WORK PLAN AND TIMELINE


PERSONS EXPECTED
ACTIVITIES OBJECTIVES STRATEGIES TIME FRAME REMARKS
INVOLVED OUTCOMES
1. Pruning or trimming of  -To reduce the danger to a -Refer to PAG-ASA -Reduced the danger to a
trees specific target caused by 7:30-9:30 am Teacher specific target caused by
visibly defined hazards in a (July 20, 2018) concerned, visibly defined hazards in a
tree. Administrator tree.
- Promote safety and Staff - Promoted safety

2. Canal Cleaning operation -To eliminate flooding in -Conduct Intensified -Eliminated flooding in
including de-clogging Roxas National High School canal visitation and Roxas National High
Teacher
(SHS) through canal de- monitor drainage 9:30-10:30 am School (SHS) through
concerned,
clogging, rehabilitation of (July 20, 2018) canal de-clogging,
Administrator
existing canals. rehabilitation of existing
and Staff
- eliminate public risk canals.
- eliminated public risks
3. Preparation of evacuation -To provide a clear, easy to -Monitor regularly and -Provided a clear, easy to
centers use (visual, multi-lingual) set religiously the progress use (visual, multi-lingual)
of safe evacuation of the evacuation centers 10:30-11:30 am Teacher set of safe evacuation
instructions for (July 20, 2018) concerned, instructions for
students/teachers/visitors. Administrator students/teachers/visitors.
and Staff
4. Inspection of electrical -To verify proper functioning -Inspect regularly and - Verified proper
connections of the electrical connections religiously the progress functioning of the electrical
after installation; and of the attendance of the connections after
-To verify that the electrical connection for Teacher installation; and
performance of the installed the safety of the children 1:30-2:30 pm concerned, - Verified that the
electrical connections meet and teachers and school (July 20, 2018) Administrator performance of the
with the specified design administration and staff and Staff installed electrical
intent through a series of connections meet with the
tests and adjustments. specified design intent
through a series of tests
and adjustments.

5. Tree-planting and - Improve the environment of -Weekly monitor for the - Improved the
vegetables gardening school vegetables as well as environment of school
- Provide a treed space for trees in school. Teacher - Provided a treed space
recreation of school 2:30-3:30 pm concerned, for recreation of school
- Prevent soil erosion by (July 20, 2018) Administrator - Prevented soil erosion by
wind or water and Staff wind or water
- Provide healthy food - Provided healthy food
- Conserve energy - Conserved energy

Prepared By:

MELCHOR G. GABUR, JR
Teacher 2

JOCELYN C.ZIPAGAN
Teacher 2

Noted By:

INOFEMIA G. GUADO
Asst. Principal 2

Approved By:

DENNIES M. LINTAO, Ed. D.


Principal 4