Construction of civil works for widening and upgrading of 427.967 kms of roads of Core Road Network (CRN) to
two-lane with paved shoulders including maintenance for 5 years have been awarded and works are in progress.
Out of 10 contracts, 9 were completed for a length of 392.167Km and under maintenance. EPC 04 work for a
to km 36/700
82/800
period of 5 years.Under this contract, 2 packages for a total length of 581.493 Km have been taken up for
maintenance for a value of Rs.220.07Cr. Works were completed and the roads were handed over to the
The packages PPP01 & PPP3 have been converted into EPC16 & EPC 14, EPC 15 respectively and works are
under progress.
Additional Works
By utilizing front loaded fund sanctioned by the World Bank and State’s own fund, three additional works EPC-11,
EPC-12 and EPC-13 have been taken up and the works are under progress. The details ongoing works are given
below:
Length in Contract
Package Name of the Road Status
Km Price in Cr
Four Laning of Omalur to
Work is in
EPC 11 Mecheri Section of SH 222 From 13.170 144.64
progress.
Ex.Km 1.150 To Ex.Km 14.300
Strengthening and Widening of
Work is in
EPC 12 Malliyakarai – Attur roa d of SH- 9.884 95.14
progress.
30 (Km.81/125 - 91/200)
Four Laning of Chithode to
Erode Section of SH 15 from
Existing km 153.500 To Existing Work is in
EPC 13 8.125 104.70
Km 161.625 (Design Km progress.
153+600 To Design Km
161+725)
Strengthening and Widening
(Four Lane) of Tirunelveli –
Work is in
EPC 14 Sengottai – Kollam Road of SH- 22.700 176.58
progress.
39 from Km 5+000 to Km
27+700 (package I)
Strengthening and Widening
(Four Lane) of Tirunelveli –
Work is in
EPC 15 Sengottai – Kollam Road (SH 39) 22.900 254.13
progress.
Km 27+700 to Km 50+600
(package II)
EPC16 Four Laning of Gobi - Erode 30.600 272.53 Work is in
Section of SH-15 from Km progress.
123+000 to Km 153+600
Tamil Nadu Infrastructure Development Board
An amount of 132.76 Crore has been sanctioned for Preparation of Detailed Project Reports for a length of 3319
Km roads under TNIDB fund. Out of this 3319Km, 1061 Km length of roads have been taken-up in first phase by
CMDA
LIST OF CONTRACTORS
Name and address of the
Sl.No. Name of Work
Contractor
1. Widening and Strengthening of Mr.Nageswaran,
Madharvedu Road km 0/0-1/6 No. 26, New No. 11,
Authullasha Street, Ponneri.
2. Widening and Strengthening of Ariyalur- Thiru.S.Devendran,
Vilangadupakkam Km 0/0-6/4 No.25, I.A.S Nagar,
Tiruverumbur,
Trichy � 620013.
3. Widening and Strengthening of Koladi M/s. SPL Infrastructure
road km 0/0-7/0 Pvt Ltd,
No:24/Old No: 13/3, I Floor,
Cresent Park Street,
T.Nagar, Chennai-17.
4. Widening and Strengthening of Taramani M/s. Gurumurthy
Link road Right side balance work km Engineering Enterprises,
0/0-3/650 7/3, 15 th avenue, Ring road,
Ashok nagar,
Chennai-83.
5. Widening and Strengthening of Minjur M/s. SPL Infrastructure
Kattur Thirupalaivanam Road km 0/0 � Pvt Ltd,
10/0 No:24/Old No: 13/3, I Floor,
Cresent Park Street,
T.Nagar, Chennai-17.
6. Widening and Strengthening of Minjur M/s. SPL Infrastructure
Kattur Thirupalaivanam Road km 10/0 � Pvt Ltd,
17/4 No:24/Old No: 13/3, I Floor,
Cresent Park Street,
T.Nagar, Chennai-17.