X X X X X X X R1 08/07/20 As per Internal Comment GS HT X X R0 12/09/19 Issue for Approval GS HT REV. Date Revision Desctiption Checked Approved Package Name: Bulandshahr Sewerage Scheme Part-III in the city of Bulandshahr under AMRUT Programme. Title: ELECTRICAL SINGLE LINE DIAGRAM FOR IPS-1 (ZONE-3) Client : Executive Engineer, UP Jal Nigam, Bulandshahr Agency : LC Infra Projects Pvt. Ltd., Ahmedabad Designed HT Eng check HT/NP/GS Drawn TP Coordination NP/GS Dwg check GS Approved HT Scale at A0 Status Rev AS SHOWN APR R1 Drawing Number BUL-IPS1-PS-SLD