PILE CAP TYPE -PCT 1 PILE CAP TYPE -PCT 3 1. ALL STRUCTURAL DRAWINGS SHALL BE READ IN
(T1) CONJUNCTION WITH CORRESPONDING
2 (B1) ARCHITECTURAL DRAWINGS.
1 1 2. ALL PLAIN AND R.C.C. CONSTRUCTION SHALL
E G
CONFIRM TO IS 456 : 2000.
B
SFR RING GROUND LEVEL GROUND LEVEL 3. SEISMIC ZONE III IS CONSIDERED.
A B C D F H I J COLUMN T8@200 C/C GROUND LEVEL (SFR) (T1) (SFR) (T2) 4. DISCREPANCY IF ANY SHALL BE BROUGHT TO THE
500
500
(T1)
150THK PCC VERTICAL (SFR) (SFR)
500
4930 2615 2935 2350 3583 2628 4919 (SFR) NOTICE OF CONSULTANT BEFORE EXECUTION OF
L T16 - 8 NOs (SFR) WORK.
EL.BOP EL.
52
0
52
0 2 600 Ø PILE EL. 5. IN CASE OF SUBSTANTIAL CHANGE IN LOADING
(D)
900 5375 900
D
20 20 150 BOP BOP
19 19 MASTER RING PATTERN STRUCTURAL CONSULTANT ARE TO BE
1200 PILE CAP PLAN TYPE -PCT 1
80
1200 3000
80
80
T8@1000 C/C REFERRED.
Z1(END)
SCALE-1:150 150 150
(B1)
SECTION B-B (B1) (SFR) (B2) (SFR) 6. EXPOSURE CONDITION ADOPTED IS SEVERE
572
2019
2019
150THK PCC
520
520
SCALE-1:50 600 Ø PILE 600 Ø PILE 7. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS
2400
2400
9 1200 1200
C4 C5 C6 C7 OTHERWISE SPECIFIED.
C3
C8 SECTION 5-5 SECTION 6-6 8. GRADE OF CONCRETE MIX SHALL BE M 30 MACHINE
8 19 19 SCALE-1:150
Z1(END) Z2(CEN.T)
20 C9 C10 20 GROUND LEVEL B B SCALE-1:150 MIXED & VIBRATED.
52 (T1) (T1)
0 52 9. REINFORCEMENT SHALL BE TMT BARS OF GRADE
(SFR) 6
500
PC4 0 PC7 (SFR)
PC3 PC8 (B1)
4993
4068
900 2400 900 Fe:500D CONFORMING TO IS1786 :1985
2400
2710
D
HARD ROCK SHALL BE AS UNDER (a) FOR FOOTING = 60 mm
80
7 150
(b) FOR COLUMN = 50 mm
C11 C12
(T2)
3D
(SFR) (B1) 11. LAP LENGTH IN REINFORCEMENT BARS SHALL BE
2400
2400
2400
2400
6 (B2) 50TIMES THE DIA OF BARS.
B
150THK PCC
C14 C17 SFR 12. NOT MORE THAN 50 % OF MAIN STEEL SHOULD BE
C13 C15 C16 C18 SECTION 1-1 5 5
SCALE-1:150 SECTION 2-2 CUT/SPLICED AT ANY SECTION.
SCALE-1:150 13. DESIGN IS SUITABLE FOR G+5 STORY AS PER
3020
900
5 TYPE NO MARK L B D MINIMUM SOCKETING IN WEATHERED ROCK IS 1800
C19 C20 C21 BOTTOM(B1) TOP(T1) LEG DIA SPACING SCALE-1:150
C22
1265
MM
PC19 PC22 PCT 1 PC3 C3 2-600 DIA 2400 900 900 T16,9 NOS T12,9 NOS 4 T8 200 C/C 3-T10 PILE CAP SCHEDULE (M30:Fe500)
PC20 PC21
4 PCT 1 PC8 C8 2-600 DIA 2400 900 900 T16,9 NOS T12,9 NOS 4 T8 200 C/C 3-T10
2400 2400 DIMENSIONS REINFORCEMENT
C23 C24 C25 C26 PCT 1 PC13 C13 2-600 DIA 2400 900 900 T16,9 NOS T12,9 NOS 4 T8 200 C/C 3-T10 PILE CAP PILE CAP COLUMN PILES
1315
MAIN STEEL ALONG (L) MAIN STEEL ALONG (B) STIRRUPS(S) SPACING SFR
PCT 1 PC18 C18 2-600 DIA 2400 900 900 T16,9 NOS T12,9 NOS 4 T8 200 C/C 3-T10 TYPE NO MARK L B D
BOTTOM(B1) TOP(T1) BOTTOM(B2) TOP(T2) LEG DIA ALONG ALONG
900
900
3 PC23 PCT 1 PC19 C19 2-600 DIA 2400 900 900 T16,9 NOS T12,9 NOS 4 T8 200 C/C 3-T10 LENGTH WIDTH
C27 PC24 PC25 PC26 C30 PCT 1 PC22 C22 2-600 DIA 2400 900 900 T16,9 NOS T12,9 NOS 4 T8 200 C/C 3-T10 PCT 3 PC14 C14 4-600 DIA 2400 2400 900 T20,21 NOS T10,20 NOS T20,21 NOS T10,20 NOS 2 T8 200 C/C 200 C/C 3-T10 PILE DATA
PC27 C28 C29 PC30
PCT 1 PC27 C27 2-600 DIA 2400 900 900 T16,9 NOS T12,9 NOS 4 T8 200 C/C 3-T10 PCT 3 PC17 C17 4-600 DIA 2400 2400 900 T20,21 NOS T10,20 NOS T20,21 NOS T10,20 NOS 2 T8 200 C/C 200 C/C 3-T10
900 520 900 PILE DIA 600 MM.
2880
2400 PC28 PC29 PCT 1 PC30 C30 2-600 DIA 2400 900 900 T16,9 NOS T12,9 NOS 4 T8 200 C/C 3-T10 PCT 3 PC32 C32 4-600 DIA 2400 2400 900 T20,21 NOS T10,20 NOS T20,21 NOS T10,20 NOS 2 T8 200 C/C 200 C/C 3-T10
PCT 1 PC31 C31 2-600 DIA 2400 900 900 T16,9 NOS T12,9 NOS 4 T8 200 C/C 3-T10 PCT 3 PC35 C35 4-600 DIA 2400 2400 900 T20,21 NOS T10,20 NOS T20,21 NOS T10,20 NOS 2 T8 200 C/C 200 C/C 3-T10 PILE MARK
20
19
PCT 1 PC36 C36 2-600 DIA 2400 900 900 T16,9 NOS T12,9 NOS 4 T8 200 C/C 3-T10
19
20
2400
2400
2400
2
C32 C35 MAX. LOAD ON PILE
C31 C33 C34 C36
PILE CAP TYPE -PCT 2
52
0
52
0
2019 520
PC33
PC32 PC34 PC35
PC36 4 (T2)
3775
20
19
19
1316
(T2) (T1) (T2)
1
1
20
20
GROUND LEVEL
(B1)
9
9
(d) (d)
(SFR)
500
(SFR)
2019
2539
2019
(SFR)
520
520
1 EL.
C37 C38 C1 C2 C39 C40 3 3 BOP
EL.
0
883
52
52
D
52
52
COLUMN BOP
19
0
0
19 20
2019 PC37 20 2019
80
80
PILE LEGEND 52 52
0 PC1 PC2 0 150THK PCC
PC38 PC39 PC40 (B1) (B2)
150
(B1) (d)
150
(d)
PILE DIA PILE MARK PILECAP LAYOUT PLAN 4 150THK PCC 150THK PCC (B2)
SCALE-1:100 2019 SECTION 3-3 SECTION 4-4
600 SCALE-1:100 SCALE-1:100
PILE CAP PLAN TYPE -PCT 2
SCALE-1:150
E G (SFR) (SFR)
(d) (d)
(SFR) SHORT BEAM (SFR)
A B C D F H I J
(B2) (T2)
4930 2615 2935 2350 3583 2628 4919 (B1) (T1)
P5 P6 P8 BOTTOM STEEL PLAN OF PILE CAP TOP STEEL PLAN OF PILE CAP
750
1500
1500
9
1500
1500
SCALE-1:150 SCALE-1:150
C4 P15 C7
925
C5 C6
PILE CAP SCHEDULE (M30:Fe500)
C3 P4 C8
8 P2 P17
2047
1500
BOTTOM(B1) TOP(T1) BOTTOM(B2) TOP(T2) BOTTOM (d) TOP(d) LEG DIA SPACING
678
750
1500
1500
1500
6
433
C14 C17
C13 C15 C16 C18 T20,14 NOS T12,14 NOS T20,14 NOS T12,14 NOS 12@200C/C 12@200C/C 2 T8 200 C/C
P24 P31 P32 P33 PCT 2 PC7 C7 3-600 DIA * * * *
3-T10
P25 P26 P27 DRAWING NO. : D137/LOT-I/VR/QTR-TYP-II /001/R0 (SHEET 1/7)
P19 P21 1475 1500 1500 1500 PCT 2 PC20 C20 3-600 DIA T20,14 NOS *
T12,14 NOS *
T20,14 NOS * T12,14 NOS * 12@200C/C 12@200C/C 2 T8 200 C/C 3-T10
P23
3020
WESTERN RAILWAY
34
750 1665 PCT 2 PC24 C24 3-600 DIA REFAR T20,14 NOS *
T12,14 NOS *
T20,14 NOS T12,14 NOS 12@200C/C 12@200C/C 2
* *
T8 200 C/C 3-T10
00
15
1500
1500
4 PCT 2 3-600 DIA T20,14 NOS T12,14 NOS T20,14 NOS * T12,14 NOS * 12@200C/C 12@200C/C 2 T8 200 C/C
1
PC29 C29 * *
3-T10
550 C23 P47 C26 1500
P52
1315
P46
0
57
3
0
P60
C27 P61 C30
C28 P62 C29 P63 PCT 2 PC38 C38 3-600 DIA T20,14 NOS *
T12,14 NOS *
T20,14 NOS * T12,14 NOS * 12@200C/C 12@200C/C 2 T8 200 C/C 3-T10
P41 PILE CAP & COLUMN RCC DETAILS
1500 P42 1500 PCT 2 PC39 C39 3-600 DIA T20,14 NOS *
T12,14 NOS *
T20,14 NOS * T12,14 NOS * 12@200C/C 12@200C/C 2 T8 200 C/C 3-T10
1497
2880
3000
1500 PCT 2 PC40 C40 3-600 DIA T20,14 NOS *
T12,14 NOS *
T20,14 NOS T12,14 NOS
* *
12@200C/C 12@200C/C 2 T8 200 C/C 3-T10
P72 P76
P66 P68 P82
P70 P78
15
P80
0
15
C33 C34
1500
1500
1500
500
(SFR)
P85 15
15 P94 0 0
P88 00 P91 15
0 P100 EL. EL.
15
D
D
0 P97 BOP BOP
866
00
00
P93
15
1500
P99
1500
1500
1500
1500
150 150
433
1
C37 C38 P96 C39 C40 (SFR) (B2) (B1) (B1) (SFR) (B2)
P90 P92 C1 C2 P101 150THK
P86 1500 P87 P98 150THK PCC 600 Ø 600 Ø PILE
P95 PILE PCC
P89
SECTION 7-7 SECTION 8-8 MUMBAI RAILWAY
SCALE-1:150 SCALE-1:150
PILE LAYOUT PLAN VIKAS CORPORATION
SCALE-1:100 (T1)
8 (B1)
PROOF CHECKED BY
SCALE-1:150
(T2)
(B2) PILE CAP SCHEDULE (M30:Fe500)
V. S. WADEKAR
DIMENSIONS REINFORCEMENT
B
8
COMBINED PILE CAP PLAN TYPE -PCT 4
SCALE-1:150 SPE / MRVC