You are on page 1of 3

Sudarmawan

Electrical Engineer/ Reliability Engineer/Certified Electrical Safety Expert


Strong organisational skills in a variety of situations. Have initiative and can work
independently or as part of a team.
Industry Preference: Petrochemical, Oil & Gas, Power Plant
Location Preference: GCC, Asia
rizkidarmawan77@gmail.com
+62895617664314

Profile Summary
Key Skills As an Electrical Engineer who has experienced over 8 years, familiar with
electrical equipment also experienced as a planner, currently as an
Transformer electrical Reliability engineer.
1. Control and planning PM, CM & PdM.
Motor Induction 2. Review and controlling maintenance budget around 7.000K USD.
3. Ensure reliability and maintainability of Electrical equipment:
Switchgear & MCC a. GIS from 150kV to 3kV
b. Power Transformer 20MVA x 2
Relay Protection
c. Distribution Transformer 30 unit
d. MV Motor more than 100 unit, (100kW - 5.5MW)
Software Applications Skills: e. LV Motor more than 1200 unit
ETAP f. MCC, Switchgear and Relay Protection
Electrical Power System Analysis g. UPS 50kVA x 4
h. DC Power Supply for Switchgear 9 unit
SA1 Mitsubishi & Visual Studio i. Other equipment such as Hoist Crane, Elevator, Lamp, etc.
Programming for SCADA 4. Planning the project and control all preparations until execution.
5. Making the planning of Shutdown Maintenance and coordination
MS. PROJECT with other related sections and even contractors.
Planning & Scheduling 6. Reviewing equipment maintenance for plant stability and cost
reduction.
MS. Office
Excel Formulas Expert
Career Timeline
2010 – 2011 2012 – Present
Soft Skills Yamaha Motor Manufacturing Indonesia Mitsubishi Chemical Indonesia
Control & Automation Engineer Electrical Reliability Engineer
 Depth Analysis
 Innovator
 Motivator
 Team Manager

Lecturer Instrumentation & Control Engineer


State Islamic University Fyrom International
2009-2010 2011 – 2012
Education
2010 Bachelor Degree of Electrical Engineering,
University of Gadjah Mada, Yogyakarta-Indonesia. GPA: 3.4 of 4

Work Experience
2012 – Present
Mitsubishi Chemical Indonesia, Electrical Reliability Engineer
Key Result Areas:
1. Planning & Scheduling Maintenance:
a. Perform the day-to-day work in order to increase profit, enhance plant reliability/integrity, and promote
safety & compliance to environmental standards.
b. Provide Maintenance team with the necessary support to maintain high level of safety performance and
comply with health, safety and environmental standards.
c. Ensure effective communication at all levels of the Maintenance organization with the aim of securing
the achievement of common objectives and maintaining an optimal work environment
d. Prepare weekly and monthly routine and preventive maintenance plans and all related activities.
e. Prepare and maintain statistical maintenance and technical reports (including work completion history
reports and material status) related to the routine and preventive maintenance activities.
f. Ensure that safety and security measures are being considered in all developed plans and schedules.
g. Perform other job-related duties as assigned by direct supervisor and being responsible for all
maintenance equipment electric.
2. Budget Control
a. Control stock of spare part by SAP.
b. Budgeting & distribution budget investment, life and daily.
c. Purchase spare parts and control delivery for project, renewal and daily maintenance.
3. Project
a. Project controls, cost estimates, man power requirements for proposal, forecasts and change orders.
4. PSDM (Planning Shutdown Maintenance)
a. Planning, scheduling and make sure every work have been execute on schedule.
b. Making integrated schedule with another section (Mechanic, Electric and Instrument)
c. Reviewing SDM work and decide improvement.
d. Coordinating with other disciplines and assist in start-up.
2011 – 2012
Fyrom International, Instrumentation & Control Engineer
Key Result Areas:
1. Work involved preparation of one line diagrams, area classification and scope of work.
2. Responsible for all electrical engineering and design of project.
a. Phototherapy
Phototherapy is the most widespread treatment for lowering bilirubin concentration in neonates.
b. Oxygen Concentrator
Oxygen concentrator is a device providing oxygen therapy to a patient at minimally to substantially
higher concentrations than available in ambient air.
c. Neonatal Incubator
It is used in preterm births or for some ill full-term babies.
d. Bubble CPAP (Cooperated with engineer from Netherland)
Bubble CPAP works by delivering a constant pressure to the infant's airway (via nasal prongs) which
decreases the work of breathing, improves ventilation or perfusion matching and helps to "splint" open
the airway.
2011 – 2012
Fyrom International, Instrumentation & Control Engineer
Knowledge & Jobs:
1. Work involved preparation of one line diagrams, area classification and scope of work.
2. Responsible for all electrical engineering and design of project.
a. Phototherapy
Phototherapy is the most widespread treatment for lowering bilirubin concentration in neonates.
b. Oxygen Concentrator
Oxygen concentrator is a device providing oxygen therapy to a patient at minimally to substantially
higher concentrations than available in ambient air.
c. Neonatal Incubator
It is used in preterm births or for some ill full-term babies.
d. Bubble CPAP (Cooperated with engineer from Netherland)
Bubble CPAP works by delivering a constant pressure to the infant's airway (via nasal prongs) which
decreases the work of breathing, improves ventilation or perfusion matching and helps to "splint"
open the airway.

Previous Experience

2010 - 2011
Yamaha Motor Parts Manufacturing Indonesia, Control & Automation Engineer
2009 - 2010
State Islamic University Sunan Kalijaga Jogjakarta-Indonesia, Lecturer
2005 – 2004
Krakatau Steel & Polyprima Karyareksa, Internship Program

Trainings
1. Electrical Power System Analysis using ETAP 11.0
2. 7 Habits of Highly Effective People (Franklin Covey)
3. Assessment System QCC with PDCA TULTA Methodology
4. Safety & Total Productive Maintenance (TPM)
5. Internal Audits: ISO 9001:2015 | ISO 14001:2015 | OHSAS 18001:2007
6. Project Management Using Ms. Project Application
7. How to Read Insulating Oil Analysis
8. How to Read Transformer Oil Analysis Report
9. Planner &Scheduling Using Ms. Project Application
10. Thermography Inspection
11. MCSA (Motor Current Signature Analysis)
12. Resistance Check using Megger Micro Ohm Meter 200A (MOM2)
13. Awareness ISO 5001 EnMS & ISO 50000 Series
14. Certified Electrical Safety Expert

Personal Details

 Date of Birth: 3 June 1986


 Mailing Address: Pondok Bakri Kasai, Cilegon-Banten Indonesia 42453
 Marital Status: Married
 No. of Dependents: 4 ( 1 spouse and 3 children)
 Nationality: Indonesia

You might also like