MOVES AHEAD
The rapid pace of National Highway development in
Andhra Pradesh has ensured seamless connectivity with
neighbouring states. Before the formation of the State
of Telangana, the total length of National Highways in
Andhra Pradesh was 7,087 km. New and in principle
NH of length 2,746 km have been added in the past
four years. At present, the total length of NH in current
Andhra Pradesh is 7,118 km.
7,118 km
NH LENGTH
BEFORE BIFURCATION
UNITED ANDHRA PRADESH
UPTO YEAR 2014
7,087 km
Adding new
National Highways
in Andhra Pradesh
2,746 km
2,550 km
6
Construction of roads
in Andhra Pradesh
1,458 km
1,457 km
7
Road Projects
awarded in Andhra Pradesh
Before Bifurcation
United Andhra Pradesh
Present Andhra Pradesh
Upto Year 2014 Upto Year 2018
2,356.19 km 2,921.67 km
8
Accelerated NH Development
under Central Road Fund (CRF)
in Andhra Pradesh
Before Bifurcation
United Andhra Pradesh Present Andhra Pradesh
Upto Year 2014 Upto Year 2018
62 135
Projects
Projects
9
Landmark Projects
in Andhra Pradesh
Amaravati- Anantapur Expressway
A 6 lane access controlled Greenfield Expressway,
spanning 598.83 km has been proposed in Andhra
Pradesh. It will connect the new State capital
Amaravati to Anantapur. Running parallel to a
railway line, the Expressway will traverse through
Guntur, Prakasam, Kurnool, Kadapa and Anantapur
districts with interlinking roads to Chennai,
Hyderabad and Bengaluru. To be built as a straight
road with no twists or turns, it will support 120
km per hour speed limits and will be upgraded to
8 lanes in future. Kadapa and Kurnool Feeder roads
will intersect the Expressway. DPR is being prepared
and land is being acquired for this project.
At a Glance
33 Major 4 Railway 14
bridges Over Bridges Interchanges
Benefits
• Will give a boost to the industrial sector
• Will open new opportunities for the people
10
Kanaka Durga Flyover project
The project envisages 4 laning of 5.122 km of new
NH-65 from Bhavanipuram to Kanakaghudhamma
Vardhi in Vijayawada City. So far, over 60% of the
work is completed. Balance work is under progress
and likely to be completed by 2019.
At a glance
Benefits
• Will provide better connectivity
• Will help in decongesting the city
• Will boost tourism
• Will create new socio economic opportunities
for the people
• Will result in overall development of the State
11
Kathipudi – Ongole Corridor
An important economic corridor spanning
364 km on NH 216 is being developed in 9
packages worth a total of Rs. 3633 Cr. Likely
to be completed by the end of 2018, it will
create massive socio economic transformation
through improved coastal connectivity with
the districts of East Godavari, West Godavari,
Krishna, Guntur and Prakasam.
At a glance
364 km Rs. 3633 Cr 9
length total cost packages
12
Ongoing projects of MoRTH in Andhra Pradesh
Sl. Lok sabha Project Name NH No Sanctioned Total Date of Likely
No. constituency (New) Cost / TPC Length Start date of
(Rs Cr) in km completion
Rehabilitation and
upgradation from
Mudigubba to
Anantapur District
1 Hindupur 42 266 68 Jun-15 Nov-18
Border Section to 2 lane
with paved shoulders
including 4 laning in
urban town limits
Rehabilitation and
upgradation of A.P
Border Anantapur
2 Anantapur section to 4 lane 42 235 70.79 Jan-15 Nov-18
with paved shoulders
including 4 lane in
Anantapur town limits
Reconstruction of Minor
3 Hindupur Bridges of Anantapur- 42 12.63 1 Feb-15 Dec-18
Chennai road
Construction of High
Level Bridge across
4 Anantapur 42 19.47 1 Jul-15 Dec-18
Chitravathi river of
Anantapur-Chennai Road
Rehabilitation and
upgradation of
Karnataka/ Andhra
5 Anantapur 67 669 57 Jun-16 Oct-18
Border to Gooty section
to 4 lane with paved
shoulder
Rehabilitation and
Upgradation Palamaneru
6 Chittoor to Krishnagiri Border 42 271 81 Oct-15 Dec-18
Section to 2 lane with
paved shoulders
Rehabilitation and
Upgradation from
Chittoor &
7 Chittoor - Kurnool Road 40 135 37.5 Oct-16 Dec-18
Rajampat
to 2 lane with paved
shoulders
Rehabilitation and
upgradation from
Chittoor &
8 Madanapalli-Punganuru- 42 373 55 Feb-17 Jan-19
Rajampat
Palamaneru Section to 2
lane with paved shoulder
Rehabilitation and
upgradation from Pileru
to Rayachoty section
9 Rajampet 40 175 51.85 Sep-15 Dec-18
to 2 lane with paved
shoulders including 4
laning in Pileru, Vidhy
Rehabilitation and
upgradation from
Kathipudi to start of
10 Kakinada 216 313 28 May-16 May-18
Kakinada bypass section
to 4 lane with paved
shoulders
Rehabilitation and
upgradation of
Gurajanapalli village -
11 Amalapuram Polekuru village section 216 348.9 50.38 Oct-16 Sep-18
and Komaragigi-
Pasarlapudi section to 2
lane with paved shoulder
Construction of
Timmapuram-
12 Kakinada Grajanapalli section 216 351 19.23 May-17 Aug-18
(Kakinada bypass) to 2
lane with paved shoulder
13
Ongoing projects of MoRTH in Andhra Pradesh
Sl. Lok sabha Project Name NH No Sanctioned Total Date of Likely
No. constituency (New) Cost / TPC Length Start date of
(Rs Cr) in km completion
Construction of 2 lane
13 Amalapuram with paved shoulder 216 132.05 20.82 Sep-17 Sep-19
from Pasarlapudi-Dhindi
Construction of High
level Bridge across
River Sileru including
14 Araku widening to 2 lane and 326 23.13 0.29 Dec-16 Jun-18
improvement of Chintur-
Motu Road in East
Godavari District
Rehabilitation &
Upgradation of Losari
15 Machilipatnam to Machavaram Section 216 288 49 Oct-16 Jul-18
to 2 lane with paved
shoulder
4 laning including 6
lane Elevated flyover
16 Vijayawada from Bhavanipuram 65 282 5.12 Dec-15 Dec-18
to Kanakadurgamma
Varadhi
Rehabilitation and
upgradation of
17 Machilipatnam Machilipatnam to 216 376 34.4 Aug-17 Aug-19
Avanigadda section to 2
lane with paved shoulder
Rehabilitation
and upgradation
of Mudigubba to
Ananthapuramu District
18 Nellore 67 330 45 Feb-15 Dec-18
Border Section to 2 lane
with paved shoulders
including 4 laning in
urban town limits
Construction of 4 lane
bypass to Vizianagaram
19 Vizianagaram 26 429 17 Nov-17 Nov-19
Town (Raipur-
Vizianagaram section)
Rehabilitation and
Up-gradation of Dhindi
- Digamarru section
21 Narasapuram 216 243 42.12 Nov-16 Jul-18
and Digamarru -Losari
section to 2 lane with
paved shoulder
Construction of 4 lane
22 Kadapa ROB Chittor - Kurnool 40 64 1 Oct-16 Sep-18
road
Widening and
Strengthening
of Muddanur to
Jammalamadugu
23 Kadapa section to 2 lane 67 144 32 Aug-15 Dec-18
with paved shoulder
including 4 laning in
Jammalamadugu town
section
14
Ongoing NHAI projects in Andhra Pradesh
NH Project Likely
Sl. Lok sabha Length
Project Stretch No. Cost Start Date date of
No. constituency in km
(New) (Rs Cr) completion
AP / TN border to
1 Chittoor 69 306 37.11 Nov-17 Nov-19
Nalagampalli
Nalagampalli to AP /
2 Chittoor 69 503 47.68 Nov-17 Nov-19
Karnataka Border
Appointed
Giddalur-
3 Ongole 544D 678.69 112.8 Date -
Vinukonda
Pending
Kadapa, Nandyal, Kudapa-Mydukur-
4 40 1585 188.752 Nov-10 Dec-18
Kurnool Kurnool
6 Laning of dedicated
Appointed
Port road to
5 Nellore & Ongole - 254.43 18 Date -
Krishnapatnam
Pending
Port (Package-I)
Eluru & Appointed
Gundugolanu -
6 Rajamahen- 16 1827 69.88 Date -
Devarapalli - Kovvuru
dravaram Pending
Appointed
7 Chittoor, Tirupati Chittor - Mallavaram 40 1730.07 61.13 Date -
Pending
Nandigama Bypass &
8 Vijayawada Kanchikacherla 65 262.93 14.34 Mar-18 Jun-19
bypass
Vijayawada,
Vijayawada -
9 Machili- 65 740.70 64.61 Nov-16 Nov-18
Machlipatnam
patnam
Vijay- Appointed
Narasannapeta-
10 nagram, 16 1350 54.2 Date -
Ranastalam
Srikakulam Pending
Visakha- Appointed
Visakhapatnam
11 patnam 16 549 12.7 Date -
Port Road
Urban Pending
Appointed
Ichapuram -
12 Srikakulam 16 439 110.28 Date -
Narasannapeta
Pending
Visakha-
patnam,
Ranastalam -
13 Vizia- 16 1187 47 Nov-17 May-20
Anandapuram
nagaram,
Srikakulam
Visakha- Appointed
Anandapuram
14 patnam 16 2013 50.78 Date -
Pendurthi Anakapalli
Rural Pending
15
In-Principle declared NH in Andhra Pradesh
Sl. Stretch Tentative
No. Length (km)
As on
30/11/2017
7 Bhadrachalam(on NH-30) (Telengana) - Telangana/ Andhra Pradesh 80.00
border- Jeelugumilli- Jangareddygudam- Devarapalli- upto Rajamundary
on NH-16 ( Length in AP= 80km, Telengaana= 68km)
8 Bhimavaram on NH 165 -Tadapallegudem on NH-16 32.00
9 Rajajmundry on NH16 -Rampachodavaram- Koyyuru - Chintapalli - 440.00
Lamasingi - Paderu - Araku - Srungavarapukota - Vizianagram on NH 26
(25 Km stretch from near Chinta
10 Stretch from Kuppam on NH42 (Andhra Pradseh) -Kolar on NH-75 25.00
(Karnataka) (Length in AP = 25km, Karnataka=40km)
11 Madakasire-Rolla (AP/Karnataka border)-Sira in the State of Karnataka 38.00
(Total length= 67 km; Andhra Pradesh= 38 km; Karnataka= 29 km)
12 Muddanur (on NH 67) - Kadapa 54.00
13 Narsaraopet-Chilakaluripeta 20.00
14 Patchur (on NH 46, TN)-Kuppam 22.00
15 Stretch from junction with NH-216 near Narsapuram-Sakhinetipalli- 23.00
Malikapuram upto junction with NH-216 near Razole alongwith
construction of new bridge between Narsapuram and Sakhinetipalli (380
meters long across Vasistha Godavari River)
16 Palsa on NH-16 upto A.P / Odisha Border- Parlakhemundi-Ramanaguda- 23.00
Bissamcuttak-Muniguda-Bhabanipatna-Kharial-Bangomunda-Patnagarh-
Padmapur-Chhattisgarh Border
17 Stretch from Suryapetat NH-65- Khammam- Ashwarapet- Rajahmundry ( 92.00
Length in Telangana=177 km; Andhra Pradesh= 92 km)
18 From junction of NH- 69 near Chintamani connecting Chelur, Rayacheruvu 15.00
in the state of Karnataka up to junction of NH- 42 near Tanakal in the state
of A.P (length in Karnataka= 55 km; Andhra Pradesh = 15 km)
19 From junction of NH- 48 near Chitradurga connecting Chelkere, Pavagada 26.00
in the state of Karnataka and terminating at its junction of NH-44 near
Penukonda in the state of Andhra Pradesh (length in Karnataka= 120 km;
Andhra Pradesh = 26 km)
20 From Junction of NH-150A near Molakalnuru- Rayadurg - Anantpur at 110.00
junction at NH-44 (length in Karnataka= 14 km; Andhra Pradesh = 110 km)
21 Tumkur-Kortatagere -Pavagada - Kalyandurg - joining up at Veparalla 49.00
(length in Karnataka= 116 km; Andhra Pradesh = 49 km)
22 Gooty connecting Pathikonda, Adoni, Madire, Hanaval, Kunthanahai, 135.00
Upparahal, Kowthalam, Urukunda, Halvi, Kumbalanuru, Manvi in the State
of Karnataka (length in Andhra Pradesh-135.00 km, Karnataka-15.00 km)
23 Junction with NH-167 near Anjaneya Temple Swamy in the Andhra Pradesh 2.00
to Ballery in the State of Karnataka (length in Andhra Pradesh= 2.00 km,
Karnataka=26.00 km)
Sub Total 1814.00
24 Vijayawada Bypass 12.60
25 Pondugala - Gamalapadu 11.30
26 Challagundla - Elchuru 31.40
27 Elchuru - Addanki 31.80
28 Addanki - Medarametla 12.40
29 Puttur - Janappanchatram 78.90
Sub Total 178.40
30 Malkangiri on NH 326- Chintapalle- Narsipattanam- Waddadi- 165.00
Chodavaram- Sabbavaram (Total length=233 km; Andhra Pradesh= 165 km;
Odisha= 68 km)
Sub Total 165.00
Total 2157.40
16
Key Indian National Highways
SRINAGAR
Jammu
Jalandhar
DELHI
Gurgaon
Jaipur Agra Lucknow Gorakhpur
Ajmer Muzaffarpur
Gwalior Kanpur
Allahabad Guwahati
Jhansi Purnea
UdaipurShivpuri Varanasi SILCHAR
Barhi
Ahmedabad Panagarh
Rajkot Vadodara Lakhnadon Kharagpur KOLKATA
PORBANDAR Surat
Nagpur
Bhubaneshwar
MUMBAI
Pune
Satara Hyderabad Vishakhapatnam
Arabian Sea
Eluru Vijayawada
Belgaum LEGEND
Chilakaluripet
Golden Quadrilateral
Tumkur
Hosur CHENNAI
Bangalore Ranipet North South Corridor
Selam Krishnagiri
Bay of Bengal East West Corridor
COCHIN Madurai
Lakshadweep
KANYAKUMARI
Indian Ocean
17
National Highways - India Story
Fast tracking National Highway Development
NH LENGTH
NH LENGTH
91,287 km 1,26,350 km
Yr 2010-2014 Yr 2014-2018
New NH
34,391.5 km
+
In principle NH length
51,980 km
New NH
Total
20,353.2 km
86,371.5 km
18
National Highways - India Story
22.5
km
16.6 2017-2018
km
12 2015-2016
km
2016-2017
2 3 2 3
km km km km
2014-2015
2013-2014
2012-2013
2010-2011 2011-2012 Rate of Highway
construction per day
Construction of roads
Rs. 3 lakh Cr worth investments in the road sector in 4 years
Significant growth of 158%
Yr 2014 - 2018
Total Cost
Rs. 1.16 lakh Cr
Total Cost
Rs. 3 lakh Cr
19
National Highways - India Story
Accelerated NH development
under Central Road Fund (CRF)
Significant increase of 207.6% in cost of CRF
works sanctioned for the upgradation & improvement
of roads /bridges in the Nation
2,876
Yr 2010 - 2014
Projects
935
Projects
Total Cost
Total Cost
Rs. 8,613.51 Cr Rs. 48,186.57 Cr
Yr 2014 - 2018
20
Transforming India’s Transport Sector
Key initiatives in 2014 -2018
Over the past four years, various smart initiatives on
Indian National Highways have resulted in transparent
processes, last mile connectivity, safer roads, upskilling,
new opportunities and employment for the people.
21
Anti Lock Braking System Model Automated
ensuring vehicle and Centres for checking
passenger safety fitness of vehicles
22