4,877 km
NH LENGTH
UPTO YEAR 2014
4,467 km
Adding new
National Highways
in Bihar
4,345 km
825 km
Yr 2014 - 2018
Yr 2010 - 2014
6
Construction of roads
in Bihar
1,146 km
812 km
Yr 2014 - 2018
Yr 2010 - 2014
Constructed Constructed
length length
7
Road Projects
awarded in Bihar
1,518 km 2,085 km
8
Accelerated NH Development
under Central Road Fund (CRF)
in Bihar
Yr 2010 - 2014 Yr 2014 - 2018
12 19
Projects
Projects
9
Landmark Projects
in Bihar
10
11
Buddhist Circuit
The Buddhist Circuits include all the places of high
significance that are Holy Sites of Buddhism; where
Lord Buddha was born, attained Enlightenment,
preached his first Sermon and attained Nirvana.
Lumbini, Bodhgaya, Sarnath and Kushinagar are the
primary pilgrimage destinations along Buddhist
Circuits associated with the life and teachings of Lord
Buddha. Apart from these, there are numerous other
sites where Buddha and the Bhikshus travelled
during his life after his transformation, which are
held in deep veneration.
Visitors from all over the world can travel through
the Buddhist Circuit today.
12
Landmark Projects of MoRTH
in Bihar
586.55 km Total length
Rs. 6,417.03 Cr Total Cost
At a glance
5.575 km length Rs 1742.01 Cr total cost
13
Anisabad-Aurangabad-Hariharganj
Section
The Anisabad Aurangabad Hariharganj section of
NH-98 is being upgraded to 2 lanes with paved
shoulders. A key interstate road between Bihar and
Jharkhand, this National Highway links the Golden
Quadrilateral projects (NH-2) at Aurangabad city. It
serves as an important industrial corridor, connecting
two NTPC (JV) power plants and the cement factory at
Nabinagar. This road is also strategically important as
it connects Patna to the naxal affected districts of
Arwal, Aurangabad and Jehanabad.
At a glance
Lot 1 Lot 2
62 km length 89 km length
Rs. 322.01 Cr Rs. 377.64 Cr
total cost total cost
65% Physical 91% Physical
Progress Progress
14
Fatuha-Harnaut-Barh Section
The Fatuha Harnaut Barh section of NH-30A is
being upgraded to 2 lanes with paved shoulders. As
a key industrial corridor this road connects the state
capital Patna to the Harnaut Railway factory and Barh
Power plant of NTPC. Connectivity with Bhutan
and Nepal is also provided via the Mahatma Gandhi
Setu. Upon its upgradation, the bridge will be of
great benefit to the local populace.
At a glance
69 km length Rs. 683.83 Cr total cost
15
Birpur – Bihpur Section
The Birpur Bihpur section of NH-106 is being
upgraded to 2 lanes with paved shoulders. The
lifeline of Bihar, this National Highway connects
the East West corridor (NH-57) to backward and
flood prone districts of Madhepura and Supaul. This
road is also vital for the socio economic development
of the adjoining areas affected by flooding of the
Koshi river. It is also an important cross border road
connecting India and Nepal.
At a glance
106 km length Rs. 780.77 Cr total cost
16
Sitamarhi-Jaynagar-Narahia Section
The Sitamarhi Jaynagar Narahia section of NH-104
is being upgraded to 2 lanes with paved shoulders.
Passing through the naxal prone Sheohar District,
this NH connects to the East West corridor at
Chakia in Motihari District. It passes through the
flood affected areas of Sitamarhi and finally meets
the East West corridor at Narahiya
in Madhubani District. The entire stretch runs parallel
to the Indo-Nepal Border. The very important
Punaura Dham, which is the birthplace of goddess
Sita, is connected by this road. This NH is very
important for socio economic development for
backward district of Bihar.
At a glance
Lot 1 Lot 2 Lot 3
17
Gaya Hisua-Rajgir-Nalanda-Biharsharif
Section
The Gaya Hisua Rajgir Nalanda Biharsharif section
of NH-82 is being upgraded to 4 lanes. This NH
connects important tourist destinations including
Bodh Gaya, a world famous pilgrimage site for
Buddhists, the UNESCO world heritage site Nalanda
university and Rajgir.
At a glance
92 km length Rs. 1,408.85 Cr total cost
18
Landmark Projects of NHAI
in Bihar
Varanasi-Aurangabad section
The 6 laning Project of Varanasi Aurangabad
section of NH-2 is the first of its kind in the State
of Bihar. It falls on the Delhi- Kolkata section of
the Golden Quadrilateral and connects Varanasi,
Chandauli Districts of U.P to Kaimur, Rohtas and
Aurangabad Districts of Bihar. The project is likely
to be completed in 2018.
At a glance
192.4 km total length
Rs. 2,848 Cr total Project Cost
19
Patna-Gaya-Dobhi Section
The Patna Gaya Dobhi section of NH-83 is being
upgraded to 4 lanes. This National Highway
connects Patna, the capital of Bihar to Gaya town,
a major tourist destination. It passes through Patna,
Jehanabad and Gaya Districts of Bihar. The project is
likely to be completed in 2020.
At a glance
127.358 km Rs. 2,264.94 Cr
total length total cost
20
Need Image
At a glance
8.15 km 1.865 km Rs. 1161 Cr
total length length of Bridge total cost
21
22
Ongoing NHAI projects in Bihar
Project
Sl. Lok Sabha NH Length likely
Project Stretch Cost Start Date
No. Constituency No. (KM) completion
(Rs. Cr)
Madhepura, Maheshkunt -Sa- appointed date
1 107 1380 87.96 -
Purnea harsa-Purnea Pkg II pending
Khagaria, Maheshkunt-Sa- appointed date
2 231 573.7 90 -
Madhepura harsa-Purnea Pkg I pending
Munger, Aunta-Simaria including appointed date
3 31 885.27 8.15 -
Begusarai Ganga Bridge pending
Patna Sahib, Bakhtiyarpur - Mokama
4 31 837 44.6 Jun-17 Dec-19
Munger section
Begusarai, Simaria - Khagaria
5 31 - 60.23 Oct-16 Apr-19
Khagaria section
Khagaria,
6 Purnea, Kati- Khagaria - Purnea 31 - 140 May-11 Apr-18
har, Bhagalpur
Rail -Cum-Road Bridge
Begusarai, across River Ganga appointed date
7 333 B 274 14.59 -
Munger at Munger Ghat Near pending
Munger
Saran, Chhapra -Rewaghat -
8 102 397 73 Apr-16 Apr-18
Muzaffarpur Muzaffarpur
Vaishali, 19 &
10 Patna- Muzzaffarpur 63 Aug-10 Jun-18
Muzzaffarpur 77
Saran, Maha-
11 rajganj, Siwan, Chhapra -Gopalganj 85 644 94.25 Dec-15 Jun-18
Gopalganj
East Cham-
16 paran, West Motihari-Raxaul 28A 375 68.79 Oct-11 Jun-17
Champaran
Patna -
17 Patna Sahib 30 - 50.6 Sep-11 Jun-18
Bakhtiarpur
appointed date
18 Danapur Patna to Koilwar 30 598 33.25 -
pending
30
19 Danapur, Ara Koilwar to Bhojpur 825 43.85 Jul-17 Jan-20
&84
Nalanda, Biharsharif -
20 Nawada, Barbigha - 82 297 55 Oct-17 Oct-19
Munger Mokama
23
Ongoing MoRTH projects in Bihar
Widening &
2 Araria Strengthening of 4 km 327E 53 4 Feb-16 Dec-18
in Araria District
Construction of Bridge
3 Bhagalpur 33 10 0.59 Feb-17 Aug-18
across river Vena
Construction of Bridge
4 Bhagalpur 33 16.3 0.36 Apr-15 Jun-18
over river Mani
Construction of High
6 Bhagalpur Level Bridge across the 33 13 0 Feb-17 Feb-19
river champa
Widening &
Strengthening from
8 Gaya 99 45.22 11.4 Aug-16 Nov-18
Dobhi to Gosaidih
Section
Widening &
Karakat/ Strengthening from
9 104 147 40 Aug-14 Jul-18
Sasaram CHAKIA to SHEOHAR
section
Widening &
Madhubani/ Strengthening from
10 105 131 28 Jun-16 May-18
Jhanjharpur Darbhanga to Jainagar
Section
Construction of bridge
from Maheshkhut to
11 Khagaria 107 57 0.29 Dec-14 May-18
Sonbarsa Section (B.P.
Mandal setu)
Widening &
Betiah/ Strengthening from
12 28B 94 24 Mar-15 Jun-18
Balmikinagar MISROULI to PARSAUNI
Section
Construction of Road
13 Katihar 31 54 1.48 Jul-17 Feb-19
Over Bridge in Maniyan
Widening &
Strengthening from
18 Motihari 28B 206 33 Dec-16 Nov-19
Parsauni to Rampur
Naka Section
24
Ongoing MoRTH projects in Bihar
Construction of High
19 Lakhisarai Level RCC minor bridge 333 5 0 Dec-17 Mar-19
in Munger
Widening &
20 Motihari Strengthening in 28B 89 15 Nov-16 Nov-18
Motihari
Balance work of
widening and
21 Bhgalpur strengthening from 33 21.3 14 Jan-16 Dec-18
Ramjanipur to Pirpainti
Section
Strengthening work
22 Bhagalpur from Sabour to 33 56 31 Nov-17 Oct-19
Ramjanipur Road
Widening &
Strengthening from
23 Maharajganj 331 39 15.5 May-12 Dec-18
Jalalpur to Shahajitpur
Section
Reconstruction of
24 Biharsharif-II damaged Bridge over 120 25.2 0 Jun-17 May-19
river Tungi Bridge
Construction of Road
25 Purnea 81 50 1.05 Sep-17 May-19
Over Bridge in Purnea
Widening &
Strengthening of
existing single lane to
27 Jainagar 105 164 25.76 Jul/16 Jul/18
double lane Carriage
way from Darbhanga to
Jaynagar section
Widening &
Strengthening
28 Jainagar 527 A 99 26.73 Mar-16 Feb-18
from Poukhrauni to
Jhanjharpur section
Widening &
Strengthening from
30 Katihar 31 140 25.15 Aug-11 Dec-18
Mania-west bengal
border section
Widening and
32 Madhepura Strengthening in 327A 84 25.01 Nov-16 Jun-18
Madhepura District
25
In-Principle approval for NH declaration in Bihar
4 Junction of NH 22 near Hazipur to junction of NH 122 Bachwada via Mahanar and 75.00
Mohiuddin Nagar
5 Starting from Junction of NH 122 & NH-32 - Samastipur - Darbhanga - upto 50.00
junction of NH 27
6 Junction of NH 22 near Hajipur - Vaishali - Areraj - Bettiah (on NH 727) ( Hajipur - 105.00
Vaishali - Areraj is SH 74 and Areraj - Bettiah is SH 54)
7 Belaganj (Gaya Disstt.) (on NH 22) - Balua morh (Nalanda Disstt.) extended upto 75.00
junction with NH-20 near Giriak
10 Stretch from Katuria (Bihar) at NH-333A - Chandan- Bihar/ Jharkhand Border- 30.00
Deoghar (Jharkhand) at NH-333 (length in Bihar= 30 km; Jharkannd= 14 km)
11 Stretch from Mehsi on NH-27 to Jhapha on NH-22 via Tetaria 50.00
12 Stretch from Junction with NH-119 - Panduka (in Bihar) - Bridge on SONE river- 6.00
Srinagar (Jharkhand) - Dagar- Chaura - Makundpur - Bhawanathpur - Nagar
Untari (on NH-39) (Total length= 58 km; Bihar = 6 km; Jharkhand= 52 km)
13 Chakiya-Kesariya-Sattargarh- Faijulpur- Masrakh-Khaira-Chhapra 120.00
19 Stretch from Chautarwa on NH 727- Dhanha- Tamkuha Bazar- Baansi- Padrauna 46.00
on NH 727
21 Stretch from Janarh NH-77 (Muzaffarpur)- Dubbapul- Dekuli Dham on NH 227 30.00
23 Stretch from the junction of NH 431 near Dhaniawan (Paatna) - Islampur- 90.00
Hulasganj- Khizr Sarai- Gaya on NH 120
24 Stretch from Hajipur on NH-22 - Mahua- Kumar Bejidpur- Tajpur on NH-122 54.00
25 Stretch from Siwan on NH 531- Maharajganj-Janta Bazar- Junction with NH 331 35.00
near Baniapur
27 Stretch from Dhakamor in state of Bihar- Hansdiha in State of Jharkhand (Total 26.00
length= 36 Km; Bihar= 26 Km; Jharkhand= 10 Km)
28 Sitalpur(Patna)(on NH-31)-Amnour-Taraiya-Mashrakh-Siwan(on NH-531) 100.00
26
In-Principle approval for NH declaration in Bihar
30 Areraj-Motihari 32.00
31 The stretch from Bheja (from proposed new bridge over river Kosi)-junction of 90.00
NH 327 near Nunupatti-Baruari-Laukha-Tarawe-Singheshwar (on NH 131)-Rani
Patti-Khurda-Chakmaka-Banamnakhi upto junction with NH 107.
32 Darbhanga-Kusheshwar Asthan-Khagaria 135.00
41 Darauli- Mairwa (NH-227 A)- nautan- Kuchaikot on NH-28/ NH-27 new 62.00
42 Mirganj (NH-85/ NH-531 new)- Bhagipatti- Samour Road upto U.P. Border 38.00
44 (NH-106/ NH- 131 new) Ganpatganj to parwaha Forbsganj (NH-27) Via Pratapganj 60.00
(NH-27)- Chhatapur (NH-57)
45 (NH-57 /NH-27 new) Bhutaha Chowk to Nirmali Via Mangasihaul- Marauna- 45.00
Madhepur dist Madhubani (Connectivity to Religious Importance)
46 (NH-106/ NH-131 new) Birpur to Bathnaha (NH-57A/ NH-527 new) (Via) Balua 50.00
27
Key Indian National Highways
SRINAGAR
Jammu
Jalandhar
DELHI
Gurgaon
Jaipur Agra Lucknow Gorakhpur
Ajmer Muzaffarpur
Gwalior Kanpur
Allahabad Guwahati
Jhansi Purnea
UdaipurShivpuri Varanasi SILCHAR
Barhi
Ahmedabad Panagarh
Rajkot Vadodara Lakhnadon Kharagpur KOLKATA
PORBANDAR Surat
Nagpur
Bhubaneshwar
MUMBAI
Pune
Satara Hyderabad Vishakhapatnam
Arabian Sea
Eluru Vijayawada
Belgaum LEGEND
Chilakaluripet
Golden Quadrilateral
Tumkur
Hosur CHENNAI
Bangalore Ranipet North South Corridor
Selam Krishnagiri
Bay of Bengal East West Corridor
COCHIN Madurai
Lakshadweep
KANYAKUMARI
Indian Ocean
28
National Highways - India Story
Fast tracking National Highway Development
NH LENGTH
NH LENGTH
91,287 km 1,26,350 km
Yr 2010-2014 Yr 2014-2018
New NH
34,391.5 km
+
In principle NH length
51,980 km
New NH
Total
20,353.2 km
86,371.5 km
29
National Highways - India Story
22.5
km
16.6 2017-2018
km
12 2015-2016
km
2016-2017
2 3 2 3
km km km km
2014-2015
2013-2014
2012-2013
2010-2011 2011-2012 Rate of Highway
construction per day
Construction of roads
Rs. 3 lakh Cr worth investments in the road sector in 4 years
Significant growth of 158%
Yr 2014 - 2018
Total Cost
Rs. 1.16 lakh Cr
Total Cost
Rs. 3 lakh Cr
30
National Highways - India Story
Accelerated NH development
under Central Road Fund (CRF)
Significant increase of 207.6% in cost of CRF
works sanctioned for the upgradation & improvement
of roads /bridges in the Nation
2,876
Yr 2010 - 2014
935
Projects
Projects
31
Transforming India’s Transport Sector
Key initiatives in 2014 -2018
Over the past four years, various smart initiatives on
Indian National Highways have resulted in transparent
processes, last mile connectivity, safer roads, upskilling,
new opportunities and employment for the people.
32
Anti Lock Braking System Model Automated
ensuring vehicle and Centres for checking
passenger safety fitness of vehicles
33
Manzilen Abhi
Aur Bhi Hain
34
35