Professional Documents
Culture Documents
D30 PILING
GENERAL
130 PILES
- Standard: To SPERW, sections 2–6 and 20, as appropriate to the pile type.
- Permitted types: ______ .
- Particular specification: Submit proposals to cover the SPERW requirements listed under
this heading for the chosen pile type.
- Other requirements: ______ .
Page |1
D30| Piling (continued)
- Shoes/ toe reinforcement: ______ .
- Pile group designation: ______ .
- Section size: ______ .
- Length: ______ .
- Other requirements: ______ .
Page |2
D30| Piling (continued)
- Placing: Inject through hollow stem of auger.
- Pile group designation: ______ .
- Diameter: ______ .
- Length: ______ .
- Reinforcement:
Quantity: ______ .
Extent: ______ .
- Other requirements: ______ .
SYSTEM PERFORMANCE
Page |3
D30| Piling (continued)
- Load magnitude: ______ .
Page |4
D30| Piling (continued)
PRODUCTS
Page |5
D30| Piling (continued)
- Number of coats: ______ .
- Thickness per coat (minimum): ______ .
Page |6
D30| Piling (continued)
- Consistence class to SPERW, table 3.1: ______ .
- Mix proportions: As SPERW, table 20.2, for concrete grade and required consistence class.
- Chloride class: ______ .
- Admixtures: ______ .
- Additional requirements: ______ .
Page |7
D30| Piling (continued)
- Nominal tensile strength: ______ .
- Deformation characteristics: ______ .
- Class of relaxation: ______ .
EXECUTION
615 RECORDS
- Detailed requirements for records additional to those specified in SPERW: ______ .
Page |8
D30| Piling (continued)
695 INSPECTION
- Manned descent: ______ .
Page |9
D30| Piling (continued)
- Number of circuits: ______ .
- Grout take (minimum): ______ .
P a g e | 10
D30| Piling (continued)
- Number: ______ .
- Locations: ______ .
- Programme: ______ .
P a g e | 11
D30| Piling (continued)
820 PILE LATERAL LOAD TESTING
- Special requirements for application of a lateral load to a pile, detailed in accordance with
expected conditions of loading: ______ .
COMPLETION
P a g e | 12
D30| Piling (continued)
P a g e | 13