You are on page 1of 1

RELAY TEST REPORT

2/09/2020
PAGE 1

NAMEPLATE DATA
MANUFACTURER: SCHNEIDER MODEL: SEPAM
SEPAMS20 S20 TEST STATUS: Pass
ASSET ID: Serial Number: 19245217 DATASHEET:
SUBSTATION CINESTAR PT RATIO: kV : V Counter Clockwise Rotation 0-360 Lag
LZOP: CT RATIO: 150 :5 A Earthing L->N Job #: 51/50-FASE
PROTECTION: INTERRUPTOR PRINCIPAL RELAY FIRMWARE:

Overcurrent Settings
Curve: I >: 0.60 A I >>: 13.33 A I >>>: 0.00 A Reset: 1.00 s
Phase
CEI Very Inverse Mult: 0.200 Time Delay 1 0.05 s I >>>Time: 0.00 s

Phase Timing Sun Feb 09 17:52:20 2020


Multiple

Test MIN. Theo. Max. A B C


P/F
# Current Time Time Time Time Time Time
(A) (s) (s) (s) (s) (s) (s)
1 1.20 0.72 8.616 9.070 9.523 8.844 8.902 8.784 P
2 1.30 0.78 5.720 6.021 6.322 5.987 5.982 5.967 P
3 1.40 0.84 4.278 4.504 4.729 4.536 4.526 4.514 P
4 1.50 0.90 3.425 3.605 3.786 3.588 3.587 3.595 P
5 2.00 1.20 1.710 1.801 1.891 1.836 1.826 1.821 P
6 2.50 1.50 1.140 1.200 1.260 1.228 1.215 1.210 P
7 3.00 1.80 0.855 0.901 0.951 0.922 0.925 0.926 P
8 4.00 2.40 0.570 0.600 0.650 0.618 0.627 0.624 P
9 5.00 3.00 0.428 0.450 0.500 0.463 0.473 0.463 P
10 7.00 4.20 0.285 0.300 0.350 0.325 0.321 0.328 P
11 9.00 5.40 0.214 0.225 0.275 0.246 0.249 0.239 P
12 11.0 6.60 0.171 0.180 0.230 0.198 0.198 0.198 P
13 15.0 9.00 0.122 0.129 0.179 0.146 0.142 0.144 P
14 18.0 10.80 0.101 0.106 0.156 0.123 0.119 0.120 P

Phase Pickup Mon Feb 10 22:17:26 2020


Setting Minimum Maximum Actual Error P/F
# Unit
(A) (A) (A) (A) (%)

1 A 0.600 0.570 0.630 0.600 -0.0 P

2 B 0.600 0.570 0.630 0.600 -0.0 P

3 C 0.600 0.570 0.630 0.600 -0.0 P

Phase Instantaneous Mon Feb 10 22:19:51 2020

Setting Minimum Maximum Actual Error P/F


# Unit
(A) (A) (A) (A) (%)

1 A 13.333 12.667 14.000 13.325 0.0 P

2 B 13.333 12.667 14.000 13.328 0.0 P

3 C 13.333 12.667 14.000 13.329 0.0 P

TEST EQUIPMENT USED: SMRT1 (SN201802070012) TESTED BY: CARLOS VIZCARRA

COPYRIGHT © 2002-2020 POWERDB, INC. www.powerdb.com Form Schema 0, REVISED 1/29/2019