PROPOSED ACCESS ROAD AND ANTI-CLIMB FENCE


2. PROPOSED CHEMICAL PREPARATION BUILDING
3. PROPOSED SLUDGE HOLDING TANK, GRIT CHAMBER AND FLOWMETER CHAMBER
4. MODIFICATION WORK AT EXISTING SLUDGE FACILITY BUILDING
5. PROPOSED 150MM PIPE
6. EXISTING CHEMICAL PREPARATION BUILDING (INSTALL NEW FLUORIDE DOSING PUMP)
7. EXISTING SEIMENTATION POND

PROPOSED 10 Nos. OF BALL VALVE

MODIFICATION WORK TRANSFER PUMP

PROPOSED PVC PIPE