to HLB Total 80.00
Ramnad Total 30.00 4800.00
Madurai Circle Total 66.04 11087.55
804 01-CRIDP-22- Tirunelveli Radhapuram Widening from Intermediate Lane 3.40 472.00
23-M-0804 to Two Lane and Strengthening at
km 0/0 - 3/4 of Radhapuram -
Irukkanthurai Road including
Widening & Reconstruction of
Culvert at km 0/6, 1/6, 2/6 & 3/2

805 01-CRIDP-22- Tirunelveli Nanguneri Widening from Intermediate Lane 3.40 388.00
23-M-0805 to Two Lane and Strengthening at
km 7/6 - 11/0 of Nanguneri -
Kalakad Road including CD works
at km 9/2
806 01-CRIDP-22- Tirunelveli Nanguneri Widening from Intermediate Lane 1.00 125.00
23-M-0806 to Two Lane and Strengthening at
km 36/0 - 37/0 of Reddiyarpatti -
Vijayanarayanam Road including
CD works

807 01-CRIDP-22- Tirunelveli Nanguneri Widening from Intermediate Lane 2.40 255.00
23-M-0807 to Two Lane and Strengthening at
km 10/0 - 12/0, 13/4 - 13/8 of
Nanguneri - Moolaikaraipatti Road.

CMRDP IL to DL Total 10.20 1240.00

MDR Page 85 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

808 01-CRIDP-22- TirunelveliPalayamkottai Widening from Two Lane to Four 0.90 305.00
23-M-0808 Lane and Strengthening at km 0/1 -
1/0 of North High Ground Road.
including Center Median
809 01-CRIDP-22- Tirunelveli Tirunelveli Widening from Two Lane to Two 1.80 310.00
23-M-0809 Lane with Paved Shoulders and
Strengthening at km 0/0 - 1/5,
Improvements at km 1/5 - 1/8 of
Ramayanpatti Road. including CD
Works
Other Widening Total 2.70 615.00
810 01-CRIDP-22- Tirunelveli Radhapuram Strengthening at km 6/2 - 12/3 of 6.10 598.00
23-M-0810 Radhapuram - Irukkanthurai Road
including Providing CC Pavement at
km 9/6 - 10/0
Strengthening/Improvements
6.10 598.00
Total
Tirunelveli Total 19.00 2453.00
811 01-CRIDP-22- Tenkasi Tenkasi Widening from Intermediate Lane 3.20 390.00
23-M-0811 to Two Lane and Strengthening at
km 4/2 - 7/4 of Courtallam-
Mathalamparai road including
retaining wall at km 4/10 and box
culvert at km 5/8, 5/10, 6/8

CMRDP IL to DL Total 3.20 390.00


812 01-CRIDP-22- Tenkasi Kadayanallur Providing Cantilever Gantry board 6.47
23-M-0812 at km 11/2 of Sivaramapettai-
Panpozhi-Shenkottai road

813 01-CRIDP-22- Tenkasi Kadayanallur Providing Metal Crash Barrier at 3.12


23-M-0813 km 2/2, 2/6 of Sivaramapettai-
Panpozhi-Shenkottai road
814 01-CRIDP-22- Tenkasi Tenkasi Providing Metal Crash Barrier at 18.92
23-M-0814 km 1/4,10 and 3/8,10 of
Courtallam-Mathalamparai road
815 01-CRIDP-22- Tenkasi Sankarankovi Providing Cantilever Gantry board 6.50
23-M-0815 l at km 0/2 of Alangulam-
Kuruvikulam-Thiruvenkadam road

816 01-CRIDP-22- Tenkasi Sankarankovi Providing Metal Crash Barrier at 1.60


23-M-0816 l km 4/6 of Sankarankoil-
Veerasigamani road
817 01-CRIDP-22- Tenkasi Sankarankovi Providing Metal Crash Barrier at 1.60
23-M-0817 l km 4/4 of Kulasekaramangalam -
Valasai road
818 01-CRIDP-22- Tenkasi Sankarankovi Providing Cantilever Gantry board 6.50
23-M-0818 l at km 9/10 of Sankarankoil-
Veerasigamani road

Road Safety Total 44.71


819 01-CRIDP-22- Tenkasi Sankarankovi Strengthening at km 5/0 - 6/0 of 1.00 86.00
23-M-0819 l Sankarankoil-Veerasigamani road

820 01-CRIDP-22- Tenkasi Kadayanallur Strengthening at km 0/0 - 1/0, 4/0 2.60 225.00
23-M-0820 - 5/6 of Kulathupuzha-Chowkey
road
Strengthening/Improvements
3.60 311.00
Total
Tenkasi Total 6.80 745.71

MDR Page 86 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

821 01-CRIDP-22- Tuticorin Kovilpatti Widening from Intermediate Lane 0.20 24.00
23-M-0821 to Two Lane and Strengthening at
km 22/8 - 23/0 of Kayathar-
Kalugumalai Road

822 01-CRIDP-22- Tuticorin Ottapidaram Widening from Intermediate Lane 2.20 320.00
23-M-0822 to Two Lane and Strengthening at
km 51/2 - 53/4 of Kovilpatti-
Ottapidaram-Pudukottai-Eral-
Mukkani Road including CD
Works at Km 53/2
823 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Intermediate Lane 3.80 376.00
23-M-0823 to Two Lane and Strengthening at
km 19/0 - 22/8 of
Meingnanapuram-Munanjipatti
Road including Cross Drainage
Works at Km 19/10, 20/6 (i), 20/6
(ii), 20/6 (iii)

824 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Intermediate Lane 6.20 600.00
23-M-0824 to Two Lane and Strengthening at
km 0/0 - 6/2 of Thailapuram -
Meignanapuram-Kayamozhi-
Gandhipuram road including
Cross Drainage Works at Km 1/2

825 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Intermediate Lane 2.00 197.00
23-M-0825 to Two Lane and Strengthening at
km 0/0 - 2/0 of Petmanagaram-
Vagaikulam Road

CMRDP IL to DL Total 14.40 1517.00


826 01-CRIDP-22- Tuticorin Thoothukudi Construction of Drain at km 0/0- 230.00
23-M-0826 1/0 of Thoothukudi -
Tharuvaikulam Road
Urban Improvements Total 230.00
827 01-CRIDP-22- Tuticorin Thoothukudi Construction of Box Culvert at Km 45.00
23-M-0827 0/2,6 of
George road
828 01-CRIDP-22- Tuticorin Thoothukudi Construction of Box Culvert at Km 10.00
23-M-0828 0/4 of South Beach Road

MDR Page 87 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

829 01-CRIDP-22- Tuticorin Thoothukudi Construction of Box Culvert at Km 17.00


23-M-0829 0/2 of Link Road

Bridges/Culverts Total 72.00


Tuticorin Total 14.40 1819.00
830 01-CRIDP-22- Nagercoil Vilavancode Widening from Intermediate Lane 2.60 280.00
23-M-0830 to Two Lane and Strengthening at
km 2/4 - 5/0 of Parasalai-
Panachamoodu Road

CMRDP IL to DL Total 2.60 280.00


831 01-CRIDP-22- Nagercoil Padmanabha Strengthening at km 0/0 - 3/5 of 3.50 285.00
23-M-0831 puram Meycode-Kulasekaram Road

Strengthening/Improvements
3.50 285.00
Total
832 01-CRIDP-22- Nagercoil Kanyakumari Construction of Retaining wall at 50.00
23-M-0832 km 0/6, 0/10 of Vellamadam-
Suchindram Road
833 01-CRIDP-22- Nagercoil Kanyakumari Construction of Retaining wall at 20.00
23-M-0833 km 0/8 of Vellamadam-
Chenbagaramanputhoor Road
Flood Permanent Total 70.00
834 01-CRIDP-22- Nagercoil Vilavancode Reconstruction of Culvert at Km 20.00
23-M-0834 0/6 of Kuzhithurai-
Thengapattinam Road
Bridges/Culverts Total 20.00
Nagercoil Total 6.10 655.00
Tirunelveli Circle Total 46.30 5672.71
Grand Total 551.39 108438.38

MDR Page 88 of 210


CRIDP 2022 - 2023
LIST OF WORKS - OTHER DISTRICT ROAD
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

835 01-CRIDP-22- Chennai City Tambaram Urban Improvements - Widening 1.10 670.00
23-O-0835 Roads End to End and Strengthening at
km 0/0 - 1/1 of Madambakkam
Road including construction of
Drain 0/525 - 1/1 (RS) & Km 0/8 -
1/1 (LS) and Culvert at Km 0/8

836 01-CRIDP-22- Chennai City Tambaram Urban Improvements - Widening 0.60 665.00
23-O-0836 Roads End to End and Strengthening at
km 1/1 - 1/7 of Madambakkam
Road including Construction of
Drain Km 1/1 - 1/7 (BS) and
Culvert at Km 1/6
Urban Improvements Total 1.70 1335.00
837 01-CRIDP-22- Chennai City Tambaram Strengthening at km 0/0 - 1/5 of 1.50 230.00
23-O-0837 Roads Rajendraprasad Road including
Providing Paver Block & Footpath

Strengthening/Improvements
1.50 230.00
Total
838 01-CRIDP-22- Chennai City Pallavaram Construction of Drain at km 0/557 - 215.00
23-O-0838 Roads 0/8, 1/157 - 1/307 of Pammal
Thiruneermalai Road including
Construction of Culvert at km 1/3

839 01-CRIDP-22- Chennai City Tambaram Construction of Drain at km 0/425 - 235.00


23-O-0839 Roads 0/765, 1/638 - 1/810 of Darga
Road
840 01-CRIDP-22- Chennai City Pallavaram Construction of Drain at km 0/0 - 340.00
23-O-0840 Roads 0/6 of Pallavaram to Cowl Bazar
Road
841 01-CRIDP-22- Chennai City Alandur Construction of Drain at km 2/5 - 455.00
23-O-0841 Roads 3/0 of Grand Southern Trunk
Loop Road
842 01-CRIDP-22- Chennai City Shozhinganall Construction of Drain at km 0/9 - 550.00
23-O-0842 Roads ur 1/2 of Santhoshapuram
Mambakkam Road Via
Vengaivasal including Construction
of Culvert at km 1/8 & 2/2

Others Total 1795.00


Chennai City Roads Total 3.20 3360.00
843 01-CRIDP-22- Thiruvallur Ponneri Widening from Single Lane to 4.27 500.00
23-O-0843 Intermediate Lane and
Strengthening at km 0/0 - 4/265 of
Chinnakavanam - Arasur -
Ayyanallur Road including
reconstruction of box culvert at Km
2/4
Other Widening Total 4.27 500.00
844 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 33.00
23-O-0844 Km 0/6 of R.K.Pet Pallipet road
Venkatraja kuppam road
845 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 30.00
23-O-0845 Km 0/4 of Maddur -
Alamelumangapuram Road

ODR Page 89 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

846 01-CRIDP-22- Thiruvallur Tiruttani Reconstruction of Box Culvert at 50.00


23-O-0846 Km 0/10 of Maddur -
Alamelumangapuram Road
847 01-CRIDP-22- Thiruvallur Thiruvallur Reconstruction of Box Culvert at 30.00
23-O-0847 Km 7/6 of CTR road - Konalam
road
848 01-CRIDP-22- Thiruvallur Thiruvallur Reconstruction of Box Culvert at 50.00
23-O-0848 Km 8/2 of CTR road - Konalam
road
849 01-CRIDP-22- Thiruvallur Thiruvallur Reconstruction of Box Culvert at 95.00
23-O-0849 Km 1/2, 2/4, 2/6, 2/8 of
Singaperumalkoil-Sriperumbudur-
Thiruvallur-Red Hills road to
Nungambakkam road

Bridges/Culverts Total 288.00


850 01-CRIDP-22- Thiruvallur Avadi Construction of Drain at km 2/342 - 75.00
23-O-0850 2/379, 3/140 - 3/235 of Noombal
road (Missing Link) including
construction of culvert at Km 2/4

851 01-CRIDP-22- Thiruvallur Tiruttani Construction of Drain at km 6/8- 90.00


23-O-0851 7/2 of Thalavedu - Poonimangadu
Road
Others Total 165.00
Thiruvallur Total 4.27 953.00
852 01-CRIDP-22- Chengalpattu Chengalpattu Widening from Single Lane to Two 4.80 690.00
23-O-0852 Lane and Strengthening at km 0/0 -
4/8 of GST Road to Ozhalur -
Manapakkam Road including
Reconstruction of Box Culverts

853 01-CRIDP-22- Chengalpattu Thiruporur Widening from Single Lane to Two 4.00 505.00
23-O-0853 Lane and Strengthening at km 0/0 -
4/0 of Manampathy - Mullipakkam
Road including CD works

854 01-CRIDP-22- Chengalpattu Thiruporur Widening from Single Lane to Two 4.00 470.00
23-O-0854 Lane and Strengthening at km 4/0 -
8/0 of Manampathy - Mullipakkam
Road including CD works

855 01-CRIDP-22- Chengalpattu Chengalpattu Widening from Single Lane to Two 2.20 257.00
23-O-0855 Lane and Strengthening at km 0/0 -
0/2, 1/0 - 3/0 of GST Road to
Thirukatchur (via) Peramanur Road
including Reconstruction of Box
Culverts
CMRDP IL to DL Total 15.00 1922.00
856 01-CRIDP-22- Chengalpattu Thiruporur Widening from Single Lane to 1.00 128.00
23-O-0856 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Mangalam - Pattikattu Road
including reconstruction of culvert
at Km 0/4

ODR Page 90 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

857 01-CRIDP-22- Chengalpattu Cheyyur Widening from Single Lane to 2.30 318.00
23-O-0857 Intermediate Lane and
Strengthening at km 4/4 - 6/7 of
Padalam - Cheyyur Road to
Neelamangalam Easur Road
including Reconstruction of Box
Culvert Km.4/6, 4/10, 5/2(i), 6/4,
6/6
858 01-CRIDP-22- Chengalpattu Cheyyur Widening from Single Lane to 3.20 340.00
23-O-0858 Intermediate Lane and
Strengthening at km 0/0 - 2/0, 4/2
- 5/4 of Vizhuthamangalam -
Nelvoy Road including
Reconstruction of Box Culvert
Km.0/6, 4/10
Other Widening Total 6.50 786.00
859 01-CRIDP-22- Chengalpattu Thiruporur Strengthening at km 0/4 - 0/750 of 0.35 22.00
23-O-0859 Siruchery H/C Road to
Thazhambur H/C and Karanai H/C
Road
860 01-CRIDP-22- Chengalpattu Chengalpattu Strengthening at km 2/6 - 3/5 of 0.90 175.00
23-O-0860 Villiyambakkam -
Sashthirambakkam Road including
Rebuilding & missing link 371 m

Strengthening/Improvements
1.25 197.00
Total
Chengalpattu Total 22.75 2905.00
861 01-CRIDP-22- Kanchipuram Kancheepura Widening from Intermediate Lane 2.20 329.00
23-O-0861 m to Two Lane and Strengthening at
km 0/0 - 2/2 of The Road
Branching Km.3/10 of
Abdullapuram - Moranam Road to
Kolivakkam Road including CD
works
862 01-CRIDP-22- Kanchipuram Sriperumbud Widening from Single Lane to Two 2.20 510.00
23-O-0862 ur Lane and Strengthening at km 0/2 -
2/4 of Somangalam Road
including CD works
863 01-CRIDP-22- Kanchipuram Sriperumbud Widening from Single Lane to Two 1.60 431.00
23-O-0863 ur Lane and Strengthening at km 1/6 -
3/2 of Vadakkupattu Road
including CD works
864 01-CRIDP-22- Kanchipuram Sriperumbud Widening from Single Lane to Two 2.00 450.00
23-O-0864 ur Lane and Strengthening at km 0/0 -
2/0 of Umayalparnacheri Road
including CD works

865 01-CRIDP-22- Kanchipuram Sriperumbud Widening from Intermediate Lane 1.60 250.00
23-O-0865 ur to Two Lane and Strengthening at
km 0/0 - 1/6 of Vadamangalam
Road including CD works

866 01-CRIDP-22- Kanchipuram Sriperumbud Widening from Single Lane to Two 1.60 660.00
23-O-0866 ur Lane and Strengthening at km 1/6 -
3/2 of Vadamangalam Road
including construction of retaining
wall, storm water drain and CD
works
CMRDP IL to DL Total 11.20 2630.00

ODR Page 91 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

867 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 2.40 340.00
23-O-0867 Intermediate Lane and
Strengthening at km 0/0 - 2/4 of
Nerkundram Road including CD
works
868 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 1.60 270.00
23-O-0868 Intermediate Lane and
Strengthening at km 1/4 - 3/0 of
Salavakkam - Annathur -
Alapakkam Road including CD
works
869 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 1.55 240.00
23-O-0869 Intermediate Lane and
Strengthening at km 1/450 - 3/0 of
Arunkundram - Arumpuliyur -
Karumbakkam Road including CD
works
870 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 2.80 341.00
23-O-0870 Intermediate Lane and
Strengthening at km 11/6 - 14/4 of
Meyyur - Pinayur Road including
CD works
871 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 3.60 470.00
23-O-0871 Intermediate Lane and
Strengthening at km 0/0 - 3/60 of
Kaliyampoondi - Andithangal Road
including CD works
872 01-CRIDP-22- Kanchipuram Kancheepura Widening from Single Lane to 2.00 250.00
23-O-0872 m Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Iyangarkulam Road including CD
Works
873 01-CRIDP-22- Kanchipuram Uthiramerur Widening from Single Lane to 2.00 300.00
23-O-0873 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
MCB road to Kuthirambakkam
Road including CD works

874 01-CRIDP-22- Kanchipuram Kancheepura Widening from Single Lane to 4.00 330.00
23-O-0874 m Intermediate Lane and
Strengthening at km 0/0 - 4/0 of
Mettukuppam - Perumbakkam
Road including CD works
Other Widening Total 19.95 2541.00
875 01-CRIDP-22- Kanchipuram Uthiramerur Strengthening at km 0/0 - 1/80 of 1.80 105.00
23-O-0875 Anambakkam Road including CD
works
Strengthening/Improvements
1.80 105.00
Total
876 01-CRIDP-22- Kanchipuram Uthiramerur Providing Slope Protection at 200.00
23-O-0876 Breached road stretch in high
embankment at km 1/6 of Magaral -
Kavanthandalam Road
877 01-CRIDP-22- Kanchipuram Uthiramerur Providing Slope Protection at 200.00
23-O-0877 Breached road stretch in high
embankment at km 1/8 of Magaral -
Kavanthandalam Road

ODR Page 92 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

878 01-CRIDP-22- Kanchipuram Uthiramerur Restoration to damaged portion in 275.00


23-O-0878 Bed Level Causeway at km 0/0-0/8
of Walajabad - Thirupulivanam
Road
Flood Permanent Total 675.00
879 01-CRIDP-22- Kanchipuram Uthiramerur Reconstruction of Box Culvert at 30.00
23-O-0879 Km 0/6 of Angampakkam - Avalur
Road
Bridges/Culverts Total 30.00
Kanchipuram Total 32.95 5981.00
Chennai Circle Total 63.17 13199.00
880 01-CRIDP-22- Tiruvannamal Polur Reconstruction of Culvert at Km 90.00
23-O-0880 ai 5/6 of Polur Pilasur Padagam
Mansurabath Road in lieu of
existing Causeway
Causeway to HLB Total 90.00
881 01-CRIDP-22- Tiruvannamal Chengam Providing Junction Improvement at 90.00
23-O-0881 ai km 0/2 of Pakkiripalayam-
Elangunni road (via) Neepathurai

Road Safety Total 90.00


882 01-CRIDP-22- Tiruvannamal Chengam Widening from Single Lane to 1.00 95.00
23-O-0882 ai Intermediate Lane and
Strengthening at km 14/0 - 15/0 of
Arattavadi-Elangunni road

883 01-CRIDP-22- Tiruvannamal Kalasapakka Widening from Single Lane to 4.80 525.00
23-O-0883 ai m Intermediate Lane and
Strengthening at km 0/0 - 1/2, 2/4
- 3/0, 4/0 - 7/0 of Pachal-
Periyakulam road (via) Nathavadi
including Reconstruction of
Culverts at Km. 0/2, 0/10, 1/2,
4/6, 5/10 & 6/6, Widening of
Culvert at Km 2/8

884 01-CRIDP-22- Tiruvannamal Kalasapakka Widening from Single Lane to 3.20 450.00
23-O-0884 ai m Intermediate Lane and
Strengthening at km 5/0 - 8/2 of
Agaram Sibbandhi Kanji road
including Reconstruction of
Culverts at Km 5/4, 6/4, 6/6,7/2,
7/4 & 7/10
885 01-CRIDP-22- Tiruvannamal Polur Widening from Single Lane to 3.20 530.00
23-O-0885 ai Intermediate Lane and
Strengthening at km 0/0 - 3/2 of
km 153/6 of Cuddalore - Chittoor
Road to Kalvasal Villankuppam
Road including Reconstruction of
Culverts at Km. 0/8, 0/10,1/2,1/6,
2/2(i),(ii), 2/4(i) (ii), 2/6, 2/8, 3/2,
Construction of Retaining Wall at
Km 2/8

886 01-CRIDP-22- Tiruvannamal Kalasapakka Widening from Single Lane to 2.00 270.00
23-O-0886 ai m Intermediate Lane and
Strengthening at km 5/0 - 7/0 of
Pachal-Nanthimangalam road
including Reconstruction of
culverts at km 5/2,6,8,10, 6/2,4
and construction of protective wall
at km 6/6 (well portion)

ODR Page 93 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

Other Widening Total 14.20 1870.00


887 01-CRIDP-22- Tiruvannamal Polur Strengthening at km 0/0 - 3/2 of 3.20 310.00
23-O-0887 ai Periyagaram Road including
Reconstruction of Culvert at Km
0/4, 1/6, 2/2, 2/4(i) (ii), 2/8(i),
2/8(ii), 2/10(i), 2/10(ii)
888 01-CRIDP-22- Tiruvannamal Kalasapakka Strengthening at km 4/0 - 5/0 of 1.00 150.00
23-O-0888 ai m Cuddalore - Chittor Road to
Arpakkam road (via) Ladavaram,
Kovur including Reconstruction of
Culvert at Km 4/2(i), 4/2(ii) &
4/10(i) (ii)
889 01-CRIDP-22- Tiruvannamal Tiruvannamal Strengthening of Polur – Chengam 4.80 430.00
23-O-0889 ai ai Road to N.C. Veeralore Road (via)
Sengaputheri at Km. 0/0 - 4/8
including Reconstruction of
Culverts at Km 0/6,10, 1/4,6,8,
2/2,8, 3/6, 4/2 (ii) and
Construction of Drain at Km 1/630
- 2/0

Strengthening/Improvements
9.00 890.00
Total
890 01-CRIDP-22- Tiruvannamal Chengam Construction of Culvert at 0/10 of 30.00
23-O-0890 ai Pondy-Krishnagiri road to
Se.Agaram road including
Construction of Retaining Wall at
Km 1/4
891 01-CRIDP-22- Tiruvannamal Polur Reconstruction of Culvert at Km 65.00
23-O-0891 ai 0/4, 0/6, 1/4 of Kilpattu Road

892 01-CRIDP-22- Tiruvannamal Polur Reconstruction of Culvert at Km 55.00


23-O-0892 ai 1/2, 1/10 of Pushpagiri ADC Road

Bridges/Culverts Total 150.00


Tiruvannamalai Total 23.20 3090.00
893 01-CRIDP-22- Ranipet Arakkonam Construction of Box Culvert at Km 185.00
23-O-0893 2/10 of Km 8/0 of Arakkonam
Ocheri Road to Arumbakkam Road
in lieu of existing causeway

894 01-CRIDP-22- Ranipet Sholingur Construction of Minor Bridge at Km 315.00


23-O-0894 1/2 of Km 92/2 of Chennai
Chittoor Bangalore Road to
Karivedu Road in lieu of existing
causeway
Causeway to HLB Total 500.00
895 01-CRIDP-22- Ranipet Arcot Urban Improvements - Widening 3.40 650.00
23-O-0895 from Single Lane to End to End and
Strengthening at km 0/0 - 1/0,
Widening from Single Lane to
Intermediate Lane and
Strengthening at km 1/0 - 3/4 of
Kalavai Chennasamudram Road
including Reconstruction of Box
Culvert at Km 1/8(i), 1/8(ii), 1/10
construction of drain and
providing Paver Block.
Urban Improvements Total 3.40 650.00

ODR Page 94 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

896 01-CRIDP-22- Ranipet Sholingur Providing Metal Crash Barrier at 5.50


23-O-0896 km 6/4 of Kattukandigai
Asanallikuppam Kilvenkatapuram
Road
897 01-CRIDP-22- Ranipet Arakkonam Providing Metal Crash Barrier at 4.50
23-O-0897 km 1/10 of Km 3/6 of Itchiputhur
Valarpuram Road to
Palliyankuppam Road
898 01-CRIDP-22- Ranipet Arakkonam Providing Cantilever Gantry board 7.00
23-O-0898 at km 0/2(RS) of Mulvoy
Anaipakkam Road
899 01-CRIDP-22- Ranipet Sholingur Providing Cantilever Gantry board 7.00
23-O-0899 at km 0/2 (RS) of Anwarthikhanpet
R.S. Ameerpet Road to
Nanthivedanthangal Road

900 01-CRIDP-22- Ranipet Arakkonam Providing Cantilever Gantry board 7.00


23-O-0900 at km 0/2 (RS) of Itchiputhur
Valarpuram Road
901 01-CRIDP-22- Ranipet Sholingur Providing Cantilever Gantry board 14.00
23-O-0901 at km 3/8, 4/2 of Panapakkam
Damal Road
902 01-CRIDP-22- Ranipet Arcot Providing Metal Crash Barrier at 10.00
23-O-0902 km 21/2 of Kalavai
Chennasamudram Road to Melnelli
Road
903 01-CRIDP-22- Ranipet Arcot Providing Metal Crash Barrier at 17.00
23-O-0903 km 0/2,8,10 of Arumbakkam
Branch Road
904 01-CRIDP-22- Ranipet Arcot Providing Metal Crash Barrier at 6.00
23-O-0904 km 3/10 of Sakkaramallur Road
Branching from Km 5/4 of
Pudupadi Illuppai Road to
Esaiyanoor Road
Road Safety Total 78.00
905 01-CRIDP-22- Ranipet Sholingur Widening from Single Lane to 1.40 115.00
23-O-0905 Intermediate Lane and
Strengthening at km 3/6 - 5/0 of
Kodakkal Road
906 01-CRIDP-22- Ranipet Ranipet Widening from Single Lane to 2.80 305.00
23-O-0906 Intermediate Lane and
Strengthening at km 0/0 - 2/8 of
Km 117/8 of Chennai Chittoor
Bangalore Road to Ranipet Thengal
Road (via) Maniyambattu Road
including Construction of Drain at
Km 0/2-0/8 and Reconstruction of
Culverts at Km 0/4 & 0/8.

907 01-CRIDP-22- Ranipet Arcot Widening from Single Lane to 3.20 450.00
23-O-0907 Intermediate Lane and
Strengthening at km 0/0 - 3/2 of
Valayathur Road including
Reconstruction of Box Culvert at
Km 0/4,10, 1/4,10, 2/2(i),2/2(ii)
and construction of Culvert at Km
2/10 and Construction of
Retaining Wall at Km 1/10

ODR Page 95 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

908 01-CRIDP-22- Ranipet Arcot Widening from Single Lane to 2.00 230.00
23-O-0908 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Sathur Labbaipettai Road
including Reconstruction of Box
Culvert at Km 0/6, 1/6
909 01-CRIDP-22- Ranipet Arakkonam Widening from Single Lane to 6.00 560.00
23-O-0909 Intermediate Lane and
Strengthening at km 3/8 - 9/8 of
Banavaram Perunkanchi Road
including Reconstruction of culvert
at Km 6/4
Other Widening Total 15.40 1660.00
910 01-CRIDP-22- Ranipet Ranipet Strengthening at km 1/6 - 4/8 of 3.20 215.00
23-O-0910 Walajah Palar Anaicut Road

Strengthening/Improvements
3.20 215.00
Total
911 01-CRIDP-22- Ranipet Ranipet Construction of Drain at Km 1/0- 120.00
23-O-0911 1/6 of Vanapadi Branch Road

Flood Permanent Total 120.00


Ranipet Total 22.00 3223.00
912 01-CRIDP-22- Vellore Arcot Construction of Retaining wall at 210.00
23-O-0912 km 2/2-2/6 of T.B.Hospital
Arcottangudisai Road
913 01-CRIDP-22- Vellore Anaikattu Construction of Drain at km 1/6- 130.00
23-O-0913 2/0 of Abdullapuram Pakkam
Road to Poigai Road including
Construction of Retaining wall at
Km 0/6-1/0
914 01-CRIDP-22- Vellore Gudiyattam Providing Metal Crash Barrier at 13.50
23-O-0914 km 8/4 of Perumabadi Sempalli
Jittapalli Road
915 01-CRIDP-22- Vellore Kilvaithinank Providing Metal Crash Barrier at 32.00
23-O-0915 uppam km 2/4,6, 3/10, 5/8,10 of Chittoor
- Gudiyatham Road to D.P.Palayam
K.V.Palayam Road
Road Safety Total 385.50
916 01-CRIDP-22- Vellore Ambur Widening from Single Lane to 1.40 118.00
23-O-0916 Intermediate Lane and
Strengthening at km 6/0 - 7/4 of
Pallikuppam Road.
917 01-CRIDP-22- Vellore Arcot Widening from Single Lane to 2.27 175.00
23-O-0917 Intermediate Lane and
Strengthening at km 0/0 - 1/525,
2/260 - 2/925, 3/120 - 3/2 of Km
177/2 of CC Road to joining at Km
178/4 of C.C.Road (via)
Kurumbapalayam, Bangalathan
Road including Reconstruction of
Culvert at Km 0/10 and
Construction of Drain at Km 0/8 &
0/10
Other Widening Total 3.67 293.00
918 01-CRIDP-22- Vellore Ambur Strengthening at km 0/0 - 1/6 of 1.60 92.00
23-O-0918 Krishnagiri - Ranipet Road to
Chennacheri Road including
Reconstruction of Culvert at Km
1/4

ODR Page 96 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

919 01-CRIDP-22- Vellore Katpadi Strengthening at km 0/0 - 1/2 of 1.20 140.00


23-O-0919 Vandranthangal Road including
Construction of Drain at Km 0/0 -
0/4
Strengthening/Improvements
2.80 232.00
Total
920 01-CRIDP-22- Vellore Anaikattu Construction of Drain at km 1/150- 36.00
23-O-0920 1/4 of Odugathur - Rajapalayam
Road
921 01-CRIDP-22- Vellore Anaikattu Construction of Drain at km 3/2 of 41.00
23-O-0921 Saduperi Sembedu Thellur Road to
Sembedu Road
922 01-CRIDP-22- Vellore Anaikattu Construction of Drain at km 2/10 21.00
23-O-0922 of Saduperi Road

Others Total 98.00


Vellore Total 6.47 1008.50
923 01-CRIDP-22- Cheyyar Cheyyar Providing Junction Improvement at 50.00
23-O-0923 km 3/10 of Perungattur -
Sirungattur Road
924 01-CRIDP-22- Cheyyar Cheyyar Providing Metal Crash Barrier at 23.00
23-O-0924 km 4/8 (LS), 5/2 (BS) of
Pappanthngal - Sumangali Road
925 01-CRIDP-22- Cheyyar Cheyyar Providing Metal Crash Barrier at 13.00
23-O-0925 km 0/2 (LS), 0/4 (BS), 0/6(LS), 4/2
(RS), 15/4 (RS) of Kancheepuram
Thiruvathipuram Road to
Pudupadi – Vada Illuppai Road

926 01-CRIDP-22- Cheyyar Cheyyar Providing Metal Crash Barrier at 22.00


23-O-0926 km 0/4 (RS), 0/6 (LS) 1/4 (RS),
1/6(LS), 1/8 (BS), 1/10 (RS), 2/2
(RS) of Vellakulam - Vada Illuppai
Road to Kilkanjankuli Road

927 01-CRIDP-22- Cheyyar Vandavasi Providing Cantilever Gantry board 7.00


23-O-0927 at km 8/8 of Sembur S.Katteri road
(via) Theyyar
928 01-CRIDP-22- Cheyyar Vandavasi Providing Cantilever Gantry board 7.00
23-O-0928 at km 5/10 of Sadathangal road

929 01-CRIDP-22- Cheyyar Vandavasi Providing Cantilever Gantry board 7.00


23-O-0929 at km 13/5 of Marudadu
Veepankaranai road (via) Osur
Road Safety Total 129.00
930 01-CRIDP-22- Cheyyar Cheyyar Widening from Single Lane to 3.80 410.00
23-O-0930 Intermediate Lane and
Strengthening at km 3/0 - 6/8 of
Perungalathur - Pappanthangal
Road including reconstruction of
culverts at km 3/4, 4/4, 4/6, 5/4,
6/6

ODR Page 97 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

931 01-CRIDP-22- Cheyyar Cheyyar Widening from Single Lane to 2.80 395.00
23-O-0931 Intermediate Lane and
Strengthening at km 0/0 - 1/4, 2/4
- 2/8, 3/0 - 4/0 of Vembakkam -
Bokkasamauthiram Road
including reconstruction of culverts
at km 0/6, 0/8,0/8(ii), 0/10 and
Construction of drain at km 0/6-
1/0

932 01-CRIDP-22- Cheyyar Cheyyar Widening from Single Lane to 6.00 688.00
23-O-0932 Intermediate Lane and
Strengthening at km 0/0 - 6/0 of
Palanzur - Tirumpoondi Road
including Reconstruction of
Culverts at Km 0/2, 0/4, 0/6,
0/10, 2/2(i), 2/2(ii), 2/6, 2/8,
3/2(i), 3/2(ii), 3/4, 4/2(i), 4/2(ii),
5/2, 5/4, 5/8 and Construction of
Retaining wall at Km 0/4

933 01-CRIDP-22- Cheyyar Cheyyar Widening from Single Lane to 2.60 433.00
23-O-0933 Intermediate Lane and
Strengthening at km 10/0 - 12/6 of
Kancheepuram Thiruvathipuram
Road to Pudupadi – Vada Illuppai
Road including reconstruction of
culverts at km 10/2, 10/10, 11/4,
11/10, 12/6

934 01-CRIDP-22- Cheyyar Vandavasi Widening from Single Lane to 5.20 680.00
23-O-0934 Intermediate Lane and
Strengthening at km 0/0 - 5/2 of
Kilkodungalur road including
Reconstruction of Culvert at
Km.2/2 (i), 2/2 (ii), 2/4, 3/6(i),
3/6(ii), 4/2 and Construction of
Drain at Km.0/0-0/4
935 01-CRIDP-22- Cheyyar Vandavasi Widening from Single Lane to 2.60 280.00
23-O-0935 Intermediate Lane and
Strengthening at km 0/0 - 2/6 of
Arcot Tindivanam road to
Vengunam road including
Reconstruction of Culvert Km.0/8,
1/4(i), 1/4(ii), 2/4
936 01-CRIDP-22- Cheyyar Vandavasi Widening from Single Lane to 4.20 570.00
23-O-0936 Intermediate Lane and
Strengthening at km 1/0 - 5/2 of
Vazhur Marudadu road including
reconstruction of Culvert at Km
3/4, 3/8 & 4/2 and Construction
of Culvert at Km 4/6 and 4/10
Construction of Retaining Wall at
Km 2/4

ODR Page 98 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

937 01-CRIDP-22- Cheyyar Arani Widening from Single Lane to 2.60 323.00
23-O-0937 Intermediate Lane and
Strengthening at km 8/4 - 9/0,
11/0 - 13/0 of Sevoor -
Vethajipuram Road (Via)
Mullandram including
Reconstruction of Culverts at Km
8/6, 9/2, 11/4, 11/6, 11/8, 12/2
(i) & (ii), 12/6, 12/8 and 12/10 (i)
& (ii) and Construction of Retaining
Wall at Km 12/6 and 12/8

938 01-CRIDP-22- Cheyyar Vandavasi Widening from Single Lane to 6.50 635.00
23-O-0938 Intermediate Lane and
Strengthening at km 0/0 - 2/0, 5/0
- 9/5 of Arcot Tindivanam road to
Mavalavady road including
Reconstruction of Culvert at
Km.1/6, 5/2
Other Widening Total 36.30 4414.00
939 01-CRIDP-22- Cheyyar Cheyyar Strengthening at km 13/2 - 14/2 of 1.00 135.00
23-O-0939 Vellakulam - Vada Illuppai Road
including reconstruction of culvert
at km 12/10, 13/6

940 01-CRIDP-22- Cheyyar Cheyyar Strengthening at km 2/2 - 8/0 of 5.80 360.00


23-O-0940 Cheyyar Arni road to Enathavady
road (via) Sundivakkam Enathavadi
HC road and Arunthathiyar
Narikuravar Colony including
reconstruction of culvert at km
3/6, 3/8, 4/4, 4/8

941 01-CRIDP-22- Cheyyar Vandavasi Strengthening at km 8/2 - 10/2 of 2.00 160.00


23-O-0941 Cheyyur- Vandavasi Polur road to
Desur road (via) Melnandiyambadi,
Vayalur, Poongunam and Madam
road including Construction of
Culvert at Km.8/2 Reconstruction
of Culvert at Km.9/4

942 01-CRIDP-22- Cheyyar Vandavasi Strengthening at km 6/0 - 7/6 of 1.60 153.00


23-O-0942 Kottai Badur road to
Veliyambakkam road including
Reconstruction of Culvert at
Km.6/2, 6/8, 7/2

ODR Page 99 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

943 01-CRIDP-22- Cheyyar Cheyyar Strengthening at km 21/4 - 22/4 of 1.00 60.00


23-O-0943 Kancheepuram Thiruvathipuram
Road to Pudupadi – Vada Illuppai
Road including reconstruction of
culverts at km 22/2

Strengthening/Improvements
11.40 868.00
Total
944 01-CRIDP-22- Cheyyar Cheyyar Reconstruction of Box Culvert at 37.00
23-O-0944 Km 8/8 of Vembakkam -
Bokkasamauthiram Road
945 01-CRIDP-22- Cheyyar Cheyyar Reconstruction of Box Culvert at 31.00
23-O-0945 Km 15/8 of Kancheepuram
Thiruvathipuram Road to
Pudupadi – Vada Illuppai Road
946 01-CRIDP-22- Cheyyar Vandavasi Construction of Box Culvert at Km 75.00
23-O-0946 2/6 of Cheyyur - Vandavasi - Polur
road to Thellar Mazhayur Road (via)
Venkatapuram Kadambai

947 01-CRIDP-22- Cheyyar Vandavasi Reconstruction of Culvert at Km 80.00


23-O-0947 1/6, 1/8 of Vallam Branch road to
Melpathi road (via) Vallam ADC

948 01-CRIDP-22- Cheyyar Arani Reconstruction of Minor Bridge at 180.00


23-O-0948 1/10 of Poosimalaikuppam Road
including Reconstruction of culvert
at Km 1/2
949 01-CRIDP-22- Cheyyar Arani Reconstruction of Box Culvert at 100.00
23-O-0949 Km 6/4, 6/8 of Arni - Vazhapandal
Road
950 01-CRIDP-22- Cheyyar Arani Reconstruction of Box Culvert at 50.00
23-O-0950 Km 2/10 of Munugapattu Road

951 01-CRIDP-22- Cheyyar Arani Reconstruction of Box Culvert at 30.00


23-O-0951 Km 0/2, 0/8 of Kannamangalam -
Arni Road to Adiyapulam Road
(Via) Rattinamangalam
952 01-CRIDP-22- Cheyyar Arani Reconstruction of Box Culvert at 50.00
23-O-0952 Km 0/4, 1/6 of Arni - Municipal
Limit to Malayampattu H.C. Road

953 01-CRIDP-22- Cheyyar Arani Reconstruction of Box Culvert at 50.00


23-O-0953 Km 0/4 of Sirumur to Sevoor
Vethajipuram road
954 01-CRIDP-22- Cheyyar Vandavasi Construction of Culvert at Km 1/10 60.00
23-O-0954 of Thellar Senal Nergunam road

Bridges/Culverts Total 743.00


Cheyyar Total 47.70 6154.00

ODR Page 100 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

955 01-CRIDP-22- Thirupathur Jolarpet Widening from Intermediate Lane 2.90 585.00
23-O-0955 to Two Lane and Strengthening at
km 0/3 - 0/7, 0/8 - 1/0
Strengthening at km 0/0 - 0/3, 1/0
- 1/4, 2/0 - 3/4, 3/6 - 3/8 of
Jolarpet - Ambalur Road including
Construction of box culvert at km
1/2, 2/6, 3/8, and Widening of
culvert at km 1/4, 2/2 and
construction of Retaining wall at
1/2, 2/10, 3/2

956 01-CRIDP-22- Thirupathur Jolarpet Widening from Single Lane to Two 3.50 530.00
23-O-0956 Lane and Strengthening at km 0/7 -
0/8, 1/4 - 2/0, 3/4 - 3/6, 3/8 -
5/0 Strengthening at km 5/0 -
6/4 of Jolarpet - Ambalur Road
including Construction of Box
culvert at km 4/8, 5/8 and
Construction of retaining wall at
km 4/6, 4/8, 4/10

CMRDP IL to DL Total 6.40 1115.00


957 01-CRIDP-22- Thirupathur Ambur Providing Over Head Gantry board 12.50
23-O-0957 at km 0/2 of Madhanur - Agaram
Road.
958 01-CRIDP-22- Thirupathur Vaniyambadi Providing Metal Crash Barrier at 26.10
23-O-0958 km 0/10, 1/2,4,6, 2/10 of Polur -
Jamunamarathur - Alangayam -
Vaniyambadi Road to Lala Eri
Road.
959 01-CRIDP-22- Thirupathur Vaniyambadi Providing Metal Crash Barrier at 48.30
23-O-0959 km 8/8,10 of Avarankuppam -
Narayanapuram Road.
960 01-CRIDP-22- Thirupathur Tirupattur Providing Metal Crash Barrier at 60.00
23-O-0960 km 2/0-2/4, 6/6, 7/4-7/8 of
Mambakkam - Anganathavalasai
Road
961 01-CRIDP-22- Thirupathur Jolarpet Providing Metal Crash Barrier at 7.00
23-O-0961 km 0/4, 1/8, 4/10 of Tirupattur -
Natrampalli Road to Mallapalli
962 01-CRIDP-22- Thirupathur Jolarpet Providing Metal Crash Barrier at 22.80
23-O-0962 km 2/4 of Km 34/6 of NH 46 to
Vellanaickaneri Road
963 01-CRIDP-22- Thirupathur Jolarpet Providing Metal Crash Barrier at 53.00
23-O-0963 km 1/8, 2/8, 3/6,10 of
Mandalavadi - Kunnathur Road
964 01-CRIDP-22- Thirupathur Tirupattur Providing Metal Crash Barrier at 32.00
23-O-0964 km 0/6-1/2 of KM 102/2 of Salem -
Tirupattur Road to Elavampatti
Road
965 01-CRIDP-22- Thirupathur Tirupattur Providing Metal Crash Barrier at 35.00
23-O-0965 km 2/4, 2/8, 3/4 of Matrapalli -
Pudurnadu Road
966 01-CRIDP-22- Thirupathur Vaniyambadi Providing Metal Crash Barrier at 64.40
23-O-0966 km 10/4, 10/8 of Avarankuppam -
Narayanapuram Road.
967 01-CRIDP-22- Thirupathur Vaniyambadi Providing Metal Crash Barrier at 2.00
23-O-0967 km 2/4 of Lala Pettai - Mechari
Road.

ODR Page 101 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

968 01-CRIDP-22- Thirupathur Jolarpet Providing Metal Crash Barrier at 50.00


23-O-0968 km 0/6,10, 1/2,4, 2/4 of Km
39/10 of N.H. 46 to Kaveripattu
Road (Via) Ezharaipatti
969 01-CRIDP-22- Thirupathur Jolarpet Providing Metal Crash Barrier at 16.00
23-O-0969 km 0/0-0/4 of KM 3/8 of Puram
Road to KM 6/2 of Mookanoor -
Pudupet Link Road (via) Tirupattur -
Natrampalli Road
Road Safety Total 429.10
970 01-CRIDP-22- Thirupathur Jolarpet Widening from Single Lane to 0.40 45.00
23-O-0970 Intermediate Lane and
Strengthening at km 3/4 - 3/6, 6/8
- 7/0 of Nayanacheruvu - A.P.
Border Road.
971 01-CRIDP-22- Thirupathur Vaniyambadi Widening from Single Lane to 3.00 320.00
23-O-0971 Intermediate Lane and
Strengthening at km 4/0 - 7/0 of
Km 37/4 of NH 46 to Mallagunda -
Gurubavanigunda Road. including
construction of retaining wall at km
6/2 & Km 6/6 and Reconstruction
of Box culvert at km 5/8

972 01-CRIDP-22- Thirupathur Ambur Widening from Single Lane to 3.00 350.00
23-O-0972 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Km 24/6 of Gudiyatham -
Gadambur - Kailasagiri -
Vaniyambadi Road to Mittalam
(Via) Kuttakandur -
Vanniyanathapuram Road.
including construction of retaining
wall at km 0/2 and km 2/4

973 01-CRIDP-22- Thirupathur Ambur Widening from Single Lane to 2.00 400.00
23-O-0973 Intermediate Lane and
Strengthening at km 9/0 - 11/0 of
Arangaldurgam Road including
Construction of retaining wall at
km 1/10 , 4/4 4/6 , 7/10 , 8/6,
9/6 , 10/2 , 10/4 , 13/2 , 13/6 &
13/8
974 01-CRIDP-22- Thirupathur Jolarpet Widening from Single Lane to 1.40 290.00
23-O-0974 Intermediate Lane and
Strengthening at km 0/0 - 1/2 &
Strengthening at km 1/2 - 1/4 of
Annandapatti Road including
Construction of Box Culvert Km
0/2 (i),(ii), 0/4,8,10 and
construction of drain at km 0/4 -
0/8
Other Widening Total 9.80 1405.00
975 01-CRIDP-22- Thirupathur Vaniyambadi Construction of Retaining wall at 225.00
23-O-0975 km 10/10, 11/2 of Jaffrabad -
Velathigamanibenda Road.
Flood Permanent Total 225.00
976 01-CRIDP-22- Thirupathur Tirupattur Construction of Box Culvert at Km 38.00
23-O-0976 4/10, 5/8 of Tirupattur -
Jalagamparai Road

ODR Page 102 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

977 01-CRIDP-22- Thirupathur Ambur Reconstruction of Box Culvert at 45.00


23-O-0977 Km 0/6 (i), (ii), 1/6 of Bangishop to
V.K.Road (via)Venkatasamudiram

978 01-CRIDP-22- Thirupathur Ambur Reconstruction of Box Culvert at 90.00


23-O-0978 Km 0/2 1,2, 0/10,
1/2,1/8,2/2,2/4 of Madanancheri -
Ilayanagaram Road

979 01-CRIDP-22- Thirupathur Ambur Reconstruction of Box Culvert at 50.00


23-O-0979 km 0/2,8,10, 1/2 of km 37/2 of
Gudiyatham - Gadambur -
Kailasagiri - Vaniyambadi to
Chinnapallikuppam - Vadacheri
Road
Bridges/Culverts Total 223.00
Thirupathur Total 16.20 3397.10
980 01-CRIDP-22- Kallakurichi Ulundurpettai Providing Metal Crash Barrier at 4.30
23-O-0980 km at km 0/8(RS) of A. Kolathur
Sikkadu Road
981 01-CRIDP-22- Kallakurichi Rishivandiya Providing Metal Crash Barrier at 35.00
23-O-0981 m km 0/2, 1/4,6, 3/2 of Pazhangur
Road
982 01-CRIDP-22- Kallakurichi Ulundurpettai Providing Metal Crash Barrier at 4.30
23-O-0982 km at km 1/6(RS) of Eraiyur
Adhanur Road
983 01-CRIDP-22- Kallakurichi Ulundurpettai Providing Metal Crash Barrier at 12.25
23-O-0983 km at km 2/2(RS), 2/6, 3/10, 4/2
(LS) of Koovagam road to Irundai
(via)Kuchipalayam
984 01-CRIDP-22- Kallakurichi Kallakurichi Providing Metal Crash Barrier at 62.50
23-O-0984 km 2/8-3/2, 4/4-4/8 of
Thiyagadurgam Pudhukeni Road
985 01-CRIDP-22- Kallakurichi Kallakurichi Providing Metal Crash Barrier at 8.10
23-O-0985 km 1/2 of Kallakurichi Pavandhur
Road
986 01-CRIDP-22- Kallakurichi Kallakurichi Providing Metal Crash Barrier at 18.20
23-O-0986 km 2/2, 3/2 of Nallathur Road

987 01-CRIDP-22- Kallakurichi Kallakurichi Providing Metal Crash Barrier at 18.20


23-O-0987 km 16/6, 22/2,4 of Pagandai X
Road to Mamandhur Road
988 01-CRIDP-22- Kallakurichi Kallakurichi Providing Metal Crash Barrier at 8.10
23-O-0988 km 10/2 of Chinnasalem Koogaiyur
Road
989 01-CRIDP-22- Kallakurichi Sankarapura Providing Metal Crash Barrier at 14.00
23-O-0989 m km 8/2 of Mamandhur
Kachirapalayam Road
Road Safety Total 184.95
990 01-CRIDP-22- Kallakurichi Kallakurichi Widening from Single Lane to 3.60 460.00
23-O-0990 Intermediate Lane and
Strengthening at km 0/0 - 3/60 of
Indhili Sembakurichi Road
(Via)Pukkiravari including
reconstruction of culvert at km
0/2, 0/4, 0/10, 1/6 & 3/2.

ODR Page 103 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

991 01-CRIDP-22- Kallakurichi Kallakurichi Widening from Single Lane to 2.20 285.00
23-O-0991 Intermediate Lane and
Strengthening at km 6/0 - 8/2 of
Rayappanur Vettiperumalagaram
Road Via Thagarai including
reconstruction of culvert at
km.7/2, 7/8 & 8/2 (ii) and
construction of retaining wall at
km.8/2.

992 01-CRIDP-22- Kallakurichi Sankarapura Widening from Single Lane to 1.00 147.00
23-O-0992 m Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Kachirapalayam Thavadipattu Road
including reconstruction of culvert
at km 0/10 (i) (ii).
993 01-CRIDP-22- Kallakurichi Sankarapura Widening from Single Lane to 3.60 530.00
23-O-0993 m Intermediate Lane and
Strengthening at km 5/6 - 9/2 of
Arasampattu Mottampatti Road
including Reconstruction of RCC
Box culverts Km 6/2, 6/10, 7/10.
8/6, 8/8, 8/10 & 9/2 Construction
of PCC Retainingwall at Km 6/10,
8/2 & 8/4

Other Widening Total 10.40 1422.00


994 01-CRIDP-22- Kallakurichi Kallakurichi Strengthening at km 0/0 - 2/0 of 2.00 200.00
23-O-0994 Chinnasalem Koogaiyur Road to
Pethasamudram Road including
Reconstruction of box culvert at km
0/8, 1/2, 1/4, 1/6 & 1/10.

995 01-CRIDP-22- Kallakurichi Tirukkoyilur Strengthening at km 0/0 - 1/6 of 1.60 110.00


23-O-0995 Vadamarudhur Road

996 01-CRIDP-22- Kallakurichi Tirukkoyilur Strengthening at km 0/8 - 1/715 of 0.92 63.00


23-O-0996 Kattupaiyur Vadamalayanur Road

Strengthening/Improvements
4.52 373.00
Total
997 01-CRIDP-22- Kallakurichi Sankarapura Reconstruction of Box Culvert at 53.00
23-O-0997 m Km 1/10 of Sankarapuram
Puthirampattu Road
998 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 16.00
23-O-0998 m Km 3/2 of Ayyanarpalayam -
Melapazhangur
999 01-CRIDP-22- Kallakurichi Rishivandiya Construction of Box Culvert at Km 50.00
23-O-0999 m 6/2 of Thiyagadurgam
Sankarapuram Road
1000 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 20.00
23-O-1000 m Km 2/2 of Dhevaradiyarkuppam
Road
1001 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 35.00
23-O-1001 m Km 1/2 of Kazhumaram Road

1002 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 46.00


23-O-1002 m Km 0/2 of Arudhangudi Road

ODR Page 104 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1003 01-CRIDP-22- Kallakurichi Rishivandiya Reconstruction of Box Culvert at 65.00


23-O-1003 m Km 6/10,9/6 of Senganankollai
Thathanur Road
1004 01-CRIDP-22- Kallakurichi Kallakurichi Reconstruction of Box Culvert at 20.00
23-O-1004 Km 7/6 of Pethanur Ammakalathur
Road
1005 01-CRIDP-22- Kallakurichi Sankarapura Reconstruction of Box Culvert at 45.00
23-O-1005 m Km 0/2, 3/10 5/2 of Chinnasalem
Periyasiruvathur Road

1006 01-CRIDP-22- Kallakurichi Kallakurichi Reconstruction of Box Culvert at 30.00


23-O-1006 Km 1/2 of Ulagankathan Road

1007 01-CRIDP-22- Kallakurichi Ulundurpettai Reconstruction of Box Culvert at 52.00


23-O-1007 Km 0/4 of Kattusellur Road

Bridges/Culverts Total 432.00


Kallakurichi Total 14.92 2411.95
Tiruvannamalai Circle Total 130.49 19284.55
1008 01-CRIDP-22- Villupuram Vikravandi Widening from Single Lane to Two 1.00 182.00
23-O-1008 Lane and Strengthening at km 2/0 -
3/0 of Vikkiravandy-Nemur road

1009 01-CRIDP-22- Villupuram Vanur Widening from Intermediate Lane 1.50 635.00
23-O-1009 to Two Lane and Strengthening at
km 1/6 - 3/1 of Parangani-
Vazhudavur road including
Reconstruction of culvert at Km
1/8, 2/4(i) (ii), 2/8 & 2/10

1010 01-CRIDP-22- Villupuram Gingee Widening from Intermediate Lane 4.20 600.00
23-O-1010 to Two Lane and Strengthening at
km 4/0 - 8/2 of Thathikulam-
Melmalaiyanur road including
reconstruction of culvert at km
4/2,4/6,4/8,7/2,8/2

1011 01-CRIDP-22- Villupuram Gingee Widening from Intermediate Lane 2.00 280.00
23-O-1011 to Two Lane and Strengthening at
km 0/0 - 2/0 of Jayankondan-
Perani road
1012 01-CRIDP-22- Villupuram Villupuram Widening from Intermediate Lane 2.50 400.00
23-O-1012 to Two Lane and Strengthening at
km 0/0 - 2/5 of Valavanur-
Poovarasankuppam road including
including reconstruction of Box
culvert at Km 0/6,1/2,2/2 and
construction drain at km 0/2

1013 01-CRIDP-22- Villupuram Gingee Widening from Intermediate Lane 2.60 600.00
23-O-1013 to Two Lane and Strengthening at
km 2/0 - 4/0 and Single Lane to
Two Lane at km 4/0 - 4/6 of
Jayankondan-Perani road including
box culvert at km
2/8,2/10(i),(ii),3/2,3/4,3/6,3/8(i)(ii
),3/10, 4/6

CMRDP IL to DL Total 13.80 2697.00

ODR Page 105 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1014 01-CRIDP-22- Villupuram Gingee Reconstruction of Box Culvert at 175.00


23-O-1014 Km 4/4 of Gingee-
Kanakkankuppam road in lieu of
existing causeway
1015 01-CRIDP-22- Villupuram Mailam Reconstruction of Box Culvert at 145.00
23-O-1015 Km 4/2 of Melkalavai-Eachur road
(via) Neganur road in lieu of
existing causeway
1016 01-CRIDP-22- Villupuram Mailam Reconstruction of Box Culvert at 100.00
23-O-1016 Km 2/8 of Melkalavai-Eachur road
(via) Neganur road in lieu of
existing causeway
1017 01-CRIDP-22- Villupuram Tirukkoyilur Reconstruction of Box Culvert at 200.00
23-O-1017 Km 1/2 of Kandachipuram
Arakandanallur Road in lieu of
existing causeway
1018 01-CRIDP-22- Villupuram Tirukkoyilur Reconstruction of Box Culvert at 190.00
23-O-1018 Km 0/10 of Veerangipuram Road
in lieu of existing causeway

1019 01-CRIDP-22- Villupuram Mailam Reconstruction of Box Culvert at 100.00


23-O-1019 Km 4/8 of Tindivanam-Olakkur
road (via) Purangarai-Sathanur
road in lieu of existing causeway

1020 01-CRIDP-22- Villupuram Mailam Reconstruction of Box Culvert at 150.00


23-O-1020 Km 4/10 of Tindivanam-Olakkur
road (via) Purangarai-Sathanur
road in lieu of existing causeway

1021 01-CRIDP-22- Villupuram Villupuram Reconstruction of Box Culvert at 100.00


23-O-1021 Km 4/6 of Valavanur-Sengadu road
in lieu of existing causeway

1022 01-CRIDP-22- Villupuram Villupuram Reconstruction of Box Culvert at 140.00


23-O-1022 Km 3/2 of Villupuram-
Kavanipakkam road in lieu of
Existing causeway
Causeway to HLB Total 1300.00
1023 01-CRIDP-22- Villupuram Vanur Widening from Single lane to 3.70 485.00
23-O-1023 Intermediate lane & Strengthening
of Pathirapuliyur-Elaiyandipattu
road (via) Veedur at km 0/0 -1/0 &
6/0-8/7 including Reconstruction
of culverts at Km 6/4,7/4(i) &
7/10.

1024 01-CRIDP-22- Villupuram Vanur Widening from Single lane to 3.00 685.00
23-O-1024 Intermediate lane & Strengthening
of Puthurai road at km 0/0-3/0
including reconstruction of culverts
at Km 0/4, 0/6, 1/6,1/10, 2/4 ,
2/6 (i),(ii), 2/8, 2/10, construction
of Retaining wall at Km 0/4-
0/6,0/8-0/10 and construction of
Body Wall for Culvert at Km 1/8.

Other Widening Total 6.70 1170.00


1025 01-CRIDP-22- Villupuram Mailam Strengthening at km 0/0 - 1/425 of 1.43 90.00
23-O-1025 Venmaniyathur road

ODR Page 106 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1026 01-CRIDP-22- Villupuram Tindivanam Strengthening at km 0/0 - 1/035 of 1.04 445.00


23-O-1026 Marakkanam-Thenpakkam road
including reconstruction of culverts
at km 0/6 & 0/10 and construction
of storm water drain on both sides.

Strengthening/Improvements
2.46 535.00
Total
Villupuram Total 22.96 5702.00
1027 01-CRIDP-22- Cuddalore Panruti Widening from Single Lane to Two 2.00 400.00
23-O-1027 Lane and Strengthening at km 0/0 -
2/0 of Kattiyampalayam-
Ammapettai road CD works at Km
0/6,0/8 & 1/8

CMRDP IL to DL Total 2.00 400.00


1028 01-CRIDP-22- Cuddalore Kattumannar Construction of Retaining wall at 100.00
23-O-1028 koil km 2/2,4,6,8,10 of Mannargudy-
Omampuliyur road
Road Safety Total 100.00
1029 01-CRIDP-22- Cuddalore Neyveli Widening from Single Lane to 0.40 67.00
23-O-1029 Intermediate Lane and
Strengthening at km 4/6 - 5/0 of
Ambalavananpettai-Puliyur-
Othiyadikuppam road including
reconstruction of CD work at km
4/8
1030 01-CRIDP-22- Cuddalore Kurinjipadi Widening from Single Lane to 3.00 400.00
23-O-1030 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Thotti-Vellapakkam road including
Reconstruction of Culverts at km
0/8, 1/8, 2/4 and Construction of
Retaining wall at km 2/10.

Other Widening Total 3.40 467.00


1031 01-CRIDP-22- Cuddalore Bhuvanagiri Rebuilding at km 0/0 - 0/360 of 0.36 350.00
23-O-1031 MRK Sugar Cane Yard road

1032 01-CRIDP-22- Cuddalore Kattumannar Strengthening at km 0/0 - 2/3 of 2.30 160.00


23-O-1032 koil Palvaikandan road

1033 01-CRIDP-22- Cuddalore Kattumannar Strengthening at km 3/850 - 8/735 4.89 343.40


23-O-1033 koil of The road from km.2/4 of
Karuveppilankurichi -
Rajendirapattinam to
Gunamangalam road
1034 01-CRIDP-22- Cuddalore Kattumannar Strengthening at km 0/0 - 3/0 of 3.00 333.60
23-O-1034 koil Muttam road

1035 01-CRIDP-22- Cuddalore Kattumannar Strengthening at km 4/8 - 5/6 of 0.80 60.00


23-O-1035 koil Palayamkottai-Kondasamuthiram
road
1036 01-CRIDP-22- Cuddalore Bhuvanagiri Strengthening at km 3/9 - 6/0 of 2.10 170.00
23-O-1036 Puduvilagam-Sathamangalam road
(0/8-1/2 except) including
reconstruction of culverts at
km.4/4 & 5/2

ODR Page 107 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1037 01-CRIDP-22- Cuddalore Kurinjipadi Strengthening at km 0/0 - 2/660 of 2.66 150.00


23-O-1037 The road from km.8/4 of Cuddalore-
Chittoor road to join at km.7/10 of
Cuddalore-Thirukoilur-
Sankarapuram road (via)
Karamanikuppam including
Reconstruction of Culverts at km
1/2 and 2/4.
1038 01-CRIDP-22- Cuddalore Neyveli Strengthening at km 0/0 - 1/6 of 1.60 105.00
23-O-1038 Keeliruppu-Kattupalayam road

1039 01-CRIDP-22- Cuddalore Bhuvanagiri Improvements at Km 0/8 - 2/0 of 1.20 188.00


23-O-1039 Pinnalur Manjakollai road
including reconstruction of culverts
at Km 1/4, 1/8 & 1/10
1040 01-CRIDP-22- Cuddalore Chidambara Improvements at Km 3/4 - 5/4 of 2.00 160.00
23-O-1040 m Puduchathiram Poovalai road

1041 01-CRIDP-22- Cuddalore Chidambara Strengthening at km 1/0 - 2/0 of 1.00 150.00


23-O-1041 m The road from km.0/4 of
Periyapattu-Poochimedu road to
Thatchampalayam road
1042 01-CRIDP-22- Cuddalore Chidambara Strengthening at km 3/5 - 5/8 of 2.30 180.00
23-O-1042 m The road branching from NH 45A to
Jayankondapattinam road

1043 01-CRIDP-22- Cuddalore Kattumannar Strengthening at km 0/0 - 3/6 of 3.60 250.00


23-O-1043 koil Edayar-Thirumoolasthanam road

1044 01-CRIDP-22- Cuddalore Neyveli Strengthening at km 0/0 - 3/0 of 3.00 130.00


23-O-1044 Vallam Road

Strengthening/Improvements
30.81 2730.00
Total
1045 01-CRIDP-22- Cuddalore Cuddalore Temporary Restoration to Bridge at 13.00
23-O-1045 km 3/450 of Marudhadu -
Erandayiravilagam road
Flood Permanent Total 13.00
1046 01-CRIDP-22- Cuddalore Tittakudi Reconstruction of Box Culvert at 38.00
23-O-1046 Km 3/4 of S.Naraiyur road

1047 01-CRIDP-22- Cuddalore Tittakudi Reconstruction of Box Culvert at 32.00


23-O-1047 Km 0/6, 1/4 (i),(ii) of A.Agaram-
Nithinatham road
1048 01-CRIDP-22- Cuddalore Tittakudi Reconstruction of Box Culvert at 35.00
23-O-1048 Km 2/2 of Arasankudi-
Adhithiravidarcolony road
1049 01-CRIDP-22- Cuddalore Chidambara Construction of Culvert at Km 0/8 15.00
23-O-1049 m of Biological station road

1050 01-CRIDP-22- Cuddalore Chidambara Construction of Culvert at Km 8/2 15.00


23-O-1050 m of Anaikaranchathiram-Manikollai
road
1051 01-CRIDP-22- Cuddalore Kurinjipadi Reconstruction of Box Culvert at 25.00
23-O-1051 Km 3/10 of Rasakuppam-
Arangamangalam road
1052 01-CRIDP-22- Cuddalore Chidambara Reconstruction of Box Culvert at 15.00
23-O-1052 m Km 1/10 of Puduchathiram-
Poovalai road

ODR Page 108 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1053 01-CRIDP-22- Cuddalore Kurinjipadi Reconstruction of Box Culvert at 42.00


23-O-1053 Km 2/6 of Mettupalayam-
Ayeethurai road
1054 01-CRIDP-22- Cuddalore Kurinjipadi Reconstruction of Box Culvert at 25.00
23-O-1054 Km 2/4 & 2/6 of Kolakudi road

1055 01-CRIDP-22- Cuddalore Bhuvanagiri Reconstruction of Box Culvert at 75.00


23-O-1055 Km 3/6 of Ambalpuram road

1056 01-CRIDP-22- Cuddalore Bhuvanagiri Reconstruction of Box Culvert at 40.00


23-O-1056 Km 2/10 of Bhudavarayanpettai-
Krishnapuram road
1057 01-CRIDP-22- Cuddalore Chidambara Reconstruction of Box Culvert at 48.00
23-O-1057 m Km 2/8 & 2/10 of Chidambaram-
Sivapuri-Kavarapattu road
1058 01-CRIDP-22- Cuddalore Bhuvanagiri Reconstruction of Box Culvert at 38.00
23-O-1058 Km 0/8(i) & 4/8 of Orathur-
T.Neduncherry road
1059 01-CRIDP-22- Cuddalore Chidambara Reconstruction of Box Culvert at 93.00
23-O-1059 m Km 0/4 & 1/10 of Periyakomatti
road
1060 01-CRIDP-22- Cuddalore Cuddalore Reconstruction of Culvert at Km 40.00
23-O-1060 2/6 of Thookanampakkam-
Keelkumaramangalam-
Reddichavadi road
1061 01-CRIDP-22- Cuddalore Kurinjipadi Reconstruction of Culvert at Km 25.00
23-O-1061 2/8 of Kannarapettai-Ramapuram-
Sathankuppam road

1062 01-CRIDP-22- Cuddalore Neyveli Reconstruction of Box culvert at 45.00


23-O-1062 km 3/8 of The Road from Km 34/4
of Cuddalore – Chithoor Road to
Sendanadu Road (via)
Somachipalayam Road
Bridges/Culverts Total 646.00
Cuddalore Total 36.21 4356.00
1063 01-CRIDP-22- Ariyalur Kunnam Providing Junction Improvement at 270.00
23-O-1063 km 0/2 of Sendurai - Nakkambadi -
Kadur road
1064 01-CRIDP-22- Ariyalur Kunnam Construction of Retaining wall at 171.00
23-O-1064 km 4/2,4,6 of Anganur -
Thamaraipoondi road (Via)
Sannasinallur road
1065 01-CRIDP-22- Ariyalur Kunnam Construction of Retaining wall at 100.00
23-O-1065 km 2/2,4 of Anganur -
Thamaraipoondi road (Via)
Sannasinallur road
Road Safety Total 541.00
1066 01-CRIDP-22- Ariyalur Kunnam Widening from Single Lane to 1.80 492.00
23-O-1066 Intermediate Lane and
Strengthening at km 8/0 - 9/8 of
Ponparappy - Thittakudi road
including Construction of Retaining
wall at Km 8/2, 8/4, 8/6, 8/8 and
Reconstruction of Box culvert at
Km 8/8, 9/4

ODR Page 109 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1067 01-CRIDP-22- Ariyalur Ariyalur Widening from Single Lane to 1.00 151.00
23-O-1067 Intermediate Lane and
Strengthening at km 10/0 - 11/0 of
Poyyur - Sundakkudi road
including Reconstruction of Box
culvert at km 10/2,10/8,
construction of Retaining wall at
km 10/8
1068 01-CRIDP-22- Ariyalur Ariyalur Widening from Single Lane to 2.00 595.00
23-O-1068 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Keelakavettankurichi - Alambadi
Mettutheru road including
Reconstruction of Box culvert at
km 0/2, 0/4 (i), 0/4(ii), 0/8, 1/8,
1/10 Construction of drain at km
0/0- 0/8 & 0/10-2/0

1069 01-CRIDP-22- Ariyalur Jayankondam Widening from Single Lane to 4.00 675.00
23-O-1069 Intermediate Lane and
Strengthening at km 0/0 - 2/0, 5/0
- 6/0, 7/0 - 8/0 of Kallathur -
Pappakudi - Melanikuzhi road
including Reconstruction of Box
culvert at km 1/4, 5/6, 7/6 and
Construction of Retainingwall at
km 0/2,4,6,8,10, 1/2,8, 5/2,4

1070 01-CRIDP-22- Ariyalur Jayankondam Widening from Single Lane to 3.00 333.00
23-O-1070 Intermediate Lane and
Strengthening at km 6/0 - 7/0, 8/0
- 10/0 of Edayar -
Kaduvettankurichi road including
Reconstruction of Box culvert at
km 6/2, 6/8
Other Widening Total 11.80 2246.00
1071 01-CRIDP-22- Ariyalur Ariyalur Strengthening at km 1/0 - 5/2 of 4.20 484.00
23-O-1071 Poyyathanallur - Illuppaiyur road
including Reconstruction of Box
culvert at km 1/8, 2/2, 2/8, 3/4,
3/8, 4/8, 4/10, 5/2 Construction
of Retaining wall at km 1/2,
2/2,4,8, 3/4, 4/4, Protective wall
at km 2/2 - 2/6 and Construction
of Drain at km 3/8

1072 01-CRIDP-22- Ariyalur Kunnam Strengthening at km 7/0 - 9/8 of 2.80 270.00


23-O-1072 Anganur - Thamaraipoondi road
(Via) Sannasinallur road including
construction of Box culvert at Km
7/2, 7/4, 7/6 (i), 7/6 (ii), 8/2, 8/6,
8/8, 8/10, 9/2, 9/4 and 9/6

Strengthening/Improvements
7.00 754.00
Total
1073 01-CRIDP-22- Ariyalur Jayankondam Construction of Box Culvert at Km 17.00
23-O-1073 1/6 of Andimadam - Kovil Valkai
road to Keelaneduvai road

1074 01-CRIDP-22- Ariyalur Kunnam Reconstruction of Box Culvert at 50.00


23-O-1074 Km 3/8(i),(ii),5/6 of Unjini -
Variyankaval road

ODR Page 110 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

Bridges/Culverts Total 67.00


1075 01-CRIDP-22- Ariyalur Kunnam Providing Cantilever Gantry board 6.00
23-O-1075 at km 0/2 of Anganur -
Thamaraipoondi road (Via)
Sannasinallur road
1076 01-CRIDP-22- Ariyalur Kunnam Providing Cantilever Gantry board 6.00
23-O-1076 at km 6/4 of Thungapuram -
Kulumur road
Others Total 12.00
Ariyalur Total 18.80 3620.00
1077 01-CRIDP-22- Perambalur Kunnam Widening from Single Lane to Two 0.46 80.00
23-O-1077 Lane and Strengthening at km
0/240 - 0/7 of Km 15/0 of
Perambalur - Manamadurai road to
Moongilpadi road [Via]
Periyammapalayam including
Construction of Box Culvert at Km
0/8
1078 01-CRIDP-22- Perambalur Kunnam Widening from Single Lane to Two 1.00 140.00
23-O-1078 Lane and Strengthening at km 1/0 -
2/0 of Melamathur - Adhanur road
[Via] Periammapalayam including
Construction of Box Culvert at Km
1/10

1079 01-CRIDP-22- Perambalur Kunnam Widening from Single Lane to Two 2.60 395.00
23-O-1079 Lane and Strengthening at km 0/0 -
2/6 of KM 11/8 of Perambalur -
Manamadurai road to Othiyam
road including Reconstruction of
Box Culvert at Km 0/8, 1/2, 1/6,
1/10 (i) (ii), 2/2, 2/6

CMRDP IL to DL Total 4.06 615.00


1080 01-CRIDP-22- Perambalur Kunnam Reconstruction of Minor Bridge at 210.00
23-O-1080 Km 1/8 of Athiyur-Agaramseegur
Road across Local Odai in lieu of
Existing damaged Piped Causeway

1081 01-CRIDP-22- Perambalur Kunnam Reconstruction of Minor Bridge at 180.00


23-O-1081 Km 1/6 of Keelaperambalur -
Vasistapuram Road across Local
Odai in lieu of Existing damaged
Piped Causeway
1082 01-CRIDP-22- Perambalur Perambalur Reconstruction of Minor Bridge at 220.00
23-O-1082 Km 6/8 of Krishnapuram -
Thondamandurai - Annamangalam
road in lieu of existing damaged
cutstone causeway

1083 01-CRIDP-22- Perambalur Perambalur Reconstruction of Minor Bridge at 220.00


23-O-1083 Km 9/2 of Krishnapuram -
Thondamandurai - Annamangalam
road across Local Odai in lieu of
Existing damaged Piped Causeway

1084 01-CRIDP-22- Perambalur Perambalur Reconstruction of Minor Bridge at 170.00


23-O-1084 Km 4/2 of Athur-Perambalur road
to Alambadi road in lieu of existing
causeway
Causeway to HLB Total 1000.00

ODR Page 111 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1085 01-CRIDP-22- Perambalur Perambalur Providing Junction Improvement at 150.00


23-O-1085 km 0/2 of Sengunam -
Murukkangudi - Mangalamedu
road
1086 01-CRIDP-22- Perambalur Kunnam Providing Junction Improvement at 70.00
23-O-1086 km 4/6 of NH-45 km 256/2 of
Keelapuliyur road
1087 01-CRIDP-22- Perambalur Perambalur Providing Junction Improvement at 45.00
23-O-1087 km 0/2 of Mettucheri - Ranjangudi
road
1088 01-CRIDP-22- Perambalur Perambalur Providing Junction Improvement at 35.00
23-O-1088 km 0/2 of Pasumbalur - Bimbalur
road
Road Safety Total 300.00
1089 01-CRIDP-22- Perambalur Perambalur Widening from Single Lane to 4.50 595.00
23-O-1089 Intermediate Lane and
Strengthening at km 0/0 - 4/0, 6/0
- 6/5 of Esanai - Anukkur road
including Reconstruction of Box
Culvert at km 0/2 (i) (ii), 0/8, 0/10,
1/2, 1/8, 2/6 (i) (ii), 3/2, 3/10, 6/2
and Construction of Retaining wall
at km 0/10, 2/6, 2/8, 2/10, 3/8

1090 01-CRIDP-22- Perambalur Perambalur Widening from Single Lane to 1.20 110.00
23-O-1090 Intermediate Lane and
Strengthening at km 9/0 - 10/2 of
Arumbavur - A.Mettur -
Malayalapatti road including
Reconstruction of Box Culvert at
Km 9/4, Widening of Slab Culvert
at Km 9/2
1091 01-CRIDP-22- Perambalur Perambalur Widening from Single Lane to 2.00 215.00
23-O-1091 Intermediate Lane and
Strengthening at km 15/0 - 17/0 of
Ranjangudi - V.Kalathur -
Kaikalathur road including
Reconstruction of Box Culvert at
Km 15/2, 15/4, 16/2, 16/4, 16/6

1092 01-CRIDP-22- Perambalur Kunnam Widening from Single Lane to 3.40 350.00
23-O-1092 Intermediate Lane and
Strengthening at km 1/0 - 4/4 of
Kolakkanatham -
Garudamangalam road including
Reconstruction of Box culverts at
km 2/8, 2/10 (i) (ii), 3/4, 3/6, 3/8,
Construction of retaining wall at
Km 2/10, 3/2 and Protective wall
at Km 3/8
1093 01-CRIDP-22- Perambalur Perambalur Widening from Single Lane to 4.80 490.00
23-O-1093 Intermediate Lane and
Strengthening at km 3/8 - 8/6 of
Palaiyur - Anukkur -
Valikandapuram road including
Reconstruction of Box Culvert at
Km 4/4(i) (ii), 5/10, 6/4, 6/8,
6/10, 7/4, 8/4

ODR Page 112 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1094 01-CRIDP-22- Perambalur Perambalur Widening from Single Lane to 1.40 150.00
23-O-1094 Intermediate Lane and
Strengthening at km 4/6 - 6/0 of
Venganur - Poolambadi road [Via]
Periyammapalam including
Reconstruction of Box Culvert at
Km 5/6, 5/8 and Construction of
Protective Wall at km 5/4, 5/8,
5/10
1095 01-CRIDP-22- Perambalur Perambalur Widening from Single Lane to 5.40 615.00
23-O-1095 Intermediate Lane and
Strengthening at km 0/0 - 3/0, 4/6
- 7/0 of Esanai - Melapuliyur road
including Reconstruction of Box
Culvert at km 0/2, 0/8, 0/10, 1/4,
1/6, 2/2, 5/8 and Construction of
Retaining wall at Km 1/2, 1/4,
1/8, 2/4, 2/8, 2/10 and
Construction of Protective Wall at
Km 6/8

Other Widening Total 22.70 2525.00


1096 01-CRIDP-22- Perambalur Kunnam Strengthening at km 2/0 - 5/4 of 3.40 440.00
23-O-1096 Sendurai - Anganur -
Agaramseegore - Thirumandurai
road to Kilumathur road [Via]
Ogalur Palayarasamangalam
including Reconstruction of Box
culvert at Km 2/2 (i) (ii), 2/4 (i) (ii),
2/6, 2/8, 2/10 (i) (ii), 3/2, 4/6,
5/2, 5/4
Strengthening/Improvements
3.40 440.00
Total
1097 01-CRIDP-22- Perambalur Kunnam Reconstruction of Box Culvert at 15.00
23-O-1097 Km 1/4 of Vayalapadi -
Veeramanallur road
Bridges/Culverts Total 15.00
Perambalur Total 30.16 4895.00
Villupuram Circle Total 108.13 18573.00
1098 01-CRIDP-22- Salem Attur Widening from Single Lane to 1.00 125.00
23-O-1098 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Kalarampatty road including
construction of retaining wall at
km.0/2, 0/4 & 0/6.
1099 01-CRIDP-22- Salem Attur Widening from Single Lane to 2.60 300.00
23-O-1099 Intermediate Lane and
Strengthening at km 0/0 - 2/6 of
Salem - Ulundurpet road to
Ammampalayam Narikuravar
Colony road including
Reconstruction of Box culvert at
Km.1/4
1100 01-CRIDP-22- Salem Yercaud Widening from Single Lane to 4.40 565.00
23-O-1100 Intermediate Lane and
Strengthening at km 0/0 - 4/4 of
Mettupatty-Vellalagundam road
including Construction of retaining
wall at km.0/4 (L/S) & 4/4 (R/S)
and Reconstruction of Culvert at
Km.0/10, 1/4, 1/6, 1/8, 2/8,
2/10, 3/10 & 4/2.

ODR Page 113 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1101 01-CRIDP-22- Salem Attur Widening from Single Lane to 1.32 130.00
23-O-1101 Intermediate Lane and
Strengthening at km 3/885 - 5/2 of
Attur - Paithur Road including
Widening of pipe culvert at
Km.4/10
Other Widening Total 9.32 1120.00
1102 01-CRIDP-22- Salem Yercaud Construction of Retaining wall at 300.00
23-O-1102 Km 2/8, 5/2, 5/6, 6/2, 6/4, 6/6 of
Vellakadai - Nallur (Via) Melur
Road including Construction of
Parapet wall at Km 0/2, 0/6, 0/10,
1/4, 1/8, 1/10, 2/2, 2/4, 2/8, 3/4,
3/6, 3/10, 4/2, 4/4, 4/6, 4/10,
5/2, 5/4, 5/6, 5/8, 5/10, 6/2, 6/4,
6/6, 6/8, 6/10, 7/2 and CC drain
at Km 0/4, 0/8, 0/10, 1/4, 1/6,
1/8, 1/10, 2/4, 2/10, 3/8, 3/10,
4/2, 4/4, 4/6, 5/2, 5/4, 5/6, 5/8,
5/10, 6/2, 6/4, 6/6, 6/8, 6/10,
7/2.

Tourism Important Total 300.00


Salem Total 9.32 1420.00
1103 01-CRIDP-22- Edappadi Mettur Widening from Intermediate Lane 4.60 680.00
23-O-1103 to Two Lane and Strengthening at
km 0/0 - 4/6 of Kolathur
Guruvareddiyur road including
Construction of Box Culvert at
2/10, Reconstruction of Box
Culvert at Km.3/8(i), (ii), Widening
of Slab Culvert at Km.4/2(i), (ii) &
(iii) & Construction of Retaining
Wall at Km.0/4, 0/10, 2/2 & 2/8,
Construction of Parapet in existing
Retaining Wall at Km.0/8, 4/4 &
4/6

1104 01-CRIDP-22- Edappadi Mettur Widening from Intermediate Lane 5.40 640.00
23-O-1104 to Two Lane and Strengthening at
km 4/6 - 10/0 of Kolathur
Guruvareddiyur road including
Construction of Retaining Wall at
Km.4/8 & 4/10

CMRDP IL to DL Total 10.00 1320.00


1105 01-CRIDP-22- Edappadi Sankari Providing Metal Crash Barrier at 1.20
23-O-1105 km 8/8(i) of Alathur -
Reddipalayam - Thevur road
1106 01-CRIDP-22- Edappadi Sankari Providing Metal Crash Barrier at 1.20
23-O-1106 km 8/8(ii) of Annamar Kovil -
Poomaniyur road
1107 01-CRIDP-22- Edappadi Sankari Providing Metal Crash Barrier at 20.18
23-O-1107 km 2/2,4,6, 3/2 of Km 42/4 of
Salem - Cochin Road to
Mothaiyanur Road
1108 01-CRIDP-22- Edappadi Sankari Providing Metal Crash Barrier at 5.07
23-O-1108 km 4/10 of Vaigundam -
Kozhikkalnatham Road

ODR Page 114 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1109 01-CRIDP-22- Edappadi Sankari Providing Metal Crash Barrier at 24.06


23-O-1109 km 6/4, 7/6, 8/6,10 of Katchupalli
- Alagappampalayam - Elampillai
road
1110 01-CRIDP-22- Edappadi Sankari Providing Metal Crash Barrier at 8.56
23-O-1110 km 0/2, 2/0, 2/10, 3/2 of The road
branching from Km.0/10 of
Annamarkoil - Kalvadagam Road to
Vettrampalayam Road (via)
Senrayanur & Anchettipatty
1111 01-CRIDP-22- Edappadi Edappadi Providing Metal Crash Barrier at 35.70
23-O-1111 km 0/2,4,8,10, 1/6,8,10 of
Pudupalayam - Koranampatti -
Upparapatti Kalinku road
1112 01-CRIDP-22- Edappadi Edappadi Providing Metal Crash Barrier at 16.30
23-O-1112 km 6/4,6, 7/2,4 of Edapady -
Dadapuram road - Katchupalli -
Pudupalayam road
1113 01-CRIDP-22- Edappadi Mettur Providing Metal Crash Barrier at 4.00
23-O-1113 km 1/8, 2/8 of Kaligoundanur-
Chinnathirupathypoosaripatty
road
1114 01-CRIDP-22- Edappadi Omalur Providing Metal Crash Barrier at 2.40
23-O-1114 km 4/4 of Thalavipatty- Karuvalli
road (via) Mokkanur
1115 01-CRIDP-22- Edappadi Omalur Providing Metal Crash Barrier at 15.85
23-O-1115 km 1/6,8 of Kuppur-
Kanjanaickanpatty road
1116 01-CRIDP-22- Edappadi Omalur Providing Metal Crash Barrier at 6.35
23-O-1116 km 0/2,4 of Karuvalli - Dasanur
road
1117 01-CRIDP-22- Edappadi Omalur Providing Metal Crash Barrier at 20.15
23-O-1117 km 0/8, 1/2,4, 2/10, 3/6,8,10 of
Danishpet -Palapallikombai road

1118 01-CRIDP-22- Edappadi Mettur Providing Metal Crash Barrier at 45.00


23-O-1118 km 6/2,4, 10/10, 11/2,4,6,8 of
Kolathur Thanda road
1119 01-CRIDP-22- Edappadi Edappadi Providing Metal Crash Barrier at 15.00
23-O-1119 km 1/4,6,8 of The Road from
Sadayampalayam to
Kanniyampatty four Road junction
to Vellakovil Panikkanur Link (via)
Senkuttaieari Road

1120 01-CRIDP-22- Edappadi Sankari Providing Metal Crash Barrier at 6.25


23-O-1120 km 0/4,6 of Valayachettipatti -
Senguttapatty Road
1121 01-CRIDP-22- Edappadi Omalur Providing Metal Crash Barrier at 1.60
23-O-1121 km 2/0 of Kamalapuram-
Thinnaptty- Pannapatty road
1122 01-CRIDP-22- Edappadi Salem West Providing Metal Crash Barrier at 1.60
23-O-1122 km 3/6 of Tharamangalam -K.R.
Thoppur (via) Pothanur road
1123 01-CRIDP-22- Edappadi Omalur Providing Metal Crash Barrier at 4.80
23-O-1123 km 3/8, 4/4, 5/8 of Pottipuram-
Thumbipady-Mattukaranpudur
road
Road Safety Total 235.27

ODR Page 115 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1124 01-CRIDP-22- Edappadi Sankari Widening from Single Lane to 3.80 530.00
23-O-1124 Intermediate Lane and
Strengthening at km 0/0 - 2/6, 6/6
- 7/8 of Vaigundam -
Kozhikkalnatham Road including
Reconstruction of Box culvert at
km 0/4 (i) , 0/4 (iii), 1/6,10, 2/2(i),
2/2 (ii), 2/4, 6/10, 7/6 and
widening of Box culvert at km 0/4
(ii) Construction of Retaining wall
at km 0/6-1/0 and Construction of
drain at km 7/6

1125 01-CRIDP-22- Edappadi Sankari Widening from Single Lane to 3.00 408.00
23-O-1125 Intermediate Lane and
Strengthening at km 3/4 - 5/4, 6/0
- 7/0 of Alathur - Reddipalayam -
Thevur road including
Reconstruction of box culvert at km
4/4,5/2, 6/2, 6/4 (i), (ii), 6/6,
construction of well Protective wall
at km 5/2 and construction of
retaining wall at km 6/10

Other Widening Total 6.80 938.00


1126 01-CRIDP-22- Edappadi Omalur Strengthening at km 3/2 - 6/0 of 2.80 165.00
23-O-1126 Amarakundhi-Periyeripatty road

Strengthening/Improvements
2.80 165.00
Total
1127 01-CRIDP-22- Edappadi Omalur Reconstruction of Box Culvert at 50.00
23-O-1127 Km 3/6, 4/2 of Kuppur-
Kanjanaickanpatty road
1128 01-CRIDP-22- Edappadi Omalur Reconstruction of Box Culvert at 15.00
23-O-1128 8/2 of Tharamangalam- Vanavasi
road to Sedapatty (via) Ariyampatty-
S.Karattupatty road including
Construction of Drain at km.8/2

Bridges/Culverts Total 65.00


Edappadi Total 19.60 2723.27
1129 01-CRIDP-22- Namakkal Namakkal Widening from Intermediate Lane 2.10 163.00
23-O-1129 to Two Lane and Strengthening at
km 0/8 - 2/9 of Thottipatti -
Kanavaipatty road including
Construction of retaining wall at
Km 2/6 and Construction of Box
culvert at Km 1/8

1130 01-CRIDP-22- Namakkal Namakkal Widening from Intermediate Lane 1.60 91.00
23-O-1130 to Two Lane and Strengthening at
km 0/0 - 1/6 of Kanavaipatty -
Thanneerpandal road

ODR Page 116 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1131 01-CRIDP-22- Namakkal Senthamanga Widening from Single Lane to Two 1.00 180.00
23-O-1131 lam Lane and Strengthening at km
10/6 - 11/6 of Semmedu -
Sellipatti -Arapaleeswarar kovil
road. including Construction of
Retaining Wall at Km 10/10 and
construction of Culverts at Km
11/2 and Providing Paver Block in
Km 11/0-11/4.
1132 01-CRIDP-22- Namakkal Namakkal Widening from Intermediate Lane 4.60 600.00
23-O-1132 to Two Lane and Strengthening at
km 5/8 - 10/4 of Kalangani -
Thirumalaipatty road including
construction of Retaining wall, Well
protective wall and CD works

1133 01-CRIDP-22- Namakkal Senthamanga Widening from Intermediate Lane 1.40 112.00
23-O-1133 lam to Two Lane and Strengthening at
km 0/0 - 1/4 of Erumapatti loop
road including Construction of
Retaining wall at Km 1/2, 1/4 and
Reconstruction of culvert at Km
0/2.

CMRDP IL to DL Total 10.70 1146.00


1134 01-CRIDP-22- Namakkal Namakkal Providing Metal Crash Barrier at 4.00
23-O-1134 km 2/2 of Namakkal - Nainamalai
road
1135 01-CRIDP-22- Namakkal Namakkal Providing Metal Crash Barrier at 6.70
23-O-1135 km 10/8, 14/4 of Namakkal -
Thindaman galam - Keerambur
road.
1136 01-CRIDP-22- Namakkal Paramathi Providing Metal Crash Barrier at 8.80
23-O-1136 Velur km 0/4, 10/0, 11/2 of Ernapuram -
Paramathi road
1137 01-CRIDP-22- Namakkal Namakkal Providing Metal Crash Barrier at 2.00
23-O-1137 km 0/6 of Namakkal - Nainamalai
road to Avalnaicken patti - Senkali
goundanur road
1138 01-CRIDP-22- Namakkal Rasipuram Providing Metal Crash Barrier at 38.00
23-O-1138 km 4/2,4,6, 5/2,10 of Seerapalli -
Singalantha puram road
1139 01-CRIDP-22- Namakkal Rasipuram Providing Metal Crash Barrier at 7.50
23-O-1139 km 1/8 of V C C road to
Singalantha puram road (via)
Patchal.
1140 01-CRIDP-22- Namakkal Rasipuram Providing Metal Crash Barrier at 40.10
23-O-1140 km 2/6,8,10, 3/6, 4/2 of Mallur -
Vennandur - Semmandapatty road

1141 01-CRIDP-22- Namakkal Rasipuram Providing Metal Crash Barrier at 35.30


23-O-1141 km 0/2,4, 2/4,6, 5/8, 6/2 of
R.Pudupatti - Moolapallipatti -
Mettala road
1142 01-CRIDP-22- Namakkal Namakkal Providing Metal Crash Barrier at 6.00
23-O-1142 km 1/6 of Vallipuram - Palapatti
road
1143 01-CRIDP-22- Namakkal Namakkal Providing Metal Crash Barrier at 7.00
23-O-1143 km 0/6,8, 4/8 of
Athiyappampalayam -
Thindamangalam road

ODR Page 117 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

Road Safety Total 155.40


1144 01-CRIDP-22- Namakkal Paramathi Widening from Single Lane to 3.20 277.00
23-O-1144 Velur Intermediate Lane and
Strengthening at km 4/8 - 7/6, 8/6
- 9/0 of Serukkalai Cross road
including Construction of Retaining
wall at Km 5/6 & 5/8, Widening of
Pipe Culvert at Km 5/6 (i) (ii) &
5/8, Construction of box culvert at
Km 6/8 and Construction of Well
productive wall at Km 8/8

1145 01-CRIDP-22- Namakkal Namakkal Widening from Single Lane to 1.20 77.00
23-O-1145 Intermediate Lane and
Strengthening at km 0/0 - 1/2 of
VCC road to Thottipatti road
including Reconstruction of cut
stone culvert at Km 1/2
1146 01-CRIDP-22- Namakkal Senthamanga Widening from Single Lane to Two 1.60 290.00
23-O-1146 lam Lane and Strengthening at km 3/0 -
4/6 of Gandhipuram-Karavalli
road. including Reconstruction of
Culvert into box culvert at Km 3/4
(i) & (ii),3/6, 3/10,4/4,4/6 and
Widening of Culvert at Km 3/2
Construction of Retaining Wall 4/6.

1147 01-CRIDP-22- Namakkal Rasipuram Widening from Single Lane to 1.60 130.00
23-O-1147 Intermediate Lane and
Strengthening at km 0/0 - 1/6 of
Attaiyampatti - Masakalipatti road
to Minnakal Agraharam road
including Construction of Retaining
Wall, Drain and CD Works

1148 01-CRIDP-22- Namakkal Senthamanga Widening from Single Lane to 6.55 650.00
23-O-1148 lam Intermediate Lane and
Strengthening at km 0/0 - 4/040,
4/290 - 4/8, 5/0 - 7/0 of
Solakadu - Kulivalavu road
including Construction of CC
Drain, Retaining Wall and
Reconstruction of Culverts
1149 01-CRIDP-22- Namakkal Paramathi Widening from Single Lane to 1.20 78.00
23-O-1149 Velur Intermediate Lane and
Strengthening at km 1/2 - 2/4 of
Velur-Kabilarmalai road including
Widening of pipe culvert at km 2/2

1150 01-CRIDP-22- Namakkal Paramathi Widening from Single Lane to 5.00 360.00
23-O-1150 Velur Intermediate Lane and
Strengthening at km 0/0 - 5/0 of
Nallur - Kabilarmalai -
Pandamangalam road including
Reconstruction of box culvert in
lieu of existing pipe culvert,
Widening of pipe culvert, Widening
of slab culvert and Construction of
Retaining wall

ODR Page 118 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1151 01-CRIDP-22- Namakkal Tiruchengode Widening from Single Lane to 1.60 348.00
23-O-1151 Intermediate Lane and
Strengthening at km 8/0 - 9/6 of
Molasi road including
Construction of Well Protective
wall, Retaining wall and Toe wall,
Construction of Culvert at Km 8/2,
8/6 and Reconstruction of Culverts
8/10,9/2
1152 01-CRIDP-22- Namakkal Kumarapalay Widening from Single Lane to 1.20 152.00
23-O-1152 am Intermediate Lane and
Strengthening at km 1/0 - 2/2 of
Padaiveedu road including
Reconstruction of Culverts at Km
1/2(i)(ii),1/8,1/10(i)(ii),2/2
1153 01-CRIDP-22- Namakkal Tiruchengode Widening from Single Lane to 3.42 390.00
23-O-1153 Intermediate Lane and
Strengthening at km 7/8 - 11/220
of Vaikuntham - Kolikkalnatham
road including Construction of
Well protective wall and Retaining
wall, Construction of Culvert at 9/6
and Reconstruction of culverts at
Km
8/0(i)(ii),8/2,8/8,9/4,9/8,9/10,10/
4

1154 01-CRIDP-22- Namakkal Paramathi Widening from Single Lane to 3.20 220.00
23-O-1154 Velur Intermediate Lane and
Strengthening at km 9/0 - 10/2,
12/0 - 13/4, 15/4 - 16/0 of
Nallur - Kabilarmalai -
Pandamangalam road including CD
Works
Other Widening Total 29.77 2972.00
Namakkal Total 40.47 4273.40
1155 01-CRIDP-22- Dharmapuri Palacode Construction of Retaining wall at 100.00
23-O-1155 km 2/0-2/2 of Chinnar Reservior
Project road
1156 01-CRIDP-22- Dharmapuri Palacode Construction of Retaining wall at 254.00
23-O-1156 km 2/2-2/8 of Chinnar Reservior
Project road
Road Safety Total 354.00
1157 01-CRIDP-22- Dharmapuri Pappireddipp Widening from Single Lane to 1.00 85.00
23-O-1157 atti Intermediate Lane and
Strengthening at km 3/0 - 4/0 of
Kadathur - Thalanatam road
1158 01-CRIDP-22- Dharmapuri Pappireddipp Widening from Single Lane to 4.20 430.00
23-O-1158 atti Intermediate Lane and
Strengthening at km 3/8 - 8/0 of
Annasagaram - Kombi road
including Reconstruction of Box
culverts at km 3/10, 4/2,6,8,
5/2,8,10, 6/4, 7/2,10,
Construction of Well Protective Well
at Km 7/4

ODR Page 119 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1159 01-CRIDP-22- Dharmapuri Dharmapuri Widening from Single Lane to 1.40 400.00
23-O-1159 Intermediate Lane and
Strengthening at km 0/0 - 1/4 of
National Highways -7
Mukkalnaickanpatti (Via)
Eamakuttaiyur, Ettimarathupatti
road including Reconstruction of
Box culverts at km 0/4, 0/6(i), (ii),
1/2 Construction of Box culvert at
Km 0/2, 0/4(ii) and construction of
Retaining wall at km 0/320 - 0/600
(L/S) and Construction of Drain at
Km 0/0-0/320 (LS) & 0/6-0/8 (BS)

1160 01-CRIDP-22- Dharmapuri Palacode Widening from Single Lane to 0.20 25.00
23-O-1160 Intermediate Lane and
Strengthening at km 8/8 - 9/0 of
Ekkandahalli - Theertharapatti
road
1161 01-CRIDP-22- Dharmapuri Palacode Widening from Single Lane to 1.80 200.00
23-O-1161 Intermediate Lane and
Strengthening at km 5/2 - 6/0, 6/6
- 6/8, 7/2 - 7/6, 8/0 - 8/2, 12/4 -
12/6 of Begarahalli road to
National Highways -7 at joining at
KM 121/6 including Construction
of Box Culvert at km 12/6 In Lieu
of damaged pipe Culvert and
Construction of Retaining wall at
km 5/6-5/8
1162 01-CRIDP-22- Dharmapuri Dharmapuri Widening from Single Lane to 3.20 470.00
23-O-1162 Intermediate Lane and
Strengthening at km 1/4 - 1/8, 3/6
- 4/4, 5/0 - 5/2, 6/2 - 6/6
Strengthening at km 0/0 - 1/4 of
Nallampalli - Mittareddihalli (Via)
Laligam road including
Reconstruction of Box culvert at
Km 0/8, 5/2 and Construction of
Retaining wall at km 1/400 -1/800,
3/700-3/800
1163 01-CRIDP-22- Dharmapuri Dharmapuri Widening from Single Lane to 1.80 250.00
23-O-1163 Intermediate Lane and
Strengthening at km 1/0 - 1/6, 3/4
- 4/0, 5/2 - 5/8 of Annasagaram -
Komathampatti road including
Reconstruction of Box culverts at
km 1/4, 1/6 (i) (ii), 3/4, 3/8 and
and Construction of box culvert at
Km 1/2

Other Widening Total 13.60 1860.00


1164 01-CRIDP-22- Dharmapuri Pappireddipp Strengthening at km 3/8 - 5/8 of 2.00 140.00
23-O-1164 atti Boothanatham - Kalliyur -
Jammanahalli road including
Construction of Retaining wall at
km 4/8
1165 01-CRIDP-22- Dharmapuri Pappireddipp Strengthening at km 0/0 - 3/0 of 3.00 130.00
23-O-1165 atti Molaiyanur - Vizhuthupatti road

ODR Page 120 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

Strengthening/Improvements
5.00 270.00
Total
1166 01-CRIDP-22- Dharmapuri Palacode Construction of Box Culvert at Km 55.00
23-O-1166 4/2 of Gooliganur - Udayandahalli
road in lieu of damaged RR
Masonry slab culvert

Bridges/Culverts Total 55.00


Dharmapuri Total 18.60 2539.00
1167 01-CRIDP-22- Krishnagiri Veppanahalli Widening from Single Lane to 4.00 464.00
23-O-1167 Intermediate Lane and
Strengthening at km 0/0-4/0 of
Avalnatham road including CD
works and Retaining Wall
1168 01-CRIDP-22- Krishnagiri Bargur Widening from Single Lane to 6.27 690.00
23-O-1168 Intermediate Lane and
Strengthening at km 0/930 - 7/2 of
Pochampalli - Thogarapalli -
Kappalvadi road including CD
works
1169 01-CRIDP-22- Krishnagiri Krishnagiri Widening from Single Lane to 3.00 510.00
23-O-1169 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Kaveripattinam - KRP Dam road via
Kalvehalli including CD works &
Retaining wall
1170 01-CRIDP-22- Krishnagiri Krishnagiri Widening from Single Lane to 3.69 620.00
23-O-1170 Intermediate Lane and
Strengthening at km 3/0 - 6/685 of
Kaveripattinam - KRP Dam road via
Kalvehalli including CD works &
Retaining wall

Other Widening Total 16.96 2284.00


1171 01-CRIDP-22- Krishnagiri Uthangarai Strengthening at km 0/0 - 1/2 of 1.20 145.00
23-O-1171 Karapattu - Kallavi road including
CD works
1172 01-CRIDP-22- Krishnagiri Bargur Strengthening at km 5/0-6/0, 7/6- 2.60 200.00
23-O-1172 8/0 and 8/4-9/6 of Bargur
Sinthagampalli road including
(extra length 100m) and CD works

Strengthening/Improvements
3.80 345.00
Total
Krishnagiri Total 20.76 2629.00
Salem Circle Total 108.74 13584.67
1173 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 8.00
23-O-1173 km 4/2, 4/6, 7/8 of Kallipalayam -
Vavipalayam road
1174 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 26.00
23-O-1174 km 1/6,8, 2/8,10, 4/6 of
Rayarpalayam - Ganapathypalayam
road (Via) Goundampalayam

1175 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 41.00


23-O-1175 km 1/2,10, 4/4, 5/2,4,6,8 of
Thuttaripalayan - Pongalur road
1176 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 22.00
23-O-1176 km 2/2,4,10, 3/10, 4/6,8 of
Panapalayam - Pethampalayam
road

ODR Page 121 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1177 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50


23-O-1177 at km 1/10 of Semmipalayam -
K.Ayyampalayam road

1178 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 13.00


23-O-1178 at km 5/6,8 of Venkittapuram -
Kalipalayam road

1179 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50


23-O-1179 at km 0/2 of Nagai - Gudalur -
Mysore road at Km 310/4 to
Semmipalayam (Via) Kalivelampatty

1180 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 13.00


23-O-1180 at km 0/2, 12/4 of Palladam -
Dharapuram road at Km 8/8 of
Kamanaickenpalayam - Annaur
road
1181 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50
23-O-1181 at km 0/2 of Karanampettai -
Rasagoudempalayam road

1182 01-CRIDP-22- Tiruppur Tiruppur Providing Metal Crash Barrier at 13.00


23-O-1182 North km 1/4 of Goundampalayam -
Boyempalayam road
1183 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 2.50
23-O-1183 km 1/4 of Koduvai -
Ayyampalayam road
1184 01-CRIDP-22- Tiruppur Tiruppur Providing Metal Crash Barrier at 2.00
23-O-1184 North km 17/2 of Cheyur - Kunnathur
road
1185 01-CRIDP-22- Tiruppur Avinashi Providing Metal Crash Barrier at 77.40
23-O-1185 km 0/6-1/100, 1/8-2/2, 2/6 of
Avinashi - Koottapalli road to
Semmandampalayam (Via) Cheyur -
Kunnathur road
1186 01-CRIDP-22- Tiruppur Tiruppur Providing Metal Crash Barrier at 14.30
23-O-1186 North km 1/6 of pattampalayam -
Kunnathur road
1187 01-CRIDP-22- Tiruppur Perundurai Providing Metal Crash Barrier at 17.70
23-O-1187 km 2/10 of Kunnathur road to
Salem - Cochin road
1188 01-CRIDP-22- Tiruppur Perundurai Providing Metal Crash Barrier at 5.00
23-O-1188 km 2/10 of Kunnathur - Nadupatti
road
1189 01-CRIDP-22- Tiruppur Perundurai Providing Metal Crash Barrier at 3.00
23-O-1189 km 1/10 of Senkalipalayam -
Kattuvalasu road
1190 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50
23-O-1190 at km 0/2 of Pongalur -
Pollikalipalayam road
1191 01-CRIDP-22- Tiruppur Tiruppur Providing Cantilever Gantry board 6.50
23-O-1191 South at km 0/2 of Tirupur - Padiyur
road Km 9/0 of the road from
Peruntholuvu
1192 01-CRIDP-22- Tiruppur Palladam Providing Cantilever Gantry board 6.50
23-O-1192 at km 4/10 of Tirupur - Padiyur
road Km 9/0 of the road from
Peruntholuvu

ODR Page 122 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1193 01-CRIDP-22- Tiruppur Tiruppur Providing Cantilever Gantry board 13.00


23-O-1193 North at km 3/10, 22/2 of Cheyur -
Kunnathur road
1194 01-CRIDP-22- Tiruppur Tiruppur Providing Cantilever Gantry board 13.00
23-O-1194 North at km 4/10, 5/2 of Perumanallur -
Kallimadaikuttai road

1195 01-CRIDP-22- Tiruppur Kangayam Providing Metal Crash Barrier at 4.00


23-O-1195 km 4/2 of Erode - Kangayam road
to Kanjarpalayam -
Theerthampalayam (Via)
Nathakadaiyur road
1196 01-CRIDP-22- Tiruppur Kangayam Providing Metal Crash Barrier at 8.00
23-O-1196 km 17/8 & 18/8 of Vellakovil -
Veppampalayam - Noyyal road
1197 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 2.50
23-O-1197 km 1/2 of Valupuramman kovil -
Kandiyan kovil road
1198 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 8.10
23-O-1198 km 0/6 of Tirupur - Padiyur road
at Km 7/8 of Vijayapuram road
1199 01-CRIDP-22- Tiruppur Kangayam Providing Metal Crash Barrier at 15.00
23-O-1199 km 2/10 & 4/6 of Gobi -
Dharapuram road at Km 70/0 of
Vengipalayam road
1200 01-CRIDP-22- Tiruppur Palladam Providing Metal Crash Barrier at 4.20
23-O-1200 km 2/10 of Nagai - Gudalur -
Mysore road to Kosavampalayam
road
1201 01-CRIDP-22- Tiruppur Kangayam Providing Metal Crash Barrier at 8.00
23-O-1201 km 4/2 & 4/4 of Savadi - Keeranur
road
1202 01-CRIDP-22- Tiruppur Kangayam Providing Cantilever Gantry board 13.00
23-O-1202 at km 10/8 & 10/10 of Mullipuram
- Bhagavathipalayam -
Silambagoundenvalasu road

1203 01-CRIDP-22- Tiruppur Kangayam Providing Cantilever Gantry board 7.00


23-O-1203 at km 0/2 of Nagaipattinam -
Gudalur - Mysore road
Veeranampalayam road

Road Safety Total 392.70


1204 01-CRIDP-22- Tiruppur Kangayam Widening from Single Lane to 2.00 175.00
23-O-1204 Intermediate Lane and
Strengthening at km 1/0 - 3/0 of
Kangayam - Molapalayam road
including Reconstruction of Box
culvert at km 1/4 & 2/8.
1205 01-CRIDP-22- Tiruppur Kangayam Widening from Single Lane to 1.40 170.00
23-O-1205 Intermediate Lane and
Strengthening at km 2/6 - 4/0 of
Nathakadaiyur - Kurukkapalayam
road including Reconstruction of
Box culvert at km 2/10,3/2(i),
(ii),3/6,&3/8.
Other Widening Total 3.40 345.00
1206 01-CRIDP-22- Tiruppur Avinashi Construction of Box Culvert at Km 55.00
23-O-1206 2/60 of Avinashi - Koottappalli
road to Odarpalayam road

ODR Page 123 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1207 01-CRIDP-22- Tiruppur Tiruppur Construction of Box Culvert at Km 90.00


23-O-1207 North 1/10 of Perumanallur -
Kallimadaikuttai road including
Construction of Drain
Bridges/Culverts Total 145.00
1208 01-CRIDP-22- Tiruppur Avinashi Providing Cantilever Gantry board 6.60
23-O-1208 at km 11/4 of Karuvalur -
Aalampalayam road (Via)
Mondipalayam
1209 01-CRIDP-22- Tiruppur Avinashi Providing Cantilever Gantry board 13.00
23-O-1209 at km 4/6,8 of
Thandukkaranpalayam - Pasur
road
Others Total 19.60
Tiruppur Total 3.40 902.30
1210 01-CRIDP-22- Dharapuram Dharapuram Construction of Box Culvert at 160.00
23-O-1210 10/4 of The road branching at km
18/6 of Palladam - Dharapuram
road to Taluk limit (via)
Nandhavanampalayam in lieu of
existing causeway
1211 01-CRIDP-22- Dharapuram Madathukula Construction of Box Culvert at Km 100.00
23-O-1211 m 0/6 of Malayandigoundanur -
Kilavunkattur road. in lieu of
existing causeway
1212 01-CRIDP-22- Dharapuram Madathukula Construction of Box Culvert at Km 50.00
23-O-1212 m 4/2 of Andipatti Village road. in
lieu of existing causeway

1213 01-CRIDP-22- Dharapuram Udumalaipett Construction of Box Culvert at 5/2 105.00


23-O-1213 ai of The road branching at Km 28/8
of Pollachi - Dharapuram - Karur
road to Poolavadi in lieu of existing
causeway
1214 01-CRIDP-22- Dharapuram Madathukula Construction of Box Culvert at 5/8 85.00
23-O-1214 m of The road branching at Km 10/6
of Thippampatti -
Sellappampalayam road to Km
20/8 of Anaimalai - Poolankinar
road (via) Pungamuthur in lieu of
existing causeway
1215 01-CRIDP-22- Dharapuram Udumalaipett Construction of Box Culvert at Km 108.00
23-O-1215 ai 3/2 of Sungaramudakku -
Ammapatti road. in lieu of existing
causeway
1216 01-CRIDP-22- Dharapuram Dharapuram Construction of Box Culvert at Km 50.00
23-O-1216 6/8 of Puthukkottai pirivu -
Kambaliyampatty road (via)
Vellinagar in lieu of existing
causeway
1217 01-CRIDP-22- Dharapuram Dharapuram Construction of Box Culvert at Km 175.00
23-O-1217 0/10 of Muthur - Mulanur road to
Vanjivalasu (via)
Sunnampukattuvalasu. in lieu of
existing causeway
Causeway to HLB Total 833.00
1218 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 1.70
23-O-1218 km 0/6 of Muthugoundenpalayam -
Thumbalapatty road

ODR Page 124 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1219 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 2.50


23-O-1219 km 2/10 of The road branching at
km 18/6 of Palladam -
Dharapuram road to Taluk limit
(via) Nandhavanampalayam
1220 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 1.60
23-O-1220 km 9/4 of The road branching at
km 18/6 of Palladam -
Dharapuram road to Taluk limit
(via) Nandhavanampalayam
1221 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 20.00
23-O-1221 km 6/0, 6/4 of Suriyanallur -
Eragampatti road.
1222 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 2.00
23-O-1222 m km 3/4 of Thungavi -
Madathukulam road
1223 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 5.50
23-O-1223 km 0/6 of Kundadam -
Sankarandampalayam road (via)
Nochipalayam, Aalampalayam,
Karaiputhur Arisana Colony.
1224 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 2.00
23-O-1224 m km 2/8 of Pappankulam Pirivu -
Neelambur road
1225 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 10.50
23-O-1225 km 8/4 of The road branching at
km 18/6 of Palladam -
Dharapuram road to Taluk limit
(via) Nandhavanampalayam
1226 01-CRIDP-22- Dharapuram Kangayam Providing Metal Crash Barrier at 15.00
23-O-1226 km 4/8, 5/4 of Othakadai -
Vellappnaickenvalasu -
Vellathankaraipudur road.
1227 01-CRIDP-22- Dharapuram Udumalaipett Providing Metal Crash Barrier at 2.00
23-O-1227 ai km 9/10 of Thungavai - Poolavadi
road.
1228 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 50.00
23-O-1228 km 8/6, 11/4, 13/6, 13/8 - 14/2
of The road branching at Km 83/8
of Gobi - Dharapuram road to join
at km 8/6 of Uthiyur-
Dasanaickenpatty road (via)
Sankarandampalayam
1229 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 10.00
23-O-1229 km 8/8, 11/2 of Kundadam -
Govindapuram road.
1230 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 4.00
23-O-1230 m km 8/10 of Kolumam - Kallapuram
road.
1231 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 17.00
23-O-1231 km 4/10 of Erasanampalayam -
Erachapadi (via) Moolapalayam
1232 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 7.50
23-O-1232 km 6/8, 8/0, and 8/2 of Periyapatti
- Sadayapalayam road.

ODR Page 125 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1233 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 5.00


23-O-1233 m km 2/6 of The road branching at
Km 80/0 of Coimbatore - Dindigal
road to meet at km 4/6 of
Karatholuvu - komarlingam

1234 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 7.00


23-O-1234 km 1/10 of Parakadai -
Punjaithalayur road (via) Manalur
road
1235 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 10.00
23-O-1235 m km 2/6, 5/4 of Amaravathi sugar
mill to Kongalakurichi road

1236 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 2.50


23-O-1236 km 9/2 of Karaiyur -
Athimarathupudur road
1237 01-CRIDP-22- Dharapuram Kangayam Providing Metal Crash Barrier at 14.00
23-O-1237 km 3/300 of Kangayam -
Kodumudi road to Noyyal Barrage
(via) Molagoundenpudur
1238 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 1.56
23-O-1238 km 17/2 of Mulanur - Pethampatty
- Neelangalivalasu road

1239 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 7.00


23-O-1239 m km 0/6, 0/10 of The road
branching at Km 2/4 of Udumalpet
- Komaralingam road to
Kannamanaickanur
1240 01-CRIDP-22- Dharapuram Kangayam Providing Metal Crash Barrier at 2.00
23-O-1240 km 4/2 & 7/4 of Muthur - Mulanur
road to Udayam road
1241 01-CRIDP-22- Dharapuram Udumalaipett Providing Metal Crash Barrier at 7.36
23-O-1241 ai km 8/4-8/8 of Periyapatti -
Negamam road (via) Ammapatti.
1242 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 7.00
23-O-1242 m km 0/4, 4/6 of Neelambur -
Amaravathi sugarmill road
1243 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 2.50
23-O-1243 km 2/8, 4/8 of Kilangundal -
Markampatti road (via)
Chinnamaruthur.
1244 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 6.00
23-O-1244 m km 1/2, 2/2 of
Malayandigoundanur -
Kilavunkattur road.
1245 01-CRIDP-22- Dharapuram Kangayam Providing Metal Crash Barrier at 2.00
23-O-1245 km 2/8 & 4/2 of Mettukkadai -
Moothampalayam road.
1246 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 58.74
23-O-1246 m km 0/0-1/0 of The road branching
at Km 10/2 of Udumalpet -
Chinnar road to
Chinnakumarapalayam
1247 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 10.92
23-O-1247 km 5/2,4 of
Kasilingampalayampirivu -
Bhagavankovil road (via)
Uchannavalasu

ODR Page 126 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1248 01-CRIDP-22- Dharapuram Madathukula Providing Metal Crash Barrier at 7.36


23-O-1248 m km 5/8 of Modakkupatti -
Thirumoorthi Nagar road.
1249 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 3.90
23-O-1249 km 8/2 of Puthukkottai pirivu -
Kambaliyampatty road (via)
Vellinagar
1250 01-CRIDP-22- Dharapuram Kangayam Providing Metal Crash Barrier at 4.00
23-O-1250 km 0/10, 1/2, 1/8 & 2/4 of
Moothampalayam - Oodayam road

1251 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 4.68


23-O-1251 km 9/0 of Dharapuram -
Bhagavankovil road.
1252 01-CRIDP-22- Dharapuram Kangayam Providing Metal Crash Barrier at 1.50
23-O-1252 km 2/2 of Vepampalayam -
Kagayam - Kodumudi road (via)
Muthugoundanpalayam road
1253 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 1.25
23-O-1253 km 3/4 of Mulanur - Nathapalayam
road (via) Kottaimulanur.

1254 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 1.25


23-O-1254 km 3/4 of Mallipattypirivu - Kottai
Mulanur road
1255 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 2.50
23-O-1255 km 3/2, 3/6 of Othamanthurai -
Velampoondi road.
1256 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 1.25
23-O-1256 km 5/8 of Mulanur - Vadugapatti
road.
1257 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 2.50
23-O-1257 km 0/8, 1/2 of Dharapuram -
Bhavankovil road to Elugamvalasu
road
1258 01-CRIDP-22- Dharapuram Dharapuram Providing Metal Crash Barrier at 1.25
23-O-1258 km 0/2 of Somankottai -
Kasilingampalayam road (via)
Thanneerpanthal
1259 01-CRIDP-22- Dharapuram DHARAPURA Providing Metal Crash Barrier at 3.10
23-O-1259 M km 5/2 of Dharapuram -
Mathukampalayam road.
Road Safety Total 329.42
1260 01-CRIDP-22- Dharapuram Madathukula Widening from Single Lane to 2.40 382.00
23-O-1260 m Intermediate Lane and
Strengthening at km 7/0 - 9/4 of
Poolankinar - Dhali road. including
Construction Of Retaining wall.

1261 01-CRIDP-22- Dharapuram Madathukula Widening from Single Lane to 1.10 190.00
23-O-1261 m Intermediate Lane and
Strengthening at km 4/6 - 5/7 of
Kaniyur - Myvadi - Periyakottai
road. including Cross Drainage
Works and Retaining Wall Works.

ODR Page 127 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1262 01-CRIDP-22- Dharapuram Madathukula Widening from Single Lane to 1.40 268.00
23-O-1262 m Intermediate Lane and
Strengthening at km 0/6 - 2/0 of
Kaniyur - Kadathur road including
Cross Drainage Works and
Retaining Wall Works.
1263 01-CRIDP-22- Dharapuram Kangayam Widening from Single Lane to 2.00 340.00
23-O-1263 Intermediate Lane and
Strengthening at km 0/0 - 1/7,
Strengthening at km 1/7 - 2/0 of
Mylrangam - Velapanaickenvalasu
road including Construction of Box
culvert at km 0/10 and
Construction of Retaining wall at
km 0/8,10

1264 01-CRIDP-22- Dharapuram Kangayam Widening from Single Lane to 1.00 170.00
23-O-1264 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Kangayam - Kodumudi road to
Oodayam road including
Reconstruction of Box culvert in
lieu of Existing damaged Culverts
at km 0/2, 0/4
Other Widening Total 7.90 1350.00
1265 01-CRIDP-22- Dharapuram Madathukula Strengthening at km 0/0 - 2/2 of 2.20 190.00
23-O-1265 m Karatholuvu - Komaralingam road
to Amaravathi canal road including
Cross Drainage Works and
Retaining Wall Works.
1266 01-CRIDP-22- Dharapuram Kangayam Strengthening at km 22/0 - 22/450 0.45 50.00
23-O-1266 of Mullipuram -
Bhagavathipalayam -
Silambagoundanvalasu road
Strengthening/Improvements
2.65 240.00
Total
Dharapuram Total 10.55 2752.42
1267 01-CRIDP-22- Erode Erode West Widening from Single Lane to Two 0.60 120.00
23-O-1267 Lane and Strengthening at km 0/0 -
0/6 of Erode - Sathy road to
Sadayampalayam road including
construction of storm water drain
at Km 0/4,0/6 and reconstruction
of culvert at km 0/6

CMRDP IL to DL Total 0.60 120.00


1268 01-CRIDP-22- Erode Anthiyur Providing Metal Crash Barrier at 10.00
23-O-1268 km 0/0-3/8 of
Karuppagoundenpudur road
Road Safety Total 10.00
1269 01-CRIDP-22- Erode Modakurichi Widening from Two Lane to Four 0.80 660.00
23-O-1269 Lane and Strengthening at km 2/6 -
3/4 of Erode Outer Ring road
including Widening the Pipe culvert
at km 2/10,3/4 and Widening the
slab culvert at km 3/4 ,
Construction of Protective wall at
km 2/8,10, 3/2,4

ODR Page 128 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1270 01-CRIDP-22- Erode Bhavani Widening from Single Lane to 1.40 180.00
23-O-1270 Intermediate Lane and
Strengthening at km 1/0 - 2/4 of
Singampettai - Guruvareddiyur
road including Reconstruction of
Box culvert at km 1/2,1/4(i) in
lieu of existing damaged cut stone
culvert and Reconstruction of Box
culvert at km 1/4(ii),1/8(i),18(ii) in
lieu of existing damaged pipe
culvert
1271 01-CRIDP-22- Erode Perundurai Widening from Single Lane to 5.00 420.00
23-O-1271 Intermediate Lane and
Strengthening at km 7/0 - 12/0 of
Thudupathy - Nadupatty road
including Reconstruction of culvert
at Km 7/4,8/8,9/6,9/10,10/6

1272 01-CRIDP-22- Erode Bhavani Widening from Single Lane to 3.00 320.00
23-O-1272 Intermediate Lane and
Strengthening at km 0/8 - 3/6, 4/0
- 4/2 of Nallipalayam road
including Reconstruction of Box
culvert at km 0/10 in lieu of
existing damaged cut stone culvert
and Reconstruction of Box culvert
at km 1/8,10, 2/2,4,8,10 and 3/2
in lieu of existing damaged Pipe
culvert.
Other Widening Total 10.20 1580.00
1273 01-CRIDP-22- Erode Modakurichi Reconstruction of Culvert at Km 17.00
23-O-1273 2/6 of Mullamparappu -
Mettupalayam road including lead
drain
1274 01-CRIDP-22- Erode Modakurichi Reconstruction of Box Culvert at 43.00
23-O-1274 Km 6/10, 8/8 of
Ganapathipalayam - Sivagiri road

Bridges/Culverts Total 60.00


Erode Total 10.80 1770.00
1275 01-CRIDP-22- Karur Aravakurichi Providing Metal Crash Barrier at 6.00
23-O-1275 km 0/4, 3/6, 4/6, 6/4 of
Sellivalasu pirivu - Vennaikothur
road
Road Safety Total 6.00
1276 01-CRIDP-22- Karur Aravakurichi Widening from Single Lane to 4.00 390.00
23-O-1276 Intermediate Lane and
Strengthening at km 0/0 - 4/0 of
Thottampatty-Chinnathipalayam
road including Construction of Box
culvert at km 3/2 (i), in lieu of
existing damaged Pipe culvert to
Reconstruction Box culvert at km
3/2 (ii) and Construction of
Retaining wall at km 0/10, 1/2 and
2/10

ODR Page 129 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1277 01-CRIDP-22- Karur Aravakurichi Widening from Single Lane to 1.20 95.00
23-O-1277 Intermediate Lane and
Strengthening at km 2/0 - 3/2 of
Thennilai - Mylrangam road
including construction of culvert at
km 2/4 in lieu of existing damaged
narrow pipe culvert
1278 01-CRIDP-22- Karur Aravakurichi Widening from Single Lane to 2.00 132.00
23-O-1278 Intermediate Lane and
Strengthening at km 5/0 - 7/0 of
Periyathirumangalam road
1279 01-CRIDP-22- Karur Kulithalai Widening from Single Lane to 2.60 250.00
23-O-1279 Intermediate Lane and
Strengthening at km 0/0 - 2/6 of
perur - Singapur
Road
Other Widening Total 9.80 867.00
1280 01-CRIDP-22- Karur Kulithalai Strengthening at km 0/0 - 2/0, 3/0 3.40 82.00
23-O-1280 - 4/0, 5/4 - 5/8 of Nangavaram -
Nachalur road
Strengthening/Improvements
3.40 82.00
Total
1281 01-CRIDP-22- Karur Kulithalai Construction of Box Culvert at Km 15.00
23-O-1281 0/2 of Panjapatty - Keeranur road
in lieu of Existing Pipe Culvert

Bridges/Culverts Total 15.00


Karur Total 13.20 970.00
Tiruppur Circle Total 37.95 6394.72
1282 01-CRIDP-22- Coimbatore Kavundampal Widening from Intermediate Lane 0.40 30.00
23-O-1282 ayam to Two Lane and Strengthening at
km 1/8 - 2/2 of Karupparayam
palayam - Nehru nagar road

1283 01-CRIDP-22- Coimbatore Kavundampal Widening from Intermediate Lane 2.00 230.00
23-O-1283 ayam to Two Lane and Strengthening at
km 2/6 - 4/6 of
Kondaiyampalayam- Keeranatham
road including widening of culverts
and construction of retaining wall
and Drain

1284 01-CRIDP-22- Coimbatore Kinathukadav Widening from Intermediate Lane 1.20 165.00
23-O-1284 u to Two Lane and Strengthening at
km 0/0 - 0/4, Strengthening at km
0/4 - 0/8 of Madukkarai Market to
Kurumbapalayam Road including
Construction of CD works at Km
0/2, 0/4 (i), (ii) & Km 0/8

CMRDP IL to DL Total 3.60 425.00


1285 01-CRIDP-22- Coimbatore Thondamuth Providing Junction Improvement at 150.00
23-O-1285 ur km 0/2 of Km 3/8 of Coimbatore -
Madampatti road to join at km 5/6
of Agricultural college road (via)
Veerakeralam including
Reconstruction of Box Culvert

ODR Page 130 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1286 01-CRIDP-22- Coimbatore Kavundampal Providing Road Furniture at km 9.80


23-O-1286 ayam 0/0 - 4/0 of Km 146/6 of Salem -
Cochin road to Kaikolampalayam
road
1287 01-CRIDP-22- Coimbatore Kavundampal Providing Cantilever Gantry board 6.50
23-O-1287 ayam at km 0/2 of Km 146/6 of Salem -
Cochin road to Kaikolampalayam
road
1288 01-CRIDP-22- Coimbatore Kavundampal Providing Cantilever Gantry board 6.50
23-O-1288 ayam at km 3/10 of Km 146/6 of Salem -
Cochin road to Kaikolampalayam
road
1289 01-CRIDP-22- Coimbatore Kavundampal Providing Cantilever Gantry board 6.50
23-O-1289 ayam at km 4/6 of Km 150/0 of Salem
Cochin road to Villankurichi

1290 01-CRIDP-22- Coimbatore Kavundampal Providing Cantilever Gantry board 6.50


23-O-1290 ayam at km 5/4 of Km 150/0 of Salem
Cochin road to Villankurichi

1291 01-CRIDP-22- Coimbatore Coimbatore Providing Over Head Gantry board 24.20
23-O-1291 South at km 0/2 of Km 349/4 of NGM
Road to Sivanantha Colony Road

1292 01-CRIDP-22- Coimbatore Kinathukadav Providing Metal Crash Barrier at 5.00


23-O-1292 u km 0/2 of Km 173/10 of Salem -
Cochin road to Ettimadai Railway
station road
1293 01-CRIDP-22- Coimbatore Kinathukadav Providing Metal Crash Barrier at 5.00
23-O-1293 u km 1/4 of Puthupathi to
Chinnampathi road
1294 01-CRIDP-22- Coimbatore Kinathukadav Providing Metal Crash Barrier at 5.00
23-O-1294 u km 1/2 of Km 6/8 of Palathurai
and Km 1/8 of Ettimadai Cochin
Frontier Road to Rotti
Goundenpudur Road
1295 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-O-1295 m at km 0/2 of Km 365/4 of NGM
road to No.4 Veerapandi road

1296 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50


23-O-1296 m at km 0/2 of Km 364/4 kof NGM
road to Samichettipalayam Road

1297 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50


23-O-1297 m at km 0/2 of Km 369/8 of Nagai -
Gudalur - Mysore road to
Onnipalayam pudur road
1298 01-CRIDP-22- Coimbatore Avinashi Providing Cantilever Gantry board 6.50
23-O-1298 at km 0/2 of Pongalur -
Kanuvakarai road
1299 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-O-1299 m at km 15/2 of Annur - Othimalai
road
1300 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-O-1300 m at km 3/10 of Km 2/2 of
Karamadai Kariampalayam road to
Kalipalayam (Via) Onnipalayam

ODR Page 131 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1301 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50


23-O-1301 m at km 4/6 of Km 2/2 of Karamadai
Kariampalayam road to
Kalipalayam (Via) Onnipalayam

1302 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50


23-O-1302 m at km 9/6 of Karamadai to
Koppanari (Kuliyur Pirivu) 260-
3153 Karamadai to Koppanari Road
(Pattisalai Checkpost)
1303 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-O-1303 m at km 10/8 of Karamadai to
Koppanari (Kuliyur Pirivu) 260-
3153 Karamadai to Koppanari Road
(Pattisalai Checkpost)
1304 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-O-1304 m at km 0/2 of Mettupalayam -
Kitchakattur road (Via) Moolathurai

1305 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50


23-O-1305 m at km 0/2 of Karamadai Sirumugai
Road to Bellathi road (R-38)

1306 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50


23-O-1306 m at km 0/2 of Coimbatore
Mettupalayam Road to
Chinnathottipalayam Via
Periyathottipalayam Road
1307 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-O-1307 m at km 0/2 of Onnipalayam Pudhur
Pu School to Karuparayan Kovil
road (R-173)
1308 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-O-1308 m at km 0/2 of Dayanur -
Velliankadu road
1309 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-O-1309 m at km 5/2 of Dayanur -
Velliankadu road
1310 01-CRIDP-22- Coimbatore Mettupalaya Providing Cantilever Gantry board 6.50
23-O-1310 m at km 0/2 of Suthanthirapuram
to Edaiyarpalayam Road

Road Safety Total 329.00


1311 01-CRIDP-22- Coimbatore Sulur Widening from Single Lane to 2.20 180.00
23-O-1311 Intermediate Lane and
Strengthening at km 1/0 - 3/2 of
Km 140/2 of salem - Cochin road
to Arasur (Via) Mudalipalayam

1312 01-CRIDP-22- Coimbatore Sulur Widening from Single Lane to 1.20 85.00
23-O-1312 Intermediate Lane and
Strengthening at km 0/0 - 1/2 of
Km 138/2 of Salem - Cochin Road
to Arasur including Construction of
culvert and retaining Wall

1313 01-CRIDP-22- Coimbatore Avinashi Widening from Single Lane to 1.00 60.00
23-O-1313 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Ellapalayam -
Kembanaickenpalayam road
including widening of culverts

ODR Page 132 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1314 01-CRIDP-22- Coimbatore Kinathukadav Widening from Single Lane to 2.00 210.00
23-O-1314 u Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Palathurai - Pachapalayam road
construction of CD works
1315 01-CRIDP-22- Coimbatore Avinashi Widening from Single Lane to 2.40 250.00
23-O-1315 Intermediate Lane and
Strengthening at km 0/0 - 2/4 of
Pongalur - Kanuvakarai road
Other Widening Total 8.80 785.00
1316 01-CRIDP-22- Coimbatore Kavundampal Strengthening at km 0/0 - 4/270 of 4.27 300.00
23-O-1316 ayam Km 7/10 of Thudialur -
Saravanampatty road to
Keeranatham road including
Construction of Retaining wall at
Km 2/10
1317 01-CRIDP-22- Coimbatore Kavundampal Strengthening at km 4/0 - 5/4 of 1.40 333.00
23-O-1317 ayam Km 150/0 of Salem Cochin road to
Villankurichi including
Construction of drain
Strengthening/Improvements
5.67 633.00
Total
Coimbatore Total 18.07 2172.00
1318 01-CRIDP-22- Pollachi Pollachi Widening from Intermediate Lane 1.00 125.00
23-O-1318 to Two Lane and Strengthening at
km 0/0 - 1/0 of Km.3/2 of Pollachi -
Nadupuni road to Thalakarai.
including CD works at Km 0/10

CMRDP IL to DL Total 1.00 125.00


1319 01-CRIDP-22- Pollachi Pollachi Construction of Box culvert at Km 92.00
23-O-1319 0/8 of the Road from km1/4 of
Rasakkapalayam - Karapadi road to
Vellalapalayam in lieu of existing
causeway
1320 01-CRIDP-22- Pollachi Udumalaipett Construction of Box culvert at Km 65.00
23-O-1320 ai 0/8 of Rasakkapalayam - Karapadi
road to Vellalapalayam in lieu of
existing causeway
1321 01-CRIDP-22- Pollachi Pollachi Construction of Box culvert at Km 96.00
23-O-1321 8/8 of Negamam - Erisinampatty
road in lieu of existing causeway

1322 01-CRIDP-22- Pollachi Udumalaipett Construction of Box culvert at Km 70.00


23-O-1322 ai 1/8 of Avalchinnampalayam -
Kongalappampalayam road in lieu
of existing causeway
1323 01-CRIDP-22- Pollachi Sulur Construction of Minor Bridge at Km 215.00
23-O-1323 8/6 of Senjeri puthur -
Patchagoundanpalayam road in
lieu of existing causeway
Causeway to HLB Total 538.00
1324 01-CRIDP-22- Pollachi Valparai Providing Metal Crash barrier at 46.00
23-O-1324 Km 0/4, 0/6, 0/10, 1/2, 1/4, 1/6,
1/8 and 2/4 of Stanmore -
Sirukundra road
1325 01-CRIDP-22- Pollachi Valparai Providing Metal Crash barrier at 30.00
23-O-1325 Km 3/2, 3/4, 3/6, 3/8, 4/6,
4/8,and 4/10 of Stanmore -
Sirukundra road

ODR Page 133 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1326 01-CRIDP-22- Pollachi Valparai Providing Metal Crash barrier at 48.00


23-O-1326 Km 4/4, 4/8, 5/4, 5/6, 5/10, 6/2
and 6/4 of Iyerpady to Join KM 3/8
of Stanmore -Sirukundra road

1327 01-CRIDP-22- Pollachi Valparai Providing Metal Crash barrier at 35.00


23-O-1327 Km 7/2, 7/4, 7/6, 7/10, 8/2 and
8/4 of Iyerpady to Join KM 3/8 of
Stanmore -Sirukundra road

Road Safety Total 159.00


1328 01-CRIDP-22- Pollachi Udumalaipett Widening from Single Lane to 5.00 465.00
23-O-1328 ai Intermediate Lane and
Strengthening at km 0/0 - 5/0 of
Lakshmapuram - Mamarathupatti
road. including CD works at Km
4/8
1329 01-CRIDP-22- Pollachi Kinathukadav Widening from Single Lane to 3.20 475.00
23-O-1329 u Intermediate Lane and
Strengthening at km 0/0 - 3/2 of
Periyakuili - Chetipalayam road
including Construction of Retaining
wall at km 0/2,4, 2/2 and 2/4

1330 01-CRIDP-22- Pollachi Valparai Widening from Single Lane to 1.40 250.00
23-O-1330 Intermediate Lane and
Strengthening at km 2/6 - 4/0 of
Km.2/0 of Kottur road to
Thenkaiparai (Via) Ponkaliyur.
Including Reconstruction of Culvert
at Km 2/8, 3/10, 3/4, 3/6 and
Construction of Retaining wall at
Km 2/6
1331 01-CRIDP-22- Pollachi Valparai Widening from Single Lane to 1.65 180.00
23-O-1331 Intermediate Lane and
Strengthening at km 7/2 - 8/850 of
Km.5/4 of Kottur - Thenkaiparai
road to Vettaikaranpudur.
including Reconstruction of culvert
at Km 7/8, 7/10

1332 01-CRIDP-22- Pollachi Pollachi Widening from Single Lane to 2.80 335.00
23-O-1332 Intermediate Lane and
Strengthening at km 0/0 - 2/8 of
Km.11/4 of Pollachi - Palakkad
Road to join Uthukuli -
Thappattaikilavanpudur Road.
including Construction Culvert at
Km 0/6, 1/8, 2/2 and 2/6 and
construction of retaining Wall at
km 0/10
1333 01-CRIDP-22- Pollachi Udumalaipett Widening from Single Lane to 1.83 275.00
23-O-1333 ai Intermediate Lane and
Strengthening at km 4/0 - 5/830 of
Samathur - Devanurpudur road to
Mamarathupatti. including CD
works at Km 4/2, 4/4, 4/10, 5/2,
5/6, 5/8(i), 5/8(ii) and 5/830

ODR Page 134 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1334 01-CRIDP-22- Pollachi Sulur Widening from Single Lane to 3.00 290.00
23-O-1334 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Senjeri puthur -
Patchagoundanpalayam road.
including CD works at Km 2/6
Other Widening Total 18.88 2270.00
Pollachi Total 19.88 3092.00
1335 01-CRIDP-22- Gobi Gobichettipal Construction of Retaining wall at 70.00
23-O-1335 ayam km 3/10 of Road from Km 3/6 of
Arasur Market-Nambiyur Market
road to Sundakkampalayam road

1336 01-CRIDP-22- Gobi Bhavani Providing Metal Crash Barrier at 18.00


23-O-1336 km 4/2, 5/2 of Pavandagoundanur-
Vettukirai road

1337 01-CRIDP-22- Gobi Gobichettipal Providing Metal Crash Barrier at 5.60


23-O-1337 ayam km 0/4 of Getticheyur-Nambiyur
road
1338 01-CRIDP-22- Gobi Gobichettipal Providing Metal Crash Barrier at 2.80
23-O-1338 ayam km 1/8 of Getticheyur-
Namakkalpalayam road
1339 01-CRIDP-22- Gobi Gobichettipal Providing Metal Crash Barrier at 8.00
23-O-1339 ayam km 1/8, 3/4 & 3/6 of
Gobipalayam-Alukuli road
1340 01-CRIDP-22- Gobi Gobichettipal Providing Metal Crash Barrier at 1.60
23-O-1340 ayam km 1/10 of Kurumandur-Kadathur
road
1341 01-CRIDP-22- Gobi Anthiyur Providing Cantilever Gantry board 13.00
23-O-1341 at km 2/10 and 3/2 of Pariyur -
Vellalapalayam - Kullampalayam -
Gangampalayam road

1342 01-CRIDP-22- Gobi Bhavanisagar Providing Metal Crash Barrier at 200.00


23-O-1342 km 0/0-6/0 of Dhimbam-
Thalamalai-Thalavady road
1343 01-CRIDP-22- Gobi Gobichettipal Providing Cantilever Gantry board 19.50
23-O-1343 ayam at km 0/2, 5/10, 6/2 of Modachur-
Vellalapalayam road
1344 01-CRIDP-22- Gobi Anthiyur Providing Cantilever Gantry board 6.50
23-O-1344 at km 7/8 of Gobi Town to Bhavani
River Bank road
1345 01-CRIDP-22- Gobi Anthiyur Providing Cantilever Gantry board 6.50
23-O-1345 at km 7/6 of Pudukkaraipudur-
Sanarpalayam road

1346 01-CRIDP-22- Gobi Anthiyur Providing Cantilever Gantry board 6.50


23-O-1346 at km 0/2 of Road from km 8/8 of
Gobi-Savandapur road to Meevani
road
1347 01-CRIDP-22- Gobi Gobichettipal Providing Cantilever Gantry board 6.50
23-O-1347 ayam at km 0/2 of Nagadevampalayam
road
1348 01-CRIDP-22- Gobi Gobichettipal Providing Cantilever Gantry board 6.50
23-O-1348 ayam at km 5/4 of Siruvalur-
Chettiyampalayam road

ODR Page 135 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1349 01-CRIDP-22- Gobi Anthiyur Providing Metal Crash Barrier at 47.00


23-O-1349 km 1/2-2/2 of Perunthalaiyur to
join @ km 138/8 of Ooty -
Mettupalayam - Sathy - Gobi -
Erode road
1350 01-CRIDP-22- Gobi Perundurai Providing Metal Crash Barrier at 4.00
23-O-1350 km 10/4 of Thingalore -
Moolakadai road (via) Broughnagar,
Periyagounden- valasu

1351 01-CRIDP-22- Gobi Perundurai Providing Cantilever Gantry board 6.50


23-O-1351 at km 8/2 of Perundurai-Kanjikoil
road (via) Kolathanvalasu

1352 01-CRIDP-22- Gobi Erode West Providing Cantilever Gantry board 13.00
23-O-1352 at km 0/8 of Chithode-Perode road

1353 01-CRIDP-22- Gobi Bhavani Providing Cantilever Gantry board 6.50


23-O-1353 at km 9/2 of Perunthalaiyur to join
@ km 138/8 of Ooty -
Mettupalayam - Sathy - Gobi -
Erode road
1354 01-CRIDP-22- Gobi Gobichettipal Providing Metal Crash Barrier at 12.00
23-O-1354 ayam km 0/10, 1/2 of Road from Km 3/6
of Arasur Market-Nambiyur Market
road to Sundakkampalayam road

1355 01-CRIDP-22- Gobi Bhavanisagar Providing Cantilever Gantry board 10.00


23-O-1355 at km 1/2 of Ukkaram-
Vandipalayam road (via)
Kondayampalayam
1356 01-CRIDP-22- Gobi Gobichettipal Providing Cantilever Gantry board 6.50
23-O-1356 ayam at km 0/2 of Nambiyur-
Piliyampalayam road to
Kattupalayam (via)
Palanigoundanpalayam A.D.Colony

1357 01-CRIDP-22- Gobi Gobichettipal Providing Cantilever Gantry board 6.50


23-O-1357 ayam at km 3/8 of E.Chettipalayam-
Moonampalli-chinnakosanam road

1358 01-CRIDP-22- Gobi Anthiyur Providing Cantilever Gantry board 13.00


23-O-1358 at km 0/2 and 8/2 of Road from
km 137/4 of Ooty -Mettupalayam -
Sathy - Gobi - Erode road to join at
km 40/2 of Sathy - Athani -
Bhavani road.
1359 01-CRIDP-22- Gobi Gobichettipal Providing Metal Crash Barrier at 12.00
23-O-1359 ayam km 0/6 of Kottupullampalayam AD
colony to Allukuli AD colony road
(via) Chellamuthu nagar and
Oddarkarattupalayam
Road Safety Total 508.00

ODR Page 136 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1360 01-CRIDP-22- Gobi Anthiyur Widening from Single Lane to 0.40 55.00
23-O-1360 Intermediate Lane and
Strengthening at km 3/6 - 4/0 of
Perunthalaiyur to join @ km 138/8
of Ooty - Mettupalayam - Sathy -
Gobi - Erode road including
reconstruction of culvert at Km
3/10 & Construction of Retaining
wall Works.

1361 01-CRIDP-22- Gobi Perundurai Widening from Single Lane to 1.00 135.00
23-O-1361 Intermediate Lane and
Strengthening at km 5/4 - 6/2,
Improvements at km 6/2 - 6/4 of
Chithode-Perode road to Kanjikoil
road including reconstruction of
culvert at Km 5/8, 5/10 &
Construction of Retaining wall and
Drain Works.
1362 01-CRIDP-22- Gobi Bhavanisagar Widening from Single Lane to 2.40 290.00
23-O-1362 Intermediate Lane and
Strengthening at km 12/6 - 14/0,
19/0 - 20/0 of Thalavady-
Kongahally road including
Reconstruction of Culvert at km
19/4,19/6,Construction of
Retaining wall at km 19/6
1363 01-CRIDP-22- Gobi Bhavanisagar Widening from Single Lane to 2.50 440.00
23-O-1363 Intermediate Lane and
Strengthening at km 16/0 - 18/5 of
Thalavady-Kongahally road
including Reconstruction of
Culvert at km
16/2,16/6(i),16/6(ii),16/10,17/6,1
8/2,Construction of Retaining wall
at km 16/2 and Construction of
Drain at km 17/10

1364 01-CRIDP-22- Gobi Anthiyur Widening from Single Lane to 4.60 450.00
23-O-1364 Intermediate Lane and
Strengthening at km 1/4 - 4/6,
Strengthening at km 0/0 - 1/4 of
Thanneerpandalpudur road
including Reconstruction of culvert
at km 0/4, 1/2,1/4,1/6, 1/10 (i),
1/10 (ii), 4/2, 4/6, including
Construction of Retaining wall.

1365 01-CRIDP-22- Gobi Anthiyur Widening from Single Lane to 4.00 450.00
23-O-1365 Intermediate Lane and
Strengthening at km 0/0 - 4/0 of
Pudukkaraipudur-Vellankoil road
including reconstruction of Culvert
at Km 0/8 & 3/8, Construction of
Culvert at Km 0/10 including
Construction of Retaining wall.

ODR Page 137 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1366 01-CRIDP-22- Gobi Erode West Widening from Single Lane to 3.80 575.00
23-O-1366 Intermediate Lane and
Strengthening at km 1/6 - 5/4 of
Nasiyanur-Attaiyampalayam road
including Reconstruction of culvert
at Km 1/8 (i), (ii), 2/4 (i), (ii), 3/2
(i), (ii), 3/4, 4/4, 4/6, 4/8 (i), (ii),
5/4, construction of culvert at Km
3/6, construction of Retaining wall
& Drain Works.

1367 01-CRIDP-22- Gobi Bhavani Widening from Single Lane to 3.40 440.00
23-O-1367 Intermediate Lane and
Strengthening at km 3/0 - 5/4, 5/8
- 6/4, , Improvements at km 5/4 -
5/8 of Pavandagoundanur-
Vettukirai road including
Reconstruction of culvert at Km
3/2, 4/4 (i), (ii), 4/6, widening of
culvert at Km 5/2, Construction of
Retaining wall & Drain Works

1368 01-CRIDP-22- Gobi Anthiyur Widening from Single Lane to 3.60 360.00
23-O-1368 Intermediate Lane and
Strengthening at km 0/0 - 3/6 of
Kondayampalayam-
Kanakkampalayam road including
Reconstruction of Box Culvert at
Km 0/2, 0/6, 1/2, 1/6, 2/4 and
Retaining wall at Km 1/2, 2/6

1369 01-CRIDP-22- Gobi Gobichettipal Widening from Single Lane to 2.00 190.00
23-O-1369 ayam Intermediate Lane and
Strengthening at km 1/0 - 2/0,
Improvements at km 0/0 - 1/0 of
Vaniputhur-Gunderipallam road
including Constuction of Box
culvert at Km 0/2, 1/4
Reconstruction of Box culvert at
Km 0/10, 1/2, 1/6 and
Construction of Drain at Km 0/2
and Retaining wall at Km 1/4
1370 01-CRIDP-22- Gobi Bhavanisagar Widening from Single Lane to 1.00 100.00
23-O-1370 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Ariyappampalayam to Mettur road
(Via) Ayyanar amman koil
including Construction of Box
Culvert at Km 2/6 and Retaining
wall at Km 2/2
1371 01-CRIDP-22- Gobi Bhavanisagar Widening from Single Lane to 1.00 200.00
23-O-1371 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Ikkarai Thathapalli-
Velliyampalayam road including
Reconstruction of Culvert at km
0/4, km 0/6,km 0/8 km 0/10 (i),
km 0/10 (ii), Construction of
Retaining wall at km 0/4,0/6,0/8
and Construction of productive
wall at km 0/10,1/2

ODR Page 138 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1372 01-CRIDP-22- Gobi Bhavanisagar Widening from Single Lane to 1.00 110.00
23-O-1372 Intermediate Lane and
Strengthening at km 6/0 - 7/0 of
Road from km 4/0 of Thalavady -
Kongahally road to State limit via
Susaipuram - Metalvadi - Arulvadi
road
1373 01-CRIDP-22- Gobi Gobichettipal Widening from Single Lane to 3.80 400.00
23-O-1373 ayam Intermediate Lane and
Strengthening at km 0/0 - 3/8 of
E.Chettipalayam-Moonampalli-
chinnakosanam road including
including Construction of Retaining
wall and Reconstruction of culvert
at km 0/8 & 0/10

Other Widening Total 34.50 4195.00


1374 01-CRIDP-22- Gobi Erode West Strengthening at km 1/2 - 2/4 of 1.20 125.00
23-O-1374 Chithode-Perode road including
reconstruction of culvert at Km
1/6, 1/10 and Construction of
Retaining wall
1375 01-CRIDP-22- Gobi Anthiyur Strengthening at km 0/0 - 4/4 of 4.40 503.00
23-O-1375 Road from km 8/8 of Gobi-
Savandapur road to Meevani road
including Construction of Retaining
wall
1376 01-CRIDP-22- Gobi Anthiyur Strengthening at km 0/0 - 1/8 of 1.80 135.00
23-O-1376 Kugalur-Karungaradu road
including Reconstruction of culvert
at Km 0/2,0/4, 1/8 including
Construction of Retaining wall.

1377 01-CRIDP-22- Gobi Gobichettipal Strengthening at km 11/2 - 11/6 of 0.40 55.00


23-O-1377 ayam Pillaiyarkoilthurai-E.Chettipalayam
road including reconstruction of
Culvert at km.11/4 in lieu of
existing cut stone culvert.

1378 01-CRIDP-22- Gobi Bhavanisagar Strengthening at km 5/0 - 6/2 of 1.20 110.00


23-O-1378 Kumbaragundy-Thalavady road
including Reconstruction of Culvert
at km 5/4 and Construction of
Retaining wall at km 5/4,6/2

1379 01-CRIDP-22- Gobi Gobichettipal Strengthening at km 10/0 - 10/6 of 0.60 100.00


23-O-1379 ayam Getticheyur-Nambiyur road
including Construction of Drain.

Strengthening/Improvements
9.60 1028.00
Total
1380 01-CRIDP-22- Gobi Gobichettipal Construction of Box Culvert at Km 15.00
23-O-1380 ayam 6/10 of Nadupalayam-
Thottathupalayam road
1381 01-CRIDP-22- Gobi Perundurai Reconstruction of Box Culvert at 14.00
23-O-1381 Km 5/4 of Kavandapady-
Moolakkadai road in lieu of existing
cut stone slab culvert.

ODR Page 139 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1382 01-CRIDP-22- Gobi Gobichettipal Reconstruction of Culvert at Km 20.00


23-O-1382 ayam 21/6 of Palangarai-Nambiyur road
in lieu of existing pipe culvert.

Bridges/Culverts Total 49.00


Gobi Total 44.10 5780.00
1383 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 18.00
23-O-1383 alam km 0/8, 2/2 of Kagguchi Kookal
Kookalthurai road
1384 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 24.10
23-O-1384 alam km 1/4,6,8 of Byangi Kookal road

1385 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 30.00


23-O-1385 alam km 0/2,8,10 of Kavilorai
Odayaratty road
1386 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 20.00
23-O-1386 alam km 3/4,6,8, 4/2, 5/8 of
Thummanatty T. Manihaty road
1387 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 32.00
23-O-1387 alam km 0/2,6,8,10 of Thummanatty T.
Manihatty Road Joining at Km 6/2
of Kattabettu Iduhatty Road

1388 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 23.00


23-O-1388 alam km 0/6, 1/10, 2/10, 3/10 of
Kundha Begumbella road
1389 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 35.00
23-O-1389 alam km 0/4, 0/10, 1/2, 1/4 of
B.Manihatty Thangadu Oranally
Road
1390 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 49.00
23-O-1390 alam km 2/4,8,10, 3/8, 4/2,8,10,
5/2,4,6,8 of Thankadu Edakkadu
road
1391 01-CRIDP-22- Udhagai Udhagamand Providing Metal Crash Barrier at 43.00
23-O-1391 alam km 11/8,10, 12/6,8, 13/2,4,10,
14/8 of Road branching from Km
4/2 of Thaishola Korakundah
Upper Bhavani and Joins at
Karrington Kinnakorai Iriyaseegai
road
1392 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 41.00
23-O-1392 km 2/2,6,8, 3/4 of Nihung
Pudiyangi road
1393 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 30.60
23-O-1393 km 2/10, 4/6,8,10 of Westbrooke
Byangi road
1394 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 30.00
23-O-1394 km 1/4,6,8 of Milithene Kurukathy
road
1395 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 24.00
23-O-1395 km 0/6,8,10 of Araveny Betalada
Road
1396 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 32.50
23-O-1396 km 0/4,6,8,10 of Dhimbatty road

1397 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 24.00


23-O-1397 km 0/6,8, 1/10, 2/8, 4/8 of Selas
Kolacombai road

ODR Page 140 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1398 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 12.00


23-O-1398 km 0/0-0/575 of Manjacombai
Bazaar to Manjacombai Village road

1399 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 48.00


23-O-1399 km 1/8,10, 5/0-5/6 of Adigaratty
road
1400 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 24.00
23-O-1400 km 3/0-4/0 of Kuriyamalai Berhills
road
1401 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 10.00
23-O-1401 km 1/8 of Yellanhalli Mynala road

1402 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 10.00


23-O-1402 km 3/10, 4/10 of Kekkatty
Sogathorai (Via) Kethorai road
1403 01-CRIDP-22- Udhagai Coonoor Providing Metal Crash Barrier at 16.00
23-O-1403 km 12/0-13/6 of Kaikatty
Kolacombai road
1404 01-CRIDP-22- Udhagai Gudalur Providing Metal Crash Barrier at 20.00
23-O-1404 km 2/6, 6/8, 9/6, 13/8 of Silver
jubilee road
1405 01-CRIDP-22- Udhagai Coonoor Construction of Retaining wall at 330.00
23-O-1405 km 2/2,4,6,8,10 of Catherine Falls
road including CC Drain
Road Safety Total 926.20
1406 01-CRIDP-22- Udhagai Udhagamand Widening from Single Lane to 2.60 650.00
23-O-1406 alam Intermediate Lane and
Strengthening at km 5/0 - 7/6 of
Adashola Ebbanadu road including
CC Drain, CD works and Protective
Works
Other Widening Total 2.60 650.00
1407 01-CRIDP-22- Udhagai Coonoor Strengthening at km 3/4 - 4/8 of 1.40 150.00
23-O-1407 Yellanhalli Mynala road including
CD works and Protective works

1408 01-CRIDP-22- Udhagai Coonoor Strengthening at km 0/0 - 2/0 of 2.00 122.00


23-O-1408 Catherine Falls Road including
protective works
1409 01-CRIDP-22- Udhagai Udhagamand Strengthening at km 6/6 - 9/6 of 3.00 359.00
23-O-1409 alam Hullathi road including CC Drain,
CD Works and Protective works

Strengthening/Improvements
6.40 631.00
Total
1410 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 35.00
23-O-1410 alam km 6/2 of Dhavani road

1411 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 35.00


23-O-1411 alam km 6/4 of Dhavani road

1412 01-CRIDP-22- Udhagai Udhagamand Reconstruction of Culvert at Km 75.00


23-O-1412 alam 0/4 of Kavilorai Odayaratty road
including Protective works
1413 01-CRIDP-22- Udhagai Udhagamand Reconstruction of Box Culvert at 45.00
23-O-1413 alam Km 8/8 of Kagguchi Kookal
Kookalthurai road including
Protective works

ODR Page 141 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1414 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 35.00


23-O-1414 alam km 0/8 of Denaducombai Kavilorai
road
1415 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 65.00
23-O-1415 alam km 0/8 of B. Manihatty road

1416 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 30.00


23-O-1416 alam km 0/6 of Kilkowatty road

1417 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 30.00


23-O-1417 alam km 1/2 of Melkundha Bikkatty
Emerald road
1418 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 110.00
23-O-1418 alam km 1/2, 1/4 of Palada Lovedale
road
1419 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 45.00
23-O-1419 alam km 2/6 of Palada Lovedale road

1420 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 50.00


23-O-1420 km 2/10 of Yellanhalli Mynala road
including CC Drain
1421 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 50.00
23-O-1421 km 1/2 of Kaikatty Kolacombai
road
1422 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 49.00
23-O-1422 km 0/4 of Dhimbatty road

1423 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 49.00


23-O-1423 km 4/6 of Westbrooke Byangi road

Flood Permanent Total 703.00


1424 01-CRIDP-22- Udhagai Coonoor Reconstruction of Culvert at Km 45.00
23-O-1424 7/6 of Marvala road

1425 01-CRIDP-22- Udhagai Udhagamand Construction of Box Culvert at Km 90.00


23-O-1425 alam 9/6 of Kagguchi Kookal
Kookalthurai road Including
Protective works
Bridges/Culverts Total 135.00
1426 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 190.00
23-O-1426 alam km 1/8 & 1/10 of M. Palda B.
Manihatty (Via) Kallakoraihada
Gandhinagar road Including CC
Drain
1427 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 200.00
23-O-1427 alam km 1/10, 2/2 & 3/10 of Palada
Lovedale road CC Drain
1428 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 100.00
23-O-1428 alam km 0/4 of Palada Kallakorai road
including CD works, CC drain and
interlocking Paverblock pavement
at water logging low lying swamp
portion
1429 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 250.00
23-O-1429 km 0/2,10, 1/4, 2/4 - 2/8 of
Kaikatty Kolacombai road including
CC Drain at Km 0/2-0/8

ODR Page 142 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1430 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 140.00


23-O-1430 km 1/2 of Lovedale Ketty (via)
Achanakkal road Including CC
Drain at Km 1/0 - 1/4
1431 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 234.00
23-O-1431 km 8/8 & 9/4-10/2 of Dolphin
Nose road including CC Drain &
Interlocking Paverblock Pavement.

1432 01-CRIDP-22- Udhagai Coonoor Construction of Drain at km 0/4 of 50.00


23-O-1432 Selas Kolacombai road including
Protective works
1433 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 160.00
23-O-1433 km 14/8, 15/8,10 & 16/2 of
Kattery Selas (Via) Hulickal
Nonsuch road including CC Drain

1434 01-CRIDP-22- Udhagai Udhagamand Construction of Protective wall at 120.00


23-O-1434 alam km 0/2, 1/6 & 1/8 of B.Manihatty
Thangadu Oranally Road including
CC Drain
1435 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 180.00
23-O-1435 km 0/2, 2/4,6 of Milithene
Kurukathy road including CC
Drain at Km 1/10, 2/2,8
1436 01-CRIDP-22- Udhagai Coonoor Construction of Protective wall at 285.00
23-O-1436 km 5/2,4,6,8,10 of Kotagiri
Milithene Beragany road including
CC Drain at Km 5/0 - 7/4

Others Total 1909.00


Udhagai Total 9.00 4954.20
Coimbatore Circle Total 91.05 15998.20
1437 01-CRIDP-22- Trichy Lalgudi Strengthening at km 1/2 - 3/2 of 2.00 245.00
23-O-1437 Sembaraiodai -Komakkudy Road
including Reconstruction of Culvert
at km 1/4, 1/6, 1/8, 2/0, 2/2,
2/4, 2/6
1438 01-CRIDP-22- Trichy Thuraiyur Strengthening at km 0/0 - 1/6 of 1.60 153.00
23-O-1438 Musiri-Thuraiyur-Athur Road to
Kollampatty Road (Via)Mathurapuri
Road including Reconstruction of
Box Culvert at km 1/2,
Construction of Protective wall at
km 1/2,1/4 Construction of Drain
at km 0/10

1439 01-CRIDP-22- Trichy Musiri Strengthening at km 3/0 - 4/0 of 1.00 74.00


23-O-1439 Appanallur-Kamalapuram Road
(Via)Ammankudy
Strengthening/Improvements
4.60 472.00
Total
Trichy Total 4.60 472.00
1440 01-CRIDP-22- Tanjavur Papanasam Widening from Intermediate Lane 0.60 75.00
23-O-1440 to Two Lane and Strengthening at
km 1/6 - 2/2 of Papanasam -
Kabisthalam road

CMRDP IL to DL Total 0.60 75.00

ODR Page 143 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1441 01-CRIDP-22- Tanjavur Pattukkottai Widening from Single Lane to 2.40 365.00
23-O-1441 Intermediate Lane and
Strengthening at km 12/0 - 14/4 of
Pinnayur - Enathi road including
reconstruction of Culvert at Km
14/2 and construction of Retaining
wall at km 13/2, 13/4

1442 01-CRIDP-22- Tanjavur Thiruvaiyaru Widening from Single Lane to 1.20 190.00
23-O-1442 Intermediate Lane and
Strengthening at km 0/0 - 1/2 of
Puthukudi - Rayamundanpatti
road including Reconstruction of
box culvert at km 0/4 (i), 0/4 (ii),
0/6
1443 01-CRIDP-22- Tanjavur Papanasam Widening from Single Lane to 1.80 300.00
23-O-1443 Intermediate Lane and
Strengthening at km 5/4 - 7/2 of
Manalur - Veeramangudy -
Someshwarapuram road including
reconstruction of culvert at Km Km
5/6, 6/2(i), (ii), 7/2 and
construction of Retaining wall at
Km 6/2
1444 01-CRIDP-22- Tanjavur Thiruvidaima Widening from Single Lane to 1.40 220.00
23-O-1444 rudur Intermediate Lane and
Strengthening at km 0/0 - 1/4 of
Vannakudi Village road including
reconstruction of culvert at km
0/8, 1/4
1445 01-CRIDP-22- Tanjavur Thiruvidaima Widening from Single Lane to 1.80 270.00
23-O-1445 rudur Intermediate Lane and
Strengthening at km 0/0 - 1/8 of
Koothanur - Keelasooriyamulai
Road including reconstruction of
culvert at km 0/6, 0/8, 3/6

1446 01-CRIDP-22- Tanjavur Papanasam Widening from Single Lane to 1.00 100.00
23-O-1446 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Ayyampettai - Agaramangudy road

1447 01-CRIDP-22- Tanjavur Thiruvidaima Widening from Single Lane to 1.20 162.00
23-O-1447 rudur Intermediate Lane and
Strengthening at km 3/6 - 4/8 of
Nagarasampettai road including
Reconstruction of culvert at km
4/2, 4/4
1448 01-CRIDP-22- Tanjavur Thiruvaiyaru Widening from Single Lane to 1.20 217.00
23-O-1448 Intermediate Lane and
Strengthening at km 4/4 - 5/6 of
Mehalathur - Pathalapettai road
including Reconstruction Box
culvert at km 4/8, 5/2, 5/4 (i) and
Junction Improvement at km 5/4

ODR Page 144 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1449 01-CRIDP-22- Tanjavur Thiruvaiyaru Widening from Single Lane to 1.20 180.00
23-O-1449 Intermediate Lane and
Strengthening at km 3/2 - 4/4 of
Mehalathur - Pathalapettai road
including Reconstruction of Box
culvert at km 3/8, 4/4 (ii) and
Construction of Retaining wall at
km 3/4
1450 01-CRIDP-22- Tanjavur Orathanadu Widening from Single Lane to 0.80 185.00
23-O-1450 Intermediate Lane and
Strengthening at km 15/2 - 16/0 of
Grand anaicut canal bank road
including Junction improvement at
Km 15/6 and Construction of
Retaining wall at km 15/4 ,15/6,
15/8, 15/10
1451 01-CRIDP-22- Tanjavur Peravurani Widening from Single Lane to 2.00 330.00
23-O-1451 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Perumagalur - Athani road
including Reconstruction of Culvert
at km 0/2, 0/4(i),(ii), 1/2, 1/4,
1/10
1452 01-CRIDP-22- Tanjavur Peravurani Widening from Single Lane to 1.00 140.00
23-O-1452 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Perumagalur - Athani road
including Reconstruction of culvert
at km 2/2,2/8
1453 01-CRIDP-22- Tanjavur Orathanadu Widening from Single Lane to 0.80 200.00
23-O-1453 Intermediate Lane and
Strengthening at km 1/2 - 2/0 of
Akkaraivattam -
Dhakshnamoorthypuram road
including Reconstruction of Culvert
at km 1/4(i),(ii), 1/6, 1/10, and
Construction of retaining wall at
km 1/6,10
1454 01-CRIDP-22- Tanjavur Thiruvidaima Widening from Single Lane to 3.40 563.00
23-O-1454 rudur Intermediate Lane and
Strengthening at km 0/0 - 3/4 of
Thiruneelakkudy - Kadalangudy
road including Reconstruction of
Box Culvert at km 1/4, 3/2 (i),(ii),
3/4 (i), (ii), and Construction of
RCC Retaining Wall at km 0/10

1455 01-CRIDP-22- Tanjavur Thiruvaiyaru Widening from Single Lane to 4.84 815.00
23-O-1455 Intermediate Lane and
Strengthening at km 6/4 - 11/235
of Road branching from K.M 3/10
of Vallam - Kallaperambur road to
Singaperumalkulam Municipal
limit. including Reconstruction of
Culvert at km 6/6,6/8,7/2 (i),(ii),
7/6 ,7/8, 8/4, 8/6, 8/10, 9/8,
10/2, 10/6 and Construction of
Retaining Wall at km 8/6, 10/2 &
10/4

Other Widening Total 26.04 4237.00

ODR Page 145 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1456 01-CRIDP-22- Tanjavur Thiruvaiyaru Strengthening at km 1/6 - 2/6 of 1.00 304.00


23-O-1456 Vennar - Vettar regulater head to
Palliyagraharam road including
Construction of Retaining wall Km
1/10, 2/4, 2/6 and
Reconstruction of box culvert at
Km 1/8 , 1/10
Strengthening/Improvements
1.00 304.00
Total
1457 01-CRIDP-22- Tanjavur Thiruvidaima Reconstruction of Box Culvert at 35.00
23-O-1457 rudur Km 0/2,0/6 of Aduthurai -
Majamalli road
Bridges/Culverts Total 35.00
Tanjavur Total 27.64 4651.00
1458 01-CRIDP-22- Pudukottai Gandarvakott Reconstruction of Minor Bridge at 220.00
23-O-1458 ai Km 1/8 of Nayakkarpatti - Pachoor
Road in lieu of existing causeway

1459 01-CRIDP-22- Pudukottai Aranthangi Reconstruction of Minor Bridge at 280.00


23-O-1459 Km 3/4 of Muthuvalarkudi -
Pattamudayan road in lieu of
existing causeway
Causeway to HLB Total 500.00
1460 01-CRIDP-22- Pudukottai Gandarvakott Providing Junction Improvement at 101.00
23-O-1460 ai km 10/8 of Vellanur - Puthambur
road
Road Safety Total 101.00
1461 01-CRIDP-22- Pudukottai Alangudi Widening from Single Lane to 4.00 510.00
23-O-1461 Intermediate Lane and
Strengthening at km 0/0 - 4/0 of
Alangudi - Arimalam road
including Reconstruction of Box
culvert at Km 0/2 & 3/4 and
Construction of Retaining wall at
Km 2/6 & 2/8
1462 01-CRIDP-22- Pudukottai Pudukkottai Widening from Single Lane to 1.40 340.00
23-O-1462 Intermediate Lane and
Strengthening at km 2/4 - 3/8 of
Km 124/6 of Perambalur -
Manamadurai road to meet
Pudukkottai - Budhalur road (v)
Mullur including reconstruction of
Box culvert at Km 2/10, 3/4(ii),
3/6, and Construction of Retaining
wall at Km 2/8, 2/10, 3/4, 3/6,3/8

1463 01-CRIDP-22- Pudukottai Pudukkottai Widening from Single Lane to 2.00 290.00
23-O-1463 Intermediate Lane and
Strengthening at km 10/0 - 12/0 of
Adhanakkottai - Alangudi road
including reconstruction of box
culvert at km 11/2 and
construction of retaining wall at
Km11/4, 11/6

ODR Page 146 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1464 01-CRIDP-22- Pudukottai Gandarvakott Widening from Single Lane to 1.00 200.00
23-O-1464 ai Intermediate Lane and
Strengthening at km 1/0 - 2/0 of
Thirukattuppalli - Sengipatti -
Pattukkottai road to
Kaliyaranviduthy road including
reconstruction of box culvert at
km1/2, 1/4, 1/6, 1/8 and
construction of retaining wall at
km 1/4
1465 01-CRIDP-22- Pudukottai Gandarvakott Widening from Single Lane to 2.00 250.00
23-O-1465 ai Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
T.S.P road to Ambukoil road
including reconstruction of box
culvert at km0/6, 1/4, 1/6
1466 01-CRIDP-22- Pudukottai Gandarvakott Widening from Single Lane to 1.00 215.00
23-O-1466 ai Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Paravettivayal road including
reconstruction of box culvert at Km
0/2,4,8
1467 01-CRIDP-22- Pudukottai Alangudi Widening from Single Lane to 1.00 120.00
23-O-1467 Intermediate Lane and
Strengthening at km 19/0 - 20/0 of
km 12/2 of Pudukkottai -
Pattukkottai road to Venkatakulam
road including reconstruction of
box culvert at Km 19/2

1468 01-CRIDP-22- Pudukottai Pudukkottai Widening from Single Lane to 1.00 100.00
23-O-1468 Intermediate Lane and
Strengthening at km 17/0 - 18/0 of
Adhanakkottai - Alangudi road

1469 01-CRIDP-22- Pudukottai Alangudi Widening from Single Lane to 3.00 399.00
23-O-1469 Intermediate Lane and
Strengthening at km 2/0 - 5/0 of
Alangudi - Alangadu road
including reconstruction of box
culvert at Km3/8, 3/10, 4/10
Other Widening Total 16.40 2424.00
1470 01-CRIDP-22- Pudukottai Thirumayam Strengthening at km 0/0 - 2/490 of 2.49 170.00
23-O-1470 Km 0/8 of Vairavanpatti road to
nallavanpatti road (v)
Vedathalampatti

1471 01-CRIDP-22- Pudukottai Aranthangi Strengthening at km 6/4 - 6/8 of 0.40 30.00


23-O-1471 Venthiyangudi -
Krishnanjipattinam road
1472 01-CRIDP-22- Pudukottai Alangudi Strengthening at km 4/440 - 5/2 of 0.76 55.00
23-O-1472 Km 6/8 of Chithathikadu -
Keeramngalam road to Neivathali
(v) Kodikarambai
1473 01-CRIDP-22- Pudukottai Thirumayam Strengthening at km 7/0 - 8/0 of 1.00 105.00
23-O-1473 km 153/2 of Perambalur -
Manamadurai road to Rangiyum
road

ODR Page 147 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1474 01-CRIDP-22- Pudukottai Aranthangi Strengthening at km 0/0 - 1/0 of 1.00 120.00


23-O-1474 Aranthangi - Puduppatti road to
kongudi road including
reconstruction of culverts at km
0/8(i),0/8(ii)
Strengthening/Improvements
5.65 480.00
Total
Pudukottai Total 22.05 3505.00
1475 01-CRIDP-22- Tiruvarur Nannilam Widening from Single Lane to 2.30 295.00
23-O-1475 Intermediate Lane and
Strengthening at km 6/8 - 9/1 of
Kadalangudi - Kodavasal road
including Reconstruction of Culvert
at Km.7/4
1476 01-CRIDP-22- Tiruvarur Thiruvarur Widening from Single Lane to 2.20 355.00
23-O-1476 Intermediate Lane and
Strengthening at km 0/0 - 2/2 of
Perumpannaiyur Engan road
including Reconstruction of Culvert
at Km.1/4 and Construction of
Retaining wall at Km.1/6, 1/8,
1/10
1477 01-CRIDP-22- Tiruvarur Thiruvarur Widening from Single Lane to 1.40 175.00
23-O-1477 Intermediate Lane and
Strengthening at km 5/0 - 6/4 of
Vadapathimangalam - Kottur road
including Reconstruction of Box
Culvert at Km 5/4
1478 01-CRIDP-22- Tiruvarur Thiruvarur Widening from Single Lane to 2.06 383.00
23-O-1478 Intermediate Lane and
Strengthening at km 2/0 - 4/06 of
Velukkudi - Vadapathimangalam
road including Reconstruction of
Box culvert at Km.2/2 (i) (ii),
2/6,2/10

1479 01-CRIDP-22- Tiruvarur Nannilam Widening from Single Lane to 2.10 385.00
23-O-1479 Intermediate Lane and
Strengthening at km 6/0 - 8/1 of
Manakkal - Achuthamangalam -
Vayalur road including
Reconstruction of Box culvert at
Km.6/2, 7/2, 7/10 and Retaining
wall at Km.7/10

Other Widening Total 10.06 1593.00


1480 01-CRIDP-22- Tiruvarur Nannilam Strengthening at km 0/0 - 1/4 of 1.40 96.00
23-O-1480 Velangudi -Orugalpadagam road

Strengthening/Improvements
1.40 96.00
Total
Tiruvarur Total 11.46 1689.00
1481 01-CRIDP-22- Nagapattinam Kilvelur Widening from Single Lane to 2.40 325.00
23-O-1481 Intermediate Lane and
Strengthening at km 1/6 - 4/0 of
Pirathabaramapuram Village Road

1482 01-CRIDP-22- Nagapattinam Vedaranyam Widening from Single Lane to 5.20 590.00
23-O-1482 Intermediate Lane and
Strengthening at km 2/0 - 7/2 of
Thalainayar - Umbalacherry Road

ODR Page 148 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

Other Widening Total 7.60 915.00


1483 01-CRIDP-22- Nagapattinam Nagapattinam Strengthening at km 2/0 - 3/0 of 1.00 118.00
23-O-1483 Nagore - Aliyur Road

1484 01-CRIDP-22- Nagapattinam Kilvelur Strengthening at km 1/4 - 2/0 of 0.60 52.00


23-O-1484 Kargudy Village Road

Strengthening/Improvements
1.60 170.00
Total
1485 01-CRIDP-22- Nagapattinam Kilvelur Reconstruction of Box Culvert at 25.00
23-O-1485 Km 0/2 of Puthupalli Road

Bridges/Culverts Total 25.00


Nagapattinam Total 9.20 1110.00
1486 01-CRIDP-22- Mayiladuthur Mayiladuthur Widening from Single Lane to 1.00 185.00
23-O-1486 ai ai Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Vikraman Right Bank Road
including Construction of Retaining
wall at KM.0/6-0/10
1487 01-CRIDP-22- Mayiladuthur Poompuhar Widening from Single Lane to 2.00 275.00
23-O-1487 ai Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Kiliyanur Village Road including
Reconstruction of Box culvert at
Km.1/8 and Construction of drain
at km.1/6-1/8

Other Widening Total 3.00 460.00


1488 01-CRIDP-22- Mayiladuthur Poompuhar Strengthening at km 2/2 - 5/3 of 3.10 285.00
23-O-1488 ai Arivelur - Velur Road including
Construction of Retaining wall at
Km.5/2-5/3
1489 01-CRIDP-22- Mayiladuthur Sirkazhi Strengthening at km 0/0 - 2/0 of 2.00 223.00
23-O-1489 ai Road branching from km 9/4 of
Sattanathapuram - Thiruvenkadu -
Melaiyur road to
Chinnaperunthottam including
Reconstruction of Culvert at Km
0/4,0/6(i),0/6(ii),0/10 including
Construction of Retaining wall at
km 0/4.
1490 01-CRIDP-22- Mayiladuthur Sirkazhi Construction of C.C. Pavement at 0.19 220.00
23-O-1490 ai km 7/330 - 7/515 of Allivilagam -
Ilayamathukoodam Road including
Construction of culvert at km 7/6,
Drain at km 7/330 - 7/515 and
Construction of paver block at km
7/330 - 7/515

ODR Page 149 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1491 01-CRIDP-22- Mayiladuthur Mayiladuthur Strengthening at km 1/6 - 4/0 of 2.40 188.00


23-O-1491 ai ai Thalainayar - Kondal Road
including Reconstruction of culvert
at km 2/2
Strengthening/Improvements
7.69 916.00
Total
1492 01-CRIDP-22- Mayiladuthur Sirkazhi Reconstruction of Culvert at km 45.00
23-O-1492 ai 0/10, 1/8 & 2/2 of Mangaimadam -
Thirunagari Road

1493 01-CRIDP-22- Mayiladuthur Poompuhar Reconstruction of Box Culvert at 43.00


23-O-1493 ai km 3/8, 3/10 (i), 3/10 (ii) of
Konerirajapuram - Eachankudy
Road
1494 01-CRIDP-22- Mayiladuthur Sirkazhi Reconstruction of Box Culvert at 45.00
23-O-1494 ai km 6/2(i), 6/2(ii), 7/8 of Edamanal
- Nallur Road
Bridges/Culverts Total 133.00
Mayiladuthurai Total 10.69 1509.00
Trichy Circle Total 85.63 12936.00
1495 01-CRIDP-22- Madurai Melur Construction of Retaining wall at 72.00
23-O-1495 km 6/4 of Therkutheru - Andipatti
road
Road Safety Total 72.00
1496 01-CRIDP-22- Madurai Melur Widening from Single Lane to 3.00 400.00
23-O-1496 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Kottampatti-Thonthilingapuram
road including Reconstruction of
Culverts at km 0/2,0/6,0/10 and
widening of culvert at km 1/10 and
Construction of Retaining wall.

1497 01-CRIDP-22- Madurai Thirumangala Widening from Single Lane to 2.80 414.00
23-O-1497 m Intermediate Lane and
Strengthening at km 0/2 - 3/0 of
Anuppapatti-Veerampatti (via)
Sorikkampatti road including
Reconstruction of culverts
1498 01-CRIDP-22- Madurai Usilampatti Widening from Single Lane to 2.70 325.00
23-O-1498 Intermediate Lane and
Strengthening at km 0/0 - 2/7 of
Sedapatti-Kethuvarpatti road (via)
Jambalapuram road including
Reconstruction of Culvert at km
0/6 and construction of drain

1499 01-CRIDP-22- Madurai Sholavandan Widening from Single Lane to 2.80 415.00
23-O-1499 Intermediate Lane and
Strengthening at km 0/0 - 2/8 of
Vadipatti Railway Feeder road
including Reconstruction of Culvert
at Km 1/2, 1/4, 1/6, 2/2, 2/4,
2/6, 2/8 and Construction of
Retaining Wall at Km 0/2.

ODR Page 150 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1500 01-CRIDP-22- Madurai Sholavandan Widening from Single Lane to 2.00 255.00
23-O-1500 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Kuruvithurai-Vallabarkoil road
including Reconstruction of Culvert
at Km 1/2 and Construction of
Drain at Km 0/4.

1501 01-CRIDP-22- Madurai Sholavandan Widening from Single Lane to 1.20 200.00
23-O-1501 Intermediate Lane and
Strengthening at km 0/6 - 1/8 of
Neerathan village road including
Reconstruction of Culvert at Km
0/10(i), 0/10(ii), 1/6.

1502 01-CRIDP-22- Madurai Madurai East Widening from Single Lane to 1.00 175.00
23-O-1502 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Andarkottaram-Sakkimangalam
road including CD Works and
Protective Works.
1503 01-CRIDP-22- Madurai Usilampatti Widening from Single Lane to 1.60 275.00
23-O-1503 Intermediate Lane and
Strengthening at km 0/0 -1/6 of
Buskkaranpatti - Kakkiveeranpatti
road including Reconstruction
Culverts at 0/4, 0/6, 0/6(ii).

1504 01-CRIDP-22- Madurai Madurai East Widening from Single Lane to 1.45 306.00
23-O-1504 Intermediate Lane and
Strengthening at km 1/8 - 3/0, 3/4
- 3/650 of Lakshmipuram-
Kidaripatti road including CD
Works and Protective Works.
Other Widening Total 18.55 2765.00
1505 01-CRIDP-22- Madurai Sholavandan Strengthening at km 0/0 - 2/4 of 2.40 195.00
23-O-1505 Vagaikulam road including
Construction of CD works
1506 01-CRIDP-22- Madurai Sholavandan Strengthening at km 0/0 - 1/2 of 1.20 102.00
23-O-1506 Vikkiramangalam-Narayanapuram
road
Strengthening/Improvements
3.60 297.00
Total
1507 01-CRIDP-22- Madurai Melur Reconstruction of Minor Bridge at 82.00
23-O-1507 Km 1/6 of Keeranur road

1508 01-CRIDP-22- Madurai Thirumangala Reconstruction of Culvert at Km 17.00


23-O-1508 m 3/4 of Sivarakkottai-S.P.Natham
road
1509 01-CRIDP-22- Madurai Thirumangala Reconstruction of Culvert at Km 12.00
23-O-1509 m 1/8 of Kallikudi-Kallupatti road to
Vellakulam-Thennamanallur road
(via) Pallapacheri, Kallikudi village

1510 01-CRIDP-22- Madurai Usilampatti Reconstruction of Culvert at Km 48.00


23-O-1510 4/8,5/6,6/6 of Sindupatti-
Nattamangalam road
Bridges/Culverts Total 159.00

ODR Page 151 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1511 01-CRIDP-22- Madurai Thirumangala Construction of Breast wall at km 50.00


23-O-1511 m 4/8,10, 5/2 of Kavattinaickanpatti-
Lakshmipuram road

Others Total 50.00


Madurai Total 22.15 3343.00
1512 01-CRIDP-22- Theni Bodinayakan Providing Metal Crash Barrier at 20.00
23-O-1512 ur km 0/4-1/2 of Sothuparai -
Agamalai Road
1513 01-CRIDP-22- Theni Andipatti Providing Metal Crash Barrier at 20.00
23-O-1513 km 31/10, 32/2,4 of Chinnamanur
- Iravangalar road (via) Megamalai

1514 01-CRIDP-22- Theni Andipatti Providing Metal Crash Barrier at 3.80


23-O-1514 km 6/0-7/0 of Kadamalaikundu -
Vellimalai road
1515 01-CRIDP-22- Theni Andipatti Providing Metal Crash Barrier at 6.20
23-O-1515 km 2/0-3/0 of Kamankallu -
Combaithozhu road
1516 01-CRIDP-22- Theni Andipatti Providing Metal Crash Barrier at 3.80
23-O-1516 km 1/6, 2/10 of Balacombai road

Road Safety Total 53.80


1517 01-CRIDP-22- Theni Cumbum Widening from Single Lane to 3.40 402.00
23-O-1517 Intermediate Lane and
Strengthening at km 0/6 - 4/0 of
Odaipatty - Thenpalani road
including Construction of Retaining
wall
1518 01-CRIDP-22- Theni Cumbum Widening from Single Lane to 5.00 585.00
23-O-1518 Intermediate Lane and
Strengthening at km 0/0 - 2/0, 3/0
- 6/0 of Thevaram -
Lakshminaickan patty road (via)
Thamminaickan patty including
Reconstruction of culvert at km
0/2, 1/4, 1/10, 3/8, Widening the
culvert at km 4/10, construction of
Retaining wall , Toe wall and Drain
.
1519 01-CRIDP-22- Theni Periyakulam Widening from Single Lane to 2.60 255.00
23-O-1519 Intermediate Lane and
Strengthening at km 0/3 - 2/4
Strengthening at km 0/0 - 0/3, 3/2
- 3/4 of Vadukapatty -
Kamatchipuram road
Other Widening Total 11.00 1242.00
1520 01-CRIDP-22- Theni Bodinayakan Strengthening at km 1/4 - 3/4 of 2.00 170.00
23-O-1520 ur Govinthanagaram -
Venkitachalapuram road
1521 01-CRIDP-22- Theni Andipatti Strengthening at km 0/0 - 2/0, 3/0 3.12 209.80
23-O-1521 - 4/120 of Jambuliputthur -
Renganathapuram road (via)
Rengasamuthiram including
construction of retainingwall and
drain

ODR Page 152 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1522 01-CRIDP-22- Theni Andipatti Strengthening at km 1/0 - 2/2 of 1.20 62.00


23-O-1522 M.Suppulapuram road

Strengthening/Improvements
6.32 441.80
Total
1523 01-CRIDP-22- Theni Cumbum Reconstruction of Box Culvert at 10.00
23-O-1523 Km 0/2 of T.Mettupatty -
Sakkulatthu Mettu road
1524 01-CRIDP-22- Theni Bodinayakan Reconstruction of Box Culvert at 12.00
23-O-1524 ur Km 1/4 of Thimminaickanpatty -
Solaimanaickanpatty road (via)
Pudukottai
1525 01-CRIDP-22- Theni Andipatti Construction of Box Culvert at 67.00
23-O-1525 0/10 of Ethakovil - Maravapatty
road including Well Protective wall
at km 0/2 and Construction of
Drain
Bridges/Culverts Total 89.00
Theni Total 17.32 1826.60
1526 01-CRIDP-22- Dindigul Palani Providing Metal Crash Barrier at 100.00
23-O-1526 km 1/8,10, 2/2, 3/2, 4/4,8 of
Goshen - Kilavarai Road
1527 01-CRIDP-22- Dindigul Palani Providing Metal Crash Barrier at 100.00
23-O-1527 km 5/4, 6/4,6, 7/2,4,8 of Goshen -
Kilavarai Road
1528 01-CRIDP-22- Dindigul Palani Providing Metal Crash Barrier at 100.00
23-O-1528 km 8/8, 9/2,6 of Goshen -
Kilavarai Road
1529 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 45.00
23-O-1529 km 1/6 of Mannavanur Village
Road
1530 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 45.00
23-O-1530 km 5/2,4 of Vilpatti Village Road

1531 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 100.00


23-O-1531 km 16/6 of Periyakulam -
Kodaikkanal road (via) Adukkam
1532 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 75.00
23-O-1532 km 12/6, 13/4, 14/6,10, 15/6 of
Periyakulam - Kodaikkanal road
(via) Adukkam
1533 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 100.00
23-O-1533 km 18/2, 19/2, 20/4,8, 21/8,
22/2 of Periyakulam - Kodaikkanal
road (via) Adukkam
1534 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 75.00
23-O-1534 km 25/8, 29/4,6, 33/6, 34/8 of
Periyakulam - Kodaikkanal road
(via) Adukkam
1535 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 280.00
23-O-1535 km 18/10 of Periyakulam -
Kodaikkanal road (via) Adukkam
Road Safety Total 1020.00

ODR Page 153 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1536 01-CRIDP-22- Dindigul Natham Widening from Single Lane to 2.00 540.00
23-O-1536 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Avilipatti Road including
Construction of Retaining wall km
1/4,1/6 Re-Construction of culvert
at km 0/2,8,10, 1/4,6,8, and
Construction of Drain at km 0/4,6

1537 01-CRIDP-22- Dindigul Natham Widening from Single Lane to 1.00 270.00
23-O-1537 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Avilipatti Road including
Construction of Retaining wall at
km 2/4,2/6 , Construction of
Drain at km 2/8 and
Reconstruction of culvert at km
2/4(i), (ii), 2/6
Other Widening Total 3.00 810.00
1538 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 200.00
23-O-1538 km 17/2 of Periyakulam -
Kodaikkanal road (via) Adukkam
1539 01-CRIDP-22- Dindigul Palani Construction of Retaining wall at 30.00
23-O-1539 km 6/4,6 of Poolathur Village Road

Flood Permanent Total 230.00


1540 01-CRIDP-22- Dindigul Natham Construction & Reconstruction of 185.00
23-O-1540 Box Culvert at 0/4, 3/8 (i), (ii) of
Gopalpatti- Silvarpatti Road
including Construction of
Retaining Wall at Km 0/10, 1/2,
3/8 and 4/10
1541 01-CRIDP-22- Dindigul Athoor Reconstruction of Box Culvert at 18.00
23-O-1541 Km 1/6 of Puliyarajakkapatti -
Pudupatti Road
1542 01-CRIDP-22- Dindigul Athoor Reconstruction of Box Culvert at 18.00
23-O-1542 Km 2/8 of Puliyarajakkapatti -
Pudupatti Road
1543 01-CRIDP-22- Dindigul Athoor Reconstruction of Box Culvert at 18.00
23-O-1543 Km 3/6 of Puliyarajakkapatti -
Pudupatti Road
Bridges/Culverts Total 239.00
Dindigul Total 3.00 2299.00
1544 01-CRIDP-22- Palani Oddanchatra Reconstruction of Minor Bridge at 130.00
23-O-1544 m Km 0/8 of Veppan Valasu Village
Road
1545 01-CRIDP-22- Palani Athoor Reconstruction of Box Culvert at 40.00
23-O-1545 Km 0/8 of Puduchatram -
Nalupulikottai Road
1546 01-CRIDP-22- Palani Vedasandur Construction of Box Culvert at Km 85.00
23-O-1546 3/6, 4/4 of Aruppampatti -
Mathinipatti Road (via) Kettiyapatti

1547 01-CRIDP-22- Palani Palani Providing Metal Crash Barrier at 40.00


23-O-1547 km 0/8,10, 1/2,4 of
Pethanaickenpatti Village Road
1548 01-CRIDP-22- Palani Oddanchatra Providing Metal Crash Barrier at 25.00
23-O-1548 m km 2/2,6,8 of Appanuthu -
Pungamuthur Road

ODR Page 154 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1549 01-CRIDP-22- Palani Vedasandur Providing Metal Crash Barrier at 15.00


23-O-1549 km 3/2 of Thottanampatti -
E.Sithoor road (via)
Nallamanckenpatti road
1550 01-CRIDP-22- Palani Vedasandur Providing Metal Crash Barrier at 15.00
23-O-1550 km 5/8 of Kollapatti -Pudur Road

1551 01-CRIDP-22- Palani Palani Providing Metal Crash Barrier at 50.00


23-O-1551 km 3/4, 4/2,8 5/6, 6/2,6, 7/10,
8/2,8 of K.C.Patty- Patchalur Road

1552 01-CRIDP-22- Palani Oddanchatra Providing Metal Crash Barrier at 50.00


23-O-1552 m km 0/2,4,6,8,10, 1/4,6, 8, 2/4,
3/4,8, 4/2 of Vadakadu-Kannanur
road
Road Safety Total 450.00
1553 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 3.00 328.00
23-O-1553 m Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Thalaiyuthu -Narikkalpatti Road
(via) Periamottanuthu including
Construction of Culvert at Km 0/8,
1/2(i), 1/2(ii), 1/10

1554 01-CRIDP-22- Palani Palani Widening from Single Lane to 1.00 210.00
23-O-1554 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Ayakudi -Varathapattinam Road
including Construction of Culvert
at Km 0/2, 0/4(i), 0/4(ii), 0/4(iii),
0/6(i), 0/6 (ii), 0/6 (iii), 0/6 (iv)
including construction of Drain

1555 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 2.60 287.00
23-O-1555 m Intermediate Lane and
Strengthening at km 0/0 - 2/6 of
Vilvathampatti Road including
Construction of Culverts at Km
0/2, 0/4, 0/8, 1/6
1556 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 1.20 170.00
23-O-1556 m Intermediate Lane and
Strengthening at km 7/0 - 8/2 of
Kalanjipatti -Moonur Road
including Widening of Pipe culvert
at km 7/2, Construction of Drain
at km 7/8 and Construction of
retaining wall in the existing bridge
approaches at km 7/8

1557 01-CRIDP-22- Palani Vedasandur Widening from Single Lane to 2.60 245.00
23-O-1557 Intermediate Lane and
Strengthening at km 2/8 - 5/4 of
Kasipalayam- Koombur Road
including Reconstruction of Box
culvert at Km 3/4 & 3/6 and
Construction of Toe wall at Km
5/4.

ODR Page 155 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1558 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 2.20 340.00
23-O-1558 m Intermediate Lane and
Strengthening at km 0/0 - 2/2 of
Veeralapatti Village Road including
Reconstruction of Culvert at km
0/4, Widening of slab culvert at km
1/2 & 1/8, Construction of culvert
at km 2/2, and Construction of
Retaining wall at km 0/4, 0/6, 1/8
& 2/2 and Construction of Tank
Bund Protective wall at km 1/2

1559 01-CRIDP-22- Palani Vedasandur Widening from Single Lane to 3.00 335.00
23-O-1559 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Dindigul -Karur Road to
Servaikaranpatti Road (via)
Poosaripatti including
Reconstruction of Box culverts at
Km 0/4, 0/8(i), 0/8(ii), 1/6, 1/8 &
2/6 and Construction of Toe wall at
Km 2/6 and Providing CC
Pavement at Km 1/2.

1560 01-CRIDP-22- Palani Vedasandur Widening from Single Lane to 2.70 260.00
23-O-1560 Intermediate Lane and
Strengthening at km 12/0 - 13/0,
13/5 - 15/2 of Puliyampatti-
Koombur Road including
Reconstruction of Box culvert at
Km 13/8 and Construction of Toe
wall at Km 13/8.

1561 01-CRIDP-22- Palani Vedasandur Widening from Single Lane to 6.00 620.00
23-O-1561 Intermediate Lane and
Strengthening at km 0/0 - 6/0 of
D.Gudalore- Vellianai Road
including Reconstuction of
Boxculverts at Km 0/8, 2/4, 3/4,
3/8, 4/2, 4/8, 5/6 & 5/8 and
Construction of Toe wall at Km 0/4
and Construction of Well Protective
wall at Km 4/8.
1562 01-CRIDP-22- Palani Athoor Widening from Single Lane to 1.00 90.00
23-O-1562 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Kedaiyerambu -Palakkanuthu Road

1563 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 1.80 235.00
23-O-1563 m Intermediate Lane and
Strengthening at km 0/0 - 1/8 of
Markkampatti -Coimbatore District
Limit Road including
Reconstruction of culvert at km
0/4 and Construction of Drain at
km 0/2
1564 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 2.00 190.00
23-O-1564 m Intermediate Lane and
Strengthening at Km 3/0 - 5/0 of
Akkaraipatti - Thummalapatti
including Construction of Culvert
at Km 4/6

ODR Page 156 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1565 01-CRIDP-22- Palani Palani Widening from Single Lane to 1.60 205.00
23-O-1565 Intermediate Lane and
Strengthening at Km 0/0 - 1/6 of
Coimbatore -Dindigul Road to
Marappagoun danvalasu Road
including Construction of culverts
at Km 0/4 (i), (ii), 0/6, 0/8(i), (ii),
0/10
1566 01-CRIDP-22- Palani Oddanchatra Widening from Single Lane to 1.60 170.00
23-O-1566 m Intermediate Lane and
Strengthening at Km 0/0 - 1/6 of
Devachinnampatty to Veriyapur
Road including Reconstruction of
Box culvert at km 0/2, Widening of
Pipe culvert at km 0/8, 0/10, 1/4
& 1/6, Construction of Drain at km
1/2 and Construction of Toe wall at
km 0/2, 0/8 & 1/6

Other Widening Total 32.30 3685.00


1567 01-CRIDP-22- Palani Palani Construction of Box Culvert at Km 38.00
23-O-1567 0/2 of Pappampatti Road

1568 01-CRIDP-22- Palani Palani Construction of Box Culvert at Km 35.00


23-O-1568 0/2 of Neikarapatti- Perumal Pudur
Road
1569 01-CRIDP-22- Palani Vedasandur Construction of Box Culvert at Km 58.00
23-O-1569 1/8,1/10 of Poosaripatti road to
Thirumakkampatti road A.D.
Colony
Bridges/Culverts Total 131.00
Palani Total 32.30 4266.00
1570 01-CRIDP-22- Sivagangai Tirupattur Construction of Minor Bridge at Km 90.00
23-O-1570 0/6 of T.Mampatti - Idaiyapatti
road in lieu of existing causeway

1571 01-CRIDP-22- Sivagangai Karaikudi Construction of Minor Bridge at Km 60.00


23-O-1571 1/6 of Jeyankondan - Nattucheri
road in lieu of existing causeway

1572 01-CRIDP-22- Sivagangai Tirupattur Construction of Minor Bridge at Km 120.00


23-O-1572 1/8 of Madurai-Devakottai road to
Sevalpatti road in lieu of existing
causeway
1573 01-CRIDP-22- Sivagangai Tirupattur Construction of Minor Bridge at Km 60.00
23-O-1573 0/4 of Mettupatti - Alampatti road
in lieu of existing causeway

1574 01-CRIDP-22- Sivagangai Karaikudi Construction of Minor Bridge at Km 150.00


23-O-1574 1/8 of Sirugavayal - Thalaiyur road
to Kalathur road in lieu of existing
causeway
1575 01-CRIDP-22- Sivagangai Sivaganga Construction of Minor Bridge at Km 145.00
23-O-1575 12/10 of Salaigramam - Sarugani
road in lieu of existing causeway

1576 01-CRIDP-22- Sivagangai Manamadurai Construction of Minor Bridge at Km 150.00


23-O-1576 3/10 of Keelayur - Thayamangalam
road in lieu of existing causeway

ODR Page 157 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1577 01-CRIDP-22- Sivagangai Sivaganga Construction of Box Culvert at Km 60.00


23-O-1577 0/10 of Satharasankottai -
Maravamangalam road to
Oyyavandan road in lieu of existing
causeway
1578 01-CRIDP-22- Sivagangai Sivaganga Construction of Box Culvert at Km 60.00
23-O-1578 0/2 of Sivagangai - Elayangudi
road to Kurunthankulam (via)
Maruthangudi road in lieu of
existing causeway

Causeway to HLB Total 895.00


1579 01-CRIDP-22- Sivagangai Tirupattur Providing Junction Improvement at 40.00
23-O-1579 km 7/4 of Erumaipatti -
Thumbaipatti road
1580 01-CRIDP-22- Sivagangai Tirupattur Providing Junction Improvement at 60.00
23-O-1580 km 11/4 of A. Thekur - Pudur road

Road Safety Total 100.00


1581 01-CRIDP-22- Sivagangai Manamadurai Widening from Single Lane to 1.20 120.00
23-O-1581 Intermediate Lane and
Strengthening at km 0/0 - 1/2 of
Kanjirankulam road including
Reconstruction of Culverts

1582 01-CRIDP-22- Sivagangai Tirupattur Widening from Single Lane to 3.10 400.00
23-O-1582 Intermediate Lane and
Strengthening at km 4/0 - 7/1 of
Kanadukathan - Kadiyapatti road
including reconstruction of culverts
and construction of retainning wall

1583 01-CRIDP-22- Sivagangai Karaikudi Widening from Single Lane to 1.40 180.00
23-O-1583 Intermediate Lane and
Strengthening at km 2/0 - 3/4 of
Sakkottai - Paravayal road
including reconstruction of culverts

1584 01-CRIDP-22- Sivagangai Sivaganga Widening from Single Lane to 1.20 177.00
23-O-1584 Intermediate Lane and
Strengthening at km 5/0 - 5/2,
8/2 - 9/2 of Satharasankottai -
Sooranam road Including
Reconstruction of culvert
1585 01-CRIDP-22- Sivagangai Sivaganga Widening from Single Lane to 2.00 215.00
23-O-1585 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Solapuram - Idayamelur road
including Reconstruction of culvert

1586 01-CRIDP-22- Sivagangai Tirupattur Widening from Single Lane to 2.60 269.00
23-O-1586 Intermediate Lane and
Strengthening at km 2/4 - 3/0, 4/4
- 6/4 of V. Pudur - Palakkurichi
road including reconstruction of
culverts
1587 01-CRIDP-22- Sivagangai Manamadurai Widening from Single Lane to 2.00 235.00
23-O-1587 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Pudur - Vallakulam road including
Reconstruction of culvert

ODR Page 158 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1588 01-CRIDP-22- Sivagangai Tirupattur Widening from Single Lane to 2.40 259.00
23-O-1588 Intermediate Lane and
Strengthening at km 1/0 - 2/6,
5/2 - 6/0 of Singampunari -
Kumaripatti road including
reconstruction of culverts
1589 01-CRIDP-22- Sivagangai Karaikudi Widening from Single Lane to 3.20 400.00
23-O-1589 Intermediate Lane and
Strengthening at km 0/0 - 3/2 of
Madurai - Thondi road to
Sirunallur road including
Reconstruction of Culverts
1590 01-CRIDP-22- Sivagangai Manamadurai Widening from Single Lane to 1.60 160.00
23-O-1590 Intremediate Lane at km 0/0 - 1/6
of Keeladi to Parani Chamber road
including Reconstruction of
Culverts Km 0/2, Construction of
Retaining wall Km 0/8,10 and
construction of Drainage at Km 0/4

Other Widening Total 20.70 2415.00


1591 01-CRIDP-22- Sivagangai Karaikudi Strengthening at km 0/0 - 0/221 of 0.22 22.00
23-O-1591 Keelaoorani Round road

1592 01-CRIDP-22- Sivagangai Sivaganga Strengthening at km 2/0 - 2/4, 5/0 4.80 480.00
23-O-1592 - 5/4, 9/0 - 10/0, 11/0 - 12/0,
13/0 - 15/0 of Thanjakoor to
meet Thiruppuvanam - Pulvaikarai
road junction

1593 01-CRIDP-22- Sivagangai Sivaganga Strengthening at km 1/0 - 2/6 of 1.60 110.00


23-O-1593 Madhagupatti - Alagamanagari
road
Strengthening/Improvements
6.62 612.00
Total
1594 01-CRIDP-22- Sivagangai Sivaganga Reconstruction of Minor Bridge at 100.00
23-O-1594 Km 1/6 of Periakannanur road

Bridges/Culverts Total 100.00


Sivagangai Total 27.32 4122.00
1595 01-CRIDP-22- Ramnad Tiruvadanai Widening from Intermediate Lane 5.00 700.00
23-O-1595 to Two Lane and Strengthening at
km 0/0 - 5/0 of Anjukkottai -
Neerkundram Road including CD
works
1596 01-CRIDP-22- Ramnad Tiruvadanai Widening from Intermediate Lane 1.00 170.00
23-O-1596 to Two Lane and Strengthening at
km 5/0 - 6/0 of Anjukkottai -
Neerkundram Road Including CD
works
CMRDP IL to DL Total 6.00 870.00
1597 01-CRIDP-22- Ramnad Mudukulathu Construction of Box Culvert at Km 100.00
23-O-1597 r 2/2 of Melakodumalur -
Seyyamangalam Road in lieu of
Existing Causeway
1598 01-CRIDP-22- Ramnad Mudukulathu Construction of Minor Bridge at Km 190.00
23-O-1598 r 2/8 of Muthukulathur - Sikkal
road to Keelaselvanoor road in lieu
of Existing Causeway

ODR Page 159 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1599 01-CRIDP-22- Ramnad Mudukulathu Construction of Box Culvert at Km 50.00


23-O-1599 r 18/8 of Kamuthi - T.
Valasubramaniyapuram Road in
lieu of existing causeway
Causeway to HLB Total 340.00
1600 01-CRIDP-22- Ramnad Mudukulathu Widening from Single Lane to 1.27 135.00
23-O-1600 r Intermediate Lane and
Strengthening at km 25/550 -
26/820 of Peraiyur - Vilathikulam
Road
1601 01-CRIDP-22- Ramnad Mudukulathu Widening from Single Lane to 1.60 210.00
23-O-1601 r Intermediate Lane and
Strengthening at km 3/0 - 4/6 of
Melakidaram - Thiruvarangai road
including CD works
1602 01-CRIDP-22- Ramnad Mudukulathu Widening from Single Lane to 1.03 300.00
23-O-1602 r Intermediate Lane and
Strengthening at km 18/6 - 19/630
of Kamuthi - T.
Valasubramaniyapuram Road
including Junction Improvements,
Paver block, Reconstruction of Box
culvert at Km.18/8(i), (ii),
Construction of Retaining wall at
Km.18/8 and Drain

1603 01-CRIDP-22- Ramnad Tiruvadanai Widening from Single Lane to 1.40 270.00
23-O-1603 Intermediate Lane and
Strengthening at km 4/0 - 5/4 of
N.H.210 to Vilathur Road
including CD works
Other Widening Total 5.30 915.00
Ramnad Total 11.30 2125.00
Madurai Circle Total 113.39 17981.60
1604 01-CRIDP-22- Tirunelveli Ambasamudr Urban Improvements - Widening 2.00 300.00
23-O-1604 am from Two Lane to EndtoEnd and
Improvements at km 0/0 - 2/0 of
Cheranmahadevi River Road
including Reconstruction of Culvert
at km 1/4 ,1/8 and paver block.

Urban Improvements Total 2.00 300.00


1605 01-CRIDP-22- Tirunelveli Radhapuram Widening from Single Lane to 1.00 98.00
23-O-1605 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Avaraikulam - Mathaganeri Road

1606 01-CRIDP-22- Tirunelveli Tirunelveli Widening from Two Lane to Two 0.80 253.00
23-O-1606 Lane with Paved Shoulders and
Strengthening at km 0/0 - 0/8 of
North Mount Road including CD
Works
1607 01-CRIDP-22- Tirunelveli Ambasamudr Widening from Single Lane to 3.00 288.00
23-O-1607 am Intermediate Lane and
Strengthening at km 3/0 - 6/0 of
Karisoolnthamangalam -
Kurangumadam Road
1608 01-CRIDP-22- Tirunelveli Tirunelveli Widening from Single Lane to 1.00 130.00
23-O-1608 Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Thalaiyuthu - Rastha Road
including CD Works

ODR Page 160 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1609 01-CRIDP-22- Tirunelveli Nanguneri Widening from Single Lane to 2.93 310.00
23-O-1609 Intermediate Lane and
Strengthening at km 3/1 - 5/7,
Strengthening at km 5/7 - 6/032 of
Vallioor - Rajapudur Road
including CD works
1610 01-CRIDP-22- Tirunelveli Sankarankovi Widening from Single Lane to 2.00 208.00
23-O-1610 l Intermediate Lane and
Strengthening at km 19/0 - 21/0 of
Kalugumalai - Devarkulam Road
including CD works

Other Widening Total 10.73 1287.00


1611 01-CRIDP-22- Tirunelveli Radhapuram Strengthening at km 5/2 - 5/450 of 0.25 108.00
23-O-1611 Kavalkinaru - Radhapuram Road
including Providing Paver block at
km 5/050 - 5/650

1612 01-CRIDP-22- Tirunelveli Ambasamudr Strengthening at km 0/0 - 2/0 of 2.00 188.00


23-O-1612 am Pozhikarai - Nalancheri Road
including Reconstruction of culvert
at km
0/10(i),0/10(ii),1/2,1/6(i),1/6(ii)
1613 01-CRIDP-22- Tirunelveli Nanguneri Strengthening at km 2/8 - 3/7 of 0.90 75.00
23-O-1613 Chinnamoolaikaraipatti -
Chinthamani Road including CD
work at km 3/7
Strengthening/Improvements
3.15 371.00
Total
Tirunelveli Total 15.88 1958.00
1614 01-CRIDP-22- Tenkasi Tenkasi Widening from Intermediate Lane 2.00 264.00
23-O-1614 to Two Lane and Strengthening at
km 0/0 - 2/0 of Thiraviyanagar -
Audaiyanoor road including box
culvert at km 0/6,0/8,0/10,1/8

CMRDP IL to DL Total 2.00 264.00


1615 01-CRIDP-22- Tenkasi Kadayanallur Providing Metal Crash Barrier at 13.45
23-O-1615 km 0/4, 1/2, 1/4 of Road
branching from km 14/4 of
Sivaramapettai - Panpozhi -
Shencottai road to
Periyapillaivalasai
1616 01-CRIDP-22- Tenkasi Tenkasi Providing Metal Crash Barrier at 4.04
23-O-1616 km 0/10, 1/6 of Vellakal -
V.K.Pudur road
1617 01-CRIDP-22- Tenkasi Alangulam Providing Metal Crash Barrier at 3.11
23-O-1617 km 1/2 of Poolangulam -
Nellaiappapuram road
1618 01-CRIDP-22- Tenkasi Sankarankovi Providing Metal Crash Barrier at 4.70
23-O-1618 l km 0/100 and 3/800 of
Thiruvengadam - Kundampatti
road
1619 01-CRIDP-22- Tenkasi Sankarankovi Providing Metal Crash Barrier at 1.30
23-O-1619 l km 0/8 of Sankarankovil -
Vasudevanallur road
1620 01-CRIDP-22- Tenkasi Vasudevanall Providing Metal Crash Barrier at 1.60
23-O-1620 ur km 2/4 of Karivalamvanthanallur -
Railway Feeder road

ODR Page 161 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1621 01-CRIDP-22- Tenkasi Sankarankovi Providing Metal Crash Barrier at 0.98


23-O-1621 l km 0/4 of Puliyampatti road

1622 01-CRIDP-22- Tenkasi Sankarankovi Providing Cantilever Gantry board 6.50


23-O-1622 l at km 7/10 of Sankarankovil -
Vasudevanallur road

1623 01-CRIDP-22- Tenkasi Vasudevanall Providing Metal Crash Barrier at 0.98


23-O-1623 ur km 7/8 of Sendamaram -
Puliyankudi road
1624 01-CRIDP-22- Tenkasi Kadayanallur Providing Metal Crash Barrier at 14.11
23-O-1624 km 0/6,8,10, 1/2,4,6,8,10 of
Kandukondanmanikam road
Road Safety Total 50.77
1625 01-CRIDP-22- Tenkasi Sankarankovi Widening from Single Lane to 2.40 222.00
23-O-1625 l Intermediate Lane and
Strengthening at km 0/0 - 1/850,
1/940 - 2/4 Strengthening at km
1/850 - 1/940 of Uoothankulam -
Echantha road to Periyasamipuram
road including Construction of
Drain and CD Works

1626 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 0.60 63.00
23-O-1626 ur Intermediate Lane and
Strengthening at km 0/0 - 0/545,
Strengthening at km 0/545 - 0/6 of
Ariyanayagipuram -
Arunachalapuram road

1627 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 3.40 404.00
23-O-1627 ur Intermediate Lane and
Strengthening at km 0/0 - 3/4 of
Road branching from km 5/2 of
Sankarankovil - Veerasigamani
road to Alangulam road including
Reconstruction of Minor Bridge at
Km 3/2 and CD Works

1628 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 2.20 255.00
23-O-1628 ur Intermediate Lane and
Strengthening at km 0/8 - 1/0, 2/0
- 4/0 of Alangulam -
Veerasigamani road including CD
Works
1629 01-CRIDP-22- Tenkasi Alangulam Widening from Single Lane to 2.00 236.00
23-O-1629 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Andipatti road including box
culvert at km 0/2 , 1/2 ,1/8 and
retaining wall at km 1/8
1630 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 1.40 125.00
23-O-1630 ur Intermediate Lane and
Strengthening at km 1/8 - 3/0, 3/0
- 3/2 of Nelkattumseval - Patcheri -
Paraipatti road

ODR Page 162 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1631 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 2.60 241.00
23-O-1631 ur Intermediate Lane and
Strengthening at km 0/0 - 2/6 of
Road branching from
Nelkattumseval-Ammankulam road
to Ramachandrapuram road
including CD Works
1632 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 1.40 155.00
23-O-1632 ur Intermediate Lane and
Strengthening at km 3/0 - 4/4 of
Nagaram - Sankarankovil road
including CD Works
1633 01-CRIDP-22- Tenkasi Tenkasi Widening from Single Lane to 3.60 412.00
23-O-1633 Intermediate Lane and
Strengthening at km 0/0 - 2/0,
Widening from Single Lane to
Intermediate Lane and
Improvements at km 2/4 - 3/6 ,
Improvements at km 2/0 - 2/4 of
Kulayaneri - Rettaikulam road
including CD Works
1634 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 2.65 291.00
23-O-1634 ur Intermediate Lane and
Strengthening at km 14/2 - 16/850
of Othakkadai -
Karivalamvanthanallur road
including CD Works
1635 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 2.00 194.00
23-O-1635 ur Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Naranapuram - Keelapudur road
including CD Works
1636 01-CRIDP-22- Tenkasi Alangulam Widening from Single Lane to 2.00 200.00
23-O-1636 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Alangulam - Thuthikulam Road
including CD works
Other Widening Total 26.25 2798.00
1637 01-CRIDP-22- Tenkasi Tenkasi Strengthening at km 0/0 - 2/0 of 2.00 190.00
23-O-1637 Tenkasi - Ayiraperi road including
paver block at km 0/2 and box
culvert at km 0/6, 0/10(i),0/10
(ii),0/10 (iii)and side drain at km
0/2
1638 01-CRIDP-22- Tenkasi Alangulam Strengthening at km 0/0 - 2/0 of 2.00 141.00
23-O-1638 Mahilvannanathapuram -
Mailappapuram road including
paver block at km 0/10 and box
culvert at km 1/4 ,1/8
1639 01-CRIDP-22- Tenkasi Tenkasi Strengthening at km 3/0 - 4/4 of 1.40 85.00
23-O-1639 Road branching from km 11/2 of
Athiyuthu - Surandai road to
Vadiyoor road
Strengthening/Improvements
5.40 416.00
Total
1640 01-CRIDP-22- Tenkasi Vasudevanall Construction of Minor Bridge at Km 122.00
23-O-1640 ur 2/4 of Nagaram -
Subramaniyapuram road
1641 01-CRIDP-22- Tenkasi Vasudevanall Construction of Minor Bridge at Km 122.00
23-O-1641 ur 3/10 of Devipattinam - Western
Ghat Km road

ODR Page 163 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1642 01-CRIDP-22- Tenkasi Vasudevanall Construction of Box Culvert at Km 74.00


23-O-1642 ur 11/4 of Othakkadai -
Karivalamvanthanallur road
Bridges/Culverts Total 318.00
Tenkasi Total 33.65 3846.77
1643 01-CRIDP-22- Virudhunagar Virudhunagar Widening from Single Lane to Two 1.70 190.00
23-O-1643 Lane and Strengthening at km 0/0 -
1/7 of K Pudur -Sivakasi Union
Limit Road including Box culvert
at km 1/2.
1644 01-CRIDP-22- Virudhunagar Aruppukkotta Widening from Single Lane to Two 3.20 480.00
23-O-1644 i Lane and Strengthening at km 0/0 -
3/2 of Nenmeni - District Limit
Road (Via) Mayurnathapuram Road
including Reconstruction of
damaged culvert at km 0/10 &
widening of existing culvert at km
0/4,1/10 & including protective
works.

CMRDP IL to DL Total 4.90 670.00


1645 01-CRIDP-22- Virudhunagar Aruppukkotta Construction of Minor Bridge at Km 145.00
23-O-1645 i 4/2 4/4 of Nenmeni - Kosugundu
Road in lieu of Existing Causeways
including protective works

1646 01-CRIDP-22- Virudhunagar Tiruchuli Construction of Minor Bridge at Km 100.00


23-O-1646 2/4 of Aladipatti- Ammanpatti
Road in liue of existing causeway
in lieu of existing causeway

1647 01-CRIDP-22- Virudhunagar Tiruchuli Construction of Minor Bridge at Km 100.00


23-O-1647 0/4 of Srivilliputtur -Pathibanoor
Road to Kilavikulam Road in liue
of existing causeway in lieu of
existing causeway

1648 01-CRIDP-22- Virudhunagar Tiruchuli Construction of Minor Bridge at Km 180.00


23-O-1648 14/4 of Meenashipuram -
A.Mukkulam Road in liue of
existing causeway in lieu of existing
causeway
1649 01-CRIDP-22- Virudhunagar Sattur Construction of Minor Bridge at Km 186.00
23-O-1649 3/6 of Keelarajakularaman -
Gopalapuram Road in lieu of
existing bed level causeway
1650 01-CRIDP-22- Virudhunagar Sattur Construction of Minor Bridge at Km 175.00
23-O-1650 0/4 of Samusigapuram -
Mudhugudi Road in lieu of existing
piped causeway
1651 01-CRIDP-22- Virudhunagar Sattur Construction of Minor Bridge at Km 186.00
23-O-1651 2/4 of Samsigapuram -Vadakarai
Road in lieu of existing piped
causeway
1652 01-CRIDP-22- Virudhunagar Tiruchuli Construction of Minor Bridge at Km 120.00
23-O-1652 0/10 of P.Thottiyankulam -
Krishnapuram road in lieu of
existing causeway including
Protective works

ODR Page 164 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1653 01-CRIDP-22- Virudhunagar Tiruchuli Construction of Minor Bridge at Km 120.00


23-O-1653 2/4 of P.Thottiyankulam -
Krishnapuram Road in lieu of
existing causeway including
Protective works
1654 01-CRIDP-22- Virudhunagar Virudhunagar Construction of Minor Bridge at Km 133.00
23-O-1654 2/6 of Sankaralingapuram -
Railway Station Road in lieu of
existing causeway
1655 01-CRIDP-22- Virudhunagar Srivilliputhur Construction of Minor Bridge at Km 120.00
23-O-1655 2/8 of Malli-Krishnankovil road in
lieu of existing causeway

1656 01-CRIDP-22- Virudhunagar Srivilliputhur Construction of Minor Bridge at Km 115.00


23-O-1656 3/2 of Malli-Krishnankovil road in
lieu of existing causeway

1657 01-CRIDP-22- Virudhunagar Srivilliputhur Construction of Minor Bridge at Km 125.00


23-O-1657 1/2 of Melathottiyapatti -
Pillayarnatham Road in lieu of
existing causeway
1658 01-CRIDP-22- Virudhunagar Srivilliputhur Construction of Minor Bridge at Km 160.00
23-O-1658 3/8 of Kothankulam - Chatrapatti
Road in lieu of existing causeway

1659 01-CRIDP-22- Virudhunagar Srivilliputhur Construction of Minor Bridge at Km 160.00


23-O-1659 2/8 of Thailakulam - Nagapalayam
Road in lieu of existing causeway

1660 01-CRIDP-22- Virudhunagar Sattur Reconstruction of Minor Bridge at 145.00


23-O-1660 Km 4/10 of Thayilpatti -
Vijayakarisalkulam Road in lieu of
Existing Causeway including
Protective works
Causeway to HLB Total 2270.00
1661 01-CRIDP-22- Virudhunagar Rajapalayam Construction of Retaining wall at 175.00
23-O-1661 km 0/6 & 0/8 of South
Venganallur - Ilandiraikondan Road

Road Safety Total 175.00


1662 01-CRIDP-22- Virudhunagar Tiruchuli Widening from Single Lane to 1.00 135.00
23-O-1662 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Irunjirai - Theli Road including
CD works
1663 01-CRIDP-22- Virudhunagar Tiruchuli Widening from Single Lane to 1.00 125.00
23-O-1663 Intermediate Lane and
Strengthening at km 8/0 - 9/0 of
Aladipatti- Ammanpatti Road
including CD works
1664 01-CRIDP-22- Virudhunagar Sattur Widening from Single Lane to 1.20 176.00
23-O-1664 Intermediate Lane and
Strengthening at km 1/4 - 2/6 of
E.L.Reddiyapatti Road to District
Limit Road including CD works

1665 01-CRIDP-22- Virudhunagar Tiruchuli Widening from Single Lane to 1.60 200.00
23-O-1665 Intermediate Lane and
Strengthening at km 0/0 - 1/6 of
Trichy-Tuticorin Road to
S.Kallupatty Road including CD
Works

ODR Page 165 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1666 01-CRIDP-22- Virudhunagar Sattur Widening from Single Lane to 6.63 645.00
23-O-1666 Intermediate Lane and
Strengthening at km 0/0 - 6/63 of
Thayilpatti -Vijayakarisalkulam
Road including Reconstruction of
culvert at Km
0/10,1/4,2/2,5/10,6/4 and
Construction of Culvert at Km
4/4,4/6 and Construction of Drain
at Km 3/130-3/480 and
Construction of Breast wall at Km
5/380-5/455 and Construction of
Retaining wall at Km 0/210-0/240

1667 01-CRIDP-22- Virudhunagar Aruppukkotta Widening from Single Lane to 2.00 200.00
23-O-1667 i Intermediate Lane and
Strengthening at km 5/0 - 7/0 of
Avudayapuram - Kottor Road
including CD works
1668 01-CRIDP-22- Virudhunagar Aruppukkotta Widening from Single Lane to 3.80 530.00
23-O-1668 i Intermediate Lane and
Strengthening at km 0/0 - 3/8 of
Melamadai - Palavanatham Road to
Kallupatti Road including CD work

Other Widening Total 17.23 2011.00


1669 01-CRIDP-22- Virudhunagar Tiruchuli Strengthening at km 0/0 - 2/8 of 2.80 173.00
23-O-1669 Srivilliputtur -Parthibanoor Road
Konnappanendal Road including
CD Works
1670 01-CRIDP-22- Virudhunagar Aruppukkotta Strengthening at km 2/0 - 4/0 of 2.00 195.00
23-O-1670 i Maravarperunkudi Road including
CD WORKS
1671 01-CRIDP-22- Virudhunagar Rajapalayam Strengthening at km 1/0 - 2/0, 2/2 2.80 196.00
23-O-1671 - 4/0 of South Venganallur -
Ilandiraikondan Road
1672 01-CRIDP-22- Virudhunagar Srivilliputhur Strengthening at km 1/2 - 4/842 of 3.64 288.00
23-O-1672 Sundarapandiam - Keelapudur
Road including CD Works

1673 01-CRIDP-22- Virudhunagar Srivilliputhur Widening and Strengthening of 2.26 500.00


23-O-1673 Girivalam Road including providing
basic amenities around
Tiruvannamalai Temple
(Thenthirupathi) Km 0/0 - 2/262

Strengthening/Improvements
13.50 1352.00
Total
1674 01-CRIDP-22- Virudhunagar Tiruchuli Reconstruction of Box Culvert at 45.00
23-O-1674 Km 9/4(i), 9/4(ii), 9/6 of
Veeracholan- Kuraiyaravasithan
Road
1675 01-CRIDP-22- Virudhunagar Tiruchuli Reconstruction of Box Culvert at 65.00
23-O-1675 Km 0/2,8, 1/2,6,8 of
Kethanaickenpatti -Seneilaikudi
Road
1676 01-CRIDP-22- Virudhunagar Tiruchuli Reconstruction of Culvert at Km 35.00
23-O-1676 1/10 of Kethanaickenpatti -
Seneilaikudi Road

ODR Page 166 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1677 01-CRIDP-22- Virudhunagar Tiruchuli Reconstruction of Box Culvert at 75.00


23-O-1677 Km 0/2,4,6,10 (i), (ii) and 1/2 of
Tiruchuli - Kamuthi Road to
Iluppaiyur Road
1678 01-CRIDP-22- Virudhunagar Sattur Construction of Box Culvert at Km 27.00
23-O-1678 0/2 of Elayirampannai -
E.L.Reddiapatty Road in lieu of
damaged Pipe culvert
1679 01-CRIDP-22- Virudhunagar Tiruchuli Construction of Box Culvert at Km 25.00
23-O-1679 1/10 of Aviyoor - Kurandy road

1680 01-CRIDP-22- Virudhunagar Srivilliputhur Reconstruction of Box Culvert at 31.00


23-O-1680 Km 0/4 of Koomapatti - Kilavankoil
Road
1681 01-CRIDP-22- Virudhunagar Virudhunagar Reconstruction of Culvert at Km 60.00
23-O-1681 10/6 of Sivakasi - Kanniseri Road
Protective works in lieu of Damaged
culvert
1682 01-CRIDP-22- Virudhunagar Srivilliputhur Reconstruction of Box Culvert at 26.00
23-O-1682 Km 1/2, 4/4 of Moovaraivendran -
Thullukkapatti Road
Bridges/Culverts Total 389.00
Virudhunagar Total 35.63 6867.00
1683 01-CRIDP-22- Tuticorin Ottapidaram Widening from Intermediate Lane 2.49 327.00
23-O-1683 to Two Lane and Strengthening at
km 1/9 - 3/2, 4/8 - 5/986 of
Therkkuveeerapandiapuram road
including CD Works at Km 4/10

1684 01-CRIDP-22- Tuticorin Vilathikulam Widening from Intermediate Lane 4.75 676.00
23-O-1684 to Two Lane and Strengthening at
km 9/850 - 10/4, 10/650 - 14/6,
, Strengthening at km 10/4 -
10/650 of Nagalapuram -
Melakaranthai - Masarpatti -
Rajapatti Road including CD
Works at Km 9/10, 10/8, 10/10,
11/4, 11/6, 12/2 (i), 12/2 (ii),
13/2, 14/2, 14/6 (i) & 14/6 (ii)

1685 01-CRIDP-22- Tuticorin Kovilpatti Widening from Single Lane to Two 2.20 330.00
23-O-1685 Lane and Strengthening at km
11/0 - 13/2 of Iyyanaroorthu road
including Reconstuction of Culvert
at Km 11/2 & 11/10
1686 01-CRIDP-22- Tuticorin Kovilpatti Widening from Single Lane to Two 1.20 260.00
23-O-1686 Lane and Strengthening at km 0/0 -
1/2 of Kalugumalai-Deverkulam
road including Reconstruction of
Culvert at Km 0/2, 0/10 & 1/2,
Construction of Drain at Km 0/0-
1/2
CMRDP IL to DL Total 10.64 1593.00

ODR Page 167 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1687 01-CRIDP-22- Tuticorin Tiruchendur Widening from Single Lane to 5.00 534.00
23-O-1687 Intermediate Lane and
Strengthening at km 0/0 - 1/2, 2/2
- 4/4 Strengthening at km 7/8 -
9/0, 10/8 - 11/2 of Kulasi-
Udangudi (Via) Thandavankadu
road including CD Works at Km
0/10
1688 01-CRIDP-22- Tuticorin Tiruchendur Widening from Single Lane to 3.40 365.00
23-O-1688 Intermediate Lane and
Strengthening at km 3/0 - 6/4 of
Authoor-Punnakayal road
including CD Works at Km 4/10,
6/2
1689 01-CRIDP-22- Tuticorin Tiruchendur Widening from Single Lane to 1.65 167.00
23-O-1689 Intermediate Lane and
Strengthening at km 0/0 - 0/650,
3/0 - 4/0 of Manadu-
Thanadapathu-Seerkatchi road
1690 01-CRIDP-22- Tuticorin Tiruchendur Widening from Single Lane to 2.20 223.00
23-O-1690 Intermediate Lane and
Strengthening at km 2/0 - 4/2 of
Road branching form km 21/8 of
Thisayanvilai-Udangudi road to join
at km 4/2 of Meingnapuram-
Kadatchapuram (via) Vagaivilai
road
1691 01-CRIDP-22- Tuticorin Vilathikulam Widening from Single Lane to 1.20 210.00
23-O-1691 Intermediate Lane and
Strengthening at km 13/0 - 14/2 of
Pillayarnatham-Eppodumvendran
road including CD Works at Km
13/8
1692 01-CRIDP-22- Tuticorin Vilathikulam Widening from Single Lane to 1.80 190.00
23-O-1692 Intermediate Lane and
Strengthening at km 1/8 - 3/6 of
Vilathikulam-Perunali road
including CD Works at Km 2/6,
3/4
1693 01-CRIDP-22- Tuticorin Ottapidaram Widening from Single Lane to 2.00 179.00
23-O-1693 Intermediate Lane and
Strengthening at km 5/0 - 6/0, 9/0
- 10/0 of Srivaikundam-Vallanadu
road
1694 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Single Lane to 1.00 186.00
23-O-1694 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Thoothukudi-Tiruchendur road
Kovankadu road including
construction of box culvert at km
1/8
1695 01-CRIDP-22- Tuticorin Tiruchendur Widening from Single Lane to 7.24 690.00
23-O-1695 Intermediate Lane and
Strengthening at km 0/0 - 1/4, 2/8
- 8/635 of Meignanapuram-
Kayamozhi-Therikudiyiruppu road

1696 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Single Lane to 1.60 213.00
23-O-1696 Intermediate Lane and
Strengthening at km 0/0 - 1/6 of
Melaseriyendur road

ODR Page 168 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1697 01-CRIDP-22- Tuticorin Vilathikulam Widening from Single Lane to 3.40 650.00
23-O-1697 Intermediate Lane and
Strengthening at Km 11/6 - 15/0
of Uchinatham - Soorangudi Road
including CD works

1698 01-CRIDP-22- Tuticorin Srivaikuntam Widening from Single Lane to 3.40 280.50
23-O-1698 Intermediate Lane and
Strengthening at Km 3/4-5/0 &
11/0-12/8 of Sathankulam -
Periyathalai road
Other Widening Total 33.89 3887.50
1699 01-CRIDP-22- Tuticorin Vilathikulam Strengthening at Km 0/0 - 1/8 of 1.80 75.00
23-O-1699 S.Kumarapuram Road

1700 01-CRIDP-22- Tuticorin Tiruchendur Strengthening at km 0/0 - 2/0 of 2.00 235.00


23-O-1700 Nagakaniapuram-Moolakarai road
including CD Works at Km 0/4,
0/8, 1/7
1701 01-CRIDP-22- Tuticorin Tiruchendur Strengthening at km 0/0 - 3/2 of 3.20 220.00
23-O-1701 Road branching from km 20/6 of
Meignanapuram-Kayamozhi-
Thalayanaisasthakovil road to
Tiruchendur-Palayamkotai-
Ambasamudram-Tenkasi-
Courtallam-Shencott
1702 01-CRIDP-22- Tuticorin Tiruchendur Strengthening at km 0/0 - 1/4, 2/6 2.80 285.00
23-O-1702 - 4/0 of Thenthiruperai-Eral road
including Protective Works

1703 01-CRIDP-22- Tuticorin Srivaikuntam Strengthening at km 0/0 - 0/6 of 0.60 42.00


23-O-1703 Vadakkuvalavallan-Keelavalavallan
road
1704 01-CRIDP-22- Tuticorin Srivaikuntam Strengthening at km 0/0 - 4/8 of 4.80 180.00
23-O-1704 Peikulam-Pirandakulam road
including Laying of CC pavement at
Km 0/0-0/6
1705 01-CRIDP-22- Tuticorin Srivaikuntam Strengthening at km 2/0 - 2/8 of 0.80 31.00
23-O-1705 Chettikulam-Krishnaperi road

1706 01-CRIDP-22- Tuticorin Vilathikulam Strengthening at km 0/0 - 2/3 of 2.30 195.00


23-O-1706 Kulathur-Subramaniapuram road

1707 01-CRIDP-22- Tuticorin Srivaikuntam Strengthening at km 1/0 - 4/0 of 3.00 100.00


23-O-1707 Sathankulam-Subburayapuram
road (via) Thoppuvanam road

Strengthening/Improvements
21.30 1363.00
Total
1708 01-CRIDP-22- Tuticorin Thoothukudi Construction of Box Culvert at Km 18.00
23-O-1708 0/10 of Sankaraperi-
Ramanathapuram road
1709 01-CRIDP-22- Tuticorin Srivaikuntam Construction of Box Culvert at Km 12.00
23-O-1709 7/4 of Therkkukaraseri-
Sivanthipatti road
1710 01-CRIDP-22- Tuticorin Srivaikuntam Construction of Box Culvert at Km 35.00
23-O-1710 3/0 of Alwarthoppu-
Sirvaramamangalm road

ODR Page 169 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1711 01-CRIDP-22- Tuticorin Srivaikuntam Construction of Pipe Culvert at Km 4.00


23-O-1711 7/10 of Vaithialingapuram road

Bridges/Culverts Total 69.00


1712 01-CRIDP-22- Tuticorin Thoothukudi Construction of Drain at km 0/0 - 210.00
23-O-1712 1/0 of Boopalarayapuram -
Alangarathattu road
Others Total 210.00
Tuticorin Total 65.82 7122.50
1713 01-CRIDP-22- Nagercoil Kanyakumari Construction of Groynes at km 600.00
23-O-1713 4/245-4/660 of Pottel -
Puthenthurai - Pallamthurai road

1714 01-CRIDP-22- Nagercoil Kanyakumari Construction of Groynes at km 600.00


23-O-1714 4/660-5/075 of Pottel -
Puthenthurai - Pallamthurai road

1715 01-CRIDP-22- Nagercoil Killiyur Construction of Groynes at km 0/3- 450.00


23-O-1715 0/6 of Aravanpothai to
Mulloorthurai road
1716 01-CRIDP-22- Nagercoil Killiyur Construction of Groynes at km 0/0- 450.00
23-O-1716 0/3 of Aravanpothai to
Mulloorthurai road
1717 01-CRIDP-22- Nagercoil Kanyakumari Construction of Groynes at km 500.00
23-O-1717 3/210-3/520 of Neerodi -
Erayumanthurai Road including
gabion wall
1718 01-CRIDP-22- Nagercoil Killiyur Construction of Groynes at km 500.00
23-O-1718 3/520-3/830 of Neerodi -
Erayumanthurai Road including
gabion wall
1719 01-CRIDP-22- Nagercoil Killiyur Construction of Groynes at km 500.00
23-O-1719 3/830-4/140 of Neerodi -
Erayumanthurai Road including
gabion wall
1720 01-CRIDP-22- Nagercoil Killiyur Construction of Groynes at km 500.00
23-O-1720 2/900 - 3/210 of Neerodi -
Erayumanthurai Road including
gabion wall
Announcement Total 4100.00
1721 01-CRIDP-22- Nagercoil Nagercoil Providing Metal Crash Barrier at 10.00
23-O-1721 km 1/10, 2/2 of Perumselvavilai
Road
1722 01-CRIDP-22- Nagercoil Kanyakumari Providing Metal Crash Barrier at 50.00
23-O-1722 km 1/0 - 2/0 of Kariyakonam -
Oorakonam road
1723 01-CRIDP-22- Nagercoil Padmanabha Providing Metal Crash Barrier at 15.00
23-O-1723 puram km 3/6, 3/8 of Mulagumoodu -
Karungal Road
1724 01-CRIDP-22- Nagercoil Vilavancode Providing Metal Crash Barrier at 25.00
23-O-1724 km 5/2,8, 6/2, 7/4, 8/10 of
Arumanai - Panachamoodu Road
1725 01-CRIDP-22- Nagercoil Padmanabha Construction of Retaining wall at 100.00
23-O-1725 puram km 1/2, 1/4 of Monday Market -
Colachel Road (Via) Neyyoor

Road Safety Total 200.00


1726 01-CRIDP-22- Nagercoil Nagercoil Strengthening at km 0/0 - 4/4 of 4.40 362.00
23-O-1726 Kalliankadu Road

ODR Page 170 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1727 01-CRIDP-22- Nagercoil Kanyakumari Strengthening at km 0/0 - 0/150 of 0.15 20.00


23-O-1727 Marungoor Middle street
connecting Suchindrum -
Marungoor road and
Eathenkattumadam road
1728 01-CRIDP-22- Nagercoil Colachal Strengthening at km 1/0 - 2/4 of 1.40 60.00
23-O-1728 KM 11/6 of Parasery Monday
Market Puthukadai Road to
Neyyoor - Chemponvilai Road
1729 01-CRIDP-22- Nagercoil Padmanabha Strengthening at km 0/0 - 1/0 of 1.00 45.00
23-O-1729 puram Thickanamcode - Chenamvilai
Road
Strengthening/Improvements
6.95 487.00
Total
1730 01-CRIDP-22- Nagercoil Nagercoil Construction of Retaining wall at 85.00
23-O-1730 km 1/6 of Perumselvavilai Road

1731 01-CRIDP-22- Nagercoil Kanyakumari Construction of Retaining wall at 35.00


23-O-1731 km 0/8 of Link road to Vempathoor
- Harijan Colony Road and
Beemanagari - Harijan Colony road

1732 01-CRIDP-22- Nagercoil Padmanabha Construction of Retaining wall at 155.00


23-O-1732 puram km 1/4 of Thuckalay -
Thiruvithancode Road including
box culvet at km 1/2 (i), (ii)
1733 01-CRIDP-22- Nagercoil Padmanabha Construction of Retaining wall at 100.00
23-O-1733 puram km 1/2 of Ponmanai - Kaligesam
Road including box culvert at km
1/2
1734 01-CRIDP-22- Nagercoil Kanyakumari Reconstruction of Culvert at Km 13.00
23-O-1734 0/2 of Leepuram - Agasteeswaram
Road
1735 01-CRIDP-22- Nagercoil Kanyakumari Reconstruction of Culvert at Km 20.00
23-O-1735 0/4 of Kulasekaramputhoor -
Marungoor Road
1736 01-CRIDP-22- Nagercoil Kanyakumari Construction of Retaining wall at 40.00
23-O-1736 km 0/2 - 0/6 of Link road to
Vempathoor - Harijan Colony Road
and Beemanagari - Harijan Colony
road
Flood Permanent Total 448.00
Nagercoil Total 6.95 5235.00
Tirunelveli Circle Total 157.94 25029.27
Grand Total 896.47 142981.01

ODR Page 171 of 210


CRIDP 2022 - 2023
LIST OF WORKS - OTHER DISTRICT ROAD - SCP
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1737 01-CRIDP-22- Thiruvallur Madavaram Strengthening at km 0/0 - 3/0 of 3.00 480.00


23-P-1737 Solavaram - Orakkadu -
Arumandai - Perumullaivoyal road

Strengthening/Improvements
3.00 480.00
Total
Thiruvallur Total 3.00 480.00
Chennai Circle Total 3.00 480.00
1738 01-CRIDP-22- Tiruvannamal Kilpennathur Widening from Single Lane to 4.00 460.00
23-P-1738 ai Intermediate Lane and
Strengthening at km 7/0 - 11/0 of
Usambadi Periyakilambadi road
including Reconstruction of
Culvert at Km 7/2, 7/4, 7/6, 8/4,
8/8, 9/4, 9/8, 10/4, 10/10
Other Widening Total 4.00 460.00
Tiruvannamalai Total 4.00 460.00
1739 01-CRIDP-22- Ranipet Arakkonam Widening from Single Lane to 3.00 290.00
23-P-1739 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Km 2/4 of Arakkonam Thiruvallur
Road to Chinnamosur Road

Other Widening Total 3.00 290.00


Ranipet Total 3.00 290.00
1740 01-CRIDP-22- Vellore Kilvaithinank Widening from Single Lane to 1.00 279.00
23-P-1740 uppam Intermediate Lane and
Strengthening at km 0/0 - 1/0 of
Chittoor - Gudiyatham Road to
Ramalai Krishnapuram Road
including Reconstruction of Box
Culvert at Km 0/2, 0/4(i), 0/8,
0/10(i) & 0/10(ii) and Construction
of Protective wall at Km 0/2

Other Widening Total 1.00 279.00


1741 01-CRIDP-22- Vellore Kilvaithinank Strengthening at km 0/0 - 3/8 of 3.80 157.00
23-P-1741 uppam K.V.Kottah Road to Pillanthipattu
Road including Reconstruction of
culvert at Km 1/10 (i) & 3/2 and
Construction of Culvert at Km 1/10
(ii).
Strengthening/Improvements
3.80 157.00
Total
1742 01-CRIDP-22- Vellore Anaikattu Construction of Drain at km 12/4 146.00
23-P-1742 of Guruvarajapalayam - Odugathur
- Melarasampattu Road including
Construction of Retaining wall at
Km 10/0-10/250

Others Total 146.00


Vellore Total 4.80 582.00

ODR SCP Page 172 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1743 01-CRIDP-22- Cheyyar Vandavasi Widening from Single Lane to 3.00 390.00
23-P-1743 Intermediate Lane and
Strengthening at km 2/0 - 5/0 of
Arcot Tindivanam road to
Mavalavady road including
Reconstruction of Culvert at
Km.2/4, 2/6, 2/8, 3/2, 3/10 and
Construction of Culvert at Km.4/2

Other Widening Total 3.00 390.00


1744 01-CRIDP-22- Cheyyar Cheyyar Strengthening at km 1/0 - 1/6 of 0.60 55.00
23-P-1744 Vayalathur - Elacheri road (via)
Arasanipalayam
Strengthening/Improvements
0.60 55.00
Total
Cheyyar Total 3.60 445.00
1745 01-CRIDP-22- Thirupathur Tirupattur Widening from Single Lane to 4.60 626.00
23-P-1745 Intermediate Lane and
Strengthening at km 0/0 - 2/20,
Strengthening at km 2/20 - 4/60 of
Matrapalli - Pudurnadu Road
including Reconstruction of Box
Culvert at Km 0/2, 0/10, 1/2, 2/2,
2/6 (i), 2/6 (ii), 2/8, 3/6
Construction of Drain at Km 2/0 -
2/2 and Construction of Retaining
wall at Km 0/6, 1/2, 2/6, 2/8, 3/4

Other Widening Total 4.60 626.00


Thirupathur Total 4.60 626.00
1746 01-CRIDP-22- Kallakurichi Sankarapura Widening from Single Lane to 2.00 510.00
23-P-1746 m Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Chinnasalem Pandiyankuppam
Road including reconstruction of
culvert at km 0/4, 1/2, 1/4 &
construction of retaining wall at km
0/4-1/4 & 1/8-10.

1747 01-CRIDP-22- Kallakurichi Sankarapura Widening from Single Lane to 1.00 191.00
23-P-1747 m Intermediate Lane and
Strengthening at km 2/0 - 3/0 of
Chinnasalem Pandiyankuppam
Road including construction of
retaining wall at km.2/2, 2/4, 2/6
& 2/8
1748 01-CRIDP-22- Kallakurichi Kallakurichi Widening from Single Lane to 2.60 378.00
23-P-1748 Intermediate Lane and
Strengthening at km 7/2 - 9/8 of
Chinnasalem V. Mamandhur Road
(via) Nainarpalayam including
reconstruction of culvert at km 8/4
(i), (ii), (iii) & construction of
retaining wall at km 7/10 & 8/2.

Other Widening Total 5.60 1079.00


Kallakurichi Total 5.60 1079.00
Tiruvannamalai Circle Total 25.60 3482.00

ODR SCP Page 173 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1749 01-CRIDP-22- Cuddalore Tittakudi Widening from Single Lane to 3.60 420.00
23-P-1749 Intermediate Lane and
Strengthening at km 6/0 - 8/6,
Strengthening at km 8/6 - 9/6 of
Tholudur-Vadagarampoondi road
reconstruction of culvert at Km
6/2, 6/6, 7/6, 8/2, 8/4 & 8/6

Other Widening Total 3.60 420.00


1750 01-CRIDP-22- Cuddalore Chidambara Strengthening at km 0/0 - 2/2 of 2.20 210.00
23-P-1750 m The road from km.132/2 of Trichy-
Chidambaram road to Elanangur
road including reconstruction of
culverts at km.0/2, 0/10, 1/4 &
1/6
Strengthening/Improvements
2.20 210.00
Total
Cuddalore Total 5.80 630.00
Villupuram Circle Total 5.80 630.00
1751 01-CRIDP-22- Salem Gangavalli Widening from Single Lane to 3.00 320.00
23-P-1751 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Thalaivasal - Veeraganur Road to
Punalvasal Road including
Reconstruction of Culvert at
Km.0/4, 0/10, 1/4, 2/8 and
Widening of culvert at Km.1/8

Other Widening Total 3.00 320.00


Salem Total 3.00 320.00
1752 01-CRIDP-22- Edappadi Omalur Widening from Single Lane to 1.60 255.00
23-P-1752 Intermediate Lane and
Strengthening at km 1/6 - 3/1,
Strengthening at km 3/1 - 3/2 of
Pali semmandapatty road
including construction of Retaining
wall at km. 1/10, 2/6, 2/8 and
Reconstruction of Box culvert
km.2/8 (i), (ii) and Extra length of
40m
1753 01-CRIDP-22- Edappadi Edappadi Widening from Single Lane to 3.00 360.00
23-P-1753 Intermediate Lane and
Strengthening at km 0/0 - 3/0 of
Vanavasi- Kuppampatty (via)
Sanaraptty road including
construction of Box Culvert at km
0/10 & 2/4 with dip raising and
Construction of Retaining wall at
Km 0/10, 1/2, 1/6, 1/10 , 2/2 &
2/4.
Other Widening Total 4.60 615.00
Edappadi Total 4.60 615.00
1754 01-CRIDP-22- Dharmapuri Harur Widening from Single Lane to 2.60 390.00
23-P-1754 Intermediate Lane and
Strengthening at km 0/0 - 2/6 of
Sitlingli - Velanur road including
reconstruction of culvert at Km
0/4, 0/6, 1/2, 1/8, 1/10, 2/2, 2/6

ODR SCP Page 174 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1755 01-CRIDP-22- Dharmapuri Harur Widening from Single Lane to 2.40 515.00
23-P-1755 Intermediate Lane and
Strengthening at km 2/6 - 5/0 of
Sitlingli - Velanur road including
reconstruction of culvert at Km
2/8, 3/4, 3/6 (i), (ii), 3/8, 3/10,
4/4, 4/6, 4/10 and construction of
retaining wall at km 4/6

1756 01-CRIDP-22- Dharmapuri Harur Widening from Single Lane to 2.00 218.00
23-P-1756 Intermediate Lane and
Strengthening at km 5/0 - 7/0 of
Andiyur - Ammapet road including
reconstruction of culvert at Km
5/2, 5/4
Other Widening Total 7.00 1123.00
Dharmapuri Total 7.00 1123.00
1757 01-CRIDP-22- Krishnagiri Bargur Widening from Single Lane to 2.00 300.00
23-P-1757 Intermediate Lane and
Strengthening at km 2/0 - 4/0 of
Pannadhur - Bandarahalli road to
DTV and Vadamangalam link road
(Road - A) including CD works and
Retaining Wall
Other Widening Total 2.00 300.00
Krishnagiri Total 2.00 300.00
Salem Circle Total 16.60 2358.00
1758 01-CRIDP-22- Tiruppur Avinashi Widening from Single Lane to 3.80 395.00
23-P-1758 Intermediate Lane and
Strengthening at km 8/0 - 11/8 of
Avinashi - Kootappalli road
including Construction of box
culverts at km 9/10 (i), (ii),11/4 in
lieu of existing damaged pipe
culverts
Other Widening Total 3.80 395.00
Tiruppur Total 3.80 395.00
1759 01-CRIDP-22- Dharapuram Dharapuram Widening from Single Lane to 4.00 310.00
23-P-1759 Intermediate Lane and
Strengthening at km 0/0 - 3/0, 4/0
- 5/0 of Dharapuram -
Mathukampalayam road. including
Reconstruction of Box Culvert at
Km 0/4, 0/10, 1/4, 1/8, 2/4, 2/6,
2/8(i), 2/10 & 4/10

1760 01-CRIDP-22- Dharapuram Madathukula Widening from Single Lane to 1.00 180.00
23-P-1760 m Intermediate Lane and
Strengthening at km 1/4 - 2/4 of
Kolumam - Kallapuram road.
including Cross Drainage Works
Other Widening Total 5.00 490.00
Dharapuram Total 5.00 490.00

ODR SCP Page 175 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1761 01-CRIDP-22- Erode Erode West Widening from Single Lane to 1.40 215.00
23-P-1761 Intermediate Lane and
Strengthening at km 1/6 - 3/0 of
Kolathupalayam - Kongampalayam
road (via) Ellapalayam including
reconstruction of culvert at km
1/8,2/2,2/10, construction of
retaining wall at km 2/2,2/4 and
construction of drain at km
2/8,2/10

1762 01-CRIDP-22- Erode Anthiyur Widening from Single Lane to 1.40 275.00
23-P-1762 Intermediate Lane and
Strengthening at km 5/0 - 6/0
Strengthening at km 6/0 - 6/4 of
Vellitiruppur - Alampalayam road
including Reconstruction of
Culvert at km 5/2(i), (ii) & Km 5/8,
dip raising at Km 5/2,4 and
Construction of Drain at Km 5/0-
5/6
Other Widening Total 2.80 490.00
Erode Total 2.80 490.00
Tiruppur Circle Total 11.60 1375.00
1763 01-CRIDP-22- Pollachi Sulur Widening from Single Lane to 4.60 475.00
23-P-1763 Intermediate Lane and
Strengthening at km 0/0 - 4/6 of
Kattampatti - Koduvai road to
J.Krishnapuram. including
Reconstruction of Culvert at km
0/4, 3/8 Widening of Culvert at km
1/10
Other Widening Total 4.60 475.00
Pollachi Total 4.60 475.00
1764 01-CRIDP-22- Gobi Gobichettipal Widening from Single Lane to 3.00 300.00
23-P-1764 ayam Intermediate Lane and
Strengthening at km 2/0 - 5/0 of
Indranagar-Thoppuvinayagar road
including Reconstruction of Box
Culver at Km 2/4(i), 2/4(ii) 3/2,
3/10 and 4/2 and retaining wall at
Km 3/10, 4/2
Other Widening Total 3.00 300.00
Gobi Total 3.00 300.00
1765 01-CRIDP-22- Udhagai Coonoor Strengthening at km 3/2 - 9/0 of 5.80 490.00
23-P-1765 Kaikatty Kolacombai road including
CD works and Protective works.

Strengthening/Improvements
5.80 490.00
Total
Udhagai Total 5.80 490.00
Coimbatore Circle Total 13.40 1265.00
1766 01-CRIDP-22- Trichy Thuraiyur Widening from Single Lane to 1.80 260.00
23-P-1766 Intermediate Lane and
Strengthening at km 9/0 - 10/8 of
Pulivalam - Abinimangalam-
Edumalai Road including
Reconstruction of Box culverts at
km 9/2, 9/6 & 10/4 and Bus Lay
bye at km 9/6
Other Widening Total 1.80 260.00

ODR SCP Page 176 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1767 01-CRIDP-22- Trichy Thuraiyur Strengthening at km 0/0 - 5/0 of 5.00 240.00


23-P-1767 Viswambalsamudram -
Puliyancholai Road via
Balakrishnampatty including
Construction of Protective wall at
km 0/4
Strengthening/Improvements
5.00 240.00
Total
Trichy Total 6.80 500.00
1768 01-CRIDP-22- Tanjavur Thiruvidaima Widening from Single Lane to 2.60 420.00
23-P-1768 rudur Intermediate Lane and
Strengthening at km 7/0 - 9/6 of
Thiruppanandhal - Kannarakkudy -
Arallur road including
reconstruction of culvert at km
7/10, 8/10 and construction of
Retaining wall at km 7/6, 9/2, 9/4

1769 01-CRIDP-22- Tanjavur Papanasam Widening from Single Lane to 2.00 335.00
23-P-1769 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Sathiamangalam - Valkkai road
including Reconstruction of Culvert
at Km 0/6, 0/10, 1/6(i), (ii), 1/10
and Construction of Retaining Wall
at Km 1/10

1770 01-CRIDP-22- Tanjavur Peravurani Widening from Single Lane to 2.00 322.00
23-P-1770 Intermediate Lane and
Strengthening at km 7/0 - 9/0 of
Alivalam - Nambivayal road
including Reconstruction of Culvert
at Km 7/6, 7/8(i), (ii), 8/4, 8/6,
8/8 & 8/10
1771 01-CRIDP-22- Tanjavur Pattukkottai Widening from Single Lane to 1.00 140.00
23-P-1771 Intermediate Lane and
Strengthening at km 0/0 - 1/0 of 4
B Rajamadam road including
Reconstruction of Culvert 0/2

Other Widening Total 7.60 1217.00


Tanjavur Total 7.60 1217.00
1772 01-CRIDP-22- Pudukottai Aranthangi Widening from Single Lane to 1.00 200.00
23-P-1772 Intermediate Lane and
Strengthening at km 10/0 - 11/0 of
Okkur - Theeyathur road including
reconstruction of culvert at Km
10/2(I),10/2 (II), 10/4,10/8

1773 01-CRIDP-22- Pudukottai Aranthangi Widening from Single Lane to 2.40 475.00
23-P-1773 Intermediate Lane and
Strengthening at km 2/6 - 5/0 of
Kanur - Thiruppunavasal road
including reconstruction of culvert
at Km 2/8, 2/10, 3/2, 3/4, 3/6,
3/8, 4/2(i), 4/2(ii), 4/4, 4/6(i),
4/6(ii), 4/10

ODR SCP Page 177 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1774 01-CRIDP-22- Pudukottai Aranthangi Widening from Single Lane to 2.40 500.00
23-P-1774 Intermediate Lane and
Strengthening at km 4/0 - 5/4, 7/0
- 8/0 of Avudayarkoil -
Kottaipattinam road including
reconstruction of box culvert at Km
4/8, 5/4, 7/2,4 and construction of
retaining wall at Km 4/2,4,6,
7/2,8,10
Other Widening Total 5.80 1175.00
Pudukottai Total 5.80 1175.00
1775 01-CRIDP-22- Tiruvarur Thiruthuraipo Widening from Single Lane to 2.00 272.00
23-P-1775 ondi Intermediate Lane and
Strengthening at km 4/0 - 6/0 of
Vilakkudi - Manali road including
Reconstruction of Box culvert at
Km.4/6
1776 01-CRIDP-22- Tiruvarur Thiruvarur Widening from Single Lane to 4.20 633.00
23-P-1776 Intermediate Lane and
Strengthening at km 0/0 - 4/2 of
Mangudi - Nagalore -
Periyathumbur road
Other Widening Total 6.20 905.00
Tiruvarur Total 6.20 905.00
1777 01-CRIDP-22- Nagapattinam Nagapattinam Widening from Single Lane to 1.20 200.00
23-P-1777 Intermediate Lane and
Strengthening at km 4/0 - 5/2 of
Andipandal - Thirumarugal Road
including Reconstruction of Box
Culvert at Km 4/6, 4/10(i),
4/10(ii)
Other Widening Total 1.20 200.00
1778 01-CRIDP-22- Nagapattinam Nagapattinam Strengthening at km 0/0 - 2/2 of 2.20 215.00
23-P-1778 Manjakollai - Anthanapettai Road
including Reconstruction of box
culvert at km 0/2, 0/4, 1/8

1779 01-CRIDP-22- Nagapattinam Nagapattinam Strengthening at km 0/6 - 1/8 of 1.20 132.00


23-P-1779 Manjakollai - Ivanallur Road
including Reconstruction of box
culvert at km 1/2, 1/8
Strengthening/Improvements
3.40 347.00
Total
Nagapattinam Total 4.60 547.00
1780 01-CRIDP-22- Mayiladuthur Poompuhar Strengthening at km 0/0 - 2/4 of 2.40 190.00
23-P-1780 ai Therilandur - Kottur Road

1781 01-CRIDP-22- Mayiladuthur Poompuhar Strengthening at km 1/0 - 1/6 of 0.60 135.00


23-P-1781 ai Thirukkadiyur - Kannangudy -
Killiyur Road including
Construction of Retaining wall at
Km.1/4-1/6
1782 01-CRIDP-22- Mayiladuthur Poompuhar Strengthening at km 0/0 - 1/2 of 1.20 100.00
23-P-1782 ai Karuppur Union Road including
Reconstruction of Box culvert at
km 0/2
Strengthening/Improvements
4.20 425.00
Total
Mayiladuthurai Total 4.20 425.00
Trichy Circle Total 35.20 4769.00

ODR SCP Page 178 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1783 01-CRIDP-22- Theni Bodinayakan Strengthening at km 1/0 - 1/130 of 0.13 14.00


23-P-1783 ur Thirumalapuram -
Meenatchipuram road
1784 01-CRIDP-22- Theni Bodinayakan Strengthening at km 0/0 - 1/6 of 1.60 138.00
23-P-1784 ur Meenatchipuram vilakku -
Dompucheri road including
Construction of Retaining wall and
Drainage .
1785 01-CRIDP-22- Theni Andipatti Strengthening at km 6/4 - 9/0 of 2.60 184.00
23-P-1785 Andipatty - Theppampatty road to
Gandamanur - Myladumparai road
(via) Banthuvarpatty -
Balasamuthiram including
construction of retainingwall

1786 01-CRIDP-22- Theni Andipatti Strengthening at km 0/0 - 2/0 of 2.00 154.00


23-P-1786 Madurai - Theni road to Asaaripatty
road (via) Karisalpatty including
Reconstruction of culvert at km0/8
and 1/10 and Construction of
Retaining wall

Strengthening/Improvements
6.33 490.00
Total
Theni Total 6.33 490.00
1787 01-CRIDP-22- Palani Palani Widening from Single Lane to 2.00 290.00
23-P-1787 Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
K.C.Patty- Patchalur Road
including Widening of slab culvert
at km 0/8, Widening of Pipe culvert
at km 0/4 (i), 0/4 (II), 0/6 (I), 0/6
(II), 0/6 (III), 1/2, 1/4, 1/6 & 1/10
Construction of Drain at km 0/2 &
1/2 and Construction of retaining
wall at km 0/8, 0/10, 1/4 & 1/8

Other Widening Total 2.00 290.00


Palani Total 2.00 290.00
1788 01-CRIDP-22- Sivagangai Manamadurai Widening from Single Lane to 2.00 200.00
23-P-1788 Intermediate Lane and
Strengthening at km 4/0 - 6/0 of
Thirupachethy - Narikudi road
including Reconstruction of
Culverts
Other Widening Total 2.00 200.00
Sivagangai Total 2.00 200.00
1789 01-CRIDP-22- Ramnad Tiruvadanai Strengthening at km 3/0 - 4/0 of 1.00 125.00
23-P-1789 Ayankudi to Thiruthervilai
Adithiravidar Kudiyiruppu road
including Construction of Breast
wall at Km 3/4,3/6,3/8
1790 01-CRIDP-22- Ramnad Paramakudi Strengthening at km 0/0 - 2/0 of 2.00 165.00
23-P-1790 Kathanendal - Karuthanendal Road
including CD works
Strengthening/Improvements
3.00 290.00
Total
Ramnad Total 3.00 290.00
Madurai Circle Total 13.33 1270.00

ODR SCP Page 179 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1791 01-CRIDP-22- Tenkasi Sankarankovi Widening from Single Lane to 3.20 220.00
23-P-1791 l Intermediate Lane and
Strengthening at km 1/2 - 3/8,
10/0 - 10/6 of Kalugumalai -
Devarkulam road including CD
Works
1792 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 0.20 82.00
23-P-1792 ur Intermediate Lane and
Strengthening at km 2/4 - 2/6 of
Karivalamvanthanallur - Railway
Feeder road including Construction
of Retaining wall
1793 01-CRIDP-22- Tenkasi Sankarankovi Widening from Single Lane to 2.00 182.00
23-P-1793 l Intermediate Lane and
Strengthening at km 0/0 - 2/0 of
Nedungulam - Ramanathapuram
road including Construction of
Breast wall and CD works

1794 01-CRIDP-22- Tenkasi Vasudevanall Widening from Single Lane to 0.40 27.00
23-P-1794 ur Intermediate Lane and
Strengthening at km 0/0 - 0/4 of
Madathupatti - Puliyankudi road

Other Widening Total 5.80 511.00


1795 01-CRIDP-22- Tenkasi Kadayanallur Strengthening at km 0/0 - 1/7 of 1.70 123.00
23-P-1795 Road branching from km 14/4 of
Sivaramapettai - Panpozhi -
Shencottai road to
Periyapillaivalasai including
Construction of Box culvert at Km
1/4
Strengthening/Improvements
1.70 123.00
Total
Tenkasi Total 7.50 634.00
1796 01-CRIDP-22- Virudhunagar Tiruchuli Widening from Single Lane to 3.20 275.00
23-P-1796 Intermediate Lane and
Strengthening at km 0/0 - 3/20 of
Narikudi - Muthaneri Road
including CD works
1797 01-CRIDP-22- Virudhunagar Tiruchuli Widening from Single Lane to 3.20 320.00
23-P-1797 Intermediate Lane and
Strengthening at km 2/8 - 4/0, 6/0
- 8/0 of Keelaparalachi-
Veppankulam Road including CD
Works
Other Widening Total 6.40 595.00
Virudhunagar Total 6.40 595.00
1798 01-CRIDP-22- Tuticorin Vilathikulam Strengthening at km 6/8 - 8/0 of 1.20 75.00
23-P-1798 Mela Arasaradi-Therkkukalmedu
road
Strengthening/Improvements
1.20 75.00
Total
Tuticorin Total 1.20 75.00
Tirunelveli Circle Total 15.10 1304.00
Grand Total 139.63 16933.00

ODR SCP Page 180 of 210


CRIDP 2022 - 2023
LIST OF WORKS - IMPROVEMENTS TO RIDING QUALITY
Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1799 01-CRIDP-22- Chennai City Madavaram Improvements to Riding Quality at 1.40 375.00
23-I-1799 Roads Km 9/0 -10/4 (Both Sides) of
Grand Northern Trunk Road
(SHU87)
1800 01-CRIDP-22- Chennai City Villivakkam Improvements to Riding Quality at 2.10 250.00
23-I-1800 Roads Km 11/2 - 13/3 (RS) of Inner Ring
Road (SH2)
1801 01-CRIDP-22- Chennai City Alandur Improvements to Riding Quality at 3.65 480.00
23-I-1801 Roads km 0/0 - 0/450, 0/9 - 1/4, 1/8 -
3/6, 3/6 - 4/5 of Southern
Sector of Inner Ring Road

1802 01-CRIDP-22- Chennai City Alandur Improvements to Riding Quality at 2.30 130.00
23-I-1802 Roads km 0/0 - 2/3 of Nanganallur Road

1803 01-CRIDP-22- Chennai City Alandur Improvements to Riding Quality at 0.70 50.00
23-I-1803 Roads km 0/0 - 0/7 of Chidambaram
Stores to SBI Colony Road
Chennai City Roads Total 10.15 1285.00
1804 01-CRIDP-22- Thiruvallur Gummidipoo Improvements to Riding Quality at 5.50 150.00
23-I-1804 ndi km 0/0 - 5/5 of K.S Road - N.M.
Kandigai Road
1805 01-CRIDP-22- Thiruvallur Gummidipoo Improvements to Riding Quality at 3.35 90.00
23-I-1805 ndi km 0/0 - 3/350 of Madarpakkam -
Sathiyavedu Road

1806 01-CRIDP-22- Thiruvallur Ponneri Improvements to Riding Quality at 3.80 120.00


23-I-1806 km 0/0 - 3/8 of Km1/4 M.K.T.
Road - Devathanam
(Via)kalpakkam Road
1807 01-CRIDP-22- Thiruvallur Avadi Improvements to Riding Quality at 6.10 435.00
23-I-1807 km 2/2 - 8/3 of Thiruverkadu -
Ambattur road
Thiruvallur Total 18.75 795.00
1808 01-CRIDP-22- Chengalpattu Thiruporur Improvements to Riding Quality at 2.40 256.00
23-I-1808 km 44/7 - 45/5, 50/6 - 52/2 of
Chennai - Mamallapuram Road
(via) Thiruporur (Rajiv Gandhi
Salai)
1809 01-CRIDP-22- Chengalpattu Thiruporur Improvements to Riding Quality at 2.80 68.00
23-I-1809 km 1/6 - 4/4 of The Road
Branching at Km.6/10 of SS Road
to Pattikadu Road
1810 01-CRIDP-22- Chengalpattu Thiruporur Improvements to Riding Quality at 1.00 159.00
23-I-1810 km 57/8 - 58/8 of Chennai - Tirchy
- Dindugal Road (Abandoned
Portion of NH45) (Chengalpattu
Urban Limit)
1811 01-CRIDP-22- Chengalpattu Thiruporur Improvements to Riding Quality at 1.00 80.00
23-I-1811 km 13/0 - 14/0 of Medavakkam -
Mambakkam - Sembakkam Road

1812 01-CRIDP-22- Chengalpattu Thiruporur Improvements to Riding Quality at 0.70 30.00


23-I-1812 km 16/6 - 17/3 of Mambakkam -
Thiruporur Road
1813 01-CRIDP-22- Chengalpattu Thiruporur Improvements to Riding Quality at 1.60 39.00
23-I-1813 km 0/0 - 1/6 of Ayapakkam H/C
Road

IRQP Page 181 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1814 01-CRIDP-22- Chengalpattu Cheyyur Improvements to Riding Quality at 1.20 35.00


23-I-1814 km 0/8 - 2/0 of Pondur -
Villangadu Road
1815 01-CRIDP-22- Chengalpattu Cheyyur Improvements to Riding Quality at 0.47 15.00
23-I-1815 km 0/0 - 0/465 of Kadapakkam
Kuppam Road
1816 01-CRIDP-22- Chengalpattu Cheyyur Improvements to Riding Quality at 1.20 30.00
23-I-1816 km 0/0 - 1/2 of Pavunjur -
Annaicut Road to Kalkulam
1817 01-CRIDP-22- Chengalpattu Cheyyur Improvements to Riding Quality at 2.40 55.00
23-I-1817 km 0/0 - 2/4 of Ariyanoor -
Nesappakkam Road
1818 01-CRIDP-22- Chengalpattu Cheyyur Improvements to Riding Quality at 0.71 22.00
23-I-1818 km 0/0 - 0/705 of Alambarai kottai
Road
Chengalpattu Total 15.47 789.00
1819 01-CRIDP-22- Kanchipuram Madurantaka Improvements to Riding Quality at 2.11 52.00
23-I-1819 m km 2/2 - 4/310 of Km. 10/8 of
Uthiramerur - Kammalampoondi -
Acharapakkam - road to Kadambur
(v) Alapakkam Road

1820 01-CRIDP-22- Kanchipuram Madurantaka Improvements to Riding Quality at 1.90 47.00


23-I-1820 m km 4/6 - 6/5 of Vaipanai -
Vengodu Road to Athiyur - Melthuli
Road
1821 01-CRIDP-22- Kanchipuram Madurantaka Improvements to Riding Quality at 3.00 70.00
23-I-1821 m km 0/0 - 3/0 of Uthiramerur -
Kammalampoondi -
Acharapakkam Road to Cheyyur -
Wandavasi Road (via) Kiliyanagar,
Ottakoil Road
1822 01-CRIDP-22- Kanchipuram Madurantaka Improvements to Riding Quality at 1.70 41.00
23-I-1822 m km 5/0 - 6/7 of The Road
Branching at Km.6/8 of
Uthiramerur - Kammalampoondi -
Acharapakkam Road and joining at
Km 11/6 of Vedanthangal Road

1823 01-CRIDP-22- Kanchipuram Madurantaka Improvements to Riding Quality at 1.60 39.00


23-I-1823 m km 0/0 - 1/6 of Vedantahangal -
Chithrakoodam Road

1824 01-CRIDP-22- Kanchipuram Kancheepura Improvements to Riding Quality at 1.80 220.00


23-I-1824 m km 64/2 - 66/0 of Sadras -
Chengalpattu - Kanchipuram -
Arakkonam - Thiruthani Road
Kanchipuram Total 12.11 469.00
Chennai Circle Total 56.48 3338.00
1825 01-CRIDP-22- Tiruvannamal Chengam Improvements to Riding Quality at 2.50 90.00
23-I-1825 ai km 17/5 - 20/0 of Pakkiripalayam-
Elangunni road (via) Neepathurai

1826 01-CRIDP-22- Tiruvannamal Chengam Improvements to Riding Quality at 0.80 20.00


23-I-1826 ai km 2/4 - 3/0, 5/6 - 5/8 of Bondai
Puliampatti road
1827 01-CRIDP-22- Tiruvannamal Kilpennathur Improvements to Riding Quality at 13.40 675.00
23-I-1827 ai km 0/0 - 13/4 of Sanipoondi -
Kilpennathur - Avalurpet - Chetpet
road

IRQP Page 182 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1828 01-CRIDP-22- Tiruvannamal Kilpennathur Improvements to Riding Quality at 1.70 45.00


23-I-1828 ai km 0/0 - 1/7 of Kolakaravadi road
to Kolathur road (via)
Echankuppam
1829 01-CRIDP-22- Tiruvannamal Kilpennathur Improvements to Riding Quality at 6.40 150.00
23-I-1829 ai km 2/0 - 3/2, 4/4 - 9/6 of
Thandarai Vaipoor road
1830 01-CRIDP-22- Tiruvannamal Kilpennathur Improvements to Riding Quality at 3.40 85.00
23-I-1830 ai km 0/0 - 3/4 of Villupuram
Tiruvannamalai road to Naraiyur
road
1831 01-CRIDP-22- Tiruvannamal Kilpennathur Improvements to Riding Quality at 1.15 30.00
23-I-1831 ai km 0/0 - 1/15 of Thandarai road

1832 01-CRIDP-22- Tiruvannamal Kalasapakka Improvements to Riding Quality at 3.60 200.00


23-I-1832 ai m km 7/0 - 10/6 of N.C.Veeralore
road
1833 01-CRIDP-22- Tiruvannamal Polur Improvements to Riding Quality at 2.57 65.00
23-I-1833 ai km 0/0 - 1/95, 0/0 - 0/62 of
Erikarai road upto Chinnasamy
Field (Vallur Village) to Harichanda
loop road
Tiruvannamalai Total 35.52 1360.00
1834 01-CRIDP-22- Ranipet Arakkonam Improvements to Riding Quality at 3.20 85.00
23-I-1834 km 0/0 - 3/2 of Athur Road
Joining at Km 88/8 of Sadras
Chengalpattu Arakkonam
Kancheepuram Thiruthani Road
1835 01-CRIDP-22- Ranipet Arakkonam Improvements to Riding Quality at 1.00 27.00
23-I-1835 km 7/0 - 8/0 of Kavanur Konalam
Anaipakkam Veppagundapalayam
Road
1836 01-CRIDP-22- Ranipet Arakkonam Improvements to Riding Quality at 1.00 53.00
23-I-1836 km 1/4 - 2/4 of Arakkonam
Melpakkam R.O.B. Road
1837 01-CRIDP-22- Ranipet Sholingur Improvements to Riding Quality at 1.80 49.00
23-I-1837 km 1/2 - 3/0 of Km 8/4 of Ayal
Anwarthikhanpet Road to
Mettukunnathur Road
1838 01-CRIDP-22- Ranipet Sholingur Improvements to Riding Quality at 3.60 105.00
23-I-1838 km 0/0 - 3/6 of Road from Km
24/10 of Arakkonam Ocheri Road
to Join at Km 87/8 of M.C.B.Road
(via) Poigainallur
1839 01-CRIDP-22- Ranipet Sholingur Improvements to Riding Quality at 3.00 78.00
23-I-1839 km 0/0 - 3/0 of Km 94/2 of
Chennai Chittoor Bangalore Road
to Vegamangalam Road (via)
Sirukarumbur.
1840 01-CRIDP-22- Ranipet Arcot Improvements to Riding Quality at 3.40 185.00
23-I-1840 km 19/0 - 19/2, 20/0 - 23/2 of
Pudupadi - Illuppai - Vadailluppai -
Vishar - Kancheepuram Road

1841 01-CRIDP-22- Ranipet Arcot Improvements to Riding Quality at 2.80 64.00


23-I-1841 km 0/0 - 2/8 of Ayiramangalam
Chenganavaram Road

IRQP Page 183 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1842 01-CRIDP-22- Ranipet Arcot Improvements to Riding Quality at 2.40 55.00


23-I-1842 km 0/0 - 2/4 of Ayiramangalam
Seeyambadi Road

Ranipet Total 22.20 701.00


1843 01-CRIDP-22- Vellore Katpadi Improvements to Riding Quality at 1.80 45.00
23-I-1843 km 0/0 - 1/8 of Vinnampalli
Mittoor Magimandalam Road
1844 01-CRIDP-22- Vellore Katpadi Improvements to Riding Quality at 7.20 181.00
23-I-1844 km 0/0 - 7/2 of Kokkeri
Ramapuram Ammavarpalli Road
1845 01-CRIDP-22- Vellore Katpadi Improvements to Riding Quality at 5.80 153.00
23-I-1845 km 0/0 - 5/8 of Vandranthangal
K.V.Kottah Road

1846 01-CRIDP-22- Vellore Anaikattu Improvements to Riding Quality at 7.65 415.00


23-I-1846 km 0/0 - 5/0, 16/550 - 19/2 of
Nelvoy Pallikonda Road
1847 01-CRIDP-22- Vellore Anaikattu Improvements to Riding Quality at 2.55 111.00
23-I-1847 km 3/2 - 4/140, 4/250 - 5/858 of
Thellur Road
1848 01-CRIDP-22- Vellore Kilvaithinank Improvements to Riding Quality at 0.40 21.00
23-I-1848 uppam km 28/4 - 28/8 of Pallikonda -
Palamaneri Road
Vellore Total 25.40 926.00
1849 01-CRIDP-22- Cheyyar Arani Improvements to Riding Quality at 1.00 40.00
23-I-1849 km 28/0 - 29/0 of Arcot-
Villupuram road
1850 01-CRIDP-22- Cheyyar Arani Improvements to Riding Quality at 6.60 310.00
23-I-1850 km 0/0 - 4/0, 5/2 - 7/8 of Arni
Vandavasi road
1851 01-CRIDP-22- Cheyyar Arani Improvements to Riding Quality at 6.00 130.00
23-I-1851 km 0/0 - 4/0, 6/8 - 8/8 of
Karipoor Madura Perumattor Road

1852 01-CRIDP-22- Cheyyar Arani Improvements to Riding Quality at 1.80 36.00


23-I-1852 km 0/0 - 1/8 of Vadakumedu
Senganavaram road
1853 01-CRIDP-22- Cheyyar Arani Improvements to Riding Quality at 2.00 40.00
23-I-1853 km 0/0 - 2/0 of Arcot -
Villupuaram Road to Adiyapulam
Road to Meyyur
1854 01-CRIDP-22- Cheyyar Arani Improvements to Riding Quality at 3.00 60.00
23-I-1854 km 0/0 - 3/0 of Vannankulam -
Onnupuram Road

1855 01-CRIDP-22- Cheyyar Arani Improvements to Riding Quality at 1.10 22.00


23-I-1855 km 1/0 - 2/1 of Mullandram -
Mottukudisai Road
1856 01-CRIDP-22- Cheyyar Arani Improvements to Riding Quality at 0.75 18.00
23-I-1856 km 1/250 - 2/0 of Agrapalayam -
S.U.Vannam Road (Via) Sirumoor

1857 01-CRIDP-22- Cheyyar Vandavasi Improvements to Riding Quality at 3.00 178.00


23-I-1857 km 20/8 - 22/0, 23/4 - 24/0, 24/2
- 25/0, 38/6 - 39/0 of Arni
Vandavasi road
1858 01-CRIDP-22- Cheyyar Vandavasi Improvements to Riding Quality at 3.60 70.00
23-I-1858 km 0/0 - 3/6 of Theyyar road
Cheyyar Total 28.85 904.00

IRQP Page 184 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1859 01-CRIDP-22- Thirupathur Vaniyambadi Improvements to Riding Quality at 1.00 58.00


23-I-1859 km 70/0 - 71/0 of Polur -
Jamunamarthur - Alangayam -
Vaniambadi Road
1860 01-CRIDP-22- Thirupathur Vaniyambadi Improvements to Riding Quality at 3.20 90.00
23-I-1860 km 0/0 - 3/20 of Poongulam Road

1861 01-CRIDP-22- Thirupathur Ambur Improvements to Riding Quality at 2.60 65.00


23-I-1861 km 0/0 - 2/60 of Madanancheri -
Ilayanagaram Road

1862 01-CRIDP-22- Thirupathur Jolarpet Improvements to Riding Quality at 1.40 65.00


23-I-1862 km 5/8 - 6/0, 6/8 - 8/0 of
Jolarpet - Natrampalli Road
1863 01-CRIDP-22- Thirupathur Jolarpet Improvements to Riding Quality at 1.60 53.00
23-I-1863 km 1/20 - 2/80 of Kalnarsampatti
Road
1864 01-CRIDP-22- Thirupathur Jolarpet Improvements to Riding Quality at 1.80 56.00
23-I-1864 km 0/0 - 1/8 of KM 72/6 of
Dharmapuri - Tirupattur-
Vaniyambadi Road to
Chinakamyampattu Road
1865 01-CRIDP-22- Thirupathur Jolarpet Improvements to Riding Quality at 3.50 102.00
23-I-1865 km 0/0 - 3/50 of KM 39/10 of N.H.
46 to Kaveripattu Road (Via)
Ezharaipatti
1866 01-CRIDP-22- Thirupathur Tirupattur Improvements to Riding Quality at 5.00 125.00
23-I-1866 km 0/0 - 5/0 of Tirupattur -
Singarapet Road to Thoranampathi
Road (Via) Chinarampattu

1867 01-CRIDP-22- Thirupathur Tirupattur Improvements to Riding Quality at 3.40 115.00


23-I-1867 km 6/0 - 9/4 of Tirupattur -
Jalagamparai Road
1868 01-CRIDP-22- Thirupathur Tirupattur Improvements to Riding Quality at 1.80 58.00
23-I-1868 km 0/0 - 1/80 of
Thimmanamathur - Thammanur
Road
1869 01-CRIDP-22- Thirupathur Tirupattur Improvements to Riding Quality at 2.40 75.00
23-I-1869 km 2/0 - 4/40 of Udayamuthur -
Thirumapuram Road

Thirupathur Total 27.70 862.00


1870 01-CRIDP-22- Kallakurichi Ulundurpettai Improvements to Riding Quality at 2.80 115.00
23-I-1870 km 18/0 - 20/8 of Mangalampettai
ElavanasurKottai Road

1871 01-CRIDP-22- Kallakurichi Rishivandiya Improvements to Riding Quality at 0.95 24.00


23-I-1871 m km 7/150 - 8/1 of Thagadi
Thiyagadurgam Manalurpettai
Road
1872 01-CRIDP-22- Kallakurichi Rishivandiya Improvements to Riding Quality at 2.40 60.00
23-I-1872 m km 0/0 - 2/0, 4/0 - 4/4 of
Manalurpet Jambai Road
1873 01-CRIDP-22- Kallakurichi Rishivandiya Improvements to Riding Quality at 1.25 30.00
23-I-1873 m km 1/2 - 2/450 of Athiyandhal
Road
1874 01-CRIDP-22- Kallakurichi Rishivandiya Improvements to Riding Quality at 0.80 42.00
23-I-1874 m km 71/6 - 72/4 of Cuddalore -
Tirukoilur - Sankarapuram Road
1875 01-CRIDP-22- Kallakurichi Rishivandiya Improvements to Riding Quality at 4.00 94.00
23-I-1875 m km 0/0 - 4/0 of Sithal Sitheripattu
Road

IRQP Page 185 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1876 01-CRIDP-22- Kallakurichi Rishivandiya Improvements to Riding Quality at 2.80 72.00


23-I-1876 m km 0/0 - 2/8 of Kazhumaram Road

1877 01-CRIDP-22- Kallakurichi Sankarapura Improvements to Riding Quality at 1.00 40.00


23-I-1877 m km 1/0 - 2/0 of Chinnasalem
Elavadi Road
1878 01-CRIDP-22- Kallakurichi Sankarapura Improvements to Riding Quality at 3.40 185.00
23-I-1878 m km 3/6 - 7/0 of A. Pandalam R.V.
Nallur Road
1879 01-CRIDP-22- Kallakurichi Kallakurichi Improvements to Riding Quality at 2.60 56.00
23-I-1879 km 6/0 - 8/6 of Melnariyappanur
Kalasamudhram Road

1880 01-CRIDP-22- Kallakurichi Kallakurichi Improvements to Riding Quality at 2.68 57.00


23-I-1880 km 2/0 - 4/675 of Chinnasalem
Koogaiyur Road to Periyeri road
(via) Pakkambadi
1881 01-CRIDP-22- Kallakurichi Kallakurichi Improvements to Riding Quality at 2.00 43.00
23-I-1881 km 0/0 - 2/0 of Melur Road

1882 01-CRIDP-22- Kallakurichi Kallakurichi Improvements to Riding Quality at 1.60 40.00


23-I-1882 km 13/6 - 15/2 of Thiyagadurgam
Pudhukeni Road
Kallakurichi Total 28.28 858.00
Tiruvannamalai Circle Total 167.94 5611.00
1883 01-CRIDP-22- Villupuram Mailam Improvements to Riding Quality at 5.00 131.00
23-I-1883 km 0/0 - 5/0 of Sendiyampakkam-
Kothamangalam road

1884 01-CRIDP-22- Villupuram Vanur Improvements to Riding Quality at 9.00 320.00


23-I-1884 km 0/0 - 9/0 of Moratandy -
Bommiyapalayam road
1885 01-CRIDP-22- Villupuram Vikravandi Improvements to Riding Quality at 1.40 40.00
23-I-1885 km 0/0 - 1/4 of Anniyur-
Kosapalayam road
1886 01-CRIDP-22- Villupuram Vikravandi Improvements to Riding Quality at 2.40 69.00
23-I-1886 km 3/2 - 5/6 of Sathanur-
Kottiyampoondy road
1887 01-CRIDP-22- Villupuram Tirukkoyilur Improvements to Riding Quality at 3.00 82.00
23-I-1887 km 0/0 - 3/0 of Andrayanallur
Road
1888 01-CRIDP-22- Villupuram Tirukkoyilur Improvements to Riding Quality at 1.88 50.00
23-I-1888 km 0/0 - 1/880 of Veerangipuram
Road
1889 01-CRIDP-22- Villupuram Tirukkoyilur Improvements to Riding Quality at 1.00 28.00
23-I-1889 km 4/0 - 5/0 of Km 56/2 of
Cuddalore Chithoor Road road to
Sikkampattu via Dhamal
Kondasamudram
1890 01-CRIDP-22- Villupuram Tirukkoyilur Improvements to Riding Quality at 3.20 83.00
23-I-1890 km 0/0 - 3/2 of Amoor Road
1891 01-CRIDP-22- Villupuram Tirukkoyilur Improvements to Riding Quality at 4.60 197.00
23-I-1891 km 11/0 - 15/6 of Arakandanallur
Ayandhur Road
Villupuram Total 31.48 1000.00
1892 01-CRIDP-22- Cuddalore Tittakudi Improvements to Riding Quality at 1.70 43.00
23-I-1892 km 0/0 - 1/7 of Road branching
from km 3/2 of Avinangudi -
Adhamanagalm road to Tholar road

IRQP Page 186 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1893 01-CRIDP-22- Cuddalore Tittakudi Improvements to Riding Quality at 2.20 58.00


23-I-1893 km 1/6 - 3/8 of Sitheri-
Korakkavadi road
1894 01-CRIDP-22- Cuddalore Tittakudi Improvements to Riding Quality at 2.40 79.00
23-I-1894 km 0/0 - 2/4 of Eraiyur -
Kandappankurichi - Nallur road
1895 01-CRIDP-22- Cuddalore Neyveli Improvements to Riding Quality at 1.20 37.00
23-I-1895 km 0/0 - 1/2 of Vasanankuppam
road
1896 01-CRIDP-22- Cuddalore Neyveli Improvements to Riding Quality at 2.30 68.00
23-I-1896 km 5/9 - 8/2 of Vegakollai road

1897 01-CRIDP-22- Cuddalore Panruti Improvements to Riding Quality at 2.40 72.00


23-I-1897 km 0/0 - 2/4 of Pagandai-
Melkumaramangalam road
1898 01-CRIDP-22- Cuddalore Panruti Improvements to Riding Quality at 1.84 60.00
23-I-1898 km 0/560 - 2/4 of The road from
km.18/6 of Cuddalore-Chittoor
road to Madhakadipattu road (via)
Kozhipakkam
1899 01-CRIDP-22- Cuddalore Panruti Improvements to Riding Quality at 1.47 50.00
23-I-1899 km 0/0 - 1/47 of Nesanur road

1900 01-CRIDP-22- Cuddalore Cuddalore Improvements to Riding Quality at 1.00 30.00


23-I-1900 km 3/0 - 4/0 of Nallathur road

1901 01-CRIDP-22- Cuddalore Kurinjipadi Improvements to Riding Quality at 1.80 50.00


23-I-1901 km 0/0 - 1/8 of Pillali-Otteri road

1902 01-CRIDP-22- Cuddalore Kurinjipadi Improvements to Riding Quality at 1.00 22.00


23-I-1902 km 1/4 - 2/4 of The road from
km.2/4 of CTS road to
Arisiperiyankuppam road
1903 01-CRIDP-22- Cuddalore Kurinjipadi Improvements to Riding Quality at 1.40 40.00
23-I-1903 km 0/0 - 1/4 of Ramapuram-
Othiyadikuppam road
1904 01-CRIDP-22- Cuddalore Kurinjipadi Improvements to Riding Quality at 1.20 57.00
23-I-1904 km 0/0 - 1/2 of Thiruvandipuram
road
1905 01-CRIDP-22- Cuddalore Kurinjipadi Improvements to Riding Quality at 1.41 45.00
23-I-1905 km 0/0 - 1/410 of Kurinjipady-
Virupachi road
1906 01-CRIDP-22- Cuddalore Bhuvanagiri Improvements to Riding Quality at 2.20 63.00
23-I-1906 km 0/0 - 0/8, 2/0 - 3/4 of
Pinnalur-Manjakollai road
1907 01-CRIDP-22- Cuddalore Bhuvanagiri Improvements to Riding Quality at 1.60 50.00
23-I-1907 km 0/0 - 1/6 of Vadakkuthittai
road
1908 01-CRIDP-22- Cuddalore Bhuvanagiri Improvements to Riding Quality at 2.00 60.00
23-I-1908 km.0/0 - 2/0 of Paradhur road

1909 01-CRIDP-22- Cuddalore Chidambara Improvements to Riding Quality at 0.65 23.00


23-I-1909 m km 2/0 - 2/650 of Periyakomati-
Senthirakillai road
1910 01-CRIDP-22- Cuddalore Kattumannar Improvements to Riding Quality at 3.40 83.00
23-I-1910 koil km 10/0 - 13/4 of Kumaratchi-
Vallampadugai road
1911 01-CRIDP-22- Cuddalore Kattumannar Improvements to Riding Quality at 5.70 170.00
23-I-1911 koil km 0/0 - 5/7 of Kumaragudy-
Nachiyarpettai road to Kavalagudy
road
Cuddalore Total 38.87 1160.00

IRQP Page 187 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1912 01-CRIDP-22- Ariyalur Ariyalur Improvements to Riding Quality at 1.00 50.00


23-I-1912 km 0/0 - 1/0 of Keelapaalur -
Pullambadi road (via)
Thirumalapadi
1913 01-CRIDP-22- Ariyalur Ariyalur Improvements to Riding Quality at 2.40 121.00
23-I-1913 km 14/6 - 17/0 of Thirumanur -
Elakkurichi - Thoothur road

1914 01-CRIDP-22- Ariyalur Ariyalur Improvements to Riding Quality at 2.60 155.00


23-I-1914 km 32/0 - 34/6 of Ariyalur -
Muthuvanchery - Sripuranthan
road
1915 01-CRIDP-22- Ariyalur Jayankondam Improvements to Riding Quality at 1.00 25.00
23-I-1915 km 0/0 - 1/0 of Trichi -
Chidambaram road to
T.Cholankurichi road
1916 01-CRIDP-22- Ariyalur Jayankondam Improvements to Riding Quality at 1.60 44.00
23-I-1916 km 4/4 - 6/0 of Kavarapalayam -
Varadharajanpettai road

1917 01-CRIDP-22- Ariyalur Jayankondam Improvements to Riding Quality at 3.00 82.00


23-I-1917 km 3/0 - 6/0 of Anaikudam -
Nayaganaipriyal -
Vanathirayanpattinam road
Ariyalur Total 11.60 477.00
1918 01-CRIDP-22- Perambalur Perambalur Improvements to Riding Quality at 3.20 109.00
23-I-1918 km 11/0 - 14/2 of Periavadakarai -
Kaikalathur - Pillangulam road

1919 01-CRIDP-22- Perambalur Perambalur Improvements to Riding Quality at 0.60 14.00


23-I-1919 km 3/0 - 3/6 of Annamangalam -
Thondamandurai road to
Pillayarpalayam road

1920 01-CRIDP-22- Perambalur Perambalur Improvements to Riding Quality at 0.99 27.00


23-I-1920 km 1/2 - 2/185 of Chinnaru
Junction to Eraiyur road [Via]
Sugar Factory
1921 01-CRIDP-22- Perambalur Perambalur Improvements to Riding Quality at 1.30 38.00
23-I-1921 km 0/1 - 1/4 of Mettucheri -
Ranjangudi road
1922 01-CRIDP-22- Perambalur Kunnam Improvements to Riding Quality at 1.00 25.00
23-I-1922 km 1/0 - 2/0 of Sendurai -
Anganur - Agaramseegore -
Thirumandurai road to Kilumathur
road [Via] Ogalur
Palayarasamangalam
1923 01-CRIDP-22- Perambalur Kunnam Improvements to Riding Quality at 3.90 95.00
23-I-1923 km 0/7 - 4/6 of Km 15/0 of
Perambalur - Manamadurai road to
Moongilpadi road [Via]
Periyammapalayam

IRQP Page 188 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1924 01-CRIDP-22- Perambalur Kunnam Improvements to Riding Quality at 1.00 25.00


23-I-1924 km 0/0 - 1/0 of Keelaperambalur -
Velvimangalam road

Perambalur Total 11.99 333.00


Villupuram Circle Total 93.94 2970.00
1925 01-CRIDP-22- Salem Attur Improvements to Riding Quality at 3.00 90.00
23-I-1925 km 5/0 - 8/0 of Karumandurai-
Soolankurichi road

1926 01-CRIDP-22- Salem Attur Improvements to Riding Quality at 1.60 45.00


23-I-1926 km 0/0 - 1/6 of Umayalpuram road

1927 01-CRIDP-22- Salem Attur Improvements to Riding Quality at 3.60 95.00


23-I-1927 km 3/0 - 6/6 of Belur-Ethapur
road
1928 01-CRIDP-22- Salem Yercaud Improvements to Riding Quality at 1.00 40.00
23-I-1928 km 2/6 - 3/6 of Nagalur-Puthur
Road
1929 01-CRIDP-22- Salem Yercaud Improvements to Riding Quality at 3.80 265.00
23-I-1929 km 22/2 - 23/4, 28/0 - 30/6 of
Salem Junction to Yercadu Road

1930 01-CRIDP-22- Salem Yercaud Improvements to Riding Quality at 2.40 115.00


23-I-1930 km 16/0 - 18/4 of Kuppanur-
Kottachedu-Valavanthi Road
1931 01-CRIDP-22- Salem Yercaud Improvements to Riding Quality at 4.03 112.00
23-I-1931 km 0/0 - 4/025 of Koottathupatty-
Vilampatty road
1932 01-CRIDP-22- Salem Yercaud Improvements to Riding Quality at 9.44 275.00
23-I-1932 km 18/6 - 28/035 of Belur-
Arunuthumalai road
1933 01-CRIDP-22- Salem Yercaud Improvements to Riding Quality at 0.80 50.00
23-I-1933 km 9/2 - 10/0 of Valapady-
Thimmanaickenpatty Road
Salem Total 29.66 1087.00
1934 01-CRIDP-22- Edappadi Omalur Improvements to Riding Quality at 3.00 200.00
23-I-1934 km 0/0 - 3/0 of Theevattipatty-
Danispet-Boomidi Road

1935 01-CRIDP-22- Edappadi Omalur Improvements to Riding Quality at 2.90 160.00


23-I-1935 km 0/0 - 2/9 of Karuppur-
Vellapatty-Thathiyangarpatty road

1936 01-CRIDP-22- Edappadi Omalur Improvements to Riding Quality at 1.00 32.00


23-I-1936 km 0/0 - 1/0 of Vattakkadu road

1937 01-CRIDP-22- Edappadi Mettur Improvements to Riding Quality at 2.20 60.00


23-I-1937 km 0/0 - 2/2 of Thoppur- Mettur -
Bhavani -Erode road to Amaram
Kamatchiamman kovil road

1938 01-CRIDP-22- Edappadi Edappadi Improvements to Riding Quality at 5.02 150.00


23-I-1938 km 0/0 - 5/015 of Ammamnkovil-
Madhanaickenpatty road

1939 01-CRIDP-22- Edappadi Edappadi Improvements to Riding Quality at 6.70 250.00


23-I-1939 km 0/0 - 6/7 of Chittur - Adaiyur -
Jalagandapuram road (via)
Pakkanadu

IRQP Page 189 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1940 01-CRIDP-22- Edappadi Edappadi Improvements to Riding Quality at 2.00 90.00


23-I-1940 km 1/0 - 3/0 of Koneripatty -
Kalvadangam road
1941 01-CRIDP-22- Edappadi Edappadi Improvements to Riding Quality at 6.00 218.00
23-I-1941 km 0/0 - 2/8, 4/4 - 7/6 of
Moolapathai - Irupali road (via)
Chittur
1942 01-CRIDP-22- Edappadi Edappadi Improvements to Riding Quality at 2.00 55.00
23-I-1942 km 5/0 - 6/0, 7/0 - 8/0 of
Edapady - Dadapuram road -
Katchupalli - Pudupalayam road
1943 01-CRIDP-22- Edappadi Sankari Improvements to Riding Quality at 1.00 80.00
23-I-1943 km 17/5 - 18/5 of
Jagirammapalayam -
Tharamangalam Road
1944 01-CRIDP-22- Edappadi Sankari Improvements to Riding Quality at 2.00 80.00
23-I-1944 km 1/4 - 3/4 of Katheri -
Vaikundampalayam Road
1945 01-CRIDP-22- Edappadi Sankari Improvements to Riding Quality at 2.80 95.00
23-I-1945 km 0/0 - 2/8 of Annamar Kovil -
Poomaniyur road
1946 01-CRIDP-22- Edappadi Sankari Improvements to Riding Quality at 2.20 61.00
23-I-1946 km 2/4 - 4/6 of Irugalur -
Uthupalayam road
1947 01-CRIDP-22- Edappadi Sankari Improvements to Riding Quality at 1.80 50.00
23-I-1947 km 6/6 - 7/4, 8/6 - 9/4, 12/4 -
12/6 of Katchupalli -
Alagappampalayam - Elampillai
road
Edappadi Total 40.62 1581.00
1948 01-CRIDP-22- Namakkal Rasipuram Improvements to Riding Quality at 1.20 40.00
23-I-1948 km 1/0 - 2/2 of Kakkaveri -
Pattanam road
1949 01-CRIDP-22- Namakkal Rasipuram Improvements to Riding Quality at 1.85 50.00
23-I-1949 km 10/2 - 12/050 of Elur -
Nattamangalam- Gurusami
palayam road
1950 01-CRIDP-22- Namakkal Rasipuram Improvements to Riding Quality at 1.66 54.00
23-I-1950 km 0/0 - 1/660 of Athumedu -
Munjanur - Kallupalayam road
1951 01-CRIDP-22- Namakkal Rasipuram Improvements to Riding Quality at 1.00 30.00
23-I-1951 km 0/0 - 1/0 of Km 3/6 of
Attaiyampatti - Masakalipatti road
to Nachipatti road
1952 01-CRIDP-22- Namakkal Senthamanga Improvements to Riding Quality at 2.00 115.00
23-I-1952 lam km 19/0 - 21/0 of Namakkal -
Kananur road
1953 01-CRIDP-22- Namakkal Senthamanga Improvements to Riding Quality at 3.00 80.00
23-I-1953 lam km 0/0 - 3/0 of Palayapalayam -
Salapalayam - Perumapatti road

1954 01-CRIDP-22- Namakkal Namakkal Improvements to Riding Quality at 2.60 295.00


23-I-1954 km 24/8 - 27/4 of Tiruchengode -
Namakkal road
1955 01-CRIDP-22- Namakkal Namakkal Improvements to Riding Quality at 3.00 68.50
23-I-1955 km 9/0 - 12/0 of Namakkal -
Thindaman galam - Keerambur
road.
1956 01-CRIDP-22- Namakkal Namakkal Improvements to Riding Quality at 2.70 63.50
23-I-1956 km 0/0 - 2/7 of Thaligai union
road

IRQP Page 190 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1957 01-CRIDP-22- Namakkal Namakkal Improvements to Riding Quality at 3.80 188.00


23-I-1957 km 2/4 - 3/4, 4/2 - 7/0 of
Nainamalai - Sendamangalam road

1958 01-CRIDP-22- Namakkal Paramathi Improvements to Riding Quality at 1.20 49.50


23-I-1958 Velur km 9/4 - 10/6 of Velur- Mohanur
road
1959 01-CRIDP-22- Namakkal Paramathi Improvements to Riding Quality at 1.60 39.50
23-I-1959 Velur km 0/0 - 1/6 of Km 1/2 Velur-
Mohanur road to Veranam palayam
(via) Milk chilling centre,
Vettukattu pudur road.
1960 01-CRIDP-22- Namakkal Paramathi Improvements to Riding Quality at 0.88 38.00
23-I-1960 Velur km 0/0 - 0/879 of Approach road
to Mohanur - Vangal bridge
Namakkal Total 26.49 1111.00
1961 01-CRIDP-22- Dharmapuri Palacode Improvements to Riding Quality at 1.40 95.00
23-I-1961 km 50/0 - 51/4 of Morappur -
Marandahalli road
1962 01-CRIDP-22- Dharmapuri Palacode Improvements to Riding Quality at 0.50 40.00
23-I-1962 km 38/0 - 38/3, 44/6 - 44/8 of
Morappur - Marandahalli road
1963 01-CRIDP-22- Dharmapuri Pennagaram Improvements to Riding Quality at 4.80 135.00
23-I-1963 km 0/0 - 4/8 of Sellamudi -
Narimedu - Koundanur road
1964 01-CRIDP-22- Dharmapuri Dharmapuri Improvements to Riding Quality at 1.00 120.00
23-I-1964 km 45/8 - 46/8 of Hogenakkal -
Pennagaram - Dharmapuri -
Thirupathur road
1965 01-CRIDP-22- Dharmapuri Pappireddipp Improvements to Riding Quality at 1.00 30.00
23-I-1965 atti km 1/2 - 2/2 of Thurinjipatti road

1966 01-CRIDP-22- Dharmapuri Pappireddipp Improvements to Riding Quality at 2.80 68.00


23-I-1966 atti km 0/0 - 2/8 of Mottankurichi
road
1967 01-CRIDP-22- Dharmapuri Pappireddipp Improvements to Riding Quality at 1.40 46.00
23-I-1967 atti km 17/0 - 18/4 of Mallapuram -
Gopinathampatti road

1968 01-CRIDP-22- Dharmapuri Harur Improvements to Riding Quality at 3.83 110.00


23-I-1968 km 22/0 - 25/828 of Harur -
Sitheri road
1969 01-CRIDP-22- Dharmapuri Harur Improvements to Riding Quality at 3.60 95.00
23-I-1969 km 2/4 - 6/0 of Harur - Achalvadi -
Pethathampatti X road

1970 01-CRIDP-22- Dharmapuri Harur Improvements to Riding Quality at 3.00 78.00


23-I-1970 km 0/0 - 3/0 of Navalai -
Gobinathampatti road (Via)
Bompatti - Marapanickanpatti road

Dharmapuri Total 23.33 817.00


1971 01-CRIDP-22- Krishnagiri Bargur Improvements to Riding Quality at 4.10 225.00
23-I-1971 km 16/0 - 18/5, 19/4 - 21/0 of
Krishnagiri - Kandhikuppam road

1972 01-CRIDP-22- Krishnagiri Bargur Improvements to Riding Quality at 1.20 36.00


23-I-1972 km 0/0 - 1/2 of Mangalpatty road

1973 01-CRIDP-22- Krishnagiri Bargur Improvements to Riding Quality at 4.40 120.00


23-I-1973 km 0/0 - 2/0, 4/2 - 6/6 of
Orappam - Sentharapalli road

IRQP Page 191 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1974 01-CRIDP-22- Krishnagiri Bargur Improvements to Riding Quality at 2.00 70.00


23-I-1974 km 6/0 - 7/6, 8/0 - 8/4 of Bargur -
Sinthagampalli road
Krishnagiri Total 11.70 451.00
Salem Circle Total 131.79 5047.00
1975 01-CRIDP-22- Tiruppur Kangayam Improvements to Riding Quality at 3.60 85.00
23-I-1975 km 0/0 - 3/6 of Gobi -
Dharapuram road at Km 66/2 of
the road from Kullampalayam (Via)
Sengodampalayam road
1976 01-CRIDP-22- Tiruppur Kangayam Improvements to Riding Quality at 1.20 30.00
23-I-1976 km 4/0 - 5/2 of Mullipuram -
Unjamaram road
1977 01-CRIDP-22- Tiruppur Kangayam Improvements to Riding Quality at 4.20 110.00
23-I-1977 km 9/2 - 13/4 of Nagi - Gudalur -
Mysore road to Thayampalayam

1978 01-CRIDP-22- Tiruppur Avinashi Improvements to Riding Quality at 1.20 140.00


23-I-1978 km 116/8 - 117/8, 118/0 - 118/2
of Salem - Cochin road NH 47
abandoned stretch (Avinashi town)

1979 01-CRIDP-22- Tiruppur Tiruppur Improvements to Riding Quality at 3.20 90.00


23-I-1979 North km 0/0 - 3/2 of Road from Km
107/8 of Salem Cochin road
Rakkiapatty
1980 01-CRIDP-22- Tiruppur Tiruppur Improvements to Riding Quality at 1.60 60.00
23-I-1980 North km 3/0 - 4/6 of Podarampalayam
Kalipalayam Road

1981 01-CRIDP-22- Tiruppur Tiruppur Improvements to Riding Quality at 2.31 110.00


23-I-1981 South km 0/0 - 2/310 of Tirupur -
Somanur road at Km 2/4 of
Iduvampalayam
1982 01-CRIDP-22- Tiruppur Palladam Improvements to Riding Quality at 2.00 50.00
23-I-1982 km 0/0 - 2/0 of
Kalinathampalayam -
Ayyampalayam road
1983 01-CRIDP-22- Tiruppur Palladam Improvements to Riding Quality at 3.60 87.00
23-I-1983 km 1/4 - 5/0 of Thuttaripalayan -
Pongalur road
1984 01-CRIDP-22- Tiruppur Palladam Improvements to Riding Quality at 3.20 76.00
23-I-1984 km 0/0 - 3/2 of Avinashi - Cochin
road at Km 28/8 of Chittampalam
road (Via) Vadugapalayam

1985 01-CRIDP-22- Tiruppur Palladam Improvements to Riding Quality at 3.76 70.00


23-I-1985 km 0/0 - 1/2, 7/0 - 9/0 of
Kallipalayam - Vavipalayam road
1986 01-CRIDP-22- Tiruppur Palladam Improvements to Riding Quality at 2.20 50.00
23-I-1986 km 0/0 - 2/2 of Avinashi - Cochin
road at Km 21/6 of
Kungumapalayam - Adi Dravidar
Colony road (Via)
Goundampalayam

IRQP Page 192 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

1987 01-CRIDP-22- Tiruppur Palladam Improvements to Riding Quality at 2.20 50.00


23-I-1987 km 0/0 - 0/2, 3/8 - 5/8 of
Panapalayam - Pethampalayam
road
Tiruppur Total 34.27 1008.00
1988 01-CRIDP-22- Dharapuram Dharapuram Improvements to Riding Quality at 2.50 101.00
23-I-1988 km 3/5 - 6/0 of Uthur - Anankur
road
1989 01-CRIDP-22- Dharapuram Dharapuram Improvements to Riding Quality at 3.00 66.00
23-I-1989 km 0/0 - 3/0 of Polarai -
Kottaimualunr road
1990 01-CRIDP-22- Dharapuram Dharapuram Improvements to Riding Quality at 1.00 61.00
23-I-1990 km 0/6 - 1/6 of Dharapuram -
Pollachi road
1991 01-CRIDP-22- Dharapuram Dharapuram Improvements to Riding Quality at 4.00 102.00
23-I-1991 km 2/0 - 4/0, 6/0 - 8/0 of
Suriyanallur - Eragampatti road.
1992 01-CRIDP-22- Dharapuram Dharapuram Improvements to Riding Quality at 1.40 32.50
23-I-1992 km 0/0 - 1/4 of Dharapuram -
Bhavankovil road to Elugamvalasu
road
1993 01-CRIDP-22- Dharapuram Dharapuram Improvements to Riding Quality at 1.80 39.50
23-I-1993 km 2/4 - 4/2 of Kilangundal -
Markampatti road (via)
Chinnamaruthur.
1994 01-CRIDP-22- Dharapuram Dharapuram Improvements to Riding Quality at 2.60 57.00
23-I-1994 km 3/4 - 6/0 of Arikkaranvalsu -
Sundakampalayam road.

1995 01-CRIDP-22- Dharapuram Dharapuram Improvements to Riding Quality at 1.20 27.50


23-I-1995 km 29/0 - 30/2 of Vellakovil to
District limit road (via) Mylrangam

1996 01-CRIDP-22- Dharapuram Dharapuram Improvements to Riding Quality at 5.85 132.00


23-I-1996 km 0/0 - 5/850 of Mallipattypirivu
- Kottai Mulanur road

1997 01-CRIDP-22- Dharapuram Dharapuram Improvements to Riding Quality at 2.20 46.50


23-I-1997 km 1/8 - 4/0 of Puthukkottai
pirivu - Kambaliyampatty road
(via) Vellinagar
1998 01-CRIDP-22- Dharapuram Dharapuram Improvements to Riding Quality at 2.45 58.00
23-I-1998 km 2/0 - 4/450 of Vellakovil -
District Limit to Kathakottai (via)
Monganallampalayam road
1999 01-CRIDP-22- Dharapuram Kangayam Improvements to Riding Quality at 0.40 23.00
23-I-1999 km 11/2 - 11/6 of Vellakovil -
Mulanur road (via) Akkaraipalayam
road
2000 01-CRIDP-22- Dharapuram Kangayam Improvements to Riding Quality at 1.20 29.00
23-I-2000 km 8/0 - 9/2 of Karattupalayam -
Mylrangam - Vellathankaraipudur
road
2001 01-CRIDP-22- Dharapuram Kangayam Improvements to Riding Quality at 2.00 55.00
23-I-2001 km 0/0 - 2/0 of Muthur - Mulanur
road to Udayam road
2002 01-CRIDP-22- Dharapuram Kangayam Improvements to Riding Quality at 0.80 30.00
23-I-2002 km 1/4 - 2/2 of Manthapuram -
Valliarachal - Veerasolapuram
road

IRQP Page 193 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2003 01-CRIDP-22- Dharapuram Kangayam Improvements to Riding Quality at 8.75 215.00


23-I-2003 km 14/2 - 17/2, 18/2 - 20/4,
22/450 - 26/0 of Mullipuram -
Bhagavathipalayam -
Silambagoundanvalasu road
2004 01-CRIDP-22- Dharapuram Udumalaipett Improvements to Riding Quality at 1.20 70.00
23-I-2004 ai km 15/8 - 17/0 of Udumalpet -
Senjeri hills road
2005 01-CRIDP-22- Dharapuram Udumalaipett Improvements to Riding Quality at 2.00 50.00
23-I-2005 ai km 1/0 - 3/0 of Sungaramudakku -
Ammapatti road.

2006 01-CRIDP-22- Dharapuram Udumalaipett Improvements to Riding Quality at 1.80 45.00


23-I-2006 ai km 0/0 - 1/8 of Pudupalayam -
Adivalli road
2007 01-CRIDP-22- Dharapuram Udumalaipett Improvements to Riding Quality at 1.20 31.00
23-I-2007 ai km 0/0 - 0/4, 0/8 - 1/6 of The
road branching at Km 19/0 of
Udumalpet-Senjerihills road to
Chikkanuthu
2008 01-CRIDP-22- Dharapuram Madathukula Improvements to Riding Quality at 0.60 16.00
23-I-2008 m km 0/0 - 0/6 of The road
branching at Km 10/6 of
Thippampatti - Sellappampalayam
road to Km 20/8 of Anaimalai -
Poolankinar road (via)
Pungamuthur
2009 01-CRIDP-22- Dharapuram Madathukula Improvements to Riding Quality at 3.80 210.00
23-I-2009 m km 17/0 - 20/8 of Udumalpet -
Thirumoorthy salai
2010 01-CRIDP-22- Dharapuram Madathukula Improvements to Riding Quality at 3.20 80.00
23-I-2010 m km 2/0 - 2/8, 3/0 - 5/4 of The
road branching at Km 10/2 of
Udumalpet - Chinnar road to
Chinnakumarapalayam
Dharapuram Total 54.95 1577.00
2011 01-CRIDP-22- Erode Erode West Improvements to Riding Quality at 1.20 125.00
23-I-2011 km 0/0 - 1/2 of Erode -
Chennimalai road (MD108)
2012 01-CRIDP-22- Erode Modakurichi Improvements to Riding Quality at 1.80 110.00
23-I-2012 km 15/0 - 16/8 of Arachalur -
Thamaraipalayam road (MD130)
2013 01-CRIDP-22- Erode Modakurichi Improvements to Riding Quality at 1.63 150.00
23-I-2013 km 0/972 - 2/6 of Erode Outer
Ring road
2014 01-CRIDP-22- Erode Modakurichi Improvements to Riding Quality at 1.40 80.00
23-I-2014 km 0/6 - 2/0 of Kollampalayam to
Erode - Muthur road

2015 01-CRIDP-22- Erode Modakurichi Improvements to Riding Quality at 3.60 120.00


23-I-2015 km 8/0 - 10/0, 11/0 - 12/6 of
Avalpoondurai - Anandampalayam
road
2016 01-CRIDP-22- Erode Modakurichi Improvements to Riding Quality at 2.40 78.00
23-I-2016 km 2/2 - 4/6 of Sanarpalayam -
Modakkurichi road

2017 01-CRIDP-22- Erode Modakurichi Improvements to Riding Quality at 4.40 113.00


23-I-2017 km 0/0 - 2/0, 3/0 - 5/0, 6/0 - 6/4
of Pasur RS to
Karumandampalayam road (via)
Palanigoundampalayam

IRQP Page 194 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2018 01-CRIDP-22- Erode Bhavani Improvements to Riding Quality at 1.40 32.00


23-I-2018 km 3/0 - 4/4 of Anthiyur -
Ammapettai road to Kurichi (via)
Koochikallur
2019 01-CRIDP-22- Erode Bhavani Improvements to Riding Quality at 3.50 118.00
23-I-2019 km 2/4 - 3/4, 4/0 - 5/0, 5/8 - 6/0,
6/8 - 7/0, 7/4 - 8/5 of
Singampettai - Guruvareddiyur
road
2020 01-CRIDP-22- Erode Bhavani Improvements to Riding Quality at 1.60 39.00
23-I-2020 km 1/0 - 2/0, 3/4 - 3/6, 4/0 - 4/4
of The road Branching from Km
57/8 of Thoppur - Mettur - Bhavani
- Erode road to Sanathikal

2021 01-CRIDP-22- Erode Anthiyur Improvements to Riding Quality at 1.40 35.00


23-I-2021 km 4/0 - 5/4 of Olagadam -
Brammadesam road
Erode Total 24.33 1000.00
2022 01-CRIDP-22- Karur Aravakurichi Improvements to Riding Quality at 5.48 190.00
23-I-2022 km 6/4 - 9/0, 10/8 - 13/682 of
Paramathy - Rajapuram Road
2023 01-CRIDP-22- Karur Aravakurichi Improvements to Riding Quality at 4.00 135.00
23-I-2023 km 0/0 - 4/0 of Aru road -
Pungampady Road (via)
Venjamankudalur Road
2024 01-CRIDP-22- Karur Aravakurichi Improvements to Riding Quality at 2.00 49.00
23-I-2024 km 0/0 - 2/0 of Nagampalli road

2025 01-CRIDP-22- Karur Karur Improvements to Riding Quality at 3.20 348.00


23-I-2025 km 292/8 - 296/0 of Varanasi -
Kanyakumari Road (Abandoned
portion of NH7 at Thottakurichi
and Karur)
2026 01-CRIDP-22- Karur Krishnarayap Improvements to Riding Quality at 4.00 160.00
23-I-2026 uram km 14/4 - 18/4 of Pothapatty -
Kosur road
2027 01-CRIDP-22- Karur Krishnarayap Improvements to Riding Quality at 0.30 20.00
23-I-2027 uram km 48/6 - 48/9 of Vaiyampatty -
Karur Road (via) Mylampatty -
Uppidamangalam
2028 01-CRIDP-22- Karur Krishnarayap Improvements to Riding Quality at 5.00 105.00
23-I-2028 uram km 3/0 - 6/0, 7/2 - 9/2 of
Koravapatty - Kullampatty road
2029 01-CRIDP-22- Karur Kulithalai Improvements to Riding Quality at 3.40 154.00
23-I-2029 km 22/6 - 26/0 of Allithurai -
Thogamalai Road
2030 01-CRIDP-22- Karur Kulithalai Improvements to Riding Quality at 2.00 46.00
23-I-2030 km 5/2 - 7/2 of Inungur - Nallur
road to Pudupatty
Karur Total 29.38 1207.00
Tiruppur Circle Total 142.93 4792.00
2031 01-CRIDP-22- Coimbatore Mettupalaya Improvements to Riding Quality at 3.40 190.00
23-I-2031 m km 60/4 - 63/8 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road
2032 01-CRIDP-22- Coimbatore Mettupalaya Improvements to Riding Quality at 3.00 135.00
23-I-2032 m km 0/0 - 3/0 of Pujankanur -
Vanapathrakaliamman Koil road
(Via) thekkampatti

IRQP Page 195 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2033 01-CRIDP-22- Coimbatore Mettupalaya Improvements to Riding Quality at 1.80 55.00


23-I-2033 m km 0/0 - 1/80 of Iluppapalayam -
Vachinam palayam Road

2034 01-CRIDP-22- Coimbatore Mettupalaya Improvements to Riding Quality at 2.00 125.00


23-I-2034 m km 72/0 - 74/0 of Ooty - Kotagiri
Mettupalayam - Sathi - Gobi -
Erode Road
2035 01-CRIDP-22- Coimbatore Mettupalaya Improvements to Riding Quality at 4.00 235.00
23-I-2035 m km 3/2 - 4/2, 8/0 - 11/0 of
Karamadai - Tholampalayam road

2036 01-CRIDP-22- Coimbatore Avinashi Improvements to Riding Quality at 0.80 43.00


23-I-2036 km 8/2 - 8/6, 13/6 - 14/0 of
Karamadai - Kariyaampalayam
Road
2037 01-CRIDP-22- Coimbatore Avinashi Improvements to Riding Quality at 3.60 150.00
23-I-2037 km 2/0 - 5/6 of Km 187/2 of
Dindugal Bangalore road to
Senthampalayam
2038 01-CRIDP-22- Coimbatore Avinashi Improvements to Riding Quality at 3.40 180.00
23-I-2038 km 2/0 - 5/4 of Annur Sirumugai
Road
2039 01-CRIDP-22- Coimbatore Sulur Improvements to Riding Quality at 1.60 130.00
23-I-2039 km 26/8 - 28/4 of
Kamanaickenpalayam - Annur
road
2040 01-CRIDP-22- Coimbatore Kavundampal Improvements to Riding Quality at 2.00 118.00
23-I-2040 ayam km 0/0 - 2/0 of Thudiyalur
Chinnathadagam Road
2041 01-CRIDP-22- Coimbatore Kavundampal Improvements to Riding Quality at 1.00 35.00
23-I-2041 ayam km 4/0 - 5/0 of Kottai -
Mathampalayam road
2042 01-CRIDP-22- Coimbatore Thondamuth Improvements to Riding Quality at 0.20 50.00
23-I-2042 ur km 165/6 - 165/8 of Salem -
Cochin - Kanyakumari Road
(Abandoned from NH47)
2043 01-CRIDP-22- Coimbatore Coimbatore Improvements to Riding Quality at 1.60 165.00
23-I-2043 South km 0/0 - 1/6 of Coimbatore
Siruvani Road (including Extra
length of 50m)
2044 01-CRIDP-22- Coimbatore Coimbatore Improvements to Riding Quality at 2.23 340.00
23-I-2044 South km 1/2 - 3/430 of North
Coimbatore - Ramanathapuram -
Chettipalayam Road
Coimbatore Total 30.63 1951.00
2045 01-CRIDP-22- Pollachi Pollachi Improvements to Riding Quality at 1.00 151.00
23-I-2045 km 74/0 - 75/0 of Avinashi -
Tiruppur - Palladam - Pollachi -
Cochin (Via) Meenkarai Road
2046 01-CRIDP-22- Pollachi Pollachi Improvements to Riding Quality at 5.00 220.00
23-I-2046 km 0/0 - 5/0 of Kovilpalayam -
Negamam road.
2047 01-CRIDP-22- Pollachi Pollachi Improvements to Riding Quality at 4.20 187.00
23-I-2047 km 5/0 - 9/2 of Kovilpalayam -
Negamam road.
2048 01-CRIDP-22- Pollachi Pollachi Improvements to Riding Quality at 3.00 132.00
23-I-2048 km 4/0 - 7/0 of Seripalayam -
Thamaraikulam road.
2049 01-CRIDP-22- Pollachi Udumalaipett Improvements to Riding Quality at 2.60 232.00
23-I-2049 ai km 3/6 - 6/2 of Pollachi - Valparai
Road

IRQP Page 196 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2050 01-CRIDP-22- Pollachi Udumalaipett Improvements to Riding Quality at 1.40 130.00


23-I-2050 ai km 80/8 - 82/2 of Avinashi -
Tiruppur - Palladam - Pollachi -
Cochin (Via) Meenkarai Road
Pollachi Total 17.20 1052.00
2051 01-CRIDP-22- Gobi Erode West Improvements to Riding Quality at 1.80 52.00
23-I-2051 km 0/0 - 1/8 of Perode-
Karattupalayam road
2052 01-CRIDP-22- Gobi Perundurai Improvements to Riding Quality at 1.00 29.00
23-I-2052 km 1/8 - 2/8 of Nallampatty-
Kombaiyanvalasu (via)
Muthuvalasu
2053 01-CRIDP-22- Gobi Perundurai Improvements to Riding Quality at 3.00 119.00
23-I-2053 km 0/0 - 3/0 of Kanjikoil-
Ellispettai road
2054 01-CRIDP-22- Gobi Anthiyur Improvements to Riding Quality at 3.20 150.00
23-I-2054 km 23/0 - 23/4, 23/6 - 23/8, 24/2
- 26/2, 26/4 - 27/0 of Sathy -
Athani - Bhavani road
2055 01-CRIDP-22- Gobi Gobichettipal Improvements to Riding Quality at 2.00 75.00
23-I-2055 ayam km 4/0 - 6/0 of Kavilipalayam-
Nambiyur road
2056 01-CRIDP-22- Gobi Gobichettipal Improvements to Riding Quality at 3.20 125.00
23-I-2056 ayam km 0/0 - 3/2 of Getticheyur-
Nambiyur road
2057 01-CRIDP-22- Gobi Bhavanisagar Improvements to Riding Quality at 4.20 105.00
23-I-2057 km 0/0 - 4/2 of Moolaikinar-
Periyur road to Mettukadai road
2058 01-CRIDP-22- Gobi Bhavanisagar Improvements to Riding Quality at 2.20 55.00
23-I-2058 km 0/0 - 2/2 of Pungampalli-
Chellappampalayam road
2059 01-CRIDP-22- Gobi Bhavanisagar Improvements to Riding Quality at 1.60 40.00
23-I-2059 km 0/0 - 1/6 of Panayampalli-
Periyakallipatty road
2060 01-CRIDP-22- Gobi Bhavanisagar Improvements to Riding Quality at 4.40 200.00
23-I-2060 km 86/8 - 88/0, 88/8 - 92/0 of
Ooty - Kotagiri Mettupalayam -
Sathi - Gobi - Erode Road
Gobi Total 26.60 950.00
2061 01-CRIDP-22- Udhagai Udhagamand Improvements to Riding Quality at 2.00 50.00
23-I-2061 alam km 2/0 - 4/0 of Thummanatty T.
Manihatty Road Joining at Km 6/2
of Kattabettu Iduhatty Road

2062 01-CRIDP-22- Udhagai Udhagamand Improvements to Riding Quality at 7.00 160.00


23-I-2062 alam km 0/0 - 7/0 of Road branching
from Km 4/2 of Thaishola
Korakundah Upper Bhavani and
Joins at Karrington Kinnakorai
Iriyaseegai road
2063 01-CRIDP-22- Udhagai Udhagamand Improvements to Riding Quality at 2.00 50.00
23-I-2063 alam km 8/0 - 10/0 of Thaishola
Korakundha Upperbhavani road
2064 01-CRIDP-22- Udhagai Gudalur Improvements to Riding Quality at 3.00 100.00
23-I-2064 km 0/0 - 3/0 of Road from Km
25/4 of Gudalur Sulthanbathery to
Bennai road
2065 01-CRIDP-22- Udhagai Coonoor Improvements to Riding Quality at 3.00 80.00
23-I-2065 km 9/0 - 12/0 of Kaikatty
Kolacombai road

IRQP Page 197 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2066 01-CRIDP-22- Udhagai Coonoor Improvements to Riding Quality at 1.60 45.00


23-I-2066 km 0/0 - 1/6 of Kollimalai
Semanthada road
2067 01-CRIDP-22- Udhagai Coonoor Improvements to Riding Quality at 3.00 120.00
23-I-2067 km 12/0 - 15/0 of Kotagiri
Kodanadu View Point road (Via)
Kodanadu
Udhagai Total 21.60 605.00
Coimbatore Circle Total 96.03 4558.00
2068 01-CRIDP-22- Trichy Manapparai Improvements to Riding Quality at 1.00 26.00
23-I-2068 km 1/0 - 2/0 of NH45 to Thethur
Road
2069 01-CRIDP-22- Trichy Manapparai Improvements to Riding Quality at 2.80 73.00
23-I-2069 km 6/0 - 7/0, 8/0 - 9/8 of
Yagapuram - Pallakurichy Road via
Alampatty road
2070 01-CRIDP-22- Trichy Srirangam Improvements to Riding Quality at 1.00 26.00
23-I-2070 km 0/0 - 1/0 of Ramjeenagar -
Malaipatty Road
2071 01-CRIDP-22- Trichy Lalgudi Improvements to Riding Quality at 1.40 34.70
23-I-2071 km 0/0 - 1/4 of Anbil -
Nadarajapuram-Padugai lands
Road
2072 01-CRIDP-22- Trichy Lalgudi Improvements to Riding Quality at 1.20 32.70
23-I-2072 km 0/0 - 1/2 of Punchai -
Senganthi -Nanthiyar bridge Road

2073 01-CRIDP-22- Trichy Musiri Improvements to Riding Quality at 2.00 90.00


23-I-2073 km 26/0 - 28/0 of Namakkal -
Kananur road (SH - 161)
2074 01-CRIDP-22- Trichy Musiri Improvements to Riding Quality at 2.00 90.00
23-I-2074 km 1/0 - 2/0, 5/0 - 6/0 of
Kattuputhur -Unniyur Road
2075 01-CRIDP-22- Trichy Musiri Improvements to Riding Quality at 1.00 28.00
23-I-2075 km 1/0 - 2/0 of Devanur -
Krishnapuram Road
2076 01-CRIDP-22- Trichy Musiri Improvements to Riding Quality at 3.00 79.00
23-I-2076 km 2/0 - 5/0 of Paithamparai -
Serugudy Road
2077 01-CRIDP-22- Trichy Musiri Improvements to Riding Quality at 2.00 51.50
23-I-2077 km 1/0 - 3/0 of Mettupalayam -
Nallapannayakanpatty(via)
Pillapalayam Road

2078 01-CRIDP-22- Trichy Musiri Improvements to Riding Quality at 2.00 71.00


23-I-2078 km 6/0 - 8/0 of
Jambunathapuram - arachi
Roadvia Thulaiyanatham
2079 01-CRIDP-22- Trichy Thuraiyur Improvements to Riding Quality at 1.20 57.00
23-I-2079 km 0/8 - 2/0 of Thuraiyur -
Perambalur Road (SH-142)
2080 01-CRIDP-22- Trichy Thuraiyur Improvements to Riding Quality at 2.00 92.00
23-I-2080 km 25/0 - 27/0 of Musiri -T.Pet -
Murugur -Eragudy Road (MD-277)

2081 01-CRIDP-22- Trichy Thuraiyur Improvements to Riding Quality at 1.20 57.00


23-I-2081 km 32/6 - 33/8 of Musiri -T.Pet -
Murugur -Eragudy Road (MD - 277)

IRQP Page 198 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2082 01-CRIDP-22- Trichy Thuraiyur Improvements to Riding Quality at 2.50 63.00


23-I-2082 km 0/0 - 2/5 of Venkadesapuram
Vadakuveli Road

2083 01-CRIDP-22- Trichy Thuraiyur Improvements to Riding Quality at 1.00 28.00


23-I-2083 km 1/0 - 2/0 of Okkarai-Puthur
Road
2084 01-CRIDP-22- Trichy Thuraiyur Improvements to Riding Quality at 1.60 41.00
23-I-2084 km 0/0 - 1/6 of Puthur -
Puthupatty Road
2085 01-CRIDP-22- Trichy Thuraiyur Improvements to Riding Quality at 1.20 32.00
23-I-2085 km 0/0 - 1/2 of Kottathur -
Kunnupatty Road
2086 01-CRIDP-22- Trichy Thuraiyur Improvements to Riding Quality at 1.00 28.00
23-I-2086 km 4/0 - 5/0 of Koppampatty-
Vishvampalsumutheram-B.Metur
Road
Trichy Total 31.10 999.90
2087 01-CRIDP-22- Tanjavur Papanasam Improvements to Riding Quality at 1.00 30.00
23-I-2087 km 0/0 - 1/0 of Right bank of
Vettar KM 2/2 to Vaiyacherry road

2088 01-CRIDP-22- Tanjavur Papanasam Improvements to Riding Quality at 2.00 58.00


23-I-2088 km 0/0 - 2/0 of Arunthavapuram -
Nadupatti road

2089 01-CRIDP-22- Tanjavur Papanasam Improvements to Riding Quality at 1.60 47.00


23-I-2089 km 2/0 - 3/6 of Ammapettai -
Karuppamudaliyarkottai road
2090 01-CRIDP-22- Tanjavur Thiruvaiyaru Improvements to Riding Quality at 2.00 61.00
23-I-2090 km 4/0 - 6/0 of Kandiyur - Nedar -
Thirukkarrukkavur road
2091 01-CRIDP-22- Tanjavur Pattukkottai Improvements to Riding Quality at 4.20 118.00
23-I-2091 km 2/0 - 6/2 of Anaikudy -
Pudukkottai - Ullur road
2092 01-CRIDP-22- Tanjavur Peravurani Improvements to Riding Quality at 1.00 28.50
23-I-2092 km 5/4 - 6/4 of Rettavayal -
Velankulam road
2093 01-CRIDP-22- Tanjavur Peravurani Improvements to Riding Quality at 4.60 130.00
23-I-2093 km 0/0 - 4/6 of Sithathikkadu -
Keeramangalam road

2094 01-CRIDP-22- Tanjavur Peravurani Improvements to Riding Quality at 2.80 81.50


23-I-2094 km 0/0 - 2/8 of Pattukkottai -
Aranthangi road to South
Seruvaviduthi road
Tanjavur Total 19.20 554.00
2095 01-CRIDP-22- Pudukottai Gandarvakott Improvements to Riding Quality at 2.40 65.00
23-I-2095 ai km 2/0 - 4/4 of Pudhuviduthy -
Kallumadai road
2096 01-CRIDP-22- Pudukottai Gandarvakott Improvements to Riding Quality at 3.40 66.00
23-I-2096 ai km 1/6 - 5/0 of Km 17/0 of
Keeranur - Killukkottai road to
Rajapatty (v) Sengalur
2097 01-CRIDP-22- Pudukottai Gandarvakott Improvements to Riding Quality at 2.00 60.00
23-I-2097 ai km 11/0 - 13/0 of Vellanur -
Puthambur road
2098 01-CRIDP-22- Pudukottai Gandarvakott Improvements to Riding Quality at 2.00 60.00
23-I-2098 ai km 13/0 - 15/0 of Vellanur -
Puthambur road

IRQP Page 199 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2099 01-CRIDP-22- Pudukottai Gandarvakott Improvements to Riding Quality at 1.00 30.00


23-I-2099 ai km 6/0 - 7/0 of Rajakulathur -
Uppiliyakudi road
2100 01-CRIDP-22- Pudukottai Gandarvakott Improvements to Riding Quality at 1.00 29.00
23-I-2100 ai km 7/0 - 8/0 of Rajakulathur -
Uppiliyakudi road
2101 01-CRIDP-22- Pudukottai Viralimalai Improvements to Riding Quality at 0.40 9.00
23-I-2101 km 0/0 - 0/4 of Illuppur - Mathur
road to Avur road
2102 01-CRIDP-22- Pudukottai Viralimalai Improvements to Riding Quality at 1.70 77.00
23-I-2102 km 42/0 - 43/0, 45/0 - 45/7 of
Pudukkottai - Manapparai road
(MD - 665)
2103 01-CRIDP-22- Pudukottai Viralimalai Improvements to Riding Quality at 2.00 60.00
23-I-2103 km 2/0 - 4/0 of Rapposal road
2104 01-CRIDP-22- Pudukottai Pudukkottai Improvements to Riding Quality at 0.49 30.00
23-I-2104 km 29/4 - 29/885 of Thanjavur -
Manamadurai Road (Abandoned
NH 226) in Adhanakottai Urban
limit
2105 01-CRIDP-22- Pudukottai Thirumayam Improvements to Riding Quality at 3.80 140.00
23-I-2105 km 8/4 - 9/0, 13/8 - 17/0 of
Arimalam - Thirumayam road
2106 01-CRIDP-22- Pudukottai Thirumayam Improvements to Riding Quality at 1.86 50.00
23-I-2106 km 0/0 - 1/860 of Km 30/4 of
Karaiyur - Oliyamangalam road to
Marvamadurai road
2107 01-CRIDP-22- Pudukottai Thirumayam Improvements to Riding Quality at 4.00 160.00
23-I-2107 km 2/0 - 4/0, 6/0 - 8/0 of
Arasamalai - Palakkurichi road
2108 01-CRIDP-22- Pudukottai Alangudi Improvements to Riding Quality at 1.00 30.00
23-I-2108 km 1/0 - 2/0 of Pudukottai -
Aranthangi road to Thirukkattalai
Harizan Colony road

2109 01-CRIDP-22- Pudukottai Alangudi Improvements to Riding Quality at 1.00 50.00


23-I-2109 km 0/0 - 1/0 of Alangudi -
Alangadu road
2110 01-CRIDP-22- Pudukottai Alangudi Improvements to Riding Quality at 3.00 84.00
23-I-2110 km 0/0 - 3/0 of Chettangadu -
Tholuvangadu road
Pudukottai Total 31.05 1000.00
2111 01-CRIDP-22- Tiruvarur Thiruthuraipo Improvements to Riding Quality at 1.00 44.00
23-I-2111 ondi km 3/0 - 4/0 of Muthupet -
Voimedu road
2112 01-CRIDP-22- Tiruvarur Thiruthuraipo Improvements to Riding Quality at 1.20 60.00
23-I-2112 ondi km 39/0 - 40/2 of Velanganni -
Thiruthuraipoondi road
2113 01-CRIDP-22- Tiruvarur Mannargudi Improvements to Riding Quality at 1.00 39.00
23-I-2113 km 0/0 - 1/0 of Needamangalam -
Valachery road

2114 01-CRIDP-22- Tiruvarur Mannargudi Improvements to Riding Quality at 2.20 80.00


23-I-2114 km 6/0 - 6/2, 7/0 - 9/0 of
Mannargudi - Moovanallur -
Vaduvur road
2115 01-CRIDP-22- Tiruvarur Mannargudi Improvements to Riding Quality at 5.00 136.00
23-I-2115 km 0/0 - 5/0 of Kanjikudikadu -
Karuvakurichi road

IRQP Page 200 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2116 01-CRIDP-22- Tiruvarur Nannilam Improvements to Riding Quality at 7.00 355.00


23-I-2116 km 32/0 - 39/0 of Kumbakonam -
Karaikal Road
2117 01-CRIDP-22- Tiruvarur Nannilam Improvements to Riding Quality at 0.80 29.00
23-I-2117 km 16/6 - 17/4 of Thittai -
Dharasuram road
2118 01-CRIDP-22- Tiruvarur Nannilam Improvements to Riding Quality at 4.00 160.00
23-I-2118 km 4/0 - 8/0 of Avoor -
Avalivanallur road
Tiruvarur Total 22.20 903.00
2119 01-CRIDP-22- Nagapattinam Kilvelur Improvements to Riding Quality at 2.00 86.00
23-I-2119 km 0/0 - 2/0 of Road branching
from km 10/8 of Nagapattinam -
Velankanni Road to Seruthur

2120 01-CRIDP-22- Nagapattinam Kilvelur Improvements to Riding Quality at 1.00 29.00


23-I-2120 km 1/0 - 2/0 of Road branching
from km 21/4 of Velankanni -
Vedaranyam Road to Seruthur

2121 01-CRIDP-22- Nagapattinam Kilvelur Improvements to Riding Quality at 3.00 87.00


23-I-2121 km 0/0 - 3/0 of Ayyadimangalam -
Needur Road
2122 01-CRIDP-22- Nagapattinam Kilvelur Improvements to Riding Quality at 3.00 87.00
23-I-2122 km 0/0 - 3/0 of Puthupalli Road

2123 01-CRIDP-22- Nagapattinam Vedaranyam Improvements to Riding Quality at 6.80 151.00


23-I-2123 km 0/0 - 6/8 of Vellikidangu -
Thulachiyapattinam Road
Nagapattinam Total 15.80 440.00
2124 01-CRIDP-22- Mayiladuthur Sirkazhi Improvements to Riding Quality at 2.00 52.00
23-I-2124 ai km 0/0 - 2/0 of Kuthiraikuthi
Village Road
2125 01-CRIDP-22- Mayiladuthur Poompuhar Improvements to Riding Quality at 1.40 46.00
23-I-2125 ai km 0/6 - 2/0 of Keelaveli Union
Road
2126 01-CRIDP-22- Mayiladuthur Poompuhar Improvements to Riding Quality at 0.80 37.00
23-I-2126 ai km 0/0 - 0/8 of Akkur Railway
Beeder Road
2127 01-CRIDP-22- Mayiladuthur Poompuhar Improvements to Riding Quality at 1.40 65.00
23-I-2127 ai km 0/6 - 2/0 of Tharangambadi -
Manganallur - Aduthurai Road

2128 01-CRIDP-22- Mayiladuthur Poompuhar Improvements to Riding Quality at 4.27 144.00


23-I-2128 ai km 0/0 - 4/270 of
Konerirajapuram - Eachankudy
Road
2129 01-CRIDP-22- Mayiladuthur Poompuhar Improvements to Riding Quality at 0.90 65.00
23-I-2129 ai km 11/0 - 11/9 of Sembanarkoil -
Nalladai Road
2130 01-CRIDP-22- Mayiladuthur Poompuhar Improvements to Riding Quality at 1.20 55.00
23-I-2130 ai km 4/4 - 5/6 of Akkurmukkuttu -
Chinnankudy Road

Mayiladuthurai Total 11.97 464.00


Trichy Circle Total 131.32 4360.90
2131 01-CRIDP-22- Madurai Melur Improvements to Riding Quality at 1.20 34.50
23-I-2131 km 0/0 - 1/2 of Sennakarampatti
road

IRQP Page 201 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2132 01-CRIDP-22- Madurai Melur Improvements to Riding Quality at 1.20 34.00


23-I-2132 km 0/0 - 1/2 of Manappacheri road
branching from km 49/2 of
Dindigul-Vattanam road
2133 01-CRIDP-22- Madurai Melur Improvements to Riding Quality at 2.00 58.50
23-I-2133 km 0/0 - 2/0 of Kottakudi-
Panangadi road
2134 01-CRIDP-22- Madurai Madurai East Improvements to Riding Quality at 1.60 37.00
23-I-2134 km 0/0 - 1/6 of Velliyankundram
village road
2135 01-CRIDP-22- Madurai Sholavandan Improvements to Riding Quality at 1.00 35.00
23-I-2135 km 3/0 - 4/0 of Vikkiramangalam-
Narayanapuram road

2136 01-CRIDP-22- Madurai Sholavandan Improvements to Riding Quality at 1.80 41.00


23-I-2136 km 0/0 - 1/8 of Damodaranpatti
Harijan colony road

2137 01-CRIDP-22- Madurai Sholavandan Improvements to Riding Quality at 0.60 15.00


23-I-2137 km 0/0 - 0/6 of Sholavandan
Market road
2138 01-CRIDP-22- Madurai Thiruparanku Improvements to Riding Quality at 2.00 133.00
23-I-2138 ndram km 9/0 - 11/0 of Madurai -
Viradhanur - Valayankulam road

2139 01-CRIDP-22- Madurai Thiruparanku Improvements to Riding Quality at 1.00 105.00


23-I-2139 ndram km 0/0 - 1/0 of Madurai -
Tuticorin road
2140 01-CRIDP-22- Madurai Thiruparanku Improvements to Riding Quality at 1.60 70.00
23-I-2140 ndram km 2/2 - 3/8 of Avaniapuram-
Thirupparankundram road
2141 01-CRIDP-22- Madurai Usilampatti Improvements to Riding Quality at 5.00 130.00
23-I-2141 km 6/0 - 11/0 of Kovilankulam-
Thimmanatham road

2142 01-CRIDP-22- Madurai Usilampatti Improvements to Riding Quality at 2.00 54.00


23-I-2142 km 0/0 - 2/0 of Buskkaranpatti-
Kakkiveeranpatti road to Sirupatti
road

2143 01-CRIDP-22- Madurai Usilampatti Improvements to Riding Quality at 1.80 49.00


23-I-2143 km 0/0 - 1/8 of Vathalakundu-
Peraiyur road to Meikilarpatti road
(via) Vadakattupatti road

2144 01-CRIDP-22- Madurai Usilampatti Improvements to Riding Quality at 1.20 34.00


23-I-2144 km 1/0 - 2/2 of Kalluthu-
Seemanuthu road branching from
km 23/2 of Vathalakundu-Peraiyur
road
2145 01-CRIDP-22- Madurai Usilampatti Improvements to Riding Quality at 3.60 170.00
23-I-2145 km 7/0 - 10/6 of Elumalai road

Madurai Total 27.60 1000.00


2146 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality at 2.60 209.80
23-I-2146 km 27/0 - 29/6 of Devadanapatti -
Varusanadu Road

2147 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality at 3.00 165.00


23-I-2147 km 42/0 - 45/0 of Devadanapatti -
Varusanadu Road

IRQP Page 202 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2148 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality at 2.00 115.00


23-I-2148 km 11/6 - 12/4, 12/6 - 13/8 of
Andipatti - Velapparkovil Road
2149 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality at 3.20 174.75
23-I-2149 km 0/8 - 4/0 of Andipatti -
Velapparkovil Road
2150 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality at 1.40 49.80
23-I-2150 km 0/0 - 1/4 of Ethakovil -
Maravapatty road
2151 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality at 1.00 39.90
23-I-2151 km 0/0 - 1/0 of Madurai - Theni
road to Thimmarasanaickanur road

2152 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality at 1.00 50.00


23-I-2152 km 4/8 - 5/8 of Kumananthozhu -
Ponnampadukai road

2153 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality at 2.80 112.85


23-I-2153 km 0/0 - 2/8 of Rajathani -
Sittharpatty road(via) Ammapatty

2154 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality km 2.25 130.00


23-I-2154 47/0 - 49/250 Devathanapatty-
Varusanadu Road (SH101)

2155 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality km 1.00 64.00


23-I-2155 0/0-1/0 M.Subulapuram Road

2156 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality km 1.82 60.50


23-I-2156 0/0-1/820 Balasamuthiram -
M.Subbulapuram road
2157 01-CRIDP-22- Theni Andipatti Improvements to Riding Quality km 1.00 49.50
23-I-2157 5/8-6/8 of Kumanantholu -
Ponnampadugai Road
2158 01-CRIDP-22- Theni Periyakulam Improvements to Riding Quality at 1.60 110.00
23-I-2158 km 6/6 - 7/0, 8/0 - 9/2 of
Devadanapatti - Varusanadu Road

2159 01-CRIDP-22- Theni Periyakulam Improvements to Riding Quality at 0.60 23.00


23-I-2159 km 0/8 - 1/4 of Jeyamangalam -
Gullapuram road

2160 01-CRIDP-22- Theni Periyakulam Improvements to Riding Quality at 1.80 69.00


23-I-2160 km 1/2 - 3/0 of Dindigul - Kumuli
road to Ammapuram road (vai)
Alagapuri
2161 01-CRIDP-22- Theni Periyakulam Improvements to Riding Quality at 1.13 44.00
23-I-2161 km 8/550 - 9/680 of Periyakulam -
Sothuparai road
2162 01-CRIDP-22- Theni Periyakulam Improvements to Riding Quality at 4.97 235.00
23-I-2162 km 0/6 - 1/2, 2/0 - 2/4, 3/6 - 7/0,
7/2 - 7/768 of Periyakulam -
Palaya vathalahundu (via)
Jeyamangalam,
Bomminaickanpatti Eluvanampatti
road

IRQP Page 203 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2163 01-CRIDP-22- Theni Periyakulam Improvements to Riding Quality at 7.23 344.00


23-I-2163 km 9/4 - 9/8, 10/6 - 11/4, 12/0 -
12/4, 12/6 - 18/230 of
Periyakulam - Palaya vathalahundu
(via) Jeyamangalam,
Bomminaickanpatti Eluvanampatti
road

2164 01-CRIDP-22- Theni Periyakulam Improvements to Riding Quality at 7.80 370.00


23-I-2164 km 0/0 - 4/8, 9/2 - 9/4, 9/8 -
10/0, 10/8 - 11/6, 12/0 - 13/8
of Varadharajanagar -
Renganathapuram Road
2165 01-CRIDP-22- Theni Periyakulam Improvements to Riding Quality at 6.50 266.00
23-I-2165 km 0/6 - 1/4, 4/8 - 6/0, 6/3 -
10/8 of Periyakulam - Kodaikanal
(via) Adukkam road
2166 01-CRIDP-22- Theni Bodinayakan Improvements to Riding Quality at 1.00 50.00
23-I-2166 ur km 0/0 - 1/0 of Veerapandi -
Seepalakottai Road (M 735)
2167 01-CRIDP-22- Theni Bodinayakan Improvements to Riding Quality at 1.40 50.00
23-I-2167 ur km 0/0 - 1/4 of Govinthanagaram -
Venkitachalapuram road

2168 01-CRIDP-22- Theni Bodinayakan Improvements to Riding Quality at 2.09 170.00


23-I-2168 ur km 1/0 - 3/090 of Abandoned NH
220 in Theni Town Road (SHU 220)

2169 01-CRIDP-22- Theni Bodinayakan Improvements to Riding Quality at 1.00 59.00


23-I-2169 ur km 7/0 - 8/0 of Uthamapalyam -
Bodenthirapuram road

2170 01-CRIDP-22- Theni Bodinayakan Improvements to Riding Quality at 1.47 58.00


23-I-2170 ur km 1/130 - 2/6 of
Thirumalapuram -
Meenatchipuram road
2171 01-CRIDP-22- Theni Bodinayakan Improvements to Riding Quality at 2.60 98.00
23-I-2171 ur km 0/0 - 2/6 of Sangarapuram -
kuchanur road
2172 01-CRIDP-22- Theni Bodinayakan Improvements to Riding Quality at 1.80 149.00
23-I-2172 ur km 5/6 - 6/2, 6/6 - 7/8 of Theni -
Chinnamanur (via)
Venkatachalapuram road
2173 01-CRIDP-22- Theni Bodinayakan Improvements to Riding Quality at 5.60 406.00
23-I-2173 ur km 0/0 - 1/2, 1/4 - 2/0, 2/4 - 5/4,
10/6 - 11/0, 15/2 - 15/6 of
Koduvilarpatti - Seelayampatti
Road (via) S.Alagapuri
2174 01-CRIDP-22- Theni Bodinayakan Improvements to Riding Quality at 3.80 139.00
23-I-2174 ur km 1/0 - 2/6, 3/4 - 5/0, 5/8 - 6/4
of Thimminaickanpatty -
Solaimanaickanpatty road (via)
Pudukottai
2175 01-CRIDP-22- Theni Cumbum Improvements to Riding Quality at 1.00 40.00
23-I-2175 km 0/0 - 1/0 of Ramasaminaickan
patty - Paramathevan patty road

2176 01-CRIDP-22- Theni Cumbum Improvements to Riding Quality at 2.20 130.00


23-I-2176 km 1/0 - 3/2 of Palayam - Bodi
Road
2177 01-CRIDP-22- Theni Cumbum Improvements to Riding Quality at 1.20 75.00
23-I-2177 km 4/2 - 5/4 of Palayam - Bodi
Road

IRQP Page 204 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2178 01-CRIDP-22- Theni Cumbum Improvements to Riding Quality at 1.00 59.00


23-I-2178 km 3/0 - 4/0 of Uthamapalayam -
Surulipatti Road

2179 01-CRIDP-22- Theni Cumbum Improvements to Riding Quality at 3.40 201.00


23-I-2179 km 5/6 - 9/0 of Uthamapalayam -
Surulipatti Road

2180 01-CRIDP-22- Theni Cumbum Improvements to Riding Quality at 3.00 113.00


23-I-2180 km 6/0 - 9/0 of Anaimalaiyan
patty - Moorthinayakkanpatty road

2181 01-CRIDP-22- Theni Cumbum Improvements to Riding Quality at 2.00 77.00


23-I-2181 km 0/0 - 2/0 of Chinnamanur -
Chinna ovalapuram road
Theni Total 89.26 4556.10
2182 01-CRIDP-22- Dindigul Athoor Improvements to Riding Quality at 1.20 28.00
23-I-2182 km 0/0 - 0/8, 0/0 - 0/4 of
Alamarathupatty Village Road and
Harijan Colony Road
2183 01-CRIDP-22- Dindigul Athoor Improvements to Riding Quality at 5.88 148.00
23-I-2183 km 0/0 - 5/880 of
Puliyarajakkapatti -Pudupatti Road

2184 01-CRIDP-22- Dindigul Athoor Improvements to Riding Quality at 7.50 190.00


23-I-2184 km 0/0 - 7/5 of Kannivadi -
Kuttathupatti Road
2185 01-CRIDP-22- Dindigul Natham Improvements to Riding Quality at 5.00 190.00
23-I-2185 km 0/0 - 5/0 of Gopalpatti-
Silvarpatti Road
2186 01-CRIDP-22- Dindigul Dindigul Improvements to Riding Quality at 5.80 265.00
23-I-2186 km 4/0 - 9/8 of Dindigul -
Manakkattur Road
2187 01-CRIDP-22- Dindigul Vedasandur Improvements to Riding Quality at 2.00 75.00
23-I-2187 km 0/0 - 2/0 of Padiyur Village
Road
Dindigul Total 27.38 896.00
2188 01-CRIDP-22- Palani Oddanchatra Improvements to Riding Quality at 2.00 50.00
23-I-2188 m km 0/0 - 0/4, 1/6 - 3/2 of
Kodangipatti -Navaloothu Road
2189 01-CRIDP-22- Palani Oddanchatra Improvements to Riding Quality at 1.00 25.00
23-I-2189 m km 0/0 - 1/0 of Kedaiyurumbu -
Edayakottai Road to Periyakulipatti
Road
2190 01-CRIDP-22- Palani Athoor Improvements to Riding Quality at 2.20 60.00
23-I-2190 km 0/0 - 2/2 of Pannaipatty -
Adalur Road
2191 01-CRIDP-22- Palani Vedasandur Improvements to Riding Quality at 1.52 40.00
23-I-2191 km 0/0 - 1/520 of Vadamadurai -
Siluvathur Road to
Ramanathapuram Road
2192 01-CRIDP-22- Palani Vedasandur Improvements to Riding Quality at 4.00 150.00
23-I-2192 km 6/0 - 10/0 of Ayyalore- Eriodu
Road
2193 01-CRIDP-22- Palani Vedasandur Improvements to Riding Quality at 3.00 90.00
23-I-2193 km 0/0 - 3/0 of Mallapuram -
Chatrapatti Road.
2194 01-CRIDP-22- Palani Vedasandur Improvements to Riding Quality at 2.00 55.00
23-I-2194 km 9/0 - 11/0 of Ayalore -
Alampatti Road

IRQP Page 205 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2195 01-CRIDP-22- Palani Vedasandur Improvements to Riding Quality at 6.00 162.00


23-I-2195 km 0/0 - 6/0 of Kollapatti -Pudur
Road
2196 01-CRIDP-22- Palani Vedasandur Improvements to Riding Quality at 3.28 85.00
23-I-2196 km 0/0 - 3/275 of Dindigul -Karur
Road to R.Combai Road (via)
Anaigoundanpatti
Palani Total 25.00 717.00
2197 01-CRIDP-22- Sivagangai Tirupattur Improvements to Riding Quality at 1.80 50.00
23-I-2197 km 0/0 - 1/8 of Keelasivalpatti -
Avanipatti road to Eraniyur -
Sembagampettai road

2198 01-CRIDP-22- Sivagangai TirupatturImprovements to Riding Quality at 2.60 65.00


23-I-2198 km 0/0 - 2/6 of S.V. Mangalam
Melapatti road to Piranmalai -
Varpet meet road (via)
Thenammalpatti
2199 01-CRIDP-22- Sivagangai Karaikudi Improvements to Riding Quality at 4.90 108.00
23-I-2199 km 1/0 - 5/9 of A. Pudur - S.R.
Pattinam road
2200 01-CRIDP-22- Sivagangai Karaikudi Improvements to Riding Quality at 1.20 40.00
23-I-2200 km 3/2 - 4/4 of Madurai - Thondi
road to Sirunallur road
2201 01-CRIDP-22- Sivagangai Sivaganga Improvements to Riding Quality at 1.00 30.00
23-I-2201 km 0/0 - 1/0 of Kallal - Paganeri
road
2202 01-CRIDP-22- Sivagangai Sivaganga Improvements to Riding Quality at 1.00 48.00
23-I-2202 km 0/0 - 1/0 of Madhagupatti -
Alagamanagari road
2203 01-CRIDP-22- Sivagangai Sivaganga Improvements to Riding Quality at 1.60 40.00
23-I-2203 km 2/0 - 3/6 of Periakannanur
road
2204 01-CRIDP-22- Sivagangai Manamadurai Improvements to Riding Quality at 1.40 40.00
23-I-2204 km 2/6 - 4/0 of Munaiventri -
Kuruchi road
Sivagangai Total 15.50 421.00
2205 01-CRIDP-22- Ramnad Mudukulathu Improvements to Riding Quality at 1.00 50.00
23-I-2205 r km 35/0 - 36/0 of Aruppukottai -
perunali -Sayalkudi -
Kadugusandai - Mariyur -
Valinokkam Road
2206 01-CRIDP-22- Ramnad Mudukulathu Improvements to Riding Quality at 5.60 450.00
23-I-2206 r km 27/0 - 32/6 of Parthibanur -
Kamuthi - Aruppukottai road

2207 01-CRIDP-22- Ramnad Mudukulathu Improvements to Riding Quality at 4.40 360.00


23-I-2207 r km 33/2 - 37/6 of Parthibanur -
Kamuthi - Aruppukottai road

Ramnad Total 11.00 860.00


Madurai Circle Total 195.73 8450.10
2208 01-CRIDP-22- Tirunelveli Tirunelveli Improvements to Riding Quality at 1.00 22.00
23-I-2208 km 1/0 - 2/0 of Therkkupatti (via)
Ettankulam Road
2209 01-CRIDP-22- Tirunelveli Ambasamudr Improvements to Riding Quality at 0.80 22.00
23-I-2209 am km 0/0 - 0/8 of Zamin Singampatti
- Manimuthar Road
2210 01-CRIDP-22- Tirunelveli Ambasamudr Improvements to Riding Quality at 0.80 22.00
23-I-2210 am km 0/0 - 0/8 of
Vickramasingapuram Road

IRQP Page 206 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2211 01-CRIDP-22- Tirunelveli Ambasamudr Improvements to Riding Quality at 1.20 38.00


23-I-2211 am km 0/0 - 1/2 of Melaomanallur
Road
2212 01-CRIDP-22- Tirunelveli Nanguneri Improvements to Riding Quality at 2.00 117.00
23-I-2212 km 0/0 - 1/8, 3/0 - 3/2 of
Nanguneri - Eruvadi - Vallioor -
Vijayapathy Road
2213 01-CRIDP-22- Tirunelveli Nanguneri Improvements to Riding Quality at 3.00 77.00
23-I-2213 km 0/0 - 3/0 of Karungulam -
Moolaikaraipatti Road To
Nagalkulam Road
2214 01-CRIDP-22- Tirunelveli Nanguneri Improvements to Riding Quality at 3.43 85.00
23-I-2214 km 0/0 - 2/0, 4/0 - 5/425 of
Munanjipatti - Cherakulam Road

2215 01-CRIDP-22- Tirunelveli Nanguneri Improvements to Riding Quality at 1.00 27.00


23-I-2215 km 0/0 - 1/0 of Maruthakulam -
Moolaikaraipatti Road To
A.Sathankulam Road

2216 01-CRIDP-22- Tirunelveli Nanguneri Improvements to Riding Quality at 2.60 67.00


23-I-2216 km 0/0 - 2/6 of
Thiruvengadanathapuram -
Eruvadi Road
2217 01-CRIDP-22- Tirunelveli Radhapuram Improvements to Riding Quality at 5.60 318.00
23-I-2217 km 19/0 - 21/4, 24/2 - 27/4 of
Nanguneri - Eruvadi - Vallioor -
Vijayapathy Road
Tirunelveli Total 21.43 795.00
2218 01-CRIDP-22- Tenkasi Sankarankovi Improvements to Riding Quality at 0.80 19.00
23-I-2218 l km 0/0 - 0/8 of Mahendravadi -
Maruthankinaru road

2219 01-CRIDP-22- Tenkasi Sankarankovi Improvements to Riding Quality at 1.00 23.50


23-I-2219 l km 4/6 - 5/6 of Naluvasankottai -
Mahendravaadi road

2220 01-CRIDP-22- Tenkasi Sankarankovi Improvements to Riding Quality at 2.40 41.50


23-I-2220 l km 1/6 - 4/0 of
Meelaneelithanallur -
Keelneelithanallur road
2221 01-CRIDP-22- Tenkasi Sankarankovi Improvements to Riding Quality at 3.20 160.00
23-I-2221 l km 3/0 - 4/0, 6/0 - 8/0, 9/0 - 9/2
of Sankarankoil-Veerasigamani
road
2222 01-CRIDP-22- Tenkasi Sankarankovi Improvements to Riding Quality at 1.93 36.50
23-I-2222 l km 0/0 - 1/925 of Road branching
from Naluvasankottai -
Mahendravaadi road to
Keelaneelithanallur Panchayat
union limit.
2223 01-CRIDP-22- Tenkasi Vasudevanall Improvements to Riding Quality at 1.60 42.00
23-I-2223 ur km 0/0 - 1/6 of Road branching
from Gudaloor - Duraisamipuram
to Sivaganapuram road.

2224 01-CRIDP-22- Tenkasi Kadayanallur Improvements to Riding Quality at 1.80 103.00


23-I-2224 km 10/2 - 11/4, 12/4 - 13/0 of
Shenkottai -Pavoorchatram road
(via) Surandai

IRQP Page 207 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2225 01-CRIDP-22- Tenkasi Kadayanallur Improvements to Riding Quality at 4.50 360.00


23-I-2225 km 5/5 - 7/0, 11/0 - 14/0 of
Tenkasi - Panpozhi -
Thirumalaikovil road
2226 01-CRIDP-22- Tenkasi Kadayanallur Improvements to Riding Quality at 1.40 71.00
23-I-2226 km 4/0 - 5/0, 15/0 - 15/4 of
Sivaramapettai-Panpozhi-
Shenkottai road
2227 01-CRIDP-22- Tenkasi Tenkasi Improvements to Riding Quality at 1.20 36.00
23-I-2227 km 0/0 - 1/2 of Road branching
from km 118/10 of Thiruchandur -
Palayamkottai - Ambasamuthiram -
Tenkasi - Courtallam - Shencottai
road to Pulukkattuvalasai road

2228 01-CRIDP-22- Tenkasi Tenkasi Improvements to Riding Quality at 1.60 46.00


23-I-2228 km 0/0 - 1/6 of Road branching
from km 44/8 of Thirunelveli -
Shenkottai - Kollam raod to
Sivanadanoor road

2229 01-CRIDP-22- Tenkasi Tenkasi Improvements to Riding Quality at 2.80 95.00


23-I-2229 km 9/4 - 10/2, 10/8 - 12/8 of
Kadayam-Pavoorchatram road
2230 01-CRIDP-22- Tenkasi Alangulam Improvements to Riding Quality at 2.60 52.00
23-I-2230 km 0/0 - 2/6 of Poolangulam -
Nellaiappapuram road
2231 01-CRIDP-22- Tenkasi Alangulam Improvements to Riding Quality at 1.20 65.00
23-I-2231 km 104/8 - 106/0 of Tiruchanthur -
Palayankottai - Ambasamuthiram -
Tenkasi - Courtallam - Shenkottai
road
Tenkasi Total 28.03 1150.50
2232 01-CRIDP-22- Virudhunagar Virudhunagar Improvements to Riding Quality at 3.00 70.00
23-I-2232 km 9/0 - 12/0 of Amathur -
Lakshmiyapuram Road
2233 01-CRIDP-22- Virudhunagar Aruppukkotta Improvements to Riding Quality at 1.00 37.00
23-I-2233 i km 0/0 - 1/0 of Maravarperunkudi
Road
2234 01-CRIDP-22- Virudhunagar Aruppukkotta Improvements to Riding Quality at 1.00 27.00
23-I-2234 i km 3/0 - 4/0 of Palavanatham -
Soolakarai Road
2235 01-CRIDP-22- Virudhunagar Tiruchuli Improvements to Riding Quality at 1.60 50.00
23-I-2235 km 0/0 - 1/6 of Tiruchuli -
Kamuthi Road to Iluppaiyur Road

2236 01-CRIDP-22- Virudhunagar Tiruchuli Improvements to Riding Quality at 2.90 80.00


23-I-2236 km 9/0 - 11/9 of Veeracholan-
Kuraiyaravasithan Road
2237 01-CRIDP-22- Virudhunagar Tiruchuli Improvements to Riding Quality at 1.40 37.00
23-I-2237 km 0/0 - 1/4 of Chettikulam -
Ramasamypatty road
Virudhunagar Total 10.90 301.00
2238 01-CRIDP-22- Tuticorin Vilathikulam Improvements to Riding Quality at 2.60 90.00
23-I-2238 km 8/0 - 10/6 of Mela Arasaradi -
Therkkukalmedu road

2239 01-CRIDP-22- Tuticorin Vilathikulam Improvements to Riding Quality at 1.20 100.00


23-I-2239 km 90/8 - 92/0 of Madurai -
Tuticorin road

IRQP Page 208 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2240 01-CRIDP-22- Tuticorin Vilathikulam Improvements to Riding Quality at 2.20 55.00


23-I-2240 km 0/0 - 2/2 of Duraiyur-Erachi
road
2241 01-CRIDP-22- Tuticorin Vilathikulam Improvements to Riding Quality at 3.80 79.00
23-I-2241 km 0/0 - 3/8 of Epppodumvendran-
Athanoor road

2242 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 4.00 200.00


23-I-2242 km 7/0 - 11/0 of Alwarthirunagari -
Nazareth - Sathankulam -
Ittamozhi - Vallioor Road

2243 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 3.20 72.00


23-I-2243 km 4/2 - 7/4 of Therkkukaraseri-
Sivanthipatti road

2244 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 0.40 8.50


23-I-2244 km 4/0 - 4/4 of Nariankudiruppu
road
2245 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 1.80 37.50
23-I-2245 km 6/0 - 7/8 of Sathankulam-
Thattarmadam road
2246 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 1.31 27.00
23-I-2246 km 4/6 - 5/909 of Mudaloor-
Meingnapuram road
2247 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 1.20 24.00
23-I-2247 km 0/0 - 1/2 of Alwarthirunagari-
Nazareth-Sathankulam -Ittamozhi-
Valliyoor road to Thanjainagaram
road

2248 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 1.00 19.00


23-I-2248 km 0/0 - 1/0 of Alwarthirunagari-
Nazareth-Sathankulam-Ittamohi-
Valliyoor road to Kombankulam
road
2249 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 2.80 66.00
23-I-2249 km 0/0 - 2/8 of
Parakiramapandipuram road
2250 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 1.20 26.00
23-I-2250 km 1/0 - 2/2 of Thoothukudi-
Tiruchendur road Kovankadu road

2251 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 0.80 18.50


23-I-2251 km 0/0 - 0/8 of Srivaikuntam arts
college road
2252 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 0.60 15.00
23-I-2252 km 0/0 - 0/6 of Poovani Panchayat
road
2253 01-CRIDP-22- Tuticorin Srivaikuntam Improvements to Riding Quality at 3.00 141.00
23-I-2253 km 11/0 - 14/0 of
Alwarthirunagari - Nazareth -
Sathankulam - Ittamozhi - Vallioor
Road
2254 01-CRIDP-22- Tuticorin Ottapidaram Improvements to Riding Quality at 3.10 154.00
23-I-2254 km 25/9 - 27/8, 43/6 - 44/8 of
Palayamkottai - Kurukkusalai -
Kulathur - Vilathikulam -
Nagalapuram - Pandalkudi -
Aruppukkottai Road

IRQP Page 209 of 210


Rs. in Lakhs

Sl. No. Job Code Division Constituency Name of work Length Cost required

2255 01-CRIDP-22- Tuticorin Ottapidaram Improvements to Riding Quality at 1.40 84.00


23-I-2255 km 6/0 - 7/4 of Petmanagaram-
Vagaikulam Road

2256 01-CRIDP-22- Tuticorin Kovilpatti Improvements to Riding Quality at 3.90 140.00


23-I-2256 km 2/6 - 6/5 of Kovilpatti-
Kadalaiyur- Muthualapuram-
Perilovanpatti-Pillayarnatham road

Tuticorin Total 39.51 1356.50


2257 01-CRIDP-22- Nagercoil Kanyakumari Improvements to Riding Quality at 8.60 305.00
23-I-2257 km 0/0 - 8/6 of Ethenkattumadam
Road
2258 01-CRIDP-22- Nagercoil Colachal Improvements to Riding Quality at 3.60 148.00
23-I-2258 km 0/0 - 1/0, 1/6 - 4/2 of
Colachel - Thiruvattar Road
2259 01-CRIDP-22- Nagercoil Padmanabha Improvements to Riding Quality at 3.00 67.00
23-I-2259 puram km 0/0 - 3/0 of Eraviputhoor
Kadai - Kallupalam Road
2260 01-CRIDP-22- Nagercoil Padmanabha Improvements to Riding Quality at 1.70 70.00
23-I-2260 puram km 19/0 - 20/7 of Marthandam -
Pechiparai Road
2261 01-CRIDP-22- Nagercoil Vilavancode Improvements to Riding Quality at 3.00 95.00
23-I-2261 km 0/0 - 3/0 of Maruthencode
Road
2262 01-CRIDP-22- Nagercoil Killiyur Improvements to Riding Quality at 3.60 125.00
23-I-2262 km 3/0 - 6/6 of Kuzhivilai -
Nambali Road
2263 01-CRIDP-22- Nagercoil Killiyur Improvements to Riding Quality at 2.90 62.00
23-I-2263 km 0/0 - 2/9 of Irenipuram -
Viricode Road
Nagercoil Total 26.40 872.00
Tirunelveli Circle Total 126.26 4475.00
Grand Total 1142.42 43602.00
Over All Grand Total 3158.74 558180.00

FOR CHIEF ENGINEER,


HIGHWAYS(C&M) CHENNAI

IRQP Page 210 of 210