You are on page 1of 24

ANDHRA PRADESH

MOVES AHEAD
The rapid pace of National Highway development in
Andhra Pradesh has ensured seamless connectivity with
neighbouring states. Before the formation of the State
of Telangana, the total length of National Highways in
Andhra Pradesh was 7,087 km. New and in principle
NH of length 2,746 km have been added in the past
four years. At present, the total length of NH in current
Andhra Pradesh is 7,118 km.

30 major works spanning a length of 1,637 km, worth


Rs. 14,506 Cr are in progress. Investments worth
Rs. 1 lakh Cr in total have been planned in the State
for development of National Highways under various
programmes.
“When a network of good roads is
created, the economy of the country
also picks up pace. Roads are veins
and arteries of the nation, which help
to transform the pace of development
and ensure that prosperity reaches
the farthest corners of our nation.”
NARENDRA MODI
Prime Minister
“In the past four years, we have expanded the
length of Indian National Highways network to
1,26,350 km. The highway sector in the country has
seen a 20% growth between 2014 and 2018. Tourist
destinations have come closer. Border, tribal and
backward areas are being connected seamlessly.
Multimodal integration through road, rail and port
connectivity is creating socio economic growth
and new opportunities for the people.
In the coming years, we have planned projects with
investments worth over Rs 6 lakh crore, to further
expand the world’s second largest road network.”
NITIN GADKARI
Union Minister, Ministry of Road Transport &
Highways, Shipping and Water Resources,
River Development & Ganga Rejuvenation
Fast tracking National Highway
development in Andhra Pradesh
NH + IN PRINCIPLE NH LENGTH
IN PRESENT ANDHRA PRADESH
UPTO YEAR 2018

7,118 km
NH LENGTH
BEFORE BIFURCATION
UNITED ANDHRA PRADESH
UPTO YEAR 2014

7,087 km
Adding new
National Highways
in Andhra Pradesh

2,746 km
2,550 km

Before Bifurcation Present Andhra Pradesh


United Andhra Pradesh
Upto Year 2014 Upto Year 2018

NH length New & In principle NH length

6
Construction of roads
in Andhra Pradesh

1,458 km
1,457 km

Before Bifurcation Present Andhra Pradesh


United Andhra Pradesh
Upto Year 2018
Upto Year 2014

Constructed length Constructed length

1,458 km of National Highways have


been built in 4 years

7
Road Projects
awarded in Andhra Pradesh
Before Bifurcation
United Andhra Pradesh
Present Andhra Pradesh
Upto Year 2014 Upto Year 2018

2,356.19 km 2,921.67 km

Total Cost Total Cost


Rs. 2,506.58 Cr Rs. 19,552.93 Cr

Growth of 680% in the awarded cost


of road projects over last 4 years with
investments worth Rs. 19,552.92 Cr

8
Accelerated NH Development
under Central Road Fund (CRF)
in Andhra Pradesh
Before Bifurcation
United Andhra Pradesh Present Andhra Pradesh
Upto Year 2014 Upto Year 2018

62 135
Projects
Projects

Total Cost Total Cost


Rs. 600 Cr Rs. 1,763.5 Cr

Significant increase of 194% in cost


of CRF works sanctioned for the
upgradation & improvement of roads &
bridges in the State

9
Landmark Projects
in Andhra Pradesh
Amaravati- Anantapur Expressway
A 6 lane access controlled Greenfield Expressway,
spanning 598.83 km has been proposed in Andhra
Pradesh. It will connect the new State capital
Amaravati to Anantapur. Running parallel to a
railway line, the Expressway will traverse through
Guntur, Prakasam, Kurnool, Kadapa and Anantapur
districts with interlinking roads to Chennai,
Hyderabad and Bengaluru. To be built as a straight
road with no twists or turns, it will support 120
km per hour speed limits and will be upgraded to
8 lanes in future. Kadapa and Kurnool Feeder roads
will intersect the Expressway. DPR is being prepared
and land is being acquired for this project.

At a Glance

598.83 km Rs. 27,600 Cr 260.09 km


length total cost service road

33 Major 4 Railway 14
bridges Over Bridges Interchanges

10 km Public Green belt


Tunnel amenities

Benefits
• Will give a boost to the industrial sector
• Will open new opportunities for the people

10
Kanaka Durga Flyover project
The project envisages 4 laning of 5.122 km of new
NH-65 from Bhavanipuram to Kanakaghudhamma
Vardhi in Vijayawada City. So far, over 60% of the
work is completed. Balance work is under progress
and likely to be completed by 2019.

At a glance

5.122 km length Rs. 353.43 Cr total cost

Benefits
• Will provide better connectivity
• Will help in decongesting the city
• Will boost tourism
• Will create new socio economic opportunities
for the people
• Will result in overall development of the State

11
Kathipudi – Ongole Corridor
An important economic corridor spanning
364 km on NH 216 is being developed in 9
packages worth a total of Rs. 3633 Cr. Likely
to be completed by the end of 2018, it will
create massive socio economic transformation
through improved coastal connectivity with
the districts of East Godavari, West Godavari,
Krishna, Guntur and Prakasam.

At a glance
364 km Rs. 3633 Cr 9
length total cost packages

150 km stretch of Mydukur to Nellore Section


of NH-67 has been completed as 2-lane NH
with paved shoulder corridor with Rs. 822.73
Cr investments.

4 laning of Andhra Pradesh-Karnataka border


to Gooty section of NH 67 spanning a length of
57 km is in progress with Rs. 995 Cr investments.

12
Ongoing projects of MoRTH in Andhra Pradesh
Sl. Lok sabha Project Name NH No Sanctioned Total Date of Likely
No. constituency (New) Cost / TPC Length Start date of
(Rs Cr) in km completion
Rehabilitation and
upgradation from
Mudigubba to
Anantapur District
1 Hindupur 42 266 68 Jun-15 Nov-18
Border Section to 2 lane
with paved shoulders
including 4 laning in
urban town limits
Rehabilitation and
upgradation of A.P
Border Anantapur
2 Anantapur section to 4 lane 42 235 70.79 Jan-15 Nov-18
with paved shoulders
including 4 lane in
Anantapur town limits
Reconstruction of Minor
3 Hindupur Bridges of Anantapur- 42 12.63 1 Feb-15 Dec-18
Chennai road
Construction of High
Level Bridge across
4 Anantapur 42 19.47 1 Jul-15 Dec-18
Chitravathi river of
Anantapur-Chennai Road

Rehabilitation and
upgradation of
Karnataka/ Andhra
5 Anantapur 67 669 57 Jun-16 Oct-18
Border to Gooty section
to 4 lane with paved
shoulder

Rehabilitation and
Upgradation Palamaneru
6 Chittoor to Krishnagiri Border 42 271 81 Oct-15 Dec-18
Section to 2 lane with
paved shoulders

Rehabilitation and
Upgradation from
Chittoor &
7 Chittoor - Kurnool Road 40 135 37.5 Oct-16 Dec-18
Rajampat
to 2 lane with paved
shoulders

Rehabilitation and
upgradation from
Chittoor &
8 Madanapalli-Punganuru- 42 373 55 Feb-17 Jan-19
Rajampat
Palamaneru Section to 2
lane with paved shoulder

Rehabilitation and
upgradation from Pileru
to Rayachoty section
9 Rajampet 40 175 51.85 Sep-15 Dec-18
to 2 lane with paved
shoulders including 4
laning in Pileru, Vidhy
Rehabilitation and
upgradation from
Kathipudi to start of
10 Kakinada 216 313 28 May-16 May-18
Kakinada bypass section
to 4 lane with paved
shoulders
Rehabilitation and
upgradation of
Gurajanapalli village -
11 Amalapuram Polekuru village section 216 348.9 50.38 Oct-16 Sep-18
and Komaragigi-
Pasarlapudi section to 2
lane with paved shoulder
Construction of
Timmapuram-
12 Kakinada Grajanapalli section 216 351 19.23 May-17 Aug-18
(Kakinada bypass) to 2
lane with paved shoulder

13
Ongoing projects of MoRTH in Andhra Pradesh
Sl. Lok sabha Project Name NH No Sanctioned Total Date of Likely
No. constituency (New) Cost / TPC Length Start date of
(Rs Cr) in km completion
Construction of 2 lane
13 Amalapuram with paved shoulder 216 132.05 20.82 Sep-17 Sep-19
from Pasarlapudi-Dhindi
Construction of High
level Bridge across
River Sileru including
14 Araku widening to 2 lane and 326 23.13 0.29 Dec-16 Jun-18
improvement of Chintur-
Motu Road in East
Godavari District
Rehabilitation &
Upgradation of Losari
15 Machilipatnam to Machavaram Section 216 288 49 Oct-16 Jul-18
to 2 lane with paved
shoulder

4 laning including 6
lane Elevated flyover
16 Vijayawada from Bhavanipuram 65 282 5.12 Dec-15 Dec-18
to Kanakadurgamma
Varadhi

Rehabilitation and
upgradation of
17 Machilipatnam Machilipatnam to 216 376 34.4 Aug-17 Aug-19
Avanigadda section to 2
lane with paved shoulder
Rehabilitation
and upgradation
of Mudigubba to
Ananthapuramu District
18 Nellore 67 330 45 Feb-15 Dec-18
Border Section to 2 lane
with paved shoulders
including 4 laning in
urban town limits
Construction of 4 lane
bypass to Vizianagaram
19 Vizianagaram 26 429 17 Nov-17 Nov-19
Town (Raipur-
Vizianagaram section)

4 laning with paved


20 Vizianagaram shoulders in Raipur 26 84.12 11.62 Feb-15 Dec-18
Visakhapatnam Section

Rehabilitation and
Up-gradation of Dhindi
- Digamarru section
21 Narasapuram 216 243 42.12 Nov-16 Jul-18
and Digamarru -Losari
section to 2 lane with
paved shoulder
Construction of 4 lane
22 Kadapa ROB Chittor - Kurnool 40 64 1 Oct-16 Sep-18
road

Widening and
Strengthening
of Muddanur to
Jammalamadugu
23 Kadapa section to 2 lane 67 144 32 Aug-15 Dec-18
with paved shoulder
including 4 laning in
Jammalamadugu town
section

14
Ongoing NHAI projects in Andhra Pradesh
NH Project Likely
Sl. Lok sabha Length
Project Stretch No. Cost Start Date date of
No. constituency in km
(New) (Rs Cr) completion

AP / TN border to
1 Chittoor 69 306 37.11 Nov-17 Nov-19
Nalagampalli

Nalagampalli to AP /
2 Chittoor 69 503 47.68 Nov-17 Nov-19
Karnataka Border
Appointed
Giddalur-
3 Ongole 544D 678.69 112.8 Date -
Vinukonda
Pending
Kadapa, Nandyal, Kudapa-Mydukur-
4 40 1585 188.752 Nov-10 Dec-18
Kurnool Kurnool
6 Laning of dedicated
Appointed
Port road to
5 Nellore & Ongole - 254.43 18 Date -
Krishnapatnam
Pending
Port (Package-I)
Eluru & Appointed
Gundugolanu -
6 Rajamahen- 16 1827 69.88 Date -
Devarapalli - Kovvuru
dravaram Pending

Appointed
7 Chittoor, Tirupati Chittor - Mallavaram 40 1730.07 61.13 Date -
Pending
Nandigama Bypass &
8 Vijayawada Kanchikacherla 65 262.93 14.34 Mar-18 Jun-19
bypass
Vijayawada,
Vijayawada -
9 Machili- 65 740.70 64.61 Nov-16 Nov-18
Machlipatnam
patnam

Vijay- Appointed
Narasannapeta-
10 nagram, 16 1350 54.2 Date -
Ranastalam
Srikakulam Pending

Visakha- Appointed
Visakhapatnam
11 patnam 16 549 12.7 Date -
Port Road
Urban Pending
Appointed
Ichapuram -
12 Srikakulam 16 439 110.28 Date -
Narasannapeta
Pending

Visakha-
patnam,
Ranastalam -
13 Vizia- 16 1187 47 Nov-17 May-20
Anandapuram
nagaram,
Srikakulam

Visakha- Appointed
Anandapuram
14 patnam 16 2013 50.78 Date -
Pendurthi Anakapalli
Rural Pending

In-Principle declared NH in Andhra Pradesh


Sl. Stretch Tentative
No. Length (km)
As on
30/11/2017
1 Kodikonda check post-Lepakshi-Hindupur- Medekesire 55.00
2 Kurnool at NH-565-Gotlagattu-Podile-Uppalapadu-Chimakurti-Ongole 83.00
on NH-16
3 Stretch from Kadappa on NH 40 -Rajampet-Koduru- Renigunta junction 133.00
at NH-71
4 Mydukur (at NH-67)- Pamuru (at NH-565)-Singarayakonda (at NH-16) 242.00
5 Marialguda (Telengana) - Telangana/ Andhra Pradesh border- Piduguralla- 69.00
Narasampet (on NH-544 D) Length in AP = 69km & in Telangana=26km)
6 Chilakalurupet (on NH-16) - Chirala (on NH-216) - upto Vodarevu 46.00

15
In-Principle declared NH in Andhra Pradesh
Sl. Stretch Tentative
No. Length (km)
As on
30/11/2017
7 Bhadrachalam(on NH-30) (Telengana) - Telangana/ Andhra Pradesh 80.00
border- Jeelugumilli- Jangareddygudam- Devarapalli- upto Rajamundary
on NH-16 ( Length in AP= 80km, Telengaana= 68km)
8 Bhimavaram on NH 165 -Tadapallegudem on NH-16 32.00
9 Rajajmundry on NH16 -Rampachodavaram- Koyyuru - Chintapalli - 440.00
Lamasingi - Paderu - Araku - Srungavarapukota - Vizianagram on NH 26
(25 Km stretch from near Chinta
10 Stretch from Kuppam on NH42 (Andhra Pradseh) -Kolar on NH-75 25.00
(Karnataka) (Length in AP = 25km, Karnataka=40km)
11 Madakasire-Rolla (AP/Karnataka border)-Sira in the State of Karnataka 38.00
(Total length= 67 km; Andhra Pradesh= 38 km; Karnataka= 29 km)
12 Muddanur (on NH 67) - Kadapa 54.00
13 Narsaraopet-Chilakaluripeta 20.00
14 Patchur (on NH 46, TN)-Kuppam 22.00
15 Stretch from junction with NH-216 near Narsapuram-Sakhinetipalli- 23.00
Malikapuram upto junction with NH-216 near Razole alongwith
construction of new bridge between Narsapuram and Sakhinetipalli (380
meters long across Vasistha Godavari River)
16 Palsa on NH-16 upto A.P / Odisha Border- Parlakhemundi-Ramanaguda- 23.00
Bissamcuttak-Muniguda-Bhabanipatna-Kharial-Bangomunda-Patnagarh-
Padmapur-Chhattisgarh Border
17 Stretch from Suryapetat NH-65- Khammam- Ashwarapet- Rajahmundry ( 92.00
Length in Telangana=177 km; Andhra Pradesh= 92 km)
18 From junction of NH- 69 near Chintamani connecting Chelur, Rayacheruvu 15.00
in the state of Karnataka up to junction of NH- 42 near Tanakal in the state
of A.P (length in Karnataka= 55 km; Andhra Pradesh = 15 km)
19 From junction of NH- 48 near Chitradurga connecting Chelkere, Pavagada 26.00
in the state of Karnataka and terminating at its junction of NH-44 near
Penukonda in the state of Andhra Pradesh (length in Karnataka= 120 km;
Andhra Pradesh = 26 km)
20 From Junction of NH-150A near Molakalnuru- Rayadurg - Anantpur at 110.00
junction at NH-44 (length in Karnataka= 14 km; Andhra Pradesh = 110 km)
21 Tumkur-Kortatagere -Pavagada - Kalyandurg - joining up at Veparalla 49.00
(length in Karnataka= 116 km; Andhra Pradesh = 49 km)
22 Gooty connecting Pathikonda, Adoni, Madire, Hanaval, Kunthanahai, 135.00
Upparahal, Kowthalam, Urukunda, Halvi, Kumbalanuru, Manvi in the State
of Karnataka (length in Andhra Pradesh-135.00 km, Karnataka-15.00 km)
23 Junction with NH-167 near Anjaneya Temple Swamy in the Andhra Pradesh 2.00
to Ballery in the State of Karnataka (length in Andhra Pradesh= 2.00 km,
Karnataka=26.00 km)
Sub Total 1814.00
24 Vijayawada Bypass 12.60
25 Pondugala - Gamalapadu 11.30
26 Challagundla - Elchuru 31.40
27 Elchuru - Addanki 31.80
28 Addanki - Medarametla 12.40
29 Puttur - Janappanchatram 78.90
Sub Total 178.40
30 Malkangiri on NH 326- Chintapalle- Narsipattanam- Waddadi- 165.00
Chodavaram- Sabbavaram (Total length=233 km; Andhra Pradesh= 165 km;
Odisha= 68 km)
Sub Total 165.00
Total 2157.40

16
Key Indian National Highways

SRINAGAR
Jammu

Jalandhar

DELHI
Gurgaon
Jaipur Agra Lucknow Gorakhpur
Ajmer Muzaffarpur
Gwalior Kanpur
Allahabad Guwahati
Jhansi Purnea
UdaipurShivpuri Varanasi SILCHAR
Barhi
Ahmedabad Panagarh
Rajkot Vadodara Lakhnadon Kharagpur KOLKATA
PORBANDAR Surat
Nagpur
Bhubaneshwar
MUMBAI
Pune
Satara Hyderabad Vishakhapatnam
Arabian Sea
Eluru Vijayawada
Belgaum LEGEND
Chilakaluripet
Golden Quadrilateral
Tumkur
Hosur CHENNAI
Bangalore Ranipet North South Corridor
Selam Krishnagiri
Bay of Bengal East West Corridor
COCHIN Madurai
Lakshadweep
KANYAKUMARI
Indian Ocean

17
National Highways - India Story
Fast tracking National Highway Development

Building National Highways


A new Pace of Progress

NH LENGTH
NH LENGTH

91,287 km 1,26,350 km
Yr 2010-2014 Yr 2014-2018

New National Highways being built


86,371.5 km of New and In-Principle National
Highways added in 4 years

New NH
34,391.5 km
+
In principle NH length
51,980 km
New NH
Total
20,353.2 km
86,371.5 km

Yr 2010 - 2014 Yr 2014 - 2018

18
National Highways - India Story

Adding more National Highways


per day
Enhancing efficiency by building 28 km National 28
Highways per day in 4 years, up from 3 km km

22.5
km
16.6 2017-2018
km
12 2015-2016
km
2016-2017
2 3 2 3
km km km km
2014-2015

2013-2014
2012-2013
2010-2011 2011-2012 Rate of Highway
construction per day

Construction of roads
Rs. 3 lakh Cr worth investments in the road sector in 4 years
Significant growth of 158%
Yr 2014 - 2018

Yr 2010 - 2014 28,532 km


19,444 km

Total Cost
Rs. 1.16 lakh Cr
Total Cost
Rs. 3 lakh Cr

19
National Highways - India Story

Road Projects Awarded


100% increase in projects awarded with investments
of over Rs. 4.68 lakh Cr
Yr 2010-2014

Road Length Total Cost


25,609 km Rs. 1.62 lakh Cr
Yr 2014-2018

Road Length Total Cost


51,075.32 km Rs. 4.68 lakh Cr

Accelerated NH development
under Central Road Fund (CRF)
Significant increase of 207.6% in cost of CRF
works sanctioned for the upgradation & improvement
of roads /bridges in the Nation

2,876
Yr 2010 - 2014
Projects
935
Projects

Total Cost
Total Cost
Rs. 8,613.51 Cr Rs. 48,186.57 Cr
Yr 2014 - 2018

20
Transforming India’s Transport Sector
Key initiatives in 2014 -2018
Over the past four years, various smart initiatives on
Indian National Highways have resulted in transparent
processes, last mile connectivity, safer roads, upskilling,
new opportunities and employment for the people.

Motor Vehicle (Amendment) E Toll - FASTag to enhance


Bill 2017: To bring transparency, efficiency, and reduce long
reduce corruption queues at Toll plazas

E-Rickshaws for last mile Exemption from the


connectivity requirement of commercial
licence for LMV and LCV drivers

Driving training schools in every 0.2%-15% decrease in road


district for skill development accidents and fatalities till 2017

Road Safety Greater Compensation for Partnering with


Annual Plan accident victims of upto NGOs to ensure
Rs. 5 lakhs road safety

Green buses and electric vehicles have been introduced. Emission


standards have been upgraded for vehicles. BS VI norms along with
bio fuel B-100, flex-fuel E-85 or E-100 & ethanol ED-95, methanol
M-15 or M-100 and methanol MD-95 have been standardised

15% methanol blending can result in the replacement of around


31.9 million tons of crude oil. With crude oil prices at USD 54
per barrel, the use of clean energy biofuels will reduce fuel costs
resulting in significant savings. Compared to neat gasoline, M-15
reduces CO and HC emission by 40%. Biofuels will help in reducing
vehicle pollution levels in India

21
Anti Lock Braking System Model Automated
ensuring vehicle and Centres for checking
passenger safety fitness of vehicles

Vehicle Fleet modernization Simplified forms for


programme obtaining driving licences

Increasing Speed Limits from Taxi Policy Guidelines to


100 km/h to 120 km/h, at par ensure safe, secure and
with the global practices affordable journeys, while
reducing congestion
as well as pollution in cities

Indian Bridge Management System (IBMS), the world’s


largest inventory of bridges, has been created for proper
maintenance of these structures. Till date 1,72,519
bridges of all ages and structures have been inventoried
across India,and assigned GPS based Location Numbers,
Classification Numbers based on features, Structural Rating
& Socio-Economic Rating numbers

789 black spots have been identified and assigned unique


ID numbers. Guidelines have been prepared and notified for
investigation and rectification of these road accident-prone
black spots on National Highways. 265 spots have already
been rectified

Rectification measures at 318 spots have been sanctioned


and are in various stages of implementation. 139 spots are on
State Government roads or with other agencies. Remaining
67 spots would be taken up separately or rectified as part of
ongoing projects

22
Manzilen Abhi
Aur Bhi Hain

23
www.nitingadkari.org
www.spread.ooo

www.facebook.com/nitingadkary

www.twitter.com/nitin_gadkari

You might also like