OVERALL LENGTH OF COMPOSITE STEEL GIRDER 36900(SK)
[35954(SQ)] 12300 WIDTH OF BRIDGE 400 TO EXECUTION OF WORK
80
500 500 500 1500 300
C/C OF BEARING 36000(SK) 500 CLEAR CARRIAGE WAY 8500
FOOTPATH 120 120
[35077(SQ)]
PEDESTAL WITH POT FINISHED ROAD LEVEL FINISHED ROAD LEVEL
FINISHED ROAD LEVEL NOTE:-
TO TILAK PUTLA A PTFE BEARING CRASH BARRIER
LVL.+298.486M TO NAGPUR HIGHWAY
LVL.+298.623M LVL.+298.486M
80 80
(@ THE END OF CARRIAGEWAY)
80
SLOPE 1:30 BEARING - 350x750X149
36
80MM WEARING COAT @ LOWEST GIRDER OF CARRIAGEWAY SLOPE 1:30 2.5% 2.5%
1) ALL DIMENSIONS ARE SHOWN IN MM AND LEVELS ARE IN METER UNLESS OTHERWISE MENTIONED.
PEDESTAL -650x1050X351 50mm E.J.
2) NO DIMENSION SHALL BE SCALED FROM THE DRAWING. ONLY WRITTEN DIMENSIONS SHALL BE
SOFFIT LVL.+296.525M
FOLLOWED.
1881
COMOSITE STEEL GIRDER AS PER PIER CAP TOP 3) THE TYPE AND DIMENSIONS OF FOUNDATION AND SUBSTRUCTURE SHOWN IN THE DRAWING ARE
RDSO DRG.NO. RDSO / B -11775 2500 2500 2500 2500 LVL.+296.025M
INDICATIVE AND MAY VARY AS PER ACTUAL DESIGN.
INSPECTION LADDER 12 MACHINE FIT 4) ALL THE DIMENSIONS SHOWN SHOULD BE VERIFIED AS SITE BEFORE TAKING UP DESIGN WORK IN
1200
11500 5) NO WORK SHOULD BE STARTED TILL, DESIGN (PROOF CHECKED). AND DRAWING WITHIN RAILWAY
PIER CAP TOP
1881
INSPECTION PLATFORM LVL.+296.025M PORTION ARE APPROVED BY RAILWAY.
600
8511
RAILWAY BOUNDARY
6) DESIGN CRITERIA IS BASED ON FOLLOWING CODES :
EXISTING NARROW
1581
1500
RAILWAY BOUNDARY
ELASTOMERIC BEARING
C.L.OF FUTURE
C.L.OF FUTURE
C.L.OF FUTURE
TRACK-1 (B.G.)
TRACK-2 (B.G.)
TRACK-3 (B.G.)
230849 238317 PEDESTAL WITH POT 160 160 BOTTOM 80MM NOT a) IRC: 5-2015
6946(SK)
ELASTOMERIC BEARING
8 TO BE WELDED. NOT
6550
6550
1750 [6768(SQ)] 1750 REWALL BEARING - 350x750X149
5000
TO BE WELDED TO FLANGES
b) IRC: 6-2017
738
45
FORMATION LVL. +289.237M FORMATION LVL. +289.237M FORMATION LVL. +289.237M 875 9) EXPOSURE CONDITION IS MODERATE .
EXISTING G.L.+290.267M 10) ANGLE OF SKEW FOR SUPERSTRUCTURE - 13° (PARALLEL TO TRACK.)
FOOTING TOP LEVEL
LVL.+288.737M
FOOTING TOP LEVEL
LVL.+288.737M
SECTION OF COMPOSITE STEEL 11) ANGLE OF SKEW FOR FOUNDATION - 13° (PARALLEL TO TRACK.)
1800
1800
1800
4500 4500 9000
GIRDER 36M SPAN SCALE 1:20 12) MINIMUM VERTICAL CLEARANCE FROM RAIL LEVEL TO BOTTOM OF GIRDER SHOULD NOT BE LESS THAN
LOGITUDINAL SECTIONAL ELEVATION 'A-A' ( AS PER RDSO DRG.No. RDSO / B-11775)
AS PER IRSOD - 2004.
13) FOR INSPECTION AND MAINTENANCE OF BEARINGS, INSPECTION PATHWAY TO BE MADE AT THE LEVEL
SCALE 1:100 FOOTING BOTTOM LEVEL FOOTING BOTTOM LEVEL
LVL.+286.937M LVL.+286.937M OF PIER CAP AS PER RDSO STANDARD GUIDELINES BS-113.
CROSS SECTION OF PIER 14) PROTECTIVE SCREEN ON BOTH SIDE OF CARRIAGEWAY SHOULD BE PROVIDED AS PER RDSO
N
0 7800 CR
CH:5 STATIO
SSIN RER BG
CR 17) NO CONSTRUCTION JOINTS SHALL BE ALLOWED IN CONCRETE WORK UNLESS IT IS SPECIFIED IN DETAIL
ROW ROW ROW
P1 CR
MP
ROW
m
ROW ROW ROW ROW
KM11
CR
SANDHU
87/500
3900
CR
ROW
18) STRIP SEAL EXPANSION JOINTS SHALL BE PROVIDED AS PER LATEST MORTH STANDARDS.
CR
UM
G
CR
BH1 CR
CR 19) MASTIC ASPHALT WEARING COATS OF THICKNESS 25MM OVER 40MM BITUMINOUS SHALL BE PROVIDED
CR
P2
NEW
CR
CR
AS PER MORTH STANDARDS.
RLY CR
CRO
.BO CR
CR
20) EXCAVATION OF FOUNDATION SHALL BE DONE ONLY IN PRESENCE OF RAILWAY AUTHORIZED
UND
CR
CR
CR
CR
ARY REPRESENTATIVES TO ENSURE THE SAFETY OF RUNNING TRAINS. PROPER PRECAUTIONS SHALL BE
NW
E
N
191 328
OUNDARY
6339 1 2 14 TAKEN DURING EXCAVATION OF FOUNDATION NEAR THE EXISTING RAILWAY TRACK. IF THE DEPTH OF
W E
MP
CR
CH:53 EXCAVATION IS MORE THAN 1M, PROPER SHORING AND SHUTTERING TO BE PROVIDED AS PER PARA
DHU
13° SKE 137 500m
W 02
SAN
6339
TO ITWARI
SRJ
SE
ALL
ALL
SW NO. 403 OF INDIAN RAILWAY BRIDGE MANUAL.
0
ANGLE ROW
T
T
/ UMRED
RAILWAY B
0
S
P1 P2
STAR
STAR
123
21) THE LAUNCHING AND SHUTTERING DRAWING SHALL BE APPROVED BY CBE OF S.E.C RAILWAY.
REW
REW
ROW
ROW
6339 22) STRUCTURAL FABRICATION STEEL CONFIRMING TO IS: 2062 -2011,HSFG BOLT CONFIRMING TO
C/C BEARING 36000(SK)
C/C IS:4000-1992 , AND RDSO BS-111 (LATEST REVISION) SHALL BE FOLLOWED.
BEA 6339
[35077(SQ)] RIN
TO TILAK PUTLA 1750 1750 [350 G 3 6
23) PREFERABLY TWO GIRDERS SHALL BE LAUNCHED AT A TIME BY SUITABLE CRANE. IN CASE SINGLE
TO NAGPUR HIGHWAY 77(S 000(SK GIRDER IS LAUNCH DUE TO SITE CONDITION THEN CLAMPING ARRANGEMENT SURROUNDING THE
KM11
500500
CRASH BARRIER Q)] ) 87/400
900
RE WALL
SHY DISTANCE PEDESTALS FOR LATERAL SUPPORT OF GIRDER TO BE MADE.
24) S & T STAFF SHOULD BE INFORMED PRIOR TO START OF EARTH WORK.
C.L.OF GIRDER
13° SKEW
ROW
25) THE STRUCTURAL DRAWING AND DESIGN SHOULD BE PROOF CHECKED BY IIT/NIT BEFORE SUBMITTING
5300 7800 7800 ROW
2500
ANGLE RE WALL ROW
TO RAILWAY.
26) JPO NO. SECR/S&T/POLICY/889, DATED 05.07.2013 FOR JOINT PROCEDURE FOR UNDERTAKING OF WORK
IN THE VICINITY OF CABLES TO BE ENSURED STRICTLY BY ENGG. DEPARTMENT.
C.L.OF GIRDER CH:53 27) PROVISION OF S&T SUB ESTIMATE MUST BE KEPT IN MAIN ENGG. ESTIMATE .
400m
RAILWAY BOUNDARY 32814(SK) 28) TVU - 14370 AS ON SEPT -2018 AND CLASS OF LEVEL CROSSING - 'C' CLASS (MANNED).
2500
[31973(SQ)]
C/L OF CARRIAGEWAY
RROW +290.281 M
29) NUMBER OF LANE - 02
'A' 1608(SK) 5668(SK) 'A' ENLARGE KEY PLAN
8500
RY
30) COMPOSITE STEEL GIRDER RDSO DRAWING NO. RDSO/B-11775 TO BE FOLLOWED FOR 36M SPAN.
DA
[1566(SQ)] [5522(SQ)] [5300(SQ)] [7800(SQ)] [7800(SQ)] [5551(SQ)] [1538(SQ)]
6946(SK) SCALE 1:600 31) OPEN FOUNDATION IS SHOWN IN THE DRAWING, HOWEVER TYPE OF FOUNDATION WILL BE DECIDED AT
UN
BROA 89.975M
12300
BO
EL
THE TIME OF APPROVAL OF STRUCTURAL DRAWING AND DESIGN.
DARY
TURE
C.L.O -1 (B.G.)
URE
F FUT G.)
EXIST TRACK LEV
RY
AY
KM11
.
87/300
K-3 (B
2
ILW
BOUND
2500
Y BOUN
F FU
L .+
TURE
C.L.O -2 (B.G.)
K
RA
ING NA
LV
TRAC
TRAC
W
O
C/L P E TRACK
SED
Y
ROW
NE
F FU
RAILWA
L
E
UNDR
ROW
AY
G
RE WALL
C
RE WALL
O
ROW
U
TRAC
P
C.L.OF GIRDER
RAILW
GA
ROW
RO
ROW
AY BO
ROW
I
U
ROW
↓↓↓
TO ITWAR
/ UMRED
A
ROW
2500
ROW
G
500500
ROW
↓
SHY DISTANCE TO NAGPUR HIGHWAY
ROW
TO T ROW
RAILW
ROW
ILAK ROW
CRASH BARRIER ROW
PUTL 6.0 M WIDE ROW
CH:5330
↓
ROW
A SER
V
ROW 0 m
1500
ROW
FOOTPATH ROW
WID ROA
D ROW
1400
ROW
E SE 2515 ROW
ROW RVIC 69
E RO ROW
5300 7800
↓
CRASH BARRIER ROW
AD ROW 7800
ROW
ROW P1
↓
ROW
00
300
ROW
BH1 KM1187/2
266
TO TILAK PUTLA
↓
C/C BEARING 36000(SK)
ROW
ROW
RLY
.BO
UND
P2 00
TEM ARY
↓
[35077(SQ)] POR ROW 191
12
328
14
TEM
Y
6339
TO BHIVAPUR
ARY ROW
DAR
13° SKEW 137
02 POR
/NAGHBIR
6339
ROA
00
ANGLE
ROW ROW
ARY LEGEND :
123
D DI ROW 6339 ROW
ROA
OUN
VER C/C
BEA ROW
D DI
SION 6339
↓
RIN
[350 G 3600
77(S 0(SK
ROW
VER
SION
B
Q)] )
1. EXISTING WORK SHOWN IN BLACK.
↓
ROW
Y
ROW
WA
6.0 M ROW
↓
ROW
5300 7800 7800
2. PROPOSED ROB SHOWN IN RED.
ROW
00
WID
RAIL
ROW ROW
E SE
Y
PLAN
258
↓
ROW ROW
RVIC
BOUNDR
ROW
E RO
ROW 3. FUTURE TRACK SHOWN IN GREEN
ROW
ROW
6.0 M 25359 AD
FUTURE TRACK 3
SCALE 1:100 ROW
WID 7
ROW
4. RAILWAY BOUNDARY
E SE TO N
FUTURE TRACK 2
FUTURE TRACK 1
ROW W
RO
R ROW
VICE AGP 5. EXISTING RAILWAY N.G. TRACK TO BE DISMANTLE.
UR H
RAILWAY BOUNDRY
W
RO
ROW
ROA
↓
Y
IGHW
BROAD
D
RAILWA
ROW CH:53200m
ROW OWR
6. TEMPORARY WORK SHOWN IN GREEN
ROW ROW ROW AY
↓
W
RO
7. PROPOSED TRACK SHOWN IN RED
↓
W
RO
↓
W W
RO RO
C/L OF PROPOSED
ROW ROW ROW ROW
PROPOSED CONSTRUCTION OF 2 LANE
W
RO
↓
CR
RO
W
RO
GAUGE
1187/3 (PROJECT CH. 53262M)
81 M
RO
W
RO
TRACK LEVEL+290.2
W
EXISTING NARROW
RO
W
FILLING
291.012M 0.000 M
291.816M 0.801 M
292.483M 1.468 M
293.150M 2.135 M
293.817M 2.802 M
294.484M 3.469 M
295.151M 4.136 M
295.818M 4.803 M
296.485M 5.470 M
297.152M 6.137 M
297.819M 6.910 M
298.486M 8.094 M
298.486M 7.816 M
297.819M 6.636 M
297.152M 5.917 M
296.485M 5.201 M
295.818M 4.486 M
295.151M 3.970 M
294.484M 3.568 M
293.817M 2.930 M
293.150M 2.263 M
292.483M 1.596 M
291.816M 0.929 M
289.955M 0.000 M
C/C OF BEARING 36900(SK)
/NAGHBIR
290.487 298.486M 7.999M
IN M
[35954(SQ)]
REWALL START
REWALL START
298.486M
ROAD TOP
LEVEL
CH:53100m KM1187/000
GROUND
CH. -251.569 291.012
291.015
291.015
290.909
290.392
289.237
290.670
291.183
291.235
291.284
291.332
291.181
290.916
290.887
290.887
290.887
290.887
289.955
LEVEL CR
GOVERNMENT OF SOUTH EAST CENTRAL
MAHARASHTRA RAILWAY / NAGPUR
PROP.TRACK
CH. -22.470
CH. -47.439
CH. -27.439
CH. -20.720
CH.105.627
CH.125.627
CH.145.627
CH.165.627
CH.185.627
CH.205.627
CH.225.627
CH.253.597
CH. -87.439
CH. -67.439
CH.17.030
CH.15.280
CH.25.627
CH.45.627
CH.65.627
CH.85.627
CONSTRUCTION
CH. 0.00
CHAINAGE
CHIEF ENGINEER
PWD / NAGPUR
LONGITUDINAL SECTION OF ROAD
(H.P TRIPATHI)
P1 CE/CON/NGP
8500 KEY PLAN S.E.C.RAILWAY, NAGPUR
6/900
KM118
500 7500 500
290.200 (0.00m) SUPERINTENDING ENGINEER
YELLOWISH COLOUR SILTY CLAY SOIL SCALE 1:1500 PWD / NAGPUR
289.700 (0.50m)
00m
CH:530
300mmTH.APPROACH 2.5% 2.5%
500 WHITE COLOUR QUARZITE BOULDER
SLAB (M-30) WEARING COAT CR
COURSE 250mm TH. REDDISH / BROWNISH COLOUR SAND EXECUTIVE ENGINEER Dy.CE CON-1/NGP
PWD / NAGPUR S.E.C.RAILWAY,NAGPUR
FACIA CONCRETE 287.200 (3.00m)
PANEL
500
VARIABLE
300
REDDISH COLOUR GRANITE ROCK
WIDTH OF EXISTING OUTSIDE L.C. GATE : 14.80M
MRIDC / NAGPUR
GL GL
VILLAGE ON WEST : TITAL PUTLA CORPORATION LIMITED
100