culvert at 3.60 m span Left Widening deck thick d1 0.17 d2 0.

2
ABUTMENT WINGWALL
clear
span = 1.00 Eff.Span 3.60 0.50 0.30 0.15 0.45 0.50 0.15
H = 1.20 H+ slab thk+w.c thk = 1.475
b1 = 0.30 b1 = 0.15 0.170
b2 = 0.40 b2 = 0.45 0.15
b3 = 0.30
b4 = 0.00
B1 = 1.30 B1 = 1.10 0.30 1.475
B2 = 1.85 B2 = 1.80 1.50

0.39 0.12 BL 0.36 0.48 0.12 BL


1.20 2500 0.37 0.39 1.11 0.30 0.30
300 0.111 0.12 0 0.11 0.03 0 0.20 0.09 1.10 0.03
1.25 0.40 0.40
2800 1.11
1.45 0.40 0.40
4200 0.102 0.12 0.20 0.00 0.20 1.40 0.20
1.65 0.20
3900 0.305 0.36 0.20 0.00
0.40
0.48 1.85 0.20 1.8

###
0.20 0.20 0.00 0.39 0.30 0.30 0.12 0.00 0.20 0.00 0.00

Bearing wall

front batter
Dirt wall
Rear Batter
3.25
3.05
2.65

2.62

1.64
1.55
2.5
2

1.100
1.3
1.3

0.20
0.20
0.09
0.36
0.50 wing wall
0.12
0.03
0.40
0.20
1.300
1.410
1.800
2.100
2.400
2.520
2.550
2.550
2.750
2.750
2.750
2.950
Widening of single Vent 1.0m X 1.5m R.C.C Slab Culvert at
km 6/2 of Palakollai road (Left side Widening)
Abstract & Detailed Estimate
Sl.N Measurement
Description No Qty unit Rate Amount
o L B D
1
Earthwork excavation in all calsses of soils except hard rock requiring blasting and
depositing on bank with all leads and lifts as per SS20B, including cost of all labour,
equipments and all incidental charges such as providing and maintaining necessary
cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs,
stumps and other deleterious matter and obstructions, trimming bottom of excavation
backfilling, and clearing the site and disposal of all surplus materials etc, complete as per
relevant standard specification for FOUNDATIONS FOR ABUTMENTS WING WALL etc.,
complete

Abutment 1x 2 (3.25+1.35)/2 1.850 1.500 12.77

Wings 1x 2 (2.95+1.1)/2 1.800 1.500 10.94

23.71

or 23.71 m3 122.20 2897


2 Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using
40mm ISS HBG metal including cost and conveyance of all materials to
site and cement at site including cost of formwork, soft water,labour
charges for mixing, transporting, laying and curing concrete, working at
depths,Tools and Plants and incidental charges such as maintaining of
protective bunds, cofferdams, shoring, strutting etc; complete as per
relevant standard specification for FOOTINGS OF ABUTMENT & WINGS.

Abutment R/L
I Footing 1x 2 (3.25+1.35)/2 1.850 0.200 1.70

II Footing 1x 2 (3.25+1.35)/2 1.650 0.200 1.52

III Footing 1x 2 (3.05+1.55)/2 1.450 0.400 3.34

IV Footing 1x 2 (2.85+1.55)/2 (1.45+1.25)/2 0.400 2.38

((3.05+2.65)/2)+1.
55/2

Wings

I Footing 1x 2 (2.95+1.1)/2 1.800 0.400 2.92

II Footing 1x 2 (2.75+1.3)/2 1.400 0.400 2.27

III Footing 1x 2 (2.65+1.3)/2 (1.4+1.1)/2 0.400 1.98

((1.4+1.1)/2)+1
.3/2

or 16.11 m3 5450.26 87804


3 Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using
40mm ISS HBG metal including cost and conveyance of all materials to
site and cement at site including cost of formwork, soft water,labour
charges for mixing, transporting, laying and curing concrete, working at
depths,Tools and Plants and incidental charges such as maintaining of
protective bunds, cofferdams, shoring, strutting etc; complete as per
relevant standard specification for SUBSTRUCTURE OF ABUTMENT &
WINGS. 1 Cu.m(Below Sill level)

Abutment

Front Batter 1x 2 (2.635+2.5)/2 (0.15+0.12)/2 0.300 0.21

((2.65+2.62)/2)+2.
5/2

Bearing 1x 2 2.500 0.300 0.300 0.45

DirtWall 1x 2 2.500 0.300 0.300 0.45

Rear Batter 1x 2 (1.595+2)/2 (0.5+0.39)/2 0.300 0.48

((1.64+1.55)/2)+2
/2

Wing

Front Batter 1x 2 (2.535+2.4)/2 (0.15+0.12)/2 0.300 0.20

((2.52+2.55)/2)+
2.4/2

Rear Batter 1x 2 (1.36+1.8)/2 (0.45+0.36)/2 0.300 0.38

((1.41+1.3)/2)+1
.8/2

Centre Portion 1x 2 1.800 0.500 0.300 0.54

2.71

or 2.71 m3 5450.26 14780


4
Vibrated cement concrete M15 grade Nominal Mix 1:2:4 usnig 40 mm ISS size hard
granite broken metal including cost and conveyance of all materials to site and cement at
site including labour charges for mixing, transporting, laying, curing concrete, working at
heights, hire charges for Tools and Plants including all other incidental charges etc,
complete for SUBSTRUCTURE OF ABUTMENTS & WINGS -1 Cum (Above sill level)

Abutment

Front Batter 1x 2 (2.62+2.5)/2 (0+0.12)/2 1.050 0.32

Bearing 1x 2 2.500 0.300 1.050 1.58

DirtWall 1x 2 2.500 0.300 1.050 1.58

Rear Batter 1x 2 (2+1.64)/2 (0+0.39)/2 1.050 0.75

Wing
Front Batter 1x 2 (2.52+2.4)/2 (0+0.12)/2 1.175 0.35

Rear Batter 1x 2 (1.41+1.8)/2 (0+0.36)/2 0.68


1.175

Centre Portion 1x 2 1.800 0.500 1.175 2.12

Parapet

over deck 1x 1 1.600 0.400 0.600 0.38

Over wing 1x 2 1.800 0.400 0.600 0.86

8.61
or 8.61 m3 5470.42 47082
5
Vibrated reinforced cement concrete M25 grade Design Mix using ISS
size hard granite broken graded metal including cost and conveyance of
all materials to site and cement at site including labour charges for
mixing, transporting, laying, curing concrete, working at heights, hire
charges for tools and plants, including all other incidental chargeas, etc.,
complete for BEDBLOCK OVER ABUTMENTS . -1 Cum (For Estimate
Purpose, mix (1:1.5:3)

Dirt wall 1 x 2 2.500 0.300 0.320 0.48

Bed Block 1 x 2 2.500 0.325 0.150 0.24

0.24
or 0.24 m3 7540.42 1838

5
Vibrated cement concrete M25 using 20mm ISS HBG metal including cost and
conveyance ofall materials to site including cement which will be supplied by the
Department at the departmental stores or at site of work and its cost recovered as
stipulated in the special conditions appended herewith including cost of form work, soft
water, labour charges for mixing, transporting, laying and curing concrete, working at
depths, tools and plants and incidental charges such as baling cut water, maintaining of
protective bunds, cofferdams, shoring, structting etc., complete asper relevent standard
specification, for DECKSLAB AND KERB -1Cum

Deck Slab 1x 1 2.500 1.560 (0.2+0.17)/2 0.72

0.72
or 0.72 m3 7590.42 5476
6
Supply of HYSD steel for Reinforcement for RCC work including bending,
placing and binding etc., for Deck slab, Bed Block & surface
Reinforcement.

for super structure Deck Slab 0.16 45000.00 7200


for sub structure Bed Block 0.28
45000.00 12780
0.44 T
Add 5% wastage 0.02
0.47 T
7
Providing and fixing Tar paper for full width of seating of deck slab and
including cost and conveyance to worksite labour for fixing the same in
correct position and all other incidental charges etc. complete.

1x 2 2.500 0.325 1.63

or 1.63 m2 50.00 81
8
Providing and fixing 20mm thick PVC fiber board expansion joint
including cost and conveyance of expansion joints, Shalimar pad and joint
sealants and fixing them position etc. Complete in deck slab over
abutment.

1x 2 2.500 0.170 0.85


or 0.85 Rm 200.00 170
9
Providing filter media behind the abutments and wings with clean III
graded material 53mm to 5.6mm to 600mm thick and well compacted in
layers with smaller sized towards the soil and bigger size towards the wall
including cost and conveyance to work site including all labours and
other incidental charges including hire charges for tools and plants
employed etc., for filter media as per MOST's (Roads Wing) specifications
for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc.,
complete- 1Cum.

Abutment 1x 2 (1.55+2)/2 0.600 1.145 2.44

wings 1x 2 (1.2+0.7)/2 0.600 1.145 1.31

3.74

or 3.74 m3 1263.22 4730


10
Providing and fixing seepage pipes of 100mm dia. PVC pipes of
requied lengths for abutments and wngs including cost and conveyance
of all materials to work site, cost and labour for 900mm dia. semi-
spherical back fill arangements with 100mm size broken ganite chips at
the periphery and labour charges for fixing, etc.,to drain of the
BACKFILL IN THE ABUTMENTS AND WINGS

Abutment 1x 2 2.5 1.000 1.500 8

wings 1x 2 1.3 1.000 1.500 4

or 11 m 175.00 1995
11
Filling behind Abutments and wings with clean gritty gravel including
cost and conveyance of gravel to worksite, laying, handling charges and
filling in layers, tamping under optimum moisture content to get the
maximum density including watering, with all leads for water and all
other incidental charges etc,complete. -1 Cum

1x 2 (1.55+2)/2 (2.3+1.8)/2 1.145 8.33

Deduct filter
-3.74
media
4.59

or 4.59
m3 334.90 1536
12
Vibrated cement Concrete M30 design mix using ISS size HBG
graded metal including cost and conveyance of all materials to worksite
and cement at site including all labour charges for ixing concrete, laying,
vibrating, hire charges for tools and plants, compacting, curing with all
leads for soft water, including all other incidental charges,formwork,cost
of premoulded expansion joints and fixing the same in position etc.,
complete for wearing coat of 75mm uniform thickness over deck slab
and approach slab.

Deck Slab 1x 1 1.600 2.100 3.36

or 3.36 m2
586.12 1969
Dismantling the existing PCC parapet including all labour and other incidental charges etc.,
13
complete

parapet 1 x 1 6.10 0.60 0.550 2.013

or 2.01 m3 270.30 544

Total 190882
Schedule of Reinforcement for Deck Slab Fe 415 steel
widening span 1.00 0.3 0.2 effective span 2.5m

Sl. Spacing Total Weight / Total


Type Dia mm Length Nos.
No. mm length m kg Weight

0.1

0.1
Bottom
1 Main a # 10 180 1.63 1 X 15 24.45 0.62 15.16
Rod 1.50
0.1

0.1
Bottom
2 Main b # 16 180 1.53 1 X 15 22.95 0.89 20.43
Rod
2.45

Bottom
3 Distribut d # 12 125 2.45 1 X 13 31.85 0.89 28.35
ors 2.45
0.1

0.1

Top
4 Main c # 10 300 1.73 1 X 6 10.36 0.62 6.42
Rod 1.50

Top
5 Distribut e # 10 300 2.45 1 X 6 14.70 0.62 9.11
or 2.45
Total 79.47
Total 79.47
1 x 1 X 79.47 79.47
(or) 0.080 MT
Schedule of Reinforcement for Bed Block and Dirt wall Fe 415 steel

Sl. Dia Spacing Total Weight / Total


Type Length Nos.
No. mm mm length m kg Weight
Bed
1 Block a1 # 12 2.45 1 X 14 34.30 0.89 30.42
Main 2.45
0.23

0.23

Bed
2 Block b2 # 12 150 1.47 1 X 17 25.48 0.89 22.60
Stirrups -0.10
0.23

0.23

Dirt
2 wallStirru b2 # 12 150 1.16 1 X 17 20.11 0.89 17.84
ps 0.20
Total 70.86
Total 70.86
For 2 Bed Blocks 1x 2 X 70.86 141.72
(or) 0.142 MT