Professional Documents
Culture Documents
ASSAM ACCESSIBLE
The Gateway to the North East, Assam has seen rapid
progress in road infrastructure development since 2014.
The length of National Highways in the State has reached 3,909
km in 2018. India’s longest bridge, the 9.15 km long Bhupen
Hazarika Setu worth Rs. 876 Cr across River Brahmaputra,
connecting the Dhola and Sadiya ghats of Assam and Arunachal
Pradesh was dedicated to the nation by Prime Minister Narendra
Modi in May 2017.
3,909 km
NH LENGTH
UPTO YEAR 2014
3,634 km
Adding new
National Highways
in Assam
1,945 km
798 km
Yr 2014 - 2018
Yr 2010 - 2014
6
Road Projects
awarded in Assam
681 km 1,139.77 km
7
Accelerated NH Development
under Central Road Fund (CRF)
in Assam
Yr 2010 - 2014 Yr 2014 - 2018
12 53
Projects
Projects
8
Landmark Projects
in Assam
9
Landmark Projects
in Assam
10
Dhola Sadiya Setu
11
Bhupen Hazarika Setu
India’s longest bridge
The Bhupen Hazarika Setu, bridging Dhola and
Sadiya Ghats on the river Lohit, a tributary of the
Brahmaputra, is the longest bridge in India. The
9.15 km bridge connects the states of Assam and
Arunachal Pradesh. The project, worth Rs. 876 Cr,
has been completed and dedicated to the nation
by Prime Minister Narendra Modi on 26th May
2017. Earlier, Kaliabomra Bridge in central Assam
was the only bridge for transportation across the
mighty river Brahmaputra. All transport across the
river between the Assam and Arunachal Pradesh
was via water only. The Dhola Sadiya Bridge
project will enhance the entire transport system
of North Assam. This project is also important for
the Indian Military personnel stationed at the Indo-
China border in Arunachal Pradesh.
12
At a Glance
9.15 km length of bridge Upgrading to 2 lane
with paved shoulder
12.9 m width
on Sadiya side
Rs. 876 Cr total cost of 12.065 km.
Realignment of the 2 other Bridges of
existing road on 60 m length on
Dhola side of 7.297 km river Dhola and
35 m length on
Bhandarkhal
Benefits
• Reduction in travel time of 165 km from
5.5 hours to 30 mins
• Decongesting traffic on the existing
transport network
• Socio economic development
• Better supply chain management
• Enhanced production activities
• Fast tracked Investments
• Improved access to health and
educational facilities
• Boost to the tourism industry
• Increased border trade between Arunachal
and other ASEAN Countries
13
New Saraighat Bridge
The New Saraighat Bridge, inaugurated by
Union Minister Nitin Gadkari in January 2017,
is the first rail-cum-road bridge over the mighty
Brahmaputra located near Guwahati in Assam.
The 1.4 km long river bridge connects both
banks of the Brahmaputra at Saraighat and
has been built at a cost of Rs. 475 Cr.
At a Glance
1.4 km length 47 km NH connecting
Guwahati-Mangaldoi
Rs. 475 Cr
total cost 27 km NH at Lowarpara
14
Ongoing Projects of NHAI in Assam
SI. Lok Sabha Project Name NH No Project Total Date of Likely date of
No. Constituency (New) Cost Length Start completion
(Rs. Cr) in km
15
Ongoing Projects of NHIDCL in Assam
SI. Lok Sabha Project Name NH No Project Total Date of Likely date of
No. Constituency (New) Cost Length Start completion
(Rs. Cr) in km
7 Tezpur Four lane highway 37A & 1049.5 18.81 Jan-17 Feb-20
connecting NH 37A 52
and NH 52 between
Dolabari and Jamuguri
16
Ongoing Projects of MoRTH in Assam
17
Ongoing Projects of MoRTH in Assam
18
In-Principle declared NH in Assam
10 Lowairpowa-Kunmum 27.00
11 Silchar-Hailakandi-Maanachera-Kanaibazar-Ramkrishna 85.00
Nagar-Hasimganj
12 Silchar-Kalain Road 30.00
14 Kamalabari-Garmur-Jengrai-Haldibari-Tekeliphuta 50.00
15 Dudhnoi-Matia-Mornoi-Goalpara-Pancharatna 103.00
16 Lahowal-Bordubi-Tinsukia 48.00
17 Haldyanganj-Mankachar road 22.00
18 Agia-Medhipara-Lakhipur 32.00
19 Mangaldai-Bhutianhang-Changrang 62.00
20 Gogamukh-Ghiamara-Butikur-Telijan 57.00
21 Indo-Bhutan border-Musalpur-Tihu Chowk-Tihu-Makhibaha- 110.00
Sarthebari-Kalitakuchi
22 Pathshala-Dubi-Helona-Bongaon-Rampur-Sarthebari 45.00
23 Tihu-Sarthebari-Nagaon 50.00
24 Sonari-Mahmora-Moran 31.00
25 Baihata-Goreswar-Udaguri 50.00
26 Moran-Naharkatia Road 56.00
27 Lahowal- Naharkatia Road 47.85
28 Duliajan Digboi road 34.15
29 Digboi Pengeri Bordumsa road 34.24
31 Margherita Pengeri Phiobari Doondoma road 56.76
32 (Dhodar Ali Road) Junction with NH-129 near Golaghat- 110.00
Mariani- Amguri- Simaluguri
33 Junction of NH-215 near Sapekhati- Namrup- Upto junction of 32.00
NH-315 A near Joypur
34 Disangmukh (Sibasagar Distt.)- Tekeliphuta (Dhakuakhana)- 121.00
Lakhimpur- Kamalbari (Majuli)- Jorhat
36 Barpeta Manas Road on NH-31 to Manas (Bhutan Border) 32.00
19
Key Indian National Highways
SRINAGAR
Jammu
Jalandhar
DELHI
Gurgaon
Jaipur Agra Lucknow Gorakhpur
Ajmer Muzaffarpur
Gwalior Kanpur
Allahabad Guwahati
Shivpuri Jhansi Purnea
Udaipur Varanasi SILCHAR
Barhi
Ahmedabad Panagarh
Rajkot Vadodara Lakhnadon Kharagpur KOLKATA
PORBANDAR Surat
Nagpur
Bhubaneshwar
MUMBAI
Pune
Satara Hyderabad Vishakhapatnam
Arabian Sea
Belgaum Eluru Vijayawada
Chilakaluripet LEGEND
KANYAKUMARI
Indian Ocean
20
National Highways - India Story
Fast tracking National Highway Development
NH LENGTH
NH LENGTH
91,287 km 1,26,350 km
Yr 2010-2014 Yr 2014-2018
New NH
34,391.5 km
+
In principle NH length
51,980 km
New NH
Total
20,353.2 km
86,371.5 km
21
National Highways - India Story
22.5
km
16.6 2017-2018
km
12 2015-2016
km
2016-2017
2 3 2 3
km km km km
2014-2015
2013-2014
2012-2013
2010-2011 2011-2012 Rate of Highway
construction per day
Construction of roads
Rs. 3 lakh Cr worth investments in the road sector in 4 years
Significant growth of 158%
Yr 2014 - 2018
Total Cost
Rs. 1.16 lakh Cr
Total Cost
Rs. 3 lakh Cr
22
National Highways - India Story
Accelerated NH development
under Central Road Fund (CRF)
Significant increase of 207.6% in cost of CRF
works sanctioned for the upgradation & improvement
of roads /bridges in the Nation
2,876
Yr 2010 - 2014
Projects
935
Projects
Total Cost
Total Cost
Rs. 8,613.51 Cr Rs. 48,186.57 Cr
Yr 2014 - 2018
23
Transforming India’s Transport Sector
Key initiatives in 2014 -2018
Over the past four years, various smart initiatives on
Indian National Highways have resulted in transparent
processes, last mile connectivity, safer roads, upskilling,
new opportunities and employment for the people.
24
Anti Lock Braking System Model Automated
ensuring vehicle and Centres for checking
passenger safety fitness of vehicles
25
Manzilen Abhi
Aur Bhi Hain
26
27
www.nitingadkari.org
www.spread.ooo
www.facebook.com/nitingadkary
www.twitter.com/nitin_gadkari