This document outlines proposed infrastructure projects and modifications at a wastewater treatment facility, including a new access road, anti-climb fence, chemical preparation building, sludge holding tank, grit chamber, flowmeter chamber, 150mm pipe, installing a new fluoride dosing pump at an existing chemical preparation building, and proposed ball valves and PVC pipes, as well as modification work on transfer pumps and an existing sedimentation pond.
This document outlines proposed infrastructure projects and modifications at a wastewater treatment facility, including a new access road, anti-climb fence, chemical preparation building, sludge holding tank, grit chamber, flowmeter chamber, 150mm pipe, installing a new fluoride dosing pump at an existing chemical preparation building, and proposed ball valves and PVC pipes, as well as modification work on transfer pumps and an existing sedimentation pond.
This document outlines proposed infrastructure projects and modifications at a wastewater treatment facility, including a new access road, anti-climb fence, chemical preparation building, sludge holding tank, grit chamber, flowmeter chamber, 150mm pipe, installing a new fluoride dosing pump at an existing chemical preparation building, and proposed ball valves and PVC pipes, as well as modification work on transfer pumps and an existing sedimentation pond.
2. PROPOSED CHEMICAL PREPARATION BUILDING 3. PROPOSED SLUDGE HOLDING TANK, GRIT CHAMBER AND FLOWMETER CHAMBER 4. MODIFICATION WORK AT EXISTING SLUDGE FACILITY BUILDING 5. PROPOSED 150MM PIPE 6. EXISTING CHEMICAL PREPARATION BUILDING (INSTALL NEW FLUORIDE DOSING PUMP) 7. EXISTING SEIMENTATION POND