You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

A A
SUMP
PIT -1

KEY PLAN
B B
NOTES:
1. ALL DIMENSION ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
2. ALL CO-ORDINATES ARE RELATED TO QND95.
3. ALL LEVELS ARE IN METER AND RELATED TO QATAR NATIONAL
HEIGHT DATUM.
4. ALL STEEL SECTIONS ARE GRADE 355.

C C

Rev Date Revision Details Drawn Chkd Appd

E
Supervision Consultant :

E
Construction Contractor :

F AL JABER & MAKHLOUF W.L.L F


Design Consultant : Construction Sub-Contractor :

Project Name:
EAST LEG EAST LEG INTERMEDIATE INTERIM IMPROVEMENT OF THE
LEVEL PLAN B-RING ROAD, AL MANNAI AND
GUEST PALACE ROUNDABOUT
G G
SCHEME - PEDESTRIAN BRIDGES
Project Code:
(G009) IA 12/13/DS 002 ST
Status:
DETAILED DESIGN
WEST LEG Drawing Title:

DRAINAGE - PB SL18A
PEDESTRIAN BRIDGE
GROUND FLOOR

H Drawn:
V. BENEDICTOS
Checked:
ASAD H

Designed: Approved:
ARSLAN K. MUTHIAH
Date: Scale:
OCT 2019 1:100 @ A1
Drawing Number: Revision:

C2019-21-PQC-AJM-DR-DD-1010 R00
1 2 3 4 5 6 7 8 9 10 11 12