You are on page 1of 27

GOVERNMENT OF INDIA

MINISTRY OF FINANCE
DEPARTMENT OF ECONOMIC AFFAIRS

LOK SABHA
UNSTARRED QUESTION NO. 684
TO BE ANSWERED ON 24th July, 2023

Public Private Partnership

PQ No. 684. SHRI JAYADEV GALLA:

Will the Minister of Finance be pleased to state:

(a) whether the Government has entered into Public Private Partnership (PPP)
agreements with the private sector companies;
(b) if so, the number of PPPs entered by the Government from 2014 onwards in
the road, power and gas distribution sector classified year-wise;
(c) the list of these projects in the road, power and gas distribution along with the
details of the concessionaire involved under each project along with the cost
of the project from 2014;
(d) The total number of tender bids that have been received for each project for
the purpose; and
(e) The list of PPP projects that the Government is willing to call for tenders in the
next five years, sector wise?

ANSWER

THE MINISTER OF STATE IN MINISTRY OF FINANCE


(SHRI PANKAJ CHAUDHARY)

(a): Yes.

(b) to (e): PPP projects in road, power and gas distribution are undertaken by the
respective line ministries on the basis of several factors such as demand assessment,
market appetite, financial viability and suitability of the project for PPP. The inputs
received from the respective line ministries is placed at Annexure-I.
*****
Annexure - I
ANNEXURE REFERRED TO IN REPLY TO PARTS (b) TO (e) OF LOK
SABHA UNSTARRED QUESTION NO.684 ON 24TH July, 2023

Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
4 laning of Solapur -Akkalkot from
1 km 99.400 to km 138.352section of M/s GR Infra 807 4
NH-150E
4-laning of Sangli- Solapur (Pkg-I)
2 M/s DBL 1102.4 5
Solapur to Borgaon section of NH-166
4-laning of Sangli- Solapur (Pkg-II)
3 Borgaon to Watambare) section of NH- M/s DBL 1029.4 6
166
4-laning of Sangli – Solapur (Pkg-III)
4 Watambare to Mangalwedha section of M/s GR Infra 957 7
NH-166
4-laning of Sangli- Solapur (Pkg-IV)
5 Mangalwedha to Solapur section of M/s DBL 1141 6
NH- 166
8-laning of Vadape at Km 539.202 to M/s MEP Infra
6 Thane at km 563.000 Section of NH- (Substitution 1182.87 8
848 MSRDC)
4-laning of Sinnar- Shirdi section of
7 M/s Montecarlo 1026 6
NH 160 (including Sinnar Bypass)
Improvement and construction of
8 Ahmednagar Bypass of NH222 (Km.0 M/s GHV 715 12
to Km.40.6)
Ahmednagar to Ghogargaon, Pkg-I
9 (Ahmednagar to Mirajgaon M/s GHV 605 10
Tembhurni)
Ghogargaon to Ahmednagar- Solapur
M/s Anish Infra &
10 District Border, Pkg-II (Ahmednagar to 629 11
GHV (JV)
Mirajgaon Tembhurni)
6-laning of Satara- Kagal section of
11 M/s Adani 1749.86 4
NH- 48, Pkg-II
4-laning of Ratnagiri- Kolhapur section
12 M/s Ravi Infra 930 14
of NH 166, Pkg-I
4-laning of Ratnagiri- Kolhapur section M/s J M Mhatre &
13 839 18
of NH 167, Pkg-II Thakur Infra (JV)
M/s Megha
4-laning of Ratnagiri- Kolhapur section
14 Engineering and 986 15
of NH 168, Pkg-III
Infrastructure Limited
Raj Path Infracon Pvt
15 Amravati-Chikhali Package-I 713.07 10
Ltd - Eagle Infra Ltd
Raj Path Infracon Pvt
16 Amravati-Chikhali Package-II 633.7 10
Ltd - Eagle Infra Ltd
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Montecarlo Vadodara
17 Amravati-Chikhali Package-III Mumbai Expressway 580.01 7
Private Limited
Kalyan Toll
18 Amravati-Chikhali Package-IV 583.61 7
Infrastructure Ltd.
4L of Rajura-Korpana- Adilabad Road
upto G R Infra projects
19 1013.33 7
M.S. Border from km 32.910 to km Limited
89.090
4L of Bamni - Rajura - Warur -
20 Devada upto M.S. Border of NH - GR Infra projects Ltd 968.05 6
930D (from km 19.000 to km 52.425)
Kalthia Engineering &
21 Bodhre-Dhule 1344.78 16
Construction Ltd.
Chakur Loha Nanded
22 Chakur- Loha 1241.38 6
Highways Pvt. Ltd.
Loha Nanded
23 Loha-Waranga Waranga Highways 1236.08 7
Pvt. Ltd.
Gangamai Kalyan
24 Ausa - Chakur 1169.04 5
ACR Pvt. Ltd.
Construction of Haridwar Bypass M/s Ircon Haridwar
25 1602.89 2
(Pkg-I) (on HAM Bypass Limited
Spur to Haridwar from Saharanpur M/s KCPL Spur
26 2095.21 2
Bypass of Haridwar Highway
Paonta Sahib (Himachal Border)- M/s MKC Poanta
27 1092.9 2
Dehradun Saheb Dehradun
Paonta Sahib (Himachal Border) M/s MKC Poanta
28 524.54 2
Dehradun Saheb Dehradun
4 lane from Bhangbar (Near Ranital) to M/s Gawar Kangra
29 1322.95 2
Kangra Highway Pvt. Ltd
2 Lane with Paved Shoulder from end
of Hamirpur Bypass (Near Village
M/s Hamirpur
30 Chillbahal) to - Bhangbar Section via 1146.19 4
Highway Pvt. Ltd.
Jwalamukhi of NH-88 (New NH-03
and NH-303) (Package IV)
2 Lane with Paved Shoulder of M/s Hamirpur Bypass
31 739.39 4
Hamirpur Bypass of (New NH-103) Private Limited.
M/s SP Singla
Constructions Pvt.
Four laning from Kaithlighat to Shakral
32 Ltd: M/s Rail Vikas 2278.22 6
Village (Shimla Bypass Package-I
Nigam Ltd.
(Consortium)
M/s Gawar
Four laning from Shakral Village to
Construction Ltd. –
33 Dhalli section (Shimla Bypass, 2519.29 4
Bharat Construction
Package- II
(India) (P) Ltd. (JV)
34 Balance work of Kiratpur- Nerchowk M/s Gawar Kiratpur 2
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
(Greenfield) Nerchowk Highway 2480.6
(P) Limited
M/s SP Pandoh –
Four Lane of End of Pandoh Bypass to
35 Takoli Highway (P) 3718.36 2
Takoli
Limited
36 4 Lane configuration & Strengthening M/s IRB Infrastructure 1002 2
4 Lane configuration & Strengthening M/s Gawar
37 9
of Mo to Sihuni (Package-1B) construction Limited. 583
4 Lane configuration & Strengthening M/s Gawar
38 636.65 2
of Sihuni to Rajol .(Package-IIA) construction Limited.
2 Lane with Paved Shoulder M/s Gawar
39 734.282 1
Configuration Construction
M/s DBL Gorhar
6-Laning of Gorhar to Khairatunda
Khairatunda
40 Section from Km 320.810 to Km 1790.27 3
Highways Private
360.300
Limited
6-laning of Khairatunda to Barwa M/s Ashoka
41 Adda section from Km 360.300 to Km Khairatunda Barwa 1332.76 4
400.132 Adda Road Ltd.
4-laning from Mirza chauki to Farakka
42 from Km 215.00 to Km 260.00 RKSCPL Highway Pvt Ltd 1302.72 2
(Package-I)
4-laning of Palma-Gumla Section from Palma Gumla
43 1571.83 6
Km 26.00 to Km 89.170 Highway Pvt Ltd
4-laning from Km 23.284
Hariharganj-Parwa
44 (Hariharganj) to Km 1029.36 7
Highways Pvt Ltd
57.049 (Near Parwa More)
4-laning from Bhogu to Sankha section
M/s DRA Dalgonganj
45 of NH-75 from Km 147.450 to 196.870 1390.77 5
Highway Pvt.Ltd
(Sec-III)
4-Laning of Sankha (km. 196.870) to
M/s Rehla Garhwa
46 Khajuri (km 219.600) section on NH- 888.08 6
Highways Pvt. Ltd.
75 (Rehla/ Garhwa Bypass) (Pkg-IV)
4-laning between Km 218.500
M/s MG
47 (Khajuri) to Km 259.640 1232.38 6
Banshidhar Pvt Ltd.
(Wyndhamganj) (Sec-V)
4-laning with paved shoulder of section
Bokara Highway
48 from Km 21.110 Bokara (Jaina More) 1007.97 6
Pvt Ltd
to Km 53.600 (Gola)
4-laning with paved shoulder of section M/s PRA Gola
49 from 53.600 (Gola) to 81.446 Ormanjhi Highway 7
1214
(Ormanjhi) section Pvt. Ltd.
4-laning from Hansdiha to Mehgama
M/s Dilip Buildcon
50 section of NH-133 from Km 94.335 to 1443.77 10
Private Ltd.
41.900
51 Construction of 6-lane Greefield M/s Chatra 7
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Varanasi- Ranchi- Kolkata Highway Expressway Private
from Sonepurbigha village to junction Limited 1,814.16
with NH-22 (Chatr Bypass) near
Chatra from Km 184.700 to Km
222.000 (Pacakge-8).
Construction of 6-lane Greefield
Varanasi- Ranchi- Kolkata Highway
M/s Bhola Singh
from from Chatra to junction with NH-
52 Expressway Private 1,507.83
100 in Deoria village from Km 4
Limited
222.000 to Km 253.000
(Package-9).
Construction of 6-lane Greefield
Varanasi- Ranchi- Kolkata Highway M/s H.G. Varanasi-
53 from Deoria village to Donoreshan Kolkata Pkg-10
1,851.02
village from Km 253.000 to Km Private Limited 3
288.600 (Package-10).
Construction of 6-lane Greefield
Varanasi- Ranchi- Kolkata Highway
M/s H.G. Varanasi-
from junction with NH- 320 in Lepo
54 Kolkata Pkg-13 1,315.59 8
village to Kamlapur village (JH/WB
Private Limited
border) from Km 358.500 to Km
387.200 (Package-13).
4 Laning of Basukinath to Deoghar
Section of NH 114A from Design km
85.081 to Design Km 130.240 (Design M/s Gawar
55 1443.27 11
Length 45.159 km) in the state of Construction Ltd
Jharkhand on Hybrid
Annuity mode
4L from Km 95.400 (Udaipura) to
M/s DRA Baidnath
56 Km 8
Highways Pvt Ltd 1436.8
147.450 (Bhogu) on NH-75 (Sec-II)
Six Laning of Ramanattukara Junction
to start of Valanchery bypass section
of NH –66 (old NH-17) from Design
KNR Ramanattukara
Ch. 258+818 (Ex. km 27.840 of
57 Infra Private 2367.5 4
Kozhikode bypass) to Design Chainage
Limited
298+500 (Ex. km 304.250) in the state
of Kerala on Hybrid Annuity Mode
under Bharatmala Pariyojana
Six laning from start of Valanchery KNR Guruvayur Infra
58 2140 2
bypass to Private
Six laning from Kappirikkad to
Thalikulam section of NH 66 old NH
17 from Design Ch.335.850 Kappirikkad
59 1258
Ex.km 349.260 to Design Chainage Highways Private 6
369.015 Ex.km 382.300 in Kerala Limited
HAM under Bharatmala Pariyojana
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Six laning from Thalikulam to
Kodungallur section of NH – 66 (old
NH-17) from Design Ch.369+015 (Ex. Kodungallur
60 km 382.300) to Design Ch. 397+750 Highways Private 1420
6
(Ex. km 411.850) in the State of Kerala Limited
on Hybrid Annuity Mode under
Bharatmala Pariyojana
Six laning from Kodungallur to
Edapallysection of NH –66 (old NH-
17) from Design Chainage 397+750 Edappally to
(Ex. km 411.850) to Design Chainage Kodungallur
61 1617.2
423+780 (Ex. km 343.330 of NH Highway Private
5
47: Near 438.600 of NH- 17) in the Limited
state of Kerala on Hybrid Annuity
Mode under Bharatmala Pariyojana.
6 laning from
M/s. Viswasamudra
Kottukulangara – Start of Kollam
62 Oachira Expressway 1580
Bypass (Km 454+500 - Km 486+000) 6
Private Limited
in the State of Kerala
6 laning from Start of Kollam Bypass - M/s. Kollam
63 Kadambattukonam (Km486+000 - Km Highways Private 1385 6
517+250) in the State of Kerala Limited
M/s Azhiyur
6L of Azhiyur- Vengalam from
Vengalam Road Pvt
km.189.200 to km.
64 Ltd (SPV of M/s 1838.1 3
230.400 section ofNH-66 on HAM
Adani Enterprises
Mode in the State of Kerala
Limited )
Six-laning of Kozhikode Bypass(i.e.,
M/s Calicut
Vengalam Junction to Ramanattukara
65 Expressways Pvt. Ltd. 1710 5
Junction) section of NH-66 on HAM
(SPV of M/s KMC
Mode in the state of Kerala
Six Laning ofKT/KL Border
(Thalapaddy)-Chengala fromKm. M/s ULCCS
66 17.200 to Km. 57.20 section of NH- Kasaragod 2430.53 4
66 on HAM Mode in the State of Expressway Pvt. Ltd.,
Kerala
Six Laning of Chengala-
Neeleshwaram section of NH-66 from M/s MEIL Chengala
67
km. 56.200 tokm. 93.468 on HAM roadways Pvt.Ltd., 2349.22 4
Mode in the State of Kerala
Six laning of Neeleshwaram to
M/s MEIL
Thaliparamba section from Km
68 Neeleshwaram 3799.76
94.248 to Km 134.650 on HAM 3
roadways Pvt.Ltd.,
Mode in the State of Kerala
Six Laning of Thaliparamba to M/s Vishwasamudra
69 Muzhappilangad section of NH-66 on Kannur Expressway 3319.14 4
HAM Mode in the State of Kerala Pvt. Ltd.,
70 6-laning of Ranasthalam - M/s.Ashoka 1632.08 2
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Anandapuram section of NH16 on Ranasthalam
HAM Anandapuram Road
Ltd.,
6-laning of Narasannaptea - M/s.APCO
1803.89
71 Ranasthalam section of NH16 on Infratech Pvt 9
HAM Limited
M/s.DBL
6-laning of Anandapuram - Anakapalli Anandapuram
72 2957.25 9
section of NH16 on HAM Anakapalli Highways
Pvt. Ltd.,
4-laning of the stretch from Km.
15+320 to Km. M/s. GR Gundugolanu
73 85.204 (Gundugolanu – Devarapalli – Devarpalli Highway 5
Kovvuru Section of NH-16 ) on Pvt Ltd 2676.88
HAM
2-laning with paved shoulders from
M/s. GV Road
74 Giddalur 2
Projects Pvt. Ltd., 678.69
– Vinukonda section
Six Lanning of Chittoor to
M/s. KNR Tirumala
75 Mallavaram section of NH-140 Km 5
Infra Pvt. Ltd.,
00.000 to Km 61.128 on HAM 2330.81
6-laning of Chilakaluripet bypass on M/s. Chilakaluripet
76 2
NH-16 on HAM Bypass Pvt. Ltd., 712.44
Six laning of Vijayawada Bypass from
Chinna Avutupalli (Design Ch. 0.000)
M/s. MEIL
to Gundugolanu section of NH-16 in
77 Vijayawada Roadways 1325.33 5
the State of Andhra Pradesh under
Private Limited
Bharatmala Pariyojana on Hybrid
Annuity Mode (Pkg-III)
6-laning from Gollapudi to
Chinnakakani section of NH-16 in the M/s. Vijayawada
78 State of Andhra Pradesh under Bypass Project Pvt. 1546.31 3
Bharatmala Pariyojana on Hybrid Ltd.,
Annuity Mode
Six laning Renigunta – Naidupeta M/s. MEIL Renigunta
79 Section of NH-71 Km 00.000 to Km Roadways Pvt. 2237.99 8
57.046 on HAM Ltd.,
Development of Six Lane of Jakkuva –
Korlam Section of NH-130-CD Road
from Km. 396+800 to Km. 421+100 M/s. NKC JK
80 under Raipur – Visakhapatnam Expressway Private 12
767.75
Economics Corridor in the State of Limited
Andhra Pradesh on Hybrid Annuity
Mode – [Package-2 (AP)]
Development of Six Lane of Korlam – M/s. Korlam
Kantakapalle Section of NH-130-CD Kantakapalle
81 957.43 14
Road from Km 421+100 to Km Expressways
445+100 under Raipur – Private Limited
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
VisakhapatnamEconomics Corridor in
the State of Andhra Pradesh on Hybrid
Annuity Mode – [Package-3(AP)]
Development of Six Lane of Aluru –
Jakkuva Section of NH-130-CD Road
from Km. 365+033 to Km. 396+800 M/s. H. G Raipur
82 under Raipur – Visakhapatnam Visakhapatnam AP-1 1128.68 8
Economic Corridor in the State of Private Limited
Andhra Pradesh on Hybrid Annuity
Mode -[Package-1(AP)]
6L of Varadharajula to Kumarajapet
from km KCC Buildcon Pvt.
83 1768.33 11
0.000 to km 43.800 of NH-716B on Ltd.
HAM (Pkg- I)

6L of Veera Kaveri Raja Puram to


84 KNR Constructions 1303.29 11
Pondavakkam from km 61.380 to km
Limited
96.040 of NH 716B on HAM (Pkg-III)

6L of Kumarajapet to Veera Kaveri


EKK Infrastructure
85 Raja Puramfrom km 43.800 to km 702.52 13
Limited
61.380 of NH-716B on HAM (Pkg-
II)

6L of Pondavakkam to Kannigaipair
86 from km IRB Infrastructure 9
1105.27
96.040 to km 116.100 of NH 716B on Developers Ltd.
HAM (Pkg- IV)
Development of Six Lane of
Kantakapalle – Sabbavaram Section of
NH-130-CD Road from Km 445+100
to Km. 464+662 under Raipur – M/s. JKC KS
87 11
Visakhapatnam Economic Corridor in Expressway Private 923.91
the State of Andhra Pradesh on Hybrid Limited
Annuity Mode
– [Package-4(AP)]
Construction of 4 lane Access
Controlled New Greenfield Highway
Section of NH-365BG (Khammam-
Devarapalle) from Recharla village to M/s.
88 569.37 10
Gurvaygudem village (Design Jangareddygudem
Chainage 105+236 to 132+664) Projects Pvt Ltd
under Bharatmala Pariyojana on
Hybrid Annuity mode (Package – IV).
Construction of 4 lane Access
M/s.Rajamahendravara
Controlled New Greenfield Highway
89 m Greenfield Highway 711.94 11
Section of NH-365BG (Khammam-
Private Limited
Devarapalle) from Gurvaygudem
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
village to Devarapalle village (Design
Chainage 132+664 to 162+126)
under Bharatmala Pariyojana on
Hybrid Annuity mode. (Package
– V).
Bangalore Chennai Expressway
BANGARUPALE M
(Phase-II Pkg-III) from km.127.000to
GUDIPALA
90 Km 156.000 1288.54 16
HIGHWAYS
(Bangarupalem to Gudipala
LIMITED
section) on HAM
Bangalore Chennai Expressway
(Phase-II Pkg-I) from km.71.000 toKm Montecarlo Vadodara
91 96.000 Mumbai Expressway 1306.96 14
(Bethamangala in the state of Private Limited
Karnataka to Byreddypalli) on HAM
Madanapalli – Pileru Section of NH-71 M/s GR Madanapalli
92 Km Pileru Highway Pvt. 11
1852.12
00.000 to Km 55.900 on HAM Ltd.
Pileru – Kalur Section of NH-71 Km M/s MEIL PileruKalur
93 1047.32 6
55.900 to Km 94.017 on HAM Roadways Pvt Ltd,
Bangalore Chennai Expressway
94 (Phase-II Pkg-II) from km.96.000 to APCO Infratech 2171.37 8
Km 127.000
Four Laning of Mydukur to Badvel
Section of NH-67 from 585.820 km to M/s RITHWIK MBR
95 630.960 km on Hybrid Annuity Mode INFRA PRIVATE 1064 10
under Bharatmala Pariyojna in the State LIMITED
of Andhra Pradesh
4 Laning of NH 544D from existing km
346.300 of NH 44 (Design Chainage km M/s SRC Infra
0.000) to km 39.380 (Design Chainage Anantapur-
96 907.76 12
km 37.000) of Anantapur – Muchukota Muchukota HAM Pvt.
on Hybrid Annuity Mode under NH (O) Ltd
in the state of Andhra Pradesh
4 Laning of NH 544D from existing km
39.380 of NH 544D (Design Chainage
km 37.000) to km 74.450 (Design
MEIL Anantapur
97 Chainage km 69.000) of Muchukota – 972.96 7
Roadways Pvt. Ltd.
Bugga section of NH-544D on Hybrid
Annuity Mode under NH (O), in the
state of Andhra Pradesh
4-laning of Chilakaru cross road to
M/S. Megha
Turpu Kanupuru and 6-laning of Turpu
98 Engineering 909.24 8
Kanupuru to Port South Gate section
Infrastructure Ltd.,
of NH-516W. (Pkg-II)
6 laning of Naidupeta- Turpu M/s APCO InfraTech
99 1398.84 10
Kanupuru section of NH-71 (Pkg-IV) Ltd.
100 Four laining of Kurnool-Mandlem M/s PSK 827.39 5
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
section of NH-340C on HAM (Pkg-I) Infrastructures and
Projects Pvt ltd.
M/s PSK
Four laining of Mandlem-Atmakur
101 Infrastructures and 887.28 5
section of NH- 340C on HAM (Pkg-II)
Projects Pvt ltd.
4-laning of Bengaluru -Kadapa - M/s. Dilip Buildcon 8
102 912.94
Vijayawada Expressway (Pkg-I) Ltd
4-laning of Bengaluru -Kadapa -
103 M/s. Raj Path Infracon 750.81 11
Vijayawada Expressway (Pkg-II)
8
4-laning of Bengaluru -Kadapa - M/s. Raj Path
104 992.89
Vijayawada Expressway (Pkg-III) Infracon
7
4-laning of Bengaluru -Kadapa - M/s. Dilip Buildcon
105 1058.90
Vijayawada Expressway (Pkg-IV) Ltd
4-laning of Bengaluru -Kadapa -
106 M/s. Megha Engg 1253.24 5
Vijayawada Expressway (Pkg-V)
4-laning of Bengaluru -Kadapa - 5
107 M/s. Megha Engg 1200.42
Vijayawada Expressway (Pkg-VI)
4-laning of Bengaluru -Kadapa - M/s. Dilip Buildcon
108 956.14 4
Vijayawada Expressway Pkg VII Ltd
4-laning of Bengaluru -Kadapa -
109 M/s. Megha Engg 909.02 5
Vijayawada Expressway Pkg VIII
4-laning of Bengaluru -Kadapa - 8
110 M/s. Max infra 1092.18
Vijayawada Expressway Pkg IX
4 laning of Bengaluru -Kadapa -
111 M/s. Megha Engg 813.66 5
Vijayawada Expressway Pkg X
4 laning of Bengaluru -Kadapa - 3
112 M/s. Megha Engg 1292.66
Vijayawada Expressway Pkg XI
4 laning of Bengaluru -Kadapa - 5
113 M/s. Megha Engg 747.29
Vijayawada Expressway Pkg XII
4 laning of Bengaluru -Kadapa -
114 M/s. KNR 976.40 5
Vijayawada Expressway Pkg XIII
4 laning of Bengaluru - Kadapa -
115 M/s. Megha Engg 1103.89 5
Vijayawada Expressway Pkg XIV
Six-laning of National Corridor NH-19
from Palsit to Dankuni (upto NH-6
Connector) from Km. 588.870 to Km. M/s. Palsit Dankuni
116 2193.23 4
652.7010 (total design length 63.830 Tollway Pvt Ltd
km) in the state of West Bengal under
Bharatmala
Six-laning of National Corridor NH-19
from Panagarh to Palsit from Km.
521.120 to Km. 588.870 (total design M/s Panagarh Palsit
117 2020.93 4
length 67.75 km) in the state of West Road Private Limited.
Bengal under Bharatmala
Pariyojana to be
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
4L of Dewas - Ujjain including Dewas M/s Dewas Ujjain 12
118 842.52
Bypass NH 752D Highway Pvt. Ltd.
4-L of Dhangaon to Boregaon of M/s KCC Dhangaon-
11
119 Indore - Edlabad (Pkg-IV) of NH- Boregaon Expressway 866
347BG Pvt.Ltd
4L of Harda – Temagaon (Pkg-I) M/s Harda Pathways 9
120 675.86
Harda - Betul of NH- 47 Pvt. Ltd.
M/s Bansal Pathways
4L of Chicholi - Betul (Pkg- III) Harda 10
121 (Betul-Chhicholi) Pvt. 725.23
- Betul of NH-47
Ltd.
4L of Nanasa to Pidgaon (Pkg-III) M/s Nanasa Pidgaon 7
122 997.84
section of NH-47 Road Pvt. Ltd.
4-laning of Ujjain-Garoth section (Pkg- M/s Ujjain- Garoth
123 909.84 17
I) NH-752D Road Project Pvt. Ltd.
M/s GR Ujjian
124 Ujjain-Badnawar NH-752D Spur Badnawar Highway 1352.56 7
Pvt. Ltd.
4-laning of Ujjain-Garoth section (Pkg- M/s Ujjain Suhagadi 21
125 876.37
II) NH-752D Highway Pvt. Ltd.
M/s MKC Ujjain-
4-laning of Ujjain-Garoth section (Pkg- Garoth
126 823.12 24
III) NH-752D Mahakaleshwar
Highways Pvt. Ltd.
M/s MEIL Tejajinagar
5
127 Indore Edalabad Pkg II Balwara Roadways 1162.8
Pvt. Ltd.
BANSAL
PATHWAYS 17
128 Sagar-Kabrai Pkg-5 1632.93
(SAGAR- KABRAI)
PRIVATE LIMITED
M/s BANSAL
PATHWAYS
129 Vidisha - Mehulwa Pkg-1 (VIDISHA- 1000.63 10
HINOTIYA)
PRIVATE LIMITED
SHREEJI
RAGHOGARH
130 Indore - Harda Pkg-2 NANASA ROAD 1155.28 8
PROJECT PRIVATE
LIMITED
Boregaon Buzurg
4-laning of from Boregaon Buzurg to
131 Shahpur Private 14
Shahpur, section of NH- 753L 1497.69
Limited
4-laning of Shahpur Bypass to Muktainagar Shahpur
132 Muktainagar section of NH-753L in Corridor Private
784.35 7
the State of MP/MH Limited
Four-laning of NH-161 from M/s. KNR
133 1617.14 5
Ramsanpalle to Mangloor in the State Constructions
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
of Telangana under BM on HAM

Four laning of Mangaloor to TS/MH


M/s. Dilip Buildcon
134 Border of NH-161 in the State of 1311.35 5
Limited
Telangana
M/s. Adani Transport
Four laning of Suryapet to Khammam Limited Prakash
135 section of NH-365 BB in the State of Asphaltings& Toll 2379.24 4
Telangana Highways (India)
Limited
M/s. Adani Transport
Four laning of Mancherial to Limited Prakash
136 Repallewada section of NH-363 in the Asphaltings& Toll 1913.85 4
State of Telangana Highways (India)
Limited Consortium

137 Four laning of Kandi toRamsanpalle 6


M/s. Ashoka
section ofNH-161 in the State of
ConcessionsLimited 1516.96
Telangana

Four laning of NH-363from


138 7
Repallewada to Telangana/
Maharashtra Border under NH(O) on M/s. Dilip Buildcon
1280.73
HAM Limited
Four laning of kodad tokhammam
139 section of NH-365A under NH(O) 10
M/s. Adani Road
on HAM 1309.05
Transport Limited
4 lane of NH-365BG (Khammam -
Devarapalle section) Somavaram
M/s. HG Infra
140 villagetoChintagudemv 761.35 10
Engineering Limited
illage(designlength29.
513 km) Pkg II
4 lane of NH-365BG (Khammam-
Devarapallesection)fromChintagudem M/s. KMV
141 10
village to Thumburu village (design Projects Limited 948.53
length 42.119 km) Pkg III
Constructionof6laneAc
cessControlledHighwayof Nandinne M/s. Megha
village to Julekal village Engineering and
142 20
fromKm.202.900 to Km.242.200 under Infrastructures 1043.89
BM (Akalkot- KurnoolSection) Limited
(Package-I)
Four laning of NH -163from M/s. Megha
143 Hyderabad (ORR near Appa Junction Engineering and 1130.42 15
atKm. 14+000) to Infrastructures
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Manneguda (Km.59+500) in the Limited
State of Telangana
Construction of 6 laneAccess
Controlled Highway of Julekal village
to M/s. Megha
144 Dinnedevarapadu village Engineering and 1315.87 14
fromKm.242.200 to Km.280.400 under Infrastructures Limited
BM(Akalkot- Kurnool Section)
(Package-II)
4 lane of NH-365BG (Khammam -
M/s. HG Infra
Devarapalle section) from
145 Engineering 10
Thallampadu village to Somavaram 1060.97
Limited
village (design length33.604 km) Pkg I
Four Laning of Karimnagar – Warangal
Section of NH- 563 from Km.49.275 to M/s. Dilip Buildcon
146 Limited 2146.86 9
Km.116.875 (Design Length
67.600Km.)

4-Lane AC GH section on NH-163G


M/s Megha
(Warangal-Khammam) from
Engineering and
147 Oorugonda village to Venkatpur village 11
Infrastructure 1161.93
as part of Nagpur Vijayawada
Limited
Corridor on HAM in Telangana
(Package-I)
4-Lane AC GH section on NH-163G
(Warangal-Khammam) from
M/s GR Infra
148 Venkatpur to Thallasenkesa village as 11
Projects Limited 1111.76
part of Nagpur Vijayawada Corridor
on HAM in Telangana (Package-II)

4-Lane AC GH sectionon NH-163G


(Khammam- Vijayawada) from M/s Megha
Brahmanapalli(K) village to Engineering and
149 832.62 7
Remidicherlavillage as part of Nagpur Infrastructure
Vijayawada Corridor on HAM in Limited
Telangana and AP (Package-II)

4-Lane AC GH sectionon NH-163G


(Khammam- Vijayawada) from M/s Megha
Remidicherla village toJakkampudi Engineering and 6
150 1190.86
village (onNH-16) as part of Nagpur Infrastructure
Vijayawada Corridor on HAM in Limited
Telangana and AP (Package-III)
151 4-Laning of Bilaspur- Pathrapali section from M/s Bilaspur Pathrapali 8.28 Total 5
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Km Road Pvt.Ltd.
0.00 to Km. 53.300 of NH-111 (New NH
130) under HAM Mode
4-Laning of Bilaspur-Urga from Km. 0.00 to
M/s GR Bilaspur Urga
152 Km. 70.20of NH-130A (HAM) under .85 7
Highway Pvt. Ltd.
Bharatmala Pariyojna
4- laning of Champa–Korba–Katghora section
Korba Kathghora Highways
153 from km. 0.000 to 999.97 7
Pvt. Ltd.
38.200 of NH-149B underNH (O)
Shalimar Corporation
6-lane Jhanki-Sargi section of 130 CD from
Limited JV with APCO
154 Km.0.000 toKm.42.800 under Raipur- 12
Infratech Private 1368.19
Visakhapattnam (CG-I)
Limited

155 6-lane Sargi-Basanwahi section of 130 CD from 7


Raipur- Visakhapatnam
Km.42.800 to Km.99.500 1470.73
CG-2Highways Limited
under Raipur- Visakhapattnam (CG-II)
6-lane Basanwahi- Marangpuri section of 130
KMV Projects Ltd.,
156 CD from Km.99.500 to Km.124.661 under 1307.16 6
Hyderabad
Raipur-Visakhapattnam (CG-III)
4-Lane with paved shoulderconfiguration of
Pathrapali-Katghora
157 Pathrapali Katghora of NH-111 from 865.1 3
Highways Pvt. Ltd.
Km 53+300 to Km. 92+600
4 Lane Urga – Pathalgaon section of NH-130A
from design Ch. 70 + 200 to Ch.157+745 under
Urga-PathalgaonHighways
158 HAM Mode 1955 5
Ltd.

M/s ChetakEnterprise
159 Shamlaji to Chiloda(Pkg-6) 1361 7
Limited, Rajasthan
Dhrol-Bhadra-Patiyaand Bhadra M/s Dilip Buildcon
160 896.97 7
Patiya- Pipaliya Ltd
Upgradation to 4L PS from
Bhimasar, Junction of NH-
41 to Anjar- Bhuj up to M/s G R Infraprojects
161 1373.06 11
Airport Junction from Km Limited
0.000 to Km 65.478of NH-
341
Kalthia Engineering &
162 Dholera end to NariSection 819.14 4
Construction Ltd.
IRB Infrastructure
163 Vadodara to Padra(VME, PKG-1) 2702.05 4
Developers Ltd.
IRCON International
164 Padra to Sanpa (VME,Pkg-2) 1990.6 6
Limited
Patel Infrastructure
165 Sanpa to Manubar (VME,Pkg-3) 1445.99 6
Limited
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Manubar to Ankleshwar (VME,Pkg- Ashoka Buildcon
166 1401.28 4
4) Limited
M/s. Sadbhav
167 Ankleshwar to Kim (VME,Pkg-5) InfrastructureProject 1404 4
Ltd.
M/s G R Infraprojects
168 Ena to Kim (VME,Pkg-6) 2271.86 4
Limited
M/s IRB Infrastructure
169 Gandeva to Ena(VME,Pkg-7) 1710.3 3
Developers Ltd
M/s Roadway
170 Jujuwa to Gandeva(VME, PKg-8) Solutions IndiaInfra 2144.42 11
Ltd.
M/s Roadway
171 Jujuwa to Gandeva(VME, PKg-9) Solutions IndiaInfra 1277.14 13
Ltd.
M/s Roadway
172 Talsari to Karvad(VME,Pkg-10) Solutions India Infra 1909.74 11
Ltd.
Dwarka - (Kuranga) – Khambhaliya – G R Infraprojects
173 1024.69 5
Devariyasection Limited
Bangalore - Nidagatta(6 laning) NH-
174 M/s. Dilip Buildcon 56.20 8
275

175 Nidagatta - Mysore (6laning) - NH-275 M/s. Dilip Buildcon 61.10 9


4 lane of Tumkur - Shimoga section of
176 NH-206 from km 12+310 tokm 66+540 M/s. Ashoka Buildco 52.89 6
(Package - I)
4 lane of Tumkur - Shimoga section of
177 NH-206 from km 66+540 tokm M/s. Ashoka Buildco 56.70 7
119+790 (Package -II)
4-laning of Belgaum-Khanapur Section
178 M/s. Ashoka Buildco 30.00 7
of NH 4A.
Byrapura – Chalkere section of NH-
179 150A from Km.309/150 to Km. M/s. Dilip Buildcon 49.95 6
359/100 (Package-II)
180 Bellary - Byrapura -55.55 TPC- 1313.9 M/s. Dilip Buildcon 54.95 6

181 Chalkere - Hiriyur - 55. M/s. PNC Infratech 55.71 8

tumkur - Shivmoga(Bettadahalli -
182 M/s. Ashoka Buidco 56.35 4
Shivmoga) Pkg-IV -56.35
Four laning of Banavara to
Bettadahalli Sectionfrom Design
183 Km. 121+900 to Design Km. M/s. Ashoka Buidco 48.52 8
170+415 of NH-206 on HAM under
Bharathmala Pariyojana, in the state
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
of Karnataka.(Package III)

Bangalore Ring RoadPkg 1 [4


Laning from km 0.00 to km 42.00 of
184 Dobbaspet to Doddaballapura M/s. SNC 42.00 11
Bypasssection of NH-648 (old NH-
207)]
Bangalore Ring RoadPkg 2 [4
laning fromkm. 42.000 to km. 80.00
185 of Doddaballapura Bypassto M/s. Dilip Buildcon 38.00 9
Hoskote section of NH-648 (Old
NH-207)
4L of Sannur to Bikarnakatte section
from Km 691.350 to Km 736.362 of
186 M/s. Dilip Buildcon 45.00 5
NH-169
Karkala - Mangalore(Package-III)
Bangalore-Chennai Expressway-
187 Package-Iof Phase-I from km 0.00 to M/s. Dilip Buildcon 27.10 11
km 26.400 from Bangalore- Malur
Bangalore-Chennai Expressway-
188 Package-IIof Phase-I from km 26.400 M/s. Dilip Buildcon 27.10 11
to km 53.500from Malur - Bangarpet
Bangalore-Chennai Expressway-
Package-IIIof Phase-I from km 53.500
189 M/s. KCC Buildcon 17.50 14
to km 71.00from Bangarpet-
Bethamangala
Development of 6-laneAccess
Controlled Greenfiled hihgway rom
190 Km 162/500 to Km203/100 M/s. Ashoka Buildco 40.60 13
Baswantpur toSingnodi section of NH-
150C (Pkg IV)
Development of 6-laneAccess
Controlled Greenfiled hihgway from
Km 26.97 to Km
191 M/s. PNC Infratech 71.00 15
97.00 MH/KNT Border (Badadal) to
Maradgi SAnkola section of NH-
150C (Pkg II)
Construction of STRR (West side)
NH 948A Balagondapalli (TN) to
192 KNT/TN Border from Km. 144/480 to M/s. Montecorlo 35.77 6
Km. 179/936 (Greenfield)in the State
of TamilNadu
Development of 6-laneAccess
Controlled Highway from Km 97 to
Km 162/500 MaradgiS Andola to
193 M/s. Dilip Buildcon 65.5 17
Baswantpur section of NH-150C (Pkg
III) of Akkalkot - KNT /TS Border) on
HAM modeunder Bharatmala
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Pariyojana
D.Y.Uppar and Sons-
194 Mysore-Madikere (Pkg-2) KMC Constructions 22.7 7
Ltd(JV)
Ramalingam
195 Mysore-Madikere (Pkg-3) Construction Company 24.1 10
pvt ltd
Ramalingam
196 Mysore-Madikere (Pkg-3) Construction Company 24.1 10
pvt ltd
197 Mysore-Madikere (Pkg-5) KNR Constructions Ltd 18.985 6
198 Belgaum-Hungund-Raichur (pkg-5) GR Infra ProjectsLtd 46.2 12
199 Belgaum-Hungund-Raichur (pkg-6) GR Infra ProjectsLtd 44.9 10
Construction of Two lane with paved
shoulder from Km. 0.0to Km. 80.0 on
NH 548B (Vijayapura- Sankeshwar Vijayapura Athani
200 766.64 12
section) inthe state of Karnatakaon Highways Pvt.Ltd
Hybrid Annuity Mode (HAM)-Job -
No.NH-548B-knt-2020- 21-920
201 Belgavi Bypass (pkg-1) GR Infra ProjectsLtd 34.48 6
Six Laning of Chakeri- Allahabad M/s PNC Triveni
202 Section of NH- 2 from Km. 483.687 to Sangam Highways Pvt. 2159 6
Km. 628.753 Ltd
Unnao-Lalganj section of New NH-31
M/s PNC Unnao
203 (Old NH- 232A) from Km. 0.000 to 1602 4
Highways Pvt. Ltd.
Km. 70.000
4-lanning of Aligarh-Kanpur
section from Km 140.200 (Design
chainage 140.200) to Km M/s BG Aligarh
204 1000 4
186.000(Design Chainage 195.733) Kanpur Highway
(Package-1 from Aligarh-Bhardwas)
of NH-91 in
4-lanning of Aligarh- Kanpur
section from Km 186.000 (Design
M/s PNC Aligarh
chainage 195.733) to Km 229.000
205 Highways Private 4
(Design
Limited
Chainage 240.897) (Package-II from
1197
Bhardwas-Kalyanpur)
4-lanning of Aligarh- Kanpur section M/s APCO
from Km 229.000 (Design chainage Navkalyan
206 240.897) to Km 289.000(Design Expressway Private 3
Chainage 302.108) (Package-III from Limited 1332
Kalyanpur-Naviganj)
Improvement and Up- gradation of
Existing Road to 4-lane with Paved M/s Hardoi
207 Shoulder from Km 175.000 to Highways Private 864 12
220.070, End of Hardoi Bypass to End Limited
of Hardoi District of NH- 731 (Pkg-
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
III) on Hybrid Annuity Mode under
NH(O) in the State of Uttar Pradesh
4-laning of Aligarh- Kanpur section
fromKm. 289.000 (Design Chainage
302.108) to Km. 356.000 (Design
Chainage 373.085) (Package-IV GR Aligarh Kanpur
208 BPC-2200 Cr. 9
Naviganj- Mitrasen) of NH-91 in HighwayPvt. Ltd
the State of Uttar Pradesh on Hybrid
Annuity mode under Bharatmala
Pariyojana
4-laning of Aligarh- Kanpur section
fromKm. 356.000 (DesignChainage
PNC Bithur- Kanpur
209 373.085)toKm.414.000(Design BPC-2252 Cr. 5
HighwaysPvt.Ltd
Chainage-
433.728)(Package-V

4-laning of Meerut Najibabad section PNC Meerut


210 from Km 11.500 (design Chainage Haridwar Highways BPC-1412 Cr. 4
11.500 Meerut) Private Limited
Four Laning of NH 530B from
MathuraBypass (Start) atExisting km
154.20 of NH-44 (Existing km 885.0 +
266.000 of SH33/Design km 0.000)to M/s Yamuna
211 3.00 8
Gaju Village (Designkm 32.982) Highways Pvt.Ltd.
(O&M COST)
(Designlength = 32.982 km) in the
State of Uttar Pradesh on HAM mode
[PACKAGE 1-B]
Four Laning of NH
M/s Hathras 738+ 3.00
212 530B from Gaju Village(Design km 3
Highways Pvt.Ltd., (O&MCOST)
32.982, Mathura - Aligarh
Construction of Sixlane upgradable to
Eight lane of Kanpur Lucknow
Expressway including spur from Km Kanpur Lucknow
213 10+980 to Km 28+500 in the state of Expressway Private 1288.41 12
UttarPradesh on HybridAnnuity mode Limited
underBharatmala Pariyojana (Package-
I)
Construction of Sixlane upgradable
toEight lane of Kanpur Lucknow
Expressway including spur from
Awadh Expressway
214 km. 28.500 to km. 73.744 in the 1377.55 9
Private Limited
state of Uttar Pradesh on Hybrid
Annuity mode under Bharatmala
Pariyojana (Package-2).
6-laning of Hapur Bypass to M/s IRB Infrastructure
215 2140.93 3
MoradabadSection including Hapur Developers Ltd.
216 Four Laning of Sonauli- Gorakhpur Sonauli-Gorakhpur 2562 15
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
section of NH- 29E from Design Ch. Highways Pvt. Ltd.
0+000 to Design Ch. 79+540 (from
Existing Ch. 0+000 to Existing Ch.
80+295) on Hybrid Annuity Mode in
the state of Uttar Pradesh (TenderID:
2021_NHAI_94444_1).
4-laning of Jagdishpur- Faizabad
(Ayodhya)section from km. 47.930
(Design Chainage km 47.800) to km.
107.680 (DesignChainage km. M/s PNC Gomti
217 1980.6 3
108.020) of NH-330A in the State of Highways Pvt. Ltd.
Uttar Pradesh under on Hybrid
Annuity modeunder NH(O)-(Sanction
Code no. N/08023/03001/UP).
Construction of 4-lanegreen field
highwayfrom Km. 35.000 to Km. M/s S and P
49.155 of NH- lnfrastructure
218 697.66 7
731A with paved shoulders on Hybrid Developers Private
Annuity Mode in the state of Uttar Limited
Pradesh
Construction of 4-lanehighway with
pavedshoulders from Km
M/s PNC Infratech
219 49.155 to Km 74.700 of NH-731A on 1156.72 7
Limited
Hybrid Annuity Mode in the state of
Uttar Pradesh
Construction of Four lane access
controlled Greenfield National
Highway from Amas (on NH-02) (Ch. M/s Amas Shivrampur
220 1390.92 4
00+000 Km) to village Shivrampur Roadways Pvt. Ltd
(Ch. 55+002 km), at NH-119D under
Bharatmala Pariyojna in
Construction of Four lane access-
controlled Greenfield National
M/s MEIL Ramnagar
Highway from Shivrampur
221 Four Lane Roadways 1494.31 3
(Ch.55+002 Km) to Ramnagar (Ch.
Pvt. Ltd.
109+324 km), of NH- 119D under
Bharatmala
Construction of Four Lane
M/s MEIL Kalyanpur
222 Access Controlled Greenfield 1358 1
Roadways Pvt. Ltd.
National
M/s Megha
Construction and Upgradation to Four
Engineering and
223 Lane from Siwan (Design Ch. Km 1399.22 Cr. 2
Infrastructures
4+217) to Mashrakh
Limited
Package- I (Combined) "Rehabilitation,
M/s. Mayi Ram Pyari
Up-gradation and Construction of Two
224 Devi Highways(P) 1473.20 Cr. 2
Lane with paved Shoulder of Selected
Ltd.
road stretches from Hatwaria near
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Umagaom Junction
Construction of Four lane access
controlled
M/s Aneeka
Greenfield National Highway from
225 Expressway Private 2185.75 4
Balbhadarpur (Ch.47+000) to Bela
Limited
Nawada (Ch. 89+210) section
of NH-119D
Four Laning of Munger to
Mirzachauki (NH-80) section from M/s Montecarlo
226 Munger to Kharia village junction Munger Mirzachauki 1485.66 Cr. 8
Design Chainage Km 69+520 to Km 1 Highway Pvt. Ltd
95+580 (Package 01)
Four Laning of Munger
to Mirzachauki (NH-80) section from
M/s Apco Magadh
Kharia village junction to start of
227 Expressway Pvt. 1020.84 Cr. 8
existing Bhagalpur bypass Design
Ltd.
Chainage Km Km 95+580 to km
125+000 (Package 02)
Four Laning of Munger to
Mirzachauki (NH-80) section from
M/s Montecarlo
Start of existing Bhagalpur bypass to
228 Munger Mirzachauki 1769.503Cr. 8
Rasulpur (Design Chainage km
3 Highway Pvt. Ltd
125+000 to km 157+350)
(Package 03)
Four Laning of Munger to
Mirzachauki (NH-80) section from M/s Apco
1198.017
229 Near Rasulpur to Mirzachauki (Design Vikramshila 9
Cr.
Chainage Km 157+350 to Km Expressway Pvt. Ltd
193+931) (Package 04)
Four laning of Rajauli- Bakhtiyarpur
section of NH-31 (New NH-20) from
Hardiya Hasanpur
230 Km. 54+405 to Km 101+630 (package- 897.46 9
Highway Pvt. Ltd.
II) on Hybrid annuity mode in the state
of Bihar
Four laning of Rajauli- Bakhtiyarpur
Section of NH-31 (New NH- 20)
Hasanpur
from km 101+630 to km 152+520
231 Bakhtiyarpur 2156.22 8
(Pkg-III) on
Highway Pvt. Ltd.
Hybrid Annuity Mode in the state of
Bihar
Construction of New Construction
and upgradation of
M/s Narenpur Purnea
NH – 131A from Km 34.600 (design
232 Highways Private 5
Ch: 6.000) near Narenpur to Km
Limited (Known as
79.970 2334.67
M/s Dilip Buildcon)
(design Ch: 53.000) near
Four Laning of Galgalia M/s GR Galgalia
233 1097.17 2
to Bahadurganj Section Bahadurganj
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Four Laning of M/s GR
234 1143.45 3
Bahadurganj to Araria Bahadurganj Araria
235 Malout - Abohar - Sadhuwa M/s Ceigall India Ltd. 918.54 8
M/s Chetak
236 Amritsar - Ghoman (Pkg-I) 843.23 8
Enterprises
M/s GR Infraprojects
237 Amritsar - Bathinda (Pkg-I) 1801.37 9
L
M/s GR Infraprojects
238 Ludhiana - Roopnagar (Pkg- 1368.91 12
L
239 Moga - Bajakhana C Constructions (I) P 864.23 6
M/s Krishna
240 Jalandhar Bypass 2163.34 9
Construction
241 Ludhiana - Roopnagar (Pkg-I) IRCON International 15.01.02 6
242 hpur Romana - Mandi Dab M/s Ceigall India Ltd. 789.26 5
M/s Krishna
243 Amritsar - Bathinda (Pkg-II 1801.37 12
Construction
M/s Krishna
244 Amritsar - Bathinda (Pkg-III 2029.17 13
Construction
245 Ludhiana - Roopnagar (Pkg-I M/s Ceigall India Ltd. 1488.23 10
Ram Kumar
246 Ludhiana - Bathinda (Pkg-I) 906.51 13
Construction
247 Ghoman - Tanda (Pkg-II) a Engineering & Infr 818.41 13
M/s Gawar Fazilka
248 of Abohar - Fazilka section 1409.88 3
Highway Pvt. Ltd.
4/6 laning of Narnaul Bypass Crossing
to Paniyala Mor (NH-148B) ( at NH-
48
Junction)= 31.24 Km, Nizampur Link
M/s Gawar Narnaul
249 Road=2.76 km and Narnaul Bypass 1996.95 4
HighwayPrivate Ltd.
Crossing to Pacheri Kalan=11.30 Km
(NH-11) Package-I in stateof Haryana
under Bharatmala Pariyojanaon Hybrid
Annuity Mode
Construction of proposed Narnaul
Bypass (design length 24.0 km.) &
Ateli Mandito Narnaul Section of NH-
M/s HG Ateli Narnaul
11 from Km.43.445to Km.56.900
250 HighwayPrivate 1765.53 5
(design length 14.0 km.) as an
Limited
Economic Corridor & Feeder Route
Package II in the State of Haryana on
HybridAnnuity Mode.
Up-gradation of Four lane of Rewari-
Ateli Mandi section of NH-11 km.
11.780 to Rewari to Ex. Km 43.445 M/s HG RewariAteli
251 near AteliMandi (designed length Highway Private 1355.8 3
30.45 km) as Feeder Route in the state Limited
of Haryana on Hybrid Annuity Mode
(Pkg-III)
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Construction of Proposed Rewari
M/s HG Rewari
Bypass (Design Length 14.4 km) NH-
252 Bypass Private 1205.91 2
11 as aFeeder Route in the state of
Limited.
Haryana on Hybrid Annuity Mode
Construction of Gurgaon - Pataudi -
Rewari section of NH-352W (Design M/s IRCON
253 length 46.11 km) as Feederroute in Gurgaon Rewari 1724.87 6
the state of Haryana on Hybrid Highway Limited
Annuity Mode.
Six laning & Strengthening of NH-
248A From Existing Km 2+740 (Rajiv M/s Rajiv Chowk
254 Chowk) to Km 11+682in Gurugram – Sohna Highway 1187.23 7
under NHDP- IV on hybrid annuity Private Limited
Mode in the state of Haryana
Six laning & Strengthening of NH-
248A from existing km.11.682 to km.
24.400 (Design Ch. Km. 9.282to km. M/s Gurgaon Sohna
255 988.92 4
22.000) under NHDP phase IV in the HighwayPvt. Ltd.
state of Haryana on Hybrid Annuity
Mode
Four laning of Sethiyathope
M/s.Patel
–Cholapuram
256 Sethiyathope 1825.83 3
sectionfrom Km 65.960 to Km
Cholapuram PvtLtd
116.440 of
Four laning of Cholapuram - Thanjavur
M/s.Patel Cholapuram
257 sectionfrom Km 116.440 to Km 1767.28 2
- Thanjavur Pvt Ltd
164.275
Four Laning of Kamalapuram to M/s. Yashodhan
258 1051.69 4
Oddanchatram Highways Pvt Ltd.
Four laning of M/s. KNR PalaniInfra
259 1518.53 6
Oddanchatram toMadathukulam Pvt Ltd
Four laning of M/s. DPJ Pollachi
260 1409.38 5
Madathukulam toPollachi HAM Project Pvt Ltd
Construction/ Up- gradation of Two
lane with paved shoulder of NH-70 M/s Dineshchandra
1438.29
261 from Munabao(NH-25E)-Sundra - Tanot Infra Pvt. 4
(BPC)
Myajlar - Dhanana - Ltd.
Asutar - Ghotaru - Tanot
Construction/upgradation of two lanes
with paved shoulders from
Sriganganagar to Raisinghnagar M/s VRC SR 553.89
262 16
(Design Chainage -0.500 km to Design Highways Pvt. Ltd (BPC)
Chainage 101.000 km) under NH(O) in
the State of Rajasthan (Package-1)
Construction of 4 -Lane Greenfield
M/s GR Bandikui
expressway spur from Delhi-
263 Jaipur Expressway 1368 13
Vadodara Greenfield expressway
Pvt Ltd
near Bandikui to
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Jaipur in Bharatmala Pariyojana
Phase-I in the state of Rajasthan on
Hybrid Annuity Mode
Rohna/ Hassangarh to Jhajjar Section M/s Gawar
264 1032.24 5
of NH-334 B (Pkg.-II) Construction Limited
4-laning of Gohana - Sonepat section M/s Brij Gopal
265 1275.31 5
of NH-352A (Pkg-2) Construction Co Ltd.
Four laning of Jind- Gohana section of M/s Brij Gopal
266 944 5
NH- 252A (Greenfield Pkg-1) Construction Co Ltd.
M/s. Gawar
267 UP/HR Border to Rohna s Construction Ltd., 1215.98 2
Gurugram.
M/s KCC Buildcon
268 Delhi-Amritsar-Katra 2010.17 16
Private Limited
M/s CDS Infra
269 Delhi-Amritsar-Katra 1374.04 17
Projects Limited
M/s KCC Buildcon
270 Delhi-Amritsar-Katra 1662 15
Private Limited
M/s NKC Buildcon
271 Delhi-Amritsar-Katra 1460 15
Private Limited
M/s CDS Infra
272 Delhi-Amritsar-Katra 1981 14
Projects Limited
M/s VRC
273 Mandi Dabwali to Chautal Constructions (I) Pvt 903 6
Ltd.
Jalbehra-Shahbad (sahabad-Thol) M/s. Ceigall India
274 927 3
section of NH-152G Limited
M/s DCC infra
275 Ambala-Kalaamb section 1183.7 9
Projects Ltd
Gawar Construction
276 Bhiwani - Hansi NH 148 B 1322.13 5
Limited
H. G. Infra
277 Karnal Ring Road (NH-44) Engineering 1691.45 2
Limited
278 Ambala Ring Road (NH-44) M/s Ram Kumar Cont 1088.64 4
Rehabilitation and Upgradation to
Six-laning of Chandikhole-Bhadrak
Section of NH-5 (New NH-16) from M/s DBL Chandikhole
279 Km 62.000 to Km 136.500 in the Bhadrak Highways 2030.38 6
State of Odisha to be executed on Limited
Hybrid Annuity Mode under
NHDP Phase-V
M/s BG Bhadrak
Rehabilitation and Upgradation of Six-
280 Baleswar Highway 1153.03 2
laning of Bhadrak – Baleshwar
Private Limited
6L of Dhanara - Hatibena Section from
M/s NKC DH
281 Km 124.611 to km 146.50 of NH-130- 586.46 7
Expressway Pvt Ltd
CD (Pkg OD-1)
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
6L of Hatibena - Badakumari Section M/s PRA Hatibena
282 from Km 146.50 to km 179.00 of NH- Badakumari 925.53 4
130-CD (Package – OD-2) Expressway Pvt Ltd
6L of Badakumari - Karki Section from
M/s Badakumari
283 Km 179.000 to km 226.500 of NH-130- 1249.42 2
Karki Road Pvt Ltd.
CD (Package – OD-3)
6L of Karki – Kaliagura Section from
Km 226.500 to km 249.000 of NH-130- M/s NKC KK
284 593.3 5
CD Expressway Pvt Ltd
(Package – OD-4)
6L Greenfield Kaliagura toBaunsagura
M/s. H.G. Raipur
Section of NH-130CD Road from
285 Visakhapatnam OD-5 1,731.40 5
Km.249+000 to Km. 293+000
Pvt. Ltd.
(Package OD-5)
6L Greenfield Baunsagura to Baraja
M/s. H.G. Raipur
Section of NH- 130CD Road from
286 Visakhapatnam OD-6 1,458.91 5
Km.293+000 to Km.338+500
Pvt. Ltd.
(Package OD-6)
DRA Rameshwaram
6L Greenfield Baraja to Kandili
Infra Pvt. Ltd. (M/s
Section of NH- 130CD Road from
287 Dineshchandra 708.73 5
Km.338+500 to Km.342+500
R. Agrawal Infracon
(Package OD-7)
Pvt. Ltd.)
M/s. Max Infra (I)
6L Greenfield Kandili to Tumbigura Ltd. - M/s Bekem
Section of NH- 130CD Road from Infra Project Ltd. (M/s
288 1,451.33
Km.342+500 to Km.365+033 (Package Eastern Ghats 8
OD-8) Highway Project
Private Limited)
Rehabilitation & Upgradation to four
laning of Singara to Binjabahal M/s. Montecarlo
289 section fromCh. Km.311.000 to Singhara Binjhabahal 1420 2
Km.414.000 (of NH-6 (New NH-49) Highway Pvt. Ltd.
in the State of Odisha
M/s Binjabahal
Rehabilitation and Up Gradation to
toTileibani Section
Four laningof Binjabahal to Telebani
(Km. 414+000 to
290 section, Km 414.000 to Km 491.710 1161.4 3
491+710) of NH-6
of NH-6 (New NH-49) in the state of
(New NH-49)
Odisha
Highway Pvt. Ltd.
Construction of four/six- lane access-
controlled expressway from Junction
with Pathankot- Gurdaspur road (NH-
M/s MEIL Balsua-
54) near Balsua to Junction with 3044.02
291 Hiranagar Expressway 10
Hiranagar Road near village Gurha (1939)
Ltd.
Baildaran (km 423+500to km
468+100) of Delhi Amritsar Katra
Expressway on HAM mode under
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Bharatmala Pariyojana in the state of
Punjab and UT of J&K (Phase II-
Package XIV]
Construction of four/six-lane access-
controlled expressway from Junction
with Hiranagar Road near village
Gurha Baildaran to Junction with M/s Vishwa Samudra
Jammu Ring Road NH 244A near Jakh Vaishnodevi 2714.95
292 11
village section as part of Delhi- Expressway Pvt. (1870)
Amritsar-Katra Expressway on HAM Ltd.
mode under Bharatmala Pariyojana
(Design Ch. 468+100 to 503+250) in
the UT of J&K (Phase II-Package XV]

Development of Jakh (Vijaypur)-


Kunjwani section of NH-44 to six- lane
Expressway standards as part of Delhi-
Amritsar-Katra Expressway [Design
Km 503+200 to Km 515+000
of Delhi-Amritsar-Katra Expressway] Vijaypur Kunjwani 1821.72
293 16
including development of Kunjwani to Highways Pvt. Ltd (1765)
4th Tawi Bridge section of NH-144A
to four-lane NH standards [Ch. 0+000
to 7+385 of NH-144A; Spur
Connectivity to Jammu Airport] in the
UT of Jammu & Kashmir on Hybrid
Annuity mode[Package – XVI]
Development of 4-6-lane Access
Control Exp. from Design Chainage
Km515.000-Km528.300
M/s APCO Maa
(Kunjwani to Sidhra Section of NH-
Vaishno 2,570.09
294 44) and from Design Chainage 8
Expressway Pvt. (1547.91)
Km550.900-Km566.520
Ltd.
(Domel to Katra Section) on HAM
under BMP in the UT of JK.(Phase-II-
PKG-XVII)
M/s APCO Shri
Amarnathji
295 Z-Morth Tunnel project Rs 2716.90 4
Tunnelway Pvt.
Ltd.
Balance work of construction of 4 lane
Road from Km 140.700 to Km 190.587
M/s Dineshchandra R
(Nirmbanglo - Jatinga
296 Agarwal Infracon Pvt. 1910.13 6
Junction – Harangajao) under
Ltd.
Bharatmala Pariyojana on Hybrid
Annuity Mode.
Four laning of Trichy (Km.0/000) to M/s.KNR
297 1422.13 5
Kallagam Km.38/700) Srirangam InfraPvt.
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
Ltd
Four laning of Kallagam (km 38/700)
M/s. Kallagam-
Karuppur(Km.50/382) and two laning
298 Meensurutti Highways 1483.16 3
withpaved shoulders fromKaruppur
Pvt Ltd
(50/382)–Meensurutti (98/433)
Two laning with pavedshoulders of
M/s. Sunway RNSIL
299 Meensurutti (km 98/433) to 767.24 4
MC Pvt. Ltd.,
Chidambaram(129/965)
Four laning of NeraluruThorapalli M/s. Neraluru
300 Agraharamsection of NH-844 from Thorapalli Roadways 1751.18 5
Km.0+000 to Km.23+350 (Package-I) Pvt. Ltd
M/s. Sunway
Four laning ofThorapalli Agraharam
Construction SdnBhd
301 section of NH-844 fromKm.25.000 to 1243.57 6
– RNS Infrastructure
Km.63.500 - (Package- II)
Ltd.,
Four laning of Jittandahalli-
Dharmapuri section ofNH- M/s. Dinesh chandra
302 844(existing chainage Km.63.500 to R. Agrawal Infracon 1291.37 5
Km.100.600 from Km.60.100 to Pvt. Ltd.
Km.94.460 (Package-III)
M/s. DBL Villupuram
Four laning ofVillupuram (Km.0/000)
303 -Puducherry 1358.31 10
to Puducherry(Km.29/000)
Highways Pvt.Ltd.
Four laning of Puducherry M/s. DBL Puducherry
304 (Km.29/000) toPoondiyankuppam - Poondiyankuppam 1588.4 8
(Km.67/000) Highways Pvt. Ltd
Four laning of Poondiyankuppam M/s. Poondiankuppam
305 (Km.67/000) to SattanathapuramPvt 2565.63 7
Sattanathapuram (Km.123/800) Ltd.
M/s. Welspun
Four laning of Sattanathapuram
Satttanathapuram
306 (Km.123/800) to 2756.09 4
NagapattinamRoad
Nagapattinam (Km.179/555)
Pvt. Ltd
Four laning of Mamallapuram to
M/s JSR ECR Project
307 Mugaiyur section of NH 332A from 1360.53 7
Pvt. Ltd
km 0.000 to Km 31.000
Four laning of Mugaiyur to
Marakkanam section ofNH-332A M/s. SPL ECR
308 1116.13 4
from km 31.000 to Km Highway Pvt Ltd
62.000
4 lane Bangalore to Chennai
Montecarlo Bangalore
Expressway from Km 156/000 to Km
309 Chennai Expressway 1023.91 13
180/000 (Gudipala to Walajahpet) -
P3P1Private Limited
(Package-I)
4 Lane BangaloreChennai Expressway
from Km.180.000 to Km.204.500 M/s. KCC Walajahpet
310 843.48 10
(Wahalajahpet toArakkonam) - Expressway PvtLtd
(PackageII)
Name of TPC No of
Sl Name of Project
Concessionaire (Rs in cr) bidders
4 Lane Bangalore Chennai Expressway
from Km 204.500 to Km 230.00 M /S DP Jain & Co,
311 1155.49 8
(Arakonamto Kancheepuram)- InfrastructurePvt. Ltd
(Package-III)
4 Bangalore – Chennai Expressway
from Km
RCCL Srikanche 6
312 230.000 to Km 261.705 2948.31
Expressway Pvt. Ltd
(Kanchepuramto Sriperumbudur)
(Package-IV)

You might also like