You are on page 1of 143

fyk(Mpa

slab LY Lx=Le Span ratio ) βa effective Slab


Panel Span type (mm) (mm) (Ly/Lx)     depth(d) system
S-1 end 4900 4000 1.23 300 37.75 90.07 two way
S-2 end 4900 4000 1.23 300 37.75 90.07 two way
S-3 end 4900 4000 1.23 300 37.75 90.07 two way
S-4 end 4900 4600 1.07 300 39.35 99.37 two way
S-5 end 5000 4000 1.25 300 37.50 90.67 two way
S-6 Interior 5000 4000 1.25 300 42.50 80.00 two way
S-7 Interior 5000 4000 1.25 300 42.50 80.00 two way
S-8 Interior 5000 4000 1.25 300 42.50 80.00 two way
S-9 end 5000 4600 1.09 300 39.13 99.92 two way
S-10 end 5000 4000 1.25 300 37.50 90.67 two way
S-11 Interior 5000 4000 1.25 300 42.50 80.00 two way
S-12 Interior 5000 4000 1.25 300 42.50 80.00 two way
S-13 Interior 5000 4000 1.25 300 42.50 80.00 two way
S-14 Interior 5000 4000 1.25 300 42.50 80.00 two way
S-15 Interior 5000 4000 1.25 300 42.50 80.00 two way
S-16 end 4700 4000 1.18 300 38.25 88.89 two way
S-17 end 4700 4000 1.18 300 38.25 88.89 two way
S-18 end 4700 4000 1.18 300 38.25 88.89 two way
S-19 end 4700 4000 1.18 300 38.25 88.89 two way
S-20 end 4700 4600 1.02 300 39.78 98.28 two way
C-1 cantilever 5000 900 5.56 300 12 76.50 cantilever
C-2 cantilever 4600 1300 3.54 300 12 92.08 cantilever

C-3 cantilever 4000 1500 2.67 300 10 127.50 cantilever

From the serviceability results of the above table, the effective depth in S9 governs the design
for all end and interior slab. C3&C4 governs the design for all cantilever slab.

ds max = 99.92 mm
dc max= 127.5 mm
Assuming Φ10mm reinforcement bars and 15mm concrete cover. Hence
Overall Depth for two way slab (Ds)=99.92+15+10/2=111.92mm, Use Ds=120mm
d=120-15-10/2=100mm (for shorter span reinforcement)
d=120-15-10-10/2=90mm (for longer span reinforcement)
Overall depth for cantilever slab (Dc) = 127.5+15+10/2+= 147.5 mm, Use Dc=150mm
dmin = 150-15-10/2=130mm

LIVE LOAD
 For General(residential, dormitory, café, school,
Restaurants, etc)=2KN/m2
 For Stair case =3KN/m2
 For Balcony =4KN/m

Panel 1
 15cm RC slab=0.12*25=3KN/m2
 2mm pvc tile =0.002*16=0.032KN/m2
 48mm cement screed=0.048*23=1.104 KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m
 Live load =4KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.39 KN/m2
Panel 2

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=10.79 KN/m2

Panel 3

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=10.79 KN/m2

Panel 4

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (4.8*2.85 *3.25 )=44.4 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗44.4
= x100% =21.43= 20%,
1.3 ( 4.61∗19.6+ 44.4 ) +1.6∗3∗19.6
Hence the load can be distributed to slab as follows

44.4
=2.265 KN /m2
19.6
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.74 KN/m2

Panel 5
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (3.85*2.85 *3.25 )=35.66 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗35.66
= x100% =16.97 %< 20%,
1.3 ( 4.61∗19.6+35.66 )+ 1.6∗3∗19.6
Hence the load can be distributed to slab as follows

35.66
=1.82 KN /m2
19.6
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.16 KN/m2
Panel 6

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (6.8 *2.85 *3.25 )=62.98 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗62.98
= x100% =66.5 %< 20%,
1.3 ( 4.61∗19.6+ 62.98 )+ 1.6∗3∗19.6
Hence the load can be distributed to slab as follows

62.98
=3.21 KN /m2
19.6
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=14.97 KN/m2

Panel 7

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 22.54m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (12.56*2.85*3.25 )= 116.34KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗116.34
= x100% = 36.7%< 20%,
1.3 ( 4.61∗22.54 +116.34 )+1.6∗3∗22.54
Hence the load can be distributed to slab as follows

116.34
=5.16 KN /m 2
22.54
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=17.5 KN/m2

Panel 8

 15cm RC slab=0.12*25=3KN/m2
 2mm pvc tile =0.002*16=0.032KN/m2
 48mm cement screed=0.048*23=1.104 KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m
 Live load =4KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.39 KN/m2
 Live load =4KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.39 KN/m2
Panel 9

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=10.79 KN/m2

Panel 10

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=10.79 KN/m2

Panel 11

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (4.5 *2.85 *3.25 )=41.68 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗41.68
= x100% =20 = 20%,
1.3 ( 4.61∗20+ 41.68 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows

41.68
=2.1 KN /m2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.52 KN/m2
Panel 12

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =5KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (5.4 *2.85*3.25 )=50 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗50
= x100% =23.14 %< 20%,
1.3 ( 4.6∗20+50 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows

50
=2.5 KN /m2
19.6

 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=14 KN/m2

Panel 13

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 23m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (5.4 *2.85 *3.25 )=50 KN


1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗50
= x100% =20.75 %< 20%,
1.3 ( 4.61∗23+50 )+1.6∗3∗23
Hence the load can be distributed to slab as follows

50
=2.17 KN /m 2
23
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.61 KN/m2

Panel 14

 15cm solid slab=0.12*24=3.6KN/m2


 2mm pvc tile =0.002*16=0.032KN/m2
 48mm cement screed=0.048*23=1.104 KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m
 Live load =4KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.39 KN/m2

Panel 15

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=10.79 KN/m2

Panel 16

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=10.79 KN/m2

Panel 17

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2
Total Wt. of partition wall (PWt) = (2.9*2.85 *3.25 )=26.81 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗26.81
= x100% =13.1 %< 20%,
1.3 ( 4.61∗20+26.81 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows

26.81
=1.34 KN /m 2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.54 KN/m2

Panel 18

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (3.8*2.85 *3.25 )=35.2 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗35.2
= x100% =16.5 %< 20%,
1.3 ( 4.61∗20+35.2 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows

35.2
=1.76 KN /m2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.08 KN/m2

Panel 19

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (7*2.85 *3.25 )= 64.8KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗64.8
= x100% =33.43 %< 20%,
1.3 ( 4.61∗20+ 64.8 )+ 1.6∗3∗20
Hence the load can be distributed to slab as follows

64.8
=3.2 KN /m2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=14.95 KN/m

Panel 20

 15cm RC slab=0.12*25=3KN/m2
 2mm pvc tile =0.002*16=0.032KN/m2
 48mm cement screed=0.048*23=1.104 KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m
 Live load =4KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.39 KN/m2

Panel 21

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=10.79 KN/m2

Panel 22
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 18.8m2
 20cm partition wall = (0.2x14 + 2x0.025x23) =3.95𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (2.3*2.85 *3.95 )=25.89 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗25.89
= x100% =11.33 %< 20%,
1.3 ( 4.61∗18.8+25.89 )+1.6∗4∗18.8
Hence the load can be distributed to slab as follows

25.89
=1.38 KN /m2
18.8

 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.58 KN/m2

Panel 23

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =4KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 18.8m2
 20 cm partition = (0.2*14 + 2*0.025*23)=3.95 KN/m2

Total Wt. of partition wall (PWt) = (3.8*2.85 *3.25 )=42.77 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap

Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd


1.3∗42.77
= x100% =19.26%< 20%,
1.3 ( 4.61∗18.8+ 42.77 ) +1.6∗4∗18.8
Hence the load can be distributed to slab as follows

42.78
=2.28 KN /m2
18.8
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=15.35 KN/m2
Panel 24

 15cm solid slab=0.15*24=3.6KN/m2


 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=5.21 KN/m2
 Live load =4KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 21.62m2
 20 cm partition = (0.2*14 + 2*0.025*23)=3.95 KN/m2

Total Wt. of partition wall (PWt) = (4.4*2.85 *3.25 )=49.5KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap

Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd


1.3∗49.5
= x100% = 19.36%< 20%,
1.3 ( 4.61∗21.62+ 49.5 )+ 1.6∗4∗21.62
Hence the load can be distributed to slab as follows

49.5
=2.29 KN /m2
21.62
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=15.37 KN/m2
Cantilever slab (C1)

Here we have used lightweight aluminum framed railing with no specific detailed information so
the dead weight (KN) is ignored.
Finishes for all area of space.
 15 𝑐𝑚 𝑡ℎ𝑖𝑐𝑘 𝑅𝐶 𝑠𝑙𝑎𝑏 = 0.15 × 25 = 3.75 𝐾𝑁/𝑚2
 2.5𝑐𝑚 𝑝𝑙𝑎𝑠𝑡𝑒𝑟𝑖𝑛𝑔 = 0.025 × 23 = 0.575𝐾𝑁/𝑚2
 2𝑐𝑚 ceramic 𝑡𝑖𝑙𝑒 = 0.002 × 16 = 0.46𝐾𝑁/𝑚2
 30𝑚𝑚 𝑐𝑒𝑚𝑒𝑛𝑡 𝑠𝑐𝑟𝑒𝑒𝑑 = 0.03 × 23 = 0.69𝐾𝑁/𝑚2
𝑇𝑜𝑡𝑎𝑙 𝑑𝑒𝑎𝑑 (𝐷L) = 3.75 + 0.575 + 0.46 + 0 .69 = 5.475 𝐾𝑁/𝑚2

QK (live load) =4KN/m2 (EBCS-1, 1995, table 2.9 & 2.10, imposed loads on building floors) for

Hotel.

Therefore , Design load ( P d ) for C 5=1.3 ( DL )+1.6 ( ¿ )


¿ 1.3(5.475)+1.6∗4=13.52 KN ⁄ m2

Cantilever slab (C2)

Here we have used lightweight aluminum framed railing with no specific detailed information so
the dead weight (KN) is ignored.
Finishes for all area of space.
 15 𝑐𝑚 𝑡ℎ𝑖𝑐𝑘 𝑅𝐶 𝑠𝑙𝑎𝑏 = 0.15 × 25 = 3.75 𝐾𝑁/𝑚2
 2.5𝑐𝑚 𝑝𝑙𝑎𝑠𝑡𝑒𝑟𝑖𝑛𝑔 = 0.025 × 23 = 0.575𝐾𝑁/𝑚2
 2𝑐𝑚 ceramic 𝑡𝑖𝑙𝑒 = 0.002 × 16 = 0.46𝐾𝑁/𝑚2
 30𝑚𝑚 𝑐𝑒𝑚𝑒𝑛𝑡 𝑠𝑐𝑟𝑒𝑒𝑑 = 0.03 × 23 = 0.69𝐾𝑁/𝑚2
𝑇𝑜𝑡𝑎𝑙 𝑑𝑒𝑎𝑑 (𝐷𝐿) = 3.75 + 0.575 + 0.46 + 0 .69 = 5.475 𝐾𝑁/𝑚2

QK (live load) =4KN/m2 (EBCS-1, 1995, table 2.9 & 2.10, imposed loads on building floors) for

Hotel.

Therefore , Design load ( P d ) for C 5=1.3 ( DL )+1.6 ( ¿ )


¿ 1.3(5.475)+1.6∗4=13.52 KN ⁄ m2

Cantilever slab (C3)

Here we have used lightweight aluminum framed railing with no specific detailed information so
the dead weight (KN) is ignored.
Finishes for all area of space.
 15 𝑐𝑚 𝑡ℎ𝑖𝑘 𝑅𝐶 𝑠𝑙𝑎𝑏 = 0.15 × 25 = 3.75 𝐾𝑁/𝑚2
 2.5𝑐𝑚 𝑝𝑙𝑎𝑠𝑡𝑒𝑟𝑖𝑛𝑔 = 0.025 × 23 = 0.575𝐾𝑁/𝑚2
 2𝑐𝑚 ceramic 𝑡𝑖𝑙𝑒 = 0.002 × 16 = 0.46𝐾𝑁/𝑚2
 30𝑚𝑚 𝑐𝑒𝑚𝑒𝑛𝑡 𝑠𝑐𝑟𝑒𝑒𝑑 = 0.03 × 23 = 0.69𝐾𝑁/𝑚2
𝑇𝑜𝑡𝑎𝑙 𝑑𝑒𝑎𝑑 (𝐷𝐿) = 3.75 + 0.575 + 0.46 + 0 .69 = 5.475 𝐾𝑁/𝑚2
QK (live load) =4KN/m2 (EBCS-1, 1995, table 2.9 & 2.10, imposed loads on building floors) for

Hotel.

Therefore , Design load ( P d ) for C 5=1.3 ( DL )+1.6 ( ¿ )


¿ 1.3(5.475)+1.6∗4=13.52 KN ⁄ m2

3.1.2 Analysis of slab Moment


 For two way slab: mi= αiPdLx2
 For cantilever: M=PdLx2/2+pL/4

Where Pd is distributed load

Where, mi=the design moment per unit width at the point of reference αi=the coefficient given in
Table A−1 in EBCS2−1995. Pd=the design load Lx=the length of the shorter span of the of the
panel

Mxs=αxs∗Pd∗L 2eff Mxf =αxf ∗Pd∗L 2 eff

Mys=αys∗Pd∗L 2eff Myf =αys∗Pd∗L 2 eff

Here we have considered bending moment coefficients of half continues panels as fully
continues panels, If the continues section is greater or equal to the discontinues part of the panel.

panel Suppor Lx Ly Ly/L Pd αxs αxf αys αyf Mxs Mxf Mys Myf
t cond. x
S1 4 4 4. 1.2 12.39 0.063 0.047 0.047 0.036 12.49 9.317 9.32 7.14
9
S2 3 4 4. 1.2 10.79 0.056 0.042 0.039 0.03 9.67 7.25 6.73 5.18
9
S3 3 4 4. 1.2 10.79 0.056 0.042 0.039 0.03 9.67 7.25 6.73 5.18
9
S4 3 4 4. 1.2 13.74 0.056 0.042 0.039 0.03 12.31 9.23 8.57 6.6
9
S5 6 4 4. 1.2 13.16 4.34 2.2 17.55 8.77
9
S6 3 4 4. 1.2 14.97 4.99 2.48 19.98 9.98
9
S7 4 4. 4. 1.1 17.5 7.72 3.86 30.85 15.43
6 9
S8 2 4 5 1.3 10.79 0.052 0.039 0.039 0.029 8.98 6.73 6.73 5.01
S9 1 4 5 1.3 10.79 0.046 0.035 0.032 0.024 7.94 6.04 5.52 4.14
S10 1 4 5 1.3 10.79 0.046 0.035 0.032 0.024 7.94 6.04 5.52 4.14
S11 2 4 5 1.3 13.52 0.052 0.039 0.039 0.029 10.98 8.44 8.44 6.27
S12 2 4 5 1.3 14 4.67 2.33 18.67 9.33
S13 2 4. 5 1.1 13.61 6 3 23.99 11.99
6
S14 2 4 5 1.3 12.39 0.052 0.039 0.039 0.029
10.31 7.73 7.73 5.75
S15 1 4 5 1.3 10.79 0.046 0.035 0.032 0.024
7.94 6.04 5.52 4.14
S16 1 4 5 1.3 10.79 0.046 0.035 0.032 0.024
7.94 6.04 5.52 4.14
S17 1 4 5 1.3 12.54 0.046 0.035 0.032 0.024
9.23 7.02 6.42 4.52
S18 3 4 5 1.3 13.08 0.062 0.047 0.039 0.03
12.96 9.84 8.16 6.28
S19 1 4 5 1.3 14.95 4.99 2.48 19.96 9.98
S20 4 4 4. 1.2 12.39 0.063 0.047 0.047 0.036 12.49 9.32 9.32 7.14
7
S21 3 4 4. 1.2 10.79 0.056 0.042 0.039 0.03 9.67 7.25 6.73 5.18
7
S22 3 4 4. 1.2 12.58 0.056 0.042 0.039 0.03 11.27 8.45 7.85 6.04
7
S23 3 4 4. 1.2 15.36 0.056 0.042 0.039 0.03 13.76 10.32 9.58 7.37
7
S24 4 4. 4. 1 15.37 0.047 0.036 0.047 0.036 15.29 11.71 15.29 11.71
7
6
support and field moment calculation

For panel 5

W = 13.16 KN/m2 W/2 = 6.58 KN/m2


Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is assigned
to the direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used
Calculation of moments
X direction middle strip along A-A:

Cantilever moment: mx = 13.16 * 12/2 = 6.58KNm


Negative Moment: mxs = 6.58* 2/3 = 4.34KNm

Positive moment: mxf = 6.58 * 1/3 = 2.2KNm


X direction edge strip

Cantilever moment: mx = 6.58 * 12/2 = 3.29KNm


Negative Moment: mxs = 3.29 * 2/3 = 2.19KNm
Positive moment: mxf = 3.29 * 1/3 = 1.1KNm

Y direction middle strip along B-B:


Simply supported span moment: my = 13.16* 42/8 = 26.32KNm

Negative Moment: mys = 26.32 * 2/3 = 17.55KNm

Positive moment: myf = 26.32 * 1/3 = 8.77KNm


Y direction edge strip:
Cantilever moment: my = 6.58 * 12/2 = 3.29KNm

Negative Moment: mys = 3.29* 2/3 = 2.19KNm


Positive moment: myf = 3.29 * 1/3 = 1.1KNm

For panel 6

W = 14.97 KN/m2 W/2 = 7.49 KN/m2


Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is
assigned to the direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used
Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 14.97 * 12/2 = 7.49KNm
Negative Moment: mxs = 7.49 * 2/3 = 4.99KNm

Positive moment: mxf = 7.49 * 1/3 = 2.48KNm


X direction edge strip
Cantilever moment: mx = 7.49 * 12/2 = 3.75KNm
Negative Moment: mxs = 3.75 * 2/3 = 2.45KNm
Positive moment: mxf = 3.75 * 1/3 = 1.25KNm

Y direction middle strip along B-B:

Simply supported span moment: my = 14.97* 42/8 = 29.94KNm


Negative Moment: mys = 29.94 * 2/3 = 19.96KNm

Positive moment: myf = 29.94 * 1/3 = 9.98KNm

Y direction edge strip:


Cantilever moment: my = 7.49 * 12/2 = 3.75KNm
Negative Moment: mys = 3.75* 2/3 = 2.5KNm
Positive moment: myf = 3.75 * 1/3 = 1.25KNm

FOR PANEL 7
W/2 = 8.75
W = 17.5 KN/m2 KN/m2
Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4.6/4 = 1.15m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is assigned to the
direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 14.97 * 1.152/2 = 11.57KNm
Negative Moment: mxs = 11.57 * 2/3 = 7.72KNm

Positive moment: mxf = 11.57 * 1/3 = 3.86KNm


X direction edge strip
Cantilever moment: mx = 8.75 * 1.152/2 = 5.79KNm
Negative Moment: mxs = 5.79 * 2/3 = 3.86KNm
Positive moment: mxf = 5.79 * 1/3 = 1.92KNm

Y direction middle strip along B-B:

Simply supported span moment:my=17.5*4.62/8=46.2KNm


Negative Moment: mys = 46.2 * 2/3 = 30.85KNm

Positive moment: myf = 46.2 * 1/3 = 15.43KNm

Y direction edge strip:


Cantilever moment: mx = 8.75 * 1.152/2 = 5.79KNm
Negative Moment: mxs = 5.79 * 2/3 = 3.86KNm
Positive moment: mxf = 5.79 * 1/3 = 1.92K

Panel 12
W = 14 KN/m2 W/2 = 7 KN/m2
Strips in the slabs
The discontinuity lines are selected as shown in the figure
below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load
is assigned to the direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments
X direction middle strip along A-A:

Cantilevermoment:mx=14*12/2=7KNm
Negative Moment: mxs = 7 * 2/3 =4.67KNm

Positive moment: mxf = 7 * 1/3 = 2.33KNm


X direction edge strip

Cantilever moment: mx = 7*12/2=3.5KNm


Negative Moment: mxs = 3.5*2/3=2.33KNm
Positive moment: mxf = 3.5 * 1/3=1.17KNm

Y direction middle strip along B-B:


Simply supported:my=14*42/8=28KNm

Negative Moment: mys = 28 *2/3= 18.67KNm

Positive moment: myf = 28*1/3=9.33KNm


Y direction edge strip:

Cantilever moment: mx = 7*12/2=3.5KNm


Negative Moment: mxs = 3.5*2/3=2.33KNm
Positive moment: mxf = 3.5 * 1/3=1.17KNm

Panel 13
W = 13.61 KN/m2 W/2 =6.81 KN/m2
Strips in the slabs
The discontinuity lines are selected as shown in the figure
below.
Edge strip width = b/4 = 4.6/4 = 1.15m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is
assigned to the direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments
X direction middle strip along A-A:

Cantilevermoment:mx=13.61*1.152/2=9KNm
Negative Moment: mxs = 9 * 2/3 =6KNm

Positive moment: mxf = 9* 1/3 =3KNm


X direction edge strip

Cantilever moment: mx = 6.81*1.152/2=4.5KNm


Negative Moment: mxs =4.5*2/3=3KNm
Positive moment: mxf = 4.5 * 1/3=1.5KNm

Y direction middle strip along B-B:


Simply supported:my=13.61*4.62/8=35.99KNm

Negative Moment: mys = 35.99 *2/ 3=23.99KNm

Positive moment: myf = 35.99*1/3=11.99KNm


Y direction edge strip:

Cantilever moment: mx = 6.81*1.152/2=4.5KNm


Negative Moment: mxs =4.5*2/3=3KNm
Positive moment: mxf = 4.5 * 1/3=1.5KNm

Panel 19
W = 14.95 KN/m2 W/2 = 7.48 KN/m2
Strips in the slabs
The discontinuity lines are selected as shown in the figure
below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is
assigned to the direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments
X direction middle strip along A-A:

Cantilevermoment:mx=14.97*12/2=7.49KNm
Negative Moment: mxs = 7.49 * 2/3 =4.99KNm

Positive moment: mxf = 7.49 * 1/3 = 2.48KNm


X direction edge strip

Cantilever moment: mx = 7.49*12/2=3.75KNm


Negative Moment: mxs = 3.75*2/3=2.45KNm
Positive moment: mxf = 3.75 * 1/3=1.25KNm

Y direction middle strip along B-B:


Simply supported:my=14.97*42/8=29.94KNm

Negative Moment: mys = 29.94 *2/ 3=19.96KNm

Positive moment: myf = 29.94*1/3=9.98KNm


Y direction edge strip:
Cantilever moment: my=7.49*12/2=3.75KNm

Negative Moment: mys = 3.75* 2/3 =2.5KNm


Positive moment: myf = 3.75 * 1/3=1.25KNm

CANTILEVER MOMNT

PANEL LX(M) DL(KN/M2) Mx(KN/M2)


C1 09 13.52 5.5
C2 1.3 13.52 11.4
C3 1.5 13.52 15.21
Moment adjustment
A. Support moment adjustment
Coefficient Method of Moment Distribution

For supports in which the slab is continuous there will be two different support moments. The
difference may be distributed between the panels on either side of support to equalize their
moments.

Two methods of different accuracy are given for treating the effect of this redistribution on
moments away from the support.

EBCS 2, 1995 article A.3.3.1 No.3 and 4

If the difference between initial support moments are less than 20%of the average moment

If the percentage difference between moments is >20% ,use moment distribution method

Moment adjustment
Check whether the support moment is greater than 20% or not.
Sample calculation
For S-1
Mmax=9.32KN-m,
Mmin=6.73KN-m
ΔMs = Mmax - Mmin =9.32-6.73=2.59 KNm
ΔMs*100%/Mmax=2.59*100%/9.32=27.79%
Therefore 27.79% > 20% use moment
distributionmethed.

ΔMs*100%
Slab panel Mmax Mmin ΔMs 20%(Mmax) Method
Mmax
S1/S2 9.32 6.73 2.59 27.79 >20% Moment distribution
S1/S8 12.49 8.98 3.51 28.10 >20% Moment distribution
S2/S3 6.73 6.73 0.00 0.00 <20% Average
S2/S9 9.67 7.94 1.73 17.89 <20% Average
S3/S4 8.57 6.73 1.84 21.47 >20% Moment distribution
S3/S10 9.67 7.93 1.74 17.99 <20% Average
S4/S5 17.55 8.57 8.98 51.17 <20% Moment distribution
S4/S11 12.31 10.98 1.33 10.80 <20% Average
S5/S6 19.96 17.55 2.41 12.07 <20% Average
S6/S7 30.85 19.69 11.16 36.18 >20% Moment distribution
S6/S12 4.99 4.67 0.32 6.41 <20% Average
S7/S13 7.72 6.00 1.72 22.28 >20% Moment distribution
S8/S9 6.73 5.52 1.21 17.98 <20% Average
S8/S14 10.31 8.98 1.33 12.90 <20% Average
S9/S10 5.52 5.52 0.00 0.00 <20% Average
S9/S15 7.94 7.94 0.00 0.00 <20% Average
S10/S11 8.44 5.52 2.92 34.60 >20% Moment distribution
S10&/S16 7.94 7.94 0.00 0.00 <20% Average
S11/S17 10.98 9.23 1.75 15.94 <20% Average
S12/S13 23.99 18.67 5.32 22.18 >20% Moment distribution
S12/S19 4.99 4.67 0.32 6.41 <20% Average
S13/C1 6.00 5.50 0.50 8.33 <20% Average
S14/S15 7.73 5.52 2.21 28.59 >20% Moment distribution
S14/S20 12.49 10.31 2.18 17.45 <20% Average
S15/S16 6.42 5.52 0.90 14.02 <20% Average
S15/S21 9.67 7.94 1.73 17.89 <20% Average
S16/S17 6.42 5.52 0.90 14.02 <20% Average
S16/C3 15.21 7.94 7.27 47.80 >20% Moment distribution
S17/S18 8.16 6.42 1.74 21.32 >20% Moment distribution
S17/C3 15.21 9.23 5.98 39.32 >20% Moment distribution
S18/S19 19.96 8.16 11.80 59.12 >20% Moment distribution
S18/S22 12.96 11.27 1.69 13.04 <20% Average
S19/C1 19.96 5.50 14.46 72.44 >20% Moment distribution
S19/S23 13.76 4.99 8.77 63.74 >20% Moment distribution
S20/S21 9.32 6.73 2.59 27.79 >20% Moment distribution
S21/C3 15.21 6.73 8.48 55.75 >20% Moment distribution
S22/S23 9.58 7.85 1.73 18.06 <20% Average
S22/C3 15.21 7.85 7.36 48.39 >20% Moment distribution
S23/S24 15.21 9.58 5.63 37.02 >20% Moment distribution
S24/C2 15.21 11.42 3.79 24.92 >20% Moment distribution

Use moment distribution method

3 EI
Stiffness for end support K=
4 lx

3 EI
K 1= =0.1875
4∗4

3 EI
K 2= =0.01875
4∗4

0.1875
Distribution factor DF1= =0.5
0.1875+0.1875

0 .1875
Distribution factor DF2= =0 .5
0 .1875∗0 . 1875

For S1&S2

s-1 s-2
DF 0.5 0.5
Un balanced moment -9.32 6.73
1.3 1.3
Balanced moment -8.03 8.03

For S1&S8

s-1 s-8
DF 0.5 0.5
Un balanced moment -12.49 8.98
1.76 1.76
Balanced moment -10.74 10.74
For S3&S4

s-4 s-3
DF 0.5 0.5
Un balanced moment -8.57 6.73
0.92 0.92
Balanced moment -7.65 7.65
For S4&S5

s-5 s-4
DF 0.5 0.5
Un balanced moment -17.55 8.57
4.49 4.49
Balanced moment -13.06 13.06

For S6&S7

s-7 s-6
DF 0.5 0.5
Un balanced moment -30.85 19.69
5.58 5.58
Balanced moment -25.27 25.27
For S7&S13

s-7 s-13
DF 0.5 0.5
Un balanced moment -7.72 6
0.86 0.86
Balanced moment -6.86 6.86
For S10&S11

s-11 s-10
DF 0.5 0.5
Un balanced moment -8.44 5.52
1.46 1.46
Balanced moment -6.98 6.98
For S12&S13

s-13 s-12
DF 0.5 0.5
Un balanced moment -23.99 18.67
2.66 2.66
Balanced moment -21.33 21.33
For S14&S15

s-14 s-15
DF 0.5 0.5
Un balanced moment -7.73 5.52
1.11 1.11
Balanced moment -6.63 6.63
For C3&S16

C3 s-16
DF 0.8 0.3
Un balanced moment -15.21 7.94

Balanced moment
For S17&S18

s-18 s-17
DF 0.5 0.5
Un balanced moment -8.16 6.42
0.87 0.87
Balanced moment -7.29 7.29
For S17&C3

C3 s-17
DF 0.8 0.2
Un balanced moment -15.21 9.23

Balanced moment

For S18 & S19

s-19 s-18
DF 0.2 0.8
Un balanced moment -19.96 8.16
5.9 5.9
Balanced moment -14.06 14.06
For S19&C1
s-19 s-C1
DF 0.2 0.8
Un balanced moment -19.96 5.5
2.89 11.57
Balanced moment -17.07 17.07
For S19&S23

s-23 s-19
DF 0.5 0.5
Un balanced moment -13.76 4.99
4.39 4.39
Balanced moment -9.38 9.38
For S20&S21

s-20 S21
DF 0.5 0.5
Un balanced moment -9.32 6.73
1.3 1.3
Balanced moment -8.02 8.02
For S21&C3

C3 s-21
DF 0.8 0.2
Un balanced moment -15.21 6.73

Balanced moment
For S22&C3

C3 S22
DF 0.8 0.2
Un balanced moment -15.21 7.85
For S23& S24
Balanced moment s-24 S243
DF 0.5 0.5
Un balanced moment -15.29 9.58
2.86 2.86
Balanced moment -12.44 12.44
For S24& C2

s-24 C2
DF 0.2 0.8
Un balanced moment -15.29 11.42
0.77 3.1
Balanced moment -14.52 14.52
B.Span Moment Adjustment

Calculation of adjusted span moments based of change of support moments.

moment adjustment for slab

Slab no lx K DF Un Balanced
balanced moment
moment
S1&S2 S1 4 0.188 0.5 9.32 Use DF 8.03
S2 4 0.188 0.5 6.73 8.03
S1&S8 S1 4 0.188 0.5 12.49 Use DF 16.74
S8 4 0.188 0.5 8.98 16.74
S2&S3 S2 4 0 6.73 Take 6.73
S3 4 0 6.73 average 6.73
S2&S9 S2 4 0.87 9.67 Take 8.81
S9 4 0.87 7.94 average 8.81
S3&S4 S3 4 0.188 0.5 6.73 Use DF 7.65
S4 4 0.188 0.5 8.57 7.65
S3&S10 S3 4 0.85 9.67 Take 8.82
S10 4 0.85 7.97 average 8.82
S4&S5 S4 4 0.188 8.57 Use DF 13.06
S5 4 0.188 17.77 13.06
S4&S11 S4 4 0.67 12.31 Take 11.65
S11 4 0.67 10.98 average 11.65
S5&S6 S5 4 1.21 17.55 Take 18.75
S6 4 1.21 19.96 average 18.75
S6&S7 S6 4 0.188 0.5 19.96 Use DF 25.27
S7 4.6 0.163 0.5 30.85 25.27
S6&S12 S6 4 0.16 4.99 Take 4.83
S12 4 0.16 4.67 average 4.83
S7&S13 S7 4.6 0.163 0.5 7.72 Use DF 6.86
S13 4.6 0.163 0.5 6 6.86
S8&S9 S8 4 0.61 6.73 Take 6.13
S9 4 0.61 5.52 6.13
average
S8&S14 S8 4 0.67 8.98 Take 9.65
S14 4 0.67 10.31 average 9.65
S9&S10 S9 4 0 5.52 Take 5.52
S10 4 0 5.52 average 5.52
S9&S15 S9 4 0 7.94 Take 7.94
S15 4 0 7.94 average 7.94
S10&S1 S10 4 0.188 0.5 5.52 Use DF 6.98
1 S11 4 0.188 0.5 8.44 6.98
S10&S1 S10 4 0 7.94 Take 7.94
S16 4 0 7.94 average 7.94
6
S11&S1 S11 4 0.88 10.98 Take 10.11
S17 0.88 9.23 average 10.11
7
S12&S1 S12 4 0.188 0.5 18.67 Use DF 21.33
S13 4.6 0.188 0.5 23.99 21.33
3
S12&S1 S12 4 0.16 4.67 Take 4.83
S19 4 0.16 4.99 4.83
9 average
S13&C1 S13 4.6 0.25 6 Take 5.75
C1 09 0.27 5.5 average 5.75
S14&S1 S14 4 0.188 0.5 7.73 Use DF 6.63
S15 4 0.188 0.5 5.52 6.63
5
S14&S2 S14 4 1.1 10.31 Take 11.4
S20 1 1.1 12.49 average 11.4
0
S15&S1 S15 4 0.45 5.52 Take 5.97
S16 4 0.45 6.42 average 5.97
6
S15&S2 S15 4 0.87 7.94 Take 8.81
S21 1 0.87 9.67 average 8.81
1
S16&S1 S16 4 0.45 5.52 Take 5.97
S17 4 0.45 6.42 average 5.97
7
S16&C3 S16 4 0.188 0.3 7.94 Use DF 15.21
C3 1.5 0.5 0.8 15.21 15.21
S17&S1 S17 4 0.188 0.5 6.42 Use DF 7.29
S18 4 0.188 0.5 8.16 7.29
8
S17&C3 S17 4 0.188 0.3 9.23 Use DF 15.21
C3 1.5 0.5 0.8 15.21 15.21
S18&S1 S18 4 0.188 0.5 8.16 Use DF 14.06
S19 4 0.188 0.5 19.96 14.06
9
S18&S2 S18 4 0.85 12.96 Take 12.12
S22 4 0.85 11.27 average 12.12
2
S19&C1 S19 4 0.188 0.2 19.96 Use DF 17.07
C1 0.9 0.8 0.8 5.5 17.07
S19&S2 S19 4 0.188 0.5 4.99 Use DF 9.38
S23 4 0.188 0.5 13.76 9.38
3
S20&S2 S20 4 0.188 0.5 9.32 Use DF 8.02
S21 4 0.188 0.5 6.73 8.02
1
S21&C3 S21 4 0.188 0.3 6.73 Use DF 15.21
C3 1.5 0.5 0.8 15.21 15.21
S22&S2 S22 4 0.87 0.5 7.85 Take 8.72
S23 4 0.87 0.5 9.58 8.72
3 average
S22&C3 S22 4 0.188 0.3 7.85 Use DF 15.21
C3 1.5 0.5 0.8 15.21 15.21
S23&S2 S23 4 0.188 0.2 9.58 Use DF 12.44
S24 4.6 0.163 0.8 15.29 12.44
4
S24&C2 S24 4 0.188 0.2 15.29 Use DF 14.52
C2 1.3 0.6 0.8 11.42 14.52

Adjustments of Field Moments

According to EBCS 2, 1995 article A.3.3.3 Method II

 In this method consideration of the effects of changes of support moments is limited to


the adjacent spans. Since no effects on neighboring support sections need to be
considered; only a simple balancing operation is required at each edge and no iterative
process is involved.
 The procedure for applying method II, is as follows
o Support and span moments are first calculated for individual panels by assuming
each panel to be fully loaded. This is done by using the coefficients given in Table
A-1 as described in Section A.3.2
o The unbalanced moment is distributed using the moment distribution method. The
relative stiffness of each panel shall be taken proportional to its gross moment of
inertia divided by the smaller span.
o If the support moment is decreased, the span moments mxf and myf are then
increased to allow for the changes of support moments. This increase is calculated
as being equal to the change of the support moment multiplied by the factors
given in Table A-2. If a support moment is increased, no adjustments shall be
made to the span moments.
Δ𝒎𝒙𝒇= 𝒄𝒙Δ𝒎𝒙𝒔+ 𝒄𝒙Δ𝒎𝒚𝒔 Δ𝒎𝒚𝒇= 𝒄𝒚Δ𝒎𝒙𝒔+ 𝒄𝒚Δ𝒎𝒚𝒔

filed moment adjustment 1Summarizes table below the adjustment of span moments

panel m xs m ys Ly /lx Cx1 Cy1 Cx2 Cy2 m xf m yf


S1 1.76 1.3 1.2 0.338 0.172 0.344 0.364 10.35 7.92
S2 0.87 1.2 0.338 0.172 0.344 0.364 7.52 5.18
S3 0.85 - 1.2 0.338 0.172 0.344 0.364 7.53 6.73
S4 0.67 0.92 1.2 0.338 0.172 0.344 0.364 9.77 7.05
S5 - 4.49 1.2 0.338 0.172 0.344 0.364 2.2 10.50
S6 0.16 1.21 1.2 0.338 0.172 0.344 0.364 3.00 10.44
S7 0.86 5.58 1.1 0.356 0.220 0.314 0.347 4.53 17.63
S8 - 0.61 1.3 0.325 0.135 0.373 0.350 6.73 5.22
S9 - 4.14 1.3 0.325 0.135 0.373 0.350 6.04 5.59
S10 - - 1.3 0.325 0.135 0.373 0.350 6.04 4.14
S11 0.88 - 1.3 0.325 0.135 0.373 0.350 8.73 6.27
S12 0.16 2.66 1.3 0.325 0.135 0.373 0.350 3.374 10.28
S13 - 2.66 1.1 0.356 0.220 0.314 0.347 3 12.91
S14 0.67 - 1.3 0.325 0.135 0.373 0.350 7.95 5.75
S15 0.87 - 1.3 0.325 0.135 0.373 0.350 6.32 4.14
S16 - 0.45 1.3 0.325 0.135 0.373 0.350 6.04 4.30
S17 - 4.52 1.3 0.325 0.135 0.373 0.350 7.02 4.702
S18 0.85 0.87 1.3 0.325 0.135 0.373 0.350 10.44 6.70
S19 2.48 2.89 1.3 0.325 0.135 0.373 0.350 4.13 11.33
S20 1.1 1.3 1.2 0.338 0.172 0.344 0.364 10.14 7.80
S21 0.87 - 1.2 0.338 0.172 0.344 0.364 7.54 5.14
S22 0.85 - 1.2 0.338 0.172 0.344 0.364 8.74 6.04
S23 4.36 0.87 1.2 0.338 0.172 0.344 0.364 12.09 8.44
S24 0.77 2.86 1 0.380 0.280 0.280 0.380 12.80 13.01

Note;-

 𝑐𝑦1 𝑎𝑛𝑑 𝑐𝑥1 Represent adjustment of span moment due to change in moment in the
longer length of the slab.
 𝑐𝑦2 𝑎𝑛𝑑 𝑐𝑥2 Represent adjustment of span moment due to change in moment in the
shorter length of the slab.

Sample calculation

Panel S-1
ΔM xs= 12.49-10.74=1.76

ΔM xf = 9.32-8.03=1.3

LY 5
= =1 .2
For LX 4 [EBCS-2, 1995 Table A-2]

Cx1 Cy1 Cx2 Cy2


0.338 0.172 0.344 0.364

Δ𝒎𝒙𝒇= 𝒄𝒙1Δ𝒎𝒙𝒔+ 𝒄𝒙2Δ𝒎𝒚𝒔=0.338*1.76+1.3*0.344=1.04

Δ𝒎𝒚𝒇= 𝒄𝒚1Δ𝒎𝒙𝒔+ 𝒄𝒚2Δ𝒎𝒚𝒔=0.172*1.76+0.364*1.3=0.4315=0.78

Adjusted moment

Mxf = 9.317+1.04=10.36

Myf =7.14+0.78= 7.92


Calculation of reinforcement for the slab

Characteristic strength of material

Concrete

Using concrete quality (grade) c-25 and class I work

fcu = 25MPa

fck = 0.8fcu = 0.8 x 25 MPa = 20 MPa

Steel

Steel quality (grade) fyk = 300 MPa

Design Strength of Materials

Concrete

γc=1.5 (Ordinary loading) from[EBCS – 2, 1995 table 3.1]

γs= 1.15

0 .8 5∗f ck 0 .85∗20
fcd= = = 11.33MPa
γc 1.5

fyk 300
fyd= = = 260.87MPa
γs 1. 15

i. Check trial thickness for flexure


For two way slabs
M max=12.8knm/m ……..span moment for slab No.S-24
b=1000mm, μmax =0.295 for 0%redstrebution of elastic moment
M max 12.8∗106
d req=
√ μ max∗fcd∗b √
=
0. 295∗11 .33∗1000
= 61.88mm

d provided = D-φ/2-clear cover

= 120-10/2-15= 100mm

dreq< d provided ………………ok, (hence the trial depth is adequate for flexure)

 depth of slab: for two way slab,D=120

dx= D-φ/2-clear cover

= 120-10/2-15= 100mm

dy= dx- φb

=100-10= 90mm

 depth of slab: for cantilever slab, D=150

dx= D-φ/2-clear cover

= 150-10/2-15= 130mm

dy= dx- φb

=130-10= 120mm

Sample flexural reinforcement calculation for Slabs

Panel S-24

a) Positive(bottom) reinforcement
i) In short span :- Mxf= 12.8 KNm
dx= 100mm

md 12.8∗106
μreq= = =0.11297
b∗fcd∗d∗d 1000∗11.33∗1002

zmin=dx /2 ¿=100/2 ¿

ρmin=0.5/ fyk =0.5/300 =0.00167


Then, rigid area of tension steel

md 12.8∗10 6
AS= = =522.04
zmin∗fyd 93.990∗260.78

A smin=ρ min∗bd = 0.00167*1000*100=167mm2

As >Asmin. Hence it is……. ok provide As calculated

πd2 π∗102
as= = =78.5
4 4

as∗1 ooo
Spacing = =150.372 mm
As

Spacing

Spacing between bars for main reinforcement shall satisfy the following requirement.

Smax= 2 t=2∗120 mm=240 mm


{
¿ 350 mm → Recommended

Provided S bmax =240 mm

Spacing minimum of the following

 ∅ main ¯¿ 10
 ∅ aggregate mm =15+5=20
 Spacing >Minimum=20 < S maximum=240

Provide: φ10 bars at 150.37mm c/c placed at the bottom in short span direction

ii) In longer span direction:- Myf=13.01 KNm

Dy= 90mm

md 13.01∗106
μreq= = =0.14176
b∗fcd∗d∗d 1000∗11.33∗90 2

zmin=dx /2 ¿=90 /2 ¿83.09

ρmin=0.5/ fyk =0.5/300 =0.00167


Then, rigid area of tension steel

md 13.01∗106
AS= = =¿600.21
zmin∗fyd 83.09∗260.78

A smin=ρ min∗bd = 0.00167*1000*90=150.3mm2

As >Asmin. Hence it is……. ok provide As calculated

πd2 π∗102
as= = =78.5
4 4

as∗1 ooo
Spacing = =130.787 mm
As

Spacing

Spacing between bars for main reinforcement shall satisfy the following requirement.

Smax= 2 t=2∗120 mm=240 mm


{
¿ 350 mm → Recommended

Provided S bmax =240 mm

Spacing minimum of the following

 ∅ main ¯¿ 10
 ∅ aggregate mm =15+5=20
 Spacing >Minimum=20 < S maximum=240

Provide: φ10 bars at 130.787mm c/c placed at the bottom in short span direction

b) Negative (top) reinforcement


In short span: - Mxs= 14.52 KNm
dx= 100mm

md 14.52∗106
μreq= = =0.12816
b∗fcd∗d∗d 1000∗11.33∗1002

zmin=dx /2 ¿=100/2 ¿

ρmin=0.5/ fyk =0.5/300 =0.00167


Then, rigid area of tension steel

md 14.52∗106
AS= = =597.731
zmin∗fyd 93.119∗260.78

A smin=ρ min∗bd = 0.00167*1000*100=167mm2

As >Asmin. Hence it is……. ok provide As calculated

πd2 π∗102
as= = =78.5
4 4

as∗1 ooo
Spacing = =131.330 mm
As

Spacing

Spacing between bars for main reinforcement shall satisfy the following requirement.

Smax= 2 t=2∗120 mm=240 mm


{
¿ 350 mm → Recommended

Provided S bmax =240 mm

Spacing minimum of the following

 ∅ main ¯¿ 10
 ∅ aggregate mm =15+5=20
 Spacing >Minimum=20 < S maximum=240

Provide: φ10 bars at 131.330mm c/c placed at the bottom in short span direction

ii. In longer span direction:- Mys=12.44 KNm

Dy= 90mm

md 12.44∗10 6
μreq= = =0.13555
b∗fcd∗d∗d 1000∗11.33∗90 2

zmin=dx /2 ¿=90 /2 ¿
ρmin=0.5/ fyk =0.5/300 =0.00167

Then, rigid area of tension steel

md 12.44∗106
AS= = =571.849
zmin∗fyd 94.785∗260.78

A smin=ρ min∗bd = 0.00167*1000*90=150.3mm2

As >Asmin. Hence it is……. ok provide As calculated

πd2 π∗102
as= = =78.5
4 4

as∗1 ooo
Spacing = =137.274 mm
As

Spacing

Spacing between bars for main reinforcement shall satisfy the following requirement.

Smax= 2 t=2∗120 mm=240 mm


{
¿ 300 mm → Recommended

Provided S bmax =240 mm

Spacing minimum of the following

 ∅ main ¯¿ 10
 ∅ aggregate mm =15+5=20
 Spacing >Minimum=20 < S maximum=240

Provide: φ10 bars at 137.274mm c/c placed at the bottom in short span direction
Table Reinforcement design
Md dx/y fcd fyd b Zmin Ast,x/yAstminAst,useØbar ast S,cal SmaxS,provAst,prov
Slab No Location μreq
(KN-m/m) (mm) (N/mm2()N/mm2)
2 2 2 2 2
(mm) (mm) (mm ) (mm ) (mm ) (mm) (mm )(mm)(mm)(mm) (mm )
Short 10.35 100 11.33 261 1000 0.091 95.20 416.74 170 416.74 10 78.5 188 300 185 424.32
span
Long 7.92 90 11.33 261 1000 0.086 85.93 353.30 153 353.30 10 78.5 222 300 220 356.82
S-1 S1&S2 8.03 90 11.33 261 1000 0.087 85.87 358.45 153 358.45 10 78.5 219 300 215 365.12
support S1&S8 16.74 100 11.33 261 1000 0.148 91.97 697.75 170 697.75 10 78.5 113 300 110 713.64

Short 7.52 100 11.33 261 1000 0.066 96.56 298.53 170 221.00 10 78.5 355 300 300 261.67
span 227.23 153 227.23 10 78.5 345 300 300 261.67
Long 5.18 90 11.33 261 1000 0.056 87.38
S-2 S2&S3 6.73 90 11.33 261 1000 0.073 86.57 298.01 153 298.01 10 78.5 263 300 260 301.92
support S2&S9 8.81 100 11.33 261 1000 0.078 95.95 351.98 170 221.00 10 78.5 355 300 300 261.67

Short 7.53 100 11.33 261 1000 0.066 96.56 298.94 170 298.94 10 78.5 263 300 260 301.92
span 298.01 153 298.01 10 78.5 263 300 260 301.92
Long 6.73 90 11.33 261 1000 0.073 86.57
S-3
S3&S4 7.65 90 11.33 261 1000 0.083 86.08 340.68 153 340.68 10 78.5 230 300 230 341.30
support 352.40 170 352.40 10 78.5 223 300 220 356.82
S3&S10 8.82 100 11.33 261 1000 0.078 95.94
Short 9.77 100 11.33 261 1000 0.086 95.48 392.23 170 392.23 10 78.5 200 300 200 392.50
span 312.79 153 312.79 10 78.5 251 300 250 314.00
Long 7.05 90 11.33 261 1000 0.077 86.40
S-4
S4&S5 13.06 90 11.33 261 1000 0.142 83.06 602.73 153 602.73 10 78.5 130 300 130 603.85
support 472.26 170 472.26 10 78.5 166 300 165 475.76
S4&S11 11.65 100 11.33 261 1000 0.103 94.56
Short 2.20 100 11.33 261 1000 0.019 99.02 85.17 170 85.17 10 78.5 922 300 300 261.67
span 476.23 153 476.23 10 78.5 165 300 165 475.76
Long 10.50 90 11.33 261 1000 0.114 84.52
S-5 S5&S6 18.75 90 11.33 261 1000 0.204 79.61 902.89 153 221.00 10 78.5 355 300 300 261.67
support S4&S5 13.06 90 11.33 261 1000 0.142 83.06 602.73 153 602.73 10 78.5 130 300 130 603.85

Short 3.00 100 11.33 261 1000 0.026 98.66 116.56 170 116.56 10 78.5 673 300 300 261.67
span 473.32 153 473.32 10 78.5 166 300 165 475.76
Long 10.44 90 11.33 261 1000 0.114 84.55
S-6 153 10
S6&S7 25.27 90 11.33 261 1000 0.275 75.16 1288.77 1288.77 78.5 61 300 60 1308.33
support 170 10 78.5 415 300 300 261.67
S6&S12 4.83 100 11.33 261 1000 0.043 97.82 189.27 189.27
Short 4.53 100 11.33 261 1000 0.040 97.96 177.27 170 177.27 10 78.5 443 300 300 261.67
span 153 10 78.5 93 300 300 261.67
Long 17.63 90 11.33 261 1000 0.192 80.31 841.48 841.48
S-7 S7&S13 6.86 100 11.33 261 1000 0.061 96.87 271.45 170 271.45 10 78.5 289 300 285 275.44
support S7&S6 25.27 90 11.33 261 1000 0.275 75.16 1288.77 153 1288.77 10 78.5 61 300 60 1308.33

Short 6.73 100 11.33 261 1000 0.059 96.94 266.14 170 266.14 10 78.5 295 300 295 266.14
span 229.04 153 229.04 10 78.5 343 300 300 261.67
Long 5.22 90 11.33 261 1000 0.057 87.36
S-8
S8&S9 6.13 90 11.33 261 1000 0.067 86.89 270.45 153 270.45 10 78.5 290 300 292 268.84
support 387.17 170 387.17 10 78.5 203 300 200 392.50
S8&S14 9.65 100 11.33 261 1000 0.085 95.54
Short 6.04 100 11.33 261 1000 0.053 97.26 238.06 170 238.06 10 78.5 330 300 300 261.67
span 245.82 153 245.82 10 78.5 319 300 300 261.67
Long 5.59 90 11.33 261 1000 0.061 87.17
S-9
S9&S10 5.52 90 11.33 261 1000 0.060 87.21 242.64 153 242.64 10 78.5 324 300 300 261.67
support 315.85 170 315.85 10 78.5 249 300 254 309.06
S9&S15 7.94 100 11.33 261 1000 0.070 96.36
Short 6.04 100 11.33 261 1000 0.053 97.26 238.06 170 238.06 10 78.5 330 300 330 237.88
span 180.50 153 180.50 10 78.5 435 300 300 261.67
Long 4.14 90 11.33 261 1000 0.045 87.92
S-10
S10&S11 6.98 90 11.33 261 1000 0.076 86.44 309.55 153 309.55 10 78.5 254 300 250 314.00
support 315.85 170 315.85 10 78.5 249 300 245 320.41
S10&S16 7.94 100 11.33 261 1000 0.070 96.36
Short 8.73 100 11.33 261 1000 0.077 95.99 348.64 170 348.64 10 78.5 225 300 225 348.89
span 6.27 276.86 153 276.86 10 78.5 284 300 280 280.36
Long 90 11.33 261 1000 0.068 86.81
S-11
S11&s17 10.11 100 11.33 261 1000 0.089 95.32 406.58 170 406.58 10 78.5 193 300 190 413.16
support
Short 3.37 100 11.33 261 1000 0.030 98.49 131.16 170 131.16 10 78.5 598 300 300 261.67
span 465.58 153 465.58 10 78.5 169 300 165 475.76
Long 10.28 90 11.33 261 1000 0.112 84.64
S-12 153 10
S12&S13 21.33 90 11.33 261 1000 0.232 77.92 1049.35 1049.35 78.5 75 300 100 785.00
support 170 10 78.5 415 300 300 261.67
S12&S19 4.83 100 11.33 261 1000 0.043 97.82 189.27 189.27
Short 3.00 100 11.33 261 1000 0.026 98.66 116.56 170 116.56 10 78.5 673 300 300 261.67
span 12.91 153 10 78.5 132 300 130 603.85
Long 90 11.33 261 1000 0.141 83.15 595.18 595.18
S-13 170 10
S13&C1 5.75 100 11.33 261 1000 0.051 97.39 226.31 226.31 78.5 347 300 300 261.67

Short 7.95 100 11.33 261 1000 0.070 96.36 316.26 170 316.26 10 78.5 248 300 245 320.41
span 5.75 253.10 153 253.10 10 78.5 310 300 300 261.67
Long 90 11.33 261 1000 0.063 87.09
S-14
S14&S15 6.63 90 11.33 261 1000 0.072 86.62 293.40 153 293.40 10 78.5 268 300 265 296.23
support 461.52 170 461.52 10 78.5 170 300 170 461.76
S14&S20 11.40 100 11.33 261 1000 0.101 94.69
Short 6.32 100 11.33 261 1000 0.056 97.13 249.43 170 249.43 10 78.5 315 300 300 261.67
span 4.14 180.50 153 180.50 10 78.5 435 300 300 261.67
Long 90 11.33 261 1000 0.045 87.92
S-15
S15&S16 5.97 90 11.33 261 1000 0.065 86.97 263.13 153 263.13 10 78.5 298 300 295 266.10
support 351.98 170 351.98 10 78.5 223 300 220 356.8
S15&S21 8.81 100 11.33 261 1000 0.078 95.95
Short 6.04 100 11.33 261 1000 0.053 97.26 238.06 170 238.06 10 78.5 330 300 300 261.67
span 4.30 187.65 153 187.65 10 78.5 418 300 300 261.67
Long 90 11.33 261 1000 0.047 87.84
S-16
S16&S17 5.97 90 11.33 261 1000 0.065 86.97 263.13 153 263.13 10 78.5 298 300 295 266.10
support 628.53 170 221.00 10 78.5 355 300 300 261.67
S16&C3 15.21 100 11.33 261 1000 0.134 92.76
Short 7.02 100 11.33 261 1000 0.062 96.80 278.00 170 278.00 10 78.5 282 300 280 280.36
span 4.70 205.59 153 205.59 10 78.5 382 300 300 261.67
Long 90 11.33 261 1000 0.051 87.63
S-17
S17&S18 7.29 90 11.33 261 1000 0.079 86.27 323.92 153 323.92 10 78.5 242 300 240 327.08
support 628.53 170 221.00 10 78.5 355 300 300 261.67
S17&C3 15.21 100 11.33 261 1000 0.134 92.76
Short 10.44 100 11.33 261 1000 0.092 95.16 420.56 170 420.56 10 78.5 187 300 185 424.32
span 296.62 153 296.62 10 78.5 265 300 265 296.23
Long 6.70 90 11.33 261 1000 0.073 86.59
S-18
S18&S22 12.12 100 11.33 261 1000 0.107 94.33 492.53 170 492.53 10 78.5 159 300 155 506.45
support 653.47 153 653.47 10 78.5 120 300 120 654.17
S18&S19 14.06 90 11.33 261 1000 0.153 82.48
Short 4.13 100 11.33 261 1000 0.092 95.16 166.37 170 166.37 10 78.5 472 300 330 237.88
span 516.73 153 516.73 10 78.5 152 300 150 523.33
Long 11.33 90 11.33 261 1000 0.123 84.05
S-19
S19&C1 17.07 90 11.33 261 1000 0.186 80.66 811.24 153 811.24 10 78.5 97 300 95 826.32
support 375.83 170 375.83 10 78.5 209 300 205 382.93
S19&S23 9.38 100 11.33 261 1000 0.083 95.67
Short 10.14 100 11.33 261 1000 0.089 95.30 407.85 170 407.85 10 78.5 192 300 190 413.16
span 7.80 347.68 153 347.68 10 78.5 226 300 225 348.89
Long 90 11.33 261 1000 0.085 86.00
S-20
S20&S21 8.02 100 11.33 261 1000 0.071 96.33 319.16 170 319.16 10 78.5 246 300 245 320.41
support
Short 7.54 100 11.33 261 1000 0.067 96.55 299.35 170 299.35 10 78.5 262 300 260 301.92
span
Long 5.14 90 11.33 261 1000 0.056 87.40 225.43 153 225.43 10 78.5 348 300 300 261.67
S-21
S21&C3 15.21 90 11.33 261 1000 0.166 81.79 712.83 153 712.83 10 78.5 110 300 110 713.64
support
Short 8.74 100 11.33 261 1000 0.077 95.98 349.06 170 349.06 10 78.5 225 300 225 348.89
span 6.04 266.33 153 266.33 10 78.5 295 300 295 266.10
Long 90 11.33 261 1000 0.066 86.93
S-22
S22&S23 8.72 90 11.33 261 1000 0.095 85.50 390.96 153 390.96 10 78.5 201 300 200 392.50
S22&C3 15.21 90 11.33 261 1000 0.166 81.79 712.83 153 712.83 10 78.5 110 300 110 713.64
Short 12.09 100 11.33 261 1000 0.107 94.34 491.23 170 491.23 10 78.5 160 300 160 490.63
span 8.44 377.73 153 377.73 10 78.5 208 300 205 382.93
Long 90 11.33 261 1000 0.092 85.65
S-23
S23&S24 12.44 90 11.33 261 1000 0.136 83.42 571.65 153 571.65 10 78.5 137 300 135 581.48
support
Short 12.80 100 11.33 261 1000 0.113 93.99 522.04 170 522.04 10 78.5 150 300 150 523.33
span 13.01
Long 90 11.33 261 1000 0.142 83.09 600.21 153 600.21 10 78.5 131 300 130 603.85
S-24
S24&C2 5.97 100 11.33 261 1000 0.053 97.29 235.22 170 235.22 10 78.5 334 300 300 261.67
support

Short 12.80 100 11.33 261 1000 0.113 93.99 522.04 170 522.04 10 78.5 150 300 150 523.33
span
S-24 Long 13.01 90 11.33 261 1000 0.142 83.09 600.21 153 600.21 10 78.5 131 300 130 603.85
support S24&c2 14.52 100 11.33 261 1000 0.128 93.12 597.73 170 597.73 10 78.5 131 300 130 603.85
1ST FLOOR SLAB LOAD TRANSFER

DL LL ᵦ Shear Distrib Load


panel Shear for DL
Ly (m) Lx (m) Ly/Lx for LL (KN/m)
no
(KN/m2 ) (KN/m2 ) vi=ᵦ*DL*Lx vi=ᵦ*LL*Lx0.914*vi 0.914*vi
ᵝvxc= 0.47 Vxc= 8.67 5.64 7.92 5.15
ᵝvxd= 0.31 Vxd= 5.72 3.72 5.22 3.40
S-1 4.90 4.00 4.61 3.00 1.20
ᵝvyc= 0.4 Vyc= 7.38 4.80 6.74 4.39
ᵝvyd= 0.26 Vyd= 4.79 3.12 4.38 2.85
ᵝvxc= 0.44 Vxc= 8.11 5.28 7.42 4.83
ᵝvxd= 0.29 Vxd= 5.35 3.48 4.89 3.18
S-2 4.90 4.00 4.61 3.00 1.20
ᵝvyc= 0.36 Vyc= 6.64 4.32 6.07 3.95
ᵝvyd= …… Vyd= ….. …... ……. …….
ᵝvxc= 0.44 Vxc= 8.11 5.28 7.42 4.83
ᵝvxd= 0.29 Vxd= 5.35 3.48 4.89 3.18
S-3 4.90 4.00 4.61 3.00 1.20
ᵝvyc= 0.36 Vyc= 6.64 4.32 6.07 3.95
ᵝvyd= ……. Vyd= --- --- --- ---
ᵝvxc= 0.44 Vxc= 12.11 5.28 11.07 4.83
ᵝvxd= 0.29 Vxd= 7.98 3.48 7.29 3.18
S-4 4.90 4.00 6.88 3.00 1.20
ᵝvyc= 0.36 Vyc= 9.91 4.32 9.06 3.95
ᵝvyd= ……. Vyd= --- --- --- ---
ᵝvxc= ……. Vyd= --- --- --- ---
ᵝvxd= 0.33 Vxd= 8.49 3.96 7.76 3.62
S-5 4.90 4.00 6.43 3.00 1.20
ᵝvyc= 0.4 Vyc= 10.29 4.80 9.40 4.39

ᵝvyd= ……. Vyd= --- --- --- ---


ᵝvxc= 0.44 Vxc= 15.83 6.07 14.47 5.55
ᵝvxd= 0.29 Vxd= 10.43 4.00 9.53 3.66
S6 4.90 4.60 7.82 3.00 1.20
ᵝvyc= 0.36 Vyc= 12.95 4.97 11.84 4.54
ᵝvyd= ……. Vyd= --- --- --- ---
ᵝvxc= 0.44 Vxc= 16.95 5.28 15.49 4.83
ᵝvxd= 0.29 Vxd= 11.17 3.48 10.21 3.18
S7 5.00 4.00 9.63 3.00 1.10
ᵝvyc= 0.4 Vyc= 15.41 4.80 14.08 4.39
ᵝvyd= 0.26 Vyd= 10.02 3.12 9.15 2.85
ᵝvxc= 0.44 Vxc= 8.11 7.04 7.42 6.43
ᵝvxd= 0 Vxd= …….. …….. …… ……
S8 5.00 4.00 4.61 4.00 1.30
ᵝvyc= 0.36 Vyc= 6.64 5.76 6.07 5.26
ᵝvyd= 0.24 Vyd= 4.43 3.84 4.04 3.51
ᵝvxc= 0.41 Vxc= 7.56 4.92 6.91 4.50
ᵝvxd= ….. Vxd= --- --- --- ……
S9 5.00 4.00 4.61 3.00 1.30
ᵝvyc= 0.36 Vyc= 6.64 4.32 6.07 3.95
ᵝvyd= 0.24 Vyd= 4.43 2.88 4.04 2.63
ᵝvxc= 0.41 Vxc= 7.56 4.92 6.91 4.50
ᵝvxd= ….. Vxd= --- --- --- ……
S10 5.00 4.00 4.61 3.00 1.30
ᵝvyc= 0.36 Vyc= 6.64 4.32 6.07 3.95
ᵝvyd= 0.24 Vyd= 4.43 2.88 4.04 2.63
ᵝvxc= 0.44 Vxc= 13.58 6.07 12.41 5.55
ᵝvxd= 0 Vxd= …….. …….. …… ……
S-11 5.00 4.60 6.71 3.00 1.30
ᵝvyc= 0.36 Vyc= 11.11 4.97 10.16 4.54
ᵝvyd= 0.24 Vyd= 7.41 3.31 6.77 3.03
ᵝvxc= 0.44 Vxc= 12.51 8.80 11.44 8.04
ᵝvxd= ….. Vxd= --- --- --- ……
S-12 5.63 4.00 7.11 5.00 1.30
ᵝvyc= 0.36 Vyc= 10.24 7.20 9.36 6.58
ᵝvyd= 0.24 Vyd= 6.83 4.80 6.24 4.39
ᵝvxc= 0.39 Vxc= 10.47 4.68 9.57 4.28
ᵝvxd= 0 Vxd= …….. …….. …… ……
S13 5.00 4.00 6.71 3.00 1.10
ᵝvyc= 0.36 Vyc= 9.66 4.32 8.83 3.95
ᵝvyd= 0.24 Vyd= 6.44 2.88 5.89 2.63
ᵝvxc= 0.44 Vxc= 8.11 7.04 7.42 6.43
ᵝvxd= ….. Vxd= --- --- --- ……
S14 5.00 4.00 4.61 4.00 1.30
ᵝvyc= 0.36 Vyc= 6.64 5.76 6.07 5.26
ᵝvyd= 0.24 Vyd= 4.43 3.84 4.04 3.51

ᵝvxc= 0.41 Vxc= 7.56 4.92 6.91 4.50


ᵝvxd= --- Vxd= --- --- --- ---
S-15 5.00 4.00 4.61 3.00 1.30
ᵝvyc= 0.33 Vyc= 6.09 3.96 5.56 3.62

ᵝvyd= …… Vyd= ……. …….. …….. ……..


ᵝvxc= 0.41 Vxc= 7.56 4.92 6.91 4.50
ᵝvxd= --- Vxd= --- --- --- ---
S16 5.00 4.00 4.61 3.00 1.30
ᵝvyc= 0.33 Vyc= 6.09 3.96 5.56 3.62
ᵝvyd= …… Vyd= ……. …….. …….. ……..
ᵝvxc= 0.41 Vxc= 9.76 4.92 8.92 4.50
ᵝvxd= --- Vxd= --- --- --- ---
S17 5.00 4.00 5.95 3.00 1.30
ᵝvyc= 0.33 Vyc= 7.85 3.96 7.18 3.62
ᵝvyd= …… Vyd= ……. …….. …….. ……..
ᵝvxc= 0.47 Vxc= 12.65 5.64 11.56 5.15
ᵝvxd= 0.31 Vxd= 8.35 3.72 7.63 3.40
S18 5.00 4.00 6.73 3.00 1.30
ᵝvyc= 0.36 Vyc= 9.69 4.32 8.86 3.95
ᵝvyd= 0 Vyd= --- --- --- ---
ᵝvxc= 0.41 Vxc= 12.81 4.92 11.71 4.50
ᵝvxd= ….. Vxd= …… …… ….. ……
S19 5.00 4.00 7.81 3.00 1.30
ᵝvyc= 0.33 Vyc= 10.31 3.96 9.42 3.62
ᵝvyd= …… Vyd= … ….. ….. ….
ᵝvxc= 0.47 Vxc= 8.67 7.52 7.92 6.87
ᵝvxd= 0.31 Vxd= 5.72 4.96 5.22 4.53
S20 4.70 4.00 4.61 4.00 1.20
ᵝvyc= 0.4 Vyc= 7.38 6.40 6.74 5.85
ᵝvyd= 0.26 Vyd= 4.79 4.16 4.38 3.80
ᵝvxc= 0.44 Vxc= 8.11 5.28 7.42 4.83
ᵝvxd= 0.29 Vxd= 5.35 3.48 4.89 3.18
S-21 4.70 4.00 4.61 3.00 1.20
ᵝvyc= 0.36 Vyc= 6.64 4.32 6.07 3.95
ᵝvyd= 0 Vyd= --- --- --- ---
ᵝvxc= 0.44 Vxc= 10.52 5.28 9.62 4.83
ᵝvxd= 0.29 Vxd= 6.94 3.48 6.34 3.18
S-22 4.70 4.00 5.98 3.00 1.20
ᵝvyc= 0.36 Vyc= 8.61 4.32 7.87 3.95
ᵝvyd= 0 Vyd= --- --- --- ---
ᵝvxc= 0.44 Vxc= 12.13 7.04 11.08 6.43
ᵝvxd= 0.29 Vxd= 7.99 4.64 7.31 4.24
S23 4.70 4.00 6.89 4.00 1.20
ᵝvyc= 0.36 Vyc= 9.92 5.76 9.07 5.26
ᵝvyd= 0 Vyd= --- --- --- ---
ᵝvxc= 0.4 Vxc= 12.70 7.36 11.60 6.73
ᵝvxd= 0.26 Vxd= 8.25 4.78 7.54 4.37
S24 4.70 4.60 6.90 4.00 1.00
ᵝvyc= 0.4 Vyc= 12.70 7.36 11.60 6.73
ᵝvyd= 0.26 Vyd= 8.25 4.78 7.54 4.37

DL LL
panel no strip length Lx (m) 2
Ly/Lx P vi=DL*Lx*1m+P vi=LL*Lx*1m
(KN/m ) (KN/m2 )
C-1 1.00 0.90 5.48 4.00 1.11 Vxc= 4.93 3.60
C-2 1.00 1.30 5.48 4.00 0.77 Vxc= 7.12 5.20
C-3 1.00 1.50 5.48 4.00 0.67 Vxc= 8.22 6.00
3.7 Check Depth for Shear
Maximum shear force is obtained at support but design shear force is taken at “d” distance
from face of supporter. The maximum design shear is occurred at slab, S-7
Vsd= 1.3*15.49 + 1.6*4.83 =27.861KN
Shear resistance of concrete
The shear VC, carried by the concrete in members without significant axial force shall
be taken as;
Vc = 0.25*fctd*k1*k2*bw*d …………EBCS-2/1995 section 4.5.3.1 page 44.
k1 = 1+50ρ < 2
k2 = 1.6 - d > 1
fctd = fctk/γc ………….. ………EBCS-2/1995 section 2.4 page 10
ρ = Ast/bd where Ast =116.56mm2 , b=1000m & d = 100mm
Where As is the area of the tensile reinforcement anchored beyond the intersection of the
steel
and the line of a possible 450 cracking strength from the edge of section.
ρ = Ast/bd =116.56/(1000*100) = 0.001166
k1 = 1+50*0.001166 = 1.06 < 2 …………....OK!!!
k2 = 1.6 - 0.1 = 1.5 > 1 ……… ……OK!!!

fctd = fctk/γc = 1.5/1.5 = 1.0 N/mm2 ………EBCS-2/1995 section 2.4 & table 2.5
Vc = 0.25*fctd*k1*k2*bw*d =0.25*1*1.06*1.5*1000*100= 39.75KN
Vsd = 27.86KN < Vc = 39.75KN …………..…OK!!!
Therefore No shear reinforcement is required.

1ST FLOOR WALL LOAD TRANSEFR

Wall Wall Wall Wall Plast Wall TOTAL


Wal
Length Height Thick plast unit Wt Unit Wt LOAD
l
(m) (m) (m) thick (m) (KN/m3) (KN/m3) (KN)
On Axis 1            
A B              
B C 3.80 2.70 0.20 0.05 23.00 14.00 10.67
C D 3.80 2.70 0.20 0.05 23.00 14.00 10.67
D E 3.80 2.70 0.20 0.05 23.00 14.00 10.67
E F 3.80 2.70 0.20 0.05 23.00 14.00 10.67
F G 3.80 2.70 0.20 0.05 23.00 14.00 10.67
G H 3.80 2.70 0.20 0.05 23.00 14.00 10.67
On Axis 2            
G H 3.40 2.70 0.15 0.05 23.00 14.00 8.78
On Axis 3            
F G 4.40 2.70 0.15 0.05 23.00 14.00 8.78
G H 2.50 2.70 0.15 0.05 23.00 14.00 8.78
On Axis 4            
               
B C 2.80 2.70 0.15 0.05 23.00 14.00 8.78
C D 3.80 2.70 0.20 0.05 23.00 14.00 10.67
D E 2.30 2.70 0.20 0.05 23.00 14.00 10.67
G H 3.80 2.70 0.15 0.05 23.00 14.00 8.78
On Axis 5            
B C 3.80 2.70 0.20 0.05 23.00 14.00 10.67
On Axis B            
1 2 4.50 2.70 0.20 0.05 23.00 14.00 10.67
2 3 4.60 2.70 0.20 0.05 23.00 14.00 10.67
3 4 3.60 2.70 0.20 0.05 23.00 14.00 10.67
4 5 3.30 2.70 0.20 0.05 23.00 14.00 10.67

On Axis C            
4 5 3.40 2.70 0.20 0.05 23.00 14.00 10.67
On Axis E            
4 5 4.30 2.70 0.20 0.05 23.00 14.00 10.67
On Axis F            
1 2 2.00 2.70 0.15 0.05 23.00 14.00 8.78
On Axis G            
1 2 4.50 2.70 0.15 0.05 23.00 14.00 8.78
4 5 3.00 2.70 0.15 0.05 23.00 14.00 8.78

On Axis H
1 2 4.50 2.70 0.15 0.05 23.00 14.00 8.78
2 3 4.60 2.70 0.15 0.05 23.00 14.00 8.78
3 4 4.60 2.70 0.20 0.05 23.00 14.00 10.67
4 5 4.30 2.70 0.20 0.05 23.00 14.00 10.67
Ground FLOOR WALL LOAD    
Wall Wall Wall Wall Plast Wall TOTAL
Wall Length Height Thick plast unit Wt Unit Wt LOAD
3
(m) (m) (m) thick (m) (KN/m3) (KN/m ) (KN)
On Axis 1            
A B 3.80 2.60 0.20 0.05 23.00 14.00 10.27
B C 3.80 2.60 0.20 0.05 23.00 14.00 10.27
C D 3.80 2.60 0.20 0.05 23.00 14.00 10.27
D E 3.80 2.60 0.20 0.05 23.00 14.00 10.27
E F 3.80 2.60 0.20 0.05 23.00 14.00 10.27
F G 3.80 2.60 0.20 0.05 23.00 14.00 10.27
G H 4.40 2.60 0.20 0.05 23.00 14.00 10.27
On Axis 2            
A B 1.75 2.60 0.15 0.05 23.00 14.00 8.45
B C 3.80 2.60 0.15 0.05 23.00 14.00 8.45
C D 1.83 2.60 0.15 0.05 23.00 14.00 8.45
D E 2.40 2.60 0.15 0.05 23.00 14.00 8.45
E F 1.50 2.60 0.15 0.05 23.00 14.00 8.45
F G 3.80 2.60 0.15 0.05 23.00 14.00 8.45
G H 3.40 2.60 0.15 0.05 23.00 14.00 8.45
On Axis 3            
A B 1.85 2.60 0.15 0.05 23.00 14.00 8.45
B C 2.52 2.60 0.15 0.05 23.00 14.00 8.45
G H 3.40 2.60 0.15 0.05 23.00 14.00 8.45
On Axis 4            
               
B C 2.90 2.60 0.15 0.05 23.00 14.00 8.45
C D 3.80 2.60 0.20 0.05 23.00 14.00 10.27
D E 2.30 2.60 0.20 0.05 23.00 14.00 10.27
E F 3.80 2.60 0.20 0.05 23.00 14.00 10.27
F G 3.80 2.60 0.20 0.05 23.00 14.00 10.27
G H 2.90 2.60 0.20 0.05 23.00 14.00 10.27
On Axis 5            
A B 3.80 2.60 0.20 0.05 23.00 14.00 10.27
B C 3.80 2.60 0.20 0.05 23.00 14.00 10.27
On Axis A&H            
               
1 2 4.50 2.60 0.20 0.05 23.00 14.00 10.27
2 3 4.60 2.60 0.20 0.05 23.00 14.00 10.27
3 4 4.60 2.60 0.20 0.05 23.00 14.00 10.27
4 5 4.30 2.60 0.20 0.05 23.00 14.00 10.27
F G 3.80 2.60 0.20 0.05 23.00 14.00 10.27
G H 2.90 2.60 0.20 0.05 23.00 14.00 10.27
K L 4.87 2.48 0.20 0.05 23.00 14.00 9.80
On Axis B'            
2 3 0.20 2.60 0.15 0.05 23.00 14.00 8.45
4 5 4.30 2.60 0.20 0.05 23.00 14.00 10.27
On Axis C            
3 4 3.50 2.60 0.20 0.05 23.00 14.00 10.27
4 5 4.80 2.60 0.20 0.05 23.00 14.00 10.27
On Axis D            
1 2 4.50 2.60 0.15 0.05 23.00 14.00 8.45
On Axis E&G            
1 2 4.50 2.60 0.15 0.05 23.00 14.00 8.45
4 5 4.30 2.60 0.20 0.05 23.00 14.00 10.27
On Axis F            
4 5 4.30 2.60 0.20 0.05 23.00 14.00 10.27
slab LY Lx=Le Span ratio fyk(Mpa) βa effective Slab
Span type system
Panel (mm) (mm) (Ly/Lx)     depth(d)
S-1 end 4900 4000 1.23 300 37.75 90.07 two way

S-2 end 4900 4000 1.23 300 37.75 90.07 two way

S-3 end 4900 4000 1.23 300 37.75 90.07 two way

S-4 end 4900 4600 1.07 300 39.35 99.37 two way

S-5 end 5000 4000 1.25 300 37.50 90.67 two way

S-6 Interior 5000 4000 1.25 300 42.50 80.00 two way

S-7 Interior 5000 4000 1.25 300 42.50 80.00 two way

S-8 Interior 5000 4000 1.25 300 42.50 80.00 two way

S-9 end 5000 4600 1.09 300 39.13 99.92 two way

S-10 end 5000 4000 1.25 300 37.50 90.67 two way

S-11 Interior 5000 4000 1.25 300 42.50 80.00 two way

S-12 Interior 5000 4000 1.25 300 42.50 80.00 two way

S-13 Interior 5000 4000 1.25 300 42.50 80.00 two way

S-14 Interior 5000 4000 1.25 300 42.50 80.00 two way

C-1 cantilever 5000 900 5.56 300 12 76.50 cantilever


C-2 cantilever 3100 1000 3.10 300 10 85.00 cantilever
C-3 cantilever 3100 1000 3.10 300 10 70.83 cantilever
C-4 cantilever 4600 1300 3.54 300 12 92.08 cantilever

From the serviceability results of the above table, the effective depth in S9 governs the design
for all end and interior slab. C4 governs the design for all cantilever slab.

ds max = 99.92 mm
dc max= 92.08 mm
Assuming Φ10mm reinforcement bars and 15mm concrete cover. Hence
Overall Depth for two way slab (Ds)=99.92+15+10/2=111.92mm, Use Ds=120mm
d=120-15-10/2=100mm (for shorter span reinforcement)
d=120-15-10-10/2=90mm (for longer span reinforcement)
Overall depth for cantilever slab (Dc) = 92.08+15+10/2+= 112.08 mm, Use Dc=120mm
dmin = 120-15-10/2=100mm

Panel 1

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (2.2 *2.85 *3.25 )=20.38 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗20.38
= x100% =11.13 %< 20%,
1.3 ( 4.61∗19.6+20.38 )+ 1.6∗3∗19.6
Hence the load can be distributed to slab as follows

20.38
=1.04 KN /m 2
19.6
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.15 KN/m2
Panel 2
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (4.25 *2.85 *3.25 )=39.37 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗39.37
= x100% =18.41 %< 20%,
1.3 ( 4.61∗19.6+39.37 )+ 1.6∗3∗19.6
Hence the load can be distributed to slab as follows

39.37
=2.01 KN /m2
19.6
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.4 KN/m2

Panel 3
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (3.45 *2.85 *3.25 )=31.96 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗31.96
= x100% = 16.41%< 20%,
1.3 ( 4.61∗19.6+31.96 )+ 1.6∗3∗19.6
Hence the load can be distributed to slab as follows

31.96
=1.63 KN /m2
19.6
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.91 KN/m2

Panel 4

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (5.35*2.85 *3.25 )=49.55 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗49.55
= x100% =23.3 %< 20%,
1.3 ( 4.61∗19.6+ 49.5 ) +1.6∗3∗19.6
Hence the load can be distributed to slab as follows

49.55
=2.25 KN /m2
19.6
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=14.08 KN/m2
Panel 5

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2
Total Wt. of partition wall (PWt) = (2.6*2.85 *3.25 )=24.08 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗24.08
= x100% =12.89 %< 20%,
1.3 ( 4.61∗19.6+24.08 )+ 1.6∗3∗19.6
Hence the load can be distributed to slab as follows

24.08
=1.23 KN /m 2
19.6
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.39 KN/m2

Panel 6

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 22.54m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (12.65 *2.85 *3.25 )=117.17 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗117.17
= x100% =36.866 %< 20%,
1.3 ( 4.61∗22.54 +117.17 ) +1.6∗3∗22.54
Hence the load can be distributed to slab as follows

117.17
=5.02 KN /m2
22.54
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=17.32 KN/m2
Panel 7

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (2.2 *2.85 *3.25 )=20.38 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗20.38
= x100% =10.27 %< 20%,
1.3 ( 4.61∗20+20.38 )+ 1.6∗3∗20
Hence the load can be distributed to slab as follows

20.38
=1.02 KN /m2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.12 KN/m2
Panel 8

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (8.35 *2.85 *3.25 )=77.34 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗77.34
= x100% =30.29 %< 20%,
1.3 ( 4.61∗20+77.34 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows

77.13
=3.86 KN /m2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=15.78 KN/m2

Panel 9
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = 7.35 *2.85 *3.25) =67.602 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗67.602
= x100% =28.93 %< 20%,
1.3 ( 4.61∗20+ 67.602) +1.6∗3∗20
Hence the load can be distributed to slab as follows

67.6
=3.38 KN /m2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=15.12 KN/m2
Panel 10

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (7.75 *2.85 *3.25 )=71.78 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗71.78
= x100% =29.15 %< 20%,
1.3 ( 4.61∗20+71.78 )+1.6∗3∗20
Hence the load can be distributed to slab as follows

71.78
=3.59 KN /m 2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=15.46 KN/m2

Panel 11

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 23m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (4.8 *2.85 *3.25 )=44.4 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗44.4
= x100% =18.86 %< 20%,
1.3 ( 4.61∗23+ 44.4 ) +1.6∗3∗23
Hence the load can be distributed to slab as follows

44.4
= 1.93 KN /m2
23
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.3 KN/m2
Panel 12

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2
Total Wt. of partition wall (PWt) = (2.2 *2.85 *3.25 )=20.38 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗20.38
= x100% =10.27 %< 20%,
1.3 ( 4.61∗20+20.38 )+ 1.6∗3∗20
Hence the load can be distributed to slab as follows

20.38
=1.02 KN /m 2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.12 KN/m2

Panel 13

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (3.63 *2.85 *3.25 )=33.62 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗33.62
= x100% =15.88%< 20%,
1.3 ( 4.61∗20+33.62 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows

33.62
=1.68 KN /m2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.98 KN/m2

Panel 14

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (3.65 *2.85 *3.25 )=33.81 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗33.81
= x100% =15.96 %< 20%,
1.3 ( 4.61∗20+33.81 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows
33.81
=1.69 KN /m 2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.99 KN/m2
Panel 15

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (5.15 *2.85 *3.25 )=47.7 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗47.7
= x100% =21.13 %< 20%,
1.3 ( 4.61∗20+ 47.7 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows

47.7
=2.385 KN /m 2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.89 KN/m2
Panel 16
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (8.85*2.85 *3.25 )=81.97 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗37.31
= x100% =31.5 %< 20%,
1.3 ( 4.61∗20+37.31 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows

81.97
=4.01 KN /m 2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=16 KN/m2
Cantilever slab (C1)
Here we have used lightweight aluminum framed railing with no specific detailed information so
the dead weight (KN) is ignored.
Finishes for all area of space.
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
QK (live load) =4KN/m2 (EBCS-1, 1995, table 2.9 & 2.10, imposed loads on building floors) for

Hotel.

Therefore , Design load ( P d ) for C 5=1.3 ( DL )+1.6 ( ¿ )


¿ 1.3( 4.61)+1.6∗4=12.39 KN ⁄ m 2

Cantilever slab (C2)

Here we have used lightweight aluminum framed railing with no specific detailed information so
the dead weight (KN) is ignored.
Finishes for all area of space.
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
QK (live load) =4KN/m2 (EBCS-1, 1995, table 2.9 & 2.10, imposed loads on building floors) for

Hotel.

Therefore , Design load ( P d ) for C 5=1.3 ( DL )+1.6 ( ¿ )


¿ 1.3( 4.61)+1.6∗4=12.39 KN ⁄ m 2

Cantilever slab (C3)


Here we have used lightweight aluminum framed railing with no specific detailed information so
the dead weight (KN) is ignored.
Finishes for all area of space.
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
QK (live load) =4KN/m2 (EBCS-1, 1995, table 2.9 & 2.10, imposed loads on building floors) for

Hotel.

Therefore , Design load ( P d ) for C 5=1.3 ( DL )+1.6 ( ¿ )


¿ 1.3( 4.61)+1.6∗4=12.39 KN ⁄ m 2

Cantilever slab (C4)

Here we have used lightweight aluminum framed railing with no specific detailed information so
the dead weight (KN) is ignored.
Finishes for all area of space.
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
QK (live load) =4KN/m2 (EBCS-1, 1995, table 2.9 & 2.10, imposed loads on building floors) for
Hotel.

Therefore , Design load ( P d ) for C 5=1.3 ( DL )+1.6 ( ¿ )


¿ 1.3( 4.61)+1.6∗4=12.39 KN ⁄ m 2 Cantilever

3.1.2 Analysis of slab Moment


 For two way slab: mi= αiPdLx2
 For cantilever: M=PdLx2/2+pL/4

Where Pd is distributed load

Where, mi=the design moment per unit width at the point of reference αi=the coefficient given in
Table A−1 in EBCS2−1995. Pd=the design load Lx=the length of the shorter span of the of the
panel Mxs=αxs∗Pd∗L 2eff Mxf =αxf ∗Pd∗L 2 eff
Mys=αys∗Pd∗L 2eff Myf =αys∗Pd∗L 2 eff

Here we have considered bending moment coefficients of half continues panels as fully
continues panels, If the continues section is greater or equal to the discontinues part of the panel.

panel Suppor Lx Ly Ly/L Pd αxs αxf αys αyf Mxs Mxf Mys Myf
t cond. x
S1 4 4. 1.2 12.15 0.063 0.047 0.047 0.036 12.25 9.14 9.14 6.99
9
S2 4 4. 1.2 13.4 0.056 0.042 0.039 0.03 12.00 9.00 8.36 6.43
9
S3 4 4. 1.2 12.91 0.056 0.042 0.039 0.03 11.57 8.68 8.10 6.20
9
S4 4 4. 1.2 14.08 4.69 2.36 18.77 9.34
9
S5 4 4. 1.2 12.39 0.056 0.042 0.039 0.03 11.10 8.33 7.73 5.95
9
S6 4. 4. 1.1 17.32 7.63 3.82 30.54 15.27
9
6
S7 4 5 1.3 12.12 0.052 0.039 0.039 0.029 10.10 7.56 7.56 5.62
S8 4 5 1.3 15.78 5.26 2.63 21.04 10.52
S9 4 5 1.3 15.12 4.99 2.48 19.96 9.98
S10 4 5 1.3 15.46 5.15 2.56 20.63 10.31
S11 4. 5 1.1 13.3 0.044 0.033 0.039 0.029 12.38 9.29 10.97 8.16
6
S12 4 5 1.3 12.12 0.052 0.039 0.039 0.029 10.10 7.56 7.56 5.62
S13 4 5 1.3 12.98 0.046 0.035 0.032 0.024 9.55 7.27 6.65 4.98
S14 4 5 1.3 12.99 0.046 0.035 0.032 0.024 9.55 7.27 6.65 4.98
S15 4 5 1.3 13.98 4.63 2.32 18.52 9.26
S16 4 5 1.3 16 5.33 2.7 21.33 10.67

FOR PANEL 4

W= 14.08 KN/m2 W/2 = 704 KN/m2


Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is
assigned to the direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 14.08 * 12/2 = 7.04KNm
Negative Moment: mxs = 7.04 * 2/3 = 4.69KNm

Positive moment: mxf = 7.04 * 1/3 = 2.36KNm


X direction edge strip
Cantilever moment: my = 7.04 * 12/2 = 3.52KNm
Negative Moment: mxs = 3.52* 2/3 = 2.35KNm
Positive moment: mxf = 3.52 * 1/3 = 1.17KNm
Y direction middle strip along B-B:

Simply supported span moment: my = 14.08* 42/8 = 28.16KNm


Negative Moment: mys = 28.16 * 2/3 = 18.77KNm

Positive moment: myf = 28.16 * 1/3 = 9.34KNm


Y direction edge strip:
Cantilever moment: my = 7.04 * 12/2 = 3.52KNm
Negative Moment: mys = 3.52* 2/3 = 2.35KNm
Positive moment: myf = 3.52 * 1/3 = 1.17KNm

FOR PANEL 6
W = 17.32 KN/m2 W/2 =8.66 KN/m2
Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4.6/4 = 1.15m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is
assigned to the direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 17.32 * 1.152/2 = 11.45KNm
Negative Moment: mxs = 11.45 * 2/3 = 7.63KNm

Positive moment: mxf = 11.45 * 1/3 =3.82KNm


X direction edge strip
Cantilever moment: mx = 8.66 * 1.152/2 = 5.72KNm
Negative Moment: mxs = 5.72 * 2/3 = 3.82KNm
Positive moment: mxf = 5.72 * 1/3 = 1.91KNm
Y direction middle strip along B-B:

Simply supported span moment: my = 17.32* 4.62/8=45.81KNm


Negative Moment: mys = 45.81 * 2/3 = 30.54KNm

Positive moment: myf = 45.81 * 1/3 = 15.27KNm

Y direction edge strip:


Cantilever moment: my = 8.66 * 1.152/2 = 5.73KNm
Negative Moment: mys = 5.73* 2/3 = 3.82KNm
Positive moment: myf = 5.73 * 1/3 = 1.91 KNm

FOR PANEL 8
W = 15.78 KN/m2 W/2 = 7.89 KN/m2
Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is assigned to the direction
by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 15.78 * 12/2 = 7.89KNm
Negative Moment: mxs = 7.89 * 2/3 = 5.26KNm

Positive moment: mxf = 7.89 * 1/3 = 2.63KNm


X direction edge strip
Cantilever moment: mx = 7.89 * 12/2 = 3.95KNm
Negative Moment: mxs = 3.95 * 2/3 = 2.63KNm
Positive moment: mxf = 3.95 * 1/3 = 1.31KNm
Y direction middle strip along B-B:

Simply supported span moment: my = 15.78* 42/8 = 31.56KNm


Negative Moment: mys = 31.56 * 2/3 = 21.04KNm

Positive moment: myf = 31.56 * 1/3 = 10.52KNm

Y direction edge strip:


Cantilever moment: mx = 7.89 * 12/2 = 3.95KNm
Negative Moment: mxs = 3.95 * 2/3 = 2.63KNm
Positive moment: mxf = 3.95 * 1/3 = 1.31KNm

FOR PANEL 9
W = 14.97KN/m2 W/2=7.49KN2
Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is
assigned to the direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx=14.97*12/2=7.49KNm
Negative Moment: mxs = 7.49 * 2/3 = 4.99KNm

Positive moment: mxf = 7.49 * 1/3 = 2.48KNm


X direction edge strip
Cantilever moment: mx = 7.49 * 12/2=3.75KNm
Negative Moment: mxs = 3.75 * 2/3 2.45KNm
Positive moment: mxf = 3.75 * 1/3 = 1.25KNm
Y direction middle strip along B-B:
Simply supported span
moment:my=14.97*42/8=29.94KNm

Negative Moment: mys=29.94*2/3=19.96KNm

Positive moment: myf = 29.94 * 1/3 = 9.98KNm

Y direction edge strip:


Cantilever moment: my = 7.49 * 12/2 = 3.75KNm
Negative Moment: mys = 3.75* 2/3 = 2.5KNm
Positive moment: myf = 3.75 * 1/3 = 1.25KNm

FOR PANEL 10

W = 15.46 KN/m2 W/2 = 7.73 KN/m2


Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is
assigned to the direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 14.97 * 12/2 = 7.73KNm
Negative Moment: mxs = 7.73 * 2/3 = 5.15KNm

Positive moment: mxf = 7.73 * 1/3 = 2.56KNm


X direction edge strip
Cantilever moment: mx = 7.73 * 12/2 = 3.86KNm
Negative Moment: mxs = 3.86 * 2/3 =2.56 KNm
Positive moment: mxf = 3.86 * 1/3 = 1.29KNm
Y direction middle strip along B-B:

Simply supported span moment: my = 15.46* 42/8 = 30.92KNm


Negative Moment: mys = 30.92 * 2/3 = 20.63KNm

Positive moment: myf = 30.92 * 1/3 = 10.31KNm

Y direction edge strip:


Cantilever moment: mx = 7.73 * 12/2 = 3.86KNm
Negative Moment: mxs = 3.86 * 2/3 =2.56 KNm
Positive moment: mxf = 3.86 * 1/3 = 1.29KNm
FOR PANEL 15
2
W = 13.89 KN/m W/2 = 6.95 KN/m2
Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is assigned to the direction
by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 13.89 * 12/2 = 6.95KNm
Negative Moment: mxs = 6.95 * 2/3 = 4.63KNm

Positive moment: mxf = 6.95 * 1/3 = 2.32KNm


X direction edge strip
Cantilever moment: mx = 6.95 * 12/2 = 3.48KNm
Negative Moment: mxs = 3.48 * 2/3 = 2.32KNm
Positive moment: mxf = 3.48 * 1/3 =1.60KNm
Y direction middle strip along B-B:

Simply supported span moment: my = 13.89* 42/8 = 27.78KNm


Negative Moment: mys =27.78 * 2/3 = 18.52KNm

Positive moment: myf = 27.78 * 1/3 =9.26KNm

Y direction edge strip:


Cantilever moment: mx = 6.95 * 12/2 = 3.48KNm
Negative Moment: mxs = 3.48 * 2/3 = 2.32KNm
Positive moment: mxf = 3.48 * 1/3 =1.60KNm

FOR PANEL16
W = 16 KN/m2 W/2 = 8 KN/m2
Strips in the slabs
The discontinuity lines are selected as shown in the figure
below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of
load is assigned to the direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 16 * 12/2 = 8KNm
Negative Moment: mxs = 8 * 2/3 = 5.33KNm

Positive moment: mxf = 8 * 1/3 = 2.7KNm


X direction edge strip
Cantilever moment: mx = 8 * 12/2 = 4KNm
Negative Moment: mxs = 4 * 2/3 = 2.67KNm
Positive moment: mxf = 4 * 1/3 = 1.33KNm
Y direction middle strip along B-B:

Simply supported span moment: my = 16* 42/8 =


32KNm
Negative Moment: mys = 32 * 2/3 = 21.33KNm

Positive moment: myf = 32 * 1/3 = 10.67KNm

Y direction edge strip:


Cantilever moment: mx = 8 * 12/2 = 4KNm
Negative Moment: mxs = 4 * 2/3 = 2.67KNm
Positive moment: mxf = 4 * 1/3 = 1.33KNm

For cantilever moment


Simple calculation
Mx =pd*lx2/2
=12.39*0.92/2=5.02kn/m2

cantilever Lx(m) Pd(kn/m2) Wall load mx(kn/m2)


C1 09 12.39 5.02
C2 1.3 12.39 10.47
C3 1 12.39 6.13
C4 4 12.39 33.04

Moment adjustment
A. Support moment adjustment
Coefficient Method of Moment Distribution

For supports in which the slab is continuous there will be two different support moments. The
difference may be distributed between the panels on either side of support to equalize their
moments.
Two methods of different accuracy are given for treating the effect of this redistribution on
moments away from the support.

EBCS 2, 1995 article A.3.3.1 No.3 and 4

If the difference between initial support moments are less than 20%of the average moment

If the percentage difference between moments is >20% ,use moment distribution method

Moment adjustment
Check whether the support moment is greater than 20% or not.
Sample calculation
For S-1
Mmax=9.14KN-m,
Mmin=8.36KN-m
ΔMs = Mmax - Mmin =9.14-8.36=0.78KN-m
ΔMs*100%/Mmax =0.78*100%/9.14 =8.53%
Therefore 8.43% < 20% use moment average method.

ΔMs*100
Slab
Mmax Mmin ΔMs % 20%(Mmax) Method
panel
Mmax
S1/S2 9.14 8.36 0.78 8.53 <20% Average
S1/S7 12.25 10.10 2.15 17.55 <20% Average
S2/S3 8.36 8.10 0.26 3.11 <20% Average
S2/S8 12.00 5.26 6.74 56.17 >20% Moment distribution
S3/S4 18.77 8.10 10.67 56.85 >20% Moment distribution
S3/S9 11.53 4.99 6.54 56.72 >20% Moment distribution
S4/S5 18.77 7.73 11.04 58.82 >20% Moment distribution
S5/S6 30.54 7.73 22.81 74.69 >20% Moment distribution
S5/S10 11.10 5.15 5.95 53.60 >20% Moment distribution
S6/S11 12.38 7.63 4.75 38.37 >20% Moment distribution
S7/S8 21.04 7.56 13.48 64.07 >20% Moment distribution
S7/S12 12.38 10.10 2.28 18.42 <20% Average
S8/S9 21.04 19.96 1.08 5.13 <20% Average
S8/S13 10.10 5.26 4.84 47.92 >20% Moment distribution
S9/S14 9.55 4.99 4.56 47.75 >20% Moment distribution
S10/S11 20.63 10.97 9.66 46.83 >20% Moment distribution
S10/S16 5.33 5.15 0.18 3.38 <20% Average
S11/C1 12.38 5.02 7.36 59.45 >20% Moment distribution
S12/S13 7.56 6.65 0.91 12.04 <20% Average
S12/C4 33.04 10.10  22.94 69.43 >20% Moment distribution
S13/S14 6.65 6.65 0.00 0.00 <20% Average
S13/C3 9.95 6.13 3.82 38.39 >20% Moment distribution
S14/S15 18.52 6.65 11.87 64.09 >20% Moment distribution
S14/C3 9.55 6.13 3.42 35.81 >20% Moment distribution
S15/S16 21.33 18.52 2.81 13.17 <20% Average
S15/C3 6.13 4.63 1.50 24.47 >20% Moment distribution
S16/C1 21.33 5.02 16.31 76.47 >20% Moment distribution
S16/C3 6.13 5.33 0.80 13.05 <20% Average

Use moment distribution method

3 EI
Stiffness for end support K=
4 lx

3 EI
K 1= =0.1875
4∗4

3 EI
K 2= =0.01875
4∗4

0.1875
Distribution factor DF1= =0.5
0.1875+0.1875

0 .1875
Distribution factor DF2= =0 .5
0 .1875∗0 . 1875

For S2&S8

s-2 s-8
DF 0.5 0.5
Un balanced moment -12.00 5.26
3.37 3.37
Balanced moment -8.63 8.63
For S3&S4

s-4 s-3
DF 0.5 0.5
Un balanced moment -18.77 8.1
5.33 5.33
Balanced moment -13.44 13.44
For S3&S9

s-4 s-3
DF 0.5 0.5
Un balanced moment -11.53 4.99
3.27 3.27
Balanced moment -8.23 8.26

For S4&S5

s-4 s-5
DF 0.5 0.5
Un balanced moment -18.77 7.73
5.52 5.52
Balanced moment -13.25 13.25
For S5&S6

s-6 s-5
DF 0.5 0.5
Un balanced moment -30.54 7.73
11.4 11.4
Balanced moment -19.16 19.16
For S5&S10

s-5 s-10
DF 0.5 0.5
Un balanced moment -11.1 5.15
2.97 2.97
Balanced moment -8.13 8.13
For S6&S11

s-11 s-6
DF 0.5 0.5
Un balanced moment -12.38 7.63
2.38 2.38
Balanced moment -10.00 10.00
For S7&S8

s-8 s-7
DF 0.5 0.5
Un balanced moment -21.04 7.56
6.74 6.74
Balanced moment -14.3 14.3
For S8&S13

s-11 s-8
DF 0.5 0.5
Un balanced moment -10.1 5.26
2.42 2.42
Balanced moment -7.68 7.68
For S9&S14

s-14 s-9
DF 0.5 0.5
Un balanced moment -9.55 4.99
2.28 2.28
Balanced moment -7.27 7.27
For S10&S11

s-10 s-11
DF 0.5 0.5
Un balanced moment -20.63 10.79
4.92 4.92
Balanced moment -15.71 15.71

For S11&C1

s-11 s-C1
DF 0.2 0.8
Un balanced moment -12.38 5.02
1.472 5.88
Balanced moment -10.91 10.91
For S12&C5

s-11 s-C5
DF 0.5 0.5
Un balanced moment -33.04 10.10
11.47 11.47
Balanced moment -21.57 21.57
For S13&C3

s-13 s-C3
DF 0.2 0.8
Un balanced moment -9.95 6.13
0.76 3.06
Balanced moment -9.19 9.19
For S14&S15

s-15 s-14
DF 0.5 0.5
Un balanced moment -18.52 6.65
5.94 5.94
Balanced moment -12.58 12.58
For S14&C3

s-14 C3
DF 0.2 0.8
Un balanced moment -9.55 6.13
0.64 2.74
Balanced moment -8.87 8.87
For S15&S16

s-16 C3
DF 0.5 0.5
Un balanced moment -21.33 18.52
1.41 1.41
Balanced moment -19.93 19.93

For S15&C3

C3 s-15
DF 0.8 0.2
Un balanced moment -6.13 4.63
1.2 0.3
Balanced moment -4.93 4.93
For S16&C1

s-16 C1
DF 0.2 0.8
Un balanced moment -21.33 5.02
3.26 13.05
Balanced moment -18.1 18.1

B. Span Moment Adjustment

Calculation of adjusted span moments based of change of support moments.

moment adjustment for slab

Slab no lx K DF Un Balanced
balanced moment
moment
S1&S2 S1 4 0.48 9.14 Take 9.62
S2 4 0.48 8.36 average 9.62
S1&S7 S1 4 1.07 12.25 Take 11.18
S7 4 1.07 10.1 average 11.18
S2&S3 S2 4 0.13 8.36 Take 8.23
S3 4 0.13 8.1 average 8.23
S2&S8 S2 4 0.1875 0.5 12.00 Use DF 8.63
S8 4 0.268 0.5 5.26 8.63
S3&S4 S3 4 0.1875 0.5 8.1 Use DF 13.44
S4 4 0.1875 0.5 18.77 13.44
S3&S9 S3 4 0.1875 0.5 11.53 Use DF 8.26
S9 4 0.1875 0.5 4.99 8.26
S4&S5 S4 4 0.1875 0.5 18.77 Use DF 13.25
S5 4 0.1875 0.5 7.73 13.25
S5&S6 S5 4 0.1875 0.5 7.73 Use DF 19.16
S6 4.6 0.163 0.5 30.54 19.16
S5&S10 S5 4 0.1875 0.5 11.1 Use DF 8.13
S10 4 0.1875 0.5 5.15 8.13
S6&S11 S6 4.6 0.163 0.5 12.38 Use DF 10.00
S11 4.6 0.163 0.5 7.63 10.00
S7&S8 S7 4 0.1875 0.5 7.56 Use DF 6.74
S8 4 0.268 0.5 21.04 6.74
S7&S12 S7 4 1.14 10.1 Take 11.24
S12 4 1.14 12.38 average 11.24
S8&S9 S8 4 0.99 21.04 Take 20.05
S9 4 0.99 19.96 20.05
average
S8&S13 S9 4 0.1875 0.5 5.26 Use DF 7.68
S13 4 0.1875 0.5 10.1 7.68
S9&S14 S9 4 0.1875 0.5 4.99 Use DF 7.27
S14 4.6 0.163 0.5 9.55 7.27
S10&S1 S10 4 0.1875 0.5 10.97 Use DF 15.71
S11 4.6 0.163 0.5 20.63 15.71
1
S10&S1 S10 4 0.09 5.15 Take 5.24
S16 4 0.09 5.33 5.24
6 average
S11&C1 S11 4.6 0.163 0.5 12.38 Use DF 10.91
C1 4 0.188 0.5 5.02 10.91
S12&S1 S12 4 0.45 7.56 Take 7.11
S13 0.45 6.65 7.11
3 average
S12&C5 S12 4 0.188 10.10 Use DF 11.47
C5 0.188 33.04 11.47
S13&S1 S13 4 0 6.64 Take 6.60
S14 4 0 6.60 6.60
4 average
S13&C3 S13 4 0.188 0.2 9.55 Use DF 9.19
C3 1 0.188 0.8 6.13 9.19
S14&S1 S14 4 0.188 0.5 6.65 Use DF 12.58
S15 4.6 0.163 0.5 18.52 12.58
5
S14&C4 S14 4 0.188 0.2 9.55 Use DF 8.87
C3 1 0.80 0.8 6.13 8.87
S15&S1 S15 4 0.188 0.5 18.52 Use DF 5.49
S16 4 0.188 0.5 21.33 5.49
6
S15&C4 S15 4 0.188 0.2 4.63 Use DF 6.13
C4 1 0.80 0.8 6.13 6.13
S16&C1 S16 4 0.188 0.2 21.33 Use DF 18.1
C1 0.9 0.80 0.8 5.02 18.1
S16&C3 S16 4 0.4 5.33 Take 6.13
C3 1 0.4 6.13 6.13
average

Adjustments of Field Moments

According to EBCS 2, 1995 article A.3.3.3 Method II

 In this method consideration of the effects of changes of support moments is limited to


the adjacent spans. Since no effects on neighboring support sections need to be
considered; only a simple balancing operation is required at each edge and no iterative
process is involved.
 The procedure for applying method II, is as follows
o Support and span moments are first calculated for individual panels by assuming
each panel to be fully loaded. This is done by using the coefficients given in Table
A-1 as described in Section A.3.2
o The unbalanced moment is distributed using the moment distribution method. The
relative stiffness of each panel shall be taken proportional to its gross moment of
inertia divided by the smaller span.
o If the support moment is decreased, the span moments mxf and myf are then
increased to allow for the changes of support moments. This increase is calculated
as being equal to the change of the support moment multiplied by the factors
given in Table A-2. If a support moment is increased, no adjustments shall be
made to the span moments.

filed moment adjustment

Δ𝒎𝒙𝒇= 𝒄𝒙Δ𝒎𝒙𝒔 + 𝒄𝒙Δ𝒎𝒚𝒔 Δ𝒎𝒚𝒇= 𝒄𝒚Δ𝒎𝒙𝒔 + 𝒄𝒚Δ𝒎𝒚𝒔

Table 2. 2Summarizes table below the adjustment of span moments

panel m xs m ys Ly /lx Cx1 Cy1 Cx2 Cy2 m xf m yf


S1 1.07 0.48 1.2 0.338 0.172 0.344 0.364 9.67 7.307
S2 3.37 0.13 1.2 0.338 0.172 0.344 0.364 10.18 7.06
S3 - - 1.2 0.338 0.172 0.344 0.364 8.86 6.2
S4 - 5.52 1.2 0.338 0.172 0.344 0.364 2.36 11.15
S5 2.97 - 1.2 0.338 0.172 0.344 0.364 9.33 5.95
S6 - 11.4 1.1 0.356 0.220 0.314 0.347 3.82 19.23
S7 - 6.74 1.3 0.325 0.135 0.373 0.350 7.56 7.98
S8 - 6.74 1.3 0.325 0.135 0.373 0.350 2.63 12.88
S9 2.28 - 1.3 0.325 0.135 0.373 0.350 3.28 9.98
S10 - 4.92 1.3 0.325 0.135 0.373 0.350 2.56 12.03
S11 2.35 - 1.1 0.356 0.220 0.314 0.347 10.18 8.16
S12 1.14 0.45 1.3 0.325 0.135 0.373 0.350 8.10 5.93
S13 2.42 - 1.3 0.325 0.135 0.373 0.350 8.06 4.98
S14 0.64 - 1.3 0.325 0.135 0.373 0.350 7.48 4.98
S15 - 5.94 1.3 0.325 0.135 0.373 0.350 2.32 11.34
S16 - 3.26 1.3 0.325 0.135 0.373 0.350 2.7 11.81

Note;-

 𝑐𝑦1 𝑎𝑛𝑑 𝑐𝑥1 Represent adjustment of span moment due to change in moment in the
longer length of the slab.
 𝑐𝑦2 𝑎𝑛𝑑 𝑐𝑥2 Represent adjustment of span moment due to change in moment in the
shorter length of the slab.

Sample calculation

Panel S-1

ΔM xs= 12.25-11.18=1.07

ΔM xf = 9.62-9.14=0.48

LY 5
= =1 .2
For LX 4 [EBCS-2, 1995 Table A-2]

Cx1 Cy1 Cx2 Cy2


0.338 0.172 0.344 0.364

Δ𝒎𝒙𝒇= 𝒄𝒙1Δ𝒎𝒙𝒔+ 𝒄𝒙2Δ𝒎𝒚𝒔=1.07*0.338+0.48*0.344=0.527

Δ𝒎𝒚𝒇= 𝒄𝒚1Δ𝒎𝒙𝒔+ 𝒄𝒚2Δ𝒎𝒚𝒔=0.172*1.07+0.364*0.364=0.317

Adjusted moment

Mxf = 9.14+0.527=9.667

Myf =6.99+0.317= 7.307

Calculation of reinforcement for the slab

Characteristic strength of material

Concrete
Using concrete quality (grade) c-25 and class I work

fcu = 25MPa

fck = 0.8fcu = 0.8 x 25 MPa = 20 MPa

Steel

Steel quality (grade) fyk = 300 MPa

Design Strength of Materials

Concrete

γc=1.5 (Ordinary loading) from[EBCS – 2, 1995 table 3.1]

γs= 1.15

0 .8 5∗f ck 0 .85∗20
fcd= = = 11.33MPa
γc 1.5

fyk 300
fyd= = = 260.87MPa
γs 1. 15

j. Check trial thickness for flexure


For two way slabs
M max=33.04knm/m ……..span moment for slab No.C4
b=1000mm, μmax =0.295 for 0%redstrebution of elastic moment

M max 33.04∗106
d req=
√ μ max∗fcd∗b √
=
0. 295∗11 .33∗1000
= 99.42mm

d provided = D-φ/2-clear cover

= 120-10/2-15= 100mm

dreq< d provided ………………ok, (hence the trial depth is adequate for flexure)

 depth of slab: for two way slab,D=120

dx= D-φ/2-clear cover

= 120-10/2-15= 100mm

dy= dx- φb
=100-10= 90mm

 depth of slab: for cantilever slab, D=150

dx= D-φ/2-clear cover

= 150-10/2-15= 130mm

dy= dx- φb

=130-10= 120mm

Sample flexural reinforcement calculation for Slabs

Panel S-1

c) Positive(bottom) reinforcement
iii) In short span :- Mxf= 9.67 KNm
dx= 100mm

md 9.67∗10 6
μreq= = =0.08535
b∗fcd∗d∗d 1000∗11.33∗1002

zmin=dx /2 ¿=100/2 ¿95.53

ρmin=0.5/ fyk =0.5/300 =0.00167

Then, rigid area of tension steel

md 9.67∗106
AS= = =388.02
zmin∗fyd 95.53∗260.78

A smin=ρ min∗bd = 0.00167*1000*100=167mm2

As >Asmin. Hence it is……. ok provide As calculated

πd2 π∗102
as= = =78.5
4 4

as∗1 ooo
Spacing = =202.312 mm
As

Spacing
Spacing between bars for main reinforcement shall satisfy the following requirement.

Smax= 2 t=2∗120 mm=240 mm


{
¿ 350 mm → Recommended

Provided S bmax=240 mm

Spacing minimum of the following

 ∅ main ¯¿ 10
 ∅ aggregate mm =15+5=20
 Spacing >Minimum=20 < S maximum=240

Provide: φ10 bars at 200mm c/c placed at the bottom in short span direction

iv) In longer span direction:- Myf=7.307 KNm

Dy= 90mm

md 7.307∗10 6
μreq= = =0.07962
b∗fcd∗d∗d 1000∗11.33∗90 2

zmin=dx /2 ¿=90 /2 ¿86.262

ρmin=0.5/ fyk =0.5/300 =0.00167

Then, rigid area of tension steel

md 7.307∗10 6
AS= = =¿324.711
zmin∗fyd 86.262∗260.78

A smin=ρ min∗bd = 0.00167*1000*90=150.3mm2

As >Asmin. Hence it is……. ok provide As calculated

πd2 π∗102
as= = =78.5
4 4

as∗1 ooo
Spacing = =241.75 mm
As

Spacing
Spacing between bars for main reinforcement shall satisfy the following requirement.

Smax= 2 t=2∗120 mm=240 mm


{
¿ 350 mm → Recommended

Provided S bmax=240 mm

Spacing minimum of the following

 ∅ main ¯¿ 10
 ∅ aggregate mm =15+5=20
 Spacing >Minimum=20 < S maximum=240

Provide: φ10 bars at 240mm c/c placed at the bottom in short span direction

d) Negative (top) reinforcement


In short span: - Mxs= 11.18 KNm
dx= 100mm

md 11.18∗106
μreq= = =0.09868
b∗fcd∗d∗d 1000∗11.33∗1002

zmin=dx /2 ¿=100/2 ¿94.795

ρmin=0.5/ fyk =0.5/300 =0.00167

Then, rigid area of tension steel

md 11.18∗106
AS= = =452.096
zmin∗fyd 94.795∗260.78

A smin=ρ min∗bd = 0.00167*1000*100=167mm2

As >Asmin. Hence it is……. ok provide As calculated

πd2 π∗102
as= = =78.5
4 4

as∗1 ooo
Spacing = =173.64 mm
As
Spacing

Spacing between bars for main reinforcement shall satisfy the following requirement.

Smax= 2 t=2∗120 mm=240 mm


{
¿ 350 mm → Recommended

Provided S bmax=240 mm

Spacing minimum of the following

 ∅ main ¯¿ 10
 ∅ aggregate mm =15+5=20
 Spacing >Minimum=20 < S maximum=240

Provide: φ10 bars at 170mm c/c placed at the bottom in short span direction

iii. In longer span direction:- Mys=9.62 KNm

Dy= 90mm

md 9.62∗106
μreq= = =0.10482
b∗fcd∗d∗d 1000∗11.33∗90 2

zmin=dx /2 ¿=90 /2 ¿

ρmin=0.5/ fyk =0.5/300 =0.00167

Then, rigid area of tension steel

md 9.62∗10 6
AS= = =433.81
zmin∗fyd 85.00∗260.78

A smin=ρ min∗bd = 0.00167*1000*90=150.3mm2

As >Asmin. Hence it is……. ok provide As calculated

πd2 π∗102
as= = =78.5
4 4
as∗1 ooo
Spacing = =180.95 mm
As

Spacing

Spacing between bars for main reinforcement shall satisfy the following requirement.

Smax= 2 t=2∗120 mm=240 mm


{
¿ 300 mm → Recommended

Provided S bmax=240 mm

Spacing minimum of the following

 ∅ main ¯¿ 10
 ∅ aggregate mm =15+5=20
 Spacing >Minimum=20 < S maximum=240

Provide: φ10 bars at 180.95mm c/c placed at the bottom in short span direction
Table Reinforcement design
Md dx/y fcd fyd b Zmin Ast,x/yAstminAst,useØbar ast S,cal SmaxS,provAst,prov
Slab No Location μreq
(KN-m/m) (mm) (N/mm2()N/mm2)
2 2 2 2 2
(mm) (mm) (mm ) (mm ) (mm ) (mm) (mm )(mm)(mm)(mm) (mm )
Short 9.67 100 11.33 261 1000 0.085 95.53 388.02 170 388.02 10 78.5 202 300 200 392.5
span
Long 7.35 90 11.33 261 1000 0.080 86.24 326.71 153 326.71 10 78.5 240 300 240 327.08
S-1 S1&S2 9.62 90 11.33 261 1000 0.105 85.01 433.81 153 433.81 10 78.5 181 300 180 436.11
support S1&S7 11.18 100 11.33 261 1000 0.099 94.80 452.10 170 452.10 10 78.5 174 300 170 461.76

Short 10.18 100 11.33 261 1000 0.090 95.29 409.54 170 221.00 10 78.5 355 300 300 261.67
span 313.26 153 313.26 10 78.5 251 300 250 314.00
Long 7.06 90 11.33 261 1000 0.077 86.39
S-2 S2&S3 8.23 90 11.33 261 1000 0.090 85.77 367.84 153 367.84 10 78.5 213 300 210 373.81
support S2&S8 8.63 100 11.33 261 1000 0.076 96.03 344.48 170 221.00 10 78.5 355 300 300 261.67

Short 8.86 100 11.33 261 1000 0.078 95.92 354.06 170 354.06 10 78.5 222 300 220 356.82
span 153 10 78.5 287 300 285 275.44
Long 6.20 90 11.33 261 1000 0.068 86.85 273.65 273.65
S-3 153 10
S3&S4 13.44 90 11.33 261 1000 0.146 82.84 621.92 621.92 78.5 126 300 125 628.00
support 170 10 78.5 239 300 235 334.04
S3&S9 8.26 100 11.33 261 1000 0.073 96.21 329.10 329.10
Short 2.36 100 11.33 261 1000 0.021 98.95 91.43 170 91.43 10 78.5 859 300 300 261.67
span 153 10 78.5 155 300 155 506.45
Long 11.15 90 11.33 261 1000 0.121 84.15 507.90 507.90
S-4 153 10
S4&S5 13.25 90 11.33 261 1000 0.144 82.95 612.31 612.31 78.5 128 300 125 628.00
support

Short 9.33 100 11.33 261 1000 0.082 95.70 373.73 170 373.73 10 78.5 210 300 210 373.81
span 262.22 153 262.22 10 78.5 299 300 195 402.56
Long 5.95 90 11.33 261 1000 0.065 86.98
S-5 S5&S6 19.16 90 11.33 261 1000 0.209 79.34 925.68 153 221.00 10 78.5 355 300 300 261.67
support S5&S10 8.13 100 11.33 261 1000 0.072 96.27 323.71 170 323.71 10 78.5 242 300 240 327.08

Short 3.82 100 11.33 261 1000 0.034 98.28 148.99 170 148.99 10 78.5 527 300 300 261.67
span
Long 19.23 90 11.33 261 1000 0.210 79.30 929.59 153 929.59 10 78.5 84 300 80 981.25
S-6
S6&S11 10.00 100 11.33 261 1000 0.088 95.37 401.93 170 401.93 10 78.5 195 300 195 402.56
support

Short 7.56 100 11.33 261 1000 0.067 96.54 300.17 170 300.17 10 78.5 262 300 260 301.92
span
Long 7.98 90 11.33 261 1000 0.087 85.90 356.11 153 356.11 10 78.5 220 300 220 356.82
S-7 S7&S8 6.74 90 11.33 261 1000 0.073 86.56 298.47 153 298.47 10 78.5 263 300 260 301.92
support S7&S12 11.24 100 11.33 261 1000 0.099 94.77 454.66 170 454.66 10 78.5 173 300 170 461.76

Short 2.63 100 11.33 261 1000 0.023 98.83 102.01 170 102.01 10 78.5 769 300 300 261.67
span 593.68 153 593.68 10 78.5 132 300 130 603.85
Long 12.88 90 11.33 261 1000 0.140 83.17
S-8
S8&S9 20.05 90 11.33 261 1000 0.218 78.77 975.77 153 975.77 10 78.5 80 300 80 981.25
support 305.12 170 305.12 10 78.5 257 300 255 307.84
S8&S13 7.68 100 11.33 261 1000 0.068 96.49
Short 3.28 100 11.33 261 1000 0.029 98.53 127.61 170 127.61 10 78.5 615 300 300 261.67
span
Long 9.98 90 11.33 261 1000 0.109 84.81 451.10 153 451.10 10 78.5 174 300 170 461.76
S-9
S9&S14 7.27 100 11.33 261 1000 0.064 96.68 288.25 170 288.25 10 78.5 272 300 270 290.74
support
Short 2.56 100 11.33 261 1000 0.029 98.53 99.60 170 99.60 10 78.5 788 300 300 261.67
span 551.26 153 551.26 10 78.5 142 300 140 560.71
Long 12.03 90 11.33 261 1000 0.131 83.65
S-10
S10&S11 15.71 90 11.33 261 1000 0.171 81.49 738.98 153 738.98 10 78.5 106 300 100 785.00
support 205.74 170 205.74 10 78.5 382 300 300 261.67
S10&S16 5.24 100 11.33 261 1000 0.046 97.63
Short 10.18 100 11.33 261 1000 0.090 95.29 409.54 170 409.54 10 78.5 192 300 190 413.16
span 8.16 364.55 153 364.55 10 78.5 215 300 215 365.12
Long 90 11.33 261 1000 0.089 85.80
S-11
S11&C1 10.91 100 11.33 261 1000 0.096 94.93 440.56 170 440.56 10 78.5 178 300 175 448.57
support
Short 8.10 100 11.33 261 1000 0.071 96.29 322.47 170 322.47 10 78.5 243 300 240 327.08
span 261.31 153 261.31 10 78.5 300 300 300 261.67
Long 5.93 90 11.33 261 1000 0.065 86.99
S-12 170 10
S12&C4 11.47 100 11.33 261 1000 0.101 94.65 464.52 464.52 78.5 169 300 165 475.76
support 153 10 78.5 249 300 245 320.41
S12&S13 7.11 90 11.33 261 1000 0.077 86.37 315.57 315.57
Short 8.06 100 11.33 261 1000 0.071 96.31 320.81 170 320.81 10 78.5 245 300 245 320.41
span 4.98 153 10 78.5 360 300 300 261.67
Long 90 11.33 261 1000 0.054 87.49 218.20 218.20
S-13 153 10
S13&S146.60 90 11.33 261 1000 0.072 86.64 292.02 292.02 78.5 269 300 265 296.23
S13&C3 9.19 100 11.33 261 1000 0.081 95.77 367.86 170 367.86 10 78.5 213 300 210 373.81
Short 7.48 100 11.33 261 1000 0.066 96.58 296.88 170 296.88 10 78.5 264 300 260 301.92
span 4.98 153 10 78.5 360 300 300 261.67
Long 90 11.33 261 1000 0.054 87.49 218.20 218.20
S-14 153 10
S14&S15 12.58 90 11.33 261 1000 0.137 83.34 578.64 578.64 78.5 136 300 135 581.48
support 170 10 78.5 221 300 220 356.82
S14&C3 8.87 100 11.33 261 1000 0.078 95.92 354.48 354.48
Short 2.32 100 11.33 261 1000 0.020 98.97 89.86 170 89.86 10 78.5 874 300 300 261.67
span 11.34 153 10 78.5 152 300 150 523.33
Long 90 11.33 261 1000 0.124 84.05 517.22 517.22
S-15 153 10
5.49
S15&S16 90 11.33 261 1000 0.060 87.22 241.28 241.28 78.5 325 300 300 261.67
support 170 10 78.5 325 300 300 261.67
S15&C3 6.13 100 11.33 261 1000 0.054 97.22 241.71 241.71
Short 2.70 100 11.33 261 1000 0.024 98.79 104.76 170 104.76 10 78.5 749 300 300 261.67
span
Long 11.81 90 11.33 261 1000 0.129 83.78 540.37 153 540.37 10 78.5 145 300 145 541.38
S-16 153 10
S16&C1 18.10 90 11.33 261 1000 0.197 80.02 867.10 867.10 78.5 91 300 90 872.22
support 170 10 78.5 355 300 300 261.67
S16&C3 6.13 100 11.33 261 1000 0.054 97.22 241.71 221.00
2ND & 3RD FLOOR SLAB LOAD TRANSEFER TO BEAM

panel
DL LL ᵦ Shear for DL
Shear Distrib Load
Ly (m) Lx (m) Ly/Lx for LL (KN/m)
no
(KN/m 2 ) (KN/m2 ) vi=ᵦ*DL*Lx vi=ᵦ*LL*Lx0.914*vi 0.914*vi
ᵝvxc= 0.47 Vxc= 10.62 5.64 9.71 5.15
ᵝvxd= 0.31 Vxd= 7.01 3.72 6.40 3.40
S-1 4.90 4.00 5.65 3.00 1.20
ᵝvyc= 0.4 Vyc= 9.04 4.80 8.26 4.39
ᵝvyd= 0.26 Vyd= 5.88 3.12 5.37 2.85
ᵝvxc= 0.44 Vxc= 11.65 5.28 10.65 4.83
ᵝvxd= 0.29 Vxd= 7.68 3.48 7.02 3.18
S-2 4.90 4.00 6.62 3.00 1.20
ᵝvyc= 0.36 Vyc= 9.53 4.32 8.71 3.95
ᵝvyd= …… Vyd= ….. …... ……. …….
ᵝvxc= 0.44 Vxc= 10.98 5.28 10.04 4.83
ᵝvxd= 0.29 Vxd= 7.24 3.48 6.62 3.18
S-3 4.90 4.00 6.24 3.00 1.20
ᵝvyc= 0.36 Vyc= 8.99 4.32 8.21 3.95
ᵝvyd= ……. Vyd= --- --- --- ---
ᵝvxc= …. Vxc= ….. ….. ….. …….
ᵝvxd= 0.33 Vxd= 9.06 3.96 8.28 3.62
S-4 4.90 4.00 6.86 3.00 1.20
ᵝvyc= 0.4 Vyc= 10.98 4.80 10.03 4.39
ᵝvyd= …… Vyd= --- --- --- ---
ᵝvxc= 0.44 Vxc= 10.28 5.28 9.39 4.83
ᵝvxd= 0.29 Vxd= 6.77 3.48 6.19 3.18
S-5 4.90 4.00 5.84 3.00 1.20
ᵝvyc= 0.36 Vyc= 8.41 4.32 7.69 3.95

ᵝvyd= ……. Vyd= --- --- --- ---


ᵝvxc= 0.44 Vxc= 19.49 6.07 17.81 5.55
ᵝvxd= 0.29 Vxd= 12.85 4.00 11.74 3.66
S6 4.90 4.60 9.63 3.00 1.10
ᵝvyc= 0.4 Vyc= 17.72 5.52 16.20 5.05
ᵝvyd= 0.26 Vyd= 11.52 3.59 10.53 3.28
ᵝvxc= 0.44 Vxc= 9.91 5.28 9.06 4.83
ᵝvxd= …… Vxd= --- --- --- ---
S7 5.00 4.00 5.63 3.00 1.30
ᵝvyc= 0.36 Vyc= 8.11 4.32 7.41 3.95
ᵝvyd= 0.24 Vyd= 5.40 2.88 4.94 2.63
ᵝvxc= 0.41 Vxc= 13.89 4.92 12.70 4.50
ᵝvxd= 0 Vxd= …….. …….. …… ……
S8 5.00 4.00 8.47 3.00 1.30
ᵝvyc= 0.33 Vyc= 11.18 3.96 10.22 3.62
ᵝvyd= 0 Vyd= --- --- --- ---
ᵝvxc= 0.44 Vxc= 14.06 5.28 12.85 4.83
ᵝvxd= ….. Vxd= --- --- --- ……
S9 5.00 4.00 7.99 3.00 1.30
ᵝvyc= 0.36 Vyc= 11.51 4.32 10.52 3.95
ᵝvyd= 0.24 Vyd= 7.67 2.88 7.01 2.63
ᵝvxc= 0.44 Vxc= 14.43 5.28 13.19 4.83
ᵝvxd= ….. Vxd= --- --- --- ……
S10 5.00 4.00 8.20 3.00 1.30
ᵝvyc= 0.36 Vyc= 11.81 4.32 10.79 3.95
ᵝvyd= 0.24 Vyd= 7.87 2.88 7.20 ….
ᵝvxc= 0.39 Vxc= 11.73 5.38 10.72 4.92
ᵝvxd= …. VXd= --- --- --- ---
S-11 5.00 4.60 6.54 3.00 1.10
ᵝvyc= 0.36 Vyc= 10.83 4.97 9.90 4.54
ᵝvyd= 0.24 Vyd= 7.22 3.31 6.60 3.03
ᵝvxc= 0.44 Vxc= 9.91 5.28 9.06 4.83
ᵝvxd= ….. Vxd= --- --- --- ……
S-12 5.63 4.00 5.63 3.00 1.30
ᵝvyc= 0.36 Vyc= 8.11 4.32 7.41 3.95
ᵝvyd= 0.24 Vyd= 5.40 2.88 4.94 2.63
ᵝvxc= 0.41 Vxc= 10.32 4.92 9.43 4.50
ᵝvxd= ……. Vxd= …….. …….. …… ……
S13 5.00 4.00 6.29 3.00 1.30
ᵝvyc= 0.33 Vyc= 8.30 3.96 7.59 3.62
ᵝvyd= ……. Vyd= --- --- --- ---
ᵝvxc= 0.41 Vxc= 10.33 4.92 9.44 4.50
ᵝvxd= ……. Vxd= …….. …….. …… ……
S14 5.00 4.00 6.30 3.00 1.30
ᵝvyc= 0.33 Vyc= 8.32 3.96 7.60 3.62
ᵝvyd= ……. Vyd= --- --- --- ---

ᵝvxc= 0.47 Vxc= 13.16 5.64 12.03 5.15


ᵝvxd= 0.31 Vxd= 8.68 3.72 7.93 3.40
S15 5.00 4.00 7.00 3.00 1.30
ᵝvyc= 0.36 Vyc= 10.08 4.32 9.21 3.95
ᵝvyd= ……. Vyd= --- --- --- ---
ᵝvxc= 0.41 Vxc= 14.14 4.92 12.92 4.50
ᵝvxd= 0 Vxd= …….. …….. …… ……
S16 5.00 4.00 8.62 3.00 1.30
ᵝvyc= 0.33 Vyc= 11.38 3.96 10.40 3.62
ᵝvyd= 0 Vyd= --- --- --- ---

DL LL
panel no strip length Lx (m) Ly/Lx P vi=DL*Lx*1m+P vi=LL*Lx*1m
(KN/m2 ) (KN/m 2)
C-1 1.00 0.90 4.61 4.00 1.11 2.93 Vxc= 7.08 3.60
C-2 1.00 1.30 4.61 4.00 0.77 2.93 Vxc= 8.92 5.20
C-3 1.00 1.00 4.61 4.00 1.00 2.93 Vxc= 7.54 4.00
C-4 1.00 4.00 4.61 4.00 0.25 2.93 Vxc= 21.37 16.00
3.7 Check Depth for Shear
Maximum shear force is obtained at support but design shear force is taken at “d” distance
from face of supporter. The maximum design shear is occurred at slab, S-6
Vsd= 1.3*17.81 + 1.6*5.55 =32.033KN
Shear resistance of concrete
The shear VC, carried by the concrete in members without significant axial force shall
be taken as;
Vc = 0.25*fctd*k1*k2*bw*d …………EBCS-2/1995 section 4.5.3.1 page 44.
k1 = 1+50ρ < 2
k2 = 1.6 - d > 1
fctd = fctk/γc ………….. ………EBCS-2/1995 section 2.4 page 10
ρ = Ast/bd where Ast =527mm2 , b=1000m & d = 100mm
Where As is the area of the tensile reinforcement anchored beyond the intersection of the
steel
and the line of a possible 450 cracking strength from the edge of section.
ρ = Ast/bd =527/(1000*100) = 0.00527
k1 = 1+50*0.00527 = 1.26 < 2 …………....OK!!!
k2 = 1.6 - 0.1 = 1.5 > 1 ……… ……OK!!!

fctd = fctk/γc = 1.5/1.5 = 1.0 N/mm2 ………EBCS-2/1995 section 2.4 & table 2.5
Vc = 0.25*fctd*k1*k2*bw*d =0.25*1*1.26*1.5*1000*100= 47.25KN
Vsd = 32.033KN < Vc = 47.25KN …………..…OK!!!
Therefore No shear reinforcement is required.

2ND AND 3RD FLOOR WALL LOAD TRANSFER

Wall Wall Wall Wall Plast Wall TOTAL


Wall Length Height Thick plast unit Wt Unit Wt LOAD
3
(m) (m) (m) thick (m) (KN/m3) (KN/m ) (KN)
On Axis B&H            
1 2 4.50 2.70 0.20 0.05 23.00 14.00 10.67
2 3 4.60 2.70 0.20 0.05 23.00 14.00 10.67
3 4 4.60 2.70 0.20 0.05 23.00 14.00 10.67
On Axis C            
1 2 3.60 2.70 0.15 0.05 23.00 14.00 8.78
2 3 3.70 2.70 0.15 0.05 23.00 14.00 8.78
3 4 3.70 2.70 0.15 0.05 23.00 14.00 8.78
4 5 4.30 2.70 0.20 0.05 23.00 14.00 10.67
On Axis D            
1 2 4.50 2.70 0.15 0.05 23.00 14.00 8.78
3 4 4.60 2.70 0.15 0.05 23.00 14.00 8.78
On Axis E&F            
1 2 3.45 2.70 0.15 0.05 23.00 14.00 8.78
3 4 3.55 2.70 0.15 0.05 23.00 14.00 8.78
On Axis G            
1 2 4.50 2.70 0.15 0.05 23.00 14.00 8.78
2 3 3.55 2.70 0.15 0.05 23.00 14.00 8.78
On Axis 1&4            
               
B C 3.80 2.70 0.20 0.05 23.00 14.00 10.67
C D 3.80 2.70 0.20 0.05 23.00 14.00 10.67
D E 3.80 2.70 0.20 0.05 23.00 14.00 10.67
E F 3.80 2.70 0.20 0.05 23.00 14.00 10.67
F G 3.80 2.70 0.20 0.05 23.00 14.00 10.67
G H 4.40 2.70 0.20 0.05 23.00 14.00 10.67
On Axis 2            
               
B C 3.80 2.70 0.15 0.05 23.00 14.00 8.78
C D 2.05 2.70 0.15 0.05 23.00 14.00 8.78
D E 1.60 2.70 0.15 0.05 23.00 14.00 8.78
G H 3.40 2.70 0.15 0.05 23.00 14.00 8.78

On Axis 3

B C 3.80 2.70 0.15 0.05 23.00 14.00 8.78


C D 2.40 2.70 0.15 0.05 23.00 14.00 8.78
D E 2.35 2.70 0.15 0.05 23.00 14.00 8.78
F G 2.30 2.70 0.15 0.05 23.00 14.00 8.78
G H 4.40 2.70 0.20 0.05 23.00 14.00 10.67
fyk(Mpa
slab LY Lx=Le Span ratio ) βa effective Slab
Panel Span type (mm) (mm) (Ly/Lx)     depth(d) system
S-1 end 4900 4000 1.23 300 37.75 90.07 two way
S-2 end 4900 4000 1.23 300 37.75 90.07 two way
S-3 end 4900 4000 1.23 300 37.75 90.07 two way
S-4 end 4900 4600 1.07 300 39.35 99.37 two way
S-5 end 5000 4000 1.25 300 37.50 90.67 two way
S-6 Interior 5000 4000 1.25 300 42.50 80.00 two way
S-7 Interior 5000 4000 1.25 300 42.50 80.00 two way
S-8 Interior 5000 4000 1.25 300 42.50 80.00 two way
S-9 end 5000 4600 1.09 300 39.13 99.92 two way
S-10 end 5000 4000 1.25 300 37.50 90.67 two way
S-11 end 5000 4000 1.25 300 37.50 90.67 two way
S-12 end 5000 4000 1.25 300 37.50 90.67 two way
S-13 end 5000 4000 1.25 300 37.50 90.67 two way
S-14 end 5000 4000 1.25 300 37.50 90.67 two way
C-1 cantilever 5000 900 5.56 300 10 76.50 cantilever
C-2 cantilever 4600 1300 3.54 300 12 92.08 cantilever
C3

From the serviceability results of the above table, the effective depth in S9 governs the design
for all end and interior slab. C2 governs the design for all cantilever slab.

ds max = 99.92 mm
dc max= 92.08 mm
Assuming Φ10mm reinforcement bars and 15mm concrete cover. Hence
Overall Depth for two way slab (Ds)=99.92+15+10/2=111.92mm, Use Ds=120mm
d=120-15-10/2=100mm (for shorter span reinforcement)
d=120-15-10-10/2=90mm (for longer span reinforcement)
Overall depth for cantilever slab (Dc) = 92.08+15+10/2+= 112.08 mm, Use Dc=120mm
dmin = 120-15-10/2=100mm

Panel 1
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=10.79 KN/m2

Panel 2

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=10.79 KN/m2

Panel 3
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (4.5 *2.85 *3.25 )=41.68 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗41.68
= x100% = 22.1%< 20%,
1.3 ( 4.61∗19.6+ 41.68 ) +1.6∗3∗19.6
Hence the load can be distributed to slab as follows

41.68
=2.17 KN /m2
19.6

 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.61 KN/m2

Panel 4

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel =19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (5.35*2.85 *3.25 )=49.55 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗49.55
= x100% =21.77 %< 20%,
1.3 ( 4.61∗19.6+ 49.55 ) +1.6∗3∗19.6
Hence the load can be distributed to slab as follows

49.77
=2.54 KN /m 2
19.6

 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=14.1 KN/m2

Panel 5

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (3.95*2.85 *3.25 )=36.59 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗37.31
= x100% =17.34%< 20%,
1.3 ( 4.61∗19.6+37.31 ) +1.6∗3∗19.6
Hence the load can be distributed to slab as follows

36.59
=1.87 KN /m2
19.6

 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.22 KN/m2

Panel 6

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2
 Height of partition wall=floor height – slab thickness=2.85
 Area of the panel = 22.54m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (12.65 *2.85 *3.25 )=116.34 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗116.34
= x100% =38.336 %< 20%,
1.3 ( 4.61∗22.54 +116.34 )+1.6∗3∗22.54
Hence the load can be distributed to slab as follows

116.34
=5.16 KN /m2
22.54
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=17.5 KN/m2
Panel 7

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (4.5 *2.85 *3.25 )=41.68 KN


1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗41.68
= x100% =20=20%,
1.3 ( 4.61∗20+ 41.68 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows

41.68
=2.08 KN /m 2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.49 KN/m2
Panel 8

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=10.79 KN/m2
Panel 9

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (4.5 *2.85 *3.25 )=41.68 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗41.68
= x100% =20= 20%,
1.3 ( 4.61∗20+ 41.68 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows

41.68
=2.08 KN /m 2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.49 KN/m2
Panel 10

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 19.6m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (5.32 *2.85 *3.25 )=49.1 KN


1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗49.1
= x100% =18.57 %< 20%,
1.3 ( 4.61∗20+ 49.1 ) +1.6∗5∗20
Hence the load can be distributed to slab as follows

49.1
=2.45 KN /m 2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.98 KN/m2
Panel 11

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 23m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (5.4 *2.85 *3.25 )=50 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗50
= x100% =23.14%< 20%,
1.3 ( 4.61∗20+50 )+1.6∗3∗20
Hence the load can be distributed to slab as follows
50
=2.17 KN /m 2
23
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.61 KN/m2
Panel 12

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =4KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.39 KN/m2
Panel 13

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =4KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.39 KN/m2
Panel 14
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =5KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.39 KN/m2
Panel 15

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =5KN/m2
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=13.99 KN/m2
Panel 16

 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
 Live load =3KN/m2

 Height of partition wall=floor height – slab thickness=2.85


 Area of the panel = 20m2
 15cm partition wall = (0.15x14 + 2x0.025x23) =3.25𝐾𝑁⁄𝑚2

Total Wt. of partition wall (PWt) = (2.95*2.85 *3.25 )=27.34 KN

1.3∗PW t
% age of partition wall = x100%,
1.3 ( DL∗Ap+ PW t ) +1.6∗¿∗Ap
Since 1.3(DL∗Ap+ PWt)+1.6∗¿∗Ap=Pd
1.3∗27.34
= x100% =11.04 %< 20%,
1.3 ( 4.61∗20+37.31 ) +1.6∗3∗20
Hence the load can be distributed to slab as follows

27.34
=1.37 KN /m2
20
 Therefore, design load (pd)=1.3(DL+pwt)+1.6LL=12.57 KN/m2
Cantilever slab (C4)

Here we have used lightweight aluminum framed railing with no specific detailed information so
the dead weight (KN) is ignored.
Finishes for all area of space.
 12cm RC slab=0.12*25=3KN/m2
 8mm ceramic tiles=0.008*23=0.184KN/m2
 42mm cement screed=0.042*23=0.966KN/m2
 20mm Ceiling plaster and paint =0.02*23=0.46KN/m2
 Total DL=4.61 KN/m2
QK (live load) =4KN/m2 (EBCS-1, 1995, table 2.9 & 2.10, imposed loads on building floors) for

Hotel.

Therefore , Design load ( P d ) for C 5=1.3 ( DL )+1.6 ( ¿ )


¿ 1.3( 4.61)+1.6∗4=12.39 KN ⁄ m 2 Cantilever

3.1.2 Analysis of slab Moment


 For two way slab: mi= αiPdLx2
 For cantilever: M=PdLx2/2+pL/4

Where Pd is distributed load

Where, mi=the design moment per unit width at the point of reference αi=the coefficient given in
Table A−1 in EBCS2−1995. Pd=the design load Lx=the length of the shorter span of the of the
panel Mxs=αxs∗Pd∗L 2eff Mxf =αxf ∗Pd∗L 2 eff
Mys=αys∗Pd∗L 2eff Myf =αys∗Pd∗L 2 eff

Here we have considered bending moment coefficients of half continues panels as fully
continues panels, If the continues section is greater or equal to the discontinues part of the panel.

panel Suppor Lx Ly Ly/L Pd αxs αxf αys αyf Mxs Mxf Mys Myf
t cond. x
S1 3 4 4. 1.2 10.79 0.063 0.047 0.047 0.036 10.88 8.11 8.11 6.22
9
S2 1 4 4. 1.2 10.79 0.056 0.042 0.039 0.03 9.67 7.25 6.73 5.21
9
S3 1 4 4. 1.2 13.61 4.54 2.27 18.15 9.1
9
S4 1 4 4. 1.2 14.1 4.7 2.4 18.8 9.4
9
S5 1 4 4. 1.2 13.22 0.056 0.042 0.039 0.03 11.85 8.88 8.25 6.35
9
S6 3 4. 4. 1.1 17.5 7.72 3.86 30.82 15.43
9
6
S7 1 4 5 1.3 13.49 0.052 0.039 0.039 0.029 11.22 8.42 8.42 6.26
S8 1 4 5 1.3 10.79 0.046 0.035 0.032 0.024 7.94 6.04 5.524 4.14
S9 3 4 5 1.3 13.49 0.052 0.039 0.039 0.029 11.22 8.42 8.42 6.26
S10 3 4 5 1.3 13.98 0.052 0.039 0.039 0.029 11.63 8.72 8.72 6.49
S11 1 4. 5 1.1 13.61 5.96 2.99 23.99 11.99
6
S12 1 4 5 1.3 12.39 0.052 0.039 0.039 0.029 10.31 7.73 7.73 5.75
S13 1 4 5 1.3 12.39 0.062 0.047 0.039 0.03 12.29 9.32 7.73 5.95
S14 1 4 5 1.3 12.39 0.062 0.047 0.039 0.03 12.29 9.32 7.73 5.95
S15 3 4 5 1.3 13.99 0.065 0.045 0.034 14.55 10.10 6.74
S16 1 4 5 1.3 12.57 0.062 0.047 0.039 0.03 12.47 9.45 7.84 6.03

FOR PANEL 3

W = 13.61 KN/m2 W/2 = 6.81 KN/m2


Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is
assigned to the direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 13.61 * 12/2 = 6.81KNm
Negative Moment: mxs = 6.81 * 2/3 = 4.54KNm
Positive moment: mxf = 6.81 * 1/3 = 2.27KNm
X direction edge strip
Cantilever moment: mx = 6.81 * 12/2 = 3.41KNm
Negative Moment: mxs = 3.41 * 2/3 =2.27KNm
Positive moment: mxf = 3.41 * 1/3 = 1.14KNm

Y direction middle strip along B-B:

Simply supported span moment: my = 13.61* 42/8 = 27.22KNm


Negative Moment: mys = 27.22 * 2/3 = 18.15KNm

Positive moment: myf = 27.22 * 1/3 = 9.1KNm

Y direction edge strip:


Cantilever moment: mx = 6.81 * 12/2 = 3.41KNm
Negative Moment: mxs = 3.41 * 2/3 =2.27KNm
Positive moment: mxf = 3.41 * 1/3 = 1.14KNm

FOR PANEL 4
W = 14.1 KN/m2 W/2 = 7.05 KN/m2
Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4/4 = 1m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is assigned to the
direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 14.1 * 12/2 = 7.05KNm
Negative Moment: mxs = 7.05 * 2/3 = 4.7KNm
Positive moment: mxf = 7.05 * 1/3 = 2.4KNm
X direction edge strip
Cantilever moment: mx = 7.05 * 12/2 = 3.53KNm
Negative Moment: mxs = 3.53 * 2/3 = 2.35KNm
Positive moment: mxf = 3.53 * 1/3 = 1.18KNm

Y direction middle strip along B-B:

Simply supported span moment: my = 14.1* 42/8 = 28.2KNm


Negative Moment: mys = 28.2 * 2/3 = 18.8KNm

Positive moment: myf = 28.2 * 1/3 = 9.4KNm

Y direction edge strip:


Cantilever moment: mx = 7.05 * 12/2 = 3.53KNm
Negative Moment: mxs = 3.53 * 2/3 = 2.35KNm
Positive moment: mxf = 3.53 * 1/3 = 1.18KNm

FOR PANEL 6

W = 17.5 KN/m2 W/2 = 8.75 KN/m2


Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4.6/4 = 1.15m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is assigned to the
direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 17.5 * 1.152/2 = 11.57KNm
Negative Moment: mxs = 11.57 * 2/3 = 7.72KNm
Positive moment: mxf = 44.57 * 1/3 = 3.86KNm
X direction edge strip
Cantilever moment: mx = 8.75 * 1.152/2 = 5.79KNm
Negative Moment: mxs = 5.79 * 2/3 =3.86KNm
Positive moment: mxf = 5.79 * 1/3 = 1.93KNm

Y direction middle strip along B-B:

Simply supported span moment: my = 17.5* 4.62/8 = 46.23KNm


Negative Moment: mys = 46.23 * 2/3 = 30.82KNm

Positive moment: myf = 46.23 * 1/3 =15.43KNm

Y direction edge strip:


Cantilever moment: mx = 8.75 * 1.152/2 = 5.79KNm
Negative Moment: mxs = 5.79 * 2/3 =3.86KNm
Positive moment: mxf = 3.53 * 1/3 = 1.18KNm

FOR PANEL 11

W = 13.61 KN/m2 W/2 = 6.81 KN/m2


Strips in the slabs
The discontinuity lines are selected as shown in the figure below.
Edge strip width = b/4 = 4.6/4 = 1.15m
In the corners, the load is divided equally in the two directions; elsewhere 100 percent of load is assigned to the
direction indicated by the arrows.
A ratio of support moment to the span moment of 2 is used

Calculation of moments

X direction middle strip along A-A:


Cantilever moment: mx = 13.61 * 1.152/2 = 8.99KNm
Negative Moment: mxs = 8.99 * 2/3 = 5.96KNm
Positive moment: mxf = 8.99 * 1/3 = 2.99KNm
X direction edge strip
Cantilever moment: mx = 6.81 * 1.152/2 = 4.5KNm
Negative Moment: mxs = 4.5 * 2/3 =3KNm
Positive moment: mxf = 4.5 * 1/3 = 1.5KNm

Y direction middle strip along B-B:

Simply supported span moment: my = 13.61* 4.62/8=35.99KNm


Negative Moment: mys = 35.99 * 2/3 = 23.99KNm

Positive moment: myf = 35.99 * 1/3 =11.99KNm

Y direction edge strip:


Cantilever moment: mx = 6.81 * 1.152/2 = 4.5KNm
Negative Moment: mxs = 4.5 * 2/3 =3KNm
Positive moment: mxf = 4.5 * 1/3 = 1.5KNm

Moment adjustment
Check whether the support moment is greater than 20% or not.
Sample calculation
For S-1
Mmax=8.11KN-m, Mmin=6.73KN-
m
ΔMs = Mmax - Mmin =8.11-6.73=1.18KN-m
ΔMs*100%/Mmax =1.38*100%/8.11 =17.02%
Therefore 17.02% > 20% use moment AVERAGE methed.

Slab ΔMs*100%
Mmax Mmin ΔMs 20%(Mmax) Method
panel Mmax
S1/S2 8.11 6.73 1.38 17.02 <20% Average
S1/S7 11.22 10.88 0.34 3.03 <20% Average

S2/S3 18.15 6.73 11.42 62.92 >20% Moment distribution


S2/S8 9.67 7.94 1.73 17.89 <20% Average

S3/S4 18.80 18.15 0.65 3.46 <20% Average


S3/S9 11.22 4.55 6.67 59.45 >20% Moment distribution

S4/S5 18.80 8.25 10.55 56.12 >20% Moment distribution


S5/S6 30.82 8.25 22.57 73.23 >20% Moment distribution

S5/S10 11.88 11.63 0.25 2.10 <20% Average


S6/S11 7.72 5.95 1.77 22.93 >20% Moment distribution

S7/S8 8.42 5.52 2.90 34.44 >20% Moment distribution


S7/S12 11.22 10.31 0.91 8.11 <20% Average

S8/S13 12.29 7.94 4.35 35.39 >20% Moment distribution


S8&S9 8.42 5.52 2.90 34.44 >20% Moment distribution

S9/S14 12.29 11.22 1.07 8.71 <20% Average


S10/S11 23.99 8.72 15.27 63.65 >20% Moment distribution

S10/S16 12.47 11.63 0.84 6.74 <20% Average


S11/C1 5.92 5.02 0.90 15.20 <20% Average

S12/S13 7.73 7.73 0.00 0.00 <20% Average


S12/C5 33.04 10.3  22.74 68.82 <20% Moment distribution

S13/S14 7.73 7.73 0.00 0.00 <20% Average


S14/S15 10.10 7.73 2.37 23.47 >20% Moment distribution

S15/S16 10.10 7.84 2.26 22.38 >20% Moment distribution


S16/C1 7.84 5.02 2.82 35.97 >20% Moment distribution
Use moment distribution method

3 EI
Stiffness for end support K=
4 lx

3 EI
K 1= =0.1875
4∗4

3 EI
K 2= =0.01875
4∗4

0.1875
Distribution factor DF1= =0.5
0.1875+0.1875

0 .1875
Distribution factor DF2= =0 .5
0 .1875∗0 . 1875

For S2&S3

s-3 s-2
DF 0.5 0.5
Un balanced moment -18.15 6.73
5.71 5.71
Balanced moment -12.44 12.44
For S3&S9

s-9 s-3
DF 0.5 0.5
Un balanced moment -11.22 4.55
3.34 3.34
Balanced moment -7.89 7.89
For S4&S5

s-4 s-5
DF 0.5 0.5
Un balanced moment -18.8 8.25
5.28 5.28
Balanced moment -13.52 13.52

For S5&S6

s-6 s-5
DF 0.5 0.5
Un balanced moment -30.82 8.25
11.29 11.29
Balanced moment -19.56 19.56
For S6&S11

s-6 s-11
DF 0.5 0.5
Un balanced moment -7.72 5.95
0.89 0.89
Balanced moment -6.84 6.84
For S7&S8

s-7 s-8
DF 0.5 0.5
Un balanced moment -8.43 5.52
1.45 1.45
Balanced moment -6.97 6.97
For S8&S13

s-13 s-8
DF 0.5 0.5
Un balanced moment -12.29 7.94
2.18 2.18
Balanced moment -10.12 10.12
For S10&S11

s-11 s-10
DF 0.5 0.5
Un balanced moment -23.99 8.72
7.64 7.64
Balanced moment -16.36 16.36

For S14&S15

s-15 s-14
DF 0.5 0.5
Un balanced moment -10.1 7.73
1.19 1.19
Balanced moment -8.92 8.92
For S15&S16

s-15 s-16
DF 0.5 0.5
Un balanced moment -10.1 7.84
1.13 1.13
Balanced moment -8.97 8.97
For S16&C1

s-16 C1
DF 0.2 0.8
Un balanced moment -7.84 5.02
0.56 2.26
Balanced moment -7.28 7.28

moment adjustment for slab

Slab no lx K DF Un Balanced
balanced moment
moment
S1&S2 S1 4 0.69 8.11 Take 7.42
S2 4 0.69 6.73 average 7.42
S1&S7 S1 4 0.17 10.88 Take 11.05
S7 4 0.17 11.22 average 11.05
S2&S3 S2 4 0.188 6.73 Use DF 12.44
S3 4 0.188 18.8 12.44
S2&S8 S2 4 0.87 0.5 9.67 Take 8.81
S9 4 0.87 0.5 7.94 8.81
average
S3&S4 S3 4 0.33 0.5 18.15 Take 18.48
S4 4 0.33 0.5 18.8 18.48
average
S3&S9 S3 4 0.188 0.5 4.55 Use DF 7.89
S9 4 0.188 0.5 11.22 7.89
S4&S5 S4 4 0.188 0.5 18.8 Use DF 13.52
S5 4 0.188 0.5 8.25 13.52
S5&S6 S5 4 0.188 0.5 8.25 Use DF 19.56
S6 4.6 0.188 0.5 30.82 19.56
S5&S10 S5 4 0.13 0.5 11.88 Take 11.76
S10 4 0.13 0.5 11.63 average 11.76
S6&S11 S6 4.6 0.163 0.5 7.72 Use DF 6.84
S11 4.6 0.163 0.5 5.59 6.84
S7&S8 S7 4 0.188 0.5 8.42 Use DF 6.97
S8 4 0.188 0.5 5.52 6.97
S7&S12 S7 4 0.45 11.22 Take 10.77
S12 4 0.45 10.31 average 10.77
S8&S9 S8 4 0.188 0.5 5.52 Use DF 6.97
S9 4 0.188 0.5 8.42 6.97
S8&S13 S9 4 0.188 0.5 7.94 Use DF 10.12
S13 4 0.188 0.5 12.29 10.12
S9&S14 S9 4 0.54 11.22 Take 11.76
S14 4.6 0.54 12.29 average 11.76
S10&S1 S10 4 0.188 0.5 8.72 Use DF 16.36
S11 4.6 0.188 0.5 23.99 16.36
1
S10&S1 S10 4 0.42 11.63 Take 12.05
S16 4 0.42 12.47 12.05
6 average
S11&C1 S11 4.6 0.47 0.5 5.96 Take 5.49
C1 4 0.47 0.5 5.02 5.49
average
S12&S1 S12 4 0 7.73 Take 7.73
S13 4 0 7.73 7.73
3 average
S12&C5 S12 4 10.31 Take 33.04
C5 4 33.04 33.04
average
S13&S1 S13 4 0 7.73 Take 7.73
S14 4 0 7.73 7.73
4 average
S14&S1 S14 4 0.2 0.2 7.73 Use DF 8.92
S15 1 0.8 0.8 10.1 8.92
5
S15&S1 S14 4 0.5 0.5 10.1 Use DF 8.97
S16 4 0.5 0.5 7.84 8.97
6
S16&C1 S16 4 0.2 0.2 7.84 Use DF 7.28
C1 1 0.80 0.8 5.02 7.28
C. Span Moment Adjustment

Calculation of adjusted span moments based of change of support moments.

Adjustments of Field Moments

According to EBCS 2, 1995 article A.3.3.3 Method II

 In this method consideration of the effects of changes of support moments is limited to


the adjacent spans. Since no effects on neighboring support sections need to be
considered; only a simple balancing operation is required at each edge and no iterative
process is involved.
 The procedure for applying method II, is as follows
o Support and span moments are first calculated for individual panels by assuming
each panel to be fully loaded. This is done by using the coefficients given in Table
A-1 as described in Section A.3.2
o The unbalanced moment is distributed using the moment distribution method. The
relative stiffness of each panel shall be taken proportional to its gross moment of
inertia divided by the smaller span.
o If the support moment is decreased, the span moments mxf and myf are then
increased to allow for the changes of support moments. This increase is calculated
as being equal to the change of the support moment multiplied by the factors
given in Table A-2. If a support moment is increased, no adjustments shall be
made to the span moments.

Δ𝒎𝒙𝒇= 𝒄𝒙Δ𝒎𝒙𝒔+ 𝒄𝒙Δ𝒎𝒚𝒔

Δ𝒎𝒚𝒇= 𝒄𝒚Δ𝒎𝒙𝒔+ 𝒄𝒚Δ𝒎𝒚𝒔

Table 2. 3Summarizes table below the adjustment of span moments

panel m xs m ys Ly /lx Cx1 Cy1 Cx2 Cy2 m xf m yf


S1 - 0.69 1.2 0.338 0.172 0.344 0.364 8.11 6.47
S2 0.87 5.71 1.2 0.338 0.172 0.344 0.364 9.51 7.44
S3 - 5.71 1.2 0.338 0.172 0.344 0.364 2.27 11.18
S4 - 5.88 1.2 0.338 0.172 0.344 0.364 2.4 11.54
S5 0.13 - 1.2 0.338 0.172 0.344 0.364 8.93 6.35
S6 0.89 11.29 1.1 0.356 0.220 0.314 0.347 7.72 19.54
S7 0.45 1.45 1.3 0.325 0.135 0.373 0.350 9.11 6.83
S8 - - 1.3 0.325 0.135 0.373 0.350 6.04 4.14
S9 - 1.45 1.3 0.325 0.135 0.373 0.350 8.42 6.77
S10 - - 1.3 0.325 0.135 0.373 0.350 8.72 6.49
S11 - 7.64 1.1 0.356 0.220 0.314 0.347 2.99 14.64
S12 - - 1.3 0.325 0.135 0.373 0.350 7.73 5.75
S13 2.18 - 1.3 0.325 0.135 0.373 0.350 10.03 5.95
S14 0.45 - 1.3 0.325 0.135 0.373 0.350 9.47 5.59
S15 - 1.19 1.3 0.325 0.135 0.373 0.350 14.55 7.16
S16 0.42 0.58 1.3 0.325 0.135 0.373 0.350 10.54 6.29
Calculation of reinforcement for the slab

Characteristic strength of material

Concrete

Using concrete quality (grade) c-25 and class I work

fcu = 25MPa

fck = 0.8fcu = 0.8 x 25 MPa = 20 MPa

Steel

Steel quality (grade) fyk = 300 MPa

Design Strength of Materials

Concrete

γc=1.5 (Ordinary loading) from[EBCS – 2, 1995 table 3.1]

γs= 1.15

0 .8 5∗f ck 0 .85∗20
fcd= = = 11.33MPa
γc 1.5

fyk 300
fyd= = = 260.87MPa
γs 1. 15

k. Check trial thickness for flexure


For two way slabs
M max=15.55knm/m ……..span moment for slab No.S-15
b=1000mm, μmax =0.295 for 0%redstrebution of elastic moment
M max 14.55∗106
d req=
√ μ max∗fcd∗b √
=
0. 295∗11 .33∗1000
= 65.98mm

d provided = D-φ/2-clear cover

= 120-10/2-15= 100mm

dreq< d provided ………………ok, (hence the trial depth is adequate for flexure)

 depth of slab: for two way slab,D=120

dx= D-φ/2-clear cover

= 120-10/2-15= 100mm

dy= dx- φb

=100-10= 90mm

 depth of slab: for cantilever slab, D=150

dx= D-φ/2-clear cover

= 120-10/2-15= 100mm

dy= dx- φb

=100-10= 90mm

Sample flexural reinforcement calculation for Slabs

Panel S-15

e) Positive(bottom) reinforcement
v) In short span :- Mxf= 14.55 KNm
dx= 100mm

md 14.55∗106
μreq= = =0.1284
b∗fcd∗d∗d 1000∗11.33∗1002

zmin=dx /2 ¿=100/2 ¿

ρmin=0.5/ fyk =0.5/300 =0.00167


Then, rigid area of tension steel

md 14.55∗10 6
AS= = =599.064
zmin∗fyd 94.785∗260.78

A smin=ρ min∗bd = 0.00167*1000*100=167mm2

As >Asmin. Hence it is……. ok provide As calculated

πd2 π∗102
as= = =78.5
4 4

as∗1 ooo
Spacing = =131.037 mm use 240 mm
As

Spacing

Spacing between bars for main reinforcement shall satisfy the following requirement.

Smax= 2 t=2∗120 mm=240 mm


{
¿ 300 mm → Recommended

Provided S bmax =300 mm

Spacing minimum of the following

 ∅ main ¯¿ 10
 ∅ aggregate mm =15+5=20
 Spacing >Minimum=20 < S maximum=240

Provide: φ10 bars at 130mm c/c placed at the bottom in short span direction

vi) In longer span direction:- Myf=7.16 KNm

Dy= 90mm

md 7.16∗10 6
μreq= = =0.07802
b∗fcd∗d∗d 1000∗11.33∗90 2

zmin=dx /2 ¿=90 /2 ¿86.34

ρmin=0.5/ fyk =0.5/300 =0.00167


Then, rigid area of tension steel

md 7.16∗10 6
AS= = =¿317.888mm2
zmin∗fyd 85.379∗260.78

A smin=ρ min∗bd = 0.00167*1000*90=150.3mm2

As >Asmin. Hence it is……. ok provide As calculated

πd2 π∗102
as= = =78.5
4 4

as∗1 ooo
Spacing = =246.942 mm use 240 mm
As

Spacing

Spacing between bars for main reinforcement shall satisfy the following requirement.

Smax= 2 t=2∗120 mm=240 mm


{
¿ 300 mm → Recommended

Provided S bmax =300 mm

Spacing minimum of the following

 ∅ main ¯¿ 10
 ∅ aggregate mm =15+5=20
 Spacing >Minimum=20 < S maximum=240

Provide: φ10 bars at 245mm c/c placed at the bottom in short span direction

iv. In longer span direction:- Mys=8.97KNm

Dy= 90mm

md 8.97∗10 6
μreq= = =0.09774
b∗fcd∗d∗d 1000∗11.33∗90 2

zmin=dx /2 ¿=90 /2 ¿

ρmin=0.5/ fyk =0.5/300 =0.00167


Then, rigid area of tension steel

md 8.87∗106
AS= = =402.809
zmin∗fyd 85.363∗260.78

A smin=ρ min∗bd = 0.00167*1000*90=150.3mm2

As >Asmin. Hence it is……. ok provide As calculated

πd2 π∗102
as= = =78.5
4 4

as∗1 ooo
Spacing = =194.88 mm
As

Spacing

Spacing between bars for main reinforcement shall satisfy the following requirement.

Smax= 2 t=2∗120 mm=240 mm


{
¿ 300 mm → Recommended

Provided S bmax =240 mm

Spacing minimum of the following

 ∅ main ¯¿ 10
 ∅ aggregate mm =15+5=20
 Spacing >Minimum=20 < S maximum=240

Provide: φ10 bars at 190mm c/c placed at the bottom in short span direction
Table Reinforcement design
Md dx/y fcd fyd b Zmin Ast,x/y Astmin Ast,use Øbar ast S,cal Smax S,prov Ast,prov
Slab No Location μreq
(N/mm2) (N/mm2)
2 2 2 2 2
(KN-m/m) (mm) (mm) (mm) (mm ) (mm ) (mm ) (mm) (mm ) (mm) (mm) (mm) (mm )
Short 8.11 100 11.33 260.9 1000 0.072 96.28 322.88 170 322.88 10 78.5 243 300 240 327.0833
span
Long 6.47 90 11.33 260.9 1000 0.071 86.71 286.04 153 286.04 10 78.5 274 300 270 290.74
S-1 S1&S2 7.42 90 11.33 260.9 1000 0.081 86.20 329.96 153 329.96 10 78.5 238 300 235 334.04
support S1&S7 11.05 100 11.33 260.9 1000 0.098 94.86 446.54 170 446.54 10 78.5 176 300 175 448.57

Short 9.51 100 11.33 260.9 1000 0.084 95.61 381.29 170 221.00 10 78.5 355 300 300 261.67
span
Long 7.44 90 11.33 260.9 1000 0.081 86.19 330.89 153 330.89 10 78.5 237 300 135 581.48
S-2 S2&S3 12.44 90 11.33 260.9 1000 0.136 83.42 571.65 153 571.65 10 78.5 137 300 135 581.48
support S2&S8 8.81 100 11.33 260.9 1000 0.078 95.95 351.98 170 221.00 10 78.5 355 300 300 261.67

Short 2.27 100 11.33 260.9 1000 0.020 98.99 87.91 170 87.91 10 78.5 893 300 300 261.67
span
Long 11.54 90 11.33 260.9 1000 0.126 83.93 527.05 153 527.05 10 78.5 149 300 145 541.38
S-3
S3&S4 18.48 90 11.33 260.9 1000 0.201 79.78 887.97 153 887.97 10 78.5 88.4 300 85 923.53
support
S3&S9 7.89 100 11.33 260.9 1000 0.070 96.39 313.78 170 313.78 10 78.5 250 300 250 314.00
Short 2.40 100 11.33 260.9 1000 0.021 98.93 93.00 170 93.00 10 78.5 844 300 300 261.67
span
Long 11.54 90 11.33 260.9 1000 0.126 83.93 527.05 153 527.05 10 78.5 149 300 145 541.38
S-4
S4&S5 13.52 90 11.33 260.9 1000 0.147 82.79 625.97 153 625.97 10 78.5 125 300 125 628.00
support

Short 8.93 100 11.33 260.9 1000 0.079 95.89 356.99 170 356.99 10 78.5 220 300 215 365.12
span
Long 6.35 90 11.33 260.9 1000 0.069 86.77 280.53 153 280.53 10 78.5 280 300 275 285.45
S-5 S5&S6 19.56 90 11.33 260.9 1000 0.213 79.09 948.09 153 221.00 10 78.5 355 300 300 261.67
support S5&S10 11.76 100 11.33 260.9 1000 0.104 94.51 476.99 170 476.99 10 78.5 165 300 160 490.63

Short 7.72 100 11.33 260.9 1000 0.068 96.47 306.77 170 306.77 10 78.5 256 300 255 307.84
span
Long 19.54 90 11.33 260.9 1000 0.213 79.10 946.96 153 946.96 10 78.5 82.9 300 80 981.25
S-6
S6&S11 6.84 100 11.33 260.9 1000 0.060 96.88 270.63 170 270.63 10 78.5 290 300 290 270.69
support

Short 9.11 100 11.33 260.9 1000 0.080 95.80 364.51 170 364.51 10 78.5 215 300 215 365.12
span
Long 6.83 90 11.33 260.9 1000 0.074 86.52 302.62 153 302.62 10 78.5 259 300 255 307.84
S-7 S7&S8 6.97 90 11.33 260.9 1000 0.076 86.44 309.09 153 309.09 10 78.5 254 300 250 314.00
support S7&S12 10.77 100 11.33 260.9 1000 0.095 95.00 434.59 170 434.59 10 78.5 181 300 180 436.11

Short 6.04 100 11.33 260.9 1000 0.053 97.26 238.06 170 238.06 10 78.5 330 300 325 241.54
span
Long 4.14 90 11.33 260.9 1000 0.045 87.92 180.50 153 180.50 10 78.5 435 300 300 261.67
S-8
S8&S9 6.97 90 11.33 260.9 1000 0.076 86.44 309.09 153 309.09 10 78.5 254 300 250 314.00
support
S8&S13 10.12 100 11.33 260.9 1000 0.089 95.31 407.00 170 407.00 10 78.5 193 300 190 413.16
Short 8.42 100 11.33 260.9 1000 0.074 96.13 335.74 170 335.74 10 78.5 234 300 230 341.30
span
Long 6.77 90 11.33 260.9 1000 0.074 86.55 299.85 153 299.85 10 78.5 262 300 260 301.92
S-9
S9&S14 11.76 100 11.33 260.9 1000 0.104 94.51 476.99 170 476.99 10 78.5 165 300 160 490.63
support

Short 8.73 100 11.33 260.9 1000 0.074 96.13 348.10 170 348.10 10 78.5 226 300 225 348.89
span
Long 6.69 90 11.33 260.9 1000 0.073 86.59 296.16 153 296.16 10 78.5 265 300 265 296.23
S-10
S10&S11 16.36 90 11.33 260.9 1000 0.178 81.10 773.31 153 773.31 10 78.5 102 300 100 785.00
support
S10&S16 12.05 100 11.33 260.9 1000 0.106 94.36 489.50 170 489.50 10 78.5 160 300 160 490.63
Short 2.99 100 11.33 260.9 1000 0.026 98.66 116.17 170 116.17 10 78.5 676 300 300 261.67
span
Long 14.64 90 11.33 260.9 1000 0.160 82.13 683.27 153 683.27 10 78.5 115 300 110 713.64
S-11
S11&C1 5.49 100 11.33 260.9 1000 0.048 97.52 215.81 170 215.81 10 78.5 364 300 300 261.67
support

Short 7.73 100 11.33 260.87 1000 0.068 96.46 307.18 170 307.18 10 78.5 255.6 300 255 307.84
span
Long 5.57 90 11.33 260.87 1000 0.061 87.18 244.91 153 244.91 10 78.5 320.5 300 320 245.31
S-12
S12&S13 7.73 90 11.33 260.87 1000 0.084 86.03 344.41 153 344.41 10 78.5 227.9 300 225 348.89
support
S12&C5 11.47 100 11.33 260.87 1000 0.101 94.65 464.52 170 464.52 10 78.5 169 300 165 475.76
Short 10.03 100 11.33 260.87 1000 0.089 95.36 403.20 170 403.20 10 78.5 194.7 300 190 413.16
span
Long 5.95 90 11.33 260.87 1000 0.065 86.98 262.22 153 262.22 10 78.5 299.4 300 295 266.10
S-13 348.89
S13&S14 7.73 90 11.33 260.87 1000 0.084 86.03 344.41 153 344.41 10 78.5 227.9 300 225
support

Short 9.47 100 11.33 260.87 1000 0.084 95.63 379.61 170 379.61 10 78.5 206.8 300 205 382.93
span
Long 5.59 90 11.33 260.87 1000 0.061 87.17 245.82 153 245.82 10 78.5 319.3 300 315 249.21
S-14 402.56
S14&S15 8.92 90 11.33 260.87 1000 0.097 85.39 400.44 153 400.44 10 78.5 196 300 195
support

Short 14.55 100 11.33 260.87 1000 0.128 93.10 599.06 170 599.06 10 78.5 131 300 130 603.85
span
Long 7.16 90 11.33 260.87 1000 0.078 86.34 317.89 153 317.89 10 78.5 246.9 300 245 320.41
S-15
S15&S16 8.97 90 11.33 260.87 1000 0.098 85.36 402.81 153 402.81 10 78.5 194.9 300 190 413.16
support

Short 10.54 100 11.33 260.87 1000 0.093 95.11 424.81 170 424.81 10 78.5 184.8 300 180 436.11
span
Long 6.29 90 11.33 260.87 1000 0.069 86.80 277.78 153 277.78 10 78.5 282.6 300 280 280.36
S-16 327.08
S16&C1 7.28 90 11.33 260.87 1000 0.079 86.28 323.46 153 323.46 10 78.5 242.7 300 240
support
4TH FLOR SLAB LOAD TRANSEFE

DL LL ᵦ Shear Distrib Load


panel Shear for DL
Ly (m) Lx (m) Ly/Lx for LL (KN/m)
no
(KN/m2 ) (KN/m2 ) vi=ᵦ*DL*Lx vi=ᵦ*LL*Lx0.914*vi 0.914*vi
ᵝvxc= 0.47 Vxc= 8.67 5.64 7.92 5.15
ᵝvxd= 0.31 Vxd= 5.72 3.72 5.22 3.40
S-1 4.90 4.00 4.61 3.00 1.20
ᵝvyc= 0.4 Vyc= 7.38 4.80 6.74 4.39
ᵝvyd= 0.26 Vyd= 4.79 3.12 4.38 2.85
ᵝvxc= 0.44 Vxc= 8.11 5.28 7.42 4.83
ᵝvxd= 0.29 Vxd= 5.35 3.48 4.89 3.18
S-2 4.90 4.00 4.61 3.00 1.20
ᵝvyc= 0.36 Vyc= 6.64 4.32 6.07 3.95
ᵝvyd= …… Vyd= ….. …... ……. …….
ᵝvxc= 0.44 Vxc= 11.93 5.28 10.91 4.83
ᵝvxd= 0.29 Vxd= 7.86 3.48 7.19 3.18
S-3 4.90 4.00 6.78 3.00 1.20
ᵝvyc= 0.36 Vyc= 9.76 4.32 8.92 3.95
ᵝvyd= ……. Vyd= --- --- --- ---
ᵝvxc= …. Vxc= ….. ….. ….. …….
ᵝvxd= 0.33 Vxd= 9.44 3.96 8.63 3.62
S-4 4.90 4.00 7.15 3.00 1.20
ᵝvyc= 0.4 Vyc= 11.44 4.80 10.46 4.39
ᵝvyd= …… Vyd= --- --- --- ---
ᵝvxc= 0.44 Vxc= 11.40 5.28 10.42 4.83
ᵝvxd= 0.29 Vxd= 7.52 3.48 6.87 3.18
S-5 4.90 4.00 6.48 3.00 1.20
ᵝvyc= 0.36 Vyc= 9.33 4.32 8.53 3.95

ᵝvyd= ……. Vyd= --- --- --- ---


ᵝvxc= 0.44 Vxc= 19.49 6.07 17.81 5.55
ᵝvxd= 0.29 Vxd= 12.85 4.00 11.74 3.66
S6 4.90 4.60 9.63 3.00 1.10
ᵝvyc= 0.4 Vyc= 17.72 5.52 16.20 5.05
ᵝvyd= 0.26 Vyd= 11.52 3.59 10.53 3.28
ᵝvxc= 0.44 Vxc= 11.77 5.28 10.76 4.83
ᵝvxd= …… Vxd= --- --- --- ---
S7 5.00 4.00 6.69 3.00 1.30
ᵝvyc= 0.36 Vyc= 9.63 4.32 8.81 3.95
ᵝvyd= 0.24 Vyd= 6.42 2.88 5.87 2.63
ᵝvxc= 0.41 Vxc= 7.56 4.92 6.91 4.50
ᵝvxd= 0 Vxd= …….. …….. …… ……
S8 5.00 4.00 4.61 3.00 1.30
ᵝvyc= 0.33 Vyc= 6.09 3.96 5.56 3.62
ᵝvyd= 0 Vyd= --- --- --- ---
ᵝvxc= 0.44 Vxc= 11.77 5.28 10.76 4.83
ᵝvxd= ….. Vxd= --- --- --- ……
S9 5.00 4.00 6.69 3.00 1.30
ᵝvyc= 0.36 Vyc= 9.63 4.32 8.81 3.95
ᵝvyd= 0.24 Vyd= 6.42 2.88 5.87 2.63
ᵝvxc= 0.44 Vxc= 12.43 5.28 11.36 4.83
ᵝvxd= ….. Vxd= --- --- --- ……
S10 5.00 4.00 7.06 3.00 1.30
ᵝvyc= 0.36 Vyc= 10.17 4.32 9.29 3.95
ᵝvyd= 0.24 Vyd= 6.78 2.88 6.19 ….
ᵝvxc= 0.39 Vxc= 12.16 5.38 11.12 4.92
ᵝvxd= …. VXd= --- --- --- ---
S-11 5.00 4.60 6.78 3.00 1.10
ᵝvyc= 0.36 Vyc= 11.23 4.97 10.26 4.54
ᵝvyd= 0.24 Vyd= 7.49 3.31 6.84 3.03
ᵝvxc= 0.44 Vxc= 8.11 7.04 7.42 6.43
ᵝvxd= ….. Vxd= --- --- --- ……
S-12 5.63 4.00 4.61 4.00 1.30
ᵝvyc= 0.36 Vyc= 6.64 5.76 6.07 5.26
ᵝvyd= 0.24 Vyd= 4.43 3.84 4.04 3.51
ᵝvxc= 0.47 Vxc= 8.67 7.52 7.92 6.87
ᵝvxd= 0.31 Vxd= 5.72 4.96 5.22 4.53
S13 5.00 4.00 4.61 4.00 1.30
ᵝvyc= 0.36 Vyc= 6.64 5.76 6.07 5.26
ᵝvyd= ……. Vyd= --- --- --- ---
ᵝvxc= 0.47 Vxc= 8.67 9.40 7.92 8.59
ᵝvxd= 0.31 Vxd= 5.72 6.20 5.22 5.67
S14 5.00 4.00 4.61 5.00 1.30
ᵝvyc= 0.36 Vyc= 6.64 7.20 6.07 6.58
ᵝvyd= ……. Vyd= --- --- --- ---

ᵝvxc= …. Vxc= ….. ….. ….. …….


ᵝvxd= 0.33 Vxd= 6.09 6.60 5.56 6.03
S15 5.00 4.00 4.61 5.00 1.30
ᵝvyc= 0.4 Vyc= 7.38 8.00 6.74 7.31
ᵝvyd= …… Vyd= --- --- --- ---
ᵝvxc= 0.47 Vxc= 11.24 5.64 10.28 5.15
ᵝvxd= 0.31 Vxd= 7.42 3.72 6.78 3.40
S16 5.00 4.00 5.98 3.00 1.30
ᵝvyc= 0.36 Vyc= 8.61 4.32 7.87 3.95
ᵝvyd= …… Vyd= ….. …... ……. …….

DL LL
panel no strip length Lx (m) Ly/Lx P vi=DL*Lx*1m+P vi=LL*Lx*1m
(KN/m 2 ) (KN/m 2 )
C-1 1.00 0.90 4.61 4.00 1.11 2.93 Vxc= 7.08 3.60
C-2 1.00 1.30 4.61 4.00 0.77 2.93 Vxc= 8.92 5.20
C-3 1.00 4.00 4.61 4.00 0.25 2.93 Vxc= 21.37 16.00
3.7 Check Depth for Shear
Maximum shear force is obtained at support but design shear force is taken at “d” distance
from face of supporter. The maximum design shear is occurred at slab, S-12.
Vsd= 1.3*17.81 + 1.6*5.55 =32.03KN
Shear resistance of concrete
The shear VC, carried by the concrete in members without significant axial force shall
be taken as;
Vc = 0.25*fctd*k1*k2*bw*d …………EBCS-2/1995 section 4.5.3.1 page 44.
k1 = 1+50ρ < 2
k2 = 1.6 - d > 1
fctd = fctk/γc ………….. ………EBCS-2/1995 section 2.4 page 10
ρ = Ast/bd where Ast =572mm2 , b=1000m & d = 100mm
Where As is the area of the tensile reinforcement anchored beyond the intersection of the
steel
and the line of a possible 450 cracking strength from the edge of section.
ρ = Ast/bd =572/(1000*100) = 0.00572
k1 = 1+50*0.00572 = 1.26 < 2 …………....OK!!!
k2 = 1.6 - 0.1 = 1.5 > 1 ……… ……OK!!!

fctd = fctk/γc = 1.5/1.5 = 1.0 N/mm2 ………EBCS-2/1995 section 2.4 & table 2.5
Vc = 0.25*fctd*k1*k2*bw*d =0.25*1*1.26*1.5*1000*100= 47.25KN
Vsd = 34.03KN < Vc = 47.25KN …………..…OK!!!
Therefore No shear reinforcement is required.
4TH floor slab wall load transfer to beam
Wall Wall Wall Wall Plast Wall TOTAL
Length Height Thick plast unit Wt Unit Wt LOAD
Wall
thick
(m) (m) (m) (m) (KN/m3) (KN/m3) (KN)
On Axis B            
1 2 4.50 2.70 0.20 0.05 23.00 14.00 10.67
2 3 4.60 2.70 0.20 0.05 23.00 14.00 10.67
On Axis C            
1 2 3.50 2.70 0.15 0.05 23.00 14.00 8.78
2 3 4.60 2.70 0.15 0.05 23.00 14.00 8.78
On Axis E            
1 2 3.50 2.70 0.15 0.05 23.00 14.00 8.78
2 3 4.60 2.70 0.15 0.05 23.00 14.00 8.78
On Axis F            
1 2 3.25 2.70 0.15 0.05 23.00 14.00 8.78
3 4 2.05 2.70 0.20 0.05 23.00 14.00 10.67
On Axis G            
1 2 4.50 2.70 0.15 0.05 23.00 14.00 8.78
3 4 1.00 2.70 0.15 0.05 23.00 14.00 8.78
On Axis H            
1 2 4.50 2.70 0.20 0.05 23.00 14.00 10.67
2 3 4.60 2.70 0.20 0.05 23.00 14.00 10.67
3 4 4.60 2.70 0.20 0.05 23.00 14.00 10.67
On Axis 1            
               
B C 3.80 2.70 0.20 0.05 23.00 14.00 10.67
C D 3.80 2.70 0.20 0.05 23.00 14.00 10.67
D E 3.80 2.70 0.20 0.05 23.00 14.00 10.67
E F 3.80 2.70 0.20 0.05 23.00 14.00 10.67
F G 3.80 2.70 0.20 0.05 23.00 14.00 10.67
G H 4.40 2.70 0.20 0.05 23.00 14.00 10.67
On Axis 2            
C D 3.80 2.70 0.15 0.05 23.00 14.00 8.78
D E 3.80 2.70 0.15 0.05 23.00 14.00 8.78
G H 3.40 2.70 0.20 0.05 23.00 14.00 10.67
On Axis 3            
               
B C 2.80 2.70 0.20 0.05 23.00 14.00 10.67
C D 3.80 2.70 0.20 0.05 23.00 14.00 10.67
D E 2.80 2.70 0.20 0.05 23.00 14.00 10.67
F G 2.50 2.70 0.20 0.05 23.00 14.00 10.67
G H 4.40 2.70 0.20 0.05 23.00 14.00 10.67
On Axis 4            
F G 3.80 2.70 0.20 0.05 23.00 14.00 10.67