Strengthening to Puduchathiram - Portonovo road at km 29/2-32/8 (MD-662) including upkeeping for a period of 60

Name of the Road


months

Reach 1 2 3 4
Rolling / Plain Rolling / Plain Rolling / Plain Rolling / Plain
Road terrain
Terrain Terrain Terrain Terrain
Two-lane single Two-lane single Two-lane single Two-lane single
Carriageway lanes carriageway road carriageway road carriageway road carriageway road

Design life in years 5 5 5 5


Construction period 1 1 1 1
Year of Traffic Census Taken 2020 2020 2020 2020
Current year 2020 2020 2020 2020
Annual growth rate of CV 5 5 5 5
Initial Traffic Volume CV 1832 1832 1832 1832
Direction of traffic census taken BOTH direction BOTH direction BOTH direction BOTH direction
Characteristic Deflection 1.378 1.367 1.360 1.356
BM rate 6332.40 6332.40 6332.40 6332.40
DBM rate 7421.56 7421.56 7421.56 7421.56
Is Widening work combined NO NO NO NO
CBR(Not needed for only strengthening) 9 8 7 8
Traffic Volume after completion 1924 1924 1924 1924
Vehicle Damaging Factor, VDF 5.00 5.00 5.00 5.00
Lane Distribution Factor LDF 0.5 0.5 0.5 0.5
DESIGN TRAFFIC IN MSA

Reach 1 2 3 4
For 5 Years 9.71 9.71 9.71 9.71
For 6 Years 11.94 11.94 11.94 11.94
For 7 Years 14.3 14.3 14.3 14.3
For 8 Years 16.77 16.77 16.77 16.77
For 9 Years 19.36 19.36 19.36 19.36
For 10 Years 22.09 22.09 22.09 22.09
Suresh SE Cbe 94441 57725
(MD-662) including upkeeping for a period of 60

5
Rolling / Plain
Terrain
Two-lane single
carriageway road

5
1
2020
2020
5
1832
BOTH direction
1.380
6332.40
7421.56
NO
9
1924
5.00
0.5

5
9.71
11.94
14.3
16.77
19.36
22.09
zoorace@yahoo.com
Pavement Composition
(Strengthening)
Design Life 5 years

Strengthening to Puduchathiram - Portonovo road at km 29/2-32/8 (MD-662) including upkeeping for a period of 60 months

20.07 V (05.04.20)
Proposed
Required
BM
Reach Deflection Msa BM Overlay BM DBM BC Remarks
thickness
Thickness
in mm

1 1.378 9.71 103 0 50 30 114

2 1.367 9.71 102 0 50 30 114

3 1.360 9.71 101 0 50 30 114

4 1.356 9.71 100 0 50 30 114

5 1.380 9.71 103 0 50 30 114


S.Suresh SE(H) Coimbatore 9444157725 zoorace@yahoo.com

suresh ade 94441 57725


STRENGTHENING DESIGN AS PER IRC : 81-1997 and as per IRC:37-2018

Strengthening to Puduchathiram - Portonovo road at km 29/2-


Name of the Road
32/8 (MD-662) including upkeeping for a period of 60 months

Reach 1 2 3 4 5
Rolling / Plain Rolling / Plain Rolling / Plain Rolling / Plain Rolling / Plain
Road terrain Terrain Terrain Terrain Terrain Terrain
Two-lane Two-lane Two-lane Two-lane Two-lane
single single single single single
Carriageway lanes carriageway carriageway carriageway carriageway carriageway
road road road road road

Construction period 1 1 1 1 1

Year of Traffic Census


2020 2020 2020 2020 2020
Taken

Current year 2020 2020 2020 2020 2020

Annual growth rate of CV 5 5 5 5 5

Initial Traffic Volume CV 1832 1832 1832 1832 1832

Direction of traffic BOTH BOTH BOTH BOTH BOTH


census taken direction direction direction direction direction

Characteristic Deflection 1.378 1.367 1.360 1.356 1.380

Traffic Volume after


1924 1924 1924 1924 1924
completion
Vehicle Damaging
5 5 5 5 5
Factor, VDF
Lane Distribution Factor
0.5 0.5 0.5 0.5 0.5
LDF
DESIGN TRAFFIC IN MSA

Reach 1 2 3 4 5

For 5 Years Widening


16.18 16.18 16.18 16.18 16.18
and strengthening

For 5 Years
9.71 9.71 9.71 9.71 9.71
Strengthening only
For 10 Years 22.09 22.09 22.09 22.09 22.09
20.07 V (05.04.20) S.Suresh SE Coimbatore 94441 57725
Pavement Composition (Strengthening) zoorace@yahoo.com

Strengthening
NametoofPuduchathiram
work : - Portonovo road at km 29/2-32/8 (MD-662) including upkeeping for a p

20.07 V (05.04.20)

Design Life 5 Years


Reach BM DBM BC

1 0 50 VG 30 30 VG 30

2 0 50 VG 30 30 VG 30

3 0 50 VG 30 30 VG 30

4 0 50 VG 30 30 VG 30

5 0 50 VG 30 30 VG 30

Suresh SE Cbe 9444157725

suresh ade 94441 57725 zoorace@yahoo.com


zoorace@yahoo.com

Strengthening to Puduchathiram - Portonovo road at km 29/2-32/8


Name of Work : (MD-662) including upkeeping for a period of 60 months

Reach 1
Terrain ---------- Rolling / Plain Terrain
Two-lane single
Carriageway lanes --------
carriageway road
Constuction period in Years ---------- 1
Year of Traffic Census Taken ---------- 2020
Current year ---------- 2020
Annual growth rate of CV ---------- 5

Initial Traffic Volume CV BOTH direction ---------- 1832


Characteristic Deflection ---------- 1.378

Initial Traffic Volume after completion


1
1832x ( 1+0.05) ---------- 1924 cv/day
Vehicle Damaging Factor, VDF ---------- 5.00
Lane Distribution Factor, LDF ---------- 0.50

Design Traffic N = 365 * ( (1+r)^n - 1) * A * D * F )/ r

For 15 Years
15
= 365 x ( ( 1+0.05 ) -1) x 1924 x 5 x 0.5
0.05
= 37.88 MSa

For 10 Years
10
= 365 x ( ( 1+0.05 ) -1) x 1924 x 5 x 0.5
0.05
= 22.09 MSa

For 5 Years
5
= 365 x ( ( 1+0.05 ) -1) x 1924 x 5 x 0.5
0.05
= 9.71 MSa