31st May2017
2 Delhi - Gurgaon Section (Access Controlled 8/6 Lane) 8 27.7 RITES Ltd. -Sheladia-LR Kadiyali (JV)
5 Mahapura (near Jaipur) - Kishangarh (6 Lane) 8 90.38 BCEOM Freinch Engineering Consultant
12 ROB at Kishangarh 8 1
List of Independent Engineering & Nationality of National Highways Developement Project - Phase II
31st May2017
5 Kadal to Armur (NS-2/BOT/AP-8) 7 31 Arvee Associates Architects Eng. & Con. Pvt Ltd.
25,
6 Jhansi to Lalitpur (NS-1/BOT/UP-2) 49.79 ICT Pvt Ltd
26
7 Jhansi to Lalitpur (NS-1/BOT/UP-3) 26 49.3 Zaidun Leeng - Artefact (JV)
Kosi Bridge including approaches and Guide Bond & Afflux Bond Wilbur smith associates Inc.(USA) - WSA Pvt. Ltd.
8 57 10.63
(BR-5) (Indian)
22 Salem to Kerala Border Section (TN-6) 47 53.54 Stanley - RITES Ltd. (JV)
23 Kadloor Yellareddy to Gundla Pochampalli (NS-2/BOT/AP-2) 7 85.74 SPAN Consultants Pvt. Ltd.
26 Rajkot Bypass & Gondal Jetpur (Package-VII) 8B 36 SAI Consulting Engineers Pvt. Ltd.
30 MH/AP border to Islam Nagar (NS-2/BOT/AP-6) 7 54.6 Scott Wilson India Pvt Ltd.
Under Implementation
SMEC International Pvt. Ltd. In Assoc. with SMEC Pvt.
33 Jammu - Udhampur 1A 65
Ltd. And RODIC Cons.
List of Independent Engineering & Nationality of National Highways Developement Project - Phase III
31st May2017
2 End of Durg Bypass - Chattisgarh / Maharashtra Border 6 82.685 Consulting Engineers Group Ltd
10 Devihalli-Hassan(Approved Length 73 Km) 48 77.23 Lea Associates South Asia Pvt . Ltd.
25 Elevated Highway from Silk board junction to electronic city junction 7 9.98 Renardet S.A - CEG Ltd.
40 Pune-Sholapur Pkg-I(Approved Length Pkg I & II 170 Km) 9 110.05 Renardet S.A.
41 Pune-Sholapur Pkg-II(Approved Length I & II 170 Km) 9 101 ICT Pvt. Ltd.
Under Implementation
51 4 Laning of UP/Haryana Border-Yamunanagar-Saha-Barwala- Panchkula 73 107 STUP Consultants Ltd
54 4-Laning of Rohtak-Jind (Approved Length 45 Km) 71 48.6 Tech Mech India Pvt Ltd
59 4 laning of Jetpur-Somnath section of NH-8D (approved length 127.6) 8D 123.45 ICT Pvt Ltd
63 4 Laning of Barhi - Hazaribagh(Approved Length 40 Km) 33 41.314 SAI Consulting Engineers Pvt Ltd
64 2 Laning of Forbesganj-Jogwani(Approved Length 13 Km) 57A 9.258 Unihorn India Pvt. Ltd.
68 2-Laning of Krishnagiri-Tindivanam (Approved Length 170 Km.) 66 176.51 Theme Engineering Services Pvt Ltd
72 Vijayawada-Machhlipatnam 9 64.611
82 2-Laning with PS Motihari-Raxaul (Approved Length 67 Km) 28A 68.79 Frischmann Prabhu (India) Pvt. Ltd.
84 Bareily - Sitapur(Approved Length 134 Km) 24 151.2 Intercontinental Consultant Pvt. Ltd.
87 Panji-Goa/Karnatka Border 4A 69
89 Panikholi-Rimoli (Approved Length 106 Km) 215 163 Sai Consulting Engg. Pvt. Ltd.
30 &
92 Patna - Buxar 124.85 Bloom Infrastructure
84
99 MH/ KNT Border Sangareddy 9 145 CDM Smith JV with Willbur Smith
104 Rimoli - Roxy - Rajamunda(Approved Length 163Km) 215 96 Unihorn India Ltd
105 Bhopal-Sanchi(Approved Length 40 Km) 86Ex 53.78 Consulting Engg. Services (I) Pvt. Ltd.
110 Rohtak - Bawal(Approved Length 97 Km) 71 83.66 URS Scott Wilson Indian Pvt. Ltd
115 Ghaziabad-Aligarh (Approved Length 106 ) 91 126 SNC-Lavalin Infrastructure Pvt. Ltd.
19 &
117 Patna- Muzzaffarpur 63 ICT
77
List of Independent Engineering & Nationality of National Highways Developement Project - Phase IV
31st May2017
3 2-Laning with paved shoulder of Muzaffarpur - Barauni 28 107.56 Frischmann Prabhu (India) Pvt. Ltd.
4 2-Laning with paved shoulder of Raebareli to Jaunpur 231 166.4 SA Infrastructure Consultants Pvt Ltd
Under Implementation
8 4-Laning of Hoskote-Dobbaspet 207 80.02 M/s Aarvee Associates
AECOM Asian CO Ltd - M/s Roadiac
9 4-Laning of Goa/Karnataka Border-Kundapur Section 17 187.24
Consulatants Pvt Ltd
2-Lane with paved shoulder with provision of Capacity Augmentation of Getinsa Ingenieria S.L - Segmental consulting
13 65 154.141
Rajasthan Border-Fatehpur-Salasar Section and Infrastructure Pvt Ltd
33 &
30 4-Laning of Mahulia to Behragora to Kharagpur 127
6
34 Four laning of Gwalior-Shivpuri 3 125.03 M/s CDM Smith Indian Pvt Ltd
List of Independent Engineering & Nationality of National Highways Developement Project - Phase V
31st May2017
14 Six Laning of Nellore-Chilkaluripet 5 183.52 ICT Pvt. Ltd.-SNC Lavalin Pvt. Ltd.
23 Indore-Dewas(Approved Length 55 Km) 3 45.05 Lea Associates South Asia Pvt. Ltd.