Professional Documents
Culture Documents
2
ABUTMENT WINGWALL
clear
span = 1.00 Eff.Span 3.60 0.50 0.30 0.15 0.45 0.50 0.15
H = 1.20 H+ slab thk+w.c thk = 1.475
b1 = 0.30 b1 = 0.15 0.170
b2 = 0.40 b2 = 0.45 0.15
b3 = 0.30
b4 = 0.00
B1 = 1.30 B1 = 1.10 0.30 1.475
B2 = 1.85 B2 = 1.80 1.50
###
0.20 0.20 0.00 0.39 0.30 0.30 0.12 0.00 0.20 0.00 0.00
Bearing wall
front batter
Dirt wall
Rear Batter
3.25
3.05
2.65
2.62
1.64
1.55
2.5
2
1.100
1.3
1.3
0.20
0.20
0.09
0.36
0.50 wing wall
0.12
0.03
0.40
0.20
1.300
1.410
1.800
2.100
2.400
2.520
2.550
2.550
2.750
2.750
2.750
2.950
Widening of single Vent 1.0m X 1.5m R.C.C Slab Culvert at
km 6/2 of Palakollai road (Left side Widening)
Abstract & Detailed Estimate
Sl.N Measurement
Description No Qty unit Rate Amount
o L B D
1
Earthwork excavation in all calsses of soils except hard rock requiring blasting and
depositing on bank with all leads and lifts as per SS20B, including cost of all labour,
equipments and all incidental charges such as providing and maintaining necessary
cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs,
stumps and other deleterious matter and obstructions, trimming bottom of excavation
backfilling, and clearing the site and disposal of all surplus materials etc, complete as per
relevant standard specification for FOUNDATIONS FOR ABUTMENTS WING WALL etc.,
complete
23.71
Abutment R/L
I Footing 1x 2 (3.25+1.35)/2 1.850 0.200 1.70
((3.05+2.65)/2)+1.
55/2
Wings
((1.4+1.1)/2)+1
.3/2
Abutment
((2.65+2.62)/2)+2.
5/2
((1.64+1.55)/2)+2
/2
Wing
((2.52+2.55)/2)+
2.4/2
((1.41+1.3)/2)+1
.8/2
2.71
Abutment
Wing
Front Batter 1x 2 (2.52+2.4)/2 (0+0.12)/2 1.175 0.35
Parapet
8.61
or 8.61 m3 5470.42 47082
5
Vibrated reinforced cement concrete M25 grade Design Mix using ISS
size hard granite broken graded metal including cost and conveyance of
all materials to site and cement at site including labour charges for
mixing, transporting, laying, curing concrete, working at heights, hire
charges for tools and plants, including all other incidental chargeas, etc.,
complete for BEDBLOCK OVER ABUTMENTS . -1 Cum (For Estimate
Purpose, mix (1:1.5:3)
0.24
or 0.24 m3 7540.42 1838
5
Vibrated cement concrete M25 using 20mm ISS HBG metal including cost and
conveyance ofall materials to site including cement which will be supplied by the
Department at the departmental stores or at site of work and its cost recovered as
stipulated in the special conditions appended herewith including cost of form work, soft
water, labour charges for mixing, transporting, laying and curing concrete, working at
depths, tools and plants and incidental charges such as baling cut water, maintaining of
protective bunds, cofferdams, shoring, structting etc., complete asper relevent standard
specification, for DECKSLAB AND KERB -1Cum
0.72
or 0.72 m3 7590.42 5476
6
Supply of HYSD steel for Reinforcement for RCC work including bending,
placing and binding etc., for Deck slab, Bed Block & surface
Reinforcement.
or 1.63 m2 50.00 81
8
Providing and fixing 20mm thick PVC fiber board expansion joint
including cost and conveyance of expansion joints, Shalimar pad and joint
sealants and fixing them position etc. Complete in deck slab over
abutment.
3.74
or 11 m 175.00 1995
11
Filling behind Abutments and wings with clean gritty gravel including
cost and conveyance of gravel to worksite, laying, handling charges and
filling in layers, tamping under optimum moisture content to get the
maximum density including watering, with all leads for water and all
other incidental charges etc,complete. -1 Cum
Deduct filter
-3.74
media
4.59
or 4.59
m3 334.90 1536
12
Vibrated cement Concrete M30 design mix using ISS size HBG
graded metal including cost and conveyance of all materials to worksite
and cement at site including all labour charges for ixing concrete, laying,
vibrating, hire charges for tools and plants, compacting, curing with all
leads for soft water, including all other incidental charges,formwork,cost
of premoulded expansion joints and fixing the same in position etc.,
complete for wearing coat of 75mm uniform thickness over deck slab
and approach slab.
or 3.36 m2
586.12 1969
Dismantling the existing PCC parapet including all labour and other incidental charges etc.,
13
complete
Total 190882
Schedule of Reinforcement for Deck Slab Fe 415 steel
widening span 1.00 0.3 0.2 effective span 2.5m
0.1
0.1
Bottom
1 Main a # 10 180 1.63 1 X 15 24.45 0.62 15.16
Rod 1.50
0.1
0.1
Bottom
2 Main b # 16 180 1.53 1 X 15 22.95 0.89 20.43
Rod
2.45
Bottom
3 Distribut d # 12 125 2.45 1 X 13 31.85 0.89 28.35
ors 2.45
0.1
0.1
Top
4 Main c # 10 300 1.73 1 X 6 10.36 0.62 6.42
Rod 1.50
Top
5 Distribut e # 10 300 2.45 1 X 6 14.70 0.62 9.11
or 2.45
Total 79.47
Total 79.47
1 x 1 X 79.47 79.47
(or) 0.080 MT
Schedule of Reinforcement for Bed Block and Dirt wall Fe 415 steel
0.23
Bed
2 Block b2 # 12 150 1.47 1 X 17 25.48 0.89 22.60
Stirrups -0.10
0.23
0.23
Dirt
2 wallStirru b2 # 12 150 1.16 1 X 17 20.11 0.89 17.84
ps 0.20
Total 70.86
Total 70.86
For 2 Bed Blocks 1x 2 X 70.86 141.72
(or) 0.142 MT