You are on page 1of 2

R2-070330Discussion on control signalling for persistent scheduling of VoIP Samsung Mr.

Gert-J
R2-070331Reordering function and Marking function ASUSTeK Mr. Sam Ji
R2-070332MBMS multi cell SFN transmission over areas of varying inter siteEricsson Mr. Sven E
R2-070333LTE MBMS Functionality Ericsson Mr. Sven E
R2-070334Switching CR 25.331 Rel-7 NEC Mr. David
R2-070335Scheduling for LTE Motorola
R2-070336Granularity consideration for flexible RLC PDU sizes ASUSTeK Mr. Sam Ji
R2-070337Contention Resolution and Initial Random Access TD Tech Mr. Chang
R2-070338Summary (with revision marks) of email discussion point 3: Initi NTT DoCoMo, Inc. (E-m
R2-070339Summary (with revision marks) of email discussion on overview on Panasonic
R2-070340(3gpp-response-1 december, to 3GPP). (Reply to R3-061610) "ReIEEE 1588
R2-070341Minutes of RAN2-56, Riga, Latvia, 06-10 November 2006 ETSI MCC
R2-070342Minutes of RAN-34, Budapest, Hungary, 28 Nov - 01 Dec 2006 ETSI MCC
R2-070343Minutes of the 3GPP Workshop on LTE GSM Handovers, 10-11 ETSI MCC
R2-070344Highlights from RAN-34 to SA-34 (SP-060893) TSG RAN Chairman
R2-070345Work Item / Study Item description documents ETSI MCC
R2-070346
05.2.3: Point 4: Downlink scheduling: L1/L2 signalling overhead reduction
05.2.6: Point 8: downink packet handling at handover (forwarding, re-ordering, synchronisation)
05.7.2: Stage 2 inputs
05.7.1: Requirements/scenarios
12: TEI7
05.2.3: Point 4: Downlink scheduling: L1/L2 signalling overhead reduction
08: Improved L2 support for high data rates
05.2.2: Point 3: Random access procedure: C-RNTI and HARQ
05.2.2: Point 3: Random access procedure: C-RNTI and HARQ
05.2.8: Point 10: Overview on security issues (possibly leading to LS to SA3 at next meeting)
05.1: Incoming LSs on 3G LTE
03: Minutes and information from previous meetings
03: Minutes and information from previous meetings
04: Minutes from other groups
03: Minutes and information from previous meetings
03: Minutes and information from previous meetings

You might also like