You are on page 1of 1

UPGRADING OF SLUDGE TREATMENT FACILITY, FLORIDE DOSING SYSTEM AND

CONSTRUCTION OF NEW CHEMICAL BUILDING AT SG. DUSUN WATER


TREATMENT PLANT, HULU SELENGOR

CONTRACT NO.: PO0000004498

CONTRACT PERIOD
1ST JUL 2020 - 30TH SEPT 2021

DILAPIDATION SURVEY REPORT

CONTRACTOR: CONSULTANT: CLIENT:


SYNICO ENGINEERING SDN BHD RANHILL CONSULTING SDN BHD PENGURUSAN AIR SELANGOR SDN BHD
NO.36, JALAN MERANTI JAYA 7, SUITE 1001, LEVEL 10, 31ST FLOOR, MENARA TM ANNEXE 2,
TAMAN MERANTI JAYA IND. PLAZA PERTAMA, JALAN PANTAI JAYA,
PARK, 47120, PUCHONG, NO.6, JALAN KAMPAR OFF OFF JALAN PANTAI BARU,
SELANGOR JALAN TUN RAZAK, 59200 KUALA LUMPOR
50400 KUALA LLUMPUR

PREPARED BY CHECKED BY: APPROVED BY:


SIGNATURE SIGNATURE SIGNATURE

NAME: MUHAMAD BIN ABDULLAH NAME: NAME:


REP.: CONTRACTOR REP.: CONSULTANT REP.: AiS
DATE: 23/9/2020 DATE: DATE:

You might also like