DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT.

NONGSA JAYA BUANA SHIPYARD


01-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 1112 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 2 2 8 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 7 6 7 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 2 2 - - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 1 - 2 - - - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - - - 1 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 15 - 6 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 4 4 5 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - - - 5 5 - - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 4 - - - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 5 5 2 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 8 1 8 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - - - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 2 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - - - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - - - 1

BLASTING & PAINTING


19 PT.BKB - - - - - 2 2 2
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 4 0 55 25 46 2 3

MASUK MALAM TGL 31 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - 1 - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 12 12 Orang 96

- 1 - - 22 22 Orang 176

- - - - 0 0 Orang 0

- - - - 4 4 Orang 32

- - - - 3 3 Orang 24

- - - - 1 1 Orang 8
- - - - 21 21 Orang 168

- - - - 14 14 Orang 112

1 - 1 - 12 12 Orang 96

- - - - 4 4 Orang 32

- 1 - - 13 13 Orang 104

- - - - 18 18 Orang 144

- - - - 0 0 Orang 0

- - - - 2 2 Orang 16

- - - - 0 0 Orang 0

- - - - 6 6 Orang 48
- - - - 1 1 Orang 8

- - - - 6 6 Orang 48

1 2 1 0 139 139 Orang 1112

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
02-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 0 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - - - - - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - - - - - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - - - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - - - - - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - - - - - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - - - - - - - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - - - - - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - - - - - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - - - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - - - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - - - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - - - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - - - -

BLASTING & PAINTING


19 PT.BKB - - - - - - - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 0 0 0 0 0 0 0

MASUK MALAM TGL 02 - Agustus - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - 1 - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0
- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0
- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

0 0 0 0 0 0 Orang 0

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
03-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2632 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 1 - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 1 3 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 4 4 15 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 7 2 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 5 8 4 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 1 2 6 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 3 1 3 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 17 3 11 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 19 15 13 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 12 9 6 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 18 - 5 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - 1 - 17 3 8 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 20 7 11 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 5 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 11 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 3 1 6

BLASTING & PAINTING


19 PT.BKB - - - - - 11 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 5 0 127 59 128 1 6

MASUK MALAM TGL 2 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 44 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.BKB BLASTING & PAINTING - - - - - 3 - 1

TOTAL WORKERS & HOURS

MASUK MALAM TGL 2 - AGUSTUS - 2020 (17:00 - 04:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.CFB - - - - - 2 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS

MASUK MALAM TGL 2 - AGUSTUS - 2020 (17:00 - 05:00) = 4 ORANG , (18:00 - 05:00)
WORKING HOURS Hours/day
TOTAL HOURS 92 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 8 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 2 - AGUSTUS - 2020 (17:00 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 42 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - 6 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 2 - AGUSTUS - 2020 (17:00 - 08:00)


WORKING HOURS Hours/day
TOTAL HOURS 30 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 2 - AGUSTUS - 2020 (17:00 - 08:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - 1 - - - -
SEJAHTERA
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 1 1 Orang 8

- - - - 5 5 Orang 40

- - - - 23 23 Orang 184

- - - - 18 18 Orang 144

- - - - 17 17 Orang 136

- - - - 9 9 Orang 72

- - - - 7 7 Orang 56
- - - - 31 31 Orang 248

- - 1 - 48 48 Orang 384

- - 1 - 30 30 Orang 240

- - - - 23 23 Orang 184

- - - - 29 29 Orang 232

- - - - 38 38 Orang 304

- - - - 6 6 Orang 48

- - - - 11 11 Orang 88

- 1 - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 11 11 Orang 88

- - - - 11 11 Orang 88

0 1 2 0 329 329 Orang 2632

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 44

4 Orang 44

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 33
3 Orang 33
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 8 8 Orang 92
8 Orang 92

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 42
6 Orang 42

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 30
2 Orang 30

TOTAL WORKERS
TOTAL
WORKERS
HOURS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 1 1 Orang 12
1 Orang 12
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
04-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2112 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 4 1 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 3 2 7 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 6 5 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 7 5 7 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 6 3 4 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 3 2 4 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 8 6 17 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 10 11 2 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 9 6 6 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 13 1 5 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 16 3 4 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 9 8 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 5 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 3 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - - - 4 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 4 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 7 1 -

BLASTING & PAINTING


19 PT.BKB - - - - - 11 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 7 0 95 53 105 1 0

MASUK MALAM TGL 3 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA

TOTAL WORKERS & HOURS

LEMBUR TGL 3 - AGUSTUS - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 3 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 3 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 144 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 12 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 3 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 3 - AGUSTUS - 2020 (17:00 - 22:00)


WORKING HOURS Hours/day
TOTAL HOURS 10 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - - 2 - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 3 - AGUSTUS - 2020 (17:00 - 22:00)


WORKING HOURS Hours/day
TOTAL HOURS 10 Hours
JABATAN
NO. NAMA SUBCONT PROJECT
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.PLS
1 H-243 - - - - 2 - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 3 - AGUSTUS - 2020 (17:00 - 22:30)


WORKING HOURS Hours/day
TOTAL HOURS 30 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 5 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 3 - AGUSTUS - 2020 (17:00 - 20:00) = 4 ORANG , (19:00 - 20:00)
WORKING HOURS Hours/day
TOTAL HOURS 15 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 5 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS

LEMBUR TGL 3 - AGUSTUS - 2020 (17:00 - 20:00) = 4 ORANG


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER
PT.GKS
1 H-239 - - - 2 - 2 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 7 7 Orang 56

- - - - 0 0 Orang 0

- 1 - - 13 13 Orang 104

- - - - 15 15 Orang 120

- - - - 19 19 Orang 152

- - - - 13 13 Orang 104

- - - - 9 9 Orang 72
- - - - 31 31 Orang 248

- - 1 - 25 25 Orang 200

- - - - 23 23 Orang 184

- - - - 19 19 Orang 152

- - - - 23 23 Orang 184

- - - - 28 28 Orang 224

- - - - 5 5 Orang 40

- - - - 3 3 Orang 24

- 1 - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 9 9 Orang 72

- - - - 11 11 Orang 88

0 2 1 0 264 264 Orang 2112

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 12
3 Orang 12
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 12 12 Orang 144
12 Orang 144

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 10
2 Orang 10

TOTAL WORKERS
TOTAL
WORKERS
HOURS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 10
2 Orang 10

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 30
5 Orang 30

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 15
5 Orang 15

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 12
4 Orang 12
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
05-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2720 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - 1 - 3 2 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 2 3 6 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 13 9 17 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 7 7 7 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 2 1 - - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - 1 - 6 4 9 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 15 7 9 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 21 10 10 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 3 - 10 8 10 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 33 4 4 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 8 3 4 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 16 8 12 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 9 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 2 3 -

BLASTING & PAINTING


19 PT.BKB - - - - - 9 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 9 0 137 66 122 3 0

MASUK MALAM TGL 4 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA

TOTAL WORKERS & HOURS

MASUK MALAM TGL 4 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 144 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 12 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 4 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 96 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 8 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 4 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 3 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 9 9 Orang 72

- - - - 11 11 Orang 88

- 1 - - 40 40 Orang 320

- - - - 21 21 Orang 168

- - - - 3 3 Orang 24

- - - - 20 20 Orang 160
- - - - 31 31 Orang 248

- - - - 42 42 Orang 336

- - 1 - 32 32 Orang 256

- - - - 41 41 Orang 328

- - - - 15 15 Orang 120

- - - - 37 37 Orang 296

- - - - 6 6 Orang 48

- - - - 9 9 Orang 72

- 1 - - 3 3 Orang 24

- - - - 5 5 Orang 40
- - - - 6 6 Orang 48

- - - - 9 9 Orang 72

0 2 1 0 340 340 Orang 2720

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 12 12 Orang 144
12 Orang 144
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 8 8 Orang 96

8 Orang 96

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 36

3 Orang 36
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
06-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2488 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 3 - 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - - - 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 11 7 10 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 7 6 3 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 11 6 14 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 3 2 5 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 17 3 11 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 11 6 6 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 12 11 11 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 8 1 1 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 21 1 9 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 20 5 16 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 5 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 1 1 5

BLASTING & PAINTING


19 PT.BKB - - - - - 11 - 3
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 6 0 125 48 119 1 8

MASUK MALAM TGL 5 - AGUSTUS - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 66 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 6 - -
SEJAHTERA

TOTAL WORKERS & HOURS

MASUK MALAM TGL 5 - AGUSTUS - 2020 (17:00 - 20:00)


WORKING HOURS Hours/day
TOTAL HOURS 9 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 2 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS

MASUK MALAM TGL 5 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 144 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 12 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 5 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 3 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

LEMBUR TGL 5 - AGUSTUS - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 40 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - - - 10 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 5 - AGUSTUS - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - - - 5 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 5 5 Orang 40

- - - - 0 0 Orang 0

- 1 - - 4 4 Orang 32

- - 1 - 29 29 Orang 232

- - - - 16 16 Orang 128

- - - - 31 31 Orang 248

- - - - 10 10 Orang 80
- - - - 31 31 Orang 248

- - - - 24 24 Orang 192

- - 1 - 37 37 Orang 296

- - - - 10 10 Orang 80

- - - - 31 31 Orang 248

- - - - 41 41 Orang 328

- - - - 7 7 Orang 56

- - - - 5 5 Orang 40

- 1 - - 3 3 Orang 24

- - - - 5 5 Orang 40
- - - - 8 8 Orang 64

- - - - 14 14 Orang 112

0 2 2 0 311 311 Orang 2488

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 66

6 Orang 66

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 9
3 Orang 9
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 12 12 Orang 144

12 Orang 144

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 36

3 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 10 10 Orang 40
10 Orang 40
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 55
5 Orang 55
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
07-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2344 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 2 1 - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 2 - 1 2 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 2 5 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 5 5 10 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 1 - 8 8 11 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 3 3 13 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 12 6 9 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 15 7 7 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 12 13 8 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 9 1 5 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 12 1 5 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 3 - 20 5 12 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 3 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 10 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - - - 2

BLASTING & PAINTING


19 PT.BKB - 3 - - - 11 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 13 0 102 57 116 0 2

MASUK MALAM TGL 6 - AGUSTUS - 2020 (17:00 - 03:00 - 05:00) JAM 3 = 2 ORANG
WORKING HOURS Hours/day
TOTAL HOURS 104 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - 6

TOTAL WORKERS & HOURS

MASUK MALAM TGL 6 - AGUSTUS - 2020 (17:00 - 24:00 - 05:00) JAM 24 = 3 ORANG
WORKING HOURS Hours/day
TOTAL HOURS 69 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 7 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 6 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 44 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - - 4 -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 6 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 77 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 7 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 6 - AGUSTUS - 2020 (17:00 - 20:00)


WORKING HOURS Hours/day
TOTAL HOURS 9 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 2 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS

LEMBUR TGL 6 - AGUSTUS - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 20 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 5 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 3 3 Orang 24

- - - - 0 0 Orang 0

- 1 - - 11 11 Orang 88

- - - - 9 9 Orang 72

- - - - 20 20 Orang 160

- - - - 28 28 Orang 224

- - - - 19 19 Orang 152
- - - - 27 27 Orang 216

- - - - 30 30 Orang 240

- - 1 - 36 36 Orang 288

- - - - 15 15 Orang 120

- - - - 18 18 Orang 144

- - - - 40 40 Orang 320

- - - - 3 3 Orang 24

- - - - 10 10 Orang 80

- 1 - - 3 3 Orang 24

- - - - 5 5 Orang 40
- - - - 2 2 Orang 16

- - - - 14 14 Orang 112

0 2 1 0 293 293 Orang 2344

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 9 9 Orang 104

9 Orang 104

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 69
7 Orang 69
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 44

4 Orang 44

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 7 7 Orang 77

7 Orang 77

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 9
3 Orang 9
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 20
5 Orang 20
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
08-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2792 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - 2 - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 6 2 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 2 5 6 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 6 7 5 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 9 3 17 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 10 5 12 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 13 11 11 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 13 7 9 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 17 12 8 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 11 2 7 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 17 1 7 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 20 10 17 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 9 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 1 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 2 - 4 - 2 - -

BLASTING & PAINTING


19 PT.BKB - - - - - 16 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 8 0 130 68 141 0 0

MASUK MALAM TGL 7 - AGUSTUS - 2020 (17:00 - 20:00))


WORKING HOURS Hours/day
TOTAL HOURS 9 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 2 - 1
H-235,H-236,-H-239, H-240

TOTAL WORKERS & HOURS

MASUK MALAM TGL 7 - AGUSTUS - 2020 (17:00 - 05:00))


WORKING HOURS Hours/day
TOTAL HOURS 96 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

MEKANIK
1 PT.MMJA - - - 8 - - - -
H-235,H-239
TOTAL WORKERS & HOURS

MASUK MALAM TGL 7 - AGUSTUS - 2020 (17:00 - 05:00))


WORKING HOURS Hours/day
TOTAL HOURS 66 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 6 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 7 - AGUSTUS - 2020 (17:00 - 05:00))


WORKING HOURS Hours/day
TOTAL HOURS 108 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - 6

TOTAL WORKERS & HOURS

MASUK MALAM TGL 7 - AGUSTUS - 2020 (17:00 - 22:00 - 05:00)) JAM 22 = 2 ORANG
WORKING HOURS Hours/day
TOTAL HOURS 32 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 7 - AGUSTUS - 2020 (17:00 - 23:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 3 - 3 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 7 - AGUSTUS - 2020 (17:00 - 23:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.TWU
1 H-242 - - - - - 2 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 2 2 Orang 16

- - - - 0 0 Orang 0

- - - - 11 11 Orang 88

- 1 - - 15 15 Orang 120

- - - - 18 18 Orang 144

- - - - 29 29 Orang 232

- - - - 27 27 Orang 216
- - - - 36 36 Orang 288

- - 1 - 31 31 Orang 248

- - - - 39 39 Orang 312

- - - - 20 20 Orang 160

- - - - 25 25 Orang 200

- - - - 47 47 Orang 376

- - - - 7 7 Orang 56

- - - - 9 9 Orang 72

- - - - 4 4 Orang 32

- - - - 5 5 Orang 40
- - - - 8 8 Orang 64

- - - - 16 16 Orang 128

0 1 1 0 349 349 Orang 2792

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 9

3 Orang 9

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 8 8 Orang 96
8 Orang 96
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 66

6 Orang 66

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 9 9 Orang 108

9 Orang 108

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 32
4 Orang 32
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 36
6 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 12
2 Orang 12
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
08-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 0 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - - - - - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - - - - - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - - - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - - - - - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - - - - - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - - - - - - - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - - - - - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - - - - - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - - - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - - - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - - - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - - - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - - - -

BLASTING & PAINTING


19 PT.BKB - - - - - - - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 0 0 0 0 0 0 0

MASUK MALAM TGL 7 - AGUSTUS - 2020 (17:00 - 20:00))


WORKING HOURS Hours/day
TOTAL HOURS 9 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 2 - 1
H-235,H-236,-H-239, H-240

TOTAL WORKERS & HOURS

MASUK MALAM TGL 7 - AGUSTUS - 2020 (17:00 - 05:00))


WORKING HOURS Hours/day
TOTAL HOURS 96 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

MEKANIK
1 PT.MMJA - - - 8 - - - -
H-235,H-239
TOTAL WORKERS & HOURS

MASUK MALAM TGL 7 - AGUSTUS - 2020 (17:00 - 05:00))


WORKING HOURS Hours/day
TOTAL HOURS 66 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 6 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 7 - AGUSTUS - 2020 (17:00 - 05:00))


WORKING HOURS Hours/day
TOTAL HOURS 108 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - 6

TOTAL WORKERS & HOURS

MASUK MALAM TGL 7 - AGUSTUS - 2020 (17:00 - 22:00 - 05:00)) JAM 22 = 2 ORANG
WORKING HOURS Hours/day
TOTAL HOURS 32 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 7 - AGUSTUS - 2020 (17:00 - 23:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 3 - 3 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 7 - AGUSTUS - 2020 (17:00 - 23:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.TWU
1 H-242 - - - - - 2 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0
- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0
- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

0 0 0 0 0 0 Orang 0

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 9

3 Orang 9

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 8 8 Orang 96
8 Orang 96
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 66

6 Orang 66

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 9 9 Orang 108

9 Orang 108

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 32
4 Orang 32
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 36
6 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 12
2 Orang 12
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
08-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2624 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - 1 - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 1 1 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 2 - 5 3 12 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 3 6 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 7 5 5 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 1 - 5 3 12 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 10 3 6 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 12 9 8 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 21 6 6 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 4 - 17 6 11 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 15 3 6 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - 1 - 13 6 6 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 19 2 12 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 4 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 10 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - - - 5 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 5 - 2

BLASTING & PAINTING


19 PT.BKB - - - - - 17 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 9 0 128 54 134 0 2

9+ MASUK MALAM TGL 9 - AGUSTUS - 2020 (17:00 - 05:30)


WORKING HOURS Hours/day
TOTAL HOURS 52 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - 4 - - - -
H-235,H-236,-H-239, H-240

TOTAL WORKERS & HOURS

LEMBUR TGL 9 - AGUSTUS - 2020 (17:00 - 23:30)


WORKING HOURS Hours/day
TOTAL HOURS 63 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 9 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 9 - AGUSTUS - 2020 (17:00 - 23:30)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - - 2 1

TOTAL WORKERS & HOURS

MASUK MALAM TGL 9 - AGUSTUS - 2020 (18:00 - 12:00)


WORKING HOURS Hours/day
TOTAL HOURS 30 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 5 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 1 1 Orang 8

- - - - 4 4 Orang 32

- 1 - - 23 23 Orang 184

- - - - 11 11 Orang 88

- - - - 17 17 Orang 136

- - - - 21 21 Orang 168

- - - - 19 19 Orang 152
- - - - 29 29 Orang 232

- - - - 34 34 Orang 272

- - - - 38 38 Orang 304

- - - - 24 24 Orang 192

- - - - 26 26 Orang 208

- - - - 33 33 Orang 264

- - - - 4 4 Orang 32

- - - - 10 10 Orang 80

- - - - 5 5 Orang 40

- - - - 5 5 Orang 40
- - - - 7 7 Orang 56

- - - - 17 17 Orang 136

0 1 0 0 328 328 Orang 2624

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 52

4 Orang 52

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 9 9 Orang 63
9 Orang 63
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 30

5 Orang 30
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
11-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2768 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 5 7 11 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 1 - 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 5 8 3 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 2 - 8 8 10 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - 1 - 11 4 13 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 10 5 9 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 22 23 8 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 3 - 22 7 8 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 14 2 6 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 22 3 5 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 17 5 9 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 2 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 4 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - 4 - 4 - -

BLASTING & PAINTING


19 PT.BKB - - - - - 14 1 2
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 11 0 142 72 116 1 2

MASUK MALAM TGL 10 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 72 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 6 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 10 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 3 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 10 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.PLS
1 H-243 - - - - 4 - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 10 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 44 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 4 - -
SEJAHTERA

TOTAL WORKERS & HOURS

MASUK MALAM TGL 10 - AGUSTUS - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - - - 5


TOTAL WORKERS & HOURS

LEMBUR TGL 10 - AGUSTUS - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 8 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

MEKANIK
1 PT.MMJA - - - 2 - - - -
H-235,H-239
TOTAL WORKERS & HOURS

MASUK MALAM TGL 10 - AGUSTUS - 2020 (17:00 - 23:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 4 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 24 24 Orang 192

- - - - 3 3 Orang 24

- - - - 16 16 Orang 128

- - - - 28 28 Orang 224

- - - - 29 29 Orang 232
- - - - 24 24 Orang 192

- - 1 - 55 55 Orang 440

- - - - 40 40 Orang 320

- - - - 22 22 Orang 176

- - - - 30 30 Orang 240

- - - - 32 32 Orang 256

- - - - 2 2 Orang 16

- - - - 8 8 Orang 64

- 1 - - 3 3 Orang 24

- - - - 4 4 Orang 32
- - - - 9 9 Orang 72

- - - - 17 17 Orang 136

0 1 1 0 346 346 Orang 2768

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 72

6 Orang 72

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 33
3 Orang 33
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 44

4 Orang 44

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 55
5 Orang 55
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 8
2 Orang 8

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 24
4 Orang 24
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
12-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2696 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - 1 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 1 1 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 1 - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 2 - 6 7 7 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 12 3 5 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 6 2 4 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - 1 - 11 4 20 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 12 4 11 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 18 12 8 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 10 9 9 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 13 6 6 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 17 3 6 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 21 8 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 3 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 4 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 4 - 6

BLASTING & PAINTING


19 PT.BKB - 1 - - - 14 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 10 0 130 60 126 0 7

MASUK MALAM TGL 11 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 4 - -
SEJAHTERA

TOTAL WORKERS & HOURS

MASUK MALAM TGL 11 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.PLS
1 H-243 - - - - 2 - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 11 - AGUSTUS - 2020 (17:00 - 00:30)


WORKING HOURS Hours/day
TOTAL HOURS 32 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 4 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 11 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 3 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 11 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 84 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 7 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 11 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 72 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 4 - 2

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 2 2 Orang 16

- - - - 7 7 Orang 56

- - - - 2 2 Orang 16

- 1 - - 23 23 Orang 184

- - - - 20 20 Orang 160

- - - - 12 12 Orang 96

- - - - 36 36 Orang 288
- - - - 28 28 Orang 224

- - 2 - 41 41 Orang 328

- - - - 30 30 Orang 240

- - - - 25 25 Orang 200

- - - - 26 26 Orang 208

- - - - 39 39 Orang 312

- - - - 3 3 Orang 24

- - - - 8 8 Orang 64

- 1 - - 3 3 Orang 24

- - - - 5 5 Orang 40
- - - - 11 11 Orang 88

- - - - 16 16 Orang 128

0 2 2 0 337 337 Orang 2696

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 24
2 Orang 24
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 32

4 Orang 32

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 84
7 Orang 84
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 72

6 Orang 72
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
13-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2136 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 1 - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 1 - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 3 4 6 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 7 7 6 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 1 - 11 6 13 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 8 5 10 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 3 3 8 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 17 11 10 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 23 5 4 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 9 - 1 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 6 4 9 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 14 1 7 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 3 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 1 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 3 - 4

BLASTING & PAINTING


19 PT.BKB - - - - - 16 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 7 0 105 46 101 0 4

MASUK MALAM TGL 12 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 3 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

LEMBUR TGL 12 - AGUSTUS - 2020 (17:00 - 18:00)


WORKING HOURS Hours/day
TOTAL HOURS 1 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 1 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 12 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 1 - -
SEJAHTERA
TOTAL WORKERS & HOURS

LEMBUR TGL 12 - AGUSTUS - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 4 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - 1 - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

LEMBUR TGL 12 - AGUSTUS - 2020 (17:00 - 22:00)


WORKING HOURS Hours/day
TOTAL HOURS 15 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-237 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 12 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 1 - 3

TOTAL WORKERS & HOURS

LEMBUR TGL 12 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 20 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-241 - - - - 5 - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 12 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 78 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-241 - - - 6 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 12 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 78 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-241 - - - 6 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 1 1 Orang 8

- - - - 0 0 Orang 0

- - - - 2 2 Orang 16

- - - - 14 14 Orang 112

- - - - 20 20 Orang 160

- 1 - - 32 32 Orang 256

- 1 - - 24 24 Orang 192
- - - - 14 14 Orang 112

- - 1 - 40 40 Orang 320

- - - - 34 34 Orang 272

- - - - 10 10 Orang 80

- - - - 19 19 Orang 152

- - - - 22 22 Orang 176

- - - - 3 3 Orang 24

- - - - 1 1 Orang 8

- 1 - - 3 3 Orang 24

- - - - 4 4 Orang 32
- - - - 8 8 Orang 64

- - - - 16 16 Orang 128

0 3 1 0 267 267 Orang 2136

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 1 1 Orang 1
1 Orang 1
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 1 1 Orang 12

1 Orang 12

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 1 1 Orang 4

1 Orang 4

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 15
3 Orang 15
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 20

5 Orang 20

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 78
6 Orang 78
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 78
6 Orang 78
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
13-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2040 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 2 - 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 2 - 3 3 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 5 5 7 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 1 - 7 9 5 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 9 3 13 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 15 - 9 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 14 7 6 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 13 7 7 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 5 1 5 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - 1 - 14 3 2 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 12 7 9 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 3 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - - - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 4 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 6 - 1

BLASTING & PAINTING


19 PT.BKB - - - - - 13 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 9 0 101 45 98 0 2

LEMBUR TGL 13 - AGUSTUS - 2020 (17:00 - 22:00)


WORKING HOURS Hours/day
TOTAL HOURS 15 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.GKS
1 H-239 - - - 3 - - - -
(TUG BOAT 30 MTR)

TOTAL WORKERS & HOURS

LEMBUR TGL 13 - AGUSTUS - 2020 (17:00 - 00:15)


WORKING HOURS Hours/day
TOTAL HOURS 21 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 3 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 13 - AGUSTUS - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-241 - - - - - 3 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 13 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 5 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 13 - AGUSTUS - 2020 (17:00 - 20:00)


WORKING HOURS Hours/day
TOTAL HOURS 9 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.PLS
1 H-243 - - - - - 3 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 13 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 84 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - - - 7 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 13 - AGUSTUS - 2020 (18:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 70 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 7 - -
SEJAHTERA
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 6 6 Orang 48

- - - - 0 0 Orang 0

- - - - 12 12 Orang 96

- - - - 17 17 Orang 136

- - - - 22 22 Orang 176

- - - - 25 25 Orang 200
- - - - 24 24 Orang 192

- - - - 28 28 Orang 224

- - - - 29 29 Orang 232

- - - - 11 11 Orang 88

- - - - 20 20 Orang 160

- - - - 29 29 Orang 232

- - - - 3 3 Orang 24

- - - - 0 0 Orang 0

- - - - 3 3 Orang 24

- - - - 5 5 Orang 40
- - - - 7 7 Orang 56

- - - - 14 14 Orang 112

0 0 0 0 255 255 Orang 2040

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 15

3 Orang 15

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 21
3 Orang 21
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 12

3 Orang 12

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 9
3 Orang 9
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 7 7 Orang 84

7 Orang 84

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 7 7 Orang 70

7 Orang 70
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
15-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2776 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 1 - 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 1 - 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 7 6 5 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 1 - 11 8 8 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 16 7 17 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 15 6 10 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 13 13 14 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 26 7 5 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 6 - 2 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 28 3 5 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 16 17 15 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 3 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 2 - 4 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 4 - 4

BLASTING & PAINTING


19 PT.BKB - - - - - 16 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 6 0 143 67 125 0 4

MASUK MALAM TGL 14 - AGUSTUS - 2020 (17:00 - 08:00)


WORKING HOURS Hours/day
TOTAL HOURS 75 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - 2

TOTAL WORKERS & HOURS

MASUK MALAM TGL 14 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.PLS
1 H-243 - - - 3 - 1 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 14 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 96 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 8 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 14 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 44 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - 2 - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

LEMBUR TGL 14 - AGUSTUS - 2020 (17:00 - 19:00)


WORKING HOURS Hours/day
TOTAL HOURS 6 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-241 - - - - - 3 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 14 - AGUSTUS - 2020 (17:00 - 21:20)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.GKS
1 H-239 - - - - - 3 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 14 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 3 - -
SEJAHTERA
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 1 1 Orang 8

- 1 - - 5 5 Orang 40

- - - - 5 5 Orang 40

- - - - 18 18 Orang 144

- - - - 28 28 Orang 224

- - - - 40 40 Orang 320
- - - - 31 31 Orang 248

- - 1 - 42 42 Orang 336

- - - - 40 40 Orang 320

- - - - 8 8 Orang 64

- - - - 36 36 Orang 288

- - - - 49 49 Orang 392

- - - - 3 3 Orang 24

- - - - 8 8 Orang 64

- - - - 3 3 Orang 24

- - - - 6 6 Orang 48
- - - - 8 8 Orang 64

- - - - 16 16 Orang 128

0 1 1 0 347 347 Orang 2776

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 75

5 Orang 75

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 8 8 Orang 96

8 Orang 96

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 44

4 Orang 44

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 6
3 Orang 6
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 12

3 Orang 12

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
18-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2608 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 2 - 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 5 4 7 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 8 5 4 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 1 - 8 2 11 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - 1 - 11 10 10 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 2 - 14 8 9 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 22 9 8 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 3 - 17 5 11 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 11 5 2 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 18 3 5 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 8 22 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - - - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 9 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - - - 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 2 - 4

BLASTING & PAINTING


19 PT.BKB - - - - - 16 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 9 0 124 73 115 0 5

MASUK MALAM TGL 17 - AGUSTUS - 2020 (13:45 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 40 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - 1 - 3 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 7 7 Orang 56

- - - - 16 16 Orang 128

- - - - 17 17 Orang 136

- - - - 22 22 Orang 176

- - - - 32 32 Orang 256
- - - - 33 33 Orang 264

- - - - 40 40 Orang 320

- - - - 36 36 Orang 288

- - - - 18 18 Orang 144

- - - - 26 26 Orang 208

- - - - 40 40 Orang 320

- - - - 0 0 Orang 0

- - - - 9 9 Orang 72

- - - - 1 1 Orang 8

- - - - 5 5 Orang 40
- - - - 7 7 Orang 56

- - - - 17 17 Orang 136

0 0 0 0 326 326 Orang 2608

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 40

4 Orang 40
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
18-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2648 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - - 1 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 4 4 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 7 6 7 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 2 - 11 6 8 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - 1 - 8 5 18 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 13 3 12 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 12 10 16 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 19 4 16 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 9 2 1 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - 2 - 15 2 5 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 18 7 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 4 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - 4 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 2 - 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 7 - 3

BLASTING & PAINTING


19 PT.BKB - - - - - 17 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 9 0 119 50 148 0 4

MASUK MALAM TGL 18 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 132 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 7 3 2 - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 18 - AGUSTUS - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - 2

TOTAL WORKERS & HOURS

MASUK MALAM TGL 18 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA
TOTAL WORKERS & HOURS

LEMBUR TGL 18 - AGUSTUS - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 28 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.GKS
1 H-239 - - - 7 - - - -
(TUG BOAT 30 MTR)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 18 - AGUSTUS - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 20 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 18 - AGUSTUS - 2020 (17:00 - 22:15)


WORKING HOURS Hours/day
TOTAL HOURS 40 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 8 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 10 10 Orang 80

- - - - 11 11 Orang 88

- - - - 20 20 Orang 160

- - - - 27 27 Orang 216

- - - - 32 32 Orang 256
- - - - 28 28 Orang 224

- - 1 - 40 40 Orang 320

- - - - 41 41 Orang 328

- - - - 12 12 Orang 96

- - - - 24 24 Orang 192

- - - - 35 35 Orang 280

- - - - 4 4 Orang 32

- - - - 8 8 Orang 64

- - - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 10 10 Orang 80

- - - - 18 18 Orang 144

0 0 1 0 331 331 Orang 2648

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 12 12 Orang 132

12 Orang 132

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 55

5 Orang 55
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 7 7 Orang 28

7 Orang 28

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 20
4 Orang 20
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 8 8 Orang 40

8 Orang 40
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
18-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2648 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - - 1 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 4 4 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 7 6 7 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 2 - 11 6 8 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - 1 - 8 5 18 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 13 3 12 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 12 10 16 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 19 4 16 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 9 2 1 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - 2 - 15 2 5 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 18 7 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 4 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - 4 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 2 - 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 7 - 3

BLASTING & PAINTING


19 PT.BKB - - - - - 17 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 9 0 119 50 148 0 4

MASUK MALAM TGL 18 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 132 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 7 3 2 - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 18 - AGUSTUS - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - 2

TOTAL WORKERS & HOURS

MASUK MALAM TGL 18 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA
TOTAL WORKERS & HOURS

LEMBUR TGL 18 - AGUSTUS - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 28 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.GKS
1 H-239 - - - 7 - - - -
(TUG BOAT 30 MTR)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 18 - AGUSTUS - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 20 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 18 - AGUSTUS - 2020 (17:00 - 22:15)


WORKING HOURS Hours/day
TOTAL HOURS 40 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 8 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 10 10 Orang 80

- - - - 11 11 Orang 88

- - - - 20 20 Orang 160

- - - - 27 27 Orang 216

- - - - 32 32 Orang 256
- - - - 28 28 Orang 224

- - 1 - 40 40 Orang 320

- - - - 41 41 Orang 328

- - - - 12 12 Orang 96

- - - - 24 24 Orang 192

- - - - 35 35 Orang 280

- - - - 4 4 Orang 32

- - - - 8 8 Orang 64

- - - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 10 10 Orang 80

- - - - 18 18 Orang 144

0 0 1 0 331 331 Orang 2648

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 12 12 Orang 132

12 Orang 132

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 55

5 Orang 55
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 7 7 Orang 28

7 Orang 28

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 20
4 Orang 20
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 8 8 Orang 40

8 Orang 40
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
21-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2736 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - 1 - 4 - 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - - 2 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 3 2 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 6 5 8 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 8 4 7 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 10 9 20 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 16 5 14 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 19 9 17 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 20 7 11 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 9 4 4 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - 1 - 19 2 1 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 17 8 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 4 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 10 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 2 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 6 - 5

BLASTING & PAINTING


19 PT.BKB - - - - - 15 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 6 0 133 57 138 0 6

MASUK MALAM TGL 20 - AGUSTUS - 2020 (17:00 - 05:30)


WORKING HOURS Hours/day
TOTAL HOURS 78 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - - - 6 - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 20 - AGUSTUS - 2020 (15:00 - 00:30)


WORKING HOURS Hours/day
TOTAL HOURS 20 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 20 - AGUSTUS - 2020 (15:00 - 00:30)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - 2

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 8 8 Orang 64

- - - - 5 5 Orang 40

- 1 - - 8 8 Orang 64

- - - - 19 19 Orang 152

- - - - 19 19 Orang 152

- - - - 39 39 Orang 312
- - - - 35 35 Orang 280

- - 1 - 47 47 Orang 376

- - - - 40 40 Orang 320

- - - - 17 17 Orang 136

- - - - 23 23 Orang 184

- - - - 35 35 Orang 280

- - - - 4 4 Orang 32

- - - - 10 10 Orang 80

- - - - 3 3 Orang 24

- - - - 3 3 Orang 24
- - - - 11 11 Orang 88

- - - - 16 16 Orang 128

0 1 1 0 342 342 Orang 2736

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 78

6 Orang 78

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 20

2 Orang 20
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
22-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2672 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 3 3 8 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 1 1 - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 6 6 7 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 15 6 15 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - 1 - 7 5 11 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 7 9 11 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 16 11 13 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 24 4 13 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 6 - 4 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 22 8 7 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 16 7 13 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 4 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 6 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - 1 - 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 2 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 6 - 5

BLASTING & PAINTING


19 PT.BKB - - - - - 13 - 2
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 5 0 125 60 135 0 7

MASUK MALAM TGL 21 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 21 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 21 - AGUSTUS - 2020 (18:00 - 02:00)


WORKING HOURS Hours/day
TOTAL HOURS 45 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 5 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 14 14 Orang 112

- - - - 2 2 Orang 16

- - - - 19 19 Orang 152

- - - - 36 36 Orang 288

- - - - 24 24 Orang 192
- - - - 28 28 Orang 224

- - 1 - 42 42 Orang 336

- - - - 43 43 Orang 344

- - - - 10 10 Orang 80

- 1 - - 38 38 Orang 304

- - - - 36 36 Orang 288

- - - - 4 4 Orang 32

- - - - 6 6 Orang 48

- - - - 3 3 Orang 24

- - - - 3 3 Orang 24
- - - - 11 11 Orang 88

- - - - 15 15 Orang 120

0 1 1 0 334 334 Orang 2672

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 24

2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 55

5 Orang 55
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 45

5 Orang 45
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
24-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2672 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 2 - 5 1 7 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 1 1 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 6 6 3 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 9 5 8 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - 1 - 12 11 14 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 6 3 5 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 22 15 15 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 20 4 12 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 16 1 4 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 1 - - 16 5 12 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 21 4 9 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 4 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 11 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 4 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 6 - 1

BLASTING & PAINTING


19 PT.BKB - - - - - 11 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 1 8 0 136 56 127 0 2

MASUK MALAM TGL 23 - AGUSTUS - 2020 (18:00 - 00:00)


WORKING HOURS Hours/day
TOTAL HOURS 30 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 5 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 15 15 Orang 120

- 1 - - 4 4 Orang 32

- - - - 15 15 Orang 120

- 1 - - 23 23 Orang 184

- - - - 38 38 Orang 304
- - - - 15 15 Orang 120

- - 2 - 54 54 Orang 432

- - - - 38 38 Orang 304

- - - - 21 21 Orang 168

- - - - 34 34 Orang 272

- - - - 34 34 Orang 272

- - - - 4 4 Orang 32

- - - - 11 11 Orang 88

- - - - 3 3 Orang 24

- - - - 5 5 Orang 40
- - - - 8 8 Orang 64

- - - - 12 12 Orang 96

0 2 2 0 334 334 Orang 2672

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 30

5 Orang 30
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
24-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2568 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 1 - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 2 4 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 7 2 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 6 6 9 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 1 - 10 5 11 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 6 6 9 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 8 5 7 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 13 12 10 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 20 4 11 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - 1 - 5 3 4 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 21 6 5 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 21 9 6 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 4 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 9 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 5 - 2

BLASTING & PAINTING


19 PT.BKB - - - - - 16 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 7 0 122 62 125 0 3

LEMBUR TGL 24 - AGUSTUS - 2020 (17:00 - 20:00)


WORKING HOURS Hours/day
TOTAL HOURS 9 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 3 - -
H-235,H-236,-H-239, H-240

TOTAL WORKERS & HOURS

LEMBUR TGL 24 - AGUSTUS - 2020 (17:00 - 20:30)


WORKING HOURS Hours/day
TOTAL HOURS 32 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-241 - - - - - 8 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 24 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 3 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 24 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 22 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 2 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 24 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 4 - -
SEJAHTERA
TOTAL WORKERS & HOURS

LEMBUR TGL 24 - AGUSTUS - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 6 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 24 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - 2

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 1 1 Orang 8

- - - - 2 2 Orang 16

- - - - 15 15 Orang 120

- 1 - - 15 15 Orang 120

- - - - 21 21 Orang 168

- - - - 27 27 Orang 216

- - - - 21 21 Orang 168
- - - - 20 20 Orang 160

- - 1 - 37 37 Orang 296

- - - - 37 37 Orang 296

- - - - 13 13 Orang 104

- - - - 32 32 Orang 256

- - - - 36 36 Orang 288

- - - - 4 4 Orang 32

- - - - 9 9 Orang 72

- - - - 3 3 Orang 24

- - - - 4 4 Orang 32
- - - - 7 7 Orang 56

- - - - 17 17 Orang 136

0 1 1 0 321 321 Orang 2568

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 9

3 Orang 9

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 8 8 Orang 32

8 Orang 32
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 36

3 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 22

2 Orang 22

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 24

6 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
26-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2688 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 1 - 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 1 - 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 5 6 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 7 6 7 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 9 4 8 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - 1 - 10 8 12 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 10 7 7 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 18 11 7 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 19 8 10 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 5 3 3 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 28 8 6 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 14 9 12 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 5 - - - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 6 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 7 - 1

BLASTING & PAINTING


19 PT.BKB - - - - - 19 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 7 0 134 70 122 0 2

MASUK MALAM TGL 25 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA

TOTAL WORKERS & HOURS

MASUK MALAM TGL 25 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - 2

TOTAL WORKERS & HOURS

LEMBUR TGL 25 - AGUSTUS - 2020 (17:00 - 20:00)


WORKING HOURS Hours/day
TOTAL HOURS 18 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-241 - - - 6 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 25 - AGUSTUS - 2020 (17:00 - 20:00)


WORKING HOURS Hours/day
TOTAL HOURS 10 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

MEKANIK
1 PT.MMJA - - - 2 - - - -
H-235,H-239

TOTAL WORKERS & HOURS

MASUK MALAM TGL 25 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 72 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 6 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 25 - AGUSTUS - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 22 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - - - 2 - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 3 3 Orang 24

- - - - 5 5 Orang 40

- 1 - - 21 21 Orang 168

- - - - 20 20 Orang 160

- - - - 21 21 Orang 168

- - - - 31 31 Orang 248
- - - - 24 24 Orang 192

- - - - 37 37 Orang 296

- - - - 39 39 Orang 312

- - - - 11 11 Orang 88

- - - - 42 42 Orang 336

- - - - 36 36 Orang 288

- - - - 5 5 Orang 40

- - - - 6 6 Orang 48

- - - - 3 3 Orang 24

- - - - 4 4 Orang 32
- - - - 8 8 Orang 64

- - - - 20 20 Orang 160

0 1 0 0 336 336 Orang 2688

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 18

6 Orang 18

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 10

2 Orang 10

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 72

6 Orang 72
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 22

2 Orang 22
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
27-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2608 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 3 2 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 5 4 10 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 5 4 12 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 7 4 6 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - 1 - 8 7 11 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 17 1 5 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 4 - 24 10 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 16 16 14 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 7 2 3 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 16 4 8 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 14 6 9 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 9 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 4 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 - 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 4 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 10 - -

BLASTING & PAINTING


19 PT.BKB - - - - - 15 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 11 0 124 60 130 0 0

MASUK MALAM TGL 26 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - 1

TOTAL WORKERS & HOURS

MASUK MALAM TGL 26 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 3 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 26 - AGUSTUS - 2020 (20:00 - 06:00)


WORKING HOURS Hours/day
TOTAL HOURS 40 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 4 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 2 2 Orang 16

- - - - 1 1 Orang 8

- - - - 9 9 Orang 72

- - - - 20 20 Orang 160

- - - - 21 21 Orang 168

- - - - 17 17 Orang 136

- - - - 27 27 Orang 216
- - - - 24 24 Orang 192

- - 1 - 42 42 Orang 336

- - - - 47 47 Orang 376

- - - - 12 12 Orang 96

- - - - 28 28 Orang 224

- - - - 30 30 Orang 240

- - - - 9 9 Orang 72

- - - - 4 4 Orang 32

- - - - 3 3 Orang 24

- - - - 5 5 Orang 40
- - - - 10 10 Orang 80

- - - - 15 15 Orang 120

0 0 1 0 326 326 Orang 2608

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 36

3 Orang 36
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 40

4 Orang 40
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
28-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 1984 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 1 - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - - 3 8 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 2 4 7 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 1 - 7 4 14 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 6 5 8 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - - - - - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 20 9 14 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 12 2 6 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - 1 - 7 2 2 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 22 15 3 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 10 7 16 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - - - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 9 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - - - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - - - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - - - -

BLASTING & PAINTING


19 PT.BKB - - - - - 14 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 6 0 87 51 102 0 0

MASUK MALAM TGL 26 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - 1

TOTAL WORKERS & HOURS

MASUK MALAM TGL 26 - AGUSTUS - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 3 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 26 - AGUSTUS - 2020 (20:00 - 06:00)


WORKING HOURS Hours/day
TOTAL HOURS 40 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 4 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 1 1 Orang 8

- - - - 1 1 Orang 8

- 1 - - 13 13 Orang 104

- - - - 13 13 Orang 104

- - - - 26 26 Orang 208

- - - - 19 19 Orang 152
- - - - 0 0 Orang 0

- - - - 44 44 Orang 352

- - - - 21 21 Orang 168

- 1 - - 13 13 Orang 104

- - - - 40 40 Orang 320

- - - - 34 34 Orang 272

- - - - 0 0 Orang 0

- - - - 9 9 Orang 72

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0
- - - - 0 0 Orang 0

- - - - 14 14 Orang 112

0 2 0 0 248 248 Orang 1984

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 36

3 Orang 36
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 40

4 Orang 40
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
29-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 1768 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - - 1 6 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - - 2 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - 1 - 5 3 4 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 6 3 15 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 7 4 - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 1 1 12 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - - - - - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 19 6 4 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - 2 - 5 1 3 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 27 9 4 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 18 6 4 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 8 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - - - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 1 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - - - -

BLASTING & PAINTING


19 PT.BKB - - - - - 15 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 6 0 90 39 85 0 0
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 1 1 Orang 8

- - - - 7 7 Orang 56

- - - - 7 7 Orang 56

- - - - 13 13 Orang 104

- - - - 24 24 Orang 192

- - - - 11 11 Orang 88
- - - - 14 14 Orang 112

- - - - 0 0 Orang 0

- - - - 30 30 Orang 240

- 1 - - 12 12 Orang 96

- - - - 40 40 Orang 320

- - - - 28 28 Orang 224

- - - - 8 8 Orang 64

- - - - 0 0 Orang 0

- - - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 0 0 Orang 0

- - - - 15 15 Orang 120

0 1 0 0 221 221 Orang 1768


DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
29-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 1768 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - - 1 6 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - - 2 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - 1 - 5 3 4 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 6 3 15 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 7 4 - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 1 1 12 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - - - - - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 19 6 4 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - 2 - 5 1 3 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 27 9 4 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 18 6 4 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 8 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - - - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 1 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - - - -

BLASTING & PAINTING


19 PT.BKB - - - - - 15 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 6 0 90 39 85 0 0
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 1 1 Orang 8

- - - - 7 7 Orang 56

- - - - 7 7 Orang 56

- - - - 13 13 Orang 104

- - - - 24 24 Orang 192

- - - - 11 11 Orang 88
- - - - 14 14 Orang 112

- - - - 0 0 Orang 0

- - - - 30 30 Orang 240

- 1 - - 12 12 Orang 96

- - - - 40 40 Orang 320

- - - - 28 28 Orang 224

- - - - 8 8 Orang 64

- - - - 0 0 Orang 0

- - - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 0 0 Orang 0

- - - - 15 15 Orang 120

0 1 0 0 221 221 Orang 1768


DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
31-Aug-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 1848 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 1 1 6 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - - 4 8 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - 1 - 2 3 4 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - - - - - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 9 6 13 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 2 - 1 1 10 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - - - - - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - - - 16 4 7 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 11 4 5 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 20 8 12 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 4 2 12 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 8 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 10 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - - - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 9 - 1

BLASTING & PAINTING


19 PT.BKB - - - - - 15 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 6 0 65 35 121 0 2
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 9 9 Orang 72

- - - - 12 12 Orang 96

- - - - 10 10 Orang 80

- - - - 0 0 Orang 0

- - - - 28 28 Orang 224
- - - - 14 14 Orang 112

- - - - 0 0 Orang 0

- - - - 27 27 Orang 216

- 1 - - 21 21 Orang 168

- - - - 40 40 Orang 320

- - 1 - 20 20 Orang 160

- - - - 8 8 Orang 64

- - - - 10 10 Orang 80

- - - - 6 6 Orang 48

- - - - 0 0 Orang 0
- - - - 10 10 Orang 80

- - - - 16 16 Orang 128

0 1 1 0 231 231 Orang 1848


1 - - - - - - - -
2 - - - - - - - -
3 - - - 1 - - - -
4 - - - 4 1 2 - -
5 - - - - - - - -
6 - - - 3 - 2 - -
7 - - - 2 1 - - -
8 - - - - 2 - - -
9 - - - - - - - -
10 - - - - 1 - - -
11 - - - - - - - -
12 - - - - 1 1 - -
13 - - - 1 - - - -
14 - - - - - - - -
15 - - - - - - - -
16 - - - - - - - -
17 - - - - - - - -
18 - - - - - - - -
19 - - - - - - - -
20 - - - - - - - -
21 - - - - - - - -
22 - - - - - - - -
23 - - - - - - - -
24 - - - - - - - -
25 - - - - - 1 - -
26 - - - - - - - -
27 - - - - - 2 - -
28 - - - - - - - -
29 - - - - - - - -
30 - - - - - - - -
31 - - - - - - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
JABATAN
NO. NAMA SUBCONT PROJECT
SPV FOREMAN QC WELDER FITTER
PT. GUNA KARYA
1-Aug SUKSES (TUG BOAT 30 H-237 - 1 - 7 6
MTR)

PT. GUNA KARYA


3-Aug SUKSES (TUG BOAT 30 H-237 - - - 4 4
MTR)KARYA
PT. GUNA
4-Aug SUKSES (TUG BOAT 30 H-237 - - - 3 2
MTR)KARYA
PT. GUNA
5-Aug SUKSES (TUG BOAT 30 H-237 - - - 2 3
MTR)KARYA
PT. GUNA
6-Aug SUKSES (TUG BOAT 30 H-237 - 1 - - -
MTR)
PT. GUNA KARYA
7-Aug SUKSES (TUG BOAT H-237 - 2 - 1 2
30 MTR)

PT. GUNA KARYA


8-Aug SUKSES (TUG BOAT H-237 - - - 6 2
30 MTR)

9-Aug

PT. GUNA KARYA


10-Aug SUKSES (TUG BOAT H-237 - 2 - 5 3
30 MTR)

PT. GUNA KARYA


11-Aug SUKSES (TUG BOAT H-237 - 1 - 5 7
30 MTR)

PT. GUNA KARYA


12-Aug SUKSES (TUG BOAT H-237 - - - 1 -
30 MTR)

PT. GUNA KARYA


13-Aug SUKSES (TUG BOAT H-237 - - - 1 -
30 MTR)

PT. GUNA KARYA


15-Aug SUKSES (TUG BOAT H-237 - - - 1 -
30 MTR)
PT. GUNA KARYA
18-Aug SUKSES (TUG BOAT H-237 - - - 2 -
30 MTR)

PT. GUNA KARYA


19-Aug SUKSES (TUG BOAT H-237 - - - - 1
30 MTR)

PT. GUNA KARYA


20-Aug SUKSES (TUG BOAT H-237 - - - - 1
30 MTR)

PT. GUNA KARYA


21-Aug SUKSES (TUG BOAT H-237 - - - - 2
30 MTR)

PT. GUNA KARYA


22-Aug SUKSES (TUG BOAT H-237 - - - 3 3
30 MTR)

PT. GUNA KARYA


24-Aug SUKSES (TUG BOAT H-237 - 2 - 5 1
30 MTR)

PT. GUNA KARYA


25-Aug SUKSES (TUG BOAT H-237 - - - 2 4
30 MTR)

PT. GUNA KARYA


26-Aug SUKSES (TUG BOAT H-237 - 1 - 1 -
30 MTR)

PT. GUNA KARYA


27-Aug SUKSES (TUG BOAT H-237 - 1 - 3 2
30 MTR)

PT. GUNA KARYA


28-Aug SUKSES (TUG BOAT H-237 - - - 1 -
30 MTR)

PT. GUNA KARYA


29-Aug SUKSES (TUG BOAT H-237 - - - - 1
30 MTR)

PT. GUNA KARYA


30-Aug SUKSES (TUG BOAT H-237 - - - - 1
30 MTR)
PT. GUNA KARYA
31-Aug SUKSES (TUG BOAT H-237 - 1 - 1 1
30 MTR)
JABATAN TOTAL WORKERS
TOTAL WORKERS
HELPER PAINTER BLASTER STORE SAFETY MARKER MATERIAL PER PROJECT
7 - - - 1 - - 22 22 Orang

15 - - - - - - 23 23 Orang

7 - - - 1 - - 13 13 Orang

6 - - - - - - 11 11 Orang

2 - - - 1 - - 4 4 Orang

5 - - - 1 - - 11 11 Orang

3 - - - - - - 11 11 Orang

12 - - - 1 - - 23 23 Orang

11 - - - - - - 24 24 Orang

1 - - - - - - 2 2 Orang

1 - - - - - - 2 2 Orang

3 - - - 1 - - 5 5 Orang
5 - - - - - - 7 7 Orang

9 - - - - - - 10 10 Orang

9 - - - - - - 10 10 Orang

3 - - - - - - 5 5 Orang

8 - - - - - - 14 14 Orang

7 - - - - - - 15 15 Orang

9 - - - - - - 15 15 Orang

3 - - - - - - 5 5 Orang

3 - - - - - - 9 9 Orang

- - - - - - - 1 1 Orang

6 - - - - - - 7 7 Orang

6 - - - - - - 7 7 Orang
6 - - - - - - 9 9 Orang
HOURS

176

184

104

88

32

88

88

184

192

16

16

40
56

80

80

40

112

120

120

40

72

56

56
72