You are on page 1of 4

Name of the Road Strengthening of Karaimedu - Maruthur- Kulakudi Road km 1/2 -4/6

Reach 1 2 3 4
Rolling / Plain Rolling / Plain Rolling / Plain Rolling / Plain
Road terrain
Terrain Terrain Terrain Terrain
Intermediate lane road Intermediate lane road Intermediate lane road Two-lane single
Carriageway lanes carriageway road

Design life in years 5 5 5 5


Construction period 1 1 1 1
Year of Traffic Census Taken 2020 2020 2020
Current year 2020 2020 2020
Annual growth rate of CV 5 5 5
Initial Traffic Volume CV 845 845 845
Direction of traffic census taken BOTH direction BOTH direction BOTH direction
Characteristic Deflection 1.440 1.390 1.412
BM rate 6332.40 6332.40 6332.40 6332.40
DBM rate 7421.56 7421.56 7421.56 7421.56
Is Widening work combined NO NO NO NO
CBR(Not needed for only strengthening) 7.4 6 7 8
Traffic Volume after completion 887 887 887 0
Vehicle Damaging Factor, VDF 3.90 3.90 3.90 1.70
Lane Distribution Factor LDF 0.75 0.75 0.75 0.5
DESIGN TRAFFIC IN MSA

Reach 1 2 3 4
For 5 Years 5.24 5.24 5.24 #DIV/0!
For 6 Years 6.45 6.45 6.45 #DIV/0!
For 7 Years 7.72 7.72 7.72 #DIV/0!
For 8 Years 9.05 9.05 9.05 #DIV/0!
For 9 Years 10.45 10.45 10.45 #DIV/0!
For 10 Years 11.92 11.92 11.92 #DIV/0!
Suresh SE Cbe 94441 57725
6

5
Rolling / Plain
Terrain
Two-lane single
carriageway road

5
1

6332.40
7421.56
NO
9
0
1.70
0.5

5
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
zoorace@yahoo.com
Pavement Composition
(Strengthening)
Design Life 5 years

Strengthening of Karaimedu - Maruthur- Kulakudi Road km 1/2 -4/6

2020-2
Proposed
Required
BM
Reach Deflection Msa BM Overlay BM DBM BC Remarks
thickness in
Thickness
mm

1 1.440 5.24 84 50 0 30 93

2 1.390 5.24 78 50 0 30 93

3 1.412 5.24 81 50 0 30 93

4 0.000

5 0.000
S.Suresh SE(H) Coimbatore 9444157725 zoorace@yahoo.com

suresh ade 94441 57725