You are on page 1of 28

A

I
C I
N
H N म य रे ल, मंुबई मंडल
N
I I
O
E T
V
V I
A
E A
T
M T
I
E I
O
N V
N
T
S
E 2023- 24
S
BEST EVER PERFORMANCES

BEST
TARGET
BEFORE 2022-23 2023-24
2023-24
2022-23
GROSS REVENUE (Cr.)
5359 6470 7189 7190
(2015-16)
COACHING REVENU (Cr.)
3189 3674 4232 4075
(2018-19)
GOODS REVEUE (Cr.)
2148 2280 2448 2531
(2015-16)
TC REVENUE (Cr.) (RANK 1 OVER IR)

77 109 101 115


(2019-20)
NFR REVENUE (Cr.) (RANK 1 OVER IR)

69 64 75 95
(2019-20)
LOADING (MT)
16.89 20.75 23.70 23.32
(2021-22)
FREIGHT TRAIN INTERCHANGE
95.39 100.4 - 104.1
(2020-21)
CEREMONIAL FUNCTIONS

INAUGURAL RUN OF MADGAON – CSMT VANDE BHARAT ON 27.06.2023


LOCATION – CSMT
TOP DIGNITARY – HON’BLE CHIEF MINISTER, MAHARASHTRA

INAUGURAL RUN OF JALNA– CSMT VANDE BHARAT ON 30.12.2023


LOCATION – CSMT
TOP DIGNITARY – HON’BLE CHIEF MINISTER, MAHARASHTRA
FOUNDATION STONE LAYING OF 12 ABSS STATIONS BY HON’BLE
PRIME MINISTER ON 06.08.2023
LOCATIONS – PAREL, VIKHROLI, KANJURMARG
TOP DIGNITARY – HON’BLE GOVERNOR, MAHARASHTRA

OPENING OF KHARKOPAR –URAN SECTION & EXTENSION OF


SERVICES AND OPENING OF DIGHA GAON STATION BY HON’BLE
PRIME MINISTER ON 12.01.2024
LOCATION – URAN

FOUNDATION STONE LAYING OF 12 ABSS STATIONS, 3 ROB &


DEDICATION OF 4 RUB BY HON’BLE PRIME MINISTER ON 26.02.2024
LOCATIONS – BYCULLA, MATUNGA, VIDYAVIHAR, DIWA, TITWALA,
KHANDALA, IGATPURI & PEN
TOP DIGNITARY – HON’BLE GOVERNOR, MAHARASHTRA

INAUGURATION OF ROB AT TITWALA ON 26.02.2024


LOCATION – ROB AS LC 59
TOP DIGNITARY – HON’BLE MOSR

INAUGURATION OF HOME PLATFORM AT BADLAPUR ON 26.02.2024


LOCATION – BADLAPUR
TOP DIGNITARY – HON’BLE MOSR
DEDICATION OF 31 OSOP STALLS/TROLLYE & ONE GENERIC MEDICAL
STORE BY HON’BLE PRIME MINISTER ON 12.03.2024
LOCATIONS – BYCULLA, LTT, KALYAN & LONAVLA
TOP DIGNITARY – HON’BLE MEMBERS OF PARLIAMENT
MAJOR INTRODUCTIONS

NEW SUBURBAN SECTION :


BETWEEN KHARKOPAR & URAN
(14.60 KMS) OPENED ON 12.01.2024.

NEW SUBURBAN STATIONS OPENED :


SHEMATIKHAR, NHAVE SHEVA,
DRONAGIRI, URAN & DIGHA GAON

NEW VANDE BHARAT TRAINS :


22229/30 CSMT – MADGAON – CSMT
20705/06 CSMT – JALNA – CSMT

NEW TRAINS INTRODUCED :


15182 – LTT – MAU EXP.
11011 – CSMT – DHULE

EXTENSION OF SUBURBAN SERVICES :


40 SUBURBAN SERVICES EXTENDED
FROM KHARKOPAR TO URAN

AC SERVICES :
10 NORMAL SERVICES CONVERTED INTO AC EMU SERVICES
ABSS PROGRESS

Cost Cost Cost


Station Station Station
(cr.) (Cr.) (Cr.)
Byculla 35.52 Vidyavihar 32.78 Shahad 8.39
Chinchpokli 54.11 Kanjurmarg 27.01 Titwala 25.05
Parel 19.41 Vikhroli 19.16 Igatpuri 12.53
Matunga 17.28 Mumbra 14.61 Sandhurst Road 16.37
Kurla 28.81 Diva 45.09 Wadala Road 23.02

BYCULLA

CHINCHPOKLI

SHAHAD

TITWALA
INFRASTRUCTURE WORKS
INFRASTRUCTURE WORKS

NEW ROB :
LC 1A : KALYAN – VITHALWADI LC 3 : JASAI – JNPT
LC 2 : JASAI - JNPT LC 51 : AMBIVLI – TITWALA

NEW RUB :
LC 2 : DIVA-NILJE LC 5 : PEN-THAL
LC 67 : ASANGAON-ATGAON LC 17 : PEN-KASU
LC 74 : KHARDI-KSRA LC 20 : PEN-KASU
LC 3 : PEN-THAL LC 49 : NAGOTHANE-NIDI

CLOSURE OF LC GATE:
LC 1A : KALYAN – VITHALWADI LC 67 : ASANGAON-ATGAON
LC 2 : JASAI – JNPT LC 74 : KHARDI-KSRA
LC 3 : JASAI – JNPT LC 3 : PEN-THAL
LC 51 : AMBIVLI –TITWALA LC 5 : PEN-THAL
LC 14 : JASAI – JNPT LC 17 : PEN-KASU
LC 18 : JASAI – JNPT LC 20 : PEN-KASU
LC 2 : DIVA-NILJE LC 49 : NAGOTHANE-NIDI

HOME PLATFORM : BADLAPUR


WIDENING OF PLATFORM : DADAR PF 8
REHABILITATION OF FOB : KARJAT, KOPAR, ULHASNAGAR,
AMBERNATH, MUMBRA, GTBN, BHANDARI, KALYAN & IGATPURI

SOFT UPGRADATION : LONAVALA


NEW & REHABILITATION OF QUARTERS :
NEW – 48 NO. OF RB-III & 96 NO. OF RB-II AT KURLA COLONY.
REHABILITATION – 752 NO. QUARTERS

RESURFACING OF PLATFORMS : KING CIRCLE (PF-1), TILAK


NAGAR (PF-2), KALYAN (PF-4/5) AND IGATPURI (PF-2)

BOUNDARY WALL : 3.608 KM


GOODS SHED UPGRADATION : KALAMBOLI GOODS SHED
UNDER PPP – 8.16 CR.
NEW GOODS SHED / SIDING / GCT :
GOOD SHEDS – TROMBAY, URAN, SIDING – CWCJ &
BROWNFIELD GCT – M/S ADANI AGRI LOGISTICS LTD AT TALOJA
INCREASE IN SECTIONAL SPEED :
DIVA-ROHA-DIVA SECTION – 110 KMPH FROM 100 KMPH
DIVA-VASAI-DIVA SECTION – 110 KMPH FROM 90 KMPH
PALASDHARI-KHOPOLI SECTION – 90 KMPH FROM 60 KMPH
NERUL-KHARKOPAR – 105 KMPH FROM 80 KMPH
PASSENGER AMENITY WORKS
PASSENGER AMENITY WORKS

NEW FOBS CONSTRUCTED – (10) : WADALA ROAD,


GHATKOPAR, NERAL, KURLA, ROHA, VASIND, VASHI-MANKHURD,
THANE (2) & KURLA
NEW ESCALATORS COMMISSIONED – (32) : VIDYAVIHAR-2,
VIKHROLI-2, THAKURLI-2, MULUND-3, DOMBIVLI-2, DIVA-7, MUMBRA-3,
SEWARI-1, IGATPURI-2, BYCULLA-2, DIGHA GAON-6
NEW LIFTS COMMISSIONED – (12) : IGATPURI–2, AMBIVLI–1,
ATGAON–2, MUMBRA–1, VASIND–3, VANGANI–1, & DIGHA GAON–2

NEW TOILETS – (10) : CSMT, THANE, MUMBRA, DIWA, DATIVALI,


SHAHAD, TITWALA, ASANGAON, KHARDI & LONAVLA
RENOVATION OF TOILET BLOCKS – (5) : GHATKOPAR (CSR),
KANJURMARG, BHANDUP, MULUND & GTBN
NEW BOOKING OFFICE – (6) : GHATKOPAR, DIVA, DATIVALI,
ASANGAON, KHARDI, OOMBERMALI
RENOVATION OF BOOKING OFFICES – (3): MUMBRA,
KALYAN & GTBN
WAITING ROOM UPGRADATION : DADAR, THANE
COACH RESTAURANT : LTT
PERSONAL CARE CENTRE – (3) : CSMT, DADAR & THANE

SUPER MARKET : BYCULLA

WOLOO TOILET FOR WOMEN : MULUND, THANE, KANJURMARG


NEW ATVMS : 150 AT 65 STATIONS
BABY FEEDING CENTERS– (7) : CSMT, DADAR, THANE,
KALYAN, LTT, PANVEL & LONAVLA

GENERIC MEDICAL STORE : LTT


BATTERY OPERATED CAR : CSMT (3), DADAR (1), LTT (3) &
PANVEL (01)
OSOP TROLLEY – (26) :MASJID, SANDHURST ROAD,
CHINCHPOKLI, CURREY ROAD, MATUNGA, VIDYAVIHAR, DIVA, KOPAR,
AMBERNATH, BADLAPUR, AMAN LODGE, DOCKYARD ROAD, COTTON
GREEN SEWRI, WADALA ROAD, GOVANDI, NERAL, PANVEL., BHANDUP,
GTBN, LTT, MANKHURD, SANPADA, JUINAGAR, NERUL & BELAPUR
WATER PURIFICATION UNITS UNDER CSR : 10 WATER
PURIFICATION UNITS AT CSMT, DADAR, LTT & DOCKYARD
INDICATORS : KALYAN, BHIVANDI ROAD, DADAR
OTHER

MUMBAI DIVISION IS A CRITICAL DIVISION


PUNCTUALITY:
Suburban punctuality 94.50 % as against 94.87% in L.Y.
3587 Spl. Trains operated as against 3167 in L.Y. (13.26%)
Avg. Freight Train interchange–104.1 as against 100.4 in L.Y.
BLOCKS:
Record no of blocks operated in 2023-24.
Block Hours crossed 1 lakh hrs during the year.
More than 10000 hrs. blocks operated in last 4 months.
LOADING:
Avg. 546 Ballast wagons loaded/month as against 452 in L.Y.
856 Container Wagons loaded/day as against 836 in L.Y.
242 Iron & Steel wagons loaded/day as against 191 in L.Y.
SECURITY:
Child rescued – 309 and Life saved – 29
Touts apprehended – 201
Lost property returned – 638 (Rs.2.66 Cr.)
EBT in Ladies Coaches of EMU – 130 Rakes
CCTV in Ladies Coaches of EMU – 610 Coaches
STAFF WELFARE:
Settlements – 937 and CG appointment – 95
Promotions – 4,757 and New Recruitment – 2,838
SOLAR: Roof Top solar – 12.35 Kwp at SION
BOUGAINVILLEA PLANTATION: 65,000 plants
STP: 200 KLD STP set up at NCC Wadibunder & Thane
ELS KYN HONOURED – SHIELD RANK 3RD OVER I.R.
SAFETY & MAINTENANCE

SAFETY CASES
2019-20 2020-21 2021-22 2022-23 2023-24
Collision 01 -
Derailment 17 05 03 04 04
Fire on Train -
Miscellaneous 01 -
SPAD 03 03 01 01 01
TOTAL 20 08 04 07 05

TRACK STRUCTURE
Progress Target Progress
Sr. No. Description of work Unit
2022-23 2023-24 2023-24
1 TRR TKM 150 55 76.96
2 TSR TKM 149 85 121
3 TTR EQ 132 235
Deep screening
4 1.Plain Track Km 205 185 197
2.T/outs No 147 200 137
5 TFR Km 310 200 281
6 USFD Km 7352 8735 8332
Ballast supply 180 355 251
7 Thou.CuM
Ballast insertion 228 355 229
8 Scrap offered MT 9273 8000 6369

Replacement of Overdue
9 Switches No
135 127 268
Crossing
67 47 372

PSR REMOVAL
SECTION BETWEEN KM RESTRICTION RELEASED TO

THANE - AIROLI 36.27 TO 36.83 75 KMPH 80 KMPH

PANVEL – JNPT 69.054 TO 69.764 50 KMPH 60 KMPH

NAGOTHANE - NIDI 135.8 TO 136.1 100 KMPH 110 KMPH

PANVEL – KHANDESHWAR 48/1 TO 48/11 45 KMPH 90 KMPH

PANVEL – KHANDESHWAR 48/11 TO 48/1 45 KMPH 90 KMPH

ASANGAON – ATGAON 89/34 TO 90/8 80 KMPH 95 KMPH

ASANGAON – ATGAON 90/10 TO 90/48 80 KMPH 95 KMPH


INNOVATIONS & INITIATIVES

MISSION ZERO DEATHS – DIVA LC GATE NO. 29


 Spot for highest no. of Deaths/ Injuries over
Mumbai Division for last several years,
 Around 5 to 6 cases per month,
 Escalator with extended skywalk provided to FOB
for attracting people to use FOB,
 Ropes with Grease under Gate boom, Platform
ends blocked and Ramps removed
 RPF Posted for preventing trespassing,
 NIL cases after August 2023.

REMOVAL OF RAMPS AT PLATFORM ENDS

 Ramps at Platform ends are basically meant for


staff movement working on Rails
 However, it was being used by passengers for inter-
platform transfer endangering safety
 To prevent track crossing by passengers these
ramps at end of Platforms have been demolished.

ADVANCE DRIVER ASSISTANCE SYSTEM - ADAS


 Pilot carried out in two (2) EMU rakes,
 AI assisted & GPS enabled smart cameras, Cloud
Storage, Live streaming,
 Real time alerts with Photos and video clips to
server, Audio alert to Crew,
 3 Camera setup in each cab- Motorman, Full Cab
and Front on track,
 Alerts activated for now- Yawning, Distraction,
Mobile use and Smoking,
 Real time Conversation with crew possible,
 Expandable memory, 72 hr storage.
WATER LEVEL MONITORING IN COACHES
 Development of IoT based Live monitoring of Water
level in passenger coaches:
 IoT based remote monitoring system has been design
and developed
 Initially, the system was installed 11 coaches of train No.
12101/02 Gyaneshwari Express and 19 coaches of train
no. 11019/20 on trial which are running successfully.
INNOVATIONS & INITIATIVES
SMART ART - IGATPURI
 Alerts activated for now- Yawning, Distraction, Mobile use
and Smoking,
 Real time Conversation with crew possible,
 Expandable memory, 72 hr storage.
 Conceptualized, designed and in house fabricated:
 Mini electric crane for three dimensional heavy material
handling,
 Mini forklift,
 Light weight trolley for jack lifting,
 Light weight rail cum road trolley,
 Portable Wheel set transportation system across yard
lines
 Less manpower, Time, Fatigue for ART staff,
 Faster Deployment, Faster clearance at site,
 Less chances of accidents, equipment damage.
WATER PROOF POINT MACHINE
 First of its kind over IR,
 4 Months of heavy Monsoon over Mumbai Division,
 Lower ground level than surroundings, Yard flooding,
 Sub trains only mode of transportation during heavy
downpour,
 Conceptualized, designed, fabricated in house,
 Simple concept, Very Cheap (approx. Rs 1500),
 Electrical contacts suitably lifted, water proof insulation
provided,
 Cover made totally air tight, locking and crank handling
for the manual operation intact.
 Can be implemented on any type of Point machine
anywhere on IR.

COACH WATER & AXLE BOX TEMP. MONITORING SYSTEM


 An IOT based remote monitoring system on
mobile App,
 Live monitoring of water level in the tanks and
alarm for water level below 60%, 40%.
 Axle box temperature live monitoring system,
orange alert at 50 degree and red alert at 65
degree.
 Implemented in 67 Coaches
VACCUM TRACK CLEANER
 Conceptualized, designed, fabricated and tested in
house by
 Diesel Loco Shed, Kalyan, Made from the scrap
material,
 Very powerful suction.
INNOVATIONS & INITIATIVES

BLOCK MANAGEMENT SYSTEM


 IR's first web portal based System
 For requisitioning, sanction, acceptance & operation
of blocks for Engg, S&T, OHE and other
departments.
 Field level supervisor to requisition block
requirement, Decentralized,
 Much easier Shadow block planning as system
generated alert for already indented primary blocks
on same section and line,
 All shadow blocks sanctioned as soon as Primary
block is sanctioned,
 Sanctioning authority to sanction only 20% block, so
better overall planning & sanction,
 Block data integrity, Flexible multi report generation,
 Easier audit of system flaws
 Increases availability of Blocks
VR BASED TRAINING & COUNSELLING
 Add VR based Training to conventional classroom &
LI based training,
 Make them learn while playing,
 Pilot conducted for Siemens make EMU,
 Records performance with respect to predetermined
benchmarks,
 Can be replicated easily once module is ready, only
needs hardware,
 Crew to compete against himself, his last
performance,
 Real time feel to the crew,
 Three modes - Learn, Try & Assess.

TOILET SEAT MODIFICATION


 Normally the default position of seat cover is
“Down”,
 Gents don’t lift toilet seat when using it while
standing- Spots, Stink
 Women are biggest sufferers
 A simple solution of providing spring on seat cover
keeps the cover upright, Has to be lowered to sit
 Implemented in all trains of Mumbai Division, Very
positive response,
 Requested RCF/ICF and All Railways to adopt in all
new coaches, Coaches during POH.
INNOVATIONS & INITIATIVES

WOLOO
 Stands for “Women Loo”,
 First of its kind initiative over Indian Railways,
 Under NINFRIS
 Rs 1 /day, any Woloo toilet anywhere in India,
Railway area or outside
 Safe, spotless clean Toilets along with women’s
“Powder Room”,
 Saving on Capex & Opex of building & Maintaining
Toilet facility at stations,
 Equipped with Wi-Fi, air-conditioned,, Sanitary
napkin dispenser & women centric products,
 Provided at MLND, TNA, KJRD & in progress at
GC, CMBR & LTT.
ESCALATOR MONITORING SYSTEM
 Max cases of stoppage of escalators due to
pressing of emergency stop button
 Reset system is cumbersome & time consuming,
prolonged delays, Passenger complaints
 Web & mobile App based real time monitoring and
alert system
 Different alerts for different reasons for stoppages
 Reports generation, performance monitoring

HOT AXLE SIMULATION


 For Hot axle Mock drill exercise,
 For checking alertness of wayside staff while
exchanging signals or observing passing trains
 3 LED lights with battery fixed on axle box. Remote
switching On and Off,
 Staff who fail to detect and report hot axle are
counseled/ warned or taken up,
MODIFIED EMU MUCK SPECIAL
 Old EMU rake coaches, except the motor coaches,
modified into flat wagon by removing the roof
 Need for attaching locos at both ends for muck
special is eliminated.
 Enabled loading muck by JCB, increased load
carrying capacity , Faster loading etc.
INNOVATIONS & INITIATIVES

DECONGESTION ON PLATFORMS
 Dismantling of Service Buildings at Island Platform
4/5 at Kalyan Station- Completed (around 400 sq.
mtr.)
 Widening of PF No. 1/2 at Dadar (“The Darr”) by 4
meters – Completed
 Widening of PF. No. 5/6 at Thane by a min. of 2.5 m
by track slewing, FOB dismantling
 Dual Discharge at platform 4/5 at Dadar
 Vending Stall shifting from platforms

OFFICE TIME STAGGERING


 Peak Hours with super dense rush
 Deaths/ Injuries by falling down from running trains,
disturbs operation during peak time
 Anxiety, inconvenience, thefts, groping etc,
 Being discussed since 1956, RITES as consultant
in 2016, but no action,
 Implemented for DRM office staff of BB division
 Appeal made to all Govt. Offices (Central & State),
Municipal Offices, PSUs, Banks & Corporate
Offices, Hospitals, Schools, Colleges & all other
forums-More than 800 letters written.
GROUP SALARY ACCOUNT
 In association with Union Bank of India
 Key Highlights:
- Zero Balance Account for Staff (with Spouse
& 2 Children)
- ₹10 Lakhs worth Term Insurance
- ₹1 Cr. Personal Accident Insurance Cover
- ₹2 Cr. Air Accident Insurance Cover
- ₹1 Cr. with Partial and Total Disability Cover
 Medical Cover worth ₹3+₹30 Lakhs (Flotter)
Completely Cashless
AUDIO ALERT UNIT IN EMU CAB-SILAS
 To assist Motorman by announcing the upcoming
signal & direction of it’s location, Left / Right /
Extreme Left or Extreme Right
 Trilingual Announcement.
 GPS based location identification,
 No screens used to avoid distraction.
INNOVATIONS & INITIATIVES

EMPLOYEE GROUP INSURANCE SCHEME


 Claim settlement on submission of death certificate
of member within 10 days.
 The sum assured in case of death only. Natural as
well as accidental, suicide.
 Nominee as per office records certified by employer
termed as master policy holder.

PREMIUM
SUM
LEVEL & GR PAY
ASSURED
MONTHLY ANNUAL GST 18% TOTAL

Option for least interested 1 LAKH 31 315 57 372


PCM LEVEL 1 TO 2
15 LAKH 465 4725 850 5575
(GP - 1800-1900)
PCM LEVEL 3 TO 5
25 LAKH 774 7875 1418 9293
(GP - 2000-2800)
PCM LEVEL 6 & 7
40 LAKHS 1239 12600 2268 14868
(GP - 4200-4600)
PCM LEVEL 8 & 9
50 LAKHS 1549 15750 2835 18585
(GP - 4800-5400)
PCM LEVEL 10 & ABOVE
75 LAKHS 2323 23625 4253 27878
(GP - 6600 & ABOVE)

BODY CAMERA FOR TC & RPF


 Pilot successfully conducted with 50 camera,
 All ticket checking staff is being provided these
camera,
 For Safety and to avoid passenger complaints,
 Being planned for RPF staff as well.

 Body worn recordings has been demonstrated to be


of value in the prosecution of criminal offenses,
gathering of evidence, protecting officers from false
accusations, training and ensuring transparency of
activity.

UNTOWARD INCIDENT REPORTING SYSTEM


 Digital record keeping and reporting.
 Fast, ease of use and less manual interaction.
 Better record keeping: Collection of accurate and
factual data exhaustively.
 Collection and storage of digital records including
photographs and videos by Crew and CCTV
footage in multimedia file.
 Eliminates possibility of hostile witness.
 Better qualitative and quantitative analysis of the
UTI enquiries.
INNOVATIONS & INITIATIVES

AI & LASER BASED ATD MONITORING SYSTEM

 Laser based ATD monitoring system which uses an


AI based algorithms for predictive maintenance.
 No need for 5-8 staff for parameter measurements
and power blocks.
 Utilizes laser-operated distance sensors for precise
OHE wire elongation readings.
 Central device transmits data to a cloud-based
server for regular monitoring and preventive
maintenance.
 Horizontal measurement using emitter and target
sensors on fixed and moving pulleys.
 Vertical measurement with sensors on OHE poles,
target, and counterweight for accurate readings.
 Measures fluctuations (0.2m to 8m) with 1mm
accuracy.
 Solar-powered
 Detects sudden OHE length changes and
counterweight locking, triggering timely alarms.
 Data for ambient temperature and X-Y parameters
stored on a cloud server.
 Enables prompt detection of anomalies, reducing
failures.

DUST PROOFING OF RELAY ROOMS


 No shoes allowed, Cubicle for changing shoes
inside door,
 Double door provision,
 Windows sealed,
 Rubber door seal provided for dust and pest
prevention.

ALTERNATIVE TO EMERGENCY MEDICAL ROOM


 Tie up with nearest private clinic/nursing home/hospital
 Emergency First Aid Treatment to stabilize the victim will be given by private
Doctor before he is shifted to nearest Govt./Municipal Hospital
 MOU entered with 58 Clinics/Hospitals at 36 Stations
 Payment to private Doctors at prevailing CGHS Mumbai rates
 Ambulance Services of these Hospitals can be utilised on payment basis for
further shifting of victim to nearest Govt./Municipal Hospitals.
INNOVATIONS & INITIATIVES

GYMNASIUM IN DRM OFFICE – “COUCH POTATO”


 Staff commute from far, lot of time in travel, no
time at home for physical activity,
 Women shoulder additional burden due to family
obligations,
 Gymnasium in Divisional Office for everybody
working at CSMT Railway offices,
 Fully equipped with cutting edge facilities and
equipment,
 A small pantry with health drinks and snacks at
very low cost,
 Any time, 30-45 minutes, 12:00 to 13:00 ladies
special time

FUELING AT SITE
 Fueling of our tower wagons at site by HPCL's company owned Bowsers at Retail
price.
 HPCL's Bowser comes to any place where tower wagon is stabled and fills diesel
through digitally calibrated pumps.
 Supervisor & Incharges have been given digital cards for making payments by
swiping.
 This not only reduces chances of pilferage during transportation in drums, but
also diesel used by tower wagons in going to RCD points is also saved.
 Additionally, TW is available entire time apart from saving paths, crew etc.
 This will save paths in heavily choked system apart from financial savings.
 We are shortly going to start the same for engineering machines and proposal for
locos has also been initiated.

TOILET UNDER CSR – GHATKOPAR


 First toilet block upgraded under CSR
 Constructed by M/s D’Mart
 Maintenance by M/s D’Mart for 2 years extendable
by further 3 years
 No charges to Passengers
 Constructed at PF No. 4 at Ghatkopar and work for
another is started at PF No.2/3, after its completion
work for PF No. 1 will be started.
 D’Mart is paying License Fess to Railways also at
par with earlier licensee
 The firm has also agreed to undertake operate &
maintain of newly constructed toilets by Railways
at some other Stns. for next 5 years.
INNOVATIONS & INITIATIVES

HAND-POINT ROUTE INDICATOR


 Objective is to assist Motorman/Shunters by
indicating direction of rail track on LED indicator
linked with hand-point.
 Helps detect defective hand-points as well as
incomplete locking of hand-point.
 Prevents derailment due to “2-route” cases

LIVE LINE MONITORING GUAGE (LLMG)


 This gauge is developed for contactless accurate
Laser based OHE parameters measurement
technology i.e . OHE height, stagger & structure
implantation.
 Live line Checking of OHE Parameters on
turnouts/cross-overs & overlaps by OHE Height,
Stagger and Implantation Gauge through Mobile
APPs with GPS Mapping.
 Contactless critical readings of contact wire height
difference at obligatory structure and at take on/off
point.
 Fast, Safe & accurate OHE measurement.
 Easy to handle as lightweight – user friendly.
 No requirement of Traffic and Power block.
ODOUR SENSORS IN LAVATORIES
 Installed in Executive class coaches Vande Bharat
Trains
 The sensor analyze the odour in lavatory and sent
message to housekeeper for cleaning attention.

REPLACEMENT OF BROKEN LHB SPRING


 Starting of “On rake replacement of broken primary
spring” in LHB coaches:
 Mumbai Division organized many trials to examine
the feasibility, procedure, equipment required and
safety precautions involved in replacing a broken
LHB spring on pit along with the trip maintenance.
 On getting experience, work of replacing a broken
LHB primary spring has been started at
Wadibunder maintenance siding duly streamlining
the equipment and the procedure.
 Selected staff has been trained for this specialized
work and work instructions has been also issued.
INNOVATIONS & INITIATIVES

LHB COACH WASHING


 In-house developed LHB Bogie Washing
Integrated with Automatic Coach Washing Plant
 A system for automated bogie washing integrated
with the coach washing plant at LTT
 With the modified bogie washing system, the
manpower deployed for the purpose is saved, also
the quality of cleaning is improved.
 The innovation also helped in saving of water as
60% of water is recycled.
TURBHE GOODS SHED

PARALLELING OF QTD 108 RELAY WITH QTD 101 RELAY.


 Interlock paralleling is done by providing an
additional QTD relay.
 N/O interlock of QTD 101 is used for energizing
QTD 102 and N/O interlock of QTD 108 is used for
energizing Q30 circuit.
 Even if one interlock fails, parallel arrangement will
be available and there will be no effect on QTD
102 and Q30 operation
TRACTION MOTOR BLOWING ARRANGEMENT
 Hot air blower commissioned on 26.07.23
 This is for heating (removing moisture) of TM and
smoothing Reactor (SL) equipment on loco during
monsoon to avoid unscheduled lifting of marooned
Locos on account of TM and SL low IR

MASTER SET OF CALIBRATED SPM


 ELS KYN has kept ready 01 set of each MEDHA
and Laxven Make Speedometer and has been
calibrated from OEM along with one year validity
calibration certificate.
 After overhauling of speedometer it is compared
with calibrated speedometer on test bench.
INNOVATIONS & INITIATIVES

IGBT POWER MODULE TESTING KIT

 ELSKYN developed a testing kit for BHEL IGBT


power module
 With this healthiness of sub equipment of power
module can be determined by connecting load &
triggering particular IGBT.

HLC FULL LOAD TEST SET UP

 Set up for full load testing of HLC unit


 DBR along with MVRF motor used as a load.
 Earlier, only control circuit of HLC was tested.
 This set up will facilitate power testing of HLC on
full load & hence complete HLC healthiness can be
ensured before dispatching loco for service for
smooth operation of HOG system.

STATIC WARER LOAD TESTING


 Static water load testing units installed at WB and
LTT coaching depots.
 Facility at present being used at PUs only.
 It first time of this kind installed at any coaching
depots over IR

AUDIO VISUAL ALERT FOR OHE STATUS


 Developed by Kurla Carshed
 For safety of staff during shunting
 The device gives audio on & visual alert whether
OHE is charged or Off
 Portable staff buzzer for shunting movement

PROCUREMENT OF 31 NOS. MOTORCYCLE

 Procurement of 31 Nos. Motorcycle by RPF


 Use of these 31 bullet motorcycles will prove
effective in preventing theft of railway material in
railway premises and in catching criminal elements
immediately.
INNOVATIONS & INITIATIVES

MODIFIED POCLAIN SLEEPER REPLACEMENT MACHINE

 Self-propelled with motorized forged wheels for


easy travelling on tracks and tracked excavator
fitted with special wheels attachments.
 Self-propelled rubber padded track chain to avoid
track bruises and damages.
 Touch & play Hydraulic operating system
developed. Specifically designed grooved
attachment for Ballast removal.
 A 360 rotating Attachment to catch, rotate, lift, and
place sleepers of various sizes & weights.
 Height of the machine is such that, no need of
Electrical block is required. Speed of machine is
15km/hour on track and off the track
 30 sleepers / hour Rail track length upto 15 mtrs &
longest sleeper can be lifted easily.
 Can lift up to an average weight of 1000 kg.
 Time taken to shift sleeper 100 mtr via labor – 15
mins via machine – Less than 3 min

OPHTHAL & DENTAL DEPT. WORKS


Ophthal Department :-
 1st time in DRH KYN Intravitreal Injections (injection inside eye cavity) given
(Anti-VEGF) in cases of diabetic retinopathy.
 1st time All Indian DNB Ophthal Exam of post graduate students was conducted
at DRH KYN in March -2023.

Dental Department:-
 Single sitting Root Canal Treatment in the Dental Department has minimised man
days lost.
 Complicated Jaw fracture managed in-house successfully.
 1st time removal of Cancer tissue of Oral cavity by laser treatment in DRH
Kalyan, Central Railway.

SBI YONO APP


 Tie Up with SBI YONO App
 For receiving fine amount online through QR Code
INNOVATIONS & INITIATIVES

QUARTER MANAGEMENT SYSTEM


 Information of all the 6500 Plus quarters & mapped
as per required parameters like Colony, Pool, Type
(RB I, RB II, etc), Condition of Quarter etc.
 Employees can see vacant quarters and can
register accordingly for new or upgradation.
 Employee can see the status of his application.
 Employee is informed through SMS upon
allotment.
 Allotment orders are generated online and a copy
of the same can be downloaded.
 Occupation and vacation can be updated by
concerned IOW and the status of the quarter
changes in real time.

TRACTION MOTOR MODEL


3 Phase Traction Motor Model
 In House developed by ELS Kalyan
 Traction Motor Model will be very useful to
understand individual parts of traction Motor and
their locations.
 Various color codes are used to understand the
assembling process of the Traction motor.

Conventional Traction Motor Model

RAILWAY BIJLI SAMADHAN APP


 “Railway Bijli Samadhan Mobile App” has been
released by Railway for speedy redressal of
electricity related complaints of railway employees
and esteemed railway passengers.
 Through the Railway Bijli Samadhan App,
complainant can also track record of the status of
its complaint after registering it till its resolution.
 All the complaints registered o-n this app are
monitored by the higher officials of the Railway
Department.
INNOVATIONS & INITIATIVES

TESTING OF IGBT
 Speed sensor Test bench is used for testing of
IGBT based speed sensors .
 This test bench is suitable for different makes of
speed sensor.
 During testing, the square waveform pattern is
being monitored on CRO.
 So the healthiness of the speed sensors can be
checked and so line failure can be avoided.
CCTV ON TOWER WAGON
 The CCTV cameras allow for real-time monitoring
of maintenance work during mega blocks and night
power blocks. This can be invaluable for identifying
defects and deficiencies as they occur.
 Voice Communication through TPC to improve
coordination and enable quick decision-making.
 Early detection allows for quicker response and
resolution, minimizing disruptions during power
blocks.
 The talk-back facility through TPC provides a
means for receiving guidance during the
restoration process.
 The main goal of capturing and recording OHE
parameters during live line inspection is significant
for analysis, diagnostics, and ensuring the overall
health of OHE.
 This data can also be valuable for future planning
and preventive maintenance.
CPR TRAINING

 CPR Training has been made mandatory for all


staff undergoing PME at DRH Kalyan

BLOCK PROVING BY AXLE COUNTER


 Commissioned in Asangaon-Atgaon section in both
up and down lines on 16.2.2024.
 The salient features of tare dual detection of axle
counter with Siemens digital axle counter, auto
resetting of axle counter, data-logger contracts
taken and monitoring being carried out and
Efftronics modem used for communication
between stations.
 This is the third section commissioned with BPAC
in Khadavli-Igatpuri section.
INNOVATIONS & INITIATIVES

INSTALLATION OF SIGNAL ON TTC MAST

 Elevating signals on TTC masts provides an


unobstructed view for train operators, enhancing
signal visibility.
 Increased visibility allows train operators to detect
signals earlier, contributing to safer and more
controlled operations.
 Elevated signals help minimize signal blockages
caused by intervening structures or landscape
features, reducing the risk of signal
misinterpretation.
 Signals on TTC masts can be strategically placed
for optimal visibility, ensuring effective
communication with train operators.
 Eliminating ground-level obstructions & clearly
visibility facilitate better communication of critical
information to train operators.
 TTC masts can be adjusted to varying terrains,
ensuring consistent signal visibility across different
topographies.
 Elevating signals minimizes interference from
environmental factors.
 The long-term benefits, including improved safety
and reduced maintenance costs, make it a cost-
effective solution.

TOWER WAGON OPERATION IN GHAT WITHOUT BANKERS


 Adherence to safety protocols ensures a secure
working environment.
 Regular brake checks and engine inspections
contribute to operational reliability.
 Well-maintained TW facilitates smoother and
effective OHE maintenance.
 Comprehensive checks minimize unexpected
failures.
 Safe TW operation in Ghat sections without
bankers provides flexibility in scheduling and
reduces dependencies on additional locomotives.
 Efficient TW operation contributes to consistent
OHE functionality.
PERSONNEL ELECT. GENL.. OPERATING

BEST GARDEN - CSMT


OVER ALL EFFICIENCY

BEST CLEAN MECH. COG. COMMERCIAL


STATION - THANE
हमारा येय :
संर ा, समयपालन, गित, उ नत सुिवधाएं
एवं बुिनयादी ढांचे का िवकास

You might also like