EPC mode of contracting:

Construction of civil works for widening and upgrading of 427.967 kms of roads of Core Road Network (CRN) to

two-lane with paved shoulders including maintenance for 5 years have been awarded and works are in progress.

Out of 10 contracts, 9 were completed for a length of 392.167Km and under maintenance. EPC 04 work for a

length of 35.800Km is nearing completion.

Contract SH No. Name of the work Length Cost in


in km cores (Rs)
EPC01 SH116 Upgrading Kanchipuram –Vandavasi Road Km14/300 22.342 184.98

to km 36/700

SH58 Upgrading Sadras - Chengalpattu - Kancheepuram 26.140

Arakkonam - Thiruthani Road km 0/000 to Km 26/811

EPC02 SH4 Upgrading Arcot - Villupuram Road km 29/800 to 83.075 320.02

km110/ 165 and km 113 /325 to km 114/600

EPC03 SH9 Upgrading Cuddalore – Chittoor Road km 41 /700 to 28.450 95.22

km 44/000 and km 45/000 to km 66/190 and

construction of a new link road between SH9 and SH

37 (km 66/190 to km 71/147)

EPC04 SH70 Upgrading Vridhachalam - Parangipettai Road 35.800 129.942


km 0/000 to km 35/800 (Balance Works).
EPC-04
EPC05 SH86 Upgrading Omalur - Sankari - Thiruchengode - 26.200 103.81

Paramathy road km 54/800 to km 81/000

EPC06 SH79 Upgrading Malliyakarai -Rasipuram-Trichengode - 50.525 224.06

Erode Road km 0/000 to

km 30/600 and km 51/400 to km 71/300

EPC07 SH95 Upgrading Mohanur – Namakkal – Senthamangalam - 13.385 63.95

Rasipuram Road km 0/000 to km 13/385

SH89 Upgrading Nanguneri - Bharatavaram - Ovari Road 35.200 110.99

EPC08 upto ECR junction km 0/000 to km 35/200

EPC09 SH44 Upgrading Paruvakudi - Kovilpatti - Ettayapuram - 31.650 152.92

Vilathikulam - Vembar Road km 22/500 to km 38/750

and km 41/300 to km 56/700

EPC10 SH41 Upgrading Rajapalayam -Sankarankoil-Tirunelveli 75.200 286.50

Road Km 1/800 to km 28/000 and km 33/800 to km

82/800

Maintenance through Multi-year Output and Performance Based Road Contract


(OPRC)
Roads already upgraded in TNRSP phase 1 have been taken up for maintenance under OPRC mode for a

period of 5 years.Under this contract, 2 packages for a total length of 581.493 Km have been taken up for

maintenance for a value of Rs.220.07Cr. Works were completed and the roads were handed over to the

respective C&M Divisions.


Public Private Partnership (PPP Contract):
PPP 02 work having length of 70.2 Km has been completed and presently it is under 8 year maintenance period.

The packages PPP01 & PPP3 have been converted into EPC16 & EPC 14, EPC 15 respectively and works are

under progress.
Additional Works
By utilizing front loaded fund sanctioned by the World Bank and State’s own fund, three additional works EPC-11,

EPC-12 and EPC-13 have been taken up and the works are under progress. The details ongoing works are given

below:

Length in Contract
Package Name of the Road Status
Km Price in Cr
Four Laning of Omalur to
Work is in
EPC 11 Mecheri Section of SH 222 From 13.170 144.64
progress.
Ex.Km 1.150 To Ex.Km 14.300
Strengthening and Widening of
Work is in
EPC 12 Malliyakarai – Attur roa d of SH- 9.884 95.14
progress.
30 (Km.81/125 - 91/200)
Four Laning of Chithode to
Erode Section of SH 15 from
Existing km 153.500 To Existing Work is in
EPC 13 8.125 104.70
Km 161.625 (Design Km progress.
153+600 To Design Km
161+725)
Strengthening and Widening
(Four Lane) of Tirunelveli –
Work is in
EPC 14 Sengottai – Kollam Road of SH- 22.700 176.58
progress.
39 from Km 5+000 to Km
27+700 (package I)
Strengthening and Widening
(Four Lane) of Tirunelveli –
Work is in
EPC 15 Sengottai – Kollam Road (SH 39) 22.900 254.13
progress.
Km 27+700 to Km 50+600
(package II)
EPC16 Four Laning of Gobi - Erode 30.600 272.53 Work is in
Section of SH-15 from Km progress.
123+000 to Km 153+600
Tamil Nadu Infrastructure Development Board
An amount of 132.76 Crore has been sanctioned for Preparation of Detailed Project Reports for a length of 3319

Km roads under TNIDB fund. Out of this 3319Km, 1061 Km length of roads have been taken-up in first phase by

engaging project preparation consultants in 5 packages.


Institutional Capacity Enhancement (ICE) and Road Safety.
The implementation of ICE and RS components are being taken up through the newly formed ICERS Cell under

the control of Director General, Highways Department.

CMDA

LIST OF CONTRACTORS
Name and address of the
Sl.No. Name of Work
Contractor
1. Widening and Strengthening of Mr.Nageswaran,
Madharvedu Road km 0/0-1/6 No. 26, New No. 11,
Authullasha Street, Ponneri.
2. Widening and Strengthening of Ariyalur- Thiru.S.Devendran,
Vilangadupakkam Km 0/0-6/4 No.25, I.A.S Nagar,
Tiruverumbur,
Trichy � 620013.
3. Widening and Strengthening of Koladi M/s. SPL Infrastructure
road km 0/0-7/0 Pvt Ltd,
No:24/Old No: 13/3, I Floor,
Cresent Park Street,
T.Nagar, Chennai-17.
4. Widening and Strengthening of Taramani M/s. Gurumurthy
Link road Right side balance work km Engineering Enterprises,
0/0-3/650 7/3, 15 th avenue, Ring road,
Ashok nagar,
Chennai-83.
5. Widening and Strengthening of Minjur M/s. SPL Infrastructure
Kattur Thirupalaivanam Road km 0/0 � Pvt Ltd,
10/0 No:24/Old No: 13/3, I Floor,
Cresent Park Street,
T.Nagar, Chennai-17.
6. Widening and Strengthening of Minjur M/s. SPL Infrastructure
Kattur Thirupalaivanam Road km 10/0 � Pvt Ltd,
17/4 No:24/Old No: 13/3, I Floor,
Cresent Park Street,
T.Nagar, Chennai-17.