Professional Documents
Culture Documents
Su M Tu W Th F Sa
September 2009
Su M Tu W Th F Sa
Oc tober 2009
Su M Tu W Th F Sa
1 1 2 3 4 5 1 2 3
2 3 4 5 6 7 8 6 7 8 9 10 11 12 4 5 6 7 8 9 10
Mon, Aug 31 - Sun, Sep 6 9 10 11 12 13 14 15 13 14 15 16 17 18 19 11 12 13 14 15 16 17
16 17 18 19 20 21 22 20 21 22 23 24 25 26 18 19 20 21 22 23 24
W36-1 to W36-7
23 24 25 26 27 28 29 27 28 29 30 25 26 27 28 29 30 31
30 31
8 8
9 9
10 10
11 11
12 12
1 1
2 2
3 3
4 4
5 5
6 6
þ ABC Prioritized Task List
8 8
9 9
10 10
11 11
12 12
1 1
2 2
3 3
4 4
5 5
6 6
Additional Notes:
-- Column A is named "arr_event" and is the text displayed on
the planner.
-- Column F is named "arr_eventdate" and is used by both the
mini calendars and the planner to determine what events
should be listed or highlighted.
-- Columns D (week) and E (WeekDay) are for calculating
floating holidays. For example, Thanksgiving is on the 4th
Thursday of November.
-- Columns B (month) and C (Day) are for calculating the
date using DATE(year,month,day).
August 2009
Wk Su M Tu W Th F Sa These dates and those in the Events sheet must be formatted the same way
31 1
32 2 3 4 5 6 7 8 8/2/2009 8/3/2009 8/4/2009 8/5/2009 8/6/2009
33 9 10 11 12 13 14 15 8/9/2009 8/10/2009 8/11/2009 8/12/2009 8/13/2009
34 16 17 18 19 20 21 22 8/16/2009 8/17/2009 8/18/2009 8/19/2009 8/20/2009
35 23 24 25 26 27 28 29 8/23/2009 8/24/2009 8/25/2009 8/26/2009 8/27/2009
36 30 31 8/30/2009 8/31/2009
September 2009
Wk Su M Tu W Th F Sa
36 1 2 3 4 5 9/1/2009 9/2/2009 9/3/2009
37 6 7 8 9 10 11 12 9/6/2009 9/7/2009 9/8/2009 9/9/2009 9/10/2009
38 13 14 15 16 17 18 19 9/13/2009 9/14/2009 9/15/2009 9/16/2009 9/17/2009
39 20 21 22 23 24 25 26 9/20/2009 9/21/2009 9/22/2009 9/23/2009 9/24/2009
40 27 28 29 30 9/27/2009 9/28/2009 9/29/2009 9/30/2009
October 2009
Wk Su M Tu W Th F Sa
40 1 2 3 10/1/2009
41 4 5 6 7 8 9 10 10/4/2009 10/5/2009 10/6/2009 10/7/2009 10/8/2009
42 11 12 13 14 15 16 17 10/11/2009 10/12/2009 10/13/2009 10/14/2009 10/15/2009
43 18 19 20 21 22 23 24 10/18/2009 10/19/2009 10/20/2009 10/21/2009 10/22/2009
44 25 26 27 28 29 30 31 10/25/2009 10/26/2009 10/27/2009 10/28/2009 10/29/2009
ISO
US :: Use Start Day=1 (Sunday). Week 1 contains January 1
ISO :: Must use Start Day=2 (Monday). Week 1 contains the first Thursday
Note: When using the US week number, you must have the Analysis ToolPak add-in installed
9/4/2009 9/5/2009
9/11/2009 9/12/2009
9/18/2009 9/19/2009
9/25/2009 9/26/2009
10/2/2009 10/3/2009
10/9/2009 10/10/2009
10/16/2009 10/17/2009
10/23/2009 10/24/2009
10/30/2009 10/31/2009