You are on page 1of 24

GET SET GOA

Maharashtra

GOA

Karnataka

The coastal State of Goa attracts thousands of tourists


from across the world every year. The length of National
Highways in the State till 2014 was 262 km. In 2018, the
National Highway span in the State, including in-principle
length has reached 668 km. Over 229.40 km of Highways
have been included under Bharatmala. 28 projects worth Rs.
4,070 Cr, of length 49.62 km are in progress. 3 roads of a
total 100 km length have been announced in the State as
National Highways. Under Port Connectivity, work on 18.3
km of roads is underway. Over Rs. 12,000 Cr will be invested
towards road development in the State.

Source: www.goa.gov.in
“When a network of good roads is
created, the economy of the country
also picks up pace. Roads are veins
and arteries of the nation, which help
to transform the pace of development
and ensure that prosperity reaches
the farthest corners of our nation.”
NARENDRA MODI
Prime Minister
“In the past four years, we have expanded the
length of Indian National Highways network to
1,26,350 km. The highway sector in the country has
seen a 20% growth between 2014 and 2018. Tourist
destinations have come closer. Border, tribal and
backward areas are being connected seamlessly.
Multimodal integration through road, rail and port
connectivity is creating socio economic growth
and new opportunities for the people.
In the coming years, we have planned projects with
investments worth over Rs 6 lakh crore, to further
expand the world’s second largest road network.”
NITIN GADKARI
Union Minister, Ministry of Road Transport &
Highways, Shipping and Water Resources,
River Development & Ganga Rejuvenation
Fast tracking National Highway
development in Goa
NEW NH + IN PRINCIPLE NH LENGTH
UPTO YEAR 2018

668 km

NH LENGTH
UPTO YEAR 2014

262 km
Adding new
National Highways
in Goa

406 km
0

Yr 2014 - 2018
Yr 2010 - 2014

New NH New & In principle NH length

6
Construction of roads
in Goa

27.5 km
0 km major length

Yr 2014 - 2018
Yr 2010 - 2014

Maintenance work Construction of new roads including


widening and upgrading of existing roads
to 2/4/6-lanes

27.5 km of National Highways have


been built & upgraded in 4 years

7
Total Road Work
Awarded in Goa

Yr 2010 - 2014 Yr 2014 - 2018

60 km 126.54 km

Total Cost Total Cost


Rs. 86.31 Cr Rs. 5,978.35 Cr

Growth of 111% in the awarded length


of road projects over last 4 years with
investments worth Rs. 5,978.35 Cr

8
Accelerated NH Development
under Central Road Fund
(CRF) in Goa
Yr 2010 - 2014 Yr 2014 - 2018

0 6
Projects
Projects

Total Cost Total Cost


0 Rs. 88.24 Cr

88% investments for CRF works


sanctioned for the upgradation &
improvement of roads & bridges in
the State

9
Landmark Projects
In Goa

10
New Zuari Bridge
A state of the art, 8 lane new Zuari bridge is being built in Goa.
The approach roads to this bridge will taper into four lanes.
The project will stretch from Verna junction to Bambolim,
covering a distance of 13.64 km. It will include flyovers to allow
traffic to pass underneath along such stretches as Siridao.

Over 7 km will be constructed at an elevated level to allow


traffic to pass from below. It will enable vehicles using the
bridge to pick up speed, on the lines of an Expressway.

At a Glance
13.64 km total length 2 Tourist view towers
worth Rs. 130 Cr
Rs. 2,701 Cr estimated
preliminary cost 75 m wide space for KRC

Benefits
• Will reduce travel time between
Panaji and Margao
• Strong structure will ensure 50 years of life
for the bridge
• Will boost tourism in the State

11
New Zuari Bridge
Two Towers

Two high viewing towers worth Rs. 130 Cr are proposed


to be built atop the new Zuari bridge. The towers will
become major tourists attractions in Goa, offering
spellbinding views of the river.

Towers at a glance
110 m high Observatory & viewing
gallery
Permanent walkway on
the northern side Revolving restaurant
Passenger lift Art gallery

12
New Khandepar Bridge
Construction of the new parallel 4 lane Khandepar
bridge and the widening of two Bypasses in Curti and
Farmagudi will ensure faster traffic movement in Ponda
in Goa. Being constructed as an alternative to the old
Khandepar bridge which was built many decades ago,
the new bridge will boost trade and tourism in this region.

At a Glance
7 km total length of bridge
Rs. 355.44 Cr total cost

13
Margao Western Bypass
The Margao Western Bypass project on NH17 is aimed
at decongesting traffic in Margao. The project starts at
Nuvem, and passes through the villages of Seraulim,
Benaulim, Telaulim, Navelim and areas of Margao. On
completion, it will result in hassle free journeys for the
local population and tourists visiting this region.

At a Glance
11.9 km total length of bypass
Rs. 298.33 Cr total cost

Canacona Bypass
Construction of the Canacona Bypass connecting Char-
Rasta to Maxem junction on NH17 is going on in full swing.
The project includes 3 bridges. On completion of the
bypass, the distance from Char Rasta to Maxem via
Galgibaga will be reduced by 10 km. The bypass will
ensure safer journeys for motorists, who will be able to
avoid the sharp curves encountered on the existing road
passing through Poinguinim.

At a Glance
7.74 km total length of bridge
Rs. 290.59 Cr total cost

14
Ongoing Projects in Goa

Sl. Parliamentary Name of Project NH No. Length Sanctioned Start Likely


No. Constituencies (Old / (km) Cost Date date of
New) (Rs. Cr.) completion

1 North Goa Zuari bridge 17 8.235 819.95 Aug-16 Feb-20


package I

2 North Goa Zuari bridge 17 1.084 936.4 Feb-16 Oct-20


package II

3 South Goa Zuari bridge 17 4.316 773.979 Jun-16 Oct-19


package III

4 South Goa Canacona bypass 17 7.74 280.16 Dec-15 Sep-19

5 South Goa Margaon bypass 17 11.90 298.33 Dec-15 Dec-19

6 South Goa Verna 17B 3.84 184.05 Nov-15 Mar-19


Missing link
7 South Goa Dhavali bypass 17B 4.00 61.38 Apr-15 Dec-18

8 South Goa Khandepar bridge 4A 7.00 297.00 Apr-15 Apr-19

9 North Goa 4 Laning of Kar- 66 17.437 852.66 Dec-17 Dec-19


aswada -Porvorim
-Panaji-Bambolim
Section
10 North Goa 4 laning of Pat- 66 25.50 634.32 May-18 May-20
radevi -Karaswada
Section

15
In-Principle declared NH in Goa

Sl. Stretch Tentative Length (km)


No. As on 30.11.2017
1 Karaswada (on NH-66)- Sakhali (Sanquelim)- Pale- Usgao junction on NH-748 45.00

2 Ponda (Junction on NH-748 near Amigos)- Bethoda- Borim (Junction 5.50


on NH-748 near Bythakol)

3 Sakhali (Sanquelim)- Valpoi- Molem (on NH-748)- Collem 50.00

4 The stretch connecting NH 17 (new NH No. 66) with Mopa Airport site 8.00

Sub Total 108.50

5 Candola - Navelim 6.10

6 Navelim - Sanquelim 4.20

7 Casabe De Sanquelim - Choraundem 22.20

8 Choraundem - Jamboti 35.70

Sub Total 68.20

9 SH-7 from Sanvordemtisk to Dharbandora junction on NH-4A (new 748) 17.09

10 SH- 6 from Borim Circle to Zuna (MDR-35). Starts from Kalay Railway 36.21
Station & gets connected to SH-6 at Zuna

11 Road from old Goa to Pillar MDR-1 in St. Andre Constituency. 10.75

12 MDR-43, Velsao junction at NH 17B to Mobor Leela Beach Junction 8.00

13 MDR-13, Verem market to Nerul, upto Candolim 3.30

14 Betim via Verem upto Saligao (MDR-9) 10.70

15 Aguada- Candolim- Calangute- Arpora (MDR 10) 12.10

16 MDR-18 Chopdem to Keri Road 19.40

17 MDR-33 (starts from NH-4A at Dharbandora) Dharbandora- Sarcorda- 12.00


Satpal junction

18 Bolcornem to Tambadisurla, starts from proposed NH-17D (Sakhali- 7.70


Valpoi- Mollem- Collem road at Bolcornem junction)

19 MDR- 52 (MDR- 52 - Collem- Shigao- Voldem- Savargal) at Collem 15.95


junction MDR- 2

20 MDR-22 Shalibar to Saptakoteshwar Road 17 junction 0.36

21 Road from Sesa Goa plant to Shalibar Narva 4.13

22 Narva - Piligao Road 3.50

23 Link between nearest MDR-20 Piligao jetty and Sarmanus jetty 4.11

24 Proposed link road to NH-17 by constructing Chorao Br. Across river 16.00
Mapusa at Salvador Do Mund
25 MDR-49 to Char Rasta to Managinim 21.60

26 Road from Valpoi to Nagargao in Sateri Taluka 4.00

27 Road from Nagargao to Bharmkarmali in Sateri Taluka 4.00

28 MDR-28 Khotode to Ganjem in Sateri Taluka 5.50

29 Road from Marcel- Betki- Savoi-Verem- Vagurme to NH 4A 13.00

Sub Total 229.40

Total 406.10

16
Key Indian National Highways

SRINAGAR
Jammu

Jalandhar

DELHI
Gurgaon
Jaipur Agra Lucknow Gorakhpur
Ajmer Muzaffarpur
Gwalior Kanpur
Allahabad Guwahati
Shivpuri Jhansi Purnea
Udaipur Varanasi SILCHAR
Barhi
Ahmedabad Panagarh
Rajkot Vadodara Lakhnadon Kharagpur KOLKATA
PORBANDAR Surat
Nagpur
Bhubaneshwar
MUMBAI
Pune
Satara Hyderabad Vishakhapatnam
Arabian Sea
Belgaum Eluru Vijayawada
Chilakaluripet LEGEND

Tumkur Golden Quadrilateral


Hosur CHENNAI
Bangalore Ranipet
Selam Krishnagiri
North South Corridor
Bay of Bengal
COCHIN Madurai
Lakshadweep East West Corridor

KANYAKUMARI
Indian Ocean

17
National Highways - India Story
Fast tracking National Highway Development

Building National Highways


A new Pace of Progress

NH LENGTH
NH LENGTH

91,287 km 1,26,350 km
Yr 2010-2014 Yr 2014-2018

New National Highways being built


86,371.5 km of New and In-Principle National
Highways added in 4 years

New NH
34,391.5 km
+
In principle NH length
51,980 km
New NH
Total
20,353.2 km
86,371.5 km

Yr 2010 - 2014 Yr 2014 - 2018

18
National Highways - India Story

Adding more National Highways


per day
Enhancing efficiency by building 28 km National 28
Highways per day in 4 years, up from 3 km km

22.5
km
16.6 2017-2018
km
12 2015-2016
km
2016-2017
2 3 2 3
km km km km
2014-2015

2013-2014
2012-2013
2010-2011 2011-2012 Rate of Highway
construction per day

Construction of roads
Rs. 3 lakh Cr worth investments in the road sector in 4 years
Significant growth of 158%
Yr 2014 - 2018

Yr 2010 - 2014 28,532 km


19,444 km

Total Cost
Rs. 1.16 lakh Cr
Total Cost
Rs. 3 lakh Cr

19
National Highways - India Story

Road Projects Awarded


100% increase in projects awarded with investments
of over Rs. 4.68 lakh Cr
Yr 2010-2014

Road Length Total Cost


25,609 km Rs. 1.62 lakh Cr
Yr 2014-2018

Road Length Total Cost


51,075.32 km Rs. 4.68 lakh Cr

Accelerated NH development
under Central Road Fund (CRF)
Significant increase of 207.6% in cost of CRF works
sanctioned for the upgradation & improvement of roads &
bridges in the Nation

2,876
Yr 2010 - 2014
935
Projects
Projects

Total Cost Total Cost


Rs. 8,613.51 Cr Rs. 48,186.57 Cr
Yr 2014 - 2018

20
Transforming India’s Transport Sector
Key initiatives in 2014 -2018
Over the past four years, various smart initiatives on
Indian National Highways have resulted in transparent
processes, last mile connectivity, safer roads, upskilling,
new opportunities and employment for the people.

Motor Vehicle (Amendment) E Toll - FASTag to enhance


Bill 2017: To bring transparency, efficiency, and reduce long
reduce corruption queues at Toll plazas

E-Rickshaws for last mile Exemption from the


connectivity requirement of commercial
licence for LMV and LCV drivers

Driving training schools in every 0.2%-15% decrease in road


district for skill development accidents and fatalities till 2017

Road Safety Greater Compensation for Partnering with


Annual Plan accident victims of upto NGOs to ensure
Rs. 5 lakhs road safety

Green buses and electric vehicles have been introduced. Emission


standards have been upgraded for vehicles. BS VI norms along with
bio fuel B-100, flex-fuel E-85 or E-100 & ethanol ED-95, methanol
M-15 or M-100 and methanol MD-95 have been standardised

15% methanol blending can result in the replacement of around


31.9 million tons of crude oil. With crude oil prices at USD 54
per barrel, the use of clean energy biofuels will reduce fuel costs
resulting in significant savings. Compared to neat gasoline, M-15
reduces CO and HC emission by 40%. Biofuels will help in reducing
vehicle pollution levels in India

21
Anti Lock Braking System Model Automated
ensuring vehicle and Centres for checking
passenger safety fitness of vehicles

Vehicle Fleet modernization Simplified forms for


programme obtaining driving licences

Increasing Speed Limits from Taxi Policy Guidelines to


100 km/h to 120 km/h, at par ensure safe, secure and
with the global practices affordable journeys, while
reducing congestion
as well as pollution in cities

Indian Bridge Management System (IBMS), the world’s


largest inventory of bridges, has been created for proper
maintenance of these structures. Till date 1,72,519
bridges of all ages and structures have been inventoried
across India,and assigned GPS based Location Numbers,
Classification Numbers based on features, Structural Rating
& Socio-Economic Rating numbers

789 black spots have been identified and assigned unique


ID numbers. Guidelines have been prepared and notified for
investigation and rectification of these road accident-prone
black spots on National Highways. 265 spots have already
been rectified

Rectification measures at 318 spots have been sanctioned


and are in various stages of implementation. 139 spots are on
State Government roads or with other agencies. Remaining
67 spots would be taken up separately or rectified as part of
ongoing projects

22
Manzilen Abhi
Aur Bhi Hain

23
www.nitingadkari.org
www.spread.ooo

www.facebook.com/nitingadkary

www.twitter.com/nitin_gadkari

You might also like