RISK REDUCTION
PURPOSE: SCOPE:
• Reduce the risk of initial quality • Assembly Area
failures
• Manufacturing Operations
• Shipping / Receiving
• Error proofing past quality • All Operations
failures • Other Support Functions
• Ensure that Failure Modes have
proper controls
(prevention/detection) and RESPONSIBILITY:
work properly • Ownership
• Identify potential risks which Engineering Manager
could impact to plant Operations Manager
• Contingency Plan for All
Situations
Criteria of Requirement
PFMEA – page 5-7
1 – page 8
2 – page 9
3 – page 9/11-14
4 – page 15-16
5 – page 10
Auditor hints – page 17
Next Requirement
Consequences on:
Process Customer Plant, How Often Actions to reduce Severity/
How good is
name/ Ultimate Customer, does it Occurrence/ Detection
this method
number and Govt Regulations happen? ratings?
of finding it?
purpose ? • Design Change
• Process Changes
How Bad
is it? • Special Controls
What Controls are in
What could go wrong? place to: • Changes to Standards,
procedures
Why part reject at Op? Prevent / reduce
occurrence of causes
What would be What are the
unacceptable to Cause(s) Detect failure mode
customer described in
terms of
How could part not something RISK PRIORITY NUMBER (RPN) = S x O x D
conform to spec. that can be
corrected / S = Severity O = Occurrence D = Detection
controlled.
1 = Lowest 1000 = Highest
S C O D R. 22 Action Results
Core Team 8
Process Function Potential Failure Potential Effect(s) E L Potential Cause(s)/ C E P. Recommended Responsibility Actions S O D R.
Requirements Mode of Failure V A Mechanism(s) of C Current Process Control T N. Action(s) & Target Taken E C O P.
9 10 11 12 S 16Failure 18 U 19 E21 Completion Date V C T N. S C O D R. 22 Action Results
14 S R 20 C Process Function Potential Failure Potential Effect(s) E L Potential Cause(s)/ C E P. Recommended Responsibility Actions S O D R.
13 15 Requirements Mode of Failure V A Mechanism(s) of C Current Process Control T N. Action(s) & Target Taken E C O P.
17
9 10 11 12 S 16Failure 18 U 19 E21 Completion Date V C T N.
14 S R 20 C
13 15
17
PROCESS FLOW
• HIGH RPNs
PFMEA
POTENTIAL 1 FMEA Number
FAILURE MODE AND EFFECTS ANALYSIS
(PROCESS FMEA) Page of
• PFMEA’s shall:
– Conform to customer requirement (current AIAG or PSA guidelines),
– Have accurate Severity/Occurrence/Detection ratings,
– Be updated on a regular basis (living documents),
– Be utilized for Continuous Improvement.
• PFMEA assumption is that the product design will meet the design intent.
However PFMEA team may identify design opportunities which, if implemented,
would eliminate or reduce occurrence of a process failure mode (e.g.: adding a
feature to a part eliminates wrong orientation). Such information need to be
provided to :
– responsible design engineer,
– tooling or fixture design engineer, if applicable.
Criteria of Requirement
1 – page 19-21
2 – page 19-21
3 – page 22
4 – page 23
5 – page 24-25
Auditor hints – page 26
Risk prioritization
Once Severity, Occurrence and Detection have been defined, PFMEA team must
decide if further efforts are needed to reduce the risk.
One approach to assist in action prioritization to use Risk Priority Number (RPN):
RPN = Severity(S) x Occurrence (O) x Detection (D)
(Proactive) (Example)
RPN Completion Revised
No. OP No. Function & Failure Mode Value Who Recommended Actions Date RPN
SENSOR TO DETECT
1 10 INCORRECT BEARING INSTALLED 490 B. SHAD BEARING TYPE 12/1/2008 112
INCORRECT OR REVERSED
2 20 SUBASSEMBLY 126 N. ADAMS INSTALL LASER STATION 12/31/2008 42
Criteria of Requirement
1 – page 30
2 – page 30-31
3 – page 28-29
Auditor hints – page 32
Criteria of Requirement
1 – page 34-35
2 – page 37-39
3 – page 36/40
Auditor hints – page 41
• Once they finished the audit all the findings should be documented in an action
plan with champion and dates to complete and increase the prevention of
defects at the production line.
NO NO
END
Line
Number of
stations
Station number
or name
Stations pending to be
audited
S C O D R. 22 Action Results
Core Team 8
Process Function Potential Failure Potential Effect(s) E L Potential Cause(s)/ C E P. Recommended Responsibility Actions S O D R.
Requirements Mode of Failure V A Mechanism(s) of C Current Process Control T N. Action(s) & Target Taken E C O P.
9 10 11 12 S 16Failure 18 U 19 E21 Completion Date V C T N. S C O D R. 22 Action Results
14 S R 20 C Process Function Potential Failure Potential Effect(s) E L Potential Cause(s)/ C E P. Recommended Responsibility Actions S O D R.
13 15 Requirements Mode of Failure V A Mechanism(s) of C Current Process Control T N. Action(s) & Target Taken E C O P.
17
9 10 11 12 S 16Failure 18 U 19 E21 Completion Date V C T N.
14 S R 20 C
13 15
17
PROCESS FLOW
• HIGH RPNs
PFMEA
POTENTIAL 1 FMEA Number
FAILURE MODE AND EFFECTS ANALYSIS
(PROCESS FMEA) Page of
Core Team 8
S C O D R. 22 Action Results
Process Function Potential Failure Potential Effect(s) E L Potential Cause(s)/ C E P. Recommended Responsibility Actions S O D R.
Requirements Mode of Failure V A Mechanism(s) of C Current Process Control T N. Action(s) & Target Taken E C O P.
9 10 11 12 S 16Failure 18 U 19 E21 Completion Date V C T N.
14 S R 20 C
13 15
17
Control Plan
Criteria of Requirement
1 – page 43-44
2 – page 43
3 – page 45-46
4 – page 45-46
5 – page 45
Auditor hints – page 47
It identifies potential risks which could impact to plant normal processes, activities.
It covers risks such as:
• Un-availability of key resources (electricity, pressured air, water etc.),
• Breakdown of key processes
• Breakdown of key tierX suppliers,
• Disasters (fire, flood, earthquake etc.),
• Strikes, etc.
Formalized process of evaluation and control of risks are defined.
The responsibilities of evaluation and management of risks are clearly established,
coherent with the typology of the risks such as:
• Maintenance for breakdown of key processes & availability of key
resources (electricity…),
• Logistic for breakdown of key tier X suppliers,
• Human Resources for strikes,
• Environmental & Safety for disasters.
• Prevention and reaction plans are defined and delpoyed. When applicable, plan
is audited and simulations is carried out.
• The risks and the associated plans are periodically reviewed based on the plant,
corporate and external lessons learnt.
Plant FMEA
1st Updated
Action plan
Evaluation Evaluation
1. Human Ressources
Social Conflict (Strike) Enable to produce or
deliver
3 1 3 XXXX Doc Ref.xxxx 2 1 2
Wages too low Loss of critical
competencies
Heavy rate of absenteism Enable to produce
Major safety issue Equipement blocked due
to legal investigation
…. ….
Scoring
Severity
1 2 3
No customer Customer plant Customer plant
impact minor disruption stop
Detection
1 2 3
Very High High Low
Master securing plan which contains major risks, procedures and owners in case of
e.g.: flood, fire etc.
Verify that master security plan covers the relevant major risks.
How risks are evaluate (which criteria, is there a tool like FMEA, etc.).
Who is responsible of the whole process, who is responsible for a precise risk.
An example of risk: fire. Look at the action plan (preventive: extinguisher, training /
corrective: site evacuation plan, sprinkler, firemen on site, etc.)
Criteria of Requirement
1 – page 49
2 – page 50
3 – page 50
4 – page 51
Auditor hints – page 52
Predict (Example)
Planning / Documentation
0 5 10 15 20 25
FMEA - corrective
actions ineffective
• Management is not involved & does not allocate resources for regular reviews.
• PFMEAs not used for continuous improvement - only updated when problems occur.