Stormwater Detention Tanks

• PUB TOP Requirements


• Follow-up by Consultants

Quarterly Dialogue
18 May 2017
PUB DC Clearance
DC Conditions for TOP

Based on Town Council Act:


• TCs are the maintenance / Managing Agent ( no need
appointment)
• Detention tanks are part of common property to be
maintained by TCs

Consultant need not attached written confirmation


on appointment of MA during TOP application
DC Conditions for TOP

• PUB agreed that letter of undertaking is not required


• PUB has changed to annual online declaration that TC had
conducted the inspection. TC to file records of inspections
• PUB agreed to send reminder prompt to TC for annual
declaration

• Consultant need not attached LOU


• To indicate TC for the project and the email address
(generic from sgdi) in TOP application letter
• Consultants to conduct technical briefings to TC
TOP for Blocks and Precinct
To facilitate HDB Phase TOP arrangement
• PUB agreed that they will process and issue TOP for
blocks but the tanks should be completed

• Detention tanks will be covered under the last TOP,


i.e. Precinct works TOP

• The annual declaration by TC will be based on the TOP


date for the Precinct works.
Thank you.