Professional Documents
Culture Documents
SOLUTION:
Problem 1:
Answer: D
Problem 2:
PBA NBA
8,000,000 12,000,000
-5,000,000 -10,000,000
3,000,000 2,000,000
Answer: B
Problem 3:
Land
a P20,000,000 x P30,000,000 / P40,000,000 15,000,000
b 2,500,000
c -
Total Cost 17,500,000
Building
a P20,000,000 x P10,000,000 / P40,000,000 5,000,000
b -
c 5,000,000 x 90% 4,500,000
Total Cost 9,500,000
Answer: C
Problem 4:
PBA NBA
8,000,000 12,000,000
1,000,000 -1,000,000
9,000,000 11,000,000
Answer: A
Problem 5:
At carrying amount
PBA NBA
5,000,000 10,000,000
1,000,000 -1,000,000
6,000,000 9,000,000
Answer: B
Problem 6:
Answer: B