1 - Statement of Work (SOW) vs Project Scope Statement


2 - Illustrated Example
3 - Which Comes First ?
4 - Project Statement of Work (SOW) vs Procurement
Statement of Work (SOW)

Eng. Moemen Barakat , PMPⓇ , Fidic 2017 ,


6Sigma , Business Continuity
Mob : +966/545669454
Let’s Think & Discuss
Project SOW Project Scope Procurement
Statement SOW

Definition is known as Project Statement of a document including more As its name suggest, the
Work (to distinguish with details than Project Procurement Statement of
Procurement Statement of Statement of Work on the Work is to be created during
Project Procurement
Work) is a document including scope and deliverables of
Management. It contains
the high level description of the the project, major enough detail to allow potential
intended deliverables of the assumptions and sellers to decide whether they
project. constraints are also added are qualified or beneficial to
if appropriate. pursue the project work.

From the PMOBK Guide definitions, it seems that both Statement of


Work and Project Scope Statement are very similar as they both
contains the descriptions of the project deliverables. However, when
researched in more depths, it can be found that:

Statement of Work (SOW) contains high level information of the


project deliverables
Project Scope Statement contains more details of the deliverables
plus assumptions and constraints Let’s Think & Discuss
Project SOW Project Scope Procurement
Statement SOW
Contents Statement of Work (SOW) Project Scope Statement on
the other hands includes
The Procurement Statement of Work
contains at least the following includes the following elements:
three elements: lots of details for the
project (not necessarily performance (describe what can be
Organization strategic plan include all of the following): accomplished)
Business needs functional (convey the end purpose
High level product scope objectives or result)
project scope design (convey precisely what are
These are meant to provide an product scope to be done)
overarching direction for the requirements The Procurement Statement of Work
project only, NOT the full boundaries may be developed by either the
implementation details. The high deliverables seller or buyer. You will just need to
level product scope contained in acceptance criteria remember that the Project
the statement of work must be constraints Statement of Work (SOW) is mostly
further developed in order for all assumptions intended for internal use while the
stakeholders and project team milestones Procurement Statement of Work
members to really understand cost estimation (SOW) is for always for external use
what are expected from the specifications
project. This is where the Project configuration management
Scope Statement comes into play. requirements
approval requirements
Which Comes First?
These two terms are often confused in real-world practice as project managers may use the
two terms interchangeably to refer to documentation containing all the work to be done for
the project. But according to the PMBOK® Guide (as the PMBOK® Guide is intended for
medium to large scale projects), the Statement of Work (SOW) would only contain very high
level scope while the Project Scope Statement contains the full details.

Since the Statement of Work (SOW) contains a high level description of the project scope
while the Project Scope Statement contains the lower level (more detailed) description of the
project scope, it can be easily inferred that the Project Scope Statement is developed from
the contents of the Statement of Work (SOW). So the following documents need to be
developed in sequence:

Project Statement of Work (SOW) – documenting the very first ideas for the project
Project Charter – formally authorizing the project and project manager (= SOW + Business
Case + Contract)
Project Scope Statement – when the project manager is collecting requirements and defining