You are on page 1of 23

Under Implementation

Arranged in order of their completion with last completed shown first


Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
1 Delhi-Vadodara Greenfield 148N NHAI 31.26 28-May-19 Gawar Constructions Ltd. Rajasthan
Alignment (NH-148N) (Pkg-07)
(Ch.183.000 to Ch. 214.260)
(Junction with NH-11 - Start of
RoB near junction with NH-11A)

2 Delhi-Vadodara Greenfield 148N NHAI 31.26 28-May-19 Gawar Constructions Ltd. Rajasthan
Alignment (NH-148N) (Pkg-07)
(Ch.183.000 to Ch. 214.260)
(Junction with NH-11 - Start of
RoB near junction with NH-11A)

3 Delhi-Vadodara Greenfield 148N NHAI 25.3 8-Mar-19 GHV (India) Pvt Ltd. Madhya
Alignment (NH-148N) (Pkg-20) Pradesh
(Ch. 546+920 to Ch. 572+220)
[Bardawadi village of Mandsaur
district to Kamliya village of
Ratlam district]

4 Sangareddy - Nanded (Pkg. II) 161 NHAI 46.8 26-Mar-18 KNR Constructions Limited Telangana
Ramsanpalle to Mangloor
5 Four Laning of Akkalkot to 150E NHAI 38.95 27-Mar-18 G R Infraprojects Limited Maharashtr
Solapur (including Akkalkot a
Bypass of Length 7.35 km.) from
km. 99.400 to km. 138.352 of
NH-150 E
6 6 laning of Balance Work of 16 NHAI 33 29-Dec-17 SPL Infrastructure Pvt. Ltd Tamil Nadu
Chennai - Tada from km. 21.40
to km. 54.40
7 Varanasi Ring Road (Pkg-II) 31 NHAI 27.27 13-Feb-18 Gammon Engineers & Uttar
connecting Sandaha Village (km Contractors Pvt. Ltd. Pradesh
11.70 / NH-29) with Revasa
Village (km 818.80 / NH-2)

8 Udhampur - Ramban section of 44 NHAI 40.07 23-Sep-15 Gammon Engineers & Jammu and
NH-1A from km. 67.00 to km. Contractors Pvt. Ltd. Kashmir
89.00 and km. 130.00 to km.
151.00
9 4L of Madurai Ring Road (Phase 744A NHAI 29.96 14-Jan-19 NCC Limited Tamil Nadu
1) [Vadipatti-Thamrapatti] from
km 0.00 - km 29.960

10 Ismailabad - Narnaul (Pkg- 07) 152D NHAI 35 8-Mar-19 Gawar Constructions Ltd. - Haryana
(Ch. 165+0 to 200+0) [Junction Shivalaya Construction Co.
with NH-334B (Charkhi Dadri- Pvt. Ltd.
Jhajjar section) near Charkhi
Dadri to Junction with Rewari-
Kanina road (SH-24) near
Kanina]

11 Flyover in Sakoli town on NH-53 53 NHAI 2.94 29-Mar-18 JMC Projects (India) Ltd. Maharashtr
(Old NH - 6) (from 451.244 km a
to 454.184 km)
12 Panvel (0.000) to Indapur 66 NHAI 84.6 28-Oct-10 Supreme Infrastructure Maharashtr
(84.600) of NH-66 Pvt Ltd a
13 Balance work of Khed Ghat 60 NHAI 9.31 Maharashtr
realignment & Narayangaon a
bypass on Khed Sinnar section
of NH-60
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
14 4L of Kazhakuttam Junction - 66 NHAI 2.72 25-Sep-18 RDS-CVCC Kerala
Technopark Junction from km.
547.080 to km. 549.801
15 Kerala / Tamil Nadu border to 66 NHAI 27.25 25-Feb-16 Larsen & Toubro Ltd. Tamil Nadu
Villukuri section from km 43/0
to km 70/250 of NH-47
16 Villukuri to Kanyakumari section 66 NHAI 42.7 25-Feb-16 Larsen & Toubro Ltd. Tamil Nadu
from km 70/250 to km 96/714
of NH-47 and Nagercoil to
Kavalkinaru section from km
0/0 to km 16/376 of NH-47B

17 Mangloor to Telangana 161 NHAI 49 26-Mar-18 Dilip Buildcon Ltd. Telangana


Maharashtra Border
18 Rasisar (near Bikaner)-Deogarh 754K NHAI 30 8-Mar-19 NKC Projects Private Rajasthan
(near Dhandhaniya) (Phase-I) Limited
(AJ/RD-Package-2)

19 Rasisar (near Bikaner)-Deogarh 754K NHAI 28 8-Mar-19 NKC Projects Private Rajasthan
(near Dhandhaniya) (Phase-I) Limited
(AJ/RD-Package-5)

20 Deogarh (near Dhandhaniya)- 754K NHAI 22.14 11-Jun-19 VRC Constructions (India) Rajasthan
Rajasthan/Gujarat Border Pvt. Ltd.
(Phase-I) (AJ/DRGB-Package-1)

21 Deogarh (near Dhandhaniya)- 754K NHAI 27 3-Jun-19 VRC Construction (India) Rajasthan
Rajasthan/Gujarat Border Pvt. Ltd. - Varindera
(Phase-I) (AJ/DRGB-Package-2) Construction Ltd. - S&P
Infrastructure Developers
Pvt Ltd (JV)

22 Service Road on Indore-Dewas 52 NHAI 32 16-Oct-17 Indore-Dewas toll road Madhya


private limited Pradesh
23 Khudus - Dharampuri km 77.8 965 NHAI 39.2 18-Sep-19 J.M. Mhatre infra Pvt. Ltd. Maharashtr
to km 117.0 Pkg III of Mohol & S.M. Autade Pvt. Ltd. a
Alangi (JV)
24 Akola City -Shivar-PKV Square- 6 NHAI 13 30-May-19 BP Sangle Constructions Maharashtr
Nehru Park Square - Dakshata a
Nagar Square-Nimwadi Chowk -
Washim Bypass -Ridhora Bypass
road

25 Lalganj-Hanumana km 96.80 - 35 NHAI 43.4 22-Mar-18 Dilip Buildcon Ltd. Uttar


km 140.200 Pradesh
26 Dagamagpur to Lalganj (km 35 NHAI 47.7 13-Mar-18 Dilip Buildcon Ltd. Uttar
49.1 - km 96.8) Pradesh
27 Varanasi-Degamapur [km. 15.1 - 35 NHAI 34 27-Feb-18 Dilip Buildcon Ltd. Uttar
km. 49.1] Pradesh
28 Hapur Bypass -Moradabad 9 NHAI 99.86 28-Mar-18 IRB Infrastructure Uttar
including Hapur Bypass (km Developers Ltd. Pradesh
50.00 - km 148.277)
29 Balance Work of Bareilly - 30 NHAI 157.59 15-Oct-19 Raj Corporation Ltd Uttar
Sitapur Section from km. 262.00 Siddharth Construction & Pradesh
to km. 419.590 i/c balance ROB Jagdish Saran
at km 290.445 with approaches
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
30 Karaipettai to Walajapet 48 NHAI 36.08 5-Oct-18 SPK & CO. Tamil Nadu
from Km 71.015 to 107.091
31 Bellary to Byrapura Section km 150A NHAI 54.95 1-Jun-18 Dilip Buildcon Ltd. Karnataka
253.600 to km 308.550 of NH-
150A
32 Byrapura to Challakere Section 150A NHAI 49.95 26-Mar-18 Dilip Buildcon Ltd. Karnataka
from km 308.550 to km 358.500
of NH-150 A
33 Chittor (Design Km 0.000- 140 NHAI 61.13 26-Mar-18 KNR Constructions Limited Andhra
Existing Km 158.000 of NH-4) to Pradesh
Mallavaram (Design Km 61.128-
Existing Km 41.800 of NH-140)

34 Four Laning of Angul to 55 NHAI 150.86 22-Sep-16 GAYATRI-PTPS(JV) Odisha


Sambalpur from Km.112.000 to
Km.265.000
35 4 Lane from Km 299.000 to 52 NHAI 48.88 4-Oct-17 Patel Darah-Jhalawar Rajasthan
346.540 (Darah-Jhalawar- Highway Private Limited
Teendhar section) of NH-12.
36 Balasore - Baripada - 18 NHAI 80.6 22-Feb-16 ITL-MCL (JV) Odisha
Jharpokharia - section of NH-5
(km 0.00 to km 80.6)
37 Balance work of Ranchi-Mahulia 33 NHAI 77.3 28-Feb-19 Bvepl Bhartia JV Jharkhand
Section of NH-33 from Km
140.000 (Rampur) to Km
217.300 (Chowka) (Pkg-II)

38 Paniyala Mor (NH-48 Jn) to 11/14 NHAI 45.3 15-Jan-19 Gawar Constructions Ltd. Haryana
Narnaul Sec. of NH-148B & 8B
Narnaul to Pacheri Kalan Sec. of
NH-11 (Pkg-I)
39 Narnaul Bypass & Ateli Mandi 11/14 NHAI 40.8 8-Mar-19 H.G. Infra Engineering Haryana
to Narnaul section of NH-11 km 8B Limited
43.445 to km 56.900

40 Upgradation of 4 lane of Rewari- 11 NHAI 31 28-Feb-19 H.G. Infra Engineering Haryana


Ateli Mandi Section of NH-11 Limited
from Km11.780 to Rewari to Ex.
Km 43.445 near Ateli Mandi

41 Sriperumbudur to Karaipettai 48 NHAI 34.02 23-Jan-19 KMC Construction Ltd. Tamil Nadu

42 Delhi-Vadodara Greenfield 148N NHAI 33 1-Oct-19 G R Infraprojects Limited Madhya


Alignment (NH-148N) (Pkg-18) Pradesh
(Ch. 484+420 to Ch. 517+420)
[Jodmi village to Bani village of
Mandsaur district]

43 Under Ground U-turn near 48 NHAI 2.78 9-Nov-18 Ram Kumar Contractor Haryana
Ambience Mall and Elevated U-
Turn near Shankar Chowk from
km. 23.66 to km. 24.446 & km.
25.684 to km. 26.123
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
44 4/6L of Tada - Nellore 16 NHAI 3.82 23-Oct-19 SRC Infra Developers Ltd.a Andhra
(Permanent restoration of flood Pradesh
damaged stretches) from km.
83.35 to km. 83.68 and km.
136.91 to km. 140.40

45 4L of Suryapet to Khamam from 365BB NHAI 58.626 8-Mar-19 Adani Transport Limited Telangana
Km. 0.420 to Km.59.046 of NH and Prakash Asphaltings
365BB
46 Davanagere - Haveri of NH-48 48 NHAI 78.92 29-Mar-17 IRCON International Karnataka
(Old NH-4) from km. 260.00 to Limited
km. 338.923
47 Stand-alone Ring road/bypass NHAI 58.26 20-Dec-17 Gayatri- KMB (JV) Jammu and
around Jammu City from Raya Kashmir
Morh km. -0.687 to Jagti km.
57.568
48 4 Lane Stand Alone Ring Road/ Outer NHAI 33.5 31-Mar-16 MEP infrastructure Maharashtr
Bypasses for Nagpur City, Ring Developer Ltd. & San Jose a
Package - I from Km 0.500 to Road India Infrastructure and
Km 34.000. (Total Length - Construction Pvt. Ltd.
33.500 Km) in the state of
Maharashtra
49 Gondal Chokdi Flyover at Rajkot 27 NHAI 1.5 5-Dec-18 Sarasvati Construction. Co Gujarat

50 Flyover from Hotel Pride to Ajni 44 NHAI 2.5 4-Apr-18 Maharashtr


Square with the Metro Viaduct a
and ROB from Manish Nagar on
Wardha road at Ujjwal Nagar
and 2 lane underpass

51 Mukarba Chowk km 15.500 in 44 NHAI 70.5 24-Jul-15 Essel Infraprojects Ltd Haryana
Delhi to Panipat km 86.000 in
Haryana.
52 Bhadrak (KM 136.500) to 16 NHAI 62.64 24-Jan-18 Brij Gopal Construction Odisha
Baleshwar (KM 199.141) Pvt. Ltd.
53 Chandikhole (km 62.000) to 16 NHAI 74.5 24-Jan-18 Dilip Buildcon Ltd. Odisha
Bhadrak (km136.500)
54 Six Laning of Bihar - Jharkhand 19 NHAI 71.28 31-Jan-18 Reliance Infrastructure Jharkhand
Border (Chordaha) - Gorhar Ltd.
section of NH-2 from km
249.525 to km 320.810

55 Melur - Pilayarpatti - Karaikudi 38, NHAI 45.86 6-Feb-19 KMC Constructions Ltd. - Tamil Nadu
from km 99.920 of NH 38 to km 383 JSR Infra Developers Pvt.
12.9 of NH 383 Ext.

56 Khairatunda to Barwa Adda 19 NHAI 40.33 5-Mar-18 Ashoka Buildcon Limited Jharkhand
Section of NH 2 from km.
360.300 to km. 400.132 (Pkg II)

57 Additional Structures under Six 44 NHAI 0 9-Sep-19 Atlas Construction Pvt. Uttar
Laning of Delhi-Agra section of Ltd. Pradesh
NH-44 in the State of Uttar
Pradesh between km. 143.0 and
km. 195.10
58 Lucknow Ring Road Pkg-2 24 NHAI 32.9 23-Mar-18 Sadbhav Engineering Pvt. Uttar
(Behta Road to Sitapur Road) Ltd. Pradesh
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
59 Lucknow Ring Road Pkg 3A 24 NHAI 14.61 14-Nov-18 Dineshchandra R. Agrawal Uttar
(Sitapur Road to Kursi Road) Infracon Pvt. Ltd. Pradesh

60 Banihal (Km 189.350) to 44 NHAI 16.27 30-Apr-10 Navayuga Road Projects Jammu and
Quazigund (KM 220.700) Pvt Ltd. Kashmir
61 Ramban (KM 151.00) to Banihal 44 NHAI 32.1 23-Sep-15 Hindustan Construction Jammu and
(KM 187.00) section of NH-44 in Company Ltd. Kashmir
the State of Jammu and
Kashmir
62 Laddowal Bypass (Km. 0.000) to 5 NHAI 17.04 18-May-16 Eagle Infra Pvt. Ltd. Punjab
(Km. 17.041) Linking with NH-
95 with NH-1 Via Laddowal
Seed Farm of NH-95 in Punjab

63 Dhupguri- Salsalabari (Pkg IIA) [ 27 NHAI 41.65 28-Mar-18 Simplex Infrastructure West
Ghoshkpukur - Salsabari km Limited Bengal
113.20 - km 154.85]

64 Itarsi (Km. 63.000) to Betul (Km. 46 NHAI 73.96 28-Dec-17 Longjian - Jitendra singh Madhya
137.000) of NH-69 in Madhya (JV) Pradesh
Pradesh
65 Ludhiana (Km. 92.000) to 5 NHAI 78 6-Dec-10 Essel Infraprojects Ltd Punjab
Talwandi Section (Km. 170.000)
of NH-95 in Punjab
66 Talwandi - Ferozepur 5 NHAI 23.66 28-Feb-18 Ceigall India Ltd. - Shiv Punjab
Build India Pvt. Ltd. (JV)
67 4L of Natham - Thuvarankurichi 785E NHAI 24.42 28-Feb-19 RR Infra Private Limited Tamil Nadu
from km. 36.69 to km. 61.115
of NH-785E

68 JNPT Package 1 Km 3.600 to 348 NHAI 4.59 14-Oct-15 J Kumar InfraProjects Ltd Maharashtr
6.073 of NH-4B and from Km and J.M. Mhatre Infra Pvt a
5.300 to Km 7.422 of NH-348 Ltd
(old SH-54) in Maharashtra
69 JNPT Package 2 Gavanphata 348 NHAI 18.27 14-Oct-15 J Kumar InfraProjects Ltd Maharashtr
Interchange from 14.740 to Km and J.M. Mhatre Infra Pvt a
15.894 ( Old SH -54) Ltd
70 JNPT Package 3 from Km-7.422- 348A NHAI 11.09 6-Aug-15 J Kumar InfraProjects Ltd Maharashtr
Km-13.160 and Amra Marg and J.M. Mhatre Infra Pvt a
from Km-0.000-Km-5.360 Ltd

71 Delhi-Vadodara Greenfield 148N NHAI 30.2 28-May-19 G R Infraprojects Limited Madhya


Alignment (NH-148N) (Pkg-21) Pradesh
(Ch. 572+220 to Ch. 602+420)
[Kamliya village to Kandarwasa
village of Ratlam district]

72 2L PS/4L of Khemkaran to 354 NHAI 51.68 22-Mar-18 Ceigall India Ltd. Inderjit Punjab
Gurdaspur (Package-V) [Ramdas Mehta Construction Pvt.
to Gurdaspur] km 140.00 - km Ltd. (JV)
187.492 and 4.19 km CoS
(Kartarpur Corridor)

73 Gangaria Baori Kalan-Serwa- 925 & NHAI 196.97 19-Feb-18 GHV (India) Pvt Ltd. Rajasthan
Bakhasar section of NH-925 (km 925 A
0.000 to 136.520) and Sata
Gandhav Section oh NH-925-A
(km 0.000 to km 60.450)
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
74 Jaisalmer (NH-11) Bhadasar- 68 NHAI 193.52 23-Feb-18 Brij Gopal Construction Rajasthan
Ramgarh-Tanot- and Bhadesar- Co. Pvt. Ltd.: Ramkey
Sarkaritala (Pkg-BM/5) Infrastructure Ltd.(JV)

75 Raisinghnagar - Anupgarh - 911 NHAI 162.46 27-Feb-18 G R Infraprojects Limited Rajasthan


Gharsana - Rojri - Sattasar -
Pugal- (Part-2) (Pkg-BM/6)
76 Khajuwala-Poogal - Dantour- 911 & NHAI 212.11 27-Mar-18 Gawar Construction Ltd. Rajasthan
Jaggasar- Gokul- Goddu - 911 A
Ranjeetpura- Charanwala-
Naukh-Bap section of NH
77 Nalbari to Bijni section of NH-31 31 NHAI 27.3 31-May-05 KMC Construction Ltd. Assam
from km. 1040.30 to Km.
1013.00 (Contract Package EW-
II/ AS-07) in Assam

78 Four laning of Gorakhpur 29E & NHAI 17.66 26-Dec-16 Monte Carlo Ltd. - Uttar
Bypass from km. 79.670 of NH - 28 Backbone Enterprises Ltd Pradesh
29E to km. 251.700 of NH - 28 (JV).

79 Forbesganj (Km.0.000) to ICP at 57A NHAI 9.26 31-Aug-15 JKM Infra Projects Ltd. Bihar
Jogbani (Km.9.26) on NH-57A in
Bihar
80 Dwarka (Kuranga)-Khambhaliya - 151A NHAI 71.89 8-Mar-19 G R Infraprojects Limited Gujarat
Devariya
81 Flyovers in Akola City 53 NHAI 4.8 20-Nov-18 Ram Kumar Contractor - Maharashtr
Jandu Construction a
Company (JV)
82 Six Laning of Handia to Varanasi 19 NHAI 72.4 29-Mar-17 G R Infraprojects Limited Uttar
Section from Km. 713.146 to Pradesh
Km. 785.544
83 Delhi-Vadodara Greenfield 148N NHAI 36.14 9-Mar-19 KCC Buildcon Pvt. Ltd. Rajasthan
Alignment (NH-148N) (Pkg-05)
(Ch.115+700 to Ch. 151+840)
[Jn. at SH-44 to Jn. Keshopura
road]
84 6L of Dhankuni to Kharagpur 16 NHAI 111.4 25-Feb-11 Ashoka Buildcon Limited West
from km 17.600 to km 129.000 Bengal
of Old NH-06
85 Barwa Adda (Km. 398.240) to 19 NHAI 122.88 5-Apr-13 IL&FS Transportation West
Panagarh (Km. 521.120) Networks Ltd. Bengal
86 Bridge over Ganga River at d/s 12 NHAI 5.47 20-Aug-18 CQCE - RKEC (JV) West
of Farraka Barrage including Bengal
Approaches connecting Farakka-
Raiganj
87 Balance Work for Raiganj 12 NHAI 50.29 5-Dec-18 Dineshchandra R. Agrawal West
Dalkola section from km 398.00 Infracon Pvt. Ltd. Bengal
to km 452.700 (excl. Dalkola
Bypass)
88 Giddalur-Vinukonda from 544D NHAI 112.8 26-Mar-18 BVSR Constructions Andhra
Design km 212.983 to Design Private Limited Pradesh
km 322.800
89 Solapur-Vijayapur 52 NHAI 109.07 16-Nov-17 IJM CORPORATION Maharashtr
BERHAD LTD a
90 Delhi-Vadodara Greenfield 148N NHAI 31.16 9-Mar-19 KCC Buildcon Pvt. Ltd. Rajasthan
Alignment (NH-148N) (Pkg-06)
(Ch.151+840 to Ch. 183+000)
(Keshopura Road - Junction
with NH-11)
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
91 Gadu -Porbandar (Package VII) 51 NHAI 91.67 15-Dec-16 Kalthia Engineering & Gujarat
Construction Ltd.
92 Kodinar - Veraval (Package VI) 51 NHAI 41.75 26-Jul-16 Agroh Infrastructre & Gujarat
from km. 221.610 to km. 263.00 Developer Pvt. Ltd.
of NH-8E & km. 120.900 to km.
121.150 of NH-8D

93 Four Laning of Una to Kodinar 8E NHAI 40.95 26-May-16 Sadbhav Engineering Pvt. Gujarat
from km. 180.478 to km. Ltd.
221.610 (Package-V)
94 Mahuva to Kagvadar (Package 51 NHAI 40.02 25-Jun-16 MEP infrastructure Gujarat
III) Developer Ltd. & San Jose
India Infrastructure and
Construction Pvt. Ltd.

95 Talaja - Mahuva (Package-II) 51 NHAI 45.46 26-May-16 MEP infrastructure Gujarat


Developer Ltd. & San Jose
India Infrastructure and
Construction Pvt. Ltd.

96 Four Laning of Sangli - Solapur 166 NHAI 56.5 27-Mar-18 Dilip Buildcon Ltd. Maharashtr
(Pkg IV) [Mangalwedha- a
Solapur] from km 321.6 - km
378.10
97 Four Laning of Sangli - Solapur 166 NHAI 45.6 27-Mar-18 G R Infraprojects Limited Maharashtr
(Pkg III) [Watambare- a
Mangalwedha] from km 276.0 -
km 321.60
98 Four Laning of Sangli - Solapur 166 NHAI 52 27-Mar-18 Dilip Buildcon Ltd. Maharashtr
(Pkg II) [Boregaon-Watambare] a
from km. 224.00 to km. 276.00

99 Four Laning of Sangli - Solapur 166 NHAI 41.44 27-Mar-18 Dilip Buildcon Ltd. Maharashtr
(Pkg I) [Sangli - Borgaon km a
182.556 - km 224.00]

100 Jhansi - Khajuraho(PKG-I) 39 NHAI 76.61 31-Mar-17 PNC Infratech Limited Madhya
Pradesh
101 Jhansi-Khajuraho from Km. 76.3 39 NHAI 85.4 28-Mar-17 PNC Infratech Limited Madhya
to Km. 161.7 near Bamitha Pradesh
Town
102 6 L of Narasannapeta - 16 NHAI 54.2 5-Dec-17 APCO Infratech Pvt. Ltd. Andhra
Ranastalam Pradesh
103 Ranasthalam (Km.634.000) to 16 NHAI 47 20-Mar-17 Ashoka Buildcon Limited Andhra
Anandapuram (Km.681.000) of Pradesh
NH-16 in the State of Andhra
Pradesh
104 6L of Chakeri - Allahabad from 19 NHAI 145.07 13-Nov-17 PNC Infratech Pvt. Ltd. Uttar
483.687 to km. 628.753 of Old Pradesh
NH-02
105 Dwarka Expressway Pkg-IV 248BB NHAI 8.76 5-Mar-18 Larsen & Toubro Ltd. Haryana
(from Rail Over Bridge (ROB) to
NH-8
106 Dwarka Expressway Pkg-III 248BB NHAI 10.2 9-Oct-18 Larsen & Toubro Ltd. Haryana
(Delhi/HR Border to Start of
RoB Gurugram)
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
107 BRT Tiger Reserve Boundary 948 NHAI 170.92 26-Sep-16 Sadbhav Infrastructure Karnataka
(Km.287.500) to Bangalore Projects Ltd.
Section (Km.458.420) of NH-209
in Karnataka
108 Bar-Bilara-Jodhpur (Km 0.000 to 112 NHAI 109.65 30-Jun-16 Larsen & Toubro Ltd. Rajasthan
Km 111.000) of NH-112 in the
State of Rajasthan

109 Vadodara Mumbai Expressway NHAI 13 28-Mar-18 Ashoka Buildcon Limited Gujarat
(Ankleshwar to Manubar)
(Phase IA- Pkg IV)
110 Vadodara Mumbai Expressway NHAI 24.57 28-Mar-18 Sadbhav Infrastructure Gujarat
(Kim to Ankleshwar) (Phase IA - Projects Ltd.
Pkg V)

111 Delhi-Vadodara Greenfield 148N NHAI 18.5 5-Mar-19 APCO Infratech Pvt. Ltd. Haryana
Alignment (NH-148N) (Pkg-01)
(Ch. 0+000 to Ch. 18+461)
[Sohna-Gurugram Road (NH-
248A) near Alipur Village and
ending before KMP Expressway]

112 Delhi-Vadodara Greenfield 148N NHAI 31.88 28-May-19 Centrodorstroy India Pvt. Haryana
Alignment (NH-148N) (Pkg-03) Ltd
(Ch. 47+000 to Ch. 78+800)
[starting near Khanpur Ghati
and ending at HR/RJ Border]

113 Delhi-Vadodara Greenfield 148N NHAI 36.9 9-Mar-19 H.G. Infra Engineering Rajasthan
Alignment (NH-148N) (Pkg-04) Limited
(Ch. 78+800 to Ch. 115+700)
[HR/Raj Border to Jn. with SH-
44]
114 Gurgaon Sohna Pkg-I (Km.2.74 248A NHAI 8.94 6-Mar-18 Oriental Structural Haryana
to Km.11.682) Engineers Pvt. Ltd.
115 Jodhpur Ring Road Package-I [4- NHAI 75 19-Dec-17 Sadbhav Infrastructure Rajasthan
laning of Dangiawas (Km. Projects Ltd.
96.595) to Jajiwal (Km. 283.500)

116 Simaria (Km. 206.050) to 31 NHAI 60.23 31-Dec-15 Punj Lloyd Infrastructue Bihar
Khagaria (Km. 266.282) Ltd.
117 Package-II- 6 laning of Delhi- 24 NHAI 19.28 23-Mar-17 APCO CHETAK ULTRAWAY Delhi
Meerut Expressway and 8 PVT. LTD.
laning of NH-24 from existing
Km. 8.36 to existing Km. 27.74
(Delhi-UP Border to Dasna )

118 Chitradurga - Davanagere 48 NHAI 73 31-Mar-17 PNC Infratech Limited Karnataka


including Chitradurga bypass of
NH-48 (Old NH-4)
119 6L of Gurgaon Sohna Pkg-II 248A NHAI 12.72 6-Mar-18 H.G. Infra Engineering Haryana
from existing Km.11.682 to Limited
existing km.24.40
120 4L of Jind-Gohana road 352A NHAI 40.6 8-Mar-19 Brij Gopal Construction Haryana
(Package-1) from km. 0.00 to Pvt. Ltd.
km. 40.601 of NH-352 A under
NH(O)
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
121 4L of Gundugolanu Devarapalli 16 NHAI 69.884 13-Mar-18 G R Infraprojects Limited Andhra
Kovvuru from km 15.320 to Km Pradesh
85.204 of NH-16

122 6L of Anandapuram Pendurthi 16 NHAI 50.78 28-Feb-18 Dilip Buildcon Ltd. Andhra
Anakapalli Section from km. Pradesh
681.000 to km. 731.780 of NH-
16
123 Ring road /Bypasses for Nagpur Outer NHAI 28.03 31-Mar-16 MEP infrastructure Maharashtr
city, Package-2 from km 34.000 Ring Developer Ltd. & San Jose a
to km 62.035 (Total length Road India Infrastructure and
28.035 km) in the state of Construction Pvt. Ltd.
Maharashtra
124 Flyover in Lakhani town on NH- 53 NHAI 3.5 29-Mar-18 JMC Projects (India) Ltd. Maharashtr
53 (Old NH-6) (from 469.920 a
km to 473.420 km)
125 2L ROB including one Minor 44 NHAI 1.12 18-Jan-17 D.P. Jain & Co. Maharashtr
bridge and approaches with Infrastructure Pvt. Ltd. & a
retaining wall from Km.8.674 Khalatkar Construction
near Khapri (Nagpur) (City (JV)
Portion)
126 Shrirampur (Km. 0.000) to 27 NHAI 30 31-Jul-17 Simplex Infrastructure Assam
Kochugaon (km. 30.000) of Bijni Limited
to Assam./West Bengal Border
Section of NH-31C in Assam, AS-
12 (including balance works)

127 Pimpalkhuti ROB (km 173.050) 7 NHAI 0.7 14-Sep-17 Assosiated Engineers Maharashtr
to (km 173.750) (Package No. Enterprises a
NS-62A (MH) Bal.)

128 Construction of two VUPs at 44 NHAI 0 23-Mar-18 GHAI Construction Ltd. Telangana
Kompally on Nagpur -
Hyderabad section
129 Islampur Bypass of NH-31 (New 27 NHAI 10.31 23-Oct-15 Ashoka Buildcon Limited West
NH-27) of 10.31 km length in Bengal
the state of West Bengal

130 Ghoshpukur (km 0.000) to 27 NHAI 83.78 1-Jun-15 Larsen & Toubro Ltd. West
Dhupguri (km 83.785) of NH- Bengal
31D
131 Bal. Work of Gandhidham 41 NHAI 6.93 20-Jan-20 Shiva Build Tech Gujarat
(Kandla) to Mundra port section
of NH8A (Extn.) between Km.
0.000 to Km. 71.400

132 Flyover and junction 53 NHAI 3.56 15-Oct-19 Chevrox Constructions Chhattisgar
development at Tatibandh Pvt. Ltd. h
chowk at km 281.7 on Raipur-
Aurang section of NH-53

133 Chakur Loha Section of NH-361 361 NHAI 73.35 27-Mar-18 MEP Infrastructure Maharashtr
from km 114.600 to km 187.80 Developers Ltd. - Long Jian a
Road & Bridge Co. Ltd. (JV)
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
134 Lucknow Ring Road Pkg-1 56 NHAI 31.75 15-Oct-19 PNC Infratech Limited Uttar
(Sultanpur Road to Behta Road) Pradesh
[Bypass connecting NH-56 at
km. 17.40 and terminating near
Behta Road]

135 4L of Ausa-Chakur Section from 361 NHAI 58.51 27-Mar-18 MEP Infrastructure Maharashtr
km 55.835 to Km 114.345 of NH- Developers Ltd. - Long Jian a
361 Road & Bridge Co. Ltd. (JV)

136 Kodebod (Km 43.400) to 30 NHAI 38.81 22-Nov-16 GKC Projects Ltd. Chhattisgar
Dhamtari (Km 82.209) h
137 Raipur (Km 10.200) to Kodebod 30 NHAI 33.2 22-Nov-16 GKC Projects Ltd. Chhattisgar
(Km 43.400) of NH - 30 in h
Chhattisgarh
138 Pipli Bhavnagar-Package 1 from 751 NHAI 33.31 20-Mar-18 Kalthia Engineering & Gujarat
km 136.025 to km 169.328 Construction Ltd. JP Iscon
Pvt. Ltd. Consortium

139 Tangi to Bhubaneswar (km 16 NHAI 56.78 28-Mar-18 Punj Lloyd Infrastructue Odisha
355.0 to km 414.0) of NH-5 Ltd.
(New NH-16)
140 Puintola to Tangi (km 284.00 to 16 NHAI 75.36 23-Mar-18 Punj Lloyd Infrastructue Odisha
km 355.00) of NH-5 (New NH- Ltd.
16)
141 Four Laning of Sultanpur to 56 NHAI 74.53 24-Aug-15 Gayatri Projects Limited Uttar
Varanasi (PKG-I) [from Pradesh
Sultanpur (Km 134.700) to
Jaunpur (Km 209.230)]
142 Four Laning of Sultanpur to 56 NHAI 63.36 24-Aug-15 Gayatri Projects Limited Uttar
Varanasi (PKG-II) [from Jaunpur Pradesh
(Km 209.230) to Varanasi (Km
272.590)]
143 Balance Work for Four laning of 3, NHAI 30.66 14-Aug-19 Ceigall India Ltd. Himachal
Kiratpur to Nerchowk section of 154, Pradesh
NH-21 from km. 0.00 to km. 205
12.75 & km. 158.50 to km.
182.215 (excluding Sunder
Nagar Bypass)

144 Integrated structure at Chandni 48 NHAI 2.2 21-Dec-18 NCC Limited Maharashtr
chowk Flyover a
145 Satara (Km 725.000) to Pune 48 NHAI 140.35 20-Jan-10 Reliance Infrastructure Maharashtr
(Km 865.350) of NH - 4 (New Ltd. a
NH - 48) in Maharashtra
146 Balance work of Gwalior - 44 NHAI 82.46 13-Jul-18 Gawar Constructions Ltd. Madhya
Jhansi section Pradesh
147 Nerchowk (km 190.000) to 3 NHAI 26.29 23-Sep-16 KMC Construction Ltd. Himachal
Pandoh including Pandoh Pradesh
bypass ( km221.305)
148 Pandoh bypass (221.305) to 3 NHAI 18.91 19-Jun-17 Shapoorji Paloonji Himachal
Takoli (242.000) of NH-21 in the Pradesh
state of Himachal Pradesh

149 Takoli ( 242.000) to Kullu 3 NHAI 28.69 31-Oct-16 NKC Projects Private Himachal
(272.000) Limited Pradesh
150 Bangalore-Nidagatta (Pkg. I) 275 NHAI 56.2 28-Feb-18 Dilip Buildcon Ltd. Karnataka
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
151 Nidagatta-Mysore (Pkg II) 275 NHAI 61 28-Feb-18 Dilip Buildcon Ltd. Karnataka

152 Elevated structure including 44 NHAI 2.55 7-Mar-19 Ceigall India Ltd. Punjab
appraoches from km.352+675
to km.354+430 and VUP at
km.355+400 including
approaches at Phagwara City

153 Four Lane Flyover at km. 80.742 44 NHAI 1.42 16-Jan-18 Shree Manglam Buildcon Madhya
from km. 79.780 to km. 81.200 Pradesh
at Morena Town
154 Lalghati (Bhopal) (Km. 315.73) 46 NHAI 8.28 4-Sep-17 Centrodorstroy India Pvt. Madhya
to Mubarakpur (Km. 324.00) in Ltd Pradesh
Madhya Pradesh
155 Balance work of Dindigul - Theni 45E NHAI 44.06 29-May-19 EKK Infrastructure Limited Tamil Nadu
from km. 2.75 to km. 73.40 of and
NH-45E and Theni - Kumili from 220
km. 215.5 to km. 273.60 of NH-
220
156 4L of Haridwar-Nagina section 34 & NHAI 71.61 31-Mar-16 Corsan Corviam Uttarakhan
from km. 0.00 to km. 71.614 of 734 Construction S.A, d
NH-74 Gurugram
157 4L of Nagina-Kashipur section 74 NHAI 98.79 31-Mar-16 PNC Infratech Limited Uttarakhan
from km. 73.00 to km. 175.00 d
of NH-74
158 6L of Shamla ji to Motachilodha 48 NHAI 93.21 27-Feb-18 Chetak Enterprises Pvt Gujarat
from km.401.200 to km. Limited
494.410 of Old NH-8 (Pkg-VI)

159 Bridge across Varsova Creek 48 NHAI 2.25 27-Mar-17 Vijay M. Mistry Gujarat
and approaches with Construction Pvt. Ltd &
interchange from Km 496.100 N.G. Projects Pvt. Ltd. (JV)
to Km 498.350
160 Tunnel at Khambataki Ghat 48 NHAI 6.46 13-Dec-18 Crescent EPC Projects & Maharashtr
Section and its approaches from Technical Services Ltd. a
existing Km. 771.730 to existing
Km. 782.000
161 Special repair & Maintenance of 31 NHAI 130.27 24-Feb-20 Krishna Infrastructure Uttar
Ghazipur - Balia- UP/Bihar Pradesh
section from km. 405.030 to
km. 535.30 on NH-31

162 Shakarpur( Km 8.800) to 334 NHAI 61.19 11-Jan-16 APCO Infratech Pvt. Ltd. Uttar
Akbarpur (Km 73.512) of NH- Pradesh
235 in Uttar Pradesh (Meerut -
Bulandshahar)
163 Meerut - Muzaffarnagar - Addl. 334 NHAI 78 29-Nov-17 Krishna Constructions Pvt. Uttar
Works Ltd Pradesh
164 Balance work of 4L of 58 NHAI 38.84 15-Oct-19 Raj Shyama Constructions Uttarakhan
Muzaffarnagar - Haridwar Pvt. Ltd. d
[Package -I] (Design Chainage
km 130.360 to km 167.200)
[Muzaffarnagar to Start of
Roorkee bypass]
165 Balance work of 4L of 58 NHAI 13.1 15-Oct-19 Sam India Builtwell Pvt Uttarakhan
Muzaffarnagar - Haridwar Ltd. d
[Package -II] (Design Chainage
km 167.200 to km 180.300)
[Roorkee bypass]
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
166 Balance work of 4L of 58 NHAI 28.12 15-Oct-19 Sam India Builtwell Pvt Uttarakhan
Muzaffarnagar - Haridwar Ltd. d
[Package -III] (Design Chainage
km 180.300 to km 208.620)
[End of Roorkee Bypass to
Haridwar]
167 Elevated Structure including 58 NHAI 1.05 1-Aug-18 Ram Kumar Contractor Uttarakhan
Major Bridge on Mayapuri d
Escape Channel on
Muzzaffarnagar - Haridwar
Section
168 Tumkur-Shimoga (Pkg-I) from 73 NHAI 52.89 7-Mar-18 Ashoka Buildcon Limited Karnataka
Mallasandra to Karadi village of
NH-206
169 Tarsod - Fagne section of NH-6 53 NHAI 87.3 4-Nov-16 MBL Infrastructure Ltd, JV Maharashtr
with Agroh Infrastructure a
Developer Pvt.

170 Improvement of NH-53 passing 53 NHAI 7 30-May-19 Jandu Construction Maharashtr


through Jalgaon City to four Company a
lane along with construction of
VUPs & PUP
171 Aurangabad - Karodi km 290.00 - 52 NHAI 30.44 31-Jan-18 Larsen & Toubro Ltd. Maharashtr
km 320.104 of NH 211 (New NH a
52)
172 Karodi - Telwadi km 320.104 - 52 NHAI 54.36 31-Jan-18 Dilip Buildcon Ltd. Maharashtr
km 375.00 of NH 211 (New NH- a
52)
173 Tumkur-Shimoga (Pkg-II) from 73 NHAI 56.71 7-Mar-18 Ashoka Buildcon Limited Karnataka
Km 65.195 (Karadi) to Km
121.900 (Banawara) of NH-206

174 Flyover at Km.544.650 including 53 NHAI 6.94 28-Dec-15 Gannon Dunkerley & Co. Maharashtr
ROB, Service Roads ,Footpath Ltd. And SMS a
for RCC drains on urban link to Infrastructure Ltd (JV)
Nagpur -Raipur road (Pardi
octroi Naka to Itwari)

175 Flyover at Butibori MIDC T 44 NHAI 1.69 14-Sep-18 T&T Infra Pvt. Ltd. Maharashtr
Junction on NH-44 (Old NH - 7) a
(from 25.250 km to 26.940 km)

176 Flyover at km 77.750 of 44 NHAI 1.14 24-Oct-18 Vidya InfraBuilt Pvt. Ltd. Maharashtr
Hinganghat – Nandgaon a
Junction of NH - 44 (from
77.250 km to 78.390 km)
177 Varanasi Gorakhpur Section 24 NHAI 65.62 4-Mar-16 Jaiprakesh Associates Ltd. Uttar
Packege IV from km. 149.540 to Pradesh
km. 215.160 (Mau-Gorakhpur)

178 Varanasi (Km 12.01) to Birnon 29 NHAI 72.15 31-Mar-16 PNC Infratech Limited Uttar
(Km 84.160) [Varanasi - Pradesh
Gorakpur] ( PKG-II)

179 Balance / Additional Works in 60 & NHAI 7.57 22-Dec-17 Dineshchandra R. Agrawal Maharashtr
Pimpalgaon - Nashik - Gonde 160 Infracon Pvt. Ltd. a
Section of NH-3 from
Km.380.00 to Km.440.0 [EPC-II]
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
180 Oddanchatram Bypass from Km 83 NHAI 10.1 29-Sep-17 Om Sakthi Constructions - Tamil Nadu
23.100 to Km 33.200 of NH-209 I.Vetrivel (JV)
in Tamil Nadu
181 Sethiyathope -Cholapuram 36 NHAI 50.48 29-Sep-17 Patel Infrastructure Tamil Nadu
section of NH45C (Pkg-II) Limited
182 Vikravandi to Sethiyathopu 36 NHAI 65.96 24-Mar-17 Reliance Infrastructure Tamil Nadu
section of NH - 45C in Tamil Ltd.
Nadu (Pkg I)
183 Remaining works of Trichy - 83, NHAI 12.77 20-Jun-19 SD Infra Contractor Tamil Nadu
Karaikudi from Km. 10.00 to 336,
Km. 94.00 including Trichy 36,
Bypass (Km. 110.016 to Km. 536
135.93)
184 Karaikudi - Ramanathapuram 536 NHAI 80 17-Aug-17 DRA-SP-VM(JV) Tamil Nadu
section from Km.94/000 to
Km.174/000 including 500 m on
SH 35

185 Balance work of 2L PS of 77 NHAI 182.18 29-May-19 S.P.K. and Co. Tamil Nadu
Tindivanam Krishnagiri from
km. 37.600 to km. 219.782
186 Trichirapalli (Km 0.000) to 81 NHAI 38.7 28-Feb-18 KNR Constructions Limited Tamil Nadu
Kallagam (Km. 38.700) of NH-
227 in Tamil Nadu
187 Kallagam (km.38.700) to 81 NHAI 59.73 16-Mar-18 Oriental Structural Tamil Nadu
Meensurutti (Km.98.433) of NH- Engineers Pvt. Ltd.
227 in Tamil Nadu
188 Four Laning of Ghaghra Bridge 233 NHAI 59.92 21-Aug-15 Gayatri Projects Limited Uttar
to Varanasi (PKG-II) [Budhanpur Pradesh
Urban section (Km 180.420) to
Gossai ki bazaar bypass (Km
240.340)]

189 Four Laning of Ghaghra Bridge 233 NHAI 59.01 21-Aug-15 Gayatri Projects Limited Uttar
to Varanasi (PKG-III) [Gossai ki Pradesh
bazaar bypass (Km 240.340) to
Varanasi (Km 299.350)]

190 Maheshkunt-Saharsa-Purnea 231 NHAI 90 5-Jan-18 Gannon Dunkerley and Co. Bihar
(Pkg I) km 0.00 to km. 90.00 of Ltd
NH-107
191 Khandagiri Chowk Grade 16 NHAI 2.23 30-Oct-17 RKD Construction Pvt. Ltd. Odisha
Separator (km 412.00)
192 Binjhabahal - Telebani from km. 49 NHAI 78.32 13-Oct-16 Oriental Structural Odisha
414.000 to km. 491.71 Engineers Pvt. Ltd.
193 Singhara - Binjhabahal from km. 49 NHAI 104.17 29-Mar-17 Montecarlo Limited Odisha
310.806 to km. 414.982
194 4L/2L PS of Govindpur (Raiganj) - 18 NHAI 56.89 19-Jul-16 Ashoka Buildcon Limited Jharkhand
Chas - WB border section of
from km. 0.00 to km. 56.889 of
Old NH-32
195 4 laning of Waranga - 361 NHAI 66.88 28-Mar-17 Sadbhav Vidharbh Maharashtr
Mahagaon from km 253.700 - Highways Project Ltd. a
km 320.580
196 Four Laning of Teleibani - 53 NHAI 50.75 31-Dec-15 Punj Lloyd Infrastructue Odisha
Sambalpur from Km.493.30 to Ltd.
Km.521.30 and Km.545.176 to
Km.567.40
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
197 4L of Chikhli - Tarsod section of 53 NHAI 62.7 4-Nov-16 Vishwaraj Environmental Maharashtr
NH-6 from km 360.00 - km Pvt. Ltd. a
422.700
198 Development of Multi Lane 211 NHAI 14.93 13-Nov-19 Shrushti Contech Pvt. Ltd. Maharashtr
Carriageway of Jalna Road in a
Aurangabad city from
Nagarnaka Junction to
Cambridge School Road Section
from km. 0.00 to km. 14.293

199 Six Lane Greenfield Udaipur 76 & 8 NHAI 23.88 27-Apr-17 Sadbhav Infrastructure Rajasthan
Bypass [Connection between Projects Ltd.
NH- 76 at Existing Km. 118.500
at Debari to NH-8 Km. 287.400
at Kaya Village] (Pkg-IV)

200 6L of Udaipur to Shamlaji from 48 NHAI 113.8 26-Sep-16 IRB Infrastructure Rajasthan
Km 287.400 to km 401.200 of Developers Ltd.
Old NH-8
201 Six laning of Haveri (Km 340) to 48 NHAI 63.4 21-Mar-17 Montecarlo Ltd. Karnataka
Hubli (Km 403.400) section of
NH4 in Karnataka
202 Balance works of 6L of Jaipur 148C NHAI 46.4 30-Nov-17 LR BLC - Gawar (JV) Rajasthan
Ring Road from Agra Road (Km.
0.300) to Ajmer Road (46.700)
section
203 4L Bypass connecting NH-2 31 NHAI 16.98 30-Jan-18 G R Infraprojects Limited Uttar
(Rakhauna Village km. 782.546 Pradesh
of NH-2) with NH-56 (Vajidpur
Village km. 271.300 of NH-56)
of Varanasi Ring Road (Pkg-I,
Phase -II) from km. 0.00 to km.
16.400 i/c Interchange Loop at
NH-2

204 6L of Gorhar to Khairatunda 2 NHAI 40.19 5-Mar-18 Dilip Buildcon Ltd. Jharkhand
Section of NH-2 from Km.
320.810 to Km.360.300 (Pkg I)

205 2L of HR/UP Border - Baghpat - 334B NHAI 43.78 28-Jun-19 Raj Shyama Constructions Uttar
Meerut from km. 0.00 to km. Pvt. Ltd. Pradesh
41.36 & from km. 45.84 to km.
48.26
206 Maheshkunt -Saharsa-Purnea 231 NHAI 87.96 31-Mar-17 Gammon Engineers & Bihar
Pkg II Contractors Pvt. Ltd.
207 Bhiwani - Mundhal - Jind from 709A NHAI 61.98 20-Mar-18 Gawar Constructions Ltd. Haryana
Km.6.875 to Km. 68.857 of NH-
709A (Package-I) under NH (O)

208 Jind - Karnal from junction with 709A NHAI 85.36 20-Mar-18 Gawar Constructions Ltd. Haryana
Narwana road (NH-352) at
Subhash Chowk to ITI Chowk
(intersection with NH-1 of NH-
709A from km. 68.660 to km.
153.700
209 Chhapra - Hajipur from km. 31 NHAI 66.74 13-May-10 Madhucon Projects Ltd Bihar
143.200 to km. 209.200
210 Ambala - Saha 444A NHAI 14.84 8-Mar-19 Ceigall India Ltd. Haryana
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
211 Gagalheri-Saharanpur- 344 NHAI 51.45 31-Mar-16 MBL Infrastructure Ltd. Uttar
Yamunanagar (UP/ Haryana Pradesh
Border) Section of NH-73
212 Chutmalpur Ganeshpur section 72A NHAI 53.3 30-Mar-16 MBL (CGRG) Road Limited Uttarakhan
and Roorkee Chutmalpur d
Gagalheri section

213 UP/HR Border - Sonepat - 334B NHAI 40.5 28-Feb-19 Gawar Constructions Ltd. Haryana
Jhajjar
214 Four Laning of Rohna/ 334B NHAI 35.45 26-Mar-18 Gawar Constructions Ltd. Haryana
Hassangarh section from
Km.44.800 to km.80.250
(Package-2)
215 Jhajjar - Loharu from 334B NHAI 97.86 22-Mar-18 Ceigall India Limited - Shiv Haryana
Km.130.770 to Km. 228.630 Buildtech Pvt. Ltd. (JV)

216 Bhatinda - Malout from km. 7 NHAI 38.67 27-Nov-19 Dineshchandra R. Agrawal Punjab
0.00 to km. 38.642 Infracon Pvt. Ltd.

217 Yadagiri (km 54.000) to 163 NHAI 99.1 10-Dec-15 Larsen & Toubro Ltd. Telangana
Warangal (km 150.000) of NH-
163 in Telengana
218 Chandigarh (km.0.000) to 205 & NHAI 10.18 24-Sep-15 Larsen & Toubro Ltd. Punjab
Kharar (km10.185) of NH-21 05
and NH-95 in Punjab
219 6L of Gurgaon - Kotputli - Jaipur 48 NHAI 225.6 21-Feb-08 Emirates Trading Agency Rajasthan
section from km. 42.700 to km. LLC - KMC Construction
273.00 of NH-8 (New NH-48) Ltd.

220 4L of Phagwara -Rupnagar from 344A NHAI 80.82 22-Aug-16 GR Infraprojects Ltd Punjab
km. 0.00 to km. 80.82 of NH-
344A
221 Brahmani Bypass Rajmunda 143 NHAI 46.95 28-Dec-17 RKD Construction Pvt. Ltd. Odisha

222 4 laning of End of 53 NHAI 51.1 31-Jan-18 G R Infraprojects Limited Odisha


Kamakhyanagar Bypass - Duburi
from km. 335.946 to km
388.382 (Pkg-II)
223 Junagadh Bypass 151 NHAI 20.6 12-Oct-17 Gawar Constructions Ltd. Gujarat

224 2L PS of JH / WB Border (km. 18 NHAI 73.28 31-Mar-18 Dineshchandra R. Agrawal West


70.524) - Purulia (km.84.400) & Infracon Pvt. Ltd. Bengal
Purulia (km. 94.30) - Chandil
(Junction with NH-33) (km.
153.705) of Old NH-32

225 Rampur - Rudrapur Section 87 NHAI 43.45 31-Mar-16 Sadbhav Engineering Pvt. Uttarakhan
from km. 0.000 to km. 43.446 Ltd. d
[Rampur Kathgodam (Package-
1)]
226 Rudrapur Kathgodam Section 87 NHAI 49.78 31-Mar-16 Sadbhav Engineering Pvt. Uttarakhan
from km. 43.446 to km. 93.226 Ltd. d
of Rampur Kathgodam (Package-
2)
227 Sinnar-Shirdi (including Sinnar 160 NHAI 50.94 9-Mar-19 Montecarlo Limited Maharashtr
Bypass) a
228 4L of Madurai to Chettikulam 785 NHAI 7.3 29-Mar-18 JMC Projects (India) Ltd. Tamil Nadu
from km.0.00 to km 7.30 of NH-
785
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
229 Four Laning of Chettikulam to 785 NHAI 29.39 30-Mar-18 Ksheerabad Construction Tamil Nadu
Natham section of NH-785 Pvt. Ltd. - I Vetrivel - OM
Sakthi Construction (JV)

230 JNPT Package 4 FROM KM 348 NHAI 10.56 18-Sep-15 Ashoka Buildcon Limited Maharashtr
21.200 TO KM 27.270 (D TO E a
SECTION) AND FROM KM 0.000
TO KM 4.492 (D TO G SECTION)

231 2L PS/4L of Khemkaran to 354 NHAI 48.82 19-Mar-18 Ceigall India Ltd. Inderjit Punjab
Gurdaspur (Package-II) Mehta Construction Pvt.
[Khemkaran to start of Amritsar Ltd. (JV)
Bypass] from km. 22.673 to km.
71.496
232 Flyover at Karanja on NH-53 6 NHAI 1 20-Jan-20 Jandu Construction Maharashtr
Company a
233 Delhi-Vadodara Greenfield 148N NHAI 28.5 5-Mar-19 APCO Infratech Pvt. Ltd. Haryana
Alignment (NH-148N) (Pkg-02)
(Ch. 18+500 to Ch. 47+000)
[Expressway starting before
KMP Expressway and ending at
Ch. 47+000 near Khanpur Ghati]

234 Balance Work of Piprakothi- 28A NHAI 68.6 10-Dec-18 Ram Kripal Singh Bihar
Motihari-Raxaul on NH-28A and Construction Pvt. Ltd
527D
235 2nd Flyover (LCW) Parallel to 31 NHAI 3.18 28-Mar-18 Bihar Rajya Pul Nirman Bihar
Existing Flyover in Kishanganj Nigam Ltd.
Town
236 Delhi-Vadodara Greenfield 148N NHAI 25 7-Aug-19 G R Infraprojects Limited Madhya
Alignment (NH-148N) (Pkg-23) Pradesh
(Ch. 627+420 to Ch.652+720)
[Bawadi village (Near Shivgarh)
of Ratlam district to Ranni
Village of Jhabua district]

237 Vadodara Mumbai Expressway NHAI 23.74 20-Mar-18 IRB Infrastructure Gujarat
(Padra to Vadodara) (Phase IA - Developers Ltd.
Pkg I) [Km 355.00 to Km
378.740]
238 Vadodara Mumbai Expressway NHAI 32 28-Mar-18 IRCON International Gujarat
(Sanpa to Padra) (Phase IA - Pkg Limited
II) [Km 323.00 to Km 355.00]

239 Package-IV- Delhi Meerut 24 NHAI 31.77 29-Dec-17 G R Infraprojects Limited Delhi
Expressway Km.27.740 of NH-
24 - Km.51.975
240 Flyover and Underpass at Hero 48 NHAI 1 20-Oct-14 Valecha Engineering Ltd Haryana
Honda Chowk
241 Chiloda-Naroda (Package-VII) 48 NHAI 15.31 15-Nov-16 KCC Buildcon Pvt. Ltd. Gujarat

242 4L Elevated Corridor in Deesa 27 NHAI 3.75 3-Dec-18 Rachana Construction Co. Gujarat
Town from km. 565.850 to km.
569.600 of NH-27

243 4-L of Rajamunda to Barkote 143 NHAI 49.99 16-Jan-18 Gayatri Projects Limited Odisha
Section of NH-23 from km.
287.200 to km. 337.185
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
244 Barhi-Koderma Section of NH31 31 NHAI 27.67 31-Jan-18 Ram Kripal Singh Jharkhand
km 0.00 - km 27.5 Construction Pvt. Ltd
245 8L of Dwarka Expressway Pkg-II 248BB NHAI 4.2 26-Jul-19 J Kumar Infra Projects Ltd. Delhi
(RuB near Dwarka Sector 21-
DL/HR Border) from 5.300
Km.to 9.500 Km. of NH-248BB

246 Jind-Gohana road from Design 352A NHAI 50.51 22-Mar-18 Gawar Constructions Ltd. Haryana
Km.0 000 to Km. 50 505 of NH-
352A under NH (O)
247 Gohana - Sonipat (PKG-2) 352A NHAI 38.24 8-Mar-19 Brij Gopal Construction Haryana
Pvt. Ltd.
248 Barhi (Km 0.000 ) to Hazaribagh 33 NHAI 41.28 12-Aug-16 Ramky Infrastructure Ltd. Jharkhand
(40.500) of NH-33 in Jharkhand

249 ROB cum Flyover at Ranichak, 41 NHAI 1.46 8-Feb-16 Dineshchandra R. Agrawal West
Haldia Infracon Pvt. Ltd. Bengal

250 4/6 Laning of Raipur-Simga (Pkg- 30 NHAI 48.58 28-Dec-15 Punj Lloyd Infrastructue Chhattisgar
I) from km. 0.00 to km. 48.58 Ltd. h

251 Balance work of Ranchi-Mahulia 33 NHAI 44.22 28-Feb-19 Iron Triangle Ltd Jharkhand
Section of NH-33 from Km
233.350 (Saharbeda) to Km
277.568 (Mahulia) (Package -IV)

252 Development of Emergency 16 NHAI 5 6-Aug-18 Venkat Rao Infra Projects Andhra
Landing Facility on Pvt. Ltd. Pradesh
Chilakaluripet - Nellore Section
from km. 1210.00 to km.
1214.00
253 4L Elevated section from 5 NHAI 12.95 31-Mar-17 Gammon Engineers & Punjab
Samrala Chowk (Km. 0.000) to Contractors Pvt. Ltd. - SP
Ludhiana Municipal Limit (Km. Singla Constructions Pvt.
12.951) of NH-95 in Punjab Ltd. (JV)

254 Andhra Pradesh / Tamilnadu 69 NHAI 37.11 24-Jun-16 Gayatri Projects Limited Andhra
Border to Nalagampalli village Pradesh
from Km. 134.890 to Km.
172.000
255 Dedicated Port road to PC NHAI 18.98 26-Mar-18 VDB Projects (P) Ltd. Andhra
Krishnapatnam Port (Package-I) Pradesh
from Km. 0.000 to Km. 18.000

256 Grade Seperator from H-7 Area 516C NHAI 0.773 10-May-18 MVR infra projects Pvt Ltd Andhra
to Port Connectivity Road Pradesh
bypassing Convent Junction

257 Additional Works under 6L of 19 NHAI 4.4 20-Nov-19 Dynasty Promoters Pvt. Delhi
Badarpur Elevated Highway on Ltd.
Delhi - Agra Section from km.
16.100 to km. 20.500

258 Six Laning of Varanasi to 19 NHAI 192.4 29-Apr-10 Soma - Isolux Bihar
Aurangabad from km. 786.00 to
km. 978.40 of Old NH-2
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
259 Additional Structures under Six 44 NHAI 0 25-Jun-19 Gawar Construction Ltd. - Haryana
Laning of Delhi-Agra section of The E5 Company (JV)
NH-44 in the State of Haryana
between km. 34.0 and km.
93.00
260 Ismailabad - Narnaul (Pkg- 04) 152D NHAI 28 26-Aug-19 JiangXi Construction Haryana
(Ch. 80+000 to 108+000) Engineering (Group)
[Junction with Jind-Safidon road Corporation Ltd. - Shiv
(SH-14) near Kheri village to Build India Pvt. Ltd. (JV)
Junction with NH-352 (Jind-
Gohana section) near Julana]

261 Ismailabad - Narnaul (Pkg- 05) 152D NHAI 23 8-Mar-19 Gawar Constructions Ltd. Haryana
(Ch. 108+000 to 131+000)
[Junction with NH-352 (Jind-
Gohana) near Julana to Junction
with NH-9 (Rohtak-Jind section)
near Kharkara]

262 6L of Saundard ROB on Raipur 53 NHAI 1.6 24-Oct-18 Rajdeep Buildcon Pvt. Ltd. Maharashtr
Nagpur (from 441.970 km to a
443.560 km)
263 Bakhtiyarpur (Km 153.300) to 31 NHAI 44.6 31-Dec-15 BSCPL Infrastructure Ltd. Bihar
Mokama (Km 197.900)
264 Aunta - Simaria including Ganga 31 NHAI 8.15 31-Aug-17 Welspun Enterprises Ltd. Bihar
Bridge In consortium with
Welspun Energy P. Ltd.
265 Koilwar Bhojpur from km. 922 NHAI 43.85 17-Aug-15 PNC-SPSCPL (JV) Bihar
137.375 of NH- 30 to km. 27.37
of NH-84
266 4L of Patna - Gaya - Dobhi (from 22 NHAI 127.22 9-Oct-14 IL & FS Engineering and Bihar
Km. 0.00 to Km. 127.217) [Jaica - Construction Company
Oda Loan assistance] Ltd.

267 Chittorgarh-Udaipur Section of 27 NHAI 93.5 23-Sep-16 Tril Roads Pvt. Ltd. Rajasthan
NH76
268 Vadakkenchery (Km 236.000) to 544 NHAI 28.36 27-Feb-09 KMC Construction Ltd. Kerala
Thrissur (Km 264.490) of NH -
544 in Kerala

269 Six Laning of Delhi - Agra 19&4 NHAI 179.5 19-May-10 Reliance Infrastructure Uttar
section from Km.20.500 to 4 Ltd. Pradesh
Km.200 in the State of Haryana
and U.P.
270 Delhi-Vadodara Greenfield 148N NHAI 21.1 7-Aug-19 G R Infraprojects Limited Madhya
Alignment (NH-148N) (Pkg-24) Pradesh
(Ch. 652+720 to Ch.674+420)
[Ranni Village to Miyati Village
of Jhabua district]

271 Delhi-Vadodara Greenfield 148N NHAI 23.15 7-Aug-19 G R Infraprojects Limited Madhya
Alignment (NH-148N) (Pkg-25) Pradesh
(Ch.673.770 to Ch.696.920)
[Miyati Village to MP-Gujarat
Border]
272 Agra - Etawah Bypass Section of 19 NHAI 124.48 6-Jul-15 IRB Infrastructure Uttar
NH-2 from Km. 199.660 to Km. Developers Ltd. Pradesh
323.525 in the State of Uttar
Pradesh
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
273 Vadape to Thane from km 848 NHAI 20.71 28-Mar-18 MEP Infrastructure Maharashtr
539.202 to km 563.000 section Developers Ltd. - Long Jian a
of NH-3 new NH-848 Road & Bridge Co. Ltd. (JV)

274 Aligarh-Kanpur (Pkg I) [Aligarh- 34 NHAI 45.83 20-Mar-18 Brij Gopal Construction Uttar
Bhadwas] Pvt. Ltd. Pradesh
275 Aligarh-Kanpur (Pkg II) 34 NHAI 45.2 20-Mar-18 PNC Aligarh Highways Pvt Uttar
[Bhadwas to Kalyanpur] Ltd Pradesh
276 Aligarh-Kanpur (Pkg III) 34 NHAI 61.2 27-Mar-18 APCO Infratech Pvt. Ltd. Uttar
[Kalyanpur - Naviganj] Pradesh
277 EPE Cossing to start of Shamli 709B NHAI 61.41 27-Aug-18 Krishna Constructions Pvt. Uttar
Bypass (existing NH-709-B) Ltd Pradesh

278 Shamli Byapss- Saharanpur 709B NHAI 62.77 5-Feb-19 Gawar Constructions Ltd. Uttar
from km 92.2 to km 155.025 Pradesh
279 Varanasi Gorakhpur Section 24 NHAI 65.38 4-Mar-16 Jaiprakesh Associates Ltd. Uttar
from km. 84.160 to 149.540 ( Pradesh
PKG III)
280 Development of Emergency 16 NHAI 3.5 15-Feb-19 KMC Construction Ltd. Andhra
Landing Facility on Pradesh
Chilakaluripet - Nellore Section
from km. 1273.00 to km.
1278.00
281 Nandigama Bypass and 65 NHAI 14.34 27-Dec-17 Lakshmi Infrastructure & Andhra
Kanchikacherla bypass Developers Pvt Ltd Pradesh
282 4L of Ichapuram to 16 NHAI 13.45 23-Mar-18 SPL CCCL (JV) Andhra
Narasannapeta from Km. Pradesh
470.415 to Km. 581.700
(Capacity Augmentation) of NH-
16 (Old NH-5)
283 Four Laning of Yamunanagar - 7& NHAI 19.2 26-Aug-16 Gawar Constructions Ltd. Haryana
Panchkula Section of Old NH 73 344
(Pkg - 3) from km. 160.357 to
km. 179.248
284 Construction of emergency 44 NHAI 3.5 21-Aug-19 E5 Company - Gawar Jammu and
landing facility from km. 246.60 Construction (JV) Kashmir
to km. 249.70 on Srinagar -
Banihal Section
285 Balance work of Ranchi-Mahulia 33 NHAI 26.57 28-Feb-19 Ram Kripal Singh Jharkhand
Section of NH-33 from Km Construction Pvt. Ltd
113.430 (Vikas) to Km 140.000
(Rampur) (Pkg-I)
286 Balance work of Ranchi-Mahulia 33 NHAI 16.05 10-Mar-19 Ram Kripal Singh Jharkhand
Section of NH-33 from Km Construction Pvt. Ltd
217.300 (Chowka) to Km
233.350 (Saharbeda) (pkg-III)

287 Mukkola Junction to Kerala/ 66 NHAI 16.2 13-Apr-16 Larsen & Toubro Ltd. Kerala
Tamil Nadu Border from Km
26.5 to Km 43.00 of NH 66 ( old
NH 47)
288 Addahole (km 255.703) to B C 75 NHAI 63.05 31-Mar-16 Larsen & Toubro Ltd. Karnataka
Road (km. 318.755) [Addahole
to Baniwal Pkg II]
289 Hospet-Bellary-Karnataka/AP 67 NHAI 95.37 11-Aug-16 Gammon Engineers & Karnataka
Border from Km.280.080 to Contractors Pvt. Ltd.
Km.375.450
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
290 4L of Hubli - Hospet Section of 67 NHAI 143.72 8-Aug-16 BSC - KNR (JV) Karnataka
NH-63 from: Km 128.850 to Km
272.571
291 Hassan (km 184.912) to 75 NHAI 45.14 31-Mar-16 Isolux Corsan Pvt. Ltd Karnataka
Maranahally (km 230.060) of
NH - 75 in Karnataka
292 Development of existing road in 60 NHAI 9.31 24-Apr-18 Roadway Solution Pvt. Ltd. Maharashtr
Khed and Narayangaon town a
excluding rehabilitation of
bridges on Khed Sinnar section
of NH-60

293 Delinked stretch of Seoni - 44 NHAI 28.7 17-Jan-18 Dilip Buildcon Ltd. Madhya
MP/MH Border (MP 3) Pradesh
294 Hiran River to Sindoor River 45 NHAI 64 17-Jan-18 Gawar Constructions Ltd. Madhya
(Km.66.00 - Km.130.00) Pradesh
295 Obaidullaganj Km. 2.800 to Km. 46 NHAI 46.3 28-Sep-17 NKC - CDS Madhya
8.300 and Km. 20.700 to Itarsi Pradesh
Km. 63.000 of NH-69 in Madhya
Pradesh
296 Mubarakpur (Km. 324.000) to 46 NHAI 97.33 20-Oct-17 Centrodorstoy India Pvt. Madhya
Biaora (KM. 423.000) in Ltd. and NKC Projects Pradesh
Madhya Pradesh [Bhopal-biaora
Pkg II]
297 Flyover at Dumri Junction (from 44 NHAI 0.98 5-Nov-19 Brijesh Agrawal Maharashtr
km 697.580 to km 698.56) with a
slip/ service road on Nagpur
Bypass section

298 Metro viaduct cum 4L Flyover 53 NHAI 4 28-Oct-19 Mahanagar Metro Rail Maharashtr
(under Nagpur Metro Rail) - Corporation Ltd. a
Kamptee Road between
Automotive Square to
Gaddigodam from km. 0.706 to
km. 4.735
299 4L of Saoner - Dhapewada - 547E NHAI 29 9-Mar-19 Dilip Buildcon Ltd. Maharashtr
Kalmeshwar Gondkhiari (Pkg II) a
from km 4.700 to km 33.575

300 Baharagora (199.606 Km) to 49 NHAI 111.61 6-Jul-15 Larsen & Toubro Ltd. Odisha
Singhara (310.806 Km) of NH-6

301 Wakhari - Khudus km 44.7 to 965 NHAI 33.1 18-Sep-19 J.M. Mhatre infra Pvt. Ltd. Maharashtr
km 77.8 Pkg II of Mohol Alangi & S.M. Autade Pvt. Ltd. a
(JV)
302 Mohol - Wakhari km 0.0 to km 965 NHAI 44.7 18-Sep-19 J.M. Mhatre infra Pvt. Ltd. Maharashtr
44.77 Pkg. I of Mohol Alangi & S.M. Autade Pvt. Ltd. a
(JV)
303 4 lane ROB and its approaches 66 NHAI 0.78 14-Mar-18 Essel Infraprojects Ltd Kerala
including allied works near
Neleshwaram town (Pallikara
Railway Gate) Kasargad district

304 Medshi (km 47.700) to Washim 161 NHAI 44.5 27-Mar-18 Montecarlo Limited Maharashtr
(km 92.200) of NH-161 in a
Maharashtra
305 Washim(km 92.200) to 161 NHAI 42.3 27-Mar-18 Montecarlo Limited Maharashtr
Pangare(134.500) of NH-161 in a
Maharashtra
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
306 4 Laning of Talcher to end of 53 & NHAI 41.73 31-Jan-18 MonteCarlo Ltd. - Iron Odisha
Kamakhyanagar Bypass km 149 Triangle Ltd. (JV)
8.844 - km 15.725 of NH-149
and km 301.875 - km 335.946
of NH-53 (Pkg-I)
307 Parwanoo (Km 67.00) to Solan 5 NHAI 39.14 30-Mar-15 G R Infraprojects Limited Himachal
(Km 106.14) Pradesh
308 Solan - Kaithlighat Section of NH- 5 NHAI 22.91 28-Mar-18 Airef Engineers Pvt. Ltd. Himachal
22 Now NH-5 from Km. 106.139 and Prakash Asphaltings& Pradesh
to Km.129.05 Toll Highways (I) Ltd. (JV)

309 4L of Shimla Bypass (Kaithlighat 5 NHAI 27.46 8-Aug-16 Shiv Valley Highways Himachal
(Km 129.050) to Dhalli (Km Private Limited Pradesh
156.507) of Old NH-22

310 Remaining works of Haridwar 58 & NHAI 14.95 20-Dec-18 UP State Bridge Uttarakhan
Dehradun (Pkg I) (Haridwar - 72 Corporation Limited, Setu d
Lalatappar) Bha
311 Remaining works of Haridwar 58 & NHAI 22.2 20-Dec-18 Atlas - NKC JV Uttarakhan
Dehradun (Pkg II) (Lalatappar - 72 d
Mohakampur)
312 Gulabpura(Km 69.267) to 148D NHAI 203.97 12-Jun-15 Dilip Buildcon Ltd-Ranjit Rajasthan
Uniara(282.936) of NH-148D in Buildcon Ltd (JV)
Rajasthan
313 Thalassery Mahe Bypass (Km 66 NHAI 18.6 12-Sep-17 GHV India Pvt. Ltd-EKK Kerala
170.600 to Km 189.200) of NH- Infrastructure Pvt. Ltd(JV)
17(New NH-66) in Kerala

314 4L of Nagpur - Umred section 353D NHAI 41.1 9-Mar-19 D.P. Jain & Co. Maharashtr
(From 7.300 km to 48.400 km of Infrastructure Pvt. Ltd. a
NH-353D
315 Warora - Wani from km. 930 NHAI 18.31 6-Aug-19 JiangXi Construction - Maharashtr
313.850 to km. 332.160 Agrawal Global Infratech a
(JV)
316 Belgaum-Khanapur Pkg I (Km 748 NHAI 30 7-Mar-18 Ashoka Buildcon Limited Karnataka
0.000-Km 30.800) of NH-4A
317 Khanapur-Karnataka / Goa 4A NHAI 54.12 27-Feb-18 Mr. Dilip Suryavanshi MD Karnataka
Border (Pkg II) [km. 30.0 - km. & Mr. Devendra Jain,CEO
84.12]
318 Rimuli Koida km 163 - km 206 of 520 NHAI 43.2 31-Jan-18 Montecarlo Limited Odisha
NH 215
319 Koida- Rajamunda (Pkg-II) km 520 NHAI 53.25 31-Jan-18 KMC - RKD (JV) Odisha
206.00 - km 259.453 of NH 215

320 Umagaon-Saharsa (Package-IV) 527 A NHAI 13.3 1-Oct-19 Gammon Engineers & Bihar
Koshi Bridge & approach Road - Contractors Pvt. Ltd. -
(Bheja-Bakaur) Transrail Lighting Ltd.
321 2L PS of Majhauli to Charout 527C NHAI 63.66 28-Mar-18 Ram Kripal Singh Bihar
section from km. 0.00 to km. Construction Pvt. Ltd
63.655
322 Biharsharif - Barbigha - 82 NHAI 54.58 31-Aug-15 G R Infraprojects Limited Bihar
Mokama from km. 94.478 to
km.149.02 of NH-82
323 Construction of Approach Road 333B NHAI 14.52 31-Mar-17 S.P. Singla Construction Bihar
to Rail-cum- Road Bridge across Pvt. Ltd/ Sh. Santosh Kr
river Ganga at Munger Ghat (
NH-333 B)
324 Churhat Bypass of Rewa Sidhi 39 NHAI 15.35 28-Mar-18 Dilip Buildcon Ltd. Madhya
Section Pradesh
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
325 Dalkhola By-pass from Km. 12 NHAI 5.46 8-Aug-17 ABCI Infrastructures Pvt. West
446.740 to Km. 452.162 of NH- Ltd. Bengal
34
326 Bilaspur-Pathrapalli from km. 130 NHAI 53.3 28-Mar-18 Aadani Enterprises Ltd. Chhattisgar
0.00 to km. 53.30 and Prakash Asphaltings & h
Toll Highways (India) Ltd.

327 Cuttack-Angul Section of NH-42 55 NHAI 59.8 29-Dec-17 Gayatri Projects Limited Odisha
(New NH-55) from km 0.400 to
km 60.200 (Pkg-I) in the State of
Odisha
328 Cuttack-Angul Section of NH-42 55 NHAI 51.8 15-Jan-18 Gayatri Projects Limited Odisha
(New NH-55) from Km.60.200
to Km. 112.000 (Pkg-II) in the
State of Odisha
329 Cholapuram - Thanjavur section 36 NHAI 47.83 29-Aug-17 Patel Infrastructure Tamil Nadu
of NH-45C from km 116.4 to km Limited
164.275
330 4 Laning of Duburi Chandikhole 53 NHAI 39.7 31-Jan-18 Gammon Engineers and Odisha
from km 388.376 to km 428.074 Contractors Pvt Ltd. JV
(Pkg-III) with Gammon
Infrastructure Projects Ltd.

331 Birmitrapur - Brahmani Bypass 143 NHAI 29.1 19-Jul-17 GKC Projects Ltd. Odisha
end of NH-23
332 Bhojpur Buxar section of NH-84 922 NHAI 47.9 17-Aug-15 PNC-SPSCPL (JV) Bihar
from km.27.37 to km. 75.00

333 Balance Work of Puri By Pass 316 NHAI 10.9 8-Mar-18 RKD Construction Pvt. Ltd. Odisha
Road of Bhubaneswar-Puri
Section from km. 56.500 to km.
67.500
334 Upgradation of 4 laning of old 53 NHAI 7.3 31-May-18 Jandu Construction Maharashtr
NH-6 from Km.296 to 304 Company a
passing through Khamgaon City

335 2L with ES of Yagyi - Kalewa NHAI 112.14 12-Dec-17 Punj Lloyd Ltd. - Varaha Assam
section from Milepost 40/0 to Infra Ltd. (JV)
Milepost 115/5 in Myanmar

336 6L of Gundugolanu (Design km 16 NHAI 27.4 1-Oct-19 Varaha Infra - JCEG (JV) Andhra
1023.280) to Kalaparru (Design Pradesh
km 1050.680) of NH-5 (New NH-
16)
337 6L of Kalaparru to Chinna 16 NHAI 27.4 8-Jan-19 Lakshmi Infrastructure & Andhra
Avutupalli including 6 lane Developers Pvt Ltd Pradesh
Hanuman Junction bypass
338 Ismailabad - Narnaul (Pkg- 01) 152D NHAI 23 31-Oct-19 JiangXi Construction Haryana
(Ch. 0+000 to Ch. 23+000) Engineering (Group)
[Ismailabad to Junction with Corporation Ltd. - CEIGALL
Karnal-Pehowa road (SH-9) near - Shiv Build India Pvt. Ltd.
Dhand] (JV)
Under Implementation
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.

End Date
Sr. Total
Project Strech NH By Start Date (As per Concessionaire Name State
No. Length
Contract)
339 Ismailabad - Narnaul (Pkg- 02) 152D NHAI 33 25-Oct-19 Gawar Constructions Ltd. Haryana
(Ch. 23+000 to 56+000)
[Junction with Karnal-Pehowa
road (SH-9) near Dhand village
to Junction with Kaithal-Safidon
(SH-11) road near Rajound]

340 Ismailabad - Narnaul (Pkg- 03) 152D NHAI 24 2-Dec-19 Galfar Engineering & Haryana
(Ch. 56+000 to 80+000) Contracting (India) Pvt.
[Junction with Kaithal-Safidon Ltd.
road (SH-11) near Rajound to
Junction with Jind-Safidon road
(SH-14) near Kheri village]

341 Ismailabad - Narnaul (Pkg- 06) 152D NHAI 34 8-Mar-19 Gawar Constructions Ltd. Haryana
(Ch. 131+000 to 165+000)
[Junction with NH-9 (Rohtak-
Jind section) near Kharkara to
Junction with NH-334B (Charkhi
Dadri-Jhajjar section) near
Charkhi Dadri]

342 Ismailabad - Narnaul (Pkg- 08) 152D NHAI 27.02 8-Mar-19 Gawar Constructions Ltd. Haryana
(Ch. 200+000 to 227+020)
[Junction with Rewari-Kanina
road (SH-24) near Kanina to
Narnaul]
343 Rasisar (near Bikaner)-Deogarh 754K NHAI 30 10-Oct-19 NKC Projects Private Rajasthan
(near Dhandhaniya) (Phase-I) Limited
(AJ/RD-Package-3)

344 Rasisar (near Bikaner)-Deogarh 754K NHAI 30 8-Mar-19 VRC-VCL-CIL JV Rajasthan


(near Dhandhaniya) (Phase-I)
(AJ/RD-Package-4)

345 Vadodara Mumbai Expressway NHAI 31 28-Mar-18 Patel Infrastructure Gujarat


(Manubar to Sanpa) (Phase IA - Limited
Pkg III)