Professional Documents
Culture Documents
28
PROJECT: AMAIA STEPS ALABANG ESPERANZA AREA: HALLWAY & ELEVATOR LOBBY
SUBJECT:ARCHITECTURAL AND MEPFS PUNCHLIST FLOOR LEVEL:4TH FLOOR
DATE: OCTOBER 14, 2022
PUNCHLIST FORM
ACCEPTED/CLOSED BY:
DATE
ITEM ANNEX/ DATE DATE
SPECIFIC FINDINGS/COMMENTS Sub-Contractor/ General APMC-TG (Close-out CLOSED-OUT REMARKS
NO. PAGE INSPECTED RECTIFIED
Supplier Contractor Signature) BY APMC-TG
10 Cover the holes/gaps from both fire exit lights conduit 14/10/2022
Rev. 05
Punchlisted by: Witnessed by: Fully Closed-Out by APMC-TG
REMARKS: