You are on page 1of 1

19428

230 4380 115 4090 115 3300 115 5230 230 1393 230

01
W02 W02 W02 W01

230

230
W06
BIC

2000

rcc beam to Engineer's Design


3m aluminium sliding door

rcc beam to Engineer's Design


700

W02
BEDROOM

4115
LOUNGE

5000

5000
BEDROOM VERANDAH
BEDROOM ceramic ceramic
6430

ceramic ceramic
BIC

700

W06
1053 1053
2000

700

700
BIC BIC 1766 4000

885
BIC
10029

10029

opening
700

230
2200
rcc beam to Engineer's Design
WALK-IN CLOSET

rcc beam to Engineer's Design


1500

1500
PASSAGE

12000
1315

1315
700
ceramic

W01
115

frosted glass

3080
frosted glass ceramic DINING

700
bathroom door

opening
bathroom door KC

whb
shwr
whb

ceramic 855
BATH/TOILET

1650
BATHROOM

TOILET

1153
3024

700

ceramic

230
ceramic

1 laziman door by specialist


shwr

rcc beam to Engineer's Design


BT door
KITCHEN 2hour f.rted
ceramic
230

230
GARAGE

3000
W03 W03 W05
STOREROOM

grano
1570
door
2hour f.rted powerfloat

230
W04 W03 W03

TO SEWER LINE

01

230 3198 115 2966 115 1206 230 3300 230 1377 230 6000 230

7831 11597

FLOOR PLAN
FOR APPROVAL
NAME DESIGNATION SIGNATURE DATE PROJECT INGAGULA RELOCATION PROJECT: PROPOSED TYPE B HOUSE
PREPARED BY: SCALES:
DESIGNED/DRAWN BY : T.NYAZIKA PROJECT CIVIL ENGINEER MODEL
AS SHOWN
HWANGE POWER STATION CHECKED BY : A.RAMANDI SYSTEMS ENGINEER CIVIL
ENGINEERING DEPARTMENT CHECKED BY : A.CHESE SECTION ENGINEER C/PLANT SHEET: TITLE
COMMON PLANT SECTION- CIVIL CHECKED BY : N.NCUBE SECTION HEAD C/PLANT FLOOR PLAN
1 OF 1
AUTHORISED BY : C.CHINGONO ENGINEERING MANAGER
AUTHORISED BY : M. GWESU MAINTENANCE MANAGER SHEET SIZE:
APPROVED BY : T. TSHUMA GENERAL MANAGER A2 DATE : SEPTEMBER 2020 DRAWING No. 02