You are on page 1of 40

NATIONAL HIGHWAYS

From To
Thiru.N.Balamurugan.,M.Tech.,M.B.A., Regional Officer,
Chief Engineer, Ministry of Road Transport
National Highways, and Highways,
Guindy, Regional Office,
Chennai – 600 025. Rajaji Bhavan,
Chennai – 90.

Letter No.3033/Sa3/NH /2021, dated.05.08.2021


Sir,
Sub: National Highways - Tamil Nadu – Madurai (NH) Circle – Madurai
(NH) Division – “STREGTHENING IN KM 90/0-96/0 AND
INCLUDING PERMANENT REMEDIAL MEASURES FOR BLACK
SPOTS AT KM 91/2 (SALAIKALIYAMMAN KOVIL JUNCTION-TN -02-
651), KM91/10(BOJAN PARK JUCTION-TN-02-652),
KM92/4(KATTABOMMAN STATUE-TN-02-720) AND KM 95/4(C.P.A
COLLEGE TN-02-722) OF NH 49 EXTN. (NEW NH NO.85)” - Estimate
sent herewith- Approval requested - Regarding.
Ref : 1.The Regional Officer,MoRTH, Chennai-90 Lr.No.CE-
RO/Chennai/MoRTH/12014/02/2021-22/AP dt.07.05.21.
2.The Superintending Engineer (NH) Madurai, Lr.No:1923/ 2021-
22/NH/AE-I dated:21.06.2020.
**************
I send herewith the estimate for the work of “STREGTHENING IN
KM 90/0-96/0 AND INCLUDING PERMANENT REMEDIAL MEASURES FOR
BLACK SPOTS AT KM 91/2 (SALAIKALIYAMMAN KOVIL JUNCTION-TN -02-651),
KM91/10(BOJAN PARK JUCTION-TN-02-652), KM92/4(KATTABOMMAN STATUE-
TN-02-720) AND KM 95/4(C.P.A COLLEGE TN-02-722) OF NH 49 EXTN. (NEW NH
NO.85)” amounting to Rs.809.24 Lakhs for Ministry’s approval.
The Stretch from Km 90/0-96/0 has been included in the approved list
of works under the Annual Plan 2021-22 for an amount of Rs.6.00 Crore under
strengthening vide Lr. No.CE- RO/Chennai/MoRTH/12014/02/2021-22/AP
dt.07.05.2021 by the Ministry. But, the above stretch having 4 no of black
spots at km 91/2, km 91/920, km 92/370 and km 95/350 and it was also
included under Road Safety Annual Plan 2021– 2022 for an amount of Rs.9.50
Crore. In order to obtain continuous uniformity of the stretch and also the
maintenance of the road and to engage the single contractor for completion of
the same, the above said rectification measures for 4 black spots also included
in this estimate.
Madurai – Cochin Road (NH 49 Extension) is an important road which
connects Madurai of Tamil Nadu State and Cochin of Kerala State through
important commercial towns such as Usilampatti, Aundipatti, Theni,
Bodinayakknaur and also this road leads to important tourism centers such as
Vaigai Dam, Munnar, Thekkady, etc.,
Location and Classification:
The name of this road is Madurai –cochin road NH 49 Extn.(New NH 85)
and the Black spots at various location has been tabulated with details.

The black spot at Km 91/2 (Salaikaliyamman Junction-TN-02-651) , Km


91/10 (Bojan park junction TN-02-652)), Km 92/4 (Kattabomman Statue TN-
02-720) and Km 95/4 (CPA college TN-02-722) are located in BodinayakanurTaluk.
This stretch of the road is being maintained by Theni (NH) Sub Division of Madurai (NH)
Division.
S.NO KM Village District Parliame
Carriage ROW
Chainage/ ntary
way(undiv
BS ID/ Constitue Formation
ided)
Name ncy width
1 90/900- Bodinayaka Theni Theni 7.50m to 20m -23m
91/400 nur 10.00
TN –(02)-
651
Salaikaliya
mman kovil
2 91/700- Bodinayaka Theni Theni 7.00m to 10m-12m
92/015 nur 7.50m
TN-(02)-
652
Bojan Park
3 92/100- Bodinayaka Theni Theni 7.50m to 10m - 15 m
92/400 nur 10.00m
TN-(02)-
720
Kattabomm
an statue

4 95/0- Annaikarap Theni Theni 10.00m 20m -23m


95/531 atty
TN-(02)-
722
CPA college
Scope of work:
Strengthening has been proposed from km 90/275-91/400 & km
93/920-96/0 with DBM -50mm and BC-40mm. Recycling has been proposed
from km 91/400-92/400 & 93/0-93/069 for BC-40mm only.
Elimination of identified black spot at the following chianages with details:
S.No KM Reason for accident
Plan Provision
Chainage/
BS ID
1 90/900- At this location, the vehicles made head The work has been
included in the
91/400 on collisions due to overtaking of
ministry vide
TN –(02)- vehicles. For this, it is proposed for Lr.No.CERO/Chennai
/MoRTH/12014/02/
651 widening as four lane the existing NH
2021-22/AP
Salaikaliya road with new jersy type centre median dated:07.05.2021
mman kovil as per Standards and Specifications.
2 91/700- At this location, the vehicles made head
92/015 on collisions due to overtaking of
TN-(02)- vehicles. For this it is proposed to widen
652 two lane with paved shoulders. And also,
Bojan Park cross junction exists on the Plain
Terrain. It is proposed to improve the
cross junction with road safety
measures.
3 92/100- At this location, a cross Junction exists
92/400 on the Plain Terrain. It is proposed to
TN-(02)- improve the cross junction with road
720 safety measures.
Kattabomm
an statue

4 95/0- At this location, a “T” type junction


95/531 exists on the Plain Terrain. The vehicles
TN-(02)- made head on collisions due to
722 overtaking of vehicles occurred. For this,
CPA college it is proposed widen to four lane on both
sides of the existing NH road with new
jersy type centre median as per
Standards and Specifications.
Necessity of Work:
The identified black spots tabulated in the above are located in the
stretch of NH 49Extn between Madurai to Cochin. Lot of accidents (mostly the
head on collisions) have been taking place at this stretch due to overtaking of
vehicles on junctions. This causing loss of lot of human life. Therefore the
rectification of this Black Spot points as per standards is absolutely necessary
to save the human life in the stretch at Km 91/2 (Salaikaliyamman Junction) ,
Km 91/10 (Bojan park junction), Km 92/4 (Kattabomman Statue) and Km
95/4 (CPA college)
Existing road features:
a) Existing Road Details

carriage Present status


Location/KM DLP period
way
km90/900- 2L-7.5m- 14.4.2020 The stretch is proposed to be
91/400 10.00m taken up by NHAI Vide
Salaikaliyamman Government of India, Ministry
kovil of Road Transport and
km91/700- 2L 7.00- 14.4.2020
Highways F.No:NH
92/015 7.5m
14013/6/2014 & M dt
Bojan park
Km 92/100- 2L 5.5- 14.4.2020
92/400 8.5m
Kattabomman
statue
95/0-95/531 2L10.00m 14.4.2020
03.04.2017 S.O.1018(E).The
CPA college
length of 44km from km
80/0-96/0 is handed over to
NHAI under Bharatmala
Pariyojana Scheme. But NHAI
DLP of last improvement work:
The details of last renewal are as follows:
Date of Completion
Stretch Year Scheme DLP
km 90/900-
91/400
2016 AP 15.4.2017 14.4.2020
Salaikaliyamman
kovil
km91/700-
92/015 2016 AP 15.4.2017 14.4.2020
Bojan park
Km 92/100-
92/400
2016 AP 15.4.2017 14.4.2020
Kattabomman
statue
km95/0-95/531
CPA college 2016 AP 15.4.2017 14.4.2020

Existing road features.


1 Existing Road Details at Km 90/900-91/400 Salaikaliyamman kovil :

 The stretch of km 90/900-91/400 of NH 49 Extn.(New NH No.85)


is located at Bodinayakanur village of TheniDistrict.
 The Stretches from km 90/900-91/400 is of undivided Two laning
carriage way with 7.5m-10.00m.
 ROW available in the entire stretch from km 90/900-91/400 varies
from 20m to 23m.
 The entire road passes through 100% plain terrain. Both
Horizontal and vertical geometry of this road in plain terrain.
 At this location, a cross junction exists.
 In the stretch new jersy type centre median is proposed for a
length of 245m.

 The retaining wall is proposed for a length of 80m(RHS).

2 Existing Road Details at Km 91/700-92/015 Bojan Park

 The stretch of km 91/700-92/015 of NH 49 Extn.(New NH No.85)


is located at Bodinayakanur village of TheniDistrict.
 The Stretches from km 91/700-92/015 is of undivided Two laning
carriage way with 7.00-7.50m
 ROW available in the entire stretch from km 91/700-92/015
varies from 10.00-12.00m.
 The entire road passes through 100% plain terrain. Both
Horizontal and vertical geometry of this road in plain terrain.
 At this location, a cross junction exists.

 The retaining wall is proposed at high embankment portion for a


length of 100m(RHS).

3 Existing Road Details at Km 92/100-92/400 Kattabomman statue

 The stretch of km 92/100-92/400 of NH 49 Extn.(New NH No.85)


is located at Bodinayakanur village of TheniDistrict.
 The Stretches from km 92/100-92/400 is of undivided Two laning
carriage way with 7.5-10.0m
 ROW available in the entire stretch from km 92/100-92/400
varies from 10-15m.
 The entire road passes through 100% plain terrain. Both
Horizontal and vertical geometry of this road in plain terrain.
 At this location, a cross junction exists. The junction is already
improved. It is proposed to improve the cross junction with road
safety measures.

4 Existing Road Details at Km 95/0-95/531 CPA college:

 The stretch of km 95/0-95/531 of NH 49 Extn.(New NH No.85) is


located at Annaikarapatty village of TheniDistrict.
 The Stretches from km 95/0-95/531 is of undivided Two laning
carriage way with 10m.
 ROW available in the entire stretch from km 95/0-95/531 varies
from 20-23m.
 The entire road passes through 100% plain terrain. Both
Horizontal and vertical geometry of this road in plain terrain.
 At this location, T- junction is proposed for improvement.

 The single row pipe culvert is located at Km 95/4 is proposed for


widening.
 In the stretch new jersy type centre median is proposed for length
of 301m.

Existing Pavement details


Existing Pavement
Sl.N
Stretch Gravel Bituminous
o Base(mm)
(mm) surface(mm)
km90/900-
91/400
1 160 225 96
Salaikaliyamman
kovil
km 91/700-
2 92/015 160 225 96
Bojan park
Km 92/100-
92/400
3 160 225 96
Kattabomman
statue
km 95/0-95/531
4 CPA college 160 225 96

Inventory of Cross Drainage Works:


Clear Whether
Locati No. of Road Reconstruction /
Type of Widening required
Sl. on of Span / way
Culvert /
No CD No. of width Narrow or Good or
Bridge
. Work Rows Availabl Sufficient Damage
e width d
Single
Km.90/ 1 X 1000 20 Sufficient Good
1 row pipe
6 mm dia. width
Culvert

Km RCC Slab 20 Sufficient Good


2 1 X 2.00 m
90/10 Culvert width

Km Slab 20 Sufficient Good


3 1 X 1.00 m
91/6 Culvert width

Km Slab 20 Sufficient Good


4 1 X 1.00 m
91/6 Culvert width

Km RCC Slab 20 Sufficient Good


5 1 X 5.60 m
93/2 Culvert width

Km RCC Slab 20 Sufficient Good


6 1 X 5.60 m
93/4 Culvert width

Single
Km 1 X 1000 20 Narrow & Good
7 row pipe
95/4 mm dia widening
Culvert
required
Minor
Km 20 Sufficient Good
8 Bridge 7 X 6.00 m
95/8 width

Accident details:
The accident details obtained from police department for these stretch are
tabulated below

Peri No. of No. of


S.No Location Chainage
od Accidents Fatalities
1 Salaikaliyammank Km 91/2 2016 8 2
ovil
-
2019
2016
2 Bojan park Km91/10 - 6 2
2019
2016
Kattabomman
3 Km92/4 - 5 0
statue
2019
2016
4 CPA college Km95/4 - 5 0
2019
Utilities to be shifted:
The details of the utilities to be shifted on the stretch from km 39/2-39/8 are tabulated below
LT HT
KM-Chainage Transformer Side
Poles Poles
1 1 - RHS
91/2 Salaikaliyamman
kovil
9 - - LHS

- 1 - RHS
91/10 Bojan Park
9 - - LHS

10 - - RHS
92/4 Kattabomman
statue 8 1 LHS
3

- 8 1 RHS
95/4 CPA college
5 11 - LHS
Improvement measures proposed:
1) The stretch is proposed for widening from two lane to four lane with
centre median (new jersey type) from km 90/9-91/4, 95/0-95/531 &
from two lane to 2L+PS from km 91/700-92/015.
2) Necessary road markings, sign boards, blinkers must be provided as per
MORTH standards.

Stretch Description Widening Length on NH209


km90/900-
RHS 500m
91/400
Salaikaliyamma LHS 500m
n kovil
km91/700-
LHS 315m
92/015
Bojan park RHS 165m

km95/0-
LHS 531m
95/531
CPA college RHS 531m

Traffic Details and CBR of Soil:


a) PCU and CVPD
The PCU value calculated from the census taken at the approved census point
located at Km73/4 of this road during the period 10/2017 was 33969& CVPD
was 6137 and the details are furnished as below.

Census Year of Influenced Commercial


PCU Peak/Normal
Point Census Stretches vehicle per day
Km Km 45/0-
2017 6137 33969 Normal
73/4 119/0
Sub Grade Soil Properties:

CBR Values:

The soil tests are conducted by Quality Control (NH) Division,


Madurai and communicated videLr. No. 24/2020-2021/A/CBR dated:
14.12.2020of Division Engineer, NH Quality Control, Madurai and the results
of the CBR values enclosed separately and the test values are tabulated
below.

Sl. Reach
CBR
No. (in Km)
1 Km 90/10 10

2 Km 91/2 10
Sl. Reach
CBR
No. (in Km)
3 Km92/430 9

4 Km 92/520 7

5 Km 92/560 10

6 Km 95/2 10

7 Km 95/6 10

Design Traffic Calculations:


For Km. 90/0-96/0
Pavement Thickness
Resilient Modulus (Ma)
composition (mm)
BC 40 3000 for VG 40
Km 90/900- Layer 1 3000 for VG 40
DBM 105
91/400 &
km 95/0- WMM 250 =.2*(Thickness of granular
95/531 Layer 2 layer)^0.45*modulusof
GSB 200
sub grade

BC 40 3000 for VG 40
Layer 1 3000 for VG 40
Km 91/700- DBM 125
92/015
WMM 250 =.2*(Thickness of granular
Layer 2 layer)^0.45*modulusof
GSB 225 sub grade

b) Design Traffic Calculation:

Km 90/900-91/400 & km 95/0-95/531


Two Lane with paved
1 No. of Traffic Lane
shoulders
Dual two lane (divided
2 Type of carriage –way (single/divided)
carriageway)
3 Terrain (Hilly/Plain) Plain
Number of commercial vehicle per
4 day as per last count (both directions) 6137
(P)
5 Year of census (last count) 2017
6 Year of preparation of Design 2021

7 Construction period 1 year

8 Traffic growth rate per annum 5.00 %


Initial Traffic in the year of
9 3916
completion of construction(A)
10 Vehicle damage factor 5.00
Km 91/700-92/015

Two Lane with paved


1 No. of Traffic Lane
shoulders
Two line single carriage
2 Type of carriage –way (single/divided)
way
3 Terrain (Hilly/Plain) Plain
Number of commercial vehicle per
4 day as per last count (both directions) 6137
(P)
5 Year of census (last count) 2017

6 Year of preparation of Design 2021

7 Construction period 1 year

8 Traffic growth rate per annum 5.00 %


Initial Traffic in the year of
9 7832
completion of construction(A)
10 Vehicle damage factor 5.00

Since it is a National Highway road stage construction is adopted. For the base
and sub base is designed for 20 years design life period and bituminous layers are
designed for 5 years design life period as stage construction.
Km 90/900-91/400 & 95/0-95/531

Cumulative number of standard axles to be catered for the Design life 20 years.
N20 = 365 [(1 +r) 15 – 1] x A x D x F / r
N20 = 365*[(1+0.05) ^20 – 1] * 3916* 0.75*5/0.05/1000000
= 177.23msa.
Cumulative number of standard axles to be catered for the Design life 5 years.
N5 = 365 [(1 +r) 5 – 1] x A x D x F / r

N5 = 365*[(1+0.05) ^5 – 1] *3916 * 0.75 * 5/ 0.05/1000000/0.60


= 49.36msa.
Km 91/700-92/015
Cumulative number of standard axles to be catered for the Design life 20 years.
N20 = 365 [(1 +r) 15 – 1] x A x D x F / r
N20 = 365*[(1+0.05) ^20 – 1] * 7832* 0.75*5/0.05/1000000
= 236.34 msa.
Cumulative number of standard axles to be catered for the Design life 5 years.
N5 = 365 [(1 +r) 5 – 1] x A x D x F / r

N5 = 365*[(1+0.05) ^5 – 1] *7832* 0.75 * 5/ 0.05/1000000/0.60


= 65.83msa.

c) Design for Widening Portions.


The flexible pavement is designed as three layer system as per IRC37-
2012. The bituminous layer is assumed to have 40 mm thick BC and 105 mm
thick DBM with VG40 bitumen. The granular layer is assumed to have 250 mm
thick WMM and 200 mm thick GSB. The assumed section is checked for the
limiting horizontal tensile at the bottom of the bituminous layer and vertical
compressive strain at the top of the sub grade.
Proposal for Strengthening:
BBD Values:

The BBD tests are conducted by Quality Control (NH) Division, Madurai and test results
are enclosed separately and following are the BBD values arrived as per test.
Characteristic
Sl. No. Reach(in Km)
Deflection (in mm)
1 Km 90/0-91/0 1.187
2 Km 91/0-92/0 1.229
3 Km 92/0-93/0 1.207
4 Km 93/0-94/0 1.213
5 Km 94/0-95/0 1.201
6 Km 95/0-96/0 1.225

Design Calculation for 5 Years (Base for strengthening):

Cumulative number of standard axles to be catered for the Design life 5 years
as follows

i) Km 90/0 – 96/0
Pavement Proposals for strengthening from km 90/0-96/0:
The Proposed Pavement as per design traffic is tabulated below:
Required Proposed (in mm)
BM
Deflectio BM
Reach Msa Overlay
n DBM BC thicknes
Thicknes
s s

1.187 39.50
Km 90/0-91/0 122 50 40 129
1.229 39.50
Km 91/0-92/0 129 50 40 129
1.207 39.50
Km 92/0-93/0 126 50 40 129
1.213 39.50
Km 93/0-94/0 127 50 40 129
1.201 39.50
Km 94/0-95/0 125 50 40 129
1.225 39.50
Km 95/0-96/0 129 50 40 129
Proposed Provision with justification
The provision proposed in this estimate for widening portion is tabulated below
with the justification.
Km 90/900-91/400 Salaikaliyamman kovil (ID TN-(02)-651
KM Provision proposed Justification
km 90/900- I) For widening portion of main Designed as per
91/400 carriage way in NH49extn. IS: 37-2018 and as
a) GSB Gr V - 200 mm
Salaikaliya per census taken
b) WMM - 250 mm
mman kovil c) DBM Gr I - 105 mm 2/2017.
d) BC - 40 mm
II) For widening portion of branch roads
a) GSB Gr V - 200 mm
b) WMM - 250 mm
c) DBM - 50 mm
d) BC - 30 mm
In both Theni and munnar side Centre As per standards
median to a length of 245 m(km91/2), and type design for
inter section on
National Highways,
MoRTH-1995.
Strengthening in km 90/900-91/400 Designed as per
IRC 81-1997.
In Madurai and Theni side, retaining wall As per the relevant
is proposed to protect the high standards of
embankment portion. MoRTH and IRC
Location Length Heigh
and site condition
Sides t
Km 91/2 RHS 80m 2mab
ove
GL
other features such as road furnitures etc As per IRC: 67 -
2018 & IRC 85
Km 91/700- III) For widening portion of main Designed as per
92/015 carriage way in NH49extn.km IS: 37-2018 and as
Bojan Park 91/700-92/015 per census taken
(ID TN-(02)- e) GSB Gr V - 225 mm 2/2017.
652 f) WMM - 250 mm
g) DBM Gr I - 125 mm
h) BC - 40 mm
IV) For widening portion of branch
roads
e) GSB Gr V - 200 mm
f) WMM - 250 mm
g) DBM - 50 mm
BC - 30 mm
Strengthening in km 91/700-92/015 Designed as per
IRC 81-1997.
In Madurai and Theni side , retaining wall As per the relevant
is proposed to protect the high standards of
embankment portion. MoRTH and
IRCand site
Location Sides Length Height
Km91/10 LHS 100m 2.0ma condition
bove
GL
other features such as road furnituresetc As per IRC: 67 -
2018 & IRC 35

Km 92/100- Strengthening in km 92/100-92/400 Designed as per


92/400 IRC 81-1997.
Kattabomm other features such as road furnitures etc As per IRC: 67 -

an statue 2018 & IRC 35

Km 95/0- V) For widening portion of main carriage Designed as per


95/531 way in NH49extn. IS: 37-2018 and as
CPA college i) GSB Gr V - 200 mm per census taken
j) WMM - 250 mm 2/2017.
k) DBM Gr I - 105 mm
l) BC - 40 mm
VI) For widening portion of branch
roads
h) GSB Gr V - 200 mm
i) WMM - 250 mm
j) DBM - 50 mm
BC - 30 mm
In both Theni and munnar side Centre As per standards
median to a length of 301 m ,km 95/4 and type design for
inter section on
National
Highways, MoRTH-
1995
Strengthening in km 95/0-95/531 Designed as per
IRC 81-1997.
other features such as road furnitures etc. As per IRC: 67 -
2018 & IRC 35
Strengthening is proposed in km 90/275-91/400, 93/920-96/0 as per
IRC 81-1997 and Milling is proposed for km 91/400-92/400 &93/0-
93/069 as ITC 120 -2015
Provisions allowed in the estimate:
I. Road Work
1. Dismantling of flexible pavements and disposal of dismantled
materials up to ma lead of 1000 m, as per MORT&H Specification (Vth
revision) for Widening Portion.
2. Providing and laying Granular Sub-base with Graded Material as per
Cl. 401 of MORT&H Specification (Vth revision) for Widening Portion.
3. Providing and laying, Wet Mix Macadam as per Cl. 406 of MORT&H
Specification (Vth revision) for Widening Portion.
4. Providing and laying Prime Coat over WMM surface using 6 Kg of
Emulsion Bitumen (SS1) as per Cl. 502 of MORT&H Specification (Vth
revision) for Widening Portion.
5. Providing and laying Tack Coat over WMM surface (treated with
primer) using 3.50 Kg of Bitumen Emulsion (RS1) as per Cl. 503 of
MORT&H Specification (Vth revision) for Widening Portion.
6. Providing and laying Tack Coat over Existing BT surface using 2.50
Kg of Bitumen Emulsion RS1 as per Cl. 503 of MORT&H Specification
(Vth revision).
7. Providing and laying Dense Bituminous Macadam 105mm and
125mm as per cl. 505 of MORT&H Specification (Vth revision).
8. Providing and laying Dense Bituminous Macadam 50mm as per cl.
505 of MORT&H Specification (Vth revision).
9. Recycling pavement by cold milling of existing bituminous layer is
proposed from km 91/4-92/4 & 93/0-93/069.
10. Providing and laying Bituminous concrete 40mm as per Cl. 507 of
MORT&H Specification (Vth revision).
11. Providing and applying tack coat with bitumen emulsion using
emulsion pressure distributor at the rate of 0.3 Kg/sqm on the
prepared bituminous as per of MORT&H Specification (Vth revision).
12. Providing and laying Dense Bituminous Macadam 50mm as per cl.
205 of MORT&H Specification (Vth revision).
13. Raising the cement concrete Kerb wall for island with PCC M20
Concrete Mix as per of MORT&H Specification (Vth revision).
14. Providing and applying emulsion paint finish of approved make &
shade as per of MORT&H Specification (Vth revision).
15. Carted earth filling for shoulders& Centre median as per MORT&H
Specification.
2. Crash Barrier Type Center Median
1. Plain cement concrete M 15 grade foundationas per MORT&H
Specification
2. Providing VRCC M30 mix using 20mm, ISS HBG metal
Precastcenter median as per MORT&H Specification (Vth revision).
3. Supply and fabrication of Fe-500 steel required for all RCC
Retaining wall as per MORT&H Specification (Vth revision).
4. Providing and applying emulsion paint finish of approved make &
shade as per of MORT&H Specification (Vth revision).
3.Road Furniture
1. Providing and laying of Hot applied thermoplastic compound
2.5mm thick as per MORTH Specification as per MORT&H
Specification (Vth revision).
2. Providing and fixing reflective Road studs as per MORTH
Specification as per MORT&H Specification (Vth revision).
3. Providing and Erecting of Solar Powered Blinker as per MORTH
Specification as per MORT&H Specification (Vth revision).
4. Providing and erecting of direction and place identification Retro-
reflectorized sign (Type XI) as per MORTH Specification as per
MORT&H Specification (Vth revision).
5. Providing and Erecting of Retro Reflectorized Cautionary,
Mandatory and Informatory Signs (Type IV) as per MORTH
Specification as per MORT&H Specification (Vth revision).
6. Providing and erecting of direction and Chevron board Retro-
reflectorized sign (Type XI) as per MORTH Specification as per
MORT&H Specification (Vth revision).
7. Providing and Erecting of Retro - Reflectorized Hazard Marker as
per MORTH Specification as per MORT&H Specification (Vth
revision).
8. 60cm circle, 90cm equilateral triangle & 90cm high octagon board

4.Widening Single Row Pipe Culvert:


1. Dismantling cement concrete in culvert and carefully staking the
materials reusable as per MOSRT&H Specification.
2. Earth work excavation for foundation for pipe culvert as per MoRT& H
Specification (Vth Revision).
3. Plain Cement Concrete M-15 (1:2:4) Nominal Mix grade using 40mm
nominal size as per MORT&H Specification 1000,1500,1700& 2100 for
foundation and Base wall (Sub structure).
4. Supply and conveyance of RCC NP IV pipe 1000mm dia pipes confirming
to IS 458 & clause 1010 MOSRT&H.
5. Laying and fixing of RCC NP IV pipe 1000mm dia pipes confirming to
IS 458 & clause 1010 MOSRT&H.
6. Plain Cement Concrete M-15 (1:2:4) Nominal Mix grade using 40mm
nominal size as per MORT&H Specification 1000,1500,1700& 2100 for
above sill.
7. Gravel Filling for pipe culvert including cost conveyance as per cl
710.1.4 of IRC:78 & 2200 of MOSRT& H Specification 305.401.(IV
Revision).

5. P.C.C Retaining wall.


1. Earthwork excavation in all classes of soil except hard rock upto 3m
depth for PCC Retaining wall as per MORT&H Specification (V th
revision).
2. Vibrated Cement Concrete M 15 nominal mix 1:2:4 using 40mm ISS
size HBG metal for PCC Retaining wall as per MORT&H Specification
(Vth revision).
3. Providing and fixing 100mm dia PVC thick for PCC Retaining wall as
per MORT&H Specification (Vth revision).
4. Providing and fixing 20 mm thick fiber board expansion joint for RCC
Retaining wall as per MORT&H Specification (Vth revision).
5. Supply and fabrication of Fe-500 steel required for all PCC Retaining
wall as per MORT&H Specification (Vth revision).
6. Earth filling behind the Retaining Wall with available cutting as per
MoRTH Specification 304. Using Available Foundation Cutting
Earth(toe side).
Lump sum Provisions:
1. .Provision for E.B Poles and Transformers Shifting (LS)
2. .Provision for Maintenance charges @ 2.50 % on Civil Cost.
3. .Provision for Contingencies charges @ 2.80 % on Civil Cost.
4. .Provision for Supervision Charges @ 3.00% on Civil Cost.
5. .Provision for Agency Charges @ 3.00%

Rates:

Approved common data for the year 2020-2021 pertaining to Madurai


NH Circle with Bitumen and emulsion rates as on 16.06.2021 and as per
Common Data is adopted in this estimate and the estimate in finalized for an
amount of Rs.809.24 Lakhs.
The Ministry has instructed to include the utility charges in the estimate
based on sub estimate from the concerned utility agency. But in the need of
rectifying the black spots immediately LS provisions for utility shifting is
proposed in the estimate since getting estimate from concerned utility agency
will take longer time and hence rectification of black spots will be delayed. In
this context it is requested to permit for including utility charges as LS
provision in the estimates especially for estimates for rectification of black
spots. It is assured that the approval of RO for the estimate from the concerned
utility agency will be obtained in the period tendering process and issuance of
LOA and entrust the same to the contractor to the original work.
Target completion time of this work is 12 months.
Rates:

The original estimate has been prepared with the common data for the
year 2020-21 pertaining to Madurai NH Circle with bitumen rate of 16.06.2021
and the estimate is finalized for an amount of Rs.809.24 Lakhs.
I request that technical, administrative and financial sanction of the
Ministry for the above work amounting to Rs.809.24Lakhs may please be
accorded and orders communicated early.
Encl: Estimate in duplicate
For Chief Engineer,
National Highways.

Copy to:
1. The Superintending Engineer (NH), Madurai.
2. The Divisional Engineer (NH),Madurai. of the M

O.N. submitted:
C.No: 3033/21
The above current may please be perused.
The SE (NH), Madurai has submitted the estimate for the work of
“STREGTHENING IN KM 90/0-96/0 AND INCLUDING PERMANENT
REMEDIAL MEASURES FOR BLACK SPOTS AT KM 91/2 (SALAIKALIYAMMAN
KOVIL JUNCTION-TN -02-651), KM91/10(BOJAN PARK JUCTION-TN-02-652),
KM92/4(KATTABOMMAN STATUE-TN-02-720) AND KM 95/4(C.P.A COLLEGE TN-
02-722) OF NH 49 EXTN. (NEW NH NO.85)”for Ministry’s approval.
In this regard the following note is put up below.
The Stretch from Km 90/0-96/0 has been included in the
approved list of works under the Annual Plan 2021-22 for an amount of
Rs.6.00 Crore under strengthening vide Lr. No.CE-
RO/Chennai/MoRTH/12014/02/2021-22/AP dt.07.05.2021 by the Ministry.
But, the above stretch having 4 no of black spots at km 91/2, km 91/920, km
92/370 and km 95/350 and it was also included under Road Safety Annual
Plan 2021– 2022 for an amount of Rs.9.50 Crore. In order to obtain continuous
uniformity of the stretch and also the maintenance of the road and to engage
the single contractor for completion of the same, the above said rectification
measures for 4 black spots also included in this estimate.
Madurai – Cochin Road (NH 49 Extension) is an important road which
connects Madurai of Tamil Nadu State and Cochin of Kerala State through
important commercial towns such as Usilampatti, Aundipatti, Theni,
Bodinayakknaur and also this road leads to important tourism centers such as
Vaigai Dam, Munnar, Thekkady, etc.,
Location and Classification:
The name of this road is Madurai –cochin road NH 49 Extn.(New NH 85)
and the Black spots at various location has been tabulated with details.

The black spot in at Km 91/2 (Salaikaliyamman Junction-TN-02-651) ,


Km 91/10 (Bojan park junction TN-02-652)), Km 92/4 (Kattabomman Statue
TN-02-720) and Km 95/4 (CPA college TN-02-722) are located in
BodinayakanurTaluk. This stretch of the road is being maintained by Theni (NH) Sub Division
of Madurai (NH) Division.
S.NO KM Village District Parliame
Carriage ROW
Chainage/ ntary
way(undiv
BS ID/ Constitue Formation
ided)
Name ncy width
1 90/900- Bodinayaka Theni Theni 7.50m to 20m -23m
91/400 nur 10.00
TN –(02)-
651
Salaikaliya
mman kovil
2 91/700- Bodinayaka Theni Theni 7.00m to 10m-12m
92/015 nur 7.50m
TN-(02)-
652
Bojan Park
3 92/100- Bodinayaka Theni Theni 7.50m to 10m - 15 m
92/400 nur 10.00m
TN-(02)-
720
Kattabomm
an statue

4 95/0- Annaikarap Theni Theni 10.00m 20m -23m


95/531 atty
TN-(02)-
722
CPA college
Scope of work:
Strengthening has been proposed from km 90/275-91/400 & km
93/920-96/0 with DBM -50mm and BC-40mm. Recycling has been proposed
from km 91/400-92/400 & 93/0-93/069 for BC-40mm only.
Elimination of identified black spot at the following chianages with details:
S.No KM Reason for accident
Plan Provision
Chainage/
BS ID
1 90/900- At this location, the vehicles made head The work has been
included in the
91/400 on collisions due to overtaking of
ministry vide
TN –(02)- vehicles. For this, it is proposed for Lr.No.CERO/Chennai
651 widening as four lane the existing NH
Salaikaliya road with new jersy type centre median
mman kovil as per Standards and Specifications.
2 91/700- At this location, the vehicles made head
92/015 on collisions due to overtaking of
TN-(02)- vehicles. For this it is proposed to widen
652 two lane with paved shoulders. And also,
Bojan Park cross junction exists on the Plain
Terrain. It is proposed to improve the
cross junction with road safety
measures.
3 92/100- At this location, a cross Junction exists
/MoRTH/12014/02/
92/400 on the Plain Terrain. It is proposed to
2021-22/AP
TN-(02)- improve the cross junction with road dated:07.05.2021
720 safety measures.
Kattabomm
an statue

4 95/0- At this location, a “T” type junction


95/531 exists on the Plain Terrain. The vehicles
TN-(02)- made head on collisions due to
722 overtaking of vehicles occurred. For this,
CPA college it is proposed widen to four lane on both
sides of the existing NH road with new
jersy type centre median as per
Standards and Specifications.
Necessity of Work:
The identified black spots tabulated in the above are located in the
stretch of NH 49Extn between Madurai to Cochin. Lot of accidents (mostly the
head on collisions) have been taking place at this stretch due to overtaking of
vehicles on junctions. This causing loss of lot of human life. Therefore the
rectification of this Black Spot points as per standards is absolutely necessary
to save the human life in the stretch at Km 91/2 (Salaikaliyamman Junction) ,
Km 91/10 (Bojan park junction), Km 92/4 (Kattabomman Statue) and Km
95/4 (CPA college)
Existing road features:
b) Existing Road Details

carriage Present status


Location/KM DLP period
way
km90/900- 2L-7.5m- 14.4.2020 The stretch is proposed to be
91/400 10.00m taken up by NHAI Vide
Salaikaliyamman Government of India, Ministry
kovil of Road Transport and
km91/700- 2L 7.00- 14.4.2020
Highways F.No:NH
92/015 7.5m
14013/6/2014 & M dt
Bojan park
03.04.2017 S.O.1018(E).The
Km 92/100- 2L 5.5- 14.4.2020
length of 44km from km
92/400 8.5m
80/0-96/0 is handed over to
Kattabomman
NHAI under Bharatmala
statue
95/0-95/531 2L10.00m 14.4.2020 Pariyojana Scheme. But NHAI
CPA college follows green field alignment
in the above mentioned black
spot stretches

DLP of last improvement work:


The details of last renewal are as follows:
Date of Completion
Stretch Year Scheme DLP
km 90/900-
91/400
2016 AP 15.4.2017 14.4.2020
Salaikaliyamman
kovil
km91/700-
92/015 2016 AP 15.4.2017 14.4.2020
Bojan park
Km 92/100-
92/400
2016 AP 15.4.2017 14.4.2020
Kattabomman
statue
km95/0-95/531
CPA college 2016 AP 15.4.2017 14.4.2020
Existing road features.
5 Existing Road Details at Km 90/900-91/400 Salaikaliyamman kovil :

 The stretch of km 90/900-91/400 of NH 49 Extn.(New NH No.85)


is located at Bodinayakanur village of TheniDistrict.
 The Stretches from km 90/900-91/400 is of undivided Two laning
carriage way with 7.5m-10.00m.
 ROW available in the entire stretch from km 90/900-91/400 varies
from 20m to 23m.
 The entire road passes through 100% plain terrain. Both
Horizontal and vertical geometry of this road in plain terrain.
 At this location, a cross junctionexists.
 In the stretch new jersy type centre median is proposed for a
length of 245m.

 The retaining wall is proposed for a length of 80m(RHS).

6 Existing Road Details at Km 91/700-92/015 Bojan Park

 The stretch of km 91/700-92/015 of NH 49 Extn.(New NH No.85)


is located at Bodinayakanur village of TheniDistrict.
 The Stretches from km 91/700-92/015 is of undivided Two laning
carriage way with 7.00-7.50m
 ROW available in the entire stretch from km 91/700-92/015
varies from 10.00-12.00m.
 The entire road passes through 100% plain terrain. Both
Horizontal and vertical geometry of this road in plain terrain.
 At this location, a cross junction exists.

 The retaining wall is proposed at high embankment portion for a


length of 100m(RHS).

7 Existing Road Details at Km 92/100-92/400 Kattabomman statue

 The stretch of km 92/100-92/400 of NH 49 Extn.(New NH No.85)


is located at Bodinayakanur village of TheniDistrict.
 The Stretches from km 92/100-92/400 is of undivided Two laning
carriage way with 7.5-10.0m
 ROW available in the entire stretch from km 92/100-92/400
varies from 10-15m.
 The entire road passes through 100% plain terrain. Both
Horizontal and vertical geometry of this road in plain terrain.
 At this location, a cross junction exists. The junction is already
improved. It is proposed to improve the cross junction with road
safety measures.

8 Existing Road Details at Km 95/0-95/531 CPA college:

 The stretch of km 95/0-95/531 of NH 49 Extn.(New NH No.85) is


located at Annaikarapatty village of TheniDistrict.
 The Stretches from km 95/0-95/531 is of undivided Two laning
carriage way with 10m.
 ROW available in the entire stretch from km 95/0-95/531 varies
from 20-23m.
 The entire road passes through 100% plain terrain. Both
Horizontal and vertical geometry of this road in plain terrain.
 At this location, T- junction is proposed for improvement.

 The single row pipe culvert is located at Km 95/4 is proposed for


widening.
 In the stretch new jersy type centre median is proposed for length
of 301m.

Existing Pavement details


Existing Pavement
Sl.N
Stretch Gravel Bituminous
o Base(mm)
(mm) surface(mm)
km90/900-
91/400
1 160 225 96
Salaikaliyamman
kovil
km 91/700-
2 92/015 160 225 96
Bojan park
3 Km 92/100- 160 225 96
92/400
Kattabomman
statue
km 95/0-95/531
4 CPA college 160 225 96

Inventory of Cross Drainage Works:


Clear Whether
Locati No. of Road Reconstruction /
Type of Widening required
Sl. on of Span / way
Culvert /
No CD No. of width Narrow or Good or
Bridge
. Work Rows Availabl Sufficient Damage
e width d
Single
Km.90/ 1 X 1000 20 Sufficient Good
1 row pipe
6 mm dia. width
Culvert

Km RCC Slab 20 Sufficient Good


2 1 X 2.00 m
90/10 Culvert width

Km Slab 20 Sufficient Good


3 1 X 1.00 m
91/6 Culvert width

Km Slab 20 Sufficient Good


4 1 X 1.00 m
91/6 Culvert width

Km RCC Slab 20 Sufficient Good


5 1 X 5.60 m
93/2 Culvert width

Km RCC Slab 20 Sufficient Good


6 1 X 5.60 m
93/4 Culvert width

Single
Km 1 X 1000 20 Narrow & Good
7 row pipe
95/4 mm dia widening
Culvert
required
Minor
Km 20 Sufficient Good
8 Bridge 7 X 6.00 m
95/8 width

Accident details:
The accident details obtained from police department for these stretch are
tabulated below
Peri No. of No. of
S.No Location Chainage
od Accidents Fatalities
2016
Salaikaliyammank
1 Km 91/2 - 8 2
ovil
2019
2016
2 Bojan park Km91/10 - 6 2
2019
2016
Kattabomman
3 Km92/4 - 5 0
statue
2019
2016
4 CPA college Km95/4 - 5 0
2019
Utilities to be shifted:
The details of the utilities to be shifted on the stretch from km 39/2-39/8 are tabulated below
LT HT
KM-Chainage Transformer Side
Poles Poles
1 1 - RHS
91/2 Salaikaliyamman
kovil
9 - - LHS

- 1 - RHS
91/10 Bojan Park
9 - - LHS

10 - - RHS
92/4 Kattabomman
statue 8 1 LHS
3

- 8 1 RHS
95/4 CPA college
5 11 - LHS
Improvement measures proposed:
3) The stretch is proposed for widening from two lane to four lane with
centre median (new jersey type) from km 90/9-91/4, 95/0-95/531 &
from two lane to 2L+PS from km 91/700-92/015.
4) Necessary road markings, sign boards, blinkers must be provided as per
MORTH standards.
Stretch Description Widening Length on NH209
km90/900-
RHS 500m
91/400
Salaikaliyamma LHS 500m
n kovil
km91/700-
LHS 315m
92/015
Bojan park RHS 165m

km95/0-
LHS 531m
95/531
CPA college RHS 531m

Traffic Details and CBR of Soil:


d) PCU and CVPD
The PCU value calculated from the census taken at the approved census point
located at Km73/4 of this road during the period 10/2017 was 33969& CVPD
was 6137 and the details are furnished as below.

Census Year of Influenced Commercial


PCU Peak/Normal
Point Census Stretches vehicle per day
Km Km 45/0-
2017 6137 33969 Normal
73/4 119/0
Sub Grade Soil Properties:

CBR Values:

The soil tests are conducted by Quality Control (NH) Division,


Madurai and communicated videLr. No. 24/2020-2021/A/CBR dated:
14.12.2020of Division Engineer, NH Quality Control, Madurai and the results
of the CBR values enclosed separately and the test values are tabulated
below.
Sl. Reach
CBR
No. (in Km)
1 Km 90/10 10

2 Km 91/2 10

3 Km92/430 9

4 Km 92/520 7

5 Km 92/560 10

6 Km 95/2 10

7 Km 95/6 10

Design Traffic Calculations:


For Km. 90/0-96/0
Pavement Thickness
Resilient Modulus (Ma)
composition (mm)
BC 40 3000 for VG 40
Km 90/900- Layer 1 3000 for VG 40
DBM 105
91/400 &
km 95/0- WMM 250 =.2*(Thickness of granular
95/531 Layer 2 layer)^0.45*modulusof
GSB 200
sub grade

BC 40 3000 for VG 40
Layer 1 3000 for VG 40
Km 91/700- DBM 125
92/015
WMM 250 =.2*(Thickness of granular
Layer 2 layer)^0.45*modulusof
GSB 225 sub grade

e) Design Traffic Calculation:

Km 90/900-91/400 & km 95/0-95/531


Two Lane with paved
1 No. of Traffic Lane
shoulders
Dual two lane (divided
2 Type of carriage –way (single/divided)
carriageway)
3 Terrain (Hilly/Plain) Plain

4 Number of commercial vehicle per 6137


day as per last count (both directions)
(P)
5 Year of census (last count) 2017

6 Year of preparation of Design 2021

7 Construction period 1 year

8 Traffic growth rate per annum 5.00 %


Initial Traffic in the year of
9 3916
completion of construction(A)
10 Vehicle damage factor 5.00
Km 91/700-92/015

Two Lane with paved


1 No. of Traffic Lane
shoulders
Two line single carriage
2 Type of carriage –way (single/divided)
way
3 Terrain (Hilly/Plain) Plain
Number of commercial vehicle per
4 day as per last count (both directions) 6137
(P)
5 Year of census (last count) 2017

6 Year of preparation of Design 2021

7 Construction period 1 year

8 Traffic growth rate per annum 5.00 %


Initial Traffic in the year of
9 7832
completion of construction(A)
10 Vehicle damage factor 5.00

Since it is a National Highway road stage construction is adopted. For the base
and sub base is designed for 20 years design life period and bituminous layers are
designed for 5 years design life period as stage construction.
Km 90/900-91/400 & 95/0-95/531

Cumulative number of standard axles to be catered for the Design life 20 years.
N20 = 365 [(1 +r) 15 – 1] x A x D x F / r
N20 = 365*[(1+0.05) ^20 – 1] * 3916* 0.75*5/0.05/1000000
= 177.23msa.
Cumulative number of standard axles to be catered for the Design life 5 years.
N5 = 365 [(1 +r) 5 – 1] x A x D x F / r

N5 = 365*[(1+0.05) ^5 – 1] *3916 * 0.75 * 5/ 0.05/1000000/0.60


= 49.36msa.
Km 91/700-92/015
Cumulative number of standard axles to be catered for the Design life 20 years.
N20 = 365 [(1 +r) 15 – 1] x A x D x F / r
N20 = 365*[(1+0.05) ^20 – 1] * 7832* 0.75*5/0.05/1000000
= 236.34 msa.
Cumulative number of standard axles to be catered for the Design life 5 years.
N5 = 365 [(1 +r) 5 – 1] x A x D x F / r

N5 = 365*[(1+0.05) ^5 – 1] *7832* 0.75 * 5/ 0.05/1000000/0.60


= 65.83msa.

f) Design for Widening Portions.


The flexible pavement is designed as three layer system as per IRC37-
2012. The bituminous layer is assumed to have 40 mm thick BC and 105 mm
thick DBM with VG40 bitumen. The granular layer is assumed to have 250 mm
thick WMM and 200 mm thick GSB. The assumed section is checked for the
limiting horizontal tensile at the bottom of the bituminous layer and vertical
compressive strain at the top of the sub grade.
Proposal for Strengthening:
BBD Values:

The BBD tests are conducted by Quality Control (NH) Division, Madurai and test results
are enclosed separately and following are the BBD values arrived as per test.
Characteristic
Sl. No. Reach(in Km)
Deflection (in mm)
1 Km 90/0-91/0 1.187
2 Km 91/0-92/0 1.229
3 Km 92/0-93/0 1.207
4 Km 93/0-94/0 1.213
5 Km 94/0-95/0 1.201
6 Km 95/0-96/0 1.225

Design Calculation for 5 Years (Base for strengthening):

Cumulative number of standard axles to be catered for the Design life 5 years
as follows
ii) Km 90/0 – 96/0

Pavement Proposals for strengthening from km 90/0-96/0:


The Proposed Pavement as per design traffic is tabulated below:
Required Proposed (in mm)
BM
Deflectio BM
Reach Msa Overlay
n DBM BC thicknes
Thicknes
s s

1.187 39.50
Km 90/0-91/0 122 50 40 129
1.229 39.50
Km 91/0-92/0 129 50 40 129
1.207 39.50
Km 92/0-93/0 126 50 40 129
1.213 39.50
Km 93/0-94/0 127 50 40 129
1.201 39.50
Km 94/0-95/0 125 50 40 129
1.225 39.50
Km 95/0-96/0 129 50 40 129
Proposed Provision with justification
The provision proposed in this estimate for widening portion is tabulated below
with the justification.
Km 90/900-91/400 Salaikaliyamman kovil (ID TN-(02)-651
KM Provision proposed Justification
km 90/900- VII) For widening portion of main Designed as per
91/400 carriage way in NH49extn. IS: 37-2018 and as
m) GSB Gr V - 200 mm
Salaikaliya per census taken
n) WMM - 250 mm
mman kovil o) DBM Gr I - 105 mm 2/2017.
p) BC - 40 mm
VIII) For widening portion of branch
roads
k) GSB Gr V - 200 mm
l) WMM - 250 mm
m) DBM - 50 mm
n) BC - 30 mm
In both Theni and munnar side Centre As per standards
median to a length of 245 m(km91/2), and type design for
inter section on
National Highways,
MoRTH-1995.
Strengthening in km 90/900-91/400 Designed as per
IRC 81-1997.
In Madurai and Theni side, retaining wall As per the relevant
is proposed to protect the high standards of
embankment portion. MoRTH and IRC
and site condition
Location Length Heigh
Sides t
Km 91/2 RHS 80m 2mab
ove
GL
other features such as road furnitures etc As per IRC: 67 -
2018 & IRC 85
Km 91/700- IX) For widening portion of main Designed as per
92/015 carriage way in NH49extn.km IS: 37-2018 and as
Bojan Park 91/700-92/015 per census taken
(ID TN-(02)- q) GSB Gr V - 225 mm 2/2017.
652 r) WMM - 250 mm
s) DBM Gr I - 125 mm
t) BC - 40 mm
X) For widening portion of branch roads
o) GSB Gr V - 200 mm
p) WMM - 250 mm
q) DBM - 50 mm
BC - 30 mm
Strengthening in km 91/700-92/015 Designed as per
IRC 81-1997.
In Madurai and Theni side , retaining wall As per the relevant
is proposed to protect the high standards of
embankment portion. MoRTH and
IRCand site
Location Sides Length Height
Km91/10 LHS 100m 2.0ma condition
bove
GL
other features such as road furnituresetc As per IRC: 67 -
2018 & IRC 35

Km 92/100- Strengthening in km 92/100-92/400 Designed as per


92/400 IRC 81-1997.
Kattabomm other features such as road furnitures etc As per IRC: 67 -

an statue 2018 & IRC 35

Km 95/0- XI) For widening portion of main Designed as per


95/531 carriage way in NH49extn. IS: 37-2018 and as
CPA college u) GSB Gr V - 200 mm per census taken
v) WMM - 250 mm 2/2017.
w) DBM Gr I - 105 mm
x) BC - 40 mm
XII) For widening portion of branch
roads
r) GSB Gr V - 200 mm
s) WMM - 250 mm
t) DBM - 50 mm
BC - 30 mm
In both Theni and munnar side Centre As per standards
median to a length of 301 m ,km 95/4 and type design for
inter section on
National
Highways, MoRTH-
1995
Strengthening in km 95/0-95/531 Designed as per
IRC 81-1997.
other features such as road furnitures etc. As per IRC: 67 -
2018 & IRC 35
Strengthening is proposed in km 90/275-91/400, 93/920-96/0 as per
IRC 81-1997 and Milling is proposed for km 91/400-92/400 &93/0-
93/069 as ITC 120 -2015
Provisions allowed in the estimate:
II. Road Work
1. Dismantling of flexible pavements and disposal of dismantled
materials up to ma lead of 1000 m, as per MORT&H Specification (Vth
revision) for Widening Portion.
2. Providing and laying Granular Sub-base with Graded Material as per
Cl. 401 of MORT&H Specification (Vth revision) for Widening Portion.
3. Providing and laying, Wet Mix Macadam as per Cl. 406 of MORT&H
Specification (Vth revision) for Widening Portion.
4. Providing and laying Prime Coat over WMM surface using 6 Kg of
Emulsion Bitumen (SS1) as per Cl. 502 of MORT&H Specification (Vth
revision) for Widening Portion.
5. Providing and laying Tack Coat over WMM surface (treated with
primer) using 3.50 Kg of Bitumen Emulsion (RS1) as per Cl. 503 of
MORT&H Specification (Vth revision) for Widening Portion.
6. Providing and laying Tack Coat over Existing BT surface using 2.50
Kg of Bitumen Emulsion RS1 as per Cl. 503 of MORT&H Specification
(Vth revision).
7. Providing and laying Dense Bituminous Macadam 105mm and
125mm as per cl. 505 of MORT&H Specification (Vth revision).
8. Providing and laying Dense Bituminous Macadam 50mm as per cl.
505 of MORT&H Specification (Vth revision).
9. Recycling pavement by cold milling of existing bituminous layer is
proposed from km 91/4-92/4 & 93/0-93/069.
10. Providing and laying Bituminous concrete 40mm as per Cl. 507 of
MORT&H Specification (Vth revision).
11. Providing and applying tack coat with bitumen emulsion using
emulsion pressure distributor at the rate of 0.3 Kg/sqm on the
prepared bituminous as per of MORT&H Specification (Vth revision).
12. Providing and laying Dense Bituminous Macadam 50mm as per cl.
205 of MORT&H Specification (Vth revision).
13. Raising the cement concrete Kerb wall for island with PCC M20
Concrete Mix as per of MORT&H Specification (Vth revision).
14. Providing and applying emulsion paint finish of approved make &
shade as per of MORT&H Specification (Vth revision).
15. Carted earth filling for shoulders& Centre median as per MORT&H
Specification.

2. Crash Barrier Type Center Median


1. Plain cement concrete M 15 grade foundationas per MORT&H
Specification
2. Providing VRCC M30 mix using 20mm, ISS HBG metal
Precastcenter median as per MORT&H Specification (Vth revision).
3. Supply and fabrication of Fe-500 steel required for all RCC
Retaining wall as per MORT&H Specification (Vth revision).
4. Providing and applying emulsion paint finish of approved make &
shade as per of MORT&H Specification (Vth revision).
3.Road Furniture
1. Providing and laying of Hot applied thermoplastic compound
2.5mm thick as per MORTH Specification as per MORT&H
Specification (Vth revision).
2. Providing and fixing reflective Road studs as per MORTH
Specification as per MORT&H Specification (Vth revision).
3. Providing and Erecting of Solar Powered Blinker as per MORTH
Specification as per MORT&H Specification (Vth revision).
4. Providing and erecting of direction and place identification Retro-
reflectorized sign (Type XI) as per MORTH Specification as per
MORT&H Specification (Vth revision).
5. Providing and Erecting of Retro Reflectorized Cautionary,
Mandatory and Informatory Signs (Type IV) as per MORTH
Specification as per MORT&H Specification (Vth revision).
6. Providing and erecting of direction and Chevron board Retro-
reflectorized sign (Type XI) as per MORTH Specification as per
MORT&H Specification (Vth revision).
7. Providing and Erecting of Retro - Reflectorized Hazard Marker as
per MORTH Specification as per MORT&H Specification (Vth
revision).
8. 60cm circle, 90cm equilateral triangle & 90cm high octagon board

4.Widening Single Row Pipe Culvert:


1. Dismantling cement concrete in culvert and carefully staking the
materials reusable as per MOSRT&H Specification.
2. Earth work excavation for foundation for pipe culvert as per MoRT& H
Specification (Vth Revision).
3. Plain Cement Concrete M-15 (1:2:4) Nominal Mix grade using 40mm
nominal size as per MORT&H Specification 1000,1500,1700& 2100 for
foundation and Base wall (Sub structure).
4. Supply and conveyance of RCC NP IV pipe 1000mm dia pipes confirming
to IS 458 & clause 1010 MOSRT&H.
5. Laying and fixing of RCC NP IV pipe 1000mm dia pipes confirming to
IS 458 & clause 1010 MOSRT&H.
6. Plain Cement Concrete M-15 (1:2:4) Nominal Mix grade using 40mm
nominal size as per MORT&H Specification 1000,1500,1700& 2100 for
above sill.
7. Gravel Filling for pipe culvert including cost conveyance as per cl
710.1.4 of IRC:78 & 2200 of MOSRT& H Specification 305.401.(IV
Revision).

5. P.C.C Retaining wall.


1. Earthwork excavation in all classes of soil except hard rock upto 3m
depth for PCC Retaining wall as per MORT&H Specification (V th
revision).
2. Vibrated Cement Concrete M 15 nominal mix 1:2:4 using 40mm ISS
size HBG metal for PCC Retaining wall as per MORT&H Specification
(Vth revision).
3. Providing and fixing 100mm dia PVC thick for PCC Retaining wall as
per MORT&H Specification (Vth revision).
4. Providing and fixing 20 mm thick fiber board expansion joint for RCC
Retaining wall as per MORT&H Specification (Vth revision).
5. Supply and fabrication of Fe-500 steel required for all PCC Retaining
wall as per MORT&H Specification (Vth revision).
6. Earth filling behind the Retaining Wall with available cutting as per
MoRTH Specification 304. Using Available Foundation Cutting
Earth(toe side).
Lump sum Provisions:
1. Provision for E.B Poles and Transformers Shifting (LS)
2. .Provision for Maintenance charges @ 2.50 % on Civil Cost.
3. .Provision for Contingencies charges @ 2.80 % on Civil Cost.
4. .Provision for Supervision Charges @ 3.00% on Civil Cost.
5. .Provision for Agency Charges @ 3.00%

Rates:

Approved common data for the year 2020-2021 pertaining to Madurai


NH Circle with Bitumen and emulsion rates as on 16.06.2021 and as per
Common Data is adopted in this estimate and the estimate in finalized for an
amount of Rs Lakhs.
The Ministry has instructed to include the utility charges in the estimate
based on sub estimate from the concerned utility agency. But in the need of
rectifying the black spots immediately LS provisions for utility shifting is
proposed in the estimate since getting estimate from concerned utility agency
will take longer time and hence rectification of black spots will be delayed. In
this context it is requested to permit for including utility charges as LS
provision in the estimates especially for estimates for rectification of black
spots. It is assured that the approval of RO for the estimate from the concerned
utility agency will be obtained in the period tendering process and issuance of
LOA and entrust the same to the contractor to the original work.
Target completion time of this work is 12 months.
Rates:

The original estimate has been prepared with the common data for the
year 2020-21 pertaining to Madurai NH Circle with bitumen rate of 16.06.2021
and the estimate is finalized for an amount of Rs. Lakhs.
Requesting orders whether that technical, administrative and financial
sanction of the Ministry for the above work amounting to Rs. Lakhs may
please be requested and orders communicated early.