Remarks/ Issues
Awarded Right of way Original
NHDP NH No. Sanctioned Date of Cumulative Cumulative (Land Aquisition Issue/
Length Cost (ROW) Schedule Likely date of Official Mail IDs of
SL. No. Phase/ Name of Project (Old/ Cost/TPC Date of Award Start/Appointed Physical Financial Name of the Contractor Forest Issue/ Utility
(Km) Rs. in Available Completion completion Contractor
Scheme New) Rs. in crore Date progress % progress % Shifting/ Contractor
crore % Date
Issue)
Assam
Improvement and Strenghtening of Road Section from
Completed
1 NH(O) Chand Khera to Kurti Bridge on Assam-Tripura Border in 208A 17.95 66.94 60.21 04-10-2016 28-11-2016 100.00% 100.00% 99.50% 24-01-2018 M/s Ganesh Ram Dokania -
on 31.03.2018
the state of Assam on EPC basis
One time improvement of Moran Town section of NH-37 Completed
2 NH(O) NH-37 3.5 14.52 13.5 31-05-2019 19-08-2019 100.00% 100.00% 100.00% 17-08-2020 M/s BB Enterprises -
from km 555.000 to km 558.500 on 31.12.2020
One time improvement of Digboi to Ledo Town section
Completed
3 NH(O) (via Powal and Margherita ) of NH-38 from km 20.000 to NH-38 31.5 30.84 26.92 29-07-2019 25-09-2019 100.00% 100.00% 100.00% 23-09-2020 M/s Ganpati Builders -
on 23.09.2020
km 53.000
Construction of 2-L Dibrugarh By Pass / realignment of
Completed M/s ABCI-JKM Pvt. Ltd (JV).
4 SARDP NH-37 from Bogibeel Junction at km. 581.700 to km. 37 15.447 379.32 96.84 20-02-2015 02-11-2015 100.00% 100.00% 100.00% 31/10/2018 -
on 31.10.2020
597.147
M/s ECI Engg.Construction
4-Laning of NH-52A from Gohpur (Km 264.100 on NH-52) Completed
5 SARDP 52 10.08 223.3 168.39 30-03-2015 11-12-2015 100.00% 100.00% 99.76% 10-12-2018 Co. Ltd. -
to Holongi (Km.20.370 on NH-52A) under SARDP-NE on 28.02.2022
2-laning with paved shoulders from km 6.25 to 10.40 of Completed M/s Shree Gautam
6 SARDP 53/37 4.15 76.78 53.21 23-03-2015 01-10-2015 100.00% 100.00% 99.69% 11-12-2017 -
Silchar Badarpur section on 15.05.2022 Construction Company Ltd.
c3172@simplexinfra.com
4-Laning from Rangagara to Kaliabhor Tiniali from km
10 SARDP 37 18.32 289.99 196.24 16-01-2017 23-10-2017 100.00% 83.58% 83.32% 21-04-2020 31-05-2023 M/s Simplex Infrastructure kaustab.chakraborty@simpl -
297.00 to km 315.315 of NH-37 on EPC basis.
exinfra.com
4-Laning of Jorhat to Jhanji section from Km. 453.00 to Vijeta Projects - Sweety
17 SARDP 37 37.80 738.15 220.40 05-11-2021 09-02-2022 100.00% 32.13% 30.26% 08-08-2023 15-11-2023 vpilsipljv@siplassam.com -
Km. 491.08 Infrastructure (JV)
Multi modal Logistic Park at Jogighopa (MMLP), Bongaigaon District, & MMLP-2 at Silchar, Assam under BHARATMALA PARIYOJNA (MoRTH- Logistics Section)