PROJECT: AMAIA STEPS ALABANG ESPERANZA AREA: HALLWAY & ELEVATOR LOBBY
SUBJECT:ARCHITECTURAL AND MEPFS PUNCHLIST FLOOR LEVEL:4TH FLOOR
DATE: OCTOBER 14, 2022
PUNCHLIST FORM

ACCEPTED/CLOSED BY:
DATE
ITEM ANNEX/ DATE DATE
SPECIFIC FINDINGS/COMMENTS Sub-Contractor/ General APMC-TG (Close-out CLOSED-OUT REMARKS
NO. PAGE INSPECTED RECTIFIED
Supplier Contractor Signature) BY APMC-TG

1 Both fire exit lights are not properly mounted 14/10/2022

Installed Evacuation plan at lobby area only, provide also at


2 14/10/2022
corridor

Repolish alluminum frame and rectify cracks from glass at


3 14/10/2022
FHC

4 Presence of busted lighting fixtures. For replacement 14/10/2022

Check Fire exit door treshhold elevation hazardous for


5 14/10/2022
tripping incase of emergency

Awning windows is not compliance for 4% ventilation


6 14/10/2022
requirements possibilities of suffocation incase of fire

Undone painting of firepipe near at pressure restricting


7 14/10/2022
valve at FHC, provide color RED" paint

8 Some of concealed lights are not properly mounted 14/10/2022

Potential Electrocution to Children. Provide cover for


9 14/10/2022
convenience outlet in both sides of hallway

10 Cover the holes/gaps from both fire exit lights conduit 14/10/2022

General cleaning. Remove dust accumulation and paint


11 laitances on manual pull, strobe lights, telephone jack, 14/10/2022
lighting fixtures, sprinkler heads and FHC

Rev. 05
Punchlisted by: Witnessed by: Fully Closed-Out by APMC-TG
REMARKS:

HENRY JOSEPH L. FULAY _________________________ ______________________________


APMC-TG Representative Contractor Representative Signature Over Printed name / Date