A leading beer company SabFisher needs to
find out the production and route planning The selling price for every beer brand is given
strategy for its 6 products – QueenFisher, which is same in all the markets [Excel: Selling
Hiwords, RegalStag, CharlsBorg, Roaster, Price].
BadWiser.
Labyrinthine Page 2
Copyrights Reserved by NEEV 2011 Symbiosis Centre for Management & HRD
Variable cost for per unit production and fixed the year with a 5% growth every quarter.
costs for each production line at every
location is given [Excel: Production Costs]. If
the production line is not used then the fixed
costs for that production line is not applicable
in total cost.
How to Play
Solution sheet is provided in excel. Please enter the quantity to be shipped from each plant to the
respective customer. E.g.
QueenFisher
Filtration Distance Quantity Transportation Cost
Wholesaler Shipped
Plant (km) User entered quantity.
Regular ('00
This indicates Kohlapur
kg)
Kohlapur Nandurbar 661 - Rs. - produces 2200 kg of
QueenFisher which is
Kohlapur Hingoli 605 - Rs. -
650 - sent to Gondia
Kohlapur Washim Rs. -
Kohlapur Gondia 965 22 Rs. 53,075.00
Kohlapur Akola 696 - Rs. -
Kohlapur Amravati 757 - Rs. -
Kohlapur Alibag 349 - Rs. -
Kohlapur Ahmednagar 354 - Rs. -
Kohlapur Osmanabad 306 Rs. 461,295.00
Labyrinthine Page 3
Copyrights Reserved by NEEV 2011 Symbiosis Centre for Management & HRD
1. Decide the number and locations at additional cost will be applied as given
which the beer brands are to be in the excel sheet.
produced. If the particular brand is 4. If the quantity shipped is more than
produced at any location the fixed the demand at any location then only
cost of that brand at that location will demand quantity will be sold and
be applicable. Participant might remaining inventory will be scraped
decide not to produce particular and will not earn any revenue.
brand at particular location. 5. The errors for overproduction will be
2. Participant must make sure the displayed in RED. The final solution
capacity is not exceeded at any should not have any such errors else
production line in any production the entry will be considered invalid.
location. If this happens solution will 6. The profit cell in given at the bottom
be considered invalid and entry will of the Solution sheet. The team which
be disqualified. maximizes the overall profit will be
3. Overall capacity of any plant can declared winner. Participants also
exceed. If extra capacity of plant is need to submit 1 page report on the
used then for every kg produced approach they followed to come to
the final solution.
Labyrinthine Page 4
Copyrights Reserved by NEEV 2011 Symbiosis Centre for Management & HRD
The name of the participants, college name etc. should be mentioned only on the cover page
and nowhere else in the entire document. Failure to adhere to this clause will result in
automatic disqualification.
The shortlisted teams will be invited on campus for subsequent rounds.
For any queries regarding the case write to us on labyrinthine.neev11@gmail.com
Or Contact
Manoj Jaju +91 9765897297
Aniket Dahasahasra +91 9371923182
Labyrinthine Page 5