You are on page 1of 1

09-Jan-14

QUOTATION
N° 5 / 1.14

Owner Phone N°
Boat location La Marina Mobile N°
Boat Azimut Fax N°
Hull # 85 Boat Name Lady LiLo

Dear Capt. Waked,


Please find here below our estimate for the works that will be carried on the dry Docks:

Item # Description Qty U.P. $ T.P. $


Transmission line works

Labor for dismantling and re-assembly of transmission component both


sides (propellers, shafts, shaft logs, shaft seals).
Re-installation of the above and alignment with gearbox and intermediate
1 2 3,000.00 6,000.00
shaft support.
Replacement of shaft bearings and shaft seals.
Sea trial and vibration tests for approval.

2 Miscellaneous material, consumables used for the above works 1 275.00 275.00
3 Shaft bearing 90 mm 2 780.00 1,560.00
4 Shaft seals - Sure Seal complete 90 mm x 140 mm x 222 mm 2 1,401.00 2,802.00
5 Shaft seals - shipping charges 1 175.00 175.00

6 Shaft seals - customs duties - estimate - effective amount will be charged 1 550.00 550.00

Total Material and Labor $11,362.00


V.A.T. $1,136.20
Total $12,498.20

NB:
1- Marina Dry docks and lifting charges should be settled directly with La Marina Dbayeh.
2- Works out of the scope of the above will be charged separately.
3- Payment terms are 70% on approval and 30% after work completion

Sea Pros Customer Approval


Name: Ziad Maalouf Name:
After Sales Manager
Signature Signature