Liwanag, Bianca Nicole D.

BA2101

Costing and Pricing

Step 1

Activities Center Solution Pool Rates

Utilities P500,000/50,000 P10/mhr

Scheduling and Setup 480,000/800 P600/set up

Material Handling 930,000/1,900,000 P.48 lbs

Step 2
Product A Product B Product C Total

Utilities:

A. 50,000 X 10 P500,000

B. 30,000 X 10 P300,000

C. 70,000 X 10 P700,000

P1,500,000

Scheduling and Setup:

A. 140 X 600 84,000

B. 720 X 600 432,000

C. 800 X 600 480,000

P996,000

Material Handling:

A. 600,000 X .48 288,000

B. 500,000 X .48 240,000

C. 800,000 X .48 384,000

P912,000

Total P872,000 P972,000 P1,564,000 P3,408,000